. Muir, Deanna CSNR:EX From: Sent: To: Cc: Subject: Importance: Hello Jessy and Elizabeth, Paterson, Genevieve FLNR:EX Monday, October 1, 201210:54AM 'Jessy Chaplin '; '[email protected]' Stalker, Jennifer L FLNR:EX KSM-Setting the date for 1st MDRC meeting High Hope you both had a nice weekend! Now that Chief Inspectors Office has given us the go ahead to convene the Mine Development Review Committee (yahoo!) let's work on setting a date! MPO purposed dates: October 18 th or 24th. Let me know what day works best, we are open to an alternative date if necessary. Cheers, Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268 1 FNR-2013-00423 Page 1 FNR-2013-00423 Page 1

Muir, Deanna CSNR:EX - From: Sent - Gov.bc.ca

Embed Size (px)

Citation preview

.

Muir, Deanna CSNR:EX

From: Sent: To: Cc: Subject:

Importance:

Hello Jessy and Elizabeth,

Paterson, Genevieve FLNR:EX Monday, October 1, 201210:54AM 'Jessy Chaplin '; '[email protected]' Stalker, Jennifer L FLNR:EX KSM-Setting the date for 1st MDRC meeting

High

Hope you both had a nice weekend!

Now that Chief Inspectors Office has given us the go ahead to convene the Mine Development Review Committee (yahoo!) let's work on setting a date!

MPO purposed dates: October 18th or 24th.

Let me know what day works best, we are open to an alternative date if necessary.

Cheers,

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

1 FNR-2013-00423 Page 1FNR-2013-00423 Page 1

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Subject: Attachments :

Hi there,

query from the District office

Mon 2012-10-0112:00 AM Tue 2012-10-0212:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [email protected] Monday, October 1, 2012 12:44 PM Paterson, Genevieve FLNR:EX; Stalker, Jennifer L FLNR:EX query from the District office Treaty Creek Access Road Oct_l_2012.pdf

Will Foster relayed a message to me that the District has requested air photo coverage of the proposed Treaty Creek Access Road (see map). I know that Lands has/had all the air photo coverage of Skeena Region, is it possible that Gen could try to find the air photos - hard copy - in the Lands File room? The 1 :50,000 mapsheet is 104N12.

It would be beneficial, because we used field data (walking the road alignments) and Lidar data (very high detail mapping) for the road design, not stereo air photos. It will take several weeks for me to order these new photos for the District office. And it seems redundant if they are available, just filed away.

Thanks

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

1 FNR-2013-00423 Page 2FNR-2013-00423 Page 2

Tel. (250) 847-4704

Cell.

2 FNR-2013-00423 Page 3

s.22

FNR-2013-00423 Page 3

Muir. Deanna CSNR:EX

From: Sent: To:

Jessy Chaplin [email protected]] Monday, October 1, 2012 3:04 PM Paterson, Genevieve FLNR:EX

Cc: Subject:

Stalker, Jennifer L FLNR:EX; [email protected] RE: KSM-Setting the date for 1 st MDRC meeting

Attachments: KSM MDRC invite oct 1 2012.docx

Hi Gen, Nov 6

th or 8

th•

I had a few word changes to keep the language consistent with other KSM materials. Thanks for the chance to review Jessy

From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Monday, October 01, 2012 1:50 PM To: 'Jessy Chaplin' Cc: Stalker, Jennifer L FLNR:EX; '[email protected]' Subject: RE: KSM-Setting the date for 1st MDRC meeting Importance: High

Hi Jessy,

Can you pick two potential dates that work for Sea bridge and then we can send those out to the MDRC to see what date works best.

Tuesday October 30th

Tuesday November 6th

Wed Nov 7'h or

Thurs Nov 8th "

Sense were not meeting till next week, I'm going to scratch the review of the first MDRC email off the agenda. I' m going to send it out by the end of the week so please provide any feedback on the draft email attached by no later than Wed this week.

Also we require a target date as to when Seabridge is planning to submit applications and EA Application (beginning/ midi or late November).

Thanks!

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

From: Paterson, Genevieve FLNR:EX Sent: Monday, October 1, 2012 10:54 AM To: 'Jessy Chaplin '; '[email protected]' Cc: Stalker, Jennifer L FLNR:EX

1 FNR-2013-00423 Page 4FNR-2013-00423 Page 4

Subject: KSM-Setting the date for 1st MDRC meeting Importance: High

Hello Jessy and Elizabeth,

Hope you both had a nice weekend!

Now'that Chief Inspectors Office has given us the go ahead to convene the Mine Development Review Committee (yahoo !) let's work on setting a.date!

MPO purposed dates: October 18'h or 24'h.

Let me know what day works best, we are open to an alternative date if necessary.

Cheers,

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Op·erations Major Projects Office, Skeena Region 250-847-7268

2 FNR-2013-00423 Page 5FNR-2013-00423 Page 5

----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Kerr-Sulphurets-Mitchell (KSM)KSM Mine Project:

Seabridge Gold Inc. is expected to submit an application for an Environmental Assessment Certificate (EA

Application) and Applications for provincial permits and aAuthorizations under the BC EAO C‘concurrently’Approvals Regulation in mid- November 2012

I would like to introduce myself as the Project Manager for the KSM Project with the Major Projects Office – Ministry of Forests, Lands and Natural Resource Operations (FLNRO) out of the Skeena Region. The Major Projects Office is a division within the organization to help streamline authorizations (via the One Process model) for various natural resource projects, including major mines (assisting the Provincial agencies in coordinating the authorizations and First Nations engagement for the project). My role with the MDRC will be to coordinate the authorizations for the KSM Mmine site and the access to the mine site; as well as coordinate and chair upcoming MDRC meetings for this project. The initial MDRC meeting is scheduled for October 24,November 6th, 2012 (details below). This is the first E-mail out to this distribution list to confirm members of this MDRC and provide the date/ location of this first meeting. Additional materials will be sent out within the next couple of weeks (i.e. Terms of Reference, agenda, meeting materials).

KERR-SULPHURETS-MITCHELL (KSM)KSM MINE PROJECT

MINE DEVELOPMENT REVIEW COMMITTEE MEETING

CARIBOU BOARDROOM, 2nd FLOOR 3726 ALFRED AVENUE, NORA BUILDING

(check-in @ reception)

SMITHERS, BC

October 24November 6th, 2012

Teleconference dial in:Vancouver local:

Conference IDPurpose of the Meeting:

� Outline/ present the coordinated EA/MDRC process � Provide an overview of activities intended for concurrent permitting � Confirm concurrent permit information requirements

� Confirm what permits will be required for what activities � Confirm information requirements for permits � Identify opportunities to avoid submitting duplicate information

� Identify potential issues Major Projects Office – Skeena

� KSM Mine Project – Project Management Team

� Jen Stalker – Project Manager/ MDRC Chair

� James Cuell – Strategic Lead

� Jason Pope – Consultation Coordinator (permitting)

� Genevieve Paterson – Project Coordinator/ SharePoint Site Contact

Formatted: Superscript

Formatted: Superscript

Comment [J1]: Take out concurrent as it is already in the bullet above. “concurrent” permits do not have different information requirements from other permits.

FNR-2013-00423 Page 6

s.17, s.15

s.17, s.15

FNR-2013-00423 Page 6

Batch #1 Authorizations (expected to be submitted by Seabridge concurrently with the EA application) – detailed list of all authorizations permit applications will be provided in a later E-mail.

� Access:

o Special Use Permit (SUP) for the construction of the Coulter Creek Access Road (CCAR) and construction camps-related authorizations related to road construction;

o SUP for the construction of the Treaty Creek Access Road (TCAR) and construction camps related to road construction authorizations

� Mine Site: o Obtain authorizations for construction camps to begin– equipment staging and mine site

construction; o Mines Act Permit and Environmental Management Act Permit (MA & EMA) – pioneering access

trails in the Mmine Area and in the Treaty Process Plant area and Ttailings mManagement fFacility Aarea to begin site preparation, and construction of project components such as the water storage dam and water treatment plant in the Mitchell Valley.

Thank You! Look forward to working with you all on this project. Jen Stalker, RPF Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeena Region - Smithers, BC Phone: (250) 847-7506 Fax: (250) 847-7347 Email: [email protected]

FNR-2013-00423 Page 7FNR-2013-00423 Page 7

Muir, Deanna CSNR:EX

Subject:

Start: End:

Recurrence:

Organizer:

From: Sent: To: Subject:

Done.

Genevieve Paterson

Project Coordinator

RE: query from the District office

Mon 2012-10-01 8:00 AM Mon 2012-10-01 8:30 AM

(none)

Paterson, Genevieve FLNR:EX

Paterson, Genevieve FLNR:EX Monday, October 1, 2012 8:04 PM 'Jessy Chaplin'; Stalker, Jennifer L FLNR:EX RE: query from the District office

Ministry of Forests, Lands and Natural ~esource Operations

Major Projects Office, Skeena Region

250-847-7268

From: Jessy Chaplin fmailto:[email protected]] Sent: Monday, October 1, 2012 12:44 PM To: Paterson, Genevieve FLNR:EX; Stalker, Jennifer L FLNR:EX Subject: query from the District office

Hi there,

Will Foster relayed a message to me that the District has requested air photo coverage of the proposed Treaty Creek Access Road (see map). I know that Lands has/had all the air photo coverage of Skeena Region, is it possible that Gen could try to find the air photos - hard copy - in the Lands File room? The 1:50,000 mapsheet is 104A112.

1 FNR-2013-00423 Page 8FNR-2013-00423 Page 8

It would be beneficial, because we used field data (walking the road alignments) and Lidar data (very high detail mapping) for the road design, not stereo air photos. It will take several weeks for me to order these new photos for the District office. And it seems redundant if they are available, just filed away.

Thanks

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge ~old Inc. 1235 Main Street ·

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

2 FNR-2013-00423 Page 9

s.22

FNR-2013-00423 Page 9

Muir, Deanna CSNR:EX

From: Sent:

Paterson, Genevieve FLNR:EX Friday, October 5,20129:35 AM

To: 'Jessy Chaplin'; '[email protected]'; Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX

Cc: Subject:

Cuell, James W.FLNR:EX RE: KSM-Touching Base

Just to give some flexibility on when the meeting could start.

Let me know what time works best for you.

Cheers,

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

From: Jessy Chaplin [mailto:[email protected]] Sent: Friday, October 5, 2012 9:34 AM To: Paterson, Genevieve FLNR:EX; [email protected]; Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX Cc: Cuell, James W FLNR: EX Subject: RE: KSM-Touching Base

Hi Gen, Just wondering why this has expanded to 2 hrs from half an hour which is what we planned for "update" meetings?

Jessy

-----Origlnal Appointment-----From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Friday, October 05, 2012 8:44 AM To: 'Jessy Chaplin '; '[email protected]'; Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX Cc: Cue II, James W FLNR:EX Subject: KSM-Touching Base When: Wednesday, October 10, 2012 1:00 PM-3:00 PM (UTC-08:00) Pacific Time (US & Canada). Where: Seabridge Office or Nora Building?

When: Wednesday, October 10, 2012 1:00 PM-3:00 PM (GMT-08:00) Pacific Time (US & Canada) . Where: Seabridge Office or Nora Building?

Note: The GMT offset above does not reflect daylight saving time adjustments.

Updates to Agenda

1 FNR-2013-00423 Page 10FNR-2013-00423 Page 10

Hi Jessy and Elizabeth, I'm sorry that we have to reschedule this meeting, I hope that this time works.

Hello KSM team!

Jessy I forgot I have on Tues and Wed so I hope that Thursday works for you and Elizabeth. Also where is your preference to meet, Sea bridge office or Nora Building?

Agenda

• Review of Sept 26 update email from Jennifer

• Discuss draft email to be sent to Mine Development Review Committee

• First Nations Consultation-Jason

• MDRC

• Updated Permit list/Submission Dates

• Information Requirements

• Application submissions digital vs. hardcopy

~ Review/update outstanding action items

• licence of Occupation-Tunnel Update

« Message: KSM - Update (September 26, 2012) (19.5 KB)>> «Message: KSM - MORe E-mail (40.4 KB)>>

2 FNR-2013-00423 Page 11

s.22

FNR-2013-00423 Page 11

Muir, Deanna CSNR:EX

From: Sent: To:

Paterson, Genevieve FLNR:EX Friday, October 5,20129:37 AM 'Jessy Chaplin'

Subject: RE: KSM-Touching Base

My most recent invite should have the updated agenda.

Planning on sending out the invite to MDRC today.

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations

Major Projects Office, Skeena Region 250-847-7268

From: Jessy Chaplin [mailto:[email protected] Sent: Friday, October 5, 2012 9:36 AM To: Paterson, Genevieve FLNR:EX Subject: RE: K5M-Touching Base

Hi Gen, I noticed attached to the invitation you sent out yesterday the old agenda with the wrong name for KSM on it. Has that been revised and has the invitation to the MDRC gone out7

lessy Chaplin, MSc. RPBio Permitting Coordinator Seabridge Gold Illc. 1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell.

-----Original Appointment-----From: Paterson, Genevieve FLNR:EX [mailto:Genevi<[email protected]] Sent: Friday, October OS, 2012 8:44 AM To: 'Jessy Chaplin '; '[email protected]'; Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX Cc: Cuell, James W FLNR:EX Subject: KSM-Touching Base When: Wednesday, October 10, 2012 1:00 PM-3:00 PM (UTC-08:00) Pacific Time (US & Canada). Where: Seabridge Office or Nora Building?

When: Wednesday, October 10, 2012 1:00 PM-3:00 PM (GMT-08:00) Pacific Time (US & Canada). Where: Sea bridge Office or Nora Building7

Note: The GMT offset above does not reflect daylight saving time adjustments.

1

·1

FNR-2013-00423 Page 12

s.22

FNR-2013-00423 Page 12

Updates to Agenda

Hi Jessy and Elizabeth, I'm sorry that we have to reschedule this meeting, I hope that this time works.

Hello KSM team!

Jessy I forgot I have on Tues and Wed so I hope that Thursday works for you and Elizabeth. Also where is your preference to meet, Sea bridge office or Nora Building?

Agenda

• Review of Sept 26 update email from Jennifer

• Discuss draft email to be sent to Mine Development Review Committee

• First Nations Consultation-Jason

• MDRC

• Updated· Permit List/Submission Dates

• Information Requirements

• Application submissions digital vs. hardcopy

• Review/update outstanding action Items

• Licence of Occupation-Tunnel Update

«Message: KSM - Update (September 26, 2012) (19.5 KB)>> «Message: KSM - MDRC E-mail (40.4 KB) »

2 FNR-2013-00423 Page 13

s.22

FNR-2013-00423 Page 13

Muir, Deanna CSNR:EX

From: Sent: To:

Paterson, Genevieve FLNR:EX Tuesday, October 9, 2012 3:01 PM 'Jessy Chaplin'

Subject: RE: teleconference number tomorrow 1-2 meeting

Thanks ©

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

From: Jessy Chaplin [mailto:[email protected] Sent: Tuesday, October 9,20122:59 PM To: Paterson, Genevieve FLNR:EX Cc: Rolf Schmitt Subject: teleconference number tomorrow 1-2 meeting

Hi Gen,

--.------~

Could you please send us a teleconf link for tomorrows update meeting? I've just checked in with Rescan and they should have a shape file for me to send to you today for the maximum footprint for KSM.

Thanks

lessy Chaplin, MS"c. RPBio Permitting Coordinator Sea bridge Gold Inc.

1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell.

1 FNR-2013-00423 Page 14

s.22

s.17, s.15

FNR-2013-00423 Page 14

Muir, Deanna CSNR:EX

From: Sent: To:

Subject:

Importance:

Paterson, Genevieve FLNR:EX Tuesday, October 9; 2012 4:48 PM 'Andrews, Trevor'; Applegate, Sherrie TRAN:EX; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; 'Bob Bocking'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV: EX; 'Chief Glen Williams'; 'Chief Robert Good, Chief George Daniels, Chief Phyllis Haizimsque'; 'Colin Parkinson ([email protected])'; 'DarleneBimpson'; 'DarreII,[email protected]'; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gordon Sebastian'; Grace, David H EAO:EX; Hamilton, Chris EAO:EX; Herbert, Brian FLNR:EX; Hoffman, AI MEM:EX; Howe, Diane J MEM:EX; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessy Chaplin '; 'Kathy McPherson'; 'Kyle Moselle'; Love, Mark P ENV:EX; Lutz, Carl B TRAN:EX; 'Mansell Griffin ([email protected])'; 'Norm Maclean'; Paterson, Genevieve FLNR:EX; 'Patrick Hudson'; Pesklevits, Anthony ABR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; 'Tara Marsden'; Witt, Darren L FLNR:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Invitation to KSM Mine Development Review Committee

High

KSM Mine Project:

Seabridge Gold Inc. is expected to submit an application for an Environmental Assessment Certificate rEA Application) and Applications for provincial permits and authorizations under the BC EAO Concurrent Approvals Regulation in mid­

November 2012

I would like to introduce myself as the Project Manager for the KSM Project with the Major Projects Office - Ministry of Forests, Lands and Natural Resource Operations (FLNRO) out of the Skeena Region. The Major Projects Office is a

division within the organization to help streamline authorizations (via the One Process model) for various natural resource projects, including major mines (assisting the Provincial agencies in coordinating the authorizations and First Nations engagement for the project). My role with the MDRC will be to coordinate the authorizations for the KSM Mine

and access to the mine site; as well as coordinate and chair upcoming Mine Development Review Committee (MDRC) meetings for this project. The initial MDRC meeting is scheduled for November 8'h, 2012 (details below). This is the

first E-mail out to this distribution list to confirm members of this MDRC and provide the datel location of this first meeting. Additional materials will be sent out within the next couple of weeks (Le. Terms of Reference, agenda, meeting materials).

KSM MINE PROJECT

MINE DEVELOPMENT REVIEW COMMITTEE MEETING

CARIBOU BOARDROOM, 2nd FLOOR 3726 ALFRED AVENUE, NORA BUILDING

(check-in @ reception)

SMITHERS, BC

November 8'h, 2012

1 FNR-2013-00423 Page 15FNR-2013-00423 Page 15

Purpose ofthe Meeting:

Teleconference dial in: Vancouver local:

Conference 10

• Outline/ present the coordinated EA/ MORC process • Provide an overview of activities intended for concurrent permitting • Confirm permit information requirements

• Confirm what permits will be required for what activities • Confirm information requirements for permits • Identify opportunities to avoid submitting duplicate information

• Identify potential issues

Major Projects Office - Skeena. KSM Mine Project - Project Management Team

• Jen Stalker- Project Manager/ MORC Chair

• James Cuell- Strategic Lead

• Jason Pope - Consultation Coordinator (permitting)

• Genevieve Paterson - Project Coordinator/ SharePoint Site Contact

Batch #1 Authorizations (expected to be submitted by Sea bridge concurrently with the EA application) -list of permit applications will be provided in a later E-mail.

• Access: o Special Use Permit (SUP) for the Coulter Creek Access Road (CCAR) and construction camps related to

road construction; o SUP for the Treaty Creek Access Road (TCAR) and construction camps related to road construction

• Mine Site: o Obtain authorizations for construction camps to begin equipment staging and mine site construction; o Mines Act Permit and Environmental Management Act Permit (MA & EMA) - pioneering access trails in

the Mine Area and in the Treaty Process Plant area and Tailings Man'agement Facility Area to begin site preparation, and construction of project components such as the water storage dam and water treatment plant in the Mitchell Valley.

EAOReview For further information regarding the environmental assessment process, committee, timelines, and information related to the project, please visit the EAO website, http:Ual00.gov.bc.ca/appsdata/epic/htmlfdeploy/epic project home 322.html.

MORC Participants Please review the proposed MORC list and provide any necessary updates/changes to [email protected].

Environmental Protection

Diane Howe - Deputy CI Kim Bellefontaine - Sr. Environmental

Ian Sharpe - Manager Mark Love-Compliance Officer

2 FNR-2013-00423 Page 16

s.17, s.15

s.17, s.15

FNR-2013-00423 Page 16

Jeanien Carmody-Fallows - Environmental Protection Officer Scott Jackson - Regional Hydrologist Craig Stewart - Compliance Specialist Regan Fielding-Environmental Protection Officer

Ministry of Forests, Lands and Jennifer Stalker - Project ManageriChair Natural Resource Operations Genevieve Paterson - Project Coordinator

Chris Schell- Sr. Ecosystems Biologist Eric FOl'geng - Archaeology Branch Jason Pope '- Sr. First Nations Advisor Brian Herbert - Sr. First Nations Advisor Darren Witt - Natural Resources Officer Will Foster - Resource Tenure Specialist Ron Donnelly - Tenures ForesterlEngineering Specialist Matt Sakals- Research Geomorphologist Emily Bulmer - Water Stewardship Officer

MinistlY of Transportation and Carl Lutz - District Manager, Bulkley-Stikine District Inli'astructure Sherrie Applegate - Senior Development Approvals

Rosemary Barnewall- District Program Manager Ministry of Aboriginal Relations Tony Pesklevits- Regional Negotiator and Reconciliation Federal Government Canadian Environmental Garett Cooper - Project Manager Assessment Agency Natural Resources Canada Kathy McPherson - Senior Environmental Assessment Officer Transpolt Canada Colin Parkinson - Area Officer Department of Fisheries and Trevor Andrews - Habitat Biologist (FHCP) Oceans Nis/1:a'a Lisims Government

Mansell Griffin - Lands and Resources Manager Tracey McKay-Lands Manager

First Nations ". . ' .. .. \. Gitanyow wifp Malii Chief Glen Williams wifp GamlaxyeJtxw Chief Robert Good wifp Gwaas Hlaam Chief George Daniels wifp Gwimiu Chief Phyllis Haizimsque Tahltan Nation- Norm Maclean-THREAT Coordinator Tahltan Heritage Resources Environmental Assessment Team (THREAT) Gitxsan (Wifps as identified by Gordon Sebastian- Executive Director the Gitxsan Hereditary Chiefs Office) Skii Km Lax Ha Chief Darlene Simpson

Kyle Moselle-Southeast Lar e Pro'ect Coordinator 3 FNR-2013-00423

Page 17FNR-2013-00423 Page 17

Resources Local Government . Regional District ofKitimat- Andrew Webber- Manager Planning and Economic Development Stikine Northern Health DalTell Belanger - Environmental Health Officer Proponent Seabridge Gold Elizabeth Miller - Proiect Manager

Jessy Chaplin-Project Manager Rolf Schm itt-Consultant

KSM SharePoint Site The KSM Share point site will be the venue for information sharing between Provincial permitting agencies and the MDRC.

External clients require a BCelD account to access Share Point to create a BCelD please select this link: https:/Iwww.bceid.cai

Instructions for setting up a basic bceid:

• Visit: https:/Iwww.bceid.ca

• Click "Begin Registration"

• Click "Basic BCeID" • Click "Register without specifying an online service"

• Enter your details & OK. • Provide BCelD user name to [email protected] once you have been added to the

sharepoint site access list you will receive an automated notification.

Thank You! I look forward to working with you all on this project.

Jen Stalker, RPF Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeena Region - Smithers, BC Phone: (250) 847-7506 Fax: (250) 847-7347

4 FNR-2013-00423 Page 18

s.17, s.15

FNR-2013-00423 Page 18

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc: Subject: Attachments:

Hi Gen,

FW: Update - KSM Project Footprint Shape File

Wed 2012-10-10 12:00 AM Thu 2012-10-1112:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [email protected] Wednesday, October 10, 2012 10:15 AM Paterson, Genevieve FLNR:EX; Stalker, Jennifer L FLNR:EX Pope, Jason FLNR:EX; Herbert, Brian FLNR:EX; Rolf Schmitt FW: Update - KSM Project Footprint Shape File KSM Footprint map Oct 10 2012 - maximum extent. pdf; FOOTPRINT_AIIPhases_Dissolved_2012_10_09.zip

As requested, shape files for the KSM Project footprint. Seabridge is providing MPO with this footprint shape-file so that MPO will provide Seabridge with a letter and map, as per the "Guide to Involving Proponents When Consulting First Nations, based on the Updated Procedures for Meeting Legal Obligations when Consulting First Nations (March 2011)" directing Seabridge to which Treaty and First Nations the Crown intends to delegate some procedural aspects of consultation to Seabridge during Permitting of the KSM Project.

The map which Seabridge has requested is the KSM Project footprint shape-file overlaying the Consultative Areas Database.

Regards,

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO 1 FNR-2013-00423

Page 19FNR-2013-00423 Page 19

Tel. (250) 847-4704

Cell.

From: Jessy Chaplin [mailto:[email protected]] Sent: Wednesday, October 10, 201210:01 AM To: [email protected] Subject: FW: Update - Project Footprint Shape Files

It works (UTM Zone 9)

Jessy

From: Jessy Chaplin [mailto:jessy@seabridgegold .net] Sent: Wednesday, October 10, 2012 8:52 AM To: [email protected] Subject: FW: Update - Project Footprint Shape Files

From: Ann Danilevich [mailto:[email protected]] Sent: Tuesday, October 09,20126:01 PM To: Jessy Chaplin ([email protected]) Subject: Update - Project Footprint Shape Files

Hi Jessy,

There has just been a small update to the Project footprint. If you haven't sent off the Shape files I sent you earlier, please use these.

With thanks,

Ann

2 FNR-2013-00423 Page 20

s.22

FNR-2013-00423 Page 20

Description: Danilevich , Ann

3 FNR-2013-00423 Page 21FNR-2013-00423 Page 21

KSM Footprint Oct 10 2012

0 5.25 10.5 km.

Legend

This map is a user generated static output from an Internet mapping site and is for generalreference only. Data layers that appear on this map may or may not be accurate, current, orotherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION.

Scale: 1:296,290Map center: 56°34' N, 130°5' W

--"",,, ... , o.U\lII.

MineralTicles Online

D Indian Reserves

D National Parks

D Conservancy Areas

D Parks

D Federal Transfer Lands

D First Nations Treaty Related Lands

D First Nations Treaty Lands

D BeGS Grid

Annotation (1 :250K)

Transportation - Points (1 :250K)

+- Airfield +- Anchorage. Seaplane F Ferry Route ® Heliport +- Seaplane Base

+- Air Field +- Airport +- Air Feature· Condition Unknown +- Airport.Abandoned

Transportation - Lines (1 :250K)

/ / Ferry Route ~ Aerial Cableway /' Road (Gravel Undivided) • 1 Lane ~ Road (Gravel Undivided) • 3 Lanes

p Road· PavedJanes.2or More.Divided p Road (Paved Undivided) - Not Elevated·

1 Lane p Road (Paved Undivided) - Not Elevated -

2 Lanes

p Road - PavedJanes.30r More.Undivided ~ Road (Unimproved) /' =~~~ ;l~'~"~~~.:~~~~S Dry Weather

,

$

FNR-2013-00423 Page 22FNR-2013-00423 Page 22

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Subject: Attachments:

Hi Gen,

KSM Master Permit lists V2 October 10_2012.xlsx

Thu 2012-10-1112:00 AM Fri 2012-1 0-12 12:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [email protected] Thursday, October 11, 2012 3:35 PM Paterson, Genevieve FLNR:EX KSM Master Permit lists V2 October 10_2012.xlsx KSM Master Permit lists V2 October 10_2012.xlsx

Here's the excel file for the KSM master permit list - Batch 1

Cheers

Jessy

1 FNR-2013-00423 Page 23FNR-2013-00423 Page 23

1

# of

pe

rmits

App

licat

ion

Dat

e:PE

RMIT

APP

LICA

TIO

NST

ATU

SLe

gisl

atio

n

1M

ines

Act

Exp

lora

tion

Perm

it (M

X - 1

-571

) - K

SM c

laim

sA

ctiv

eM

ines

Act

2

Expl

osiv

es P

erm

it - (

MX-

1-5

71) -

KSM

cla

ims

(ren

ewed

ann

ually

)A

ctiv

eM

ines

Act

3

Fore

st A

ct O

ccup

ant L

icen

ce to

Cut

(OLT

C 48

517)

KSM

- on

min

e fo

otpr

int a

nd a

cces

s ro

ads

Act

ive

Fore

st A

ct4

Min

es A

ct E

xplo

ratio

n Pe

rmit

(MX-

1-76

3) -

Seeb

ee c

laim

sA

ctiv

eM

ines

Act

5

Expl

osiv

es P

erm

it - (

MX-

1-7

63) -

Sea

bee

clai

ms

(ren

ewed

ann

ually

)A

ctiv

eM

ines

Act

6

Fore

st A

ct O

ccup

ant L

icen

ce to

Cut

(OLT

C L4

8259

) Sea

bee-

TM

F fo

otpr

int a

nd a

cces

s ro

ads

Act

ive

Fore

st A

ct

710

-Dec

-09

Min

ing

Leas

e KS

M C

laim

s in

pro

gres

sM

iner

al T

enur

e A

ct8

29-M

ay-1

2M

iner

al T

enur

es A

ct -

Cond

ition

al R

egis

trat

ion

Rese

rve

for M

itche

ll-Tr

eaty

Tun

nel

alig

nmen

t in

pro

gres

sM

iner

al T

enur

e A

ct

9Se

pt 2

1 20

12La

nd A

ct L

icen

ce o

f Occ

upat

ion

for S

tatu

tory

righ

t-of

-way

alo

ng th

e M

TT a

lignm

ent f

rom

M

itche

ll Va

lley

to P

lant

Site

, inc

ludi

ng T

reat

y Sa

ddle

Cam

p #6

in p

rogr

ess

Land

Act

Com

pone

nt 1

: SU

P Co

ulte

r Cre

ek A

cces

s Ro

ad (C

CAR)

10Fo

rest

Pra

ctic

es C

ode

of B

C A

ct S

peci

al U

se P

erm

it (S

UP)

for

min

e ro

ad in

pro

vinc

ial f

ores

t -Co

ulte

r Cr A

cces

s Ro

ad (C

CAR)

Fore

st P

ract

ices

of B

C A

ct

11Fo

rest

Act

Occ

upan

t Lic

ence

to C

ut (O

LTC)

- CC

AR

Fore

st A

ct12

Not

ice

of F

ores

try

Ope

ratio

ns F

orm

to W

orkS

afe

BC, T

erra

ce o

ffic

eW

orks

afe

BC A

ct13

Wild

life

Act

Per

mit

to d

estr

oy n

ests

(Act

ive

duri

ng O

LTCs

)W

ildlif

e A

ct14

Seab

ridg

e ag

reem

ent w

ith A

ltaG

as to

use

Esk

ay M

ine

Road

km

4-4

3.5

n/a

15Se

abri

dge

agre

emen

t with

Bar

rick

Gol

d In

c to

use

Esk

ay M

ine

Road

km

43.

5-en

dn/

a

16Fi

sher

ies

Act

(DFO

) - S

ectio

n 9

auth

oriz

atio

n of

Unu

k br

idge

cro

ssin

gFi

sher

ies

Act

17Fi

sher

ies

Act

(DFO

) - R

evie

w S

UP

for O

pera

tiona

l Sta

tem

ents

for s

trea

m c

ross

ings

- CC

AR

Fish

erie

s A

ct

18Tr

ansp

ort A

ct (T

rans

Can

ada)

- N

avig

able

Wat

ers

Prot

ectio

n A

ct -

Nav

igab

le s

trea

m

cros

sing

s CC

AR

Nav

igab

le W

ater

s Pr

otec

tion

Act

19H

erita

ge C

onse

rvat

ion

Act

Sec

tion

12 a

ltera

tion

perm

it (if

requ

ired

)H

erita

ge C

onse

rvat

ion

Act

KSM

Per

mit

Mas

ter

List

: Dra

ft -

Oct

ober

12,

201

2

FNR-2013-00423 Page 24FNR-2013-00423 Page 24

2

Com

pone

nt 2

: SU

P Tr

eaty

Cre

ek A

cces

s Ro

ad (T

CAR)

20

Hig

hway

s A

ct -

perm

it fo

r acc

ess

road

con

nect

ion

to H

ighw

ay 3

7NH

ighw

ays

Act

21

Fore

st A

ct O

ccup

ant L

icen

ce to

Cut

(OLT

C) -

Trea

ty C

r Acc

ess

Road

Fore

st A

ct22

Fore

st P

ract

ices

Cod

e of

BC

Act

Spe

cial

Use

Per

mit

(SU

P) f

or m

ine

road

in p

rovi

ncia

l for

est -

Trea

ty C

r Acc

ess

Road

and

TM

F an

d Pl

ant S

ite

- up

to m

ine

foot

prin

t and

acc

ess

road

s

Fore

st P

ract

ices

of B

C A

ct

23N

otic

e of

For

estr

y O

pera

tions

For

m to

Wor

kSaf

e BC

, Ter

race

off

ice

Wor

ksaf

e BC

Act

24La

nd A

ct L

icen

ce o

f Occ

upat

ion

for a

tran

smis

sion

line

righ

t-of

-way

par

alle

l to

the

Trea

ty

Cree

k SU

P to

the

Plan

t Site

and

TM

FLa

nd A

ct

25W

ildlif

e A

ct P

erm

it to

des

troy

nes

ts (A

ctiv

e du

ring

OLT

Cs) (

TCA

R)W

ildlif

e A

ct26

Fish

erie

s A

ct (D

FO) -

Sec

tion

9 au

thor

izat

ion

of B

ell I

rvin

g br

idge

cro

ssin

g (T

CAR)

Fish

erie

s A

ct

27Se

ctio

n 9

Wat

er A

ct A

ppro

val f

or w

orks

in a

nd a

bout

a s

trea

m (b

ridg

e in

stal

latio

n) T

CAR

Wat

er A

ct S

ectio

n 9

28Fi

sher

ies

Act

(DFO

) - R

evie

w S

UP

for O

pera

tiona

l Sta

tem

ents

for s

trea

m c

ross

ings

- TC

AR

Fish

erie

s A

ct

29H

erita

ge C

onse

rvat

ion

Act

Sec

tion

12 a

ltera

tion

perm

it (if

requ

ired

)H

erita

ge C

onse

rvat

ion

Act

Com

pone

nt 3

: Con

stru

ctio

n Ca

mps

Se

e Sh

eet #

2 Co

nstr

uctio

n Ca

mps

Com

pone

nt 4

: Min

es A

ct a

nd E

MA

Act

Per

mit

for C

onst

ruct

ion

30M

ines

Act

(MA

) and

Env

iron

men

tal M

anag

emen

t Act

(EM

A) P

erm

it fo

r Site

Con

stru

ctio

n A

ctiv

ities

: Bat

ch 1

Min

es A

ct

31M

ines

Act

(MA

) and

Env

iron

men

tal M

anag

emen

t Act

(EM

A) P

erm

it fo

r Site

Con

stru

ctio

n A

ctiv

ities

: Bat

ch 1

Envi

ronm

enta

l Man

agem

ent A

ct

32M

iner

al T

enur

es A

ct -

Min

ing

Leas

e fo

r TM

F an

d Pl

ant S

iteM

iner

al T

enur

es A

ct33

Wat

er A

ct -

Sect

ion

9 W

ater

lice

nce

for u

p to

8 n

on-c

onta

ct d

iver

sion

s in

the

Min

e A

rea

- Pu

rpos

e: C

onse

rvat

ion

and

Land

Impr

ovem

ent U

seW

ater

Act

34W

ater

Act

- Se

ctio

n 9

Wat

er li

cenc

e fo

r up

to 8

non

-con

tact

div

ersi

ons

in th

e Pr

oces

s Pl

ant

and

TMF

Are

a - P

urpo

se: C

onse

rvat

ion

and

Land

Impr

ovem

ent U

seW

ater

Act

35W

ater

Act

- Se

ctio

n 9

Wat

er li

cenc

e fo

r non

-con

tact

div

ersi

on a

t the

Sad

dle

Port

al -

Purp

ose:

Con

serv

atio

n an

d La

nd Im

prov

emen

t Use

Wat

er A

ct

36EM

A- W

aste

Man

agem

ent P

erm

it - A

ir (i

ncin

erat

ors

at c

amps

>10

0 pe

rson

s)En

viro

nmen

tal M

anag

emen

t Act

37EM

A- E

nvir

onm

enta

l Man

agem

ent A

ct P

erm

it -S

olid

Was

te a

utho

riza

tion

for a

land

fill i

n th

e M

ine

Are

aEn

viro

nmen

tal M

anag

emen

t Act

38EM

A- E

nvir

onm

enta

l Man

agem

ent A

ct P

erm

it -S

olid

Was

te a

utho

riza

tion

for a

land

fill i

n th

e Pr

oces

s Pl

ant a

nd T

MF

Are

aEn

viro

nmen

tal M

anag

emen

t Act

FNR-2013-00423 Page 25FNR-2013-00423 Page 25

3

39EM

A- E

nvir

onm

enta

l Man

agem

ent A

ct P

erm

it -S

olid

Was

te a

utho

riza

tion

for a

co

ntam

inat

ed s

oils

land

farm

in th

e M

ine

Are

aEn

viro

nmen

tal M

anag

emen

t Act

40EM

A- E

nvir

onm

enta

l Man

agem

ent A

ct P

erm

it -S

olid

Was

te a

utho

riza

tion

for a

co

ntam

inat

ed s

oils

land

farm

in th

e Pr

oces

s Pl

ant &

TM

F A

rea

Envi

ronm

enta

l Man

agem

ent A

ct

41EM

A- E

nvir

onm

enta

l Man

agem

ent A

ct p

erm

it - S

peci

al W

aste

Reg

ulat

ions

-Was

te O

il ge

nera

tor p

erm

itEn

viro

nmen

tal M

anag

emen

t Act

Com

pone

nt 5

: Fed

eral

Per

mits

42

Inte

rnat

iona

l Riv

er Im

prov

emen

ts R

egul

atio

ns -

wat

er s

tora

ge fa

cilit

y po

tent

ially

alte

r se

ason

al fl

ows

to th

e U

nuk

Rive

r abo

ve th

resh

old

crite

ria

of 0

.3 m

3/se

c ha

ve to

che

ck th

is

as T

MF

disc

harg

e no

long

er g

oes

to T

eige

n Cr

eek

(Unu

k Ri

ver t

ribu

tary

)43

Tran

spor

t Can

ada

Nav

igab

le W

ater

s A

ct A

utho

riza

tions

Nav

igab

le W

ater

s Pr

otec

tion

Act

44

Fish

erie

s A

ct S

ectio

n 36

(2):

Fis

h H

abita

t Com

pens

atio

n Pl

an

Fish

erie

s A

ct45

Fish

erie

s A

ct S

ectio

n 36

(2):

Met

al M

inin

g Ef

fluen

t Reg

ulat

ions

Fish

erie

s A

ct46

Cana

da E

xplo

sive

s A

ct -

Expl

osiv

es F

acto

ry L

icen

ce

Cana

da E

xplo

sive

s A

ct47

Cana

da T

rans

port

atio

n A

ct -

Am

mon

ium

Nitr

ate

Stor

age

faci

litie

sCa

nada

Tra

nspo

rtat

ion

Act

FNR-2013-00423 Page 26FNR-2013-00423 Page 26

Muir. Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc: Subject:

Genevieve

"

RE: KSM Master Permit lists V2 October 10_2012.xlsx

Thu 2012-10-1112:00 AM Fri 2012-10-1212:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [email protected] Thursday, October 11, 2012 3:59 PM Paterson, Genevieve FLNR:EX Rolf Schmitt; [email protected] RE: KSM Master Permit lists V2 October 10_2012.xlsx

One more action Item - MPO to write a letter to Sea bridge directing Seabridge to the First Nations Sea bridge is to engage with on the Project. We requested this letter several months ago and still have not received direction from FLNRO on permit applications engagement with First Nations. For example, there are several MOE permits which require us to consult (their word) with First Nations, stakeholders and the Public. Please send us a letter with a map with the KSM Project shape file overlaying the Consultative Areas Database so that Seabridge can fulfill the legal requirements for applying for provincial permits.

Thanks

Jessy Chaplin, MSc. RPBio Permitting Coordinator Sea bridge Gold Inc. 1235 Main Street P.O. Box 2536 Smithers, BC VOJ 2NO Tel. (250) 847-4704 Cell.

-----Original Message-----From: Paterson, Genevieve FLNR:EX [mailto:[email protected] Sent: Thursday, October 1 ~, 2012 3:36 PM To: 'Jessy Chaplin' Subject: RE: KSM Master Permit lists V2 October 10_2012.xlsx

. Cool, thanks :)

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

From: Jessy Chaplin [mailto:[email protected]

1 FNR-2013-00423 Page 27

s.22

FNR-2013-00423 Page 27

Sent: Thursday, October 11,20123:35 PM To: Paterson, Genevieve FLNR:EX Subject: KSM Master Permit lists V2 October 10_2012.xlsx

Hi Gen, Here's the excel file for the KSM master permit list - Batch 1 Cheers Jessy

2 FNR-2013-00423 Page 28FNR-2013-00423 Page 28

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc: Subject:

Hi Gen,

RE: Seabridge/ MPO Meeting Agenda (October 30,2012)

Tue 2012-10-30 12:00 AM Wed 2012-10-3112:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [email protected]] Tuesday, October 30, 2012 8:45 AM Paterson, Genevieve FLNR:EX; 'Elizabeth Miller' Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Cue Ii, James W FLNR:EX RE: Seabridgej MPO Meeting Agenda (October 30,2012)

Thanks for the agenda and email.

Elizabeth and I are up against some deadlines today, could we meet "by teleconference"?

If you could send us the proposed Nov 8 Agenda for discussion, that would be great.

We are reviewing the permit list and will have comments for you by 1 :00.

Thanks

Jessy

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, Be VOJ 2NO

Tel. (250) 847-4704

1 FNR-2013-00423 Page 29FNR-2013-00423 Page 29

Cell.

From: Paterson, Genevieve FLNR:EX [i'nailto:[email protected] Sent: Monday, October 29,20123:28 PM To: 'Jessy Chaplin '; 'Elizabeth Miller' Cc: Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Cuell, James W FLNR:EX Subject: Seabridge/ MPO Meeting Agenda (October 30, 2012)

Hi Jessy & Elizabeth

Here is our proposed agenda for tomorrow's meeting, scheduled for 1 :00..,. 3:00 at the Nora Building. .

KSM Mine Project - Sea bridge/ MPO Meeting

Date: Tuesday October 30th, 1 :00 - 3:00 PM

Location: Ptarmigan Room, 1st Floor - Nora Building

Conference Call Info:

Dial In:

1.0. #:

Participants:

Jessy Chaplin, Seabridge ..

Elizabeth Miller, Seabridge

Rolf Schmitt, Rescan

Jen Stalker (Chair), FLNRO

Genevieve Paterson, FLNRO

James Cuell, FLNRO

2 FNR-2013-00423 Page 30

s.22

s.17, s.15

FNR-2013-00423 Page 30

Jason Pope, FLNRO

A) Process Co-ordination

Update on Coordinated MDRC and EAO Process

Update on Coordinated Consultation (Jason)

* EMA permits and First Nations Engagement (follow-up)

B) Co-ordinated Authorizations (Genevieve)

Authorizations list (attached) Still draft as I am waiting to hear back from our Archeology branch and DFO on permits required.

o One template, one list

C) MDRC Meeting (Nov. 8th)

Draft Agenda

D) Operational

Action Items

Next meeting

Please feel free to add additional items that you would like to discuss.

Thanks,

Genevieve Paterson

Project Coordinator

3 FNR-2013-00423 Page 31FNR-2013-00423 Page 31

Ministry of Forests, Lands and Natural Resource Operations

Major Projects Office, Skeena Region

250-847-7268

4 FNR-2013-00423 Page 32FNR-2013-00423 Page 32

Muir, Deanna CSNR:EX

From: Sent: To:

Paterson, Genevieve FLNR:EX Tuesday, October 3D, 2012 1 :31 PM 'Jessy Chaplin'; 'Elizabeth Miller'

Subject: Attachments:

RE: Sea bridge/ MPO Meeting Agenda (October 3D, 2012) Concurrent Review Process - DRAFT(V O.4).pdf

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

From: Jessy Chaplin [mailto:jessy@seabridgegold,net) Sent: Tuesday, October 30, 2012 8:45 AM To: Paterson, Genevieve FLNR:EX; 'Elizabeth Miller' Cc: Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Cuell, James W FLNR:EX Subject: RE: Seabridgej MPO Meeting Agenda (October 30, 2012)

Hi Gen, Thanks for the agenda and email. Elizabeth and I are up against some deadlines today, could we meet "by teleconference"? If you could send us the proposed Nov 8 Agenda for discussion, that would be great. We are reviewing the permit list and will have comments for you by 1:00.

Thanks Jessy

Jessy Chaplin, MSc. RPBio Permitting Coordinator Sea bridge Go ld Illc.

1235 Main Street P.O. Box 2536 Smithers, Be VOJ 2NO Tel. (250) 847-4704 Cell.

From: Paterson, Genevieve FLNR:EX [mailto:[email protected]) Sent: Monday, October 29, 2012 3:28 PM To: 'Jessy Chaplin '; 'Elizabeth Miller' Cc: Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Cue II, James W FLNR:EX Subject: Seabridgej MPO Meeting Agenda (October 30, 2012)

Hi Jessy & Elizabeth

Here is our proposed agenda for tomorrow's meeting, scheduled for 1:00 - 3:00 at the Nora Building.

KSM Mine Project - Seabridgej MPO Meeting Date: Tuesday October 30th, 1:00 - 3:00 PM Location: Ptarmigan Room, lSI Floor - Nora Building

1 FNR-2013-00423 Page 33

s.22

FNR-2013-00423 Page 33

Conference Call Info: Dial In:I.D. #:

Participants:

Jessy Chaplin, Seabridge Elizabeth Miller, Sea bridge

Rolf Schmitt, Rescan Jen Stalker (Chair), FLNRO Genevieve Paterson, FLNRO James Cuell, FLNRO Jason Pope, FLN RO

A) Process Co-ordination Update on Coordinated MDRC and EAO Process Update on Coordinated Consultation (Jason)

* EMA permits and First Nations Engagement (follow-up)

B) Co-ordinated Authorizations (Genevieve) Authorizations list (attached) Still draft as I am waiting to hear back from our Archeology branch and DFO on permits required.

o One template, one list

C) MDRC Meeting (Nov. 8th)

Draft Agenda

D) Operational Action Items Next meeting

Please feel free to add additional items that you would like to discuss.

Thanks,

Genevieve Paterson Project Coordinator

. Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

2 FNR-2013-00423 Page 34

s.17, s.15

FNR-2013-00423 Page 34

Env

ironm

enta

lA

sses

smen

tOffi

ce

(EA

App

licat

ion)

Maj

orP

roje

cts

Offi

ce

(MD

RC

–P

erm

ittin

g)

OC

TOB

ER

2012

NO

VE

MB

ER

2012

(mid

)

JULY

2013

JUN

E20

13M

AY

2013

MA

RC

H20

13FE

BR

UA

RY

2013

JAN

UA

RY

2013

DE

CE

MB

ER

2012

AP

RIL

2013

AU

GU

ST

2013

SE

PTE

MB

ER

2013

DE

CE

MB

ER

2013

NO

VE

MB

ER

2013

EAO

APP

LIC

ATI

ON

SUB

MIT

TED

(PR

OPO

NEN

T)

With

in75

Day

saf

tert

heE

AO

acce

pts

the

appl

icat

ion,

MP

Ono

tifie

sth

epr

opon

enta

ndE

AO

inw

ritin

gof

any

addi

tiona

linf

orm

atio

nre

quire

men

ts(fr

omth

eM

DR

C)i

nor

dert

oco

mpl

ete

the

revi

ew

“PR

E M

DR

C

ME

ETI

NG

”(N

OV

EM

BE

R8TH

) AP

PLI

CA

TIO

NS

SU

BM

ITTE

D(P

RO

PO

NE

NT)

(as

perS

ectio

n15

.4of

the

Sec

tion

11O

rder

–sa

me

time

asth

eE

AA

pplic

atio

n)

60da

ysto

reso

lve

outs

tand

ing

issu

es,

draf

tRec

omm

enda

tions

Rep

ort(

3w

eeks

)for

MD

RC

revi

ewan

dco

mm

ent(

2w

eeks

),dr

aftp

erm

itsre

view

(2w

eeks

),an

d su

bmit

to S

DM

’s fo

r dec

isio

n.

30D

AY

SCR

EEN

ING

(mid

Nov

.–m

idD

ec.)

EAO

PRO

VID

ESN

OTI

FIC

ATI

ON

ON

EAA

PPLI

CA

TIO

N(B

ASE

DO

N30

DA

YSC

REE

NIN

G)

IfE

AO

acce

pts

appl

icat

ion,

EA

Ow

illpr

ovid

ew

ritte

nno

tice

toth

epr

opon

enta

ndM

PO

Ifth

eap

plic

atio

nis

noti

nre

spec

tofa

nel

igib

leap

prov

alor

was

notd

eliv

ered

ontim

e,th

eex

ecut

ive

dire

ctor

(EA

O)m

ust

notif

yth

epr

opon

enti

nw

ritin

gth

atth

eap

plic

atio

nis

refu

sed

MD

RC

Tech

nica

lRev

iew

KS

MM

INE

PR

OJE

CT

–C

ON

CU

RR

EN

TR

EV

IEW

PR

OC

ES

S(E

A/M

DR

C)

DR

AFT

(V0.

4)

Key

Com

pone

nts

(EA

O/M

PO)

*O

neIs

sues

Trac

ker

*O

neC

onsu

ltatio

nR

epor

t*

Join

tCon

sulta

tion

Stra

tegy

(EA

O/M

PO

)

Pro

pone

ntto

subm

ital

lap

plic

atio

nsdi

gita

llyto

MP

O-P

roje

ctM

anag

er(J

enS

talk

er)a

ndP

roje

ctC

oord

inat

or(G

enev

ieve

Pat

erso

n)to

post

toth

eS

hare

poin

tSite

forM

DR

Cac

cess

/rev

iew

.

Pro

pone

ntre

spon

sibl

eto

prov

ide

agen

cies

with

requ

ired

hard

copi

es.

Pro

pone

ntto

prov

ide

MP

Oa

listo

fhar

dcop

ies

and

agen

cies

/Firs

tNat

ions

requ

estin

gha

rdco

pies

.

EA

O–

prim

ary

poin

tofc

onta

ctw

ithFi

rstN

atio

nsdu

ring

the

EA

revi

ew.

Man

ages

Issu

estra

ckin

gan

dco

nsul

tatio

nre

cord

durin

gth

eE

Are

view

proc

ess.

EA

Ofin

alIs

sues

Trac

ker

and

Con

sulta

tion

Rec

ord

prov

ided

toM

PO

for

man

agin

gis

sues

/tra

ckin

gco

nsul

tatio

nat

the

MD

RC

leve

l.O

neC

onsu

ltatio

nR

epor

tand

Issu

esTr

acke

rsu

bmitt

ed to

SD

M’s

with

R

ecom

men

datio

nsR

epor

t(M

DR

C)

Dec

isio

nw

ithin

45D

ays

MD

RC

Tech

nica

lRev

iew

com

plet

e(to

leav

etim

eto

reso

lve

outs

tand

ing

issu

esan

dP

M(M

PO

)to

prep

are

Rec

omm

enda

tions

Rep

ort)

OC

TOB

ER

2013

One

Con

sulta

tion

Rep

ort

and

Issu

esTr

acke

rsu

bmitt

ed to

SD

M’s

with

R

ecom

men

datio

nsR

epor

t(M

DR

C)

FLN

RO

–pr

imar

ypo

into

fcon

tact

with

Firs

tNat

ions

durin

gth

eM

DR

Cre

view

.M

anag

esIs

sues

track

ing

and

cons

ulta

tion

reco

rddu

ring

the

MD

RC

revi

ewpr

oces

s.

KIC

K–

OFF

MD

RC

Mee

ting

Pro

pone

ntto

wal

kag

enci

esth

roug

hth

eap

plic

atio

nssu

bmitt

ed

MD

RC

ME

ETI

NG

MD

RC

ME

ETI

NG

Mov

ein

tote

chni

calr

evie

won

ceal

linf

orm

atio

nre

quire

men

tsar

esu

bmitt

ed

INTE

RN

AL

CEN

TRA

LIN

FOR

MA

TIO

NSH

AR

ING

POR

TAL

(EA

O/F

LNR

O)

*IS

SU

ES

TRA

CK

ER

(ON

EIS

SU

ES

TRA

CK

ER

FOR

EA

AN

DM

DR

C)

*IN

FOR

MA

TIO

NS

HA

RIN

GM

ATE

RIA

L/D

OC

UM

EN

TS(i.

e.S

OC

’s)

AC

CE

SS

:C

hris

Ham

ilton

,Dav

idG

race

Jen

Sta

lker

,Jas

onP

ope,

Gen

evie

veP

ater

son

180

DA

YEA

APP

LIC

ATI

ON

REV

IEW

AN

DD

ECIS

ION

PAC

KA

GE

FOR

MIN

ISTE

RS

FNR-2013-00423 Page 35FNR-2013-00423 Page 35

Muir, Deanna CSNR:EX

Subject: Location:

Start: End:

Recurrence:

Meeting Status:

Organizer: Required Attendees:

Optional Attendees:

~ ~

MDRe Agenda -,ovember 8, 2012.

Good morning,

Copy: KSM Mine Development Review Committee Meeting Smithers, Nora Bulding (3726 Alfred Ave) Cariboo Room, Con Call D

Thu 2012-11-0810:30AM Thu 2012-11-084:00 PM

(none)

Not yet responded

Paterson, Genevieve FLNR:EX , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX; Carmody­Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'Mackie, John'; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin'; [email protected]; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO: I N Norm Ringstad; 'Rina Freed'; 'Frederic Tolmie'; Pardoe, Jill A EMNG:EX; Flynn, Doug EMNG:EX

Please find attached the agenda for the KSM, Mine Development Review Committee meeting being held November 8th,

2012. Please note the time has changed to 10:30-4:00 to accommodate for those folks flying in from out of town.

Other meeting materials (i.e. any PowerPoint slides etc ... ) will be sent prior to the meeting.

Morning snacks and coffee etc plus lunch to be provided. Please confirm attendance, including if you plan on attending in person or via conference call.

MORe Participants Please review the revised MDRC list and nrrlvirllp

Ministry of Energy and Mines­Chief Inspectors Office AI Hoffman - Chief Inspector (CI)

Diane Howe - Deputy CI Kim Bellefontaine ~ Sr. Environmental Geoscientist Tanya Demchuk- Senior Environmental Geologist

1 FNR-2013-00423 Page 36

s.17, s.15

s.17, s.15

FNR-2013-00423 Page 36

Northwest Regional Mines Office Kathie \Vagar ·Director Ministry of Environment-Environmental Protection Mark Love-Head of Environmental Management Section

Ian Sharpe - Regional Manager . Jeanien Carmody-Fallows ~ Environmental Protection Officer Scott Jackson ~ Regional Hydrologist Craig Stewart - Compliance Specialist Regan Fielding-Environmental Protection Officer Patrick Williston, Impact Assessment Biologist

Ministry of Forests, Lands and Natural Resource Operations

Major Projects Office James CueIl-Director Jennifer Stalker - Project Manager/Chair Genevieve Paterson - Project Coordinator Jason Pope - Sr. First Nations Advisor Brian Herbert·Sr, First Nations Advisor

Archaeology Branch Eric Forgeng - Heritage Resource Specialist

Ecology Chris Schell- Sr. Ecosystems Biologist

Lands Cam Bentley - Land Tenures Specialist

Forests Will Foster - Resource Tenure Specialist Howard Debeck-Ficld Engineer Ron Donnelly - Tenures Forester/Engineering Specialist

Water Matt Sakals- Research Geomorphologist

Emily Bulmer - Water Stewardship Officer Ministry of Transportation and Sherrie Applegate - Senior Development Approvals Infrastructure Rosemary Barnewall- District Program Manager Federal Government Canadian Environmental Assessment Garett Cooper - Project Manager Agent)' NaturAl Resources Canada Jessica Cou l son~ Team Leader

Melanie Camobell- Senior Policy Anall'st Transport Canada-Navigable \Vaters Protection John Mackie- Major Projects Management Officer Department of Fisheries and Oceans Pat Lim - Environmental Analyst Ni~a!a Lisims Government .

Mansell Griffin - Lands and Resources Manager Tracey McKay-Lands ManaRer

First Nations ........ ;< .; .... .~,

Gitanyow (lVilps to be identified by the Gitanyow Hereditary Chiefs Office)

Tahltan Nation-Tahltan Heritage Resources Nalaine Morin-THREAT Co-Chair Environmental Assessment Team (THREAn Skii Km Lax Ha Chief Darleno Simpson International Jurisdictions ... . ...

Alaska Department of Natural Resources Kyle Moselle-Southeast Large Project Coordinator

2 FNR-2013-00423 Page 37FNR-2013-00423 Page 37

KSM Share Point Site The KsM sharepoint site will be the venue for information sharing between Provincial permitting agencies and the MDRe.

External clients require a BCelD account to access Share Point to create a BCelD please select this link: https:!(www.bceid .ca(

Instructions for setting up a basic bceid:

• Visit: https:/lwww.bceid.ca • Click "Begin Registration"

• Click "Basic BCeID" • Click " Register without specifying an online service"

• Enter your details & OK. • Provide BCelD user name to [email protected] once you have been added to the

sharepoint site access list you will receive an automated notification.

Thank you,

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, skeena Region 250-847-7268

3 FNR-2013-00423 Page 38

s.17, s.15

FNR-2013-00423 Page 38

KSM MINE PROJECT

MINE DEVELOPMENT REVIEW COMMITTEE (MDRC) MEETING

CARIBIOU BOARDROOM, 2nd FLOOR3726 ALFRED AVENUE, NORA BUILDING

(check-in @ reception)

SMITHERS, BC

November 8, 2012

Teleconference dial in:Conference ID:

(All Times listed below - Pacific Standard Time)

1 Welcome and Introductions Jen Stalker/ All 10:30 – 10:45

2 KSM Project Seabridge 10:45 –12:00Project Description and Project Planning Update

Lunch (Provided)12:00 – 1:00

Authorizations and Information Requirements

Permit applications to be applied for under the EA Current Approvals Regulation will be available/ posted throughout the day/ over lunch – agencies and Seabridge available for any questions

3 Coordinated Authorizations Process Jen Stalker 1:00 – 1:30

4 First Nations Consultation Jason Pope 1:30 – 1:50

5 Concurrent Permitting – Concurrent Approval Regulation (What does this mean for the MDRC/

EA/ KSM Project?)

Jen Stalker1:50 – 2:00

6 MDRC Timelines, Milestones, Next Steps Jen Stalker 2:00 – 2:20

7 MDRC Information Sharing Genevieve Paterson

2:20 – 2:30

Break 2:30 - 2:45

8 Authorization Applications – Distribution Seabridge (Jen Stalker)

2:45 – 3:00

9 Next Steps/ Questions Period Jen Stalker 3:00 – 3:45

10 Closing Remarks/ Adjourn Jen Stalker 3:45 – 4:00

FNR-2013-00423 Page 39

s.17, s.15

s.17, s.15

FNR-2013-00423 Page 39

Muir, Deanna CSNR:EX

Subject:

Start: End:

Recurrence:

Organizer:

From: Sent: To: Subject: Attachments:

RE: Proposed KSM Project - EA Update & Working Group Confirmation Request

Tue 2012-11-06 8:00 AM Tue 2012-11-06 8:30 AM

(none)

Paterson, Genevieve FLNR:EX

Paterson, Genevieve FLNR:EX Tuesday, November 6, 2012 9:46 AM 'Jessy Chaplin' RE: Proposed KSM Project - EA Update & Working Group Confirmation Request Oct 112012_Application Screening Distribution List.xls

Thanks Jessy. I've added her to the MORC and invited her to the meeting.

Attached is EAO's list for tracking how to distribute, thought you may want to adapt for your use.

Cheers,

Genevieve Paterson

Project Coordinator

Ministry of Forests, Lands and Natural Resource Operations

Major Projects Office, Skeena Region

250-847-7268

From: Jessy Chaplin [mailto:[email protected]] Sent: Monday, November 5,20124:45 PM To: Paterson, Genevieve FLNR:EX Cc: Stalker, Jennifer L FLNR:EX Subject: FW: Proposed KSM Project - EA Update & Working Group Confirmation Request

1 FNR-2013-00423 Page 40FNR-2013-00423 Page 40

Gen.

As per our discussions on the agenda/distribution list today, there are 3 Environment Canada reps on the EAO working group list who may be interested in participating in the MPO MDRC.

The lead for EC is [email protected]

Others involved in the KSM project under June's lead are

'[email protected]';

'[email protected]'

I think that overall Garrett could give you more direction.

Regards,

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Sea bridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell

From: Vinette, Nicole EAO:EX [mailto:[email protected]] Sent: Wednesday, October 03,20123:25 PM To: Schell, Chris FLNR:EX; '[email protected]'; '[email protected]'; Stewart, Craig ENV:EX; '[email protected]'; '[email protected]'; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN;

2 FNR-2013-00423 Page 41

s.22

s.22

FNR-2013-00423 Page 41

'kenwyn.george@a/aska.gov'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; Bellefontaine, Kim MEM:EX; Huang, Li ENV:EX; XT:Nyce, Harry FLNR:IN; Downie, AJ ENV:EX; Loughran, Tony D AVED:EX; Ollenberger, Lance J OGC:IN; Tamblyn, Greg C ENV:EX; XT:Rudis,

. Deborah United States Fish and Wildlife Service EAO:IN; Applegate, Sherrie TRAN:EX; 'maxine.azak@nisgaa:net'; '[email protected]'; '[email protected]'; '[email protected]' ; Demchuk, Tania MEM:EX; '[email protected]'; Donnelly, Ron FLNR:EX; Sakiyama, Steve ENV:EX; Weinstein , Ben ENV:EX; '[email protected]'; '[email protected]'; '[email protected]'; Warnock, George MEM:EX; '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]';

'[email protected]'

'[email protected]';

; Moi, Art W FLNR:EX; '[email protected]'; Foster, Will iam J FLNR:EX; Moody, Anne MEM:EX; Herbert, Brian FLNR:EX; Barnewall , Rosemary C TRAN:EX; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]' ; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]' ; Rollo, Andrew MEM:EX; '[email protected]';; Hamilton, Chris EAO:EX; Stalker, Jennifer L FLNR:EX; '[email protected]'; '[email protected]'; XT:McKay, Tracey FOR: IN; Jackson, Scott ENV:EX; Grace, David H EAO:EX; '[email protected]'; '[email protected]'; '[email protected]'; XT:District, Stewart, Mayor TRAN:IN; '[email protected]'; Bulmer, Emily M FLNR:EX; Staplin , Sean FLNR:EX; Cc: 'Elizabeth Miller ([email protected])' ; '[email protected]';

; Hamilton, Chris EAO:EX; Grace, David H EAO:EX; Van Doorn, Mark EAO:EX; Matsko, Nataliya EAO:EX Subject: Proposed KSM Project - EA Update & Working Group Confirmation Request

Dear Working Group ,members,

Please see below for a link to a letter from Seabridge Gold to the Environmental Assessment Office (EAO) posted on the EAO website regarding a commitment to submit consultation summary reports prior to submitting the application for an environmental assessment (EA) certificate for the proposed KSM Project (Project),

http://a100.gov.bc.calappsdatalepic/documents/p322/134930211 0373_ad64facfd9b 75134dcfe3e14fc 6b 7ff44b 7f178521 fdc707d790ca5fa2828da4.pdf

FNR-2013-00423 Page 42

s.22s.22

s.22 s.22

s.22

s.22

s.22

s.22

s.22

s.22

s.22

FNR-2013-00423 Page 42

I would also like to take this opportunity to confirm the Working Group membership and contact information in order to ensure that we have a complete and accurate list of everyone who should be on the distribution list to receive updates re: the EA of the proposed Project.

Please contact me by October 24.2012 at [email protected] to indicate:

• whether there have been any changes in responsibilities in your agency/organization for the EA of the proposed Project, and whether anyone should be removed from/added to our distribution list

• whether you would like to remain on the distribution list or be removed • whether your contact information (particularly e-mail) has changed and should be updated in our

distribution list

Thanks in advance, and if there are any questions, please feel free to contact me ([email protected] or 250-356-5311) or any of the following team members from EAO:

Chris Hamilton

Executive Project Director and EAO's Project Lead

[email protected]

250-387-1032

David Grace

Project Assessment Manager

David. [email protected]

250-387-1417

Mark Van Doorn

Project Assessment Officer

[email protected]

250-387-0291 4

FNR-2013-00423 Page 43FNR-2013-00423 Page 43

-Nicole

Nicole Vinette Project Assessment Officer Environmental Assessment Office

(250) 356-5311 [email protected]

5 FNR-2013-00423 Page 44FNR-2013-00423 Page 44

Muir. Deanna CSNR:EX

From: Sent: To:

Cc: Subject: 'Attachments:

Importance:

Good afternoon,

Paterson, Genevieve FLNR:EX Wednesday, November 7,2012 11:57 AM , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX; Carmody­Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; De Beck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin '; [email protected]; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian 0 ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN 'Norm Ringstad' KSM Mine Development Review Committee Meeting Materials for November 8th. KSM MDRC Agenda - November 8, 2012.docx.docx.docx; One Process MDRC Slides KSM Projectpptx; KSM Concurrent Review Process - DRAFT(V 0.5) Nov 7 2012.pdf; KSM Permitting Requirements (Draft) .docx

High

Please find meeting materials attached for tomorrow's meeting. Please see KSM MDRC Agenda for all meeting location/call in information.

For those of you joining by conference call please expect an email from myself tomorrow morning with Sea bridge's presentation.

Just a reminder that the meeting time has changed to 10:30-4:00 PST.

If you have any questions please contact myself or [email protected]

Thank you,

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

1 FNR-2013-00423 Page 45FNR-2013-00423 Page 45

KSM MINE PROJECT

MINE DEVELOPMENT REVIEW COMMITTEE (MDRC) MEETING

CARIBIOU BOARDROOM, 2nd FLOOR

3726 ALFRED AVENUE, NORA BUILDING (check-in @ reception)

SMITHERS, BC

November 8, 2012

Teleconference dial in

Conference ID:

(All Times listed below - Pacific Standard Time)

1 Welcome and Introductions Jen Stalker/ All 10:30 – 10:45 2 KSM Project Seabridge 10:45 –12:00 Project Description and Project Planning Update

Lunch (Provided) 12:00 – 1:00

Authorizations and Information Requirements

Permit applications to be applied for under the EA Current Approvals Regulation will be available/ posted throughout the day/ over lunch – agencies and Seabridge available for any questions

3 Coordinated Authorizations Process Jen Stalker 1:00 – 1:30 4 First Nations Consultation Jason Pope 1:30 – 1:50

5

Concurrent Permitting – Concurrent Approval Regulation (What does this mean for the MDRC/

EA/ KSM Project?)

Jen Stalker 1:50 – 2:00

6 MDRC Timelines, Milestones, Next Steps Jen Stalker 2:00 – 2:20 7

MDRC Information Sharing

Genevieve Paterson

2:20 – 2:30

Break 2:30 - 2:45 8

Authorization Applications – Distribution

Seabridge (Jen Stalker)

2:45 – 3:00

9 Next Steps/ Questions Period Jen Stalker 3:00 – 3:45

10 Closing Remarks/ Adjourn Jen Stalker 3:45 – 4:00

FNR-2013-00423 Page 46FNR-2013-00423 Page 46

s.17, s.15

Env

ironm

enta

lA

sses

smen

tOffi

ce

(EA

App

licat

ion)

Maj

orP

roje

cts

Offi

ce

(MD

RC

–P

erm

ittin

g)

NO

VE

MB

ER

2012

JULY

2013

JUN

E20

13M

AY

2013

MA

RC

H20

13FE

BR

UA

RY

2013

JAN

UA

RY

2013

DE

CE

MB

ER

2012

AP

RIL

2013

AU

GU

ST

2013

SE

PTE

MB

ER

2013

DE

CE

MB

ER

2013

NO

VE

MB

ER

2013

EAO

APP

LIC

ATI

ON

SUB

MIT

TED

(PR

OPO

NEN

T)

With

in75

Day

saf

tert

heE

AO

acce

pts

the

appl

icat

ion,

MP

Ono

tifie

sth

epr

opon

enta

ndE

AO

inw

ritin

gof

any

addi

tiona

linf

orm

atio

nre

quire

men

ts(fr

omth

eM

DR

C)i

nor

dert

oco

mpl

ete

the

revi

ew

“PR

E M

DR

C

ME

ETI

NG

”(N

OV

EM

BE

R8TH

) AP

PLI

CA

TIO

NS

SU

BM

ITTE

D(P

RO

PO

NE

NT)

(as

perS

ectio

n15

.4of

the

Sec

tion

11O

rder

–sa

me

time

asth

eE

AA

pplic

atio

n)

60da

ysto

reso

lve

outs

tand

ing

issu

es,

draf

tRec

omm

enda

tions

Rep

ort(

3w

eeks

)for

MD

RC

revi

ewan

dco

mm

ent(

2w

eeks

),dr

aftp

erm

itsre

view

(2w

eeks

),an

d su

bmit

to S

DM

’s fo

r dec

isio

n.

30D

AY

SCR

EEN

ING

EAO

PRO

VID

ESN

OTI

FIC

ATI

ON

ON

EAA

PPLI

CA

TIO

N(B

ASE

DO

N30

DA

YSC

REE

NIN

G)

IfE

AO

acce

pts

appl

icat

ion,

EA

Ow

illpr

ovid

ew

ritte

nno

tice

toth

epr

opon

enta

ndM

PO

Ifth

eap

plic

atio

nis

noti

nre

spec

tofa

nel

igib

leap

prov

alor

was

notd

eliv

ered

ontim

e,th

eex

ecut

ive

dire

ctor

(EA

O)m

ust

notif

yth

epr

opon

enti

nw

ritin

gth

atth

eap

plic

atio

nis

refu

sed

MD

RC

Tech

nica

lRev

iew

KS

MM

INE

PR

OJE

CT

–C

ON

CU

RR

EN

TR

EV

IEW

PR

OC

ES

S(E

A/M

DR

C)-

DR

AFT

(V0.

5)–

Nov

embe

r7,2

012

**N

OTE

–Ti

mel

ine

and

deta

ilsin

the

follo

win

gpr

oces

sdi

agra

mar

esu

bjec

tto

chan

ge

Pro

pone

ntto

subm

ital

lap

plic

atio

nsdi

gita

llyto

MP

O-P

roje

ctM

anag

er(J

enS

talk

er)a

ndP

roje

ctC

oord

inat

or(G

enev

ieve

Pat

erso

n)to

post

toth

eS

hare

poin

tSite

forM

DR

Cac

cess

/rev

iew

.

Pro

pone

ntre

spon

sibl

eto

prov

ide

agen

cies

with

requ

ired

hard

copi

es.

Pro

pone

ntto

prov

ide

MP

Oa

listo

fhar

dcop

ies

and

agen

cies

/Firs

tNat

ions

requ

estin

gha

rdco

pies

.

EA

O–

prim

ary

poin

tofc

onta

ctfo

rFirs

tNat

ions

Con

sulta

tion

durin

gth

eE

Are

view

.M

anag

esIs

sues

track

ing

(forE

AR

evie

w)a

ndC

onsu

ltatio

nR

ecor

ddu

ring

the

EA

revi

ewpr

oces

s.

All

EA

OIs

sues

and

stat

ustra

cked

and

EA

O’s

C

onsu

ltatio

nR

ecor

dpr

ovid

edto

MP

O

Dec

isio

nw

ithin

45D

ays

MD

RC

Tech

nica

lRev

iew

com

plet

e(to

leav

etim

eto

reso

lve

outs

tand

ing

issu

esan

dP

M(M

PO

)to

prep

are

Rec

omm

enda

tions

Rep

ort)

OC

TOB

ER

2013

DE

CIS

ION

PA

CK

AG

ETO

SD

M’s

to in

clud

e (n

otlim

ited

to):

*M

DR

CR

ecom

men

datio

nsR

epor

t(w

ithIs

sues

Trac

ker

that

incl

udes

both

the

EA

proc

ess

and

MD

RC

proc

ess

com

bine

d)

*E

AO

Con

sulta

tion

Rep

ort

and

MD

RC

Con

sulta

tion

Rep

ort

FLN

RO

–pr

imar

ypo

into

fcon

tact

forF

irstN

atio

nsco

nsul

tatio

ndu

ring

the

MD

RC

revi

ew.

Man

ages

Issu

estra

ckin

gan

dC

onsu

ltatio

nR

ecor

ddu

ring

the

MD

RC

revi

ewpr

oces

s.

KIC

K–

OFF

MD

RC

Mee

ting

Pro

pone

ntto

wal

kag

enci

es/

Firs

tNat

ions

thro

ugh

the

appl

icat

ions

subm

itted

MD

RC

ME

ETI

NG

MD

RC

ME

ETI

NG

Mov

ein

tote

chni

calr

evie

won

cein

form

atio

nre

quire

men

tsar

esu

bmitt

ed/p

rovi

ded

(com

plet

eap

plic

atio

ns)

INTE

RN

AL

INFO

RM

ATI

ON

SHA

RIN

GLO

CA

TIO

N/S

ITE

(EA

O/F

LNR

O)

*IS

SU

ES

TRA

CK

ER

*IN

FOR

MA

TIO

NS

HA

RIN

GM

ATE

RIA

LS/D

OC

UM

EN

TSTH

AT

BO

THE

AO

and

FLN

RO

RE

QU

IRE

AC

CE

SS

TOD

UR

ING

THE

RE

VIE

WP

RO

CE

SS

F

AC

CE

SS

:C

hris

Ham

ilton

,Dav

idG

race

Jen

Sta

lker

,Jas

onP

ope,

Gen

evie

veP

ater

son

180

DA

YEA

APP

LIC

ATI

ON

REV

IEW

AN

DD

ECIS

ION

PAC

KA

GE

FOR

MIN

ISTE

RS

JAN

UA

RY

2014

FNR-2013-00423 Page 47FNR-2013-00423 Page 47

KSM

Con

curr

ent P

erm

ittin

g Pr

iori

ties

(KSM

Con

stru

ctio

n St

art A

ctiv

ities

)

Con

ten

ts

Coul

ter C

reek

Acc

ess

Road

Spe

cial

Use

Per

mit

and

Supp

ortin

g Pe

rmits

.....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

. 2

Trea

ty C

reek

Acc

ess

Road

Spe

cial

Use

Per

mit

and

Supp

ortin

g Pe

rmits

.....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.. 4

Oth

er C

amps

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.. 5

Phas

e 1

Min

e Si

te C

onst

ruct

ion

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.. 6

FNR-2013-00423 Page 48FNR-2013-00423 Page 48

KSM

Con

curr

ent P

erm

ittin

g Pr

iori

ties

(KSM

Con

stru

ctio

n St

art A

ctiv

ities

)

Cou

lter

Cre

ek A

cces

s R

oad

Sp

ecia

l Use

Per

mit

an

d S

up

por

tin

g P

erm

its

Pr

ojec

t Com

pone

nt

Stat

ute/

Perm

it Co

mm

ents

/Req

uire

men

ts

Publ

ic C

onsu

ltatio

n Co

ntac

t Es

kay

Acc

ess

Road

Km

0-4

Bob

Qui

nn F

SR

Road

Use

Per

mit

FS10

9-R

UPA

pp.d

oc

Mai

nten

ance

Agr

eem

ent w

ith A

ltaG

as

FW R

oad

Use

A

gree

men

t.m

sg

No

Alta

Gas

-Lau

ren

Kelly

FL

RNO

-Will

Fos

ter

Km 4

-43.

5 A

lta G

as S

UP

S253

18

1.)

Ass

ignm

ent o

f SU

P if

that

is w

hat

Alta

Gas

wan

ts o

ther

wis

e;

2.)

Mai

nten

ance

Agr

eem

ent w

ith A

ltaG

as

If

#1 (N

ew S

UP)

yes

Km 4

3.5-

End

of ro

ad

1.) B

arri

ck G

old

SUP

reas

sign

men

t of S

UP

(with

the

SUP

hold

ers

agre

emen

t)

2.) M

aint

enan

ce A

gree

men

t for

Bar

rick

Gol

d

N

o Se

abri

dge-

Jess

y Ch

aplin

End

of ro

ad to

end

of n

ew c

onst

ruct

ion

1.)

Coul

d be

an

amen

dmen

t to

exis

ting

Barr

ick

SUP

2.)

New

SU

P if

Barr

ick

SUP

in n

ot re

assi

gned

If

#2 (N

ew S

UP)

yes

FL

NRO

-Will

Fos

ter

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

(See

Cou

lter-

Sulp

hret

s Ro

ad)

http

://w

ww

.for.

gov.

bc.c

a/ds

i/M

Tenu

res_

Salv

age.

htm

#Lic

ense

_to_

Cut-

LTC

Yes

Coul

ter –

Sul

phre

ts R

oad

Th

e Fo

rest

Pra

ctic

es C

ode

of B

C an

d th

e Pr

ovin

cial

For

est U

se R

egul

atio

n ar

e th

e au

thor

izat

ion

for t

he S

peci

al U

se P

erm

it (S

UP)

.

FW C

onfir

mat

ion

of

appr

opria

te p

erm

its in

Pack

age

Pu

blic

Con

sulta

tion

for a

cces

s, S

UP

and

asso

ciat

ed O

LTC’

s ca

n be

don

e at

one

tim

e.

� SU

P �

OLT

C

FLRN

O-W

ill F

oste

r

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

Fish

erie

s A

ct-R

evie

w S

UP

for o

pera

tiona

l st

atem

ents

for

stre

am c

ross

ing

Pend

ing

Conf

irmat

ion

? D

FO-P

at L

im

Wor

ksaf

e BC

Act

- Not

ice

of F

ores

try

Ope

ratio

ns F

orm

ht

tp:/

/ww

w.w

orks

afeb

c.co

m/i

nsur

ance

/man

agi

ng_y

our_

acco

unt/

notic

e_of

_pro

ject

/def

ault.

asp

No

WSB

C Te

rrac

e

Wild

life

Act

- des

troy

ing

part

icul

ar ty

pes

of

bird

nes

ts o

r eg

gs

http

://w

ww

.env

.gov

.bc.

ca/p

asb/

fw_p

erm

reg.

htm

l N

o PA

SB

Unu

k Ri

ver

Brid

ge

Fish

erie

s A

ct-A

utho

riza

tion

of U

nuk

brid

ge

cros

sing

Pe

ndin

g Co

nfirm

atio

n ?

DFO

-Pat

Lim

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

To

be

cove

red

unde

r Co

ulte

r –

Sulp

hret

s Ro

ad

OLT

C Ye

s-Pa

rt o

f Pub

lic C

onsu

ltatio

n on

Acc

ess

Pack

age

FLRN

O-W

ill F

oste

r

Nav

igab

le W

ater

s Pr

otec

tion

Act

-Nav

igab

le

Stre

am C

ross

ing

ht

tp:/

/ww

w.t

c.gc

.ca/

eng/

paci

fic/m

arin

e-nw

pp-a

pplic

atio

ns-1

337.

htm

NW

P-Jo

hn M

acki

e

Wat

er A

ct-N

otifi

catio

n of

Wor

ks In

and

A

bout

a s

trea

m

http

://w

ww

.env

.gov

.bc.

ca/w

sd/w

ater

_rig

hts/

lic

ence

_app

licat

ion/

sect

ion9

/ N

o W

SD-E

mily

Bul

mer

Layd

own

Are

as, G

rave

l Pits

, and

Bor

row

Are

as

The

Fore

st P

ract

ices

Cod

e of

BC

and

the

Prov

inci

al F

ores

t Use

Reg

ulat

ion

are

the

auth

oriz

atio

n fo

r the

Spe

cial

Use

Per

mit

(SU

P).

Thes

e ar

eas

are

to b

e w

ithin

the

SUP

(75m

) ar

ea.

Yes,

to b

e in

clud

ed in

Cou

lter

– Su

lphr

ets

Road

SU

P Co

nsul

tatio

n Pa

ckag

e FL

NRO

-Will

Fos

ter

FNR-2013-00423 Page 49FNR-2013-00423 Page 49

KSM

Con

curr

ent P

erm

ittin

g Pr

iori

ties

(KSM

Con

stru

ctio

n St

art A

ctiv

ities

)

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t Ca

mp

#3 E

skay

Cre

ek M

ine

Site

Sta

ging

(50p

l)

Land

Act

–In

dust

rial

Lic

ence

of O

ccup

atio

n

http

://w

ww

.agf

.gov

.bc.

ca/c

lad/

Doc

umen

ts/L

PSB

/Pol

icie

s/in

dust

rial

_gen

.pdf

Ye

s ht

tp:/

/ww

w.fo

r.go

v.bc

.ca/

Land

_Ten

ures

/doc

um

ents

/cab

inet

/adv

ertis

ing.

pdf

Cam

Ben

tley

Drin

king

Wat

er P

rote

ctio

n A

ct- C

onst

ruct

ion

Perm

it (H

20-C

) W

ater

Con

stru

ctio

n Pe

rmit

Proc

ess.

pdf

Indu

stria

l Cam

p R

equi

rem

ents

- H

ealth

NH

A A

pplic

atio

n fo

r W

ater

wor

ks C

onst

ruc

NH

A A

PPLI

CA

TIO

N

WA

TER

0504

14.p

df

NH

A%

20A

pplic

atio

n%

20fo

r%20

Wat

erw

oA

pplic

atio

n fo

r H

ealth

App

rova

l.pdf

No

NH

A-S

hane

Wad

den

D

rinki

ng W

ater

Pro

tect

ion

Act

- Con

stru

ctio

n Pe

rmit

(H20

-O)

Publ

ic H

ealth

Act

-Sew

age

Perm

it

10-4

60-3

038

- G

uidl

ines

for

Ind

ustr

ia

Publ

ic H

ealth

Act

-Foo

d Pe

rmit

Ope

ning

a N

ew F

ood

Prem

ise

NH

.pdf

W

ater

Act

and

the

Wat

er P

rote

ctio

n A

ct-

Wat

er L

icen

ce

http

://w

ww

.env

.gov

.bc.

ca/w

sd/w

ater

_rig

hts/

lic

ence

_app

licat

ion/

inde

x.ht

ml

No

FL

NRO

-Em

ily B

ulm

er

W

ater

Act

-Gro

undw

ater

Wel

l Reg

istr

atio

n

http

://w

ww

.env

.gov

.bc.

ca/w

sd/p

lan_

prot

ect_

sust

ain/

grou

ndw

ater

/ind

ex.h

tml

Wat

er A

ct-N

otifi

catio

n (S

ectio

n 9)

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/wsd

/wat

er_r

ight

s/l

icen

ce_a

pplic

atio

n/se

ctio

n9/

Envi

ronm

enta

l Man

agem

ent A

ct-O

pen

Burn

ing

Requ

ired

onl

y if

open

bur

ning

is r

equi

red:

ht

tp:/

/ww

w.b

cair

qual

ity.c

a/to

pics

/bur

ning

-ou

tdoo

rs.h

tml

http

://w

ww

.env

.gov

.bc.

ca/e

pd/w

aste

_dis

char

ge_a

uth/

app_

form

s/in

dex.

htm

No

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

Envi

ronm

enta

l Man

agem

ent A

ct-S

olid

W

aste

O

nly

requ

ired

if la

ndfil

l is

plan

ned

at th

is

loca

tion:

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/was

te_d

isch

arge

_aut

h/gu

idan

ce/i

ndex

.htm

Yes

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

To

be

cove

red

unde

r Co

ulte

r –

Sulp

hret

s Ro

ad

OLT

C Ye

s FL

NRO

-Will

Fos

ter

FNR-2013-00423 Page 50FNR-2013-00423 Page 50

KSM

Con

curr

ent P

erm

ittin

g Pr

iori

ties

(KSM

Con

stru

ctio

n St

art A

ctiv

ities

)

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t Ca

mp

#8 U

nuk

Rive

r St

agin

g (4

0pl)

Sam

e pe

rmit/

info

rmat

ion

requ

irem

ents

for

Cam

p #3

Esk

ay C

reek

Min

e si

te S

tagi

ng C

amp

(50p

l).

Cam

p #1

1 Tr

eaty

Cre

ek M

arsh

allin

g (6

0pl)

Sam

e pe

rmit/

info

rmat

ion

requ

irem

ents

for

Cam

p #3

Esk

ay C

reek

Min

e si

te S

tagi

ng C

amp

(50p

l).*M

inus

Lic

ence

of O

ccup

atio

n, p

erm

itted

und

er e

xist

ing

Min

es A

ct P

erm

it

Tre

aty

Cree

k A

cces

s R

oad

Sp

ecia

l Use

Per

mit

an

d S

up

por

tin

g P

erm

its

Trea

ty C

reek

Acc

ess

Road

s (t

o Pl

ant S

ite a

nd

Port

al T

unne

l) Th

e Fo

rest

Pra

ctic

es C

ode

of B

C an

d th

e Pr

ovin

cial

For

est U

se R

egul

atio

n ar

e th

e au

thor

izat

ion

for t

he S

peci

al U

se P

erm

it (S

UP)

.

FW C

onfir

mat

ion

of

appr

opria

te p

erm

its in

Publ

ic C

onsu

ltatio

n fo

r acc

ess,

SU

P an

d as

soci

ated

OLT

C’s

can

be d

one

at o

ne ti

me.

Pa

ckag

e to

als

o in

clud

e Co

ulte

r Cr

eek

Acce

ss

SUP

& O

LTC.

SUP

� O

LTC

FLRN

O-W

ill F

oste

r

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

ht

tp:/

/ww

w.fo

r.go

v.bc

.ca/

dsi/

MTe

nure

s_Sa

lva

ge.h

tm#L

icen

se_t

o_Cu

t-LT

C

Wor

ksaf

e BC

Act

- Not

ice

of F

ores

try

Ope

ratio

ns F

orm

ht

tp:/

/ww

w.w

orks

afeb

c.co

m/i

nsur

ance

/man

agi

ng_y

our_

acco

unt/

notic

e_of

_pro

ject

/def

ault.

asp

No

http

://w

ww

.wor

ksaf

ebc.

com

/con

tact

_us/

regi

onal

_loc

atio

ns/c

on_1

0_90

.asp

W

SBC

Terr

ace

Wild

life

Act

- des

troy

ing

part

icul

ar ty

pes

of

bird

nes

ts o

r eg

gs

http

://w

ww

.env

.gov

.bc.

ca/p

asb/

fw_p

erm

reg.

htm

l N

o PA

SB

Hig

hway

s A

ct-P

rovi

ncia

l Pub

lic H

ighw

ay

Perm

it A

pplic

atio

n - C

onne

ctio

n to

Hw

y37

http

://w

ww

.th.

gov.

bc.c

a/pe

rmits

/H00

20.a

sp

No

MoT

I-She

rri A

pple

gate

Her

itage

Con

serv

atio

n A

ct-In

vest

igat

ion

Perm

it If

com

plet

e av

oida

nce

of s

ites

HdT

m-7

, HdT

n-1,

HdT

n -2,

and

HdT

o-6

is n

ot p

ossi

ble,

and

gr

ound

dis

turb

ance

with

in th

e si

te b

ound

arie

s ca

nnot

be

avoi

ded,

then

add

ition

al

arch

aeol

ogic

al e

xcav

atio

ns w

ill b

e ne

cess

ary

to

miti

gate

the

dest

ruct

ion

of th

e si

tes .

Perm

it 20

08-0

1-28

M

ap 1

No

FLN

RO-E

ric

Forg

eng

Bell-

Irvi

ng R

iver

Bri

dge

Fish

erie

s A

ct (D

FO)-

Aut

horiz

atio

n of

Bel

l Ir

ving

Bri

dge

cros

sing

Pe

ndin

g Co

nfirm

atio

n

DFO

-Pat

Lim

Fish

erie

s A

ct (D

FO)-

Rev

iew

SU

P fo

r O

pera

tiona

l Sta

tem

ents

for s

trea

m c

ross

ings

Pe

ndin

g Co

nfirm

atio

n

Wat

er A

ct-N

otifi

catio

n (S

ectio

n 9)

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/wsd

/wat

er_r

ight

s/l

icen

ce_a

pplic

atio

n/se

ctio

n9/

No

FLRN

O-E

mily

Bul

mer

Layd

own

Are

as, G

rave

l Pits

, and

Bor

row

Are

as

The

Fore

st P

ract

ices

Cod

e of

BC

and

the

Prov

inci

al F

ores

t Use

Reg

ulat

ion

are

the

auth

oriz

atio

n fo

r the

Spe

cial

Use

Per

mit

(SU

P).

Thes

e ar

eas

are

to b

e w

ithin

the

SUP

(75m

) ar

ea.

FL

RNO

-Will

Fos

ter

Tran

smis

sion

Lin

e Ri

ght o

f Way

Fo

rest

and

Ran

ge P

ract

ices

Act

– O

ccup

ant

Lice

nce

to C

ut

To b

e in

clud

ed a

s pa

rt o

f the

Tre

aty

Cree

k A

cces

s Ro

ad O

LTC

Ye

s-Pa

rt o

f SU

P &

OLT

C pa

ckag

e

Land

Act

- Util

ity- S

tat R

oW

http

://w

ww

.for.

gov.

bc.c

a/La

nd_T

enur

es/t

enu

re_p

rogr

ams/

prog

ram

s/ut

ilitie

s/in

dex.

htm

l Ye

s FL

NRO

-Cam

Ben

tley

FNR-2013-00423 Page 51FNR-2013-00423 Page 51

KSM

Con

curr

ent P

erm

ittin

g Pr

iori

ties

(KSM

Con

stru

ctio

n St

art A

ctiv

ities

)

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t Ca

mp

#5Tr

eaty

Pla

nt C

amp

(800

pl)

Min

es A

ct –

Perm

it ht

tp:/

/ww

w.e

mpr

.gov

.bc.

ca/M

inin

g/Pe

rmitt

ing-

Recl

amat

ion/

Page

s/de

faul

t.as

px

Yes

MEM

-Dia

ne H

owe

Fo

rest

and

Ran

ge P

ract

ices

Act

– O

ccup

ant

Lice

nce

to C

ut

Ther

e w

ill b

e 4

OLT

C’s

for

KSM

1.

Cou

lter

Cree

k A

cces

s 2.

Tre

aty

Cree

k A

cces

s 3.

TIA

4.

Min

e Si

te

Yes

FLRN

O-W

ill F

oste

r

Envi

ronm

enta

l Man

agem

ent A

ct-W

aste

W

ater

FW

cam

ps E

MA

pe

rmitt

ing

spec

ifica

tio

No

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

Envi

ronm

enta

l Man

agem

ent A

ct-W

aste

D

isch

arge

(Inc

iner

ator

) ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/was

te_d

isch

arge

_aut

h/ap

p_fo

rms/

inde

x.ht

m

FW F

ollo

w u

p to

Pr

e-re

gist

ratio

n M

eet

� A

pub

lic n

otic

e of

app

licat

ion

to b

e pl

aced

in

the

BC G

azet

te a

nd lo

cal n

ews

med

ia

� 30

day

pub

lic n

otifi

catio

n pe

riod

App

licat

ion

fees

(con

tact

nea

rest

Min

istr

y Re

gion

al O

ffic

e)

� A

fina

l Tec

hnic

al A

sses

smen

t Rep

ort m

ay

be r

equi

red

� Co

nsul

tatio

n Re

port

D

rinki

ng W

ater

Pro

tect

ion

Act

- Con

stru

ctio

n Pe

rmit

(H20

-C)

See

Cam

p #3

Esk

ay C

reek

Min

e si

te S

tagi

ng C

amp

(50p

l) fo

r pe

rmit/

info

rmat

ion

requ

irem

ents

.

Drin

king

Wat

er P

rote

ctio

n A

ct- C

onst

ruct

ion

Perm

it (H

20-O

) Pu

blic

Hea

lth A

ct-F

ood

Perm

it W

ater

Act

and

the

Wat

er P

rote

ctio

n A

ct-

Wat

er L

icen

ce

Wat

er A

ct-G

roun

dwat

er W

ell R

egis

trat

ion

En

viro

nmen

tal M

anag

emen

t Act

-Sol

id

Was

te

Wat

er A

ct-N

otifi

catio

n (S

ectio

n 9)

En

viro

nmen

tal M

anag

emen

t Act

-Ope

n Bu

rnin

g Ca

mp

#6 T

reat

y Sa

ddle

Cam

p (2

0pl)

Sam

e pe

rmit/

info

rmat

ion

requ

irem

ents

for

Cam

p #3

Esk

ay C

reek

Min

e si

te S

tagi

ng C

amp

(50p

l).

Cam

p #7

Unu

k N

orth

(40p

l)

Cam

p #1

2 H

wy

37 (6

0pl)

Oth

er C

amp

s Pr

ojec

t Com

pone

nt

Stat

ute/

Perm

it Co

mm

ents

/Req

uire

men

ts

Publ

ic C

onsu

ltatio

n?

Cont

act

Cam

p #1

Gra

nduc

Sta

ging

(80p

l) Pr

ivat

e A

gree

men

t N

/A

No

Seab

ridg

e-Je

ssy

Chap

lin

Cam

p #2

Ted

Mor

ris (8

0pl)

Sam

e pe

rmit/

info

rmat

ion

requ

irem

ents

for

Cam

p #3

Esk

ay C

reek

Min

e si

te S

tagi

ng C

amp

(50p

l).

Cam

p #4

Mitc

hell

Nor

th (1

25pl

) Sa

me

perm

it/in

form

atio

n re

quir

emen

ts fo

r Ca

mp

#5Tr

eaty

Pla

nt C

amp

(800

pl)

Ca

mp

#9 M

itche

ll In

itial

Cam

p (1

40pl

) Ca

mp

#10

Mitc

hell

Seco

ndar

y (4

00pl

) M

itche

ll O

pera

tions

Cam

p (3

50pl

)

FNR-2013-00423 Page 52FNR-2013-00423 Page 52

KSM

Con

curr

ent P

erm

ittin

g Pr

iori

ties

(KSM

Con

stru

ctio

n St

art A

ctiv

ities

)

Trea

ty O

pera

tions

Cam

p (2

50pl

) Sa

me

perm

it/in

form

atio

n re

quir

emen

ts fo

r Ca

mp

#5Tr

eaty

Pla

nt C

amp

(800

pl)

Ph

ase

1 M

ine

Site

Con

stru

ctio

n

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t La

ydow

n A

reas

, Gra

vel P

its a

nd B

orro

w A

reas

M

ines

Act

–Pe

rmit

One

Per

mit

for M

ine

Site

and

TIA

ht

tp:/

/ww

w.e

mpr

.gov

.bc.

ca/M

inin

g/Pe

rmitt

ing

-Rec

lam

atio

n/Pa

ges/

defa

ult.

aspx

Yes

MEM

-Dia

ne H

owe

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

O

ne O

LTC

for M

ine

Site

Ye

s FL

NRO

-Will

Fos

ter

Land

Act

–In

dust

rial

Lic

ence

of O

ccup

atio

n

http

://w

ww

.agf

.gov

.bc.

ca/c

lad/

Doc

umen

ts/L

PSB/

Polic

ies/

indu

stri

al_g

en.p

df

Yes

http

://w

ww

.for.

gov.

bc.c

a/La

nd_T

enur

es/d

ocum

ents

/cab

inet

/adv

ertis

ing.

pdf

FLN

RO-C

am B

entle

y

Min

e Si

te W

ater

Tre

atm

ent P

lant

M

ines

Act

-Per

mit

One

MA

Perm

it fo

r Min

e Si

te

M

EM-D

iane

How

e EM

A—

Efflu

ent P

erm

it O

ne P

erm

it fo

r Min

e Si

te

FW K

SM -

gen

eral

M

ines

Act

per

mitt

ing

r

� A

pub

lic n

otic

e of

app

licat

ion

to b

e pl

aced

in

the

BC G

azet

te a

nd lo

cal n

ews

med

ia

� 30

day

pub

lic n

otifi

catio

n pe

riod

**

Any

requ

irem

ents

for

publ

ic c

onsu

ltatio

n fr

om th

e EA

are

dup

licat

ed fo

r an

y EM

A

appl

icat

ions

.

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

Min

e Si

te W

ater

Sto

rage

Pon

ds

EMA

-Was

te D

isch

arge

O

ne E

MA

Per

mit

for M

ine

Site

M

oE- J

eani

en C

arm

ody-

Fallo

ws

Min

eral

Ten

ures

Act

-Min

ing

Leas

e

Wat

er A

ct a

nd th

e W

ater

Pro

tect

ion

Act

-W

ater

Lic

ence

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/wsd

/wat

er_r

ight

s/lic

ence

_app

licat

ion/

inde

x.ht

ml

No

FLRN

O-E

mily

Bul

mer

TMF-

Clea

ring

and

Gru

bbin

g M

ines

Act

-Per

mit

One

MA

Perm

it fo

r Min

e Si

te

Yes-

One

Pub

lic C

onsu

ltatio

n Pa

ckag

e fo

r M

ine

Site

BC

Gaz

ette

30

Day

s Lo

cal P

aper

30

Day

s

MEM

-Dia

ne H

owe

Min

eral

Ten

ures

Act

-Min

ing

Leas

e

Co

ntac

t?

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

O

ne O

LTC

for T

IA

Yes-

One

Pub

lic C

onsu

ltatio

n Pa

ckag

e fo

r M

ine

Site

FL

NRO

-Will

Fos

ter

TMF-

Eart

hwor

ks

Min

es A

ct-P

erm

it O

ne M

A Pe

rmit

for M

ine

Site

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

MEM

-Dia

ne H

owe

Min

eral

Ten

ures

Act

-Min

ing

Leas

e

? ?

Land

Act

–In

dust

rial

Lic

ence

of O

ccup

atio

n

http

://w

ww

.agf

.gov

.bc.

ca/c

lad/

Doc

umen

ts/L

PSB/

Polic

ies/

indu

stri

al_g

en.p

df

Yes

http

://w

ww

.for.

gov.

bc.c

a/La

nd_T

enur

es/d

ocum

ents

/cab

inet

/adv

ertis

ing.

pdf

FLN

RO-C

am B

entle

y

TMF

Are

a-8

Non

-Con

tact

Div

ersi

ons

Wat

er A

ct a

nd th

e W

ater

Pro

tect

ion

Act

-W

ater

Lic

ence

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/wsd

/wat

er_r

ight

s/lic

ence

_app

licat

ion/

inde

x.ht

ml

No

FLRN

O-E

mily

Bul

mer

Trea

ty C

reek

Por

tal

Min

es A

ct-P

erm

it O

ne M

A Pe

rmit

for M

ine

Site

Ye

s M

EM-D

iane

How

e M

iner

al T

enur

es A

ct-M

inin

g Le

ase

Fo

rest

and

Ran

ge P

ract

ices

Act

– O

ccup

ant

Lice

nce

to C

ut

One

OLT

C fo

r TIA

sid

e of

pro

ject

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

FLN

RO-W

ill F

oste

r

EMA

-Was

te D

isch

arge

O

ne E

MA

Per

mit

for M

ine

Site

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

FNR-2013-00423 Page 53FNR-2013-00423 Page 53

KSM

Con

curr

ent P

erm

ittin

g Pr

iori

ties

(KSM

Con

stru

ctio

n St

art A

ctiv

ities

)

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t M

itche

ll-Te

igen

Sad

dle

Dec

line

Port

al &

Ven

t Ra

ises

M

ines

Act

-Per

mit

One

MA

Perm

it fo

r Min

e Si

te

Yes-

One

Pub

lic C

onsu

ltatio

n Pa

ckag

e fo

r M

ine

Site

M

EM-D

iane

How

e

Min

eral

Ten

ures

Act

-Min

ing

Leas

e

EMA

-Was

te D

isch

arge

O

ne E

MA

Per

mit

for M

ine

Site

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

Mitc

hell-

Teig

en S

addl

e (M

TT)

Min

es A

ct-P

erm

it O

ne M

A Pe

rmit

for M

ine

Site

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

MEM

-Dia

ne H

owe

Min

eral

Ten

ures

Act

-Min

ing

Leas

e

EMA

-Was

te D

isch

arge

O

ne E

MA

Per

mit

for M

ine

Site

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

Mitc

hell

Trea

ty T

unne

l EM

A-E

fflu

ent

Sepa

rate

from

EM

A M

ine

Site

Per

mit

as

this

is

to b

e pe

rmitt

ed u

nder

Lan

d A

ct; o

ne E

MA

pe

rmit

can

be is

sued

onl

y fo

r th

e m

inin

g le

ase

area

.

Yes

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

Land

Act

- Util

ity- S

tat R

oW

http

://w

ww

.for.

gov.

bc.c

a/La

nd_T

enur

es/t

enur

e_pr

ogra

ms/

prog

ram

s/ut

ilitie

s/in

dex.

htm

l Ye

s FL

NRO

-Cam

Ben

tley

MTT

Pad

M

ines

Act

-Per

mit

One

MA

Perm

it fo

r Min

e Si

te

Yes-

One

Pub

lic C

onsu

ltatio

n Pa

ckag

e fo

r M

ine

Site

M

EM-D

iane

How

e

Min

eral

Ten

ures

Act

-Min

ing

Leas

e

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

O

ne O

LTC

for M

ine

Site

sid

e Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

FLN

RO-W

ill F

oste

r

EMA

-Was

te D

isch

arge

O

ne E

MA

Per

mit

for M

ine

Site

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

Mitc

hell

Port

al

Min

es A

ct-P

erm

it O

ne M

A Pe

rmit

for M

ine

Site

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

MEM

-Dia

ne H

owe

Min

eral

Ten

ures

Act

-Min

ing

Leas

e

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

O

ne O

LTC

for M

ine

Site

sid

e Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

FLN

RO-W

ill F

oste

r

Land

Act

–In

dust

rial

Lic

ence

of O

ccup

atio

n

http

://w

ww

.agf

.gov

.bc.

ca/c

lad/

Doc

umen

ts/L

PSB/

Polic

ies/

indu

stri

al_g

en.p

df

Yes

http

://w

ww

.for.

gov.

bc.c

a/La

nd_T

enur

es/d

ocum

ents

/cab

inet

/adv

ertis

ing.

pdf

Cam

Ben

tley

McT

agg

Div

ersi

on T

unne

l M

ines

Act

-Per

mit

One

MA

Perm

it fo

r Min

e Si

te

Yes-

One

Pub

lic C

onsu

ltatio

n Pa

ckag

e fo

r M

ine

Site

M

EM-D

iane

How

e

Min

eral

Ten

ures

Act

-Min

ing

Leas

e

EMA

-Was

te D

isch

arge

O

ne E

MA

Per

mit

for M

ine

Site

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

Mitc

hell

Sadd

le P

orta

l M

ines

Act

-Per

mit

One

MA

Perm

it fo

r Min

e Si

te

Yes-

One

Pub

lic C

onsu

ltatio

n Pa

ckag

e fo

r M

ine

Site

M

EM-D

iane

How

e

Min

eral

Ten

ures

Act

-Min

ing

Leas

e

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

O

ne O

LTC

for M

ine

Site

sid

e Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

FLN

RO-W

ill F

oste

r

EMA

-Was

te D

isch

arge

O

ne E

MA

Per

mit

for M

ine

Site

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

Sadd

le P

orta

l M

ines

Act

-Per

mit

One

MA

Perm

it fo

r Min

e Si

te

Yes-

One

Pub

lic C

onsu

ltatio

n Pa

ckag

e fo

r M

ine

Site

M

EM-D

iane

How

e

FNR-2013-00423 Page 54FNR-2013-00423 Page 54

KSM

Con

curr

ent P

erm

ittin

g Pr

iori

ties

(KSM

Con

stru

ctio

n St

art A

ctiv

ities

)

Min

eral

Ten

ures

Act

-Min

ing

Leas

e

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

Occ

upan

t Li

cenc

e to

Cut

O

ne O

LTC

for M

ine

Site

sid

e Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

FLN

RO-W

ill F

oste

r

EMA

-Was

te D

isch

arge

O

ne E

MA

Per

mit

for M

ine

Site

Ye

s-O

ne P

ublic

Con

sulta

tion

Pack

age

for

Min

e Si

te

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

Wat

er A

ct a

nd th

e W

ater

Pro

tect

ion

Act

-W

ater

Lic

ence

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/wsd

/wat

er_r

ight

s/lic

ence

_app

licat

ion/

inde

x.ht

ml

No

FLRN

O-E

mily

Bul

mer

M

ine

Are

a - 8

Non

-Con

tact

Div

ersi

ons

La

nd F

ills

� M

ine

Are

a �

Proc

ess

Plan

t and

TM

F A

rea

� La

nd F

arm

and

Con

tam

inat

ed S

oils

EMA

-Was

te D

isch

arge

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/mun

-w

aste

/was

te-s

olid

/lan

dfill

s/cr

iteri

a-la

ndfil

ls.h

tm

Sepa

rate

Per

mits

– N

ot c

over

ed u

nder

EM

A

Min

e Si

te P

erm

it

� A

pub

lic n

otic

e of

app

licat

ion

to b

e pl

aced

in

the

BC G

azet

te a

nd lo

cal n

ews

med

ia

� 30

day

pub

lic n

otifi

catio

n pe

riod

App

licat

ion

fees

(con

tact

nea

rest

Min

istr

y Re

gion

al O

ffic

e)

� A

fina

l Tec

hnic

al A

sses

smen

t Rep

ort m

ay

be r

equi

red

� Co

nsul

tatio

n Re

port

MoE

- Jea

nien

Car

mod

y-Fa

llow

s

FNR-2013-00423 Page 55FNR-2013-00423 Page 55

MINE PROJECT ~in e/~)evel(jpl11en tRevi

(MDRC)

SMITHERS, Be

N()vember 8, 2012 .

FNR-2013-00423 Page 56FNR-2013-00423 Page 56

Provincial "One Process" Framework

Coordination initi~tive of Natural Resource Ministries (2010-2011 ) Prmt"tiveaIid integrated approach (agencies and First Nations)

ocusses()n the project as a whole

ilnter~gency committee to cartyo~t coordinated review of auth()riz~tions

FNR-2013-00423 Page 57FNR-2013-00423 Page 57

FNR-2013-00423 Page 58FNR-2013-00423 Page 58

FNR-2013-00423 Page 59FNR-2013-00423 Page 59

Project Manager Monitor EA process Exchange information with proponent, consultation coordinator & EA working group

(Coordinate with anyCEA) • Pre-application • Application review

First Nations consultation • Decisk>n whether to issue

EA certificate :1 F O N ° I ° Irst atlons * Consultation

EM

Coordinated Authorizations Process (Coordinate with CEA if triggered and if not coordinated with BC EA)

Process Initiation Project manager establishes & chairs MDRe

. • Liaise with FN consultation coordinator

~ Pre-Application

Project description • Scoping • First Nations consultation • Application requirements

~ Initial Submission and Screening

~ Application Review

Public review & comment FN consultation & accommodations MORe review & recommendations report

• Decisions

FN·Consultation Report

Statutory decision makers decide whether to issuel approve authorizations

Information sharing

Engagement AcctJmmodation considerations

Sharing recommendations

FNR-2013-00423 Page 60FNR-2013-00423 Page 60

DEVELOPMENT REVIEWiGOMMITT~J.:.J

(MDRG)

• Primaryforum for the coordinated authorizations process

MDRC est~blished by the Chief Inspector of Mines

GOAL:

FNR-2013-00423 Page 61FNR-2013-00423 Page 61

• Coo'rdinated Authorizations

• Coordinated Consultation > _i{--:.-·-····-· ·:·-·····-· ··--··': i· .•.. --·.-·-.··.·.-.i· .. -..• · .... -··-·· ··:'···-.. -.--.-.-- .-.: .-.-.-.-.-_.:.-•. : .•.. -. .. --.--.----- .---.- ----·-.-:· .. :.-.i·:-i-.-.: -·- -.-· .. ·-·-·:-··--

Timely Communication/ Decision ·

. Issues Management

::i.

FNR-2013-00423 Page 62FNR-2013-00423 Page 62

KSM MDRC LINKAGES Chief Inspectors Office (MEM)

Regional Mines ADM

Regional FLNRO ADM Regional Executive Director

FNR-2013-00423 Page 63FNR-2013-00423 Page 63

MDRC Phases and

• Project description, scoping, application requirements, bundling • Identify issues

• Screening to ensure all application requirements are met

• Review project as a whole • Review Authorization Applications • Issues ManagementiProject Accountability

• Technical review complete? • Duty to consult met? • Recommend to SDMs to proceed to decision-making

• Draft permits and conditions/ Rec. report! Consultation report • Review and decision • Reasons for Decision

FNR-2013-00423 Page 64FNR-2013-00423 Page 64

Guide to Coordinated Authorizations for Major Mines

Version 1.0 - August 7,2012

Ministry of Energy and Mines

Ministry of Forests, Lands, and Natural Resource Operations

Ministry of Environment

http://www.for.gov.bc.ca/ftp/major...projects/externall!publish/webl mining/Mines-Guide. pdf

FNR-2013-00423 Page 65FNR-2013-00423 Page 65

Muir, Deanna CSNR:EX

From: Sent: To: Subjec~:

For sure! Sounds good ©

Genevieve Paterson Project Coordinator

Paterson, Genevieve FLNR:EX Wednesday, November 7,20124:44 PM 'Jessy Chaplin' RE: KSM Mine Development Review Committee Meeting Materials for November 8th.

Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

From: Jessy Chaplin [mailto:[email protected]] Sent: Wednesday, November 7,20124:31 PM To: Paterson, Genevieve FLNR: EX Subject: RE: KSM Mine Development Review Committee Meeting Materials for November 8th.

Thanks Gen, Sorry I didn't get comments back to you on the permitting document draft. We will get a chance to go over it in detail in the near future, I'm sure ©

lessy Chaplin, MSc. RPBio Permitting Coordinator Seabridge Gold Inc.

1235 Main Street P.O. Box 2536 Smithers, Be VOl 2NO Tel. (250) 847-4704 Cell.

From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Wednesday, November 07, 2012 11:57 AM To: ' Melanie Campbell,'; Applegate, Sherrie TRAN:EX; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin '; [email protected]; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Cc: 'Norm Ringstad' Subject: KSM Mine Development Review Committee Meeting Materials for November 8th. Importance: High

Good afternoon,

Please find meeting materials attached for tomorrow's meeting. Please see KSM MDRC Agenda for all meeting location/call in information.

1 FNR-2013-00423 Page 66

s.22

FNR-2013-00423 Page 66

For those of you joining by conference call please expect an email from myself tomorrow morning with Sea bridge's presentation.

Just a reminder that the meeting time has changed to 10:30·4:00 PST.

If you have any questions please contact myself or [email protected]

Thank you,

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

2 FNR-2013-00423 Page 67FNR-2013-00423 Page 67

Muir, Deanna CSNR:EX

, Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To:

Cc: Subject:

Attachments:

KSM Nov 8th MDRe Meeting Minutes & Next Steps

Thu 2012-11-15 12:00 AM Fri 2012-11-1612:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Thursday, November 15, 2012 3:15 PM , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; Barnewall, Rosemary C TRAN:EX;

Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX; Carmody­Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; De Beck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX;'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow

Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'June Yoo Rifkin'; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine

Morin '; Pat Lim; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine

EAO:IN 'Norm Ringstad' KSM Nov 8th MDRC Meeting Minutes & Next Steps

KSM MDRC Meeting Minutes -November 8, 2012.docx.docx; Sea bridge Gold MDRC presentation_Nov8_2012JINAL.pdf.pdf -

Good Afternoon KSM MORe,

Thank you to all that attended the KSM MORe meeting held on November 8,2012. Please find attached Seabridge Gold's Presentation and MORe Meeting Minutes (with action items captured and additional information -links, as requested).

Please review the minutes for anything that may have been missed! or other, and notify [email protected] for changes to be made.

Please note that another E-mail will be distributed shortly reguesting the following information from you:

1 FNR-2013-00423 Page 68FNR-2013-00423 Page 68

Identify how you would like to receive the authorization applications (Batch #1) from the proponent (i.e. hardcopy/ other). Please note that all applications will be posted digitally" as well" to the KSM Sharepoint Site for MORe access once submitted.

Identify if you will be actively part of the technical review of the authorization applications once submitted.. . "OR" .. . identify if you will just require project updatesl receive project information as we move through the authorization technical review/ decision process.

Please don't forget to create a BCelD so you can access to the KSM Sharepoint site.

Instructions for setting up a bceid:

Visit: https://www.bceid.ca

Click "Begin Registration"

Click "Basic BCeIO"

Click "Register without specifying an online service"

Enter your details & OK.

Provide BCelO user name to me ([email protected]). Once you have been added to the sharepoint site access list you will receive an automated notification that will include a direct link to the site.

Next Steps for the KSM MORC:

The following is a break down as to the next steps that the MORe can expect to see with regards to communications and process (as per the Concurrent Approval Regulation) once the authorization applications are submitted.

KSM MORe review process commences when:

EAO has accepted the EA Application (30 day screening) 2

FNR-2013-00423 Page 69FNR-2013-00423 Page 69

EAO has accepted Concurrent Permitting

Prior to the MORC Review Process Commencing:

Project Manager (Jen Stalker) will distribute an E-mail, notifying the MORC that Batch #1 applications have been submitted (submitted at the same time the EA application is submitted), and will post them to the KSM Sharepoint Site if agencies and First Nations (MDRC) want to view them at this time (proponent will be responsible for distributing hardcopy applicationsl other, as requested by agencies and First Nations)

As per the Concurrent Approval Regulation, the Project Manager will provide a letter to the Executive Director (Environmental Assessment Office) that the applications have! have not been filed in accordance

Environmental Assessment Office (EAO) begins a 30 day screening on the EA application (only)

MORC Review Process Commences:

If the EA Application is accepted, the Executive Director (EAO) will provide written notice to the proponent and Jen Stalker (Major Projects Office) that the EA application has been accepted. The MDRC review process begins.

This will trigger the commencement of a 75 day screening for Batch #1 authorization applications (Le. has the proponent provided all information requirements in order for the agencies and First Nations to conduct their review of the batch #1 authorizations applications?

The Project Manager (Jen Stalker) will notify the MDRC that the 75 day screening phase has commenced (via E-mail). All agencies and First Nations (MDRC technical reviewers) will be responsible for providing the Project Manager with any information requirements that are missing! deficient "within 60 days" (of the 75 day screening period) to ensure enough time for the Project Manager to compile and draft notification to the Environmental Assessment Office and the proponent as to whaU if additional information is required.

3 FNR-2013-00423 Page 70FNR-2013-00423 Page 70

A MORC meeting will be scheduled early on in this phase (screening) to allow the opportunity for the agencies and First Nations to ask questionsl gain clarificationl other to the proponent based on the applications, and next steps in the MORC review process.

Move into the technical review phase (after screening phase is complete - information requirements have been meU provided in order for the MDRe to conduct a full review on Batch #1 applications)

If you have any questions or concerns. please do not hesitate to contact me.

Jen Stalker, RPF

Project Manager

Ministry of Forests, Lands and Natural Resource Operations

Skeena Region - Smithers, Be

Phone: (250) 847-7506

Fax: (250) 847-7347

Email: [email protected]

4 FNR-2013-00423 Page 71FNR-2013-00423 Page 71

1 | P a g e

MEETING MINUTES

KSM Mine Development Review Committee MeetingNovember 8th, 2012 10:30AM - 4:00PM PSTCaribou Room, Nora Building, Smithers, BC

Attendees:Chair: Jennifer Stalker, Project Manager, Ministry of Forests Lands and Natural Resource OperationsMinutes: Genevieve Paterson, Project Coordinator, MFLNRO

Proponent:Jessy Chaplin, Permitting Coordinator, Seabridge GoldElizabeth Miller, Manager Environmental Affairs, Seabridge Gold

For full list of attendees please see KSM Mine Development Review Committee list attached.

Start time: 10:40

1. Project Description and Project Planning Update – Seabridge Gold � Action �Genevieve Paterson to send out Seabridge Project Presentation (PowerPoint) to

MDRC members and observers (attached).� PAG & ARD from the TIA, what are the potential impacts to Treaty and Teigen Creek? At

Treaty Saddle PAG rock will be moved to TMF. There will be one portal, temporary water treatment plant for MAG and PAG rock piles.

� When construction of MTT is complete and when the tunnel is in operation the PAG rock will be trucked over to the TMF, there will be no PAG left on site.

� How will estimation be done on the volume? We have existing Geo Tech data from parts ofthe tunnel we can access. This information will be in the application packages to be provided,it will include where geo technical drilling and sampling has occurred.

� What will the capacity of all the temporary treatment plants? Action: Seabridge to provide.� What is the estimate of water coming out of the tunnel? Seabridge: At this time uncertain so

we adopt a conservative approach.� Tahltan: We would like to go on record that we object to the TIA area location due to the

potential impacts to Treaty and Teigen Creek that flow into the Bell Irving River, including the impacts to salmon. We feel the settling pond is in the wrong area as acid generating rockis proposed to be in places that have never been before, the fish are not used to this.

� Norm: Suggests that the location of the TIA be raised at EA review level.� Tahltan: Non contact water into streams around the mine, what happens when they pass

thought Acid Generating Rock?� Total length of tunnels? 64 km.

Break for lunch 12:02 –return 1:052. Coordinated Authorizations Process

� Tahltan: Coordinated Authorization Process (diagram from Mines Guide) title is incorrect, does not involve First Nations.

FNR-2013-00423 Page 72FNR-2013-00423 Page 72

2 | P a g e

3. First Nations Consultation (1:20)� Jason will be consulting on site specific permits with the Nisga’a Nation, Tahltan, Skii Km

Lax Ha and Gitanyow First Nation. To be clear, there will be no other consultation forum outside of the Environmental Assessment (EA) Review and or the MDRC.

� Seabridge is not responsible for consultation, however to engage and share information. Engagement recorders will be shared with the Province.

� During the MDRC we will not re open closed issues dealt with/closed at the Environment Assessment Office (EAO).

� During the MDRC there may be impacts that will only affect one or more specific parties, all members are welcomed to tailor their attendance to future meetings accordingly

� Letters have been sent to the Nisga’a Nation, Tahltan, Skii Km Lax Ha and Gitanyow First Nation on the consultation process. If there are any questions or comments please contact [email protected].

4. Concurrent Permitting – Concurrent Approval Regulation (What does this mean for the MDRC/ EA/ KSM Project?)

� Action Item: Concurrent Approval Reg, send out to MDRC. Link: http://www.bclaws.ca/EPLibraries/bclaws_new/document/LOC/freeside/--%20e%20--/environmental%20assessment%20act%20sbc%202002%20c.%2043/05_regulations/10_371_2002.xml

� Enables the proponent to apply for their various provincial permits at the same time as theEA review.

� EAO Executive Director is to provide written notice to the proponent and the various provincial ministries of the status of application review i.e. accepted, rejected.

� MDRC will be the venue to review all provincial applications.� MDRC chair (Jennifer) will submit back to the proponent, in writing, the adequacy of the

information provided.� How is the concurrent different from synchronous? Concurrent is legislated and synchronous

is not.� Opportunity to streamline reporting? Yes, through staged reporting.� Tahltan: How is the concurrent approval distinct from the EA review? How can you make

permit applications without an Environmental Assessment Certificate? The EA review is at the strategic level and the MDRC is at the technical level, no permits will be approved prior to the approval of the EAC.

� Tahltan: Impact to wildlife through construction of access, no one pulls a bridge once aproject is done, example Galore. How will this group help to avoid this from happening again? FLRNO will be asking for reclamation security.

� NLG: No certainly that Seabridge will be able to sell this project, example Bruce Jack.� Gitanyow: Review timelines legislated? No under regulations. When the EAO ED made

approval for concurrent approval that was put into the Section 11 order? Yes. � Certified Project Description from EAO review becomes part of the project review at

permitting level. � THREAT: theoretically is the EAC gets issued; what agency is tasked with issues

management, and monitoring? The EAO is responsible for monitoring the EAC commitments. The EAO and FLRNO compliance officers do monitoring as part of the Auditor General’s program.

� Action Item: Capacity, need to discuss further to ensure we are all enabled to work on the permit review process.

FNR-2013-00423 Page 73FNR-2013-00423 Page 73

3 | P a g e

� Action Item: Genevieve to distribute Mines Guide. Link: http://www.for.gov.bc.ca/major_projects/mining/

5. MDRC Timelines, Milestones, Next Steps� 75 day Information Review� Technical Review� Recommendations� Prior to 75 days 30 day screening period? For EAO yes.� THREAT: Will First Nations get individual referrals, bundled, notice of intended decision or

though the MDRC? MDRC will be the forum both for consultation and discussions.� Proponent to submit all permit applications and applicable information to the entire MDRC.

6. MDRC Information Sharing & Authorization Application-Distribution � Genevieve proposing a Sharepoint site for the duration of the project� Most people have used Sharepoint in the past, but do not find it especially useful� Issues with data download� We can do both Sharepoint/E-mail� Government will be using the Sharepoint site-Posting all permit applications and project

management tools � Distribution of permit applications (large files ) is to be USB (sticks)� Small documents – direct E-mail� Action Item: Genevieve to send out how to obtain BCeID along with meeting minutes

package, BCeID is needed to access sharepoint site. � Action Item: Genevieve to attach table to be sent out with meeting minutes as to how people

would like to receive applications from Seabridge i.e. digital or hardcopy.� Action: MPO to send out note to MDRC of who will actually being doing the technical

review of applications and or who would like to be sent project updates.7. Next Steps/Questions Period

� Action: MPO to send out meeting minutes, all shared information from MDRC meeting and all noted items above to be included with meeting minute distribution. All information to also be posted to the KSM sharepoint site.

8. Closing Remarks� Next MDRC meeting? Within 75 day screening period.

Meeting AdjournedAdjourned at 3:00

FNR-2013-00423 Page 74FNR-2013-00423 Page 74

Muir, Deanna CSNR:EX

From: Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Tuesday, November 20,20121:06 PM Sent:

To: , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; DeBeck, Howard W FLNREX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNREX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'June Yoo Rifkin'; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin '; Pat Lim; Paterson, Genevieve FLNREX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN

Subject: REQUEST: KSM Mine Development'Review Committee Attachments: MDRC Application Distribution.xlsx

Importance: High

Good Morning KSM MDRC,

The proponent (Seabridge Gold) is expected to submit their EA application, and authorization applications

(Batch #1) in the very near future. As indicated in my previous E-mail (and as per the Concurrent Approval

Regulation), the KSM MDRC review process commences when:

• EAO has accepted the EA Application (30 day screening)

• EAO has accepted Concurrent Permitting

In preparation, please take one moment of your time to provide us with the following input to ensure you receive the materials/ documents and communications you require throughout the KSM MDRC application

review process.

1} Authorization Application Distribution - please indicate (by filling in the attachment above) how you

would like to receive the authorization applications from the proponent (Seabridge Gold) for review. For any changes (additions to the distribution) please email [email protected].

Please note that the proponent will be providing all authorization applications to the Major Projects Office digitally, where they will be posted to the KSM Sharepoint for your access/ review as well

2} KSM MDRC Communications! Requirements - please indicate one of the following:

a} I will be an actual technical reviewer throughout the KSM MORC application review process,

and will be providing comments based on my review of the applications submitted b} I will not be technically reviewing the applications that are submitted; however, I would like

to receive regular project updates and project information as we move through the MORe

review process c} Please take me off the KSM MORC distribution list (I will not be technically reviewing the

applications submitted during this phase, and do not wish to receive project updates)

d} Other (please indicate)

1 FNR-2013-00423 Page 75FNR-2013-00423 Page 75

Thank you.

J en Stalker, RPF Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeen. Region - Smithers, Be Phone: (250) 847-7506 Fax: (250) 847-7347 Em.il: [email protected]

2 FNR-2013-00423 Page 76FNR-2013-00423 Page 76

KSM direct correspondence

Appliaction: Electronic/ Hardcopy/ Both

Spatial: ShapefileYes or No

Name

To Al Hoffman CC Diane Howe

CC Kim Bellefontaine

CC Tanya Demchuck

CC Heather Narynski

CC George Warnock

CC Kathie Wagar

To Mark LoveCC Ian Sharpe

CC Jeanien Carmody-Fallows CC Scott JacksonCC Craig Stewart

CC Regan Fielding

CC Patrick Williston

To Jennifer Stalker

To Chris Schell

To Cam Bentley

To Emily Bulmer

Ministry of Forests, Land

Ministr

Ministry of Ener

FNR-2013-00423 Page 77FNR-2013-00423 Page 77

To Eric Forgeng

To Will Foster

To Ron Donnelly

To Matt SakalsTo Howard Debeck

To Sherrie Applegate

To Rosemary Barnewall

To Tara Marsden

To Tracey McKay

To Mansell Griffin

To Chief Darlene Simpson

Ministry of Trans

Sk

N

FNR-2013-00423 Page 78FNR-2013-00423 Page 78

To Nalane Morin

To Garett Cooper

To June Yoo Rifkin

To Jessica CoulsonTo Melanie Campbell

ToJohn Mackie

To Pat Lim

ToKyle Moselle

ToAndrew Webber

ToShane Wadden

CCAzreer Gill

No

Envir

Canadian Environ

Natura

Regional Dis

Alaska Departm

Department

Tra

FNR-2013-00423 Page 79FNR-2013-00423 Page 79

Title Contact email address Phone Number

Chief Inspector of Mines [email protected] 250-952-0494Deputy Chief Inspector [email protected] 250-952-0183Sr. Environmental Geoscientist [email protected] 250-952-0489Sr. Environmental Geoolgist [email protected] 250-952-0417

Geotechnical Inspector [email protected] 250-387-0883

Geotechnical Engineering Manager George,[email protected] 250-565-4327

Director -Northwest Regional Mines Office [email protected] 250-847-7653

Head of Environmental Managment [email protected] 250-847-7272Regional Manager [email protected] 250-847-7251Environmental Protection Officer [email protected] 250-847-7273Regional Hydrologist [email protected] 250-847-7507Compliance Specialist [email protected] 250-847-7416Environmental Protection Officer [email protected] 250-847-7353Impact Assessment Biologist [email protected] 250-847-7454

Project Manager [email protected] 250-847 -506

Sr. Ecosystems Biologist [email protected] 250 847-7389

Land Tenures Specialist [email protected] 250-847-7388Water Stewardship Officer Emily,[email protected] 250-847-7350

ds and Natural Resource Operations

ry of Environment

rgy, Mines and Natural Gas

FNR-2013-00423 Page 80FNR-2013-00423 Page 80

Heritage Resource Specialist [email protected] 250-953-3362

Resource Tenure Specialist [email protected] 250-847-6309Tenures Forester/Engineering Specialist [email protected] 250-847-6378Research Geomorphologist [email protected] 250-847-6322Field Engineer [email protected] 250-847-6397

Senior Development Approvals [email protected] 250-847-7396

District Program Manager [email protected] 250-847-7404

Gitanyow Huwilp Lax'yip Implementation Coordinator

[email protected] 250- 849-5373

Lands Manager [email protected] 250-633-3000

Lands Manager [email protected] 250-633-3000

Chief 250-842-5651

sportation and Infastructure

Tahltan

kii km Lax Ha

isga'a Nation

Gitanyow

FNR-2013-00423 Page 81

s.22

FNR-2013-00423 Page 81

Chair 778- 834-6292

Project Manager [email protected]

Sr.Air Quality Planner [email protected]

Team Leader [email protected] Senior Policy Analyst [email protected]

Major Projects Management Officer

[email protected]

Environmental Analyst [email protected]

Southest Large Project Coordinator

[email protected]

Manager Planning and Economic Development

[email protected]

Public Health Protection [email protected]

Environmental Health Officer

[email protected]

orthern Health

ronment Canada

nmental Assessment Agency

l Resouces Canada

strict of Kitimat-Stikine

ment of Natural Resource

of Fisheries and Oceans

nsport Canada

FNR-2013-00423 Page 82

s.22

FNR-2013-00423 Page 82

Contact Address

Chief Inspectors Office6th Floor 1810 BlanshardVictoria, BC V8W 9N3Same as above

Same as above

Same as above

Same as aboveSuite 350 - 1011 4th AvenuePrince George, BC V2L 3H93726 Alfred AvenueSmithers BC V0J 2N0

Same as aboveSame as above

Same as aboveSame as aboveSame as above

Same as above

Same as above

Same as above

Same as above

Same as above

Same as above

FNR-2013-00423 Page 83FNR-2013-00423 Page 83

#3 - 1250 Quadra StreetPO BOX 9816 STN PROV GOVTVictoria BC V8W 2K73333 Tatlow RoadSmithers BCV0J 2N0

Same as above

Same as aboveSame as above

3726 Alfred Avenue Smithers, BC V0J 2N0

Same as above

Gitanyow Hereditary ChiefsPO Box 148Kitwanga, BC V0J 2A0

PO Box 321, 2000 Lisims GovernmentNew Aiyansh, BC V0J 1A0

Same as above

Chief Darlene SimpsonSkii km Lax HaBox 17Hazelton, BC V0J 1Y0

Please phone for pick up: 250-842-5651

FNR-2013-00423 Page 84FNR-2013-00423 Page 84

Tahltan Central CouncilPO Box 69Dease Lake, BC V0C 1L0

I

I

FNR-2013-00423 Page 85FNR-2013-00423 Page 85

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc: Subject: Attachments:

Hi Jen,

FW: Crown Land Application - Acceptance Letter (file# 6408448)

Mon 2012-12-0312:00 AM Tue 2012-12-0412:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [[email protected] Monday, December 3, 2012 4:43 PM Stalker, Jennifer L FLNR:EX [email protected]; Paterson, Genevieve FLNR:EX FW: Crown Land Application - Acceptance Letter (file# 6408448) 6408448 ACCPT LTR.pdf

I received this letter today, and noticed tnat you and/or Gen weren't copied on it.

There is no mention of a coordinated review by Major Projects, MDRC being the venue for First Nations consultation or of any advertising requirements.

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

From: Chermesnok, Jennifer A FLNR:EX [mailto:[email protected]] Sent: Monday, December 03, ·2012 12: 15 PM To: '[email protected]' Subject: Crown Land Application - Acceptance Letter (file# 6408448)

1 FNR-2013-00423 Page 86

s.22

FNR-2013-00423 Page 86

Good Morning

Attached is your acceptance letter and advertising requirements on behalf of FrontCounter BC.

Please direct all of your questions I comments to Cam Bentley at 250-847-7388 or [email protected].

Thank You

Jennifer Chermesnok

a/Senior Natural Resource Specialist FrontCounter BC, Smithers Ministry of Forests, Lands and Natural Resource Operations Ph: 250-847-7348 Fax: 250-847-7556

[email protected]

P Please consider the environment before printing this email.

Your personal information may be used for reporting, referral, or survey purposes.

How Did We Do? We'd appreciate your input.

Clients of FrontCounter BC are invited to take our customer satisfaction survey.

2 FNR-2013-00423 Page 87FNR-2013-00423 Page 87

FrontCounter BC Mailing Address:Bag 50001st Floor - 3726 Alfred AvenueSmithers BC V0J 2N0

Phone: (250) 847-7356Fax: (250) 847-7556Toll Free: 1-877-855-3222Website: www.frontcounterbc.gov.bc

File/Encounter: 6408448

Date: December 3, 2012

SEABRIDGE GOLDBOX 2536 1235 MAIN STREETSMITHERS, BC V0J 2N0

[email protected]

Dear Ms. Chaplin:

Re: Application for a Statutory Right-of-Way Crown Land Tenure in the Cassiar LandDistrict

Thank you for your Crown land application for Utility – Tunnel purposes in the vicinity of Treaty Creek, and lying between Unuk River and Bell-Irving River, in northern BC.

FrontCounter BC (FCBC) has accepted your application on behalf of the Ministry of Forests, Lands and Natural Resource Operations (MFLNRO). Your application has been assigned to Cam Bentley who will review your proposal and make a recommendation to approve or disallow the application.

This letter does not imply tenure will be offered nor does it give you any authorization to occupy or use the Crown land under application.

During the application review, your application will be referred for comment to:� First Nations;� other government agencies having statutory responsibilities related to your

application;� local governments; and� the general public.

The application review requires the Province to undertake legally required consultation withthose First Nations which have aboriginal interests in the area of your application. In order to meet the Province’s legal obligations to First Nations, it is important to ensure an appropriate level of consultation is completed. In addition, some applications may require further study (e.g. archaeological assessments or review by other authorities such as the Environmental Assessment Office). The length of time required to complete an application review will vary and depends on: the complexity of the application; the potential for social and environmental impacts; and, the effect the proposal may have on aboriginal interests.

FNR-2013-00423 Page 88FNR-2013-00423 Page 88

This will provide you with certainty that the decision on your application is made in a manner that respects aboriginal interests, minimizes negative impacts on the environment and is in the best interests of the Province.

Based on the comments received from First Nation consultations, agency and stakeholder referrals and MFLNRO's technical review of the application you may be required to provide additional information in a form acceptable to MFLNRO. You may be contacted byMFLNRO to discuss the possibility of arranging a meeting between yourself, First Nations and MFLNRO. The intent of such a meeting would be to share your vision for the use of Crown land and to answer questions from the First Nation related to their use of the land.

If you require any further information or clarification, please contact Cam Bentley at 250-847-7388 or email to [email protected], quoting the above noted file number.

Sincerely,

Jennifer Chermesnoka/Senior Natural Resource SpecialistFrontCounter BCMinistry of Forests, Lands and Natural Resource Operations

Enclosure

FNR-2013-00423 Page 89FNR-2013-00423 Page 89

APPLYING FOR CROWN LAND – APPLICATION PROCESS FLOWCHART

Application Preparation and Submission� Complete Application Form � Complete Mapping Requirements� Prepare Program Specific Requirements (such as Development Plan,

Management Plan, Inventory List, etc.)� Submit Application Package to Regional FrontCounter BC office

(include application fees)

Application Received� Reviewed for completeness � Reviewed for prerequisites (such as

citizenship, 19 years of age)

Incomplete: Returned and changes requested

Review Process andFirst Nation Consultation

Complete Application Accepted� Notification sent to applicant� Application to Ministry of

Forests, Lands and Natural Resource Operations

Decision Process� Fair, transparent, consistent� Review relevant information� Target Time – 60 days

Concerns IdentifiedFurther information or

discussion required

Application AllowedOffer of Tenure made to applicant, specifying

terms and conditions of approval

Application DisallowedReasons clearly documentedNotification sent to applicant

Applicant Requirements� Advertising � Additional items if requested (such as

appraisal report, survey, upland owner consent)

Review Process Complete

Government Requirements� Referrals to Local, Provincial and

Federal Agencies � Policies, Procedures, Objectives� First Nation Consultation� Land use management plans, First

Nation agreements

FNR-2013-00423 Page 90FNR-2013-00423 Page 90

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Subject: Attachments:

Hi Jessy,

Distribution List

Thu 2012-12-06 12:00 AM Fri 2012-12-0712:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Paterson, Genevieve FLNR:EX Thursday, December 6, 2012 11:51 AM 'Jessy Chaplin' Distribution List MDRC Application Distribution.xlsx

Attached is the application distribution list for MORC members, still waiting to hear from a few people, will update when I hear back. Hopefully you find it useful.

Any chance of getting those comments on the permit list? If this template/list I developed doesn't work please feel free to nix it I only created it as I found discrepancies between the original list from the Concurrent Permitting Strategy and the Master List which made it difficult to determine how many permit were going to be required.

Talk to you soon,

Genevieve Paterson

Project Coordinator

Ministry of Forests, Lands and Natural Resource Operations

Major Projects Office, Skeena Region

250-847-7268

1 FNR-2013-00423 Page 91FNR-2013-00423 Page 91

KSM direct correspondence

Appliaction: Electronic/ Hardcopy/ Both

Spatial: ShapefileYes or No

Name

To Al Hoffman CC Diane Howe

CC Kim Bellefontaine

CC Tanya Demchuck

CC Heather Narynski

CC George Warnock

CC Kathie Wagar

To Mark LoveCC Ian Sharpe

CC Jeanien Carmody-Fallows CC Scott JacksonCC Craig Stewart

CC Regan Fielding

CC Patrick Williston

To Jennifer Stalker

To Chris Schell

To Cam Bentley

To Emily Bulmer

Ministry of Forests, Land

Ministr

Ministry of Ener

FNR-2013-00423 Page 92FNR-2013-00423 Page 92

To Eric Forgeng

To Will Foster

To Ron Donnelly

To Matt SakalsTo Howard Debeck

To Sherrie Applegate

To Rosemary Barnewall

To Tara Marsden

To Tracey McKay

To Mansell Griffin

To Chief Darlene Simpson

Ministry of Trans

Sk

N

FNR-2013-00423 Page 93FNR-2013-00423 Page 93

To Nalane Morin

To Garett Cooper

To June Yoo Rifkin

To Jessica CoulsonTo Melanie Campbell

ToJohn Mackie

To Pat Lim

ToKyle Moselle

ToAndrew Webber

ToShane Wadden

CCAzreer Gill

No

Envir

Canadian Environ

Natura

Regional Dis

Alaska Departm

Department

Tra

FNR-2013-00423 Page 94FNR-2013-00423 Page 94

Title Contact email address Phone Number

Chief Inspector of Mines [email protected] 250-952-0494Deputy Chief Inspector [email protected] 250-952-0183Sr. Environmental Geoscientist [email protected] 250-952-0489Sr. Environmental Geoolgist [email protected] 250-952-0417

Geotechnical Inspector [email protected] 250-387-0883

Geotechnical Engineering Manager George,[email protected] 250-565-4327

Director -Northwest Regional Mines Office [email protected] 250-847-7653

Head of Environmental Managment [email protected] 250-847-7272Regional Manager [email protected] 250-847-7251Environmental Protection Officer [email protected] 250-847-7273Regional Hydrologist [email protected] 250-847-7507Compliance Specialist [email protected] 250-847-7416Environmental Protection Officer [email protected] 250-847-7353Impact Assessment Biologist [email protected] 250-847-7454

Project Manager [email protected] 250-847 -506

Sr. Ecosystems Biologist [email protected] 250 847-7389

Land Tenures Specialist [email protected] 250-847-7388Water Stewardship Officer Emily,[email protected] 250-847-7350

ds and Natural Resource Operations

ry of Environment

rgy, Mines and Natural Gas

FNR-2013-00423 Page 95FNR-2013-00423 Page 95

Heritage Resource Specialist [email protected] 250-953-3362

Resource Tenure Specialist [email protected] 250-847-6309Tenures Forester/Engineering Specialist [email protected] 250-847-6378Research Geomorphologist [email protected] 250-847-6322Field Engineer [email protected] 250-847-6397

Senior Development Approvals [email protected] 250-847-7396

District Program Manager [email protected] 250-847-7404

Gitanyow Huwilp Lax'yip Implementation Coordinator

[email protected] 250- 849-5373

Lands Manager [email protected] 250-633-3000

Lands Manager [email protected] 250-633-3000

Chief 250-842-5651

sportation and Infastructure

Tahltan

kii km Lax Ha

isga'a Nation

Gitanyow

FNR-2013-00423 Page 96

s.22

FNR-2013-00423 Page 96

Chair 778- 834-6292

Project Manager [email protected]

Sr.Air Quality Planner [email protected]

Team Leader [email protected] Senior Policy Analyst [email protected]

Major Projects Management Officer

[email protected]

Environmental Analyst [email protected]

Southest Large Project Coordinator

[email protected]

Manager Planning and Economic Development

[email protected]

Public Health Protection [email protected]

Environmental Health Officer

[email protected]

orthern Health

ronment Canada

nmental Assessment Agency

l Resouces Canada

strict of Kitimat-Stikine

ment of Natural Resource

of Fisheries and Oceans

nsport Canada

FNR-2013-00423 Page 97

s.22

FNR-2013-00423 Page 97

Contact Address

Chief Inspectors Office6th Floor 1810 BlanshardVictoria, BC V8W 9N3Same as above

Same as above

Same as above

Same as aboveSuite 350 - 1011 4th AvenuePrince George, BC V2L 3H93726 Alfred AvenueSmithers BC V0J 2N0

Same as aboveSame as above

Same as aboveSame as aboveSame as above

Same as above

Same as above

Same as above

Same as above

Same as above

Same as above

FNR-2013-00423 Page 98FNR-2013-00423 Page 98

#3 - 1250 Quadra StreetPO BOX 9816 STN PROV GOVTVictoria BC V8W 2K73333 Tatlow RoadSmithers BCV0J 2N0

Same as above

Same as aboveSame as above

3726 Alfred Avenue Smithers, BC V0J 2N0

Same as above

Gitanyow Hereditary ChiefsPO Box 148Kitwanga, BC V0J 2A0

PO Box 321, 2000 Lisims GovernmentNew Aiyansh, BC V0J 1A0

Same as above

Chief Darlene SimpsonSkii km Lax HaBox 17Hazelton, BC V0J 1Y0

Please phone for pick up: 250-842-5651

FNR-2013-00423 Page 99FNR-2013-00423 Page 99

Tahltan Central CouncilPO Box 69Dease Lake, BC V0C 1L0

I

I

FNR-2013-00423 Page 100FNR-2013-00423 Page 100

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc: Subject:

Hi Gen,

RE: KSM - Update .

Fri 2012-12-1412:00 AM Sat 2012-12-1512:00 AM Free'

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin Uessy@seabridgegold,netj Friday, December 14, 2012 9:52 AM Paterson, Genevieve FlNR:EX Pope, Jason FLNR:EX; Herbert, Brian FLNR:EX RE : KSM - Update

Just wondering on the MORC update email Jen refers to in the attached email will be released?

Also, is there a First Nations letter for us?

We have been receiving questions from MORC reviewers asking when the EA Application was to be submitted, I had told Jen this information the week of November 16th

, do you know if she informed the MORC?

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

p,o, Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

1 FNR-2013-00423 Page 101

s.22

FNR-2013-00423 Page 101

From: Stalker, Jennifer L FLNR:EX [mailto:[email protected]] Sent: Monday, December 10, 2012 4:55 PM To: 'Jessy Chaplin' Cc: Cuell, James W FLNR:EX; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; Herbert, Brian FLNR:EX Subject: KSM - Update

Hi Jessy,

Tried giving you a shout this afternoon - sounds like you are busy, busy ...

A couple of things I wanted to touch base with you on:

First Nations letter Uoint letter from EAO and MPO)

o I had left a message with Chris Hamilton last. week (and will follow up again before Thursday). The letter is with EAO at this time. I have let Chris know and hoping to be able to finalize the letter and sign off The alternative would be that James Cuell sign

List of Authorizations distribution (Le. hardcopies .. )

o You should have received the distribution list from Genevieve. There are a couple of agencies left outstanding, of which Genevieve has committed to following up on and getting that information to you as soon as she receives it. .

Permit List

o Would like to follow up with yourself and Genevieve on this piece, to provide an update as to where we're at. We want to ensure that we have a complete list of authorizations (and their requirements) that we all agree on, of which will be coming in as Batch #1 (through concurrent permitting). We want to be able to line up! prepare in advance; FCBC, the agencies and First Nations (confirmation as to what they can be expecting to come in at the end of February 2013, should the EA application be accepted at that time).

2 FNR-2013-00423 Page 102

s.22

s.22

s.22 s.22

s.22

FNR-2013-00423 Page 102

Licence of Occupation (MTT)

o FCBC has sent an acceptance letter to Seabridge (as per your E-mail to myself, on December 3, 2012). The acceptance letter that you received is the standard letter that FCBC uses to indicate that the application has been accepted into the system. It is acknowledged through Major Projects that the Licence of Occupation for the MTT will be part of the Batch #1 authorizations, and First Nations Consultation will occur through the MDRC on this application.

I am aiming to get out a project update to the MDRC indicating that the EA Application is expected to be submitted to the EA late January 2013, and an amendment to Section 13 (through the EAO) now indicates that authorizations will be submitted once the EA Application is "accepted", of which we can expect applications to be submitted late February (if the EA application is accepted within the 30 day screening). However, I would like to see a copy of the approved amendment from the EAO before that update goes out to the MDRC.

If you have any questions or concerns, please don't hesitate to give me a call After that date, please contact James Cuell

and/ or Genevieve Paterson.

Thank you Jessy.

Jen Stalker, RPF

Project Manager

Ministry of Forests, Lands and Natural Resource Operations

Skeena Region - Smithers, BC

Phone: (250) 847-7506

Fax: (250) 847-7347

Email: [email protected]

3 FNR-2013-00423 Page 103

s.22

s.22

s.22

FNR-2013-00423 Page 103

Muir, Deanna CSNR:EX

From: Sent: To:

Subject:

Paterson, Genevieve FLNR:EX Wednesday, December 19,201211:48 AM , Melanie Campbell.' ; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'June Yoo Rifkin'; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin '; Pat Lim; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston , Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN KSM Mine Development Review Committee - Project Update

Good Afternoon Mine Development Review Committee Members,

Further to our first Mine Development Review Committee Meeting (November 8th, 2012), our office is now aware that

Sea bridge Gold will submit their Concurrent Permit Application at the time that the Environrnental Assessment Office accepts their Environmental Assessment Application for review. We expect this to be sometime towards the end of January 2013,

Seabridge Gold's Environmental Assessment Section 11 Order has been amended to allow this change, please refer to the EAO Project Information Centre (e-PIC) for details: http://alOO.gov.bc.ca! appsdata!epic!documents!p322!1355867414094 403085485d2355ebc47b4a530807b6847a8b3 87286b034bfOe51b6da2cbc8c74.pdf

I look forward to working with you all in the New Year.

Happy Holidays,

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

1 FNR-2013-00423 Page 104FNR-2013-00423 Page 104

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: . Sent:

To:

Cc:

Subject:

Hi Gen,

RE: KSM Mine Development Review Committee - Project Update

Wed 2012-12-1912:00 AM Thu 2012-12-20 12:00 AM Free·

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [[email protected] Wednesday, December 19, 2012 12:12 PM

Paterson, Genevieve FLNR:EX [email protected]: Cue II, James W FLNR:EX; Stalker, Jennifer L FLNR:EX; Brent

Murphy RE: KSM Mine Development Review Committee - Project Update

I said very clearly on the phone yesterday "January". Not We expect this to be sometime towards the end of January 2013.

In future, please do not take liberties with statements that Seabridge has provided.

I'don't expect you to make changes to this message as I appreciate your efforts. I appreciate and I am grateful that you understand the importance of communicating with the MORC and keeping the MORC members informed,

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P,O, Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

1 FNR-2013-00423 Page 105FNR-2013-00423 Page 105

Cell.

From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Wednesday, December 19, 2012 11:48 AM To: ' Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barriewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin ; 'John Mackie '; 'June Yoo Rifkin'; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin '; Pat Lim; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt' ; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, lanD ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Subject: KSM Mine Development Review Committee - Project Update

Good Afternoon Mine Development Review Committee Members,

Further to our first Mine Development Review Committee Meeting (November -8th, 2012), our office is

now aware that Seabridge Gold will submit their Concurrent Permit Application at the time that the Environmental Assessment Office accepts their Environmental Assessment Application for review. We expect this to be sometime towards the end of January 2013.

Seabridge Gold's Environmental Assessment Section 11 Order has been amended to allow this change, please refer to the EAO Project Information Centre (e-PIC) for details : , http://a100.gov.bc.ca/appsdata/epic/documents/p322/1355867 414094 403085485d2355ebc47b4a53 0807b6847a8b387286b034bfOe51b6da2cbc8c74.pdf

I look forward to working with you all in the New Year.

Happy Holidays,

Genevieve Paterson

Project Coordinator 2

FNR-2013-00423 Page 106

s.22

FNR-2013-00423 Page 106

Ministry of Forests, Lands and Natural Resource Operations

Major Projects Office, Skeena Region

250-847-7268

3 FNR-2013-00423 Page 107FNR-2013-00423 Page 107

Muir, Deanna CSNR:EX

From: Sent: To:

Paterson, Genevieve FLNR:EX Monday, January?, 201311:25AM 'Jessy Chaplin'

Subject: RE: KSM-Permits

Yes, lucky for us there is a room available.

See you then,

Gen

From: Jessy Chaplin [mallto:[email protected]] Sent: Monday, January 7, 2013 10:07 AM To: Paterson, Genevieve FLNR:EX Subject: RE: KSM-Permits

Hi Gen, Can I come over there? I'll bring my computer ©

-----Original Appointment-----From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Wednesday, January 02,2013 11:50 AM To: Paterson, Genevieve FLNR:EX; 'Jessy Chaplin' Subject: KSM-Permits When: Monday, January 07,2013 1:00 PM-2:30 PM (UTC-08:00) Pacific Time (US & Canada). Where: Sea bridge Office

When: Monday, January 7, 2013 1:00 PM-2:30 PM (GMT-08:00) Pacific Time (US & Canada). Where: Sea bridge Office

Note: The GMT offset above does not reflect daylight saving time adjustments.

Hi Jessy,

looking forward to working with you on thisl

• The list of bundled authorization applications to be applied for;

• Application requirements for the authorization applications to be bundled;

1 FNR-2013-00423 Page 108FNR-2013-00423 Page 108

Muir, Deanna CSNR:EX

From: Sent: To: Cc: Subject: Attachments:

Good morning Jessy,

Paterson, Genevieve FLNR:EX Tuesday, January 8,201310:52 AM 'Jessy Chaplin' Cuell, James W FLNR:EX KSM - Consultation Obligations - Draft KSM Consultation DRAFT.docx

Attached for your review and input is the letter you requested from James on the First Nations consultation obligations for KSM.

Thanks for coming in yesterday, I will have the revised version of the permit list for your review by the end of the week.

Talk to you soon,

Ci~ p~j.C">v

Project Coordinator Ministrv of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

1 FNR-2013-00423 Page 109FNR-2013-00423 Page 109

Ministry of Forests, Lands and Natural Resource Operations

Skeena Region

Mailing Address: Bag 5000 3726 Alfred Avenue Smithers BC V0J 2N0

Location Address: 3726 Alfred Avenue Smithers BC Telephone: 250 847-7260 Facsimile: 250 847-7347

January 8, 2013 Jessy Chaplin Permitting Coordinator, KSM Project 123 Main Street, P.O. Box 2536 Smithers, BC V0J 2N0 Via e-mail: [email protected] Dear Jessy, As requested, this letter is to clarify for Seabridge Gold Inc. (Seabridge), your First Nations Engagement obligations on the permit applications for the proposed KSM Mine Project (Project). The duty to consult with First Nations on the KSM Project remains wholly with the province. With respect to your proposed application under the Environmental Assessment Act, the Environmental Assessment Office has provided direction on First Nations engagement. For the purposes of coordinating the review of permit applications for the Project, the Province has convened the KSM Mine Development Review Committee (MDRC). The Province has invited potentially affected First Nations and the Nisga’a Nation to be members of this MDRC. These First Nations include:

� Gitanyow Hereditary Chiefs Office � Nisga’a Nation � Tahltan Nation � Skii km Lax Ha

The First Nations membership may be modified over time, depending on the outcomes of KSM’s environmental assessment and which issues flow from the EA to the MDRC. The Province requests that Seabridge support this engagement with First Nations and the Nisga’a Nation in the MDRC process by undertaking the following:

- Attending MDRC meetings and providing project related information; - Meeting with the identified First Nations, outside of the MDRC meetings, possibly

with the Province, to describe how specific aspects of the project may affect the interests of First Nations and the Nisga’a Nation;

- Consider ways to avoid or mitigate impacts or concerns respecting aboriginal or treaty interests brought forward by the Nisga’a Nation or First Nation; and

FNR-2013-00423 Page 110FNR-2013-00423 Page 110

- Document engagement including details where project modifications are made to address aboriginal and treaty interests and provide this record to the Province to assist in its decision making.

This engagement is not intended to duplicate the engagement currently underway in support of the Environmental Assessment process. Jennifer Stalker is the Chair of the KSM MDRC and Jason Pope is the Consultation Coordinator. Please contact either one if you have any questions. We look forward to working with Seabridge on your KSM Project. Yours truly, James Cuell Director, Skeena Major Projects Office Ministry of Forests, Lands and Natural Resource Operations cc: Tara Marsden, Implementation Coordinator, Gitanyow Hereditary Chiefs Office Frederic Tolmie, Chief Executive Officer, Nisga’a Nation Nalaine Morin, THREAT Chair, Tahltan Nation Darlene Simpson, Chief, Skii km Lax Ha Jen Stalker, Project Manager, Major Projects Office, MFLNRO Jason Pope, Consultation Coordinator, Sr. Advisor, MFLNRO Chris Hamilton, Executive Project Director, EAO

FNR-2013-00423 Page 111FNR-2013-00423 Page 111

Muir, Deanna CSNR:EX

Subject:

Start: End:

Recurrence:

Organizer:

From: Sent: To: Subject:

Thanks Jessy,

KSM Sharepoint & First Nation Consultation Draft Letter

Tue 2013·01·1511:00 AM Tue2013·01·1511:30AM

(none)

Paterson, Genevieve FLNR:EX

Paterson, Genevieve FLNR:EX Tuesday, January 15, 2013 11:31 AM 'Jessy Chaplin' KSM Sharepoint & First Nation Consultation Draft letter

I figured out a better method of access for the committee and Seabridge as creating a BCelO just seems to be inconvenient.

I've created a generic username and password.

Here you go: https://spc-flnr.gov.bc.ca/ksm/SitePages/Home.aspx

Usernam~:

Password:

Do you have any comments or updates on the draft letter I sent last week?

Talk to you soon,

Genevieve Paterson

1 FNR-2013-00423 Page 112

s.15, s.17

FNR-2013-00423 Page 112

Project Coordinator

Ministry of Forests, Lands and Natural Resource Operations

Major Projects Office, Skeena Region

250-847-7268

From: Jessy Chaplin [mailto:jessy@seabridgegold,net] Sent: Friday, January 11, 2013 2:41 PM To: Paterson, Genevieve FLNR:EX Cc: elizabeth@seabridgegold ,net Subject: KSM mine - bceid for KMS permitting MORC sharepoint

Hi Gen,

Here's the BCeid.

is my username

Thanks

Jessy

KSM SharePoint Site

The KSM Sharepoint site will be the venue for information sharing between Provincial permitting agencies and the MORC.

https:/Ispc-flnr.gov.bc.ca/ksm/SitePages/Home.aspx

External clients require a BCelO account to access SharePoint to create a BCelO please select this link: https:/Iwww.bceid .ca/

Instructions for setting up a basic bceid:

2 FNR-2013-00423 Page 113

s.15, s.17

s.15, s.17

FNR-2013-00423 Page 113

• Visit: https://www.bceid.ca

Click "Begin Registration"

Click "Basic BCeID"

Click "Register without specifying an online service"

Enter your details & OK.

Provide BCelD user name to [email protected] once you have been added to the sharepoint site access list you will receive an automated notification.

Thank You! I look forward to working with you all on this project.

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

3

\

FNR-2013-00423 Page 114

s.22

FNR-2013-00423 Page 114

Muir. Deanna CSNR:EX

Subject: RE: KSM Sharepoint & First Nation Consultation Draft Letter

Start: End:

Recurrence:

Organizer:

Thu 2013-01-17 9:00 AM Thu 2013-01-17 9:30 AM

(none)

Paterson, Genevieve FLNREX

From: Sent: To:

Jessy Chaplin [email protected] Thursday, January 17,2013 9:54 AM Paterson, Genevieve F~NR:EX

Subject: RE: KSM Sharepoint & First Nation Consultation Draft Letter

HiGen, I do have comments, not many and can hopefully get them to you next week. Thanks Jessy

-----Original Message-----From: Paterson, Genevieve FLNR:EX [mailto:[email protected] Sent: Tuesday, January 15, 2013 11 :31 AM To: 'Jessy Chaplin' Subject: KSM Sharepoint & First Nation Consultation Draft Letter

Thanks Jessy,

I figured out a better method of access for the committee and Seabridge as creating a BCelD just seems to be inconvenient.

I've created a generic username and password.

Here you go: https:/Ispc-flnr.gov.bc.ca/ksm/SitePages/Home.aspx

Username:Password:

Do you have any comments or updates on the draft letter I sent last week?

Talk to you soon,

Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations<http://www.gov.bc.ca/for/> Major Projects Office<http://www.for.gov.bc.ca/major projects/>, Skeena Region 250-847-7268

From: Jessy Chaplin [mailto:[email protected] Sent: Friday, January 11, 2013 2:41 PM To: Paterson, Genevieve FLNREX Cc: [email protected]

1 FNR-2013-00423 Page 115

s.15, s.17

FNR-2013-00423 Page 115

Subject: KSM mine - bceid for KMS permitting MORC sharepoint

Hi Gen,

Here's the BCeid. s my username

Thanks Jessy

KSM SharePoint Site The KSM Sharepoint site will be the venue for information sharing between Provincial permitting agencies and the MORC.

https:!lspc-flnr.gov.bc.calksm/SitePages/Home.aspx

External clients require a BCelO account to access SharePoint to create a BCelO please select this link: https:!lwww.bceid.ca/

Instructions for setting up a basic bceid:

* Visit: https:!lwww.bceid.ca * Click "Begin Registration" * Click "Basic BCeIO" * Click "Register without specifying an online service" * Enter your details & OK. * Provide BCelO user name to [email protected]<mailto:[email protected]> once you have been added to the sharepoint site access list you will receive an automated notification.

Thank You! I look forward to working with you all on this project.

Jessy Chaplin, MSc. RPBio Permitting Coordinator Seabridge Gold Inc. 1235 Main Street P.O. Box 2536 Smithers, BC VOJ 2NO Tel. (250) 847-4704 Cell.

2 FNR-2013-00423 Page 116

s.15, s.17

s.15, s.17

s.22

FNR-2013-00423 Page 116

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc: Subject: Attachments:

Hi Jen,

RE: KSM - MDRe Update (permit list! information requirements for Batch 1)

Wed 2013-02-13 12:00 AM Thu 2013-02-1412:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [jessy@seabridgegold .netj Wednesday, February 13, 2013 1:41 PM Stalker, Jennifer L FLNR:EX [email protected]; Rolf Schmitt; Paterson, Genevieve FLNR:EX RE: KSM - MDRC Update (permit list! information requirements for Batch 1) Feb 5 2013 - Govt KSM Permitting & Information Requirements Batch 1 .docx

Genevieve and I went over a draft in January, with a couple more changes, I think we are getting close to getting it right.

It is difficult to separate project components in last section, I left it with a list of activities in the left column and then applicable acts and regulations in the other rows. I see confusion ahead as we have an area called Mine Site which refers to the western part of the KSM Project which contains the deposits and rock storage facilities. I wasn't sure if when you were referring to the 'Mine Site' if you meant the whole Project, or not. So I made it clear where activities were within the Mine Site or PTMA (Processing and Tailing Management Area).

As you are aware, we received a time extension on the concurrent permit applications from the EAO. While the letter from the EAO states permit applications must be submitted within 7 days after the KSM EA-EIS is accepted for review, Chris H. clarified that the process is a little less simple than that. Seabridge must submit the permit applications to your office (MPO-FLNRO), they have to be accepted for review by the agencies reviewing them and the Project Manager has to confirm in writing that each application was accepted (for review) back to the EAO (with email backup). Seabridge is to be copied on the email from the MPO to the EAO.

1 FNR-2013-00423 Page 117

s.22

FNR-2013-00423 Page 117

If it is possible to talk timing, I think it would be helpful. Could you give me a call this week?Thurs or Fri this week would be good

if we can make a quick call or 1 hr meeting happen.

Regards,

Jessy Chaplin, MSc. RPBio .

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

From: Stalker, Jennifer L FLNR:EX [mailto:[email protected]] Sent: Tuesday, February 05, 20139:02 AM To: 'Jessy Chaplin' Subject: KSM - MORC Update (permit list! information requirements for Batch 1)

Jessy,

Please find attached the list of permits and information requirements for Batch 1 (KSM project) that Genevieve has provided me based on working with Seabridge and the agencies.

I will be sending out an update to the KSM MORC, where I want to include (attach) the permit! information requirements list, the ToR, and an updated timeline (permitting).

Please review the attached list of permits for Batch 1 (attached) and notify me of any discrepancies from your end before I send it out.

2 FNR-2013-00423 Page 118

s.22

s.22

s.22

FNR-2013-00423 Page 118

I would like to provide an update to the MDRC at the end of this weekI early next week.

Thank you.

Jen Stalker, RPF

Project Manager

Ministry of Forests, Lands and Natural Resource Operations

Skeena Region - Smithers, BC

Phone: (250) 847-7506

Fax: (250) 847-7347

Email: [email protected]

3 FNR-2013-00423 Page 119FNR-2013-00423 Page 119

Muir, .Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc:

Subject: Attachments:

Hi Jen,

Concurrent permit applications - submission

Mon 2013·02-25 12:00 AM Tue 2013·02·26 12:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [email protected] Monday, February 25, 2013 3:50 PM Stalker, Jennifer L FLNR:EX Paterson, Genevieve FLNR:EX; [email protected]; Rolf Schmitt; Ann Danilevich; Brent Murphy Concurrent permit applications· submission EAO _ G u idel i nes _for _ Submitti ng_ Electro n ic _ Files.pdf

It is my understanding that Seabridge is submitting the concurrent permit applications electronically to you. Do you have a format in which the applications must be in?

I ask because if the concurrent permit applications are being posted on the EAO's e-PIC site, they must be formatted as per the EAO electronic guidelines (attached).

If we submit the applications to you our preferred format will you be re-formatting them to be posted on the EAO site?

. Regards,

Jessy

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Sea bridge Gold Inc. 1235 Main Street

1 FNR-2013-00423 Page 120FNR-2013-00423 Page 120

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

I

r

2 FNR-2013-00423 Page 121

s.22

FNR-2013-00423 Page 121

ENVIRONMENTAL ASSESSMENT OFFICE Electronic Project Information Centre

Guidance to Proponents for Submitting Electronic Files

The Environmental Assessment Office (EAO) publishes environmental assessment documentation such as Terms of Reference (ToR) or Application Information Requirements (AIR) and applications for an environmental assessment certificate, project descriptions, and other related information in the electronic Project Information Centre (e-PIC).

All applicable project documentation must be submitted to EAO within the guidelines listed below. This applies to documentation prepared by both proponents and their consultants. Proponents are responsible for ensuring their consultants are aware of these guidelines.

Electronic Documentation

� All documentation must be submitted on CD, DVD or via e-mail as appropriate for the document size

and in accordance with the project requirements. � It must be in .pdf format, although other formats may also be requested by the EAO. � It must not have security limitations or passwords of any kind. � It is preferred that the electronic files do not exceed 5 MB in size but they must not exceed 10 MB.

Documentation that exceeds 10 MB may be returned to the proponent. � The table of contents must be a separate document. � Pictures can dramatically increase the file size of a document in .pdf format. Making the picture a jpeg

(.jpg) before inserting it can help to meet the size limits mentioned above. � File names must reflect the contents of the document and must not have slashes, brackets or commas. � When possible, small files of the same type should be combined and kept within the size limits

mentioned above. Format of Applications

Applications are usually large documents of several volumes with tables, figures and drawings. We have two formats that can be used when submitting applications:

Format 1: This format has all similar file types in one folder; therefore, all the drawings for all the volumes are in the drawings folder, all the figures are in the figures folder, etc. There are no sub-folders within the drawings, figures, tables, etc. folders, only files.

FNR-2013-00423 Page 122FNR-2013-00423 Page 122

Format 2: This format shows all the applicable figures, drawings, tables and additional information applicable to volume 1, within that folder.

Folders and Sub-Folders

Please note with both types of file structures, there are only two levels of folders. In Format 1, the Application level may have as many sub-folders as needed. In the next level, where folders such as “volume 1”, “appendices” or “tables” are located, those folders are to contain files only. Additional sub-folders within the “appendices”, “tables”, etc. folders are not allowed. In Format 2, the Application level may contain as many sub-folders as needed; however, the volume sub-folders are to contain all the files for each specific volume regardless of whether they are tables, figures, etc.

File Names

In Format 1, the appendices, figures, etc., are not specific to a volume, they are part of the overall application and, therefore, it is sufficient to name files “Appendix A Data Log, Figure 1-1 Lake Echo”, etc.

In Format 2, each volume has its own appendices, figures, etc. And, as it is possible to have, for example, figure 1.1 in each volume, each file needs to be named appropriately and completely for the volume it is within. Examples: Volume 1 Chapter 1 Introduction, Volume 1 Chapter 2 Table of Contents, Volume 1 Appendix A Studies of the Lake, Volume 1 Figure 2-5 Aerial View of Land.

Additional Information

For further clarification and information on these requirements, please contact the Business Applications Administrator by phone at (250) 356-7441, by fax at (250) 356-7477, or by e-mail at [email protected]

FNR-2013-00423 Page 123FNR-2013-00423 Page 123

Muir, Deanna CSNR:EX

Subject:

Start: End:

Recurrence:

Organizer:

From:

Sent: To: Cc: Subject:

Hi Jessy,

RE: Concurrent permit applications - submission

Wed 2013-02-27 8:00 AM Wed 2013-02-27 8:30 AM

(none)

Paterson, Genevieve FLNREX

Stalker, Jennifer L FLNR:EX Wednesday, February 27,2013 12:23 PM

'Jessy Chaplin' Paterson, Genevieve FLNR:EX RE: Concurrent permit applications - submission

I have checked with Shared Services (re: Sharepoint). They have confirmed that the format at which EAO outlines in the their electronic guidelines will be compatible for Sharepoint. Please submit the permit applications electronically as per the EAO electronic guidelines (formatting).

As well ... please note that we cannot post a document! single file that is over 50MB onto Sharepoint (50MB is the max per document ... not per folder). If there is an application that is over 50MB, please let us know so that we can figure out! prepare ahead of time how we can make this work on our end), or look at another option; such as a dropbox that we can make available to the MORC to view the application.

Thanks.

Jen Stalker, RPF

Project Manager

Ministry of Forests, Lands and Natural Resource Operations

Skeena Region - Smithers, BC

Phone: (250) 847-7506

1 FNR-2013-00423 Page 124FNR-2013-00423 Page 124

Fax: (250) 847-7347

Email: [email protected]

From: Jessy Chaplin [mailto:jessy@seabridgegold .netj Sent: Monday, February 25,20133:50 PM To: Stalker, Jennifer L FLNR:EX Cc: Paterson, Genevieve FLNR:EX; [email protected]; Rolf Schmitt; Ann Danilevich; Brent Murphy Subject: Concurrent permit applications - submission

Hi Jen,

It is my understanding that Seabridge is submitting the concurrent permit applications electronically to you. Do you have a format in which the applications must be in?

I ask because if the concurrent permit applications are being posted on the EAO'se-PIC site, they must be formatted as per the EAO electronic guidelines (attached).

If we submit the applications to you our preferred format will you be re-formatting them to be posted on the EAO site?

Regards,

Jessy

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Sea bridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

2 FNR-2013-00423 Page 125FNR-2013-00423 Page 125

Cell.

3 FNR-2013-00423 Page 126

s.22

FNR-2013-00423 Page 126

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc: Subject: Attachments:

Jessy,

KSM Mine Project (Permitting List! Acti;Jn Items .. . )

Fri 2013-03-22 12:00 AM Sat 2013-03-2312:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Stalker, Jennifer L FLNR:EX Friday, March 22, 2013 11:04 AM 'Jessy Chaplin' Paterson, Genevieve FLNR:EX KSM Mine Project (Permitting List! Action Items ... ) KSM Permitting Information Requirements Phase I March 21 2013 (3).docx; KSM Concurrent Review Process - March 2013.pdf; KSM Permitting Timeline - March 2013.docx

Please find attached the following;

KSM Permit list (with agency comments incorporated - these comments were discussed at the meeting with Will Foster and Jeanien Carmody- Fallows on March 8, 2013) .

MRC Process map - most current (adjusting timeline as required)

KSM Permitting Timeline - hard dates will be incorporated into this table once we know "Day 1" (the day EAO accepts the EA application for review - EA screening phase complete). This timeline will be adjusted as/ if required throughout the permitting review process (as/ if timeline dates adjust).

Meeting with Sea bridge on March 8, 2013 (Jessy Chaplin, Elizabeth Miller, Jen Stalker, Will Foster, Jeanien Carmody-Fallows)

Action Items Noted:

1 FNR-2013-00423 Page 127FNR-2013-00423 Page 127

Will Foster requesting large overview map from Seabridge (outlining the project footprint and OL TC labels)

, Will Foster to check if SUP can cross over Mines Act Permit (Will Foster has confirmed that it

cannot)

Will Foster requesting notification from Seabridge (via e-mail or letter) regarding any existing OL TC's that Seabridge would like closed out (apply for new ones, rather than amending the existing ones)

Jeanien to check into flexibility around new requirements (Landfills) - Jen to follow up with Jeanien

Issues Tracker (EA process)

o EAO has delegated issues tracking for EA review to Seabridge (my understanding)

o MPO would like regular access to the issues tracker (developed during the EA review) - help determine earlier and coordinate what issues will be addressed at EA and what issues will be brought to the MRC table.

o Seabridge has confirmed that their Issues Tracker will be made available to MPO throughout the process(s).

o Jen and Gen to coordinate with Jessy as to what this will look like? (Where the Issues Tracker will be housed, and access to it).

To Note:

As discussed at the meeting held on March 8th, the Draft 'Terms of Reference' for the KSM

MRC will be distributed for review and comment once the EA starts their screening phase (to help deter any confusion around e-mails (and what process), while the EA is gearing everyone up for the EA screening phase at this time).

The next MRC meeting will be scheduled shortly after the permit applications have been submitted (and hardcopies received by those requesting hardcopies) - as we enter into the MRC screening phase (75 days after the EA application is accepted for review, agencies (MPO to coordinate) must determine! confirm that all information requirements are included in the applications to conduct a full technical review).

o As per current timelines (what we know today) - I will be looking at scheduling this in early June 2013 (if we can expect applications to be submitted mid-May)

2 FNR-2013-00423 Page 128FNR-2013-00423 Page 128

o Purpose of the next MRC (Seabridge to walk the agencies through the applications submitted, MRC process review - next steps, project update from the proponent ... )

Based on current timelines, below is a list of 'forecasted' MRC meetings for your planning purposes (subject to change)

Forecasted MRC Meetings (subject to change)

Description

Timeline

Pre-MRC Meeting

November 8,2012

Kick-Off MRC Meeting

During Screening Phase

Early June, 2013

MRC Meeting

During Technical Review Phase

September, 2013

MRC Meeting

During Technical Review Phase

November, 2013

MRC Meeting

During Technical Review Phase

As required

Close Out! Lessons Learned

3 FNR-2013-00423 Page 129FNR-2013-00423 Page 129

April,2014

Please feel free to provide any comments, or ... as always, if any questions or concerns, please don't hesitate to contact me. .

Thank you.

Jen Stalker, RPF

Project Manager

Ministry of Forests, Lands and Natural Resource Operations

Skeena Region - Smithers, Be

Phone: (250) 847-7506

Fax: (250) 847-7347

Email: [email protected]

4 FNR-2013-00423 Page 130FNR-2013-00423 Page 130

Forests, Lands and Natural Resource Operations – Major Projects Office

1

KSM MINE PROJECT

Permitting Review – Timelines

(PHASE I Permits)

March, 2013

Note: All dates are subject to change and will be updated as required

ACTIVITY DATE TIMELINE

AUTHORIZATIONS FOR:Mine Site and Processing and Tailings Management Area (site prep and

limited construction activities), Access Roads, Camps, Tunnel, Transmission Line

Proponent submits Authorizations Electronic (MPO to post to Sharepoint)

Hardcopy to those agencies/ First

Nations that requested hardcopies

EA Application 45 Day Screening (EAO) start (once all hardcopies of complete package have been received)

Expected late March, 2013

EA Application accepted for review (45 Day Screening complete)

Mid May, 2013 Day 1

Agencies provide confirmation to PM that applications have been filed in accordance (i.e. agencies have received the applications and fees paid)

Mid May, 2013 (Day 1 – Day 6)

PM Drafts letter on behalf of agencies that applications have been filed in accordance (letter addressed to EAO, cc’ proponent)

Mid May, 2013 (by) Day 7

(within 7 days after EA application has been accepted for

review)

MRC:

Application screening (to ensure that all required information is available for technical reviewers to conduct their review of the applications).

Mid (late) May – July 2013

Day 1 - Day 60

FNR-2013-00423 Page 131FNR-2013-00423 Page 131

Forests, Lands and Natural Resource Operations – Major Projects Office

2

** Comments to be provided to PM within 60 days ofEA application being accepted **

PM to draft and deliver letter to EAO (cc’ MEM and proponent) outlining any information that is still required from the proponent to conduct a full review (letter must be delivered within 75 days of EA application acceptance)

Late July, 2013 Day 75

Technical MRC Permitting Review period Starts Late July, 2013 Day 76

Technical MRC Permitting Review period winding down (buffer to resolve/ address any outstanding issues and PM to prepare Committee Report)

(once EAC has been issued)

~ Late December,2013

(once EAC has been issued)

(Day 225)

Address final issues and prepare Draft Committee Report

Late January, 2014 Day 226 – Day 256

Draft Committee Report and Draft Permits for MRC Review and Comment (2 weeks)

February, 2014 Day 257 - Day 271

PM to prepare final Committee Report March, 2014 Day 272 - Day 285

Final Decision Package submitted to SDM’s for Decision

March, 2014 Day 286

Decision

FNR-2013-00423 Page 132FNR-2013-00423 Page 132

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

1 |

Pa

ge

Con

ten

ts

Coul

ter C

reek

Acc

ess

Road

Spe

cial

Use

Per

mit

and

Supp

ortin

g Pe

rmits

.....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

...2

Coul

ter C

reek

Con

stru

ctio

n Ca

mps

.....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

4

Trea

ty C

reek

Con

stru

ctio

n Ca

mps

.....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

..5

Trea

ty C

reek

Acc

ess

Road

Spe

cial

Use

Per

mit

and

Supp

ortin

g Pe

rmits

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

....5

Batc

h 1

Min

e Si

te &

Pro

cess

ing

and

Taili

ng M

anag

emen

t Are

a (P

TMA

) Lim

ited

Site

Con

stru

ctio

n ...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.....7

Mitc

hell-

Trea

ty T

win

Tun

nel .

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.....

10

FNR-2013-00423 Page 133FNR-2013-00423 Page 133

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

2 |

Pa

ge

1 Alth

ough

the

AD

DER

doe

s no

t spe

cify

adv

ertis

ing

requ

irem

ents

for l

icen

ces

to c

ut, t

he c

urre

nt M

FR p

olic

y is

to a

dver

tise

oppo

rtun

ities

to o

btai

n a

com

petit

ivel

y aw

arde

d FL

TC fo

r a m

inim

um o

f 2 w

eeks

us

ing

the

MFR

Off

icia

l Not

ices

web

site

A te

mpl

ate

for a

dver

tisem

ents

to c

ompe

titiv

ely

awar

d an

FLT

C is

ava

ilabl

e at

htt

p://

gww

.for.

gov.

bc.c

a/ht

h/tim

ten/

docu

men

ts/i

nter

med

iate

-sal

vage

-ex

ampl

eadv

ertis

ing-

for-

tend

ers.

doc.

1

Cou

lter

Cre

ek A

cces

s R

oad

Sp

ecia

l Use

Per

mit

an

d S

up

por

tin

g P

erm

its

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Co

mm

ents

/Req

uire

men

ts

Publ

ic C

onsu

ltat

ion

Cont

act

Eska

y A

cces

s Ro

ad

Km 0

-4 B

ob Q

uinn

FSR

Road

Use

Per

mit

FS10

9-R

UPA

pp.d

oc

M

aint

enan

ce A

gree

men

t with

Alta

Gas

FW R

oad

Use

A

gree

men

t.m

sg

No

A

lta G

as-L

oren

Kel

ly

FLRN

O-W

ill F

oste

r

Km 4

-43.

5 Al

ta G

as S

UP

S253

18

Mai

nten

ance

Agr

eem

ent w

ith A

ltaG

as

Km 4

3.5-

54.6

(tur

noff

to

CCA

R)

1.) B

arri

ck G

old

SUP

reas

sign

men

t of

SUP

(with

the

SUP

hold

ers

agre

emen

t)

2.) M

aint

enan

ce A

gree

men

t for

Ba

rric

k G

old

N

o Se

abri

dge-

Jess

y Ch

aplin

54.6

km

to e

nd o

f new

co

nstr

uctio

n at

Mitc

hell

Cree

k Br

idge

88.

5 km

1.)

Coul

d be

an

amen

dmen

t to

exis

ting

Barr

ick

SUP

2.)

New

SU

P if

Barr

ick

SUP

in n

ot

reas

sign

ed

If

#2 (N

ew S

UP)

yes

FLN

RO-W

ill F

oste

r

Coul

ter C

reek

Acc

ess

Road

(C

CAR)

The

Fore

st P

ract

ices

Cod

e of

BC

and

the

Prov

inci

al F

ores

t Use

Reg

ulat

ion

are

the

auth

oriz

atio

n fo

r the

Spe

cial

U

se P

erm

it (S

UP)

. FW

Con

firm

atio

n of

ap

prop

riate

per

mits

in

Ther

e w

ill b

e 4

OLT

C’s

for

KSM

1.

Cou

lter

Cree

k A

cces

s 2.

Tre

aty

Cree

k A

cces

s 3.

PTM

A-P

roce

ss P

lant

and

Tai

ling

Man

agem

ent A

rea

4.M

ine

Site

Pack

age

Publ

ic C

onsu

ltatio

n fo

r acc

ess,

SU

P an

d as

soci

ated

OLT

C’s

can

be d

one

at o

ne ti

me.

SUP

�O

LTC

MFR

Off

icia

l Not

ices

web

site

.1

FLRN

O-W

ill F

oste

r

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

O

ccup

ant L

icen

ce to

Cut

Fish

erie

s A

ct-R

evie

w S

UP

for

Pend

ing

Conf

irm

atio

n N

o D

FO-P

at L

im

FNR-2013-00423 Page 134FNR-2013-00423 Page 134

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

3 |

Pa

ge

oper

atio

nal s

tate

men

ts fo

r str

eam

cr

ossi

ng

Wor

ksaf

e BC

Act

- Not

ice

of F

ores

try

Ope

ratio

ns F

orm

ht

tp:/

/ww

w.w

orks

afeb

c.co

m/i

nsur

ance

/man

agin

g_yo

ur_a

cco

unt/

notic

e_of

_pro

ject

/def

ault.

asp

No

WSB

C Te

rrac

e

Wild

life

Act

- Wild

life

salv

age

and

rem

oval

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/pas

b/fw

_per

mre

g.ht

ml

No

PASB

-Con

tact

TBD

Unu

k Ri

ver B

ridg

e

Nav

igab

le W

ater

s Pr

otec

tion

Act

-N

avig

able

Str

eam

Cro

ssin

g

http

://w

ww

.tc.

gc.c

a/en

g/pa

cific

/mar

ine-

nwpp

-app

licat

ions

-13

37.h

tm

No

NW

P-Jo

hn M

acki

e

CCA

R La

ydow

n A

reas

, Log

La

ndin

gs a

nd B

orro

w A

reas

Th

e Fo

rest

Pra

ctic

es C

ode

of B

C an

d th

e Pr

ovin

cial

For

est U

se R

egul

atio

n ar

e th

e au

thor

izat

ion

for t

he S

peci

al

Use

Per

mit

(SU

P).

Thes

e ar

eas

are

to b

e w

ithin

the

SUP

boun

dary

sup

plie

d as

a

shap

e fil

e to

FLN

RO.

Mos

t of t

hese

are

as a

re w

ithin

the

75 m

RO

W.

Whe

re la

nd o

utsi

de o

f the

75

ROW

is r

equi

red,

it

is c

lear

ly id

entif

ied

on m

aps.

Yes,

to b

e in

clud

ed in

Cou

lter C

reek

Acc

ess

Road

SU

P ap

plic

atio

n Pa

ckag

e FL

NRO

-Will

Fos

ter

FNR-2013-00423 Page 135FNR-2013-00423 Page 135

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

4 |

Pa

ge

Cou

lter

Cre

ek C

onst

ruct

ion

Cam

ps

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t Ca

mp

#3 E

skay

Cre

ek M

ine

Site

Sta

ging

(50p

l)

Land

Act

–In

dust

rial

Lic

ence

of

Occ

upat

ion

ht

tp:/

/ww

w.a

gf.g

ov.b

c.ca

/cla

d/D

ocum

ents

/LPS

B/Po

licie

s/in

dust

rial

_gen

.pdf

Ye

s ht

tp:/

/ww

w.fo

r.go

v.bc

.ca/

Land

_Ten

ures

/doc

um

ents

/cab

inet

/adv

ertis

ing.

pdf

Cam

Ben

tley

Drin

king

Wat

er P

rote

ctio

n A

ct-

Cons

truc

tion

Perm

it (H

20-C

) W

ater

Con

stru

ctio

n Pe

rmit

Proc

ess.

pdf

Indu

stria

l Cam

p R

equi

rem

ents

- H

ealth

NH

A A

pplic

atio

n fo

r W

ater

wor

ks C

onst

ruc

NH

A A

PPLI

CA

TIO

N

WA

TER

0504

14.p

dfN

HA

%20

App

licat

ion

%20

for%

20W

ater

wo

App

licat

ion

for

Hea

lth A

ppro

val.p

df

No

NH

A-S

hane

Wad

den

D

rinki

ng W

ater

Pro

tect

ion

Act

- Co

nstr

uctio

n Pe

rmit

(H20

-O)

Publ

ic H

ealth

Act

-Sew

age

Perm

it

10-4

60-3

038

- G

uidl

ines

for

Ind

ustr

ia

Publ

ic H

ealth

Act

-Foo

d Pe

rmit

Ope

ning

a N

ew F

ood

Prem

ise

NH

.pdf

W

ater

Act

-Gro

undw

ater

Wel

l Re

gist

ratio

n

http

://w

ww

.env

.gov

.bc.

ca/w

sd/p

lan_

prot

ect_

sust

ain/

grou

ndw

ater

/ind

ex.h

tml

Envi

ronm

enta

l Man

agem

ent A

ct-

Ope

n Bu

rnin

g Re

quir

ed o

nly

if op

en b

urni

ng is

requ

ired

, 1 p

erm

it ca

n be

issu

ed

for m

ine

site

. ht

tp:/

/ww

w.b

cairq

ualit

y.ca

/top

ics/

burn

ing-

outd

oors

.htm

l ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/was

te_d

isch

arge

_aut

h/ap

p_fo

rms

/ind

ex.h

tm

No

MoE

- Jea

nien

Ca

rmod

y-Fa

llow

s

Cam

p #7

Unu

k N

orth

(40p

l) Sa

me

perm

it/in

form

atio

n re

quir

emen

ts fo

r Cam

p #3

Esk

ay C

amp

Min

es S

ite

Cam

p #8

Unu

k Ri

ver

Stag

ing

(40p

l) Sa

me

perm

it/in

form

atio

n re

quir

emen

ts fo

r Cam

p #3

Esk

ay C

reek

Min

e si

te S

tagi

ng C

amp

(50p

l).

FNR-2013-00423 Page 136FNR-2013-00423 Page 136

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

5 |

Pa

ge

Tre

aty

Cree

k C

onst

ruct

ion

Cam

ps

Cam

p #1

2 H

wy

37 (6

0pl)

Priv

ate

Agr

eem

ent (

Seab

ridg

e in

tend

s to

use

exi

stin

g co

nstr

uctio

n ca

mps

alo

ng H

ighw

ay 3

7, a

nd w

ill m

ake

arra

ngem

ents

with

them

). Ca

mp

#11

Trea

ty C

reek

M

arsh

allin

g (6

0pl)

Sam

e pe

rmit/

info

rmat

ion

requ

irem

ents

for C

amp

#3 E

skay

Cre

ek M

ine

site

Sta

ging

Cam

p (5

0pl).

*Min

us L

icen

ce o

f Occ

upat

ion,

this

cam

p is

to b

e pe

rmitt

ed u

nder

the

Min

es A

ct.

OLT

C th

at c

over

s th

e SU

P an

d LO

O w

ill c

over

the

cam

p lo

catio

n.

Tre

aty

Cree

k A

cces

s R

oad

Sp

ecia

l Use

Per

mit

an

d S

up

por

tin

g P

erm

its

Trea

ty C

reek

Acc

ess

Road

s (t

o Pl

ant S

ite a

nd T

reat

y Sa

ddle

Po

rtal

)

The

Fore

st P

ract

ices

Cod

e of

BC

and

the

Prov

inci

al F

ores

t Use

Re

gula

tion

are

the

auth

oriz

atio

n fo

r the

Spe

cial

Use

Per

mit

(SU

P).

FW C

onfir

mat

ion

of

appr

opria

te p

erm

its in

Yes

FLRN

O-W

ill F

oste

r

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

O

ccup

ant L

icen

ce to

Cut

ht

tp:/

/ww

w.fo

r.go

v.bc

.ca/

dsi/

MTe

nure

s_Sa

lvag

e.ht

m#L

icen

se_t

o_C

ut-L

TC

Ther

e w

ill b

e 4

OLT

C’s

for

KSM

1.

Cou

lter

Cree

k A

cces

s 2.

Tre

aty

Cree

k A

cces

s 3.

PTM

A-P

roce

ss P

lant

and

Tai

ling

Man

agem

ent A

rea

4.M

ine

Site

W

orks

afe

BC A

ct- N

otic

e of

Fo

rest

ry O

pera

tions

For

m

http

://w

ww

.wor

ksaf

ebc.

com

/ins

uran

ce/m

anag

ing_

your

_acc

ount

/not

ice_

of_p

roje

ct/d

efau

lt.as

p N

o W

SBC

Terr

ace

Wild

life

Act

- Wild

life

Salv

age

and

Rem

oval

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/pas

b/fw

_per

mre

g.ht

ml

No

PASB

Hig

hway

s A

ct-P

rovi

ncia

l Pub

lic

Hig

hway

Per

mit

App

licat

ion

- Co

nnec

tion

to H

wy

37

http

://w

ww

.th.

gov.

bc.c

a/pe

rmits

/H00

20.a

sp

No

MoT

I-She

rri

App

lega

te

Bell-

Irvi

ng R

iver

Bri

dge

Fish

erie

s A

ct (D

FO)-

Aut

hori

zatio

n of

Bel

l Irv

ing

Brid

ge c

ross

ing

Pe

ndin

g Co

nfir

mat

ion

from

DFO

?

DFO

-Pat

Lim

Fish

erie

s A

ct (D

FO)-

Rev

iew

SU

P fo

r Ope

ratio

nal S

tate

men

ts fo

r st

ream

cro

ssin

gs

Pend

ing

Conf

irmat

ion

from

DFO

?

Wat

er A

ct-N

otifi

catio

n (S

ectio

n 9)

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/wsd

/wat

er_r

ight

s/lic

ence

_app

licat

ion/

sect

ion9

/

Und

er s

ectio

n 44

(2) o

f the

Wat

er R

egul

atio

n, a

n A

ppro

val o

r N

otifi

catio

n is

not

requ

ired

for i

nstr

eam

wor

ks re

late

d to

fore

st

activ

ities

whe

re a

sta

ndar

d or

regu

latio

n ex

ists

und

er th

e Fo

rest

No

FLRN

O-E

mily

Bu

lmer

Com

men

t [G

1]:

Will

Fos

ter

adde

d

FNR-2013-00423 Page 137FNR-2013-00423 Page 137

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

6 |

Pa

ge

and

Rang

e Pr

actic

es A

ct o

f Bri

tish

Colu

mbi

a. T

his

is p

rovi

ded

that

th

e ch

ange

is m

ade

by a

mun

icip

ality

or p

erso

n w

ho:

�ho

lds

an a

gree

men

t or r

oad

use

perm

it un

der t

he F

ores

t Act

, an

agr

eem

ent u

nder

the

Rang

e A

ct, o

r a s

peci

al u

se p

erm

it un

der

the

Fore

st P

ract

ices

Cod

e of

Brit

ish

Colu

mbi

a A

ct, o

r

Nav

igab

le W

ater

s Pr

otec

tion

Act

-N

avig

able

Str

eam

Cro

ssin

g

http

://w

ww

.tc.

gc.c

a/en

g/pa

cific

/mar

ine-

nwpp

-app

licat

ions

-13

37.h

tm

No

NW

P-Jo

hn M

acki

e

Layd

own

Are

as, L

og L

andi

ngs

and

Borr

ow A

reas

Th

e Fo

rest

Pra

ctic

es C

ode

of B

C an

d th

e Pr

ovin

cial

For

est U

se

Regu

latio

n ar

e th

e au

thor

izat

ion

for t

he S

peci

al U

se P

erm

it (S

UP)

.

Thes

e ar

eas

are

to b

e w

ithin

the

SUP

boun

dary

sup

plie

d as

a

shap

e fil

e to

FLN

RO.

Mos

t of t

hese

are

as a

re w

ithin

the

75 m

RO

W.

Whe

re la

nd o

utsi

de o

f the

75

ROW

is r

equi

red,

it is

cle

arly

id

entif

ied

on m

aps.

No

FLRN

O-W

ill F

oste

r

Tran

smis

sion

Lin

e Ri

ght o

f W

ay

Land

Act

- Util

ity- L

icen

se o

f O

ccup

atio

n ht

tp:/

/ww

w.fo

r.go

v.bc

.ca/

Land

_Ten

ures

/ten

ure_

prog

ram

s/pr

ogr

ams/

utili

ties/

inde

x.ht

ml

Yes

FLN

RO-C

am

Bent

ley

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t Ca

mp

#5Tr

eaty

Pla

nt C

amp

(800

pl)

Min

es A

ct –

Perm

it ht

tp:/

/ww

w.e

mpr

.gov

.bc.

ca/M

inin

g/Pe

rmitt

ing-

Recl

amat

ion/

Page

s/de

faul

t.as

px

Yes

MEM

-Dia

ne H

owe

Fo

rest

and

Ran

ge P

ract

ices

Act

Occ

upan

t Lic

ence

to C

ut

http

://w

ww

.for.

gov.

bc.c

a/ds

i/M

Tenu

res_

Salv

age.

htm

#Lic

ense

_to

_Cut

-LTC

T

here

will

be

4 O

LTC’

s fo

r KS

M

1. C

oulte

r Cr

eek

Acc

ess

2. T

reat

y Cr

eek

Acc

ess

3. P

TMA

-Pro

cess

Pla

nt a

nd T

ailin

g M

anag

emen

t Are

a 4.

Min

e Si

te

Yes

FLRN

O-W

ill F

oste

r

Envi

ronm

enta

l Man

agem

ent A

ct-

Mun

icip

al W

aste

wat

er

Regu

latio

n

FW c

amps

EM

A

perm

ittin

g sp

ecifi

catio

No

MoE

- Jea

nien

Ca

rmod

y-Fa

llow

s

Envi

ronm

enta

l Man

agem

ent A

ct-

Was

te D

isch

arge

(Lan

dfill

) ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/mun

-was

te/w

aste

-so

lid/l

andf

ills/

crite

ria-

land

fills

.htm

No

Envi

ronm

enta

l Man

agem

ent A

ct-

Was

te D

isch

arge

(Inc

iner

ator

) ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/was

te_d

isch

arge

_aut

h/ap

p_fo

rms

/ind

ex.h

tm

�A

pub

lic n

otic

e of

app

licat

ion

to b

e pl

aced

in th

e BC

Gaz

ette

and

loca

l new

s m

edia

FNR-2013-00423 Page 138FNR-2013-00423 Page 138

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

7 |

Pa

ge

FW F

ollo

w u

p to

Pr

e-re

gist

ratio

n M

eet

�30

day

pub

lic n

otifi

catio

n pe

riod

App

licat

ion

fees

(con

tact

nea

rest

M

inis

try

Regi

onal

Off

ice)

A fi

nal T

echn

ical

Ass

essm

ent R

epor

t may

be

requ

ired

Cons

ulta

tion

Repo

rt

Drin

king

Wat

er P

rote

ctio

n A

ct-

Cons

truc

tion

Perm

it (H

20-C

) Se

e Ca

mp

#3 E

skay

Cre

ek M

ine

site

Sta

ging

Cam

p (5

0pl)

for p

erm

it/in

form

atio

n re

quir

emen

ts.

Drin

king

Wat

er P

rote

ctio

n A

ct-

Cons

truc

tion

Perm

it (H

20-O

) Pu

blic

Hea

lth A

ct-F

ood

Perm

it W

ater

Act

-Gro

undw

ater

Wel

l Re

gist

ratio

n

Cam

p #6

Tre

aty

Sadd

le C

amp

(120

pl)

Sam

e re

quir

emen

ts a

s ab

ove:

Cam

p#5

Trea

ty P

lant

Cam

p pl

us

Cam

p #6

: Tre

aty

Sadd

le r

equi

res

a Li

cenc

e of

Occ

upat

ion

whi

ch is

und

er r

evie

w s

ince

Sep

t 20,

201

2. L

ands

File

No:

640

8448

W

ater

Act

-Not

ifica

tion

(Sec

tion

9)

http

://w

ww

.env

.gov

.bc.

ca/w

sd/w

ater

_rig

hts/

licen

ce_a

pplic

atio

n/se

ctio

n9/

No

FLRN

O-E

mily

Bu

lmer

Bat

ch 1

Min

e Si

te &

Pro

cess

ing

and

Tai

lin

g M

anag

emen

t A

rea

(PT

MA

) Li

mit

ed S

ite

Con

stru

ctio

n

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t La

ydow

n A

reas

, Log

Lan

ding

s an

d Bo

rrow

Are

as

Min

e Si

te ti

mbe

r cl

eari

ng

PTM

A ti

mbe

r cle

arin

g

Min

e Si

te ro

ad c

onst

ruct

ion

PT

MA

Site

road

con

stru

ctio

n M

ine

Site

Cam

ps:

Cam

p #2

: Ted

Mor

ris

Cam

p #4

: Mitc

hell

Nor

th

Min

es A

ct –

M -

Perm

it O

ne P

erm

it fo

r KSM

Pro

ject

incl

udin

g th

e M

ine

Site

and

PTM

A-

Proc

ess

Plan

t and

Tai

ling

Man

agem

ent A

rea

http

://w

ww

.em

pr.g

ov.b

c.ca

/Min

ing/

Perm

ittin

g-Re

clam

atio

n/Pa

ges/

defa

ult.

aspx

Yes

MEM

-Dia

ne H

owe

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

O

ccup

ant L

icen

ce to

Cut

O

ne O

LTC

Am

endm

ent f

or M

ine

Site

and

one

OLT

C A

men

dmen

t fo

r PTM

A

Ther

e w

ill b

e 4

OLT

C’s

for

KSM

1.

Cou

lter

Cree

k A

cces

s 2.

Tre

aty

Cree

k A

cces

s 3.

PTM

A-P

roce

ss P

lant

and

Tai

ling

Man

agem

ent A

rea

4.M

ine

Site

Yes

FLN

RO-W

ill F

oste

r

EMA

-Was

te D

isch

arge

O

ne E

MA

Per

mit

for M

ine

Site

and

PTM

A

CON

RETE

PLA

NTS

– a

re th

ey p

lann

ed a

nd w

here

?

Yes-

One

Pub

lic C

onsu

ltatio

n Pa

ckag

e fo

r M

ine

Site

MoE

- Jea

nien

Ca

rmod

y-Fa

llow

s C

omm

ent

[G2

]: JC

F ad

ded,

ad

ditio

nal i

nfor

mat

ion

need

ed.

FNR-2013-00423 Page 139FNR-2013-00423 Page 139

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

8 |

Pa

ge

Ca

mp

#9/1

0: M

itche

ll in

itial

/sec

onda

ry

Cam

p

Wat

er S

tora

ge D

am (W

SD)

site

pre

para

tion

(in th

e M

ine

Site

) M

itche

ll-Tr

eaty

Tw

inne

d Tu

nnel

s (M

TT) M

itche

ll Po

rtal

s co

nstr

uctio

n (in

the

Min

e Si

te)

MTT

Tre

aty

Port

als

cons

truc

tion

(in th

e PT

MA

) M

TT T

reat

y Sa

ddle

Por

tal

cons

truc

tion

(at t

he T

reat

y Sa

ddle

)

REQ

UIR

E RE

GIS

TRA

TIO

N U

ND

ER C

ON

CRET

E CO

DE

– do

esn’

t hav

e to

be

done

with

Con

curr

ent –

but n

eed

to g

et d

one

earl

y in

co

nstr

uctio

n ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/was

te_d

isch

arge

_aut

h/re

gist

ratio

n/in

dex.

htm

E

NV

IRO

NM

EN

TAL

MA

NA

GE

ME

NT

ACT

-app

licat

ions

with

re

quire

d ap

plic

atio

n fe

es ($

200

per a

pplic

atio

n ) t

o be

sen

t to:

Env

ironm

enta

l Man

agem

ent B

ranc

hM

inis

try O

f Env

ironm

ent

PO

Box

937

7 S

tn P

rov

Gov

tV

icto

ria, B

C V

8W 9

M1

Or D

ELI

VER

by

cour

ier t

o:3r

d Fl

oor,

2975

Jut

land

Roa

d, V

icto

ria, B

C V

8T 5

J9

�A

pub

lic n

otic

e of

app

licat

ion

to b

e pl

aced

in th

e BC

Gaz

ette

and

loca

l new

s m

edia

30 d

ay p

ublic

not

ifica

tion

peri

od

**A

ny re

quir

emen

ts fo

r pub

lic c

onsu

ltatio

n fr

om th

e EA

are

dup

licat

ed fo

r any

EM

A

appl

icat

ions

.

FW F

irst

Nat

ions

C

onsu

ltatio

n w

ith E

MA

�A

pub

lic n

otic

e of

app

licat

ion

to b

e pl

aced

in th

e BC

Gaz

ette

and

loca

l new

s m

edia

30 d

ay p

ublic

not

ifica

tion

peri

od

�A

pplic

atio

n fe

es (c

onta

ct n

eare

st M

inis

try

Regi

onal

Off

ice)

A fi

nal T

echn

ical

Ass

essm

ent R

epor

t may

be

requ

ired

Co

nsul

tatio

n Re

port

Min

ing

Leas

e –

for t

he M

ine

Site

M

inin

g Le

ase

-for

the

PTM

A

Min

eral

Ten

ures

Act

-Min

ing

Leas

e fo

r the

Min

e Si

te A

pplic

atio

n un

der

revi

ew s

ince

Mar

ch 2

009.

In

pro

gres

s

Min

eral

Ten

ures

Br

anch

-–Tr

acy

Mar

tin

Min

eral

Ten

ures

Act

-Min

ing

Leas

e to

be

appl

ied

for t

he P

TMA

Min

eral

Ten

ures

Br

anch

–Tr

acy

Mar

tin

r

Min

e A

rea

- Non

-Con

tact

D

iver

sion

s PT

MA

– N

on-c

onta

ct

dive

rsio

ns

Wat

er A

ct a

nd th

e W

ater

Pr

otec

tion

Act

-Wat

er L

icen

ce

http

://w

ww

.env

.gov

.bc.

ca/w

sd/w

ater

_rig

hts/

licen

ce_a

pplic

atio

n/in

dex.

htm

l N

on-c

onta

ct d

iver

sion

s ar

ound

the

Min

e Si

te a

nd P

TMA

do

requ

ire

appr

oval

s.

No

FLRN

O-E

mily

Bu

lmer

FNR-2013-00423 Page 140FNR-2013-00423 Page 140

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

9 |

Pa

ge

Wor

ks T

hat D

o N

ot R

equi

re a

n A

ppro

val o

r Not

ifica

tion

Und

er s

ectio

n 44

(2) o

f the

Wat

er R

egul

atio

n, a

n A

ppro

val o

r N

otifi

catio

n is

not

requ

ired

for i

nstr

eam

wor

ks re

late

d to

fore

st

activ

ities

whe

re a

sta

ndar

d or

regu

latio

n ex

ists

und

er th

e Fo

rest

an

d Ra

nge

Prac

tices

Act

of B

ritis

h Co

lum

bia.

Thi

s is

pro

vide

d th

at

the

chan

ge is

mad

e by

a m

unic

ipal

ity o

r per

son

who

: ��

����

��

���

���

����

����

��

�����

��

����

����

����

����

�ag

reem

ent u

nder

the

Rang

e A

ct, o

r a s

peci

al u

se p

erm

it un

der t

he

Fore

st P

ract

ices

Cod

e of

Bri

tish

Colu

mbi

a A

ct, o

r ��

���

����

���

���o

con

stru

ct o

r mod

ify a

road

und

er th

e Co

al A

ct,

the

Geo

ther

mal

Res

ourc

es A

ct, t

he M

ines

Act

, the

Min

ing

Righ

t of

Way

Act

or t

he P

etro

leum

and

Nat

ural

Gas

Act

. U

nder

sec

tion

44 (3

) of t

he W

ater

Reg

ulat

ion

a ch

ange

may

als

o be

mad

e in

and

abo

ut a

str

eam

by

a pe

rson

who

hol

ds a

per

mit

unde

r se

ctio

n 10

of t

he M

ines

Act

, with

out o

btai

ning

an

App

rova

l or

Not

ifica

tion,

if th

e pe

rson

com

plie

s w

ith:

���

����

����

��� �

������

� �

��

���

���

���

���

� ���

��"�

���

�Br

itish

Col

umbi

a, a

nd

���

�����

����

���

����

��e

rmit

resp

ectin

g ch

ange

s in

and

abo

ut a

st

ream

.

Land

Fill

and

Con

tam

inat

ed

Soils

Lan

d Fa

rm

�M

ine

Site

PTM

A

Envi

ronm

enta

l Man

agem

ent A

ct-

Was

te D

isch

arge

(Lan

dfill

) ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/mun

-was

te/w

aste

-so

lid/l

andf

ills/

crite

ria-

land

fills

.htm

Yes

MoE

- Jea

nien

Ca

rmod

y-Fa

llow

s

Tem

pora

ry E

xplo

sive

Sto

rage

at

the

Min

e Si

te

Tem

pora

ry E

xplo

sive

Sto

rage

at

the

PTM

A

BC M

ines

Act

– E

xplo

sive

s St

orag

e an

d U

se P

erm

it

BC M

ines

Act

and

Reg

ulat

ions

(HSR

CBC,

200

8) re

quir

es u

sers

to

appl

y an

nual

ly fo

r an

expl

osiv

es s

tora

ge a

nd u

se p

erm

it

No

Reg

iona

l Min

es

Off

ice

– D

oug

Flyn

n, S

cott

Par

ker

FNR-2013-00423 Page 141FNR-2013-00423 Page 141

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

10 |

Pa

ge

Perm

anen

t Exp

losi

ve F

acto

ry

at th

e M

ine

Site

Expl

osiv

es A

ct -

Expl

osiv

es

Fact

ory

Lice

nce

http

://w

ww

.nrc

an.g

c.ca

/min

eral

s-m

etal

s/ex

plos

ives

/375

2

Thro

ugh

the

Expl

osiv

es R

egul

ator

y D

ivis

ion,

ESS

B pr

ovid

es

serv

ices

and

sup

port

to th

e m

embe

rs o

f the

exp

losi

ves

indu

stry

in

clud

ing

man

ufac

ture

rs, t

rans

port

ers,

impo

rter

s, s

elle

rs a

nd

user

s of

exp

losi

ves.

N

R Ca

n-M

elan

ie

Cam

pbel

l

Wat

er T

reat

men

t Fac

ility

disc

harg

e at

the

Min

e Si

te

Inte

rnat

iona

l Riv

er

Impr

ovem

ents

Act

-IRIA

Lic

ence

ht

tp:/

/ww

w.e

c.gc

.ca/

Publ

icat

ions

/def

ault.

asp?

lang

=En&

xml=

529

428D

8-8E

9B-4

F5E-

9BD

5-81

2723

95F9

E7

Yes

Env

Can-

Har

p G

ill

Mit

chel

l-T

reat

y T

win

Tu

nn

el

Mitc

hell-

Trea

ty T

win

Tun

nel

Land

s A

ct –

Lic

ence

of

Occ

upat

ion

App

licat

ion

subm

itted

thro

ugh

Fron

t Cou

nter

BC

Sept

embe

r,

2012

. Th

is a

pplic

atio

n w

ill b

e re

view

ed a

nd p

roce

ssed

as

part

of

Phas

e 1

perm

its.

Yes

Cam

Ben

tley

Op

por

tun

itie

s

1.O

LTC

for a

cces

s ro

ad w

ill c

over

cam

ps a

s w

ell (

incl

uded

in c

omm

ents

abo

ve in

tabl

e)

2.A

men

dmen

t to

the

exis

ting

min

e si

te O

LTC

may

be

an o

ptio

n, o

r app

lyin

g fo

r a n

ew O

LTC

alto

geth

er (a

s di

scus

sed

at M

arch

8th

mee

ting

with

Sea

brid

ge a

nd W

ill F

oste

r)

�Se

abri

dge

to s

end

Dis

tric

t (W

ill F

oste

r) n

otifi

catio

n cl

osin

g ou

t exi

stin

g O

LTC

(if S

eabr

idge

cho

oses

to a

pply

for a

new

one

)

Com

men

t [G

3]:

Add

ed to

incl

ude

tunn

el in

Pha

se 1

FNR-2013-00423 Page 142FNR-2013-00423 Page 142

Env

ironm

enta

lA

sses

smen

tOffi

ce

(EA

App

licat

ion)

Maj

orP

roje

cts

Offi

ce

(MR

C–

Per

mitt

ing)

FEB

RU

AR

Y20

13 EAA

PPLI

CA

TIO

NSU

BM

ITTE

D

With

in75

Day

saf

tert

heE

AO

acce

pts

the

appl

icat

ion,

MP

Ono

tifie

sth

epr

opon

enta

ndE

AO

inw

ritin

gof

any

addi

tiona

linf

orm

atio

nre

quire

men

ts(fr

omth

eM

RC

)in

orde

rto

com

plet

eth

ere

view

NO

TE:

Age

ncie

sto

prov

ide

com

men

tsto

Proj

ectM

anag

eron

/bef

ore

Day

60to

allo

wPM

toco

mpi

leco

mm

ents

and

draf

tlet

ter

with

in75

days

“PR

E M

RC

M

EE

TIN

G”

(NO

VE

MB

ER

8TH)

AP

PLI

CA

TIO

NS

SU

BM

ITTE

D(P

RO

PO

NE

NT)

60da

ysto

reso

lve

outs

tand

ing

issu

es,

draf

tCom

mitt

eeR

epor

t(3

wee

ks)f

orM

RC

revi

ewan

dco

mm

ent(

2w

eeks

),dr

aftp

erm

itre

view

(2w

eeks

),an

dsu

bmit

to S

DM

’s fo

r dec

isio

n.

45D

AY

SCR

EEN

ING

(as

perS

ectio

n24

Ord

er)

MR

CTe

chni

calR

evie

w

KS

MM

INE

PR

OJE

CT

–C

ON

CU

RR

EN

TR

EV

IEW

PR

OC

ES

S–

Mar

ch20

13**

NO

TE–

Tim

elin

ean

dde

tails

inth

efo

llow

ing

proc

ess

diag

ram

are

subj

ectt

och

ange

EA

O–

prim

ary

poin

tofc

onta

ctfo

rFirs

tNat

ions

Con

sulta

tion

durin

gth

eE

Are

view

.

All

EA

OIs

sues

and

stat

ustra

cked

and

prov

ided

toM

PO

Dec

isio

nw

ithin

45D

ays M

RC

Tech

nica

lRev

iew

(leav

etim

eto

reso

lve

outs

tand

ing

issu

esan

dP

M(M

PO

)to

prep

are

Com

mitt

eeR

epor

t)

KIC

K–

OFF

MR

CM

eetin

g

Pro

pone

ntto

wal

kag

enci

es/

Firs

tNat

ions

thro

ugh

the

appl

icat

ions

subm

itted

MR

CM

EE

TIN

GM

RC

ME

ETI

NG

Mov

ein

tote

chni

calr

evie

won

cein

form

atio

nre

quire

men

tsar

esu

bmitt

ed/p

rovi

ded

(com

plet

eap

plic

atio

ns)

INTE

RN

AL

INFO

RM

ATI

ON

SHA

RIN

G(E

AO

/FLN

RO

)

*IS

SU

ES

TRA

CK

ER

*IN

FOR

MA

TIO

NS

HA

RIN

GM

ATE

RIA

LS/D

OC

UM

EN

TSTH

AT

BO

THE

AO

and

FLN

RO

RE

QU

IRE

AC

CE

SS

TOD

UR

ING

THE

RE

VIE

WP

RO

CE

SS

Chr

isH

amilt

on,D

avid

Gra

ceJe

nS

talk

er,J

ason

Pop

e,G

enev

ieve

Pat

erso

n

180

DA

YEA

APP

LIC

ATI

ON

REV

IEW

AN

DD

ECIS

ION

PAC

KA

GE

FOR

MIN

ISTE

RS

MP

Oto

draf

tlet

tert

oE

AO

and

Pro

pone

nton

beha

lfof

the

agen

cies

that

auth

oriz

atio

nsha

vebe

enfil

edin

acco

rdan

ce(w

ithin

7da

ysof

the

EA

appl

icat

ion

bein

gac

cept

edfo

rrev

iew

)

MA

RC

H20

13A

PR

IL20

13M

AY

2013

JUN

E20

13JU

LY20

13A

UG

US

T20

13S

EP

TEM

BE

R20

13O

CTO

BE

R20

13N

OV

EM

BE

R20

13D

EC

EM

BE

R20

13JA

NU

AR

Y20

14FE

BR

UA

RY

2014

MA

RC

H20

14

As

perS

ectio

n13

Ord

er:

The

prop

onen

tifa

pply

ing

forc

oncu

rren

tre

view

ofon

eor

mor

eap

plic

atio

nsfo

rapp

rova

lsun

dero

ther

enac

tmen

ts,m

usts

ubm

itth

ere

ques

tto

the

EA

OD

irect

orw

ithin

7da

ysaf

tert

heda

teon

whi

chth

eEA

OD

irect

orno

tifie

sth

epr

opon

entu

nder

sect

ion

16(4

)oft

heA

ctth

atth

epr

opon

ents

appl

icat

ion

has

been

acce

pted

forr

evie

w

(MP

Oto

draf

tlet

tert

oE

AO

and

Pro

pone

nton

beha

lfof

the

agen

cies

that

auth

oriz

atio

nsha

vebe

enac

cept

edfo

rrev

iew

with

in7

days

ofth

eE

Aap

plic

atio

nbe

ing

acce

pted

forr

evie

w)

FLN

RO

–pr

imar

ypo

into

fcon

tact

forF

irstN

atio

nsco

nsul

tatio

ndu

ring

the

MR

Cre

view

.

Pro

pone

ntre

spon

sibl

eto

prov

ide

agen

cies

with

requ

ired

hard

copi

es(fo

rth

ose

requ

estin

gha

rdco

pies

)

NO

TE-P

ropo

nent

tosu

bmit

alla

pplic

atio

nsdi

gita

llyto

MP

O–

will

bepo

sted

toth

epr

ojec

tS

hare

poin

tSite

forM

RC

acce

ss/r

evie

w.

Dec

isio

n P

acka

ge to

SD

M’s

FNR-2013-00423 Page 143FNR-2013-00423 Page 143

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc:

Subject:

Hi Will,

KSM Project Permitting: Meeting March 8 2013 with MPO and Skeena Stikine District

Fri 2013-03-2212:00 AM Sat 2013-03-2312:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [[email protected] Friday, March 22, 2013 2:37 PM Foster, William J FLNR:EX [email protected]; Stalker, Jennifer L FLNR:EX; Paterson, Genevieve FLNR:EX; Brent Murphy KSM Project Permitting: Meeting March 8 2013 with MPO and Skeena Stikine District

On March 8th, we discussed tenuring of the TeAR SUP and Mineral Tenure Act mining lease.

Seabridge understands and shares your concern about trying to overlap a Forest Act tenure and a Mineral Tenure Act mining lease. I want to clarify with you that Seabridge will not be applying for a mining lease for the PTMA (Process and Tailings Management Area) in the Batch 1 permit applications. Seabridge will not be applying for the PTMA mining lease in concurrent permitting.

The importance of this is that the TeAR SUP permit application will not be complicated by other tenure applications around the "Lower Access" or North Treaty Lower Road. The construction and operation of the North Treaty Lower Road will be applied for under the Mines Act permit application.

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, Be VDJ 2ND

1 FNR-2013-00423 Page 144FNR-2013-00423 Page 144

Tel. (250) 847-4704

Cell.

2 FNR-2013-00423 Page 145

s.22

FNR-2013-00423 Page 145

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From:

Sent: To:

Cc: Subject:

Attachments:

Hi Jen,

RE: KSM Draft Terms of Reference and MRC (Permitting) Update

Fri 2013-04-1912:00 AM Sat 2013-04-20 12:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [email protected]

Friday, April 19, 2013 1:15 PM Stalker, Jennifer L FLNR:EX 'Elizabeth Miller'; Paterson, Genevieve FLNR:EX RE: KSM Draft Terms of Reference and MRC (Permitting) Update

2013_Apr_19 Email udpate from JStalker to KSM Mine Review Committee.docx

Thanks for the opportunity to review. Some minor text changes.

I will provide comment at a later date on the TOR.

Were there any changes to the distribution list for permit applications from Dec 6th?

Thanks

Jessy

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc . . 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

1 FNR-2013-00423 Page 146

s.22

FNR-2013-00423 Page 146

· From: Stalker, Jennifer L FLNR:EX [mailto:[email protected]] Sent: Wednesday, April 17, 2013 6:47 PM To: 'Jessy Chaplin' Cc: 'Elizabeth Miller'; Paterson, Genevieve FLNREX Subject: KSM Draft Terms of Reference and MRC (Permitting) Update

Jessy,

I will be sending an E-mail (below) and Draft ToR out to the MRC on Friday afternoon this week (April 19th

) for review and comment. Would like to give you the opportunity to review the note prior to me sending it out. If you have any questions! concerns! comments around it, please let me know by Friday (early afternoon).

Thanks,

Jen Stalker, RPF

Project Manager

Ministry of Forests, Lar:tds and Natural Resource Operations

Skeena Region - Smithers, BC

Phone: (250) 847-7506

Fax: (250) 847-7347

Email: [email protected]

Good afternoon KSM Mine Revjew Committee (MRC);

2

.,

FNR-2013-00423 Page 147FNR-2013-00423 Page 147

As per the attached Environmental Assessment Office (EAO) amended Section 11 Order (dated November 30, 2012), Seabridge Gold will be submitting Phase I of their authorization applications at the time, or prior to the EAO accepting the Environmental Assessment application for review. Seabridge will be applying for Concurrent permitting under the Concurrent Approval Regulation.

o Concurrent Approval Regulation (Regulation the proponent will be applying under for permitting)

http://www.bclaws.ca/EP Libraries/bclaws _ new/documentll D/freeside/1 0_371_2002

** Please Note: as per the Concurrent Approval Regulation, the MRC authorization review process (screening phase) will commence when:

EA application has been accepted for review by the EAO;

Authorization applications are filed in accordance to Ministry standards, and;

Notification is provided from the EA Director to the Major Projects Office that the application for concurrent review has been accepted

In preparation for Phase I authorization applications being submitted by Seabridge Gold, please find attached the following documents for review and reference;

o Mine Review Committee Draft Terms of Reference

o Identifies the purpose of the Mine Review Committee and the roles and responsibilities of its members ..

o Please review and provide comments to Jen Stalker [email protected] by May 3, 2013.

o KSM Concurrent Review Process Map

o Highlights the MRC process (should the applications be accepted by the EAO for concurrent permitting) and key milestones/ timelines as the MRC moves through the authorization review process. Please note, this document will be adjusted throughout the review process accordingly iff when required (subject to change if timelines are adjusted)

3 FNR-2013-00423 Page 148FNR-2013-00423 Page 148

o Phase I Authorizations for the following project components (please refer to the permit list attached)

o Mine Site! Processing and Tailings Management Area

o Camps

o Access Roads (Coulter Creek! Treaty Creek)

o Transmission Line

o Mitchell-Treaty Tunnel

** Please review the application distribution list attached to ensure your contact information is up to . date and that we have captured how you would like to receive the application (hardcopy, electronic or both) correctly. If changes are required please email [email protected] .

Next Steps - (Permitting)

Within 7 days of the EAO accepting the EA application for review, agencies must confirm to the EAO that applications have been filed in accordance to Ministry standards! policy

o Project Manager (PM) will be coordinating with agencies! Front Counter BC to ensure applications have been filed in accordance (i.e. all applicable fees have been paid by the proponent)

o Project Manager will submit a letter to the EAO Director, on behalf of the agencies, stating whether or not the applications have been filed in accordance to Ministry standards

o Major Projects Office (MPO) will post all Phase I applications (electronic) to the project Sharepoint site for MRC access/ review - notification will be sent out to the MRC

As per the Concurrent Approval Regulation, Section 8 (1); if the Executive Director of EAO notifies the Ministry (Major Projects Office) that the application for concurrent review is accepted, then within 75 days of the EAO accepting the EA application for review, agencies must notify the proponent and the EAO in writing of any additional information that the ministry anticipates it will require from the proponent in order to conduct the technical review.

o MPO Project Manager (PM) will coordinate the MRC comments and draft a letter to the EAO, on behalf of the technical reviewers, of any additional information required to conduct the review.

4

I i

FNR-2013-00423 Page 149FNR-2013-00423 Page 149

o · Project Manager is requesting that all comments from agencies are provided onl or before Dav 60 in order for PM to compile and draft letter to EAO by Day 75.

Next Mine Review Committee Meeting

o As the MRC enters the screening phase of the applications (should the EA application be accepted for review, applications have been filed in accordance, and the EAO Director provides notification that the applications have been accepted for concurrent review), the next MRC meeting will be scheduled early in the screening phase (expected early June, 2013)

o The purpose of this meeting will be to review the applications (for screening purposes) with the proponent available to answer questions and provide a project update. As well, direction will be provided as to next steps in the authorization review process.

If you have any questions or concerns, please do not hesitate to contact me.

Thank you.

Jen Stalker, RPF

Project Manager

Ministry of Forests, Lands and Natural Resource Operations

Skeena Region ~ Smithers, BC

Phone: (250) 847-7506

Fax: (250) 847-7347

Email: [email protected]

5 FNR-2013-00423 Page 150FNR-2013-00423 Page 150

Muir, Deanna CSNR:EX

From: Stalker, Jennifer L FLNR:EX Friday, April 19, 2013 3:03 PM Sent:

To:

Cc:

, Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAI'l:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; De Beck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper' ; 'Gitanyow Hereditary Chiefs Office'; Hoffman, Al EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; 'Jessy Chaplin '; 'John Mackie '; 'June Yoo Rifkin'; 'Kyle Moselle'; Love, Mark P ENV:EX; 'Mansell Griffin ([email protected])'; 'Nalaine Morin '; 'Pat Lim'; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN; Page, Steven FLNR:EX; Sakals, Matt E FLNR:EX Cuell, James W FLNR:EX; Herbert, Brian FLNR:EX; Robertson, Linda G ABR:EX; '[email protected]'

Subject: KSM Mine Project - Mine Review Committee (Permitting) Update Attachments: KSM MRC TOR_Draft.docx; Section 11 Order - Amended Nov2012.pdf; KSM Concurrent

Review Process - March 2013.pdf; KSM Permitting Information Requirements Phase I March 2013.pdf; MDRC Application Distribution.xlsx

Good afternoon KSM Mine Review Committee (MRC);

As per the attached Environmental Assessment Office (EAO) amended Section 11 Order (dated November 30, 2012), Seabridge Gold will be submitting Batch I of their authorization applications at the time, or prior to the EAO accepting the Environmental Assessment application for review. Seabridge will be applying for Concurrent permitting under the Concurrent Approval Regulation.

~ Concurrent Approval Regulation (Regulation the proponent will be applying under for permitting)

http://www.bclaws.ca/EPLibraries/bclaws new/documentllD/freeside/10 371 2002

** Please Note: as per the Concurrent Approval Regulation, the MRC review process (screening phase) will commence when:

• EA application has been accepted for review by the EAO; • MPO provides a coordinated response to the EAO that permit applications have been filed

in accordance to Ministry standards, and; • Notification is provided from the EA Director to the Major Projects Office that the

application for concurrent review has been accepted

To prepare for the MRC review process to start, please find attached the following documents for review and reference;

~ Mine Review Committee Draft Terms of Reference o Identifies the purpose of the Mine Review Committee and the roles and responsibilities

of its members, o Please review and provide comments to Jen Stalker [email protected] by May

3,2013. .

~ KSM Concurrent Review Process Map 1

FNR-2013-00423 Page 151FNR-2013-00423 Page 151

o Highlights the MRC process (should the applications be accepted by the EAO for concurrent permitting) and key milestones! timelines as the MRC moves through the authorization review process. Please note, this document will be adjusted throughout the review process accordingly if! when required (subject to change if timelines are adjusted)

> Batch I permit applications for the following project components (please refer to the permit applications list attached)

o Mine Site! Processing and Tailings Management Area o Camps o Access Roads (Coulter Creek! Treaty Creek) o Transmission Line o Mitchell-Treaty Tunnel

** Please review the application distribution list attached to ensure your contact information is up to date and that we have captured how you would like to receive the application (hardcopy, electronic or both) correctly. If changes are required please email [email protected] .

Next Steps - (Permitting)

• Within 7 days of the EAO accepting the EA application for review, agencies must confirm to the EAO that permit applications have been filed in accordance to Ministry standards! policy

o Project Manager (PM) will be coordinating with agencies! Front Counter BC to ensure permit applications have been filed in accordance (i.e. all applicable fees have been paid by the proponent)

o Project Manager will submit a letter to the EAO Director, on behalf of the agencies, stating whether or not the permit applications have been filed in accordance to Ministry standards

o Major Projects Office (MPO) will post all Batch I permit applications (electronic) to the project Sharepoint site for MRC access/ review - notification will be sent out to theMRC

• As per the Concurrent Approval Regulation, Section 8 (1); if the Executive Director of EAO notifies the Ministry (Major Projects Office) that the application for concurrent review is accepted , then within 75 days of the EAO accepting the EA application for review, agencies must notify the proponent and the EAO in writing of any additional information that the ministry anticipates it will require from the proponent in order to conduct the technical review.

o MPO Project Manager (PM) will coordinate the MRC comments and draft a letter to the EAO (and notify the proponent) , on behalf of the technical reviewers, of any additional information required to conduct the review.

o Project Manager is requesting that all comments from agencies are provided on/ or before Dav 60 in order for PM to compile and draft letter to EAO by Day 75.

• Next MRC Meeting o As the MRC enters the screening phase of the permit applications (should the EA

application be accepted for review, permit applications have been filed in accordance, and the EAO Director provides notification that the permit applications have been accepted for concurrent review), the next MRC meeting will be scheduled early in the screening phase (expected early June, 2013)

2

I

I

FNR-2013-00423 Page 152FNR-2013-00423 Page 152

o The purpose of this meeting will be to review the permit applications (for screening purposes) with the proponent available to answer questions and provide a project update. As well, direction will be provided as to the next steps in the mine permitting review process.

If you have any questions or concerns, please do not hesitate to contact me.

Thank you .

Jen Stalker, RPF

Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeena Region - Smithers, Be Phone: (250) 847-7506 Fax: (250) 847-7347 Email: [email protected]

3 FNR-2013-00423 Page 153FNR-2013-00423 Page 153

Env

ironm

enta

lA

sses

smen

tOffi

ce

(EA

App

licat

ion)

Maj

orP

roje

cts

Offi

ce

(MR

C–

Per

mitt

ing)

FEB

RU

AR

Y20

13 EAA

PPLI

CA

TIO

NSU

BM

ITTE

D

With

in75

Day

saf

tert

heE

AO

acce

pts

the

appl

icat

ion,

MP

Ono

tifie

sth

epr

opon

enta

ndE

AO

inw

ritin

gof

any

addi

tiona

linf

orm

atio

nre

quire

men

ts(fr

omth

eM

RC

)in

orde

rto

com

plet

eth

ere

view

NO

TE:

Age

ncie

sto

prov

ide

com

men

tsto

Proj

ectM

anag

eron

/bef

ore

Day

60to

allo

wPM

toco

mpi

leco

mm

ents

and

draf

tlet

ter

with

in75

days

“PR

E M

RC

M

EE

TIN

G”

(NO

VE

MB

ER

8TH)

AP

PLI

CA

TIO

NS

SU

BM

ITTE

D(P

RO

PO

NE

NT)

60da

ysto

reso

lve

outs

tand

ing

issu

es,

draf

tCom

mitt

eeR

epor

t(3

wee

ks)f

orM

RC

revi

ewan

dco

mm

ent(

2w

eeks

),dr

aftp

erm

itre

view

(2w

eeks

),an

dsu

bmit

to S

DM

’s fo

r dec

isio

n.

45D

AY

SCR

EEN

ING

(as

perS

ectio

n24

Ord

er)

MR

CTe

chni

calR

evie

w

KS

MM

INE

PR

OJE

CT

–C

ON

CU

RR

EN

TR

EV

IEW

PR

OC

ES

S–

Mar

ch20

13**

NO

TE–

Tim

elin

ean

dde

tails

inth

efo

llow

ing

proc

ess

diag

ram

are

subj

ectt

och

ange

EA

O–

prim

ary

poin

tofc

onta

ctfo

rFirs

tNat

ions

Con

sulta

tion

durin

gth

eE

Are

view

.

All

EA

OIs

sues

and

stat

ustra

cked

and

prov

ided

toM

PO

Dec

isio

nw

ithin

45D

ays M

RC

Tech

nica

lRev

iew

(leav

etim

eto

reso

lve

outs

tand

ing

issu

esan

dP

M(M

PO

)to

prep

are

Com

mitt

eeR

epor

t)

KIC

K–

OFF

MR

CM

eetin

g

Pro

pone

ntto

wal

kag

enci

es/

Firs

tNat

ions

thro

ugh

the

appl

icat

ions

subm

itted

MR

CM

EE

TIN

GM

RC

ME

ETI

NG

Mov

ein

tote

chni

calr

evie

won

cein

form

atio

nre

quire

men

tsar

esu

bmitt

ed/p

rovi

ded

(com

plet

eap

plic

atio

ns)

INTE

RN

AL

INFO

RM

ATI

ON

SHA

RIN

G(E

AO

/FLN

RO

)

*IS

SU

ES

TRA

CK

ER

*IN

FOR

MA

TIO

NS

HA

RIN

GM

ATE

RIA

LS/D

OC

UM

EN

TSTH

AT

BO

THE

AO

and

FLN

RO

RE

QU

IRE

AC

CE

SS

TOD

UR

ING

THE

RE

VIE

WP

RO

CE

SS

Chr

isH

amilt

on,D

avid

Gra

ceJe

nS

talk

er,J

ason

Pop

e,G

enev

ieve

Pat

erso

n

180

DA

YEA

APP

LIC

ATI

ON

REV

IEW

AN

DD

ECIS

ION

PAC

KA

GE

FOR

MIN

ISTE

RS

MP

Oto

draf

tlet

tert

oE

AO

and

Pro

pone

nton

beha

lfof

the

agen

cies

that

auth

oriz

atio

nsha

vebe

enfil

edin

acco

rdan

ce(w

ithin

7da

ysof

the

EA

appl

icat

ion

bein

gac

cept

edfo

rrev

iew

)

MA

RC

H20

13A

PR

IL20

13M

AY

2013

JUN

E20

13JU

LY20

13A

UG

US

T20

13S

EP

TEM

BE

R20

13O

CTO

BE

R20

13N

OV

EM

BE

R20

13D

EC

EM

BE

R20

13JA

NU

AR

Y20

14FE

BR

UA

RY

2014

MA

RC

H20

14

As

perS

ectio

n13

Ord

er:

The

prop

onen

tifa

pply

ing

forc

oncu

rren

tre

view

ofon

eor

mor

eap

plic

atio

nsfo

rapp

rova

lsun

dero

ther

enac

tmen

ts,m

usts

ubm

itth

ere

ques

tto

the

EA

OD

irect

orw

ithin

7da

ysaf

tert

heda

teon

whi

chth

eEA

OD

irect

orno

tifie

sth

epr

opon

entu

nder

sect

ion

16(4

)oft

heA

ctth

atth

epr

opon

ents

appl

icat

ion

has

been

acce

pted

forr

evie

w

(MP

Oto

draf

tlet

tert

oE

AO

and

Pro

pone

nton

beha

lfof

the

agen

cies

that

auth

oriz

atio

nsha

vebe

enac

cept

edfo

rrev

iew

with

in7

days

ofth

eE

Aap

plic

atio

nbe

ing

acce

pted

forr

evie

w)

FLN

RO

–pr

imar

ypo

into

fcon

tact

forF

irstN

atio

nsco

nsul

tatio

ndu

ring

the

MR

Cre

view

.

Pro

pone

ntre

spon

sibl

eto

prov

ide

agen

cies

with

requ

ired

hard

copi

es(fo

rth

ose

requ

estin

gha

rdco

pies

)

NO

TE-P

ropo

nent

tosu

bmit

alla

pplic

atio

nsdi

gita

llyto

MP

O–

will

bepo

sted

toth

epr

ojec

tS

hare

poin

tSite

forM

RC

acce

ss/r

evie

w.

Dec

isio

n P

acka

ge to

SD

M’s

FNR-2013-00423 Page 154FNR-2013-00423 Page 154

BRITISH COLUMBIA

File: 30200-20/KSMP-05-06

Reference: 102321

• November 30,2012

Jessy Chaplin Permitting Coordinator Seabridge Gold Inc. PO Box 2536 1235 Main St Smithers BC VOJ 2NO

Dear Ms. Chaplin:

This letter is in response to your letter of November 21, 2012, requesting an amendment to the November 6, 2009 Order under section 11 of the Environmental Assessment Act (Act) for the environmental assessment (EA) of the proposed KSM (Kerr-Sulphurets-Mitchell) Project (proposed Project).

Section 13 of the Act provides me with the authority to " ... vary the scope, procedures and methods determined under section 11 ... if necessary ... to complete an effective and timely assessment of the reviewable project." I consider this letter a section 13 Order for the purposes of the Act.

Section 15.4 of your section 11 Order currently states the following:

15.4 The Proponent, if applying for concurrent review of one or more applications for approvals under other enactments, must submit the request to the Project Assessment Manager no later than when the Proponent submits its Application under section 15.1 of this Order.

Pursuant to section 13 of the Act, I now order that section 15.4 of the section 11 Order be replaced with the following:

15.4 The Proponent, if applying for concurrent review of one or more applications for approvals under other enactments, must submit the request to the Executive Project Director within seven days after the date on which the Executive Project Director notifies the Proponent under section 16(4) of the Act that the Proponent's Application has been accepted for review.

Environmental Assessment Office

Mailing Address: PO Box 9426 Stn Prov Govt Victoria Be V8W 9V1

. . .12

Location: 1 st & 2nd FI - 836 Yates Street Victoria Be V8W 1 L8

FNR-2013-00423 Page 155FNR-2013-00423 Page 155

· - 2 -

If you have any questions with respect to this Order, please feel free to contact me at [email protected] or 250-387-1032, or David Grace, Project Assessment Manager, at David [email protected] or 250-387-1417, or Nicole Vinette, Project Assessment Officer, at [email protected] or 250-356-5311.

cc: Garett Cooper, Project Manager Canadian Environmental Assessment Agency

Elizabeth Miller, Manager, Environmental Affairs Seabridge Gold Inc.

FNR-2013-00423 Page 156FNR-2013-00423 Page 156

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

1 |

Pa

ge

Con

ten

tsCo

ulte

r Cre

ek A

cces

s Ro

ad S

peci

al U

se P

erm

it an

d Su

ppor

ting

Perm

its ..

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

2

Coul

ter C

reek

Con

stru

ctio

n Ca

mps

.....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

4

Trea

ty C

reek

Con

stru

ctio

n Ca

mps

.....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

..5

Trea

ty C

reek

Acc

ess

Road

Spe

cial

Use

Per

mit

and

Supp

ortin

g Pe

rmits

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

....5

Batc

h 1

Min

e Si

te &

Pro

cess

ing

and

Taili

ng M

anag

emen

t Are

a (P

TMA

) Lim

ited

Site

Con

stru

ctio

n ...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.....7

Mitc

hell-

Trea

ty T

win

Tun

nel .

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.....

10

FNR-2013-00423 Page 157FNR-2013-00423 Page 157

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

2 |

Pa

ge

1 A

lthou

gh th

e A

DD

ER d

oes

not s

peci

fy a

dver

tisin

g re

quir

emen

ts fo

r lic

ence

s to

cut

, the

cur

rent

MFR

pol

icy

is to

adv

ertis

e op

port

uniti

es to

obt

ain

a co

mpe

titiv

ely

awar

ded

FLTC

for

a m

inim

um o

f 2 w

eeks

us

ing

the

MFR

Off

icia

l Not

ices

web

site

A te

mpl

ate

for a

dver

tisem

ents

to c

ompe

titiv

ely

awar

d an

FLT

C is

ava

ilabl

e at

htt

p://

gww

.for.

gov.

bc.c

a/ht

h/tim

ten/

docu

men

ts/i

nter

med

iate

-sal

vage

-ex

ampl

eadv

ertis

ing-

for-

tend

ers.

doc.

1

Cou

lter

Cre

ek A

cces

s R

oad

Sp

ecia

l Use

Per

mit

an

d S

up

por

tin

g P

erm

its

Proj

ect

Com

pone

nt

Stat

ute/

Perm

it

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sult

atio

n Co

ntac

t Es

kay

Acc

ess

Road

Km

0-4

Bob

Qui

nn F

SR

Road

Use

Per

mit

FS10

9-R

UPA

pp.d

oc

M

aint

enan

ce A

gree

men

t with

Alta

Gas

FW R

oad

Use

A

gree

men

t.m

sg

No

A

lta G

as-L

oren

Kel

ly

FLRN

O-W

ill F

oste

r

Km 4

-43.

5 A

lta G

as S

UP

S253

18

Mai

nten

ance

Agr

eem

ent w

ith A

ltaG

as

Km 4

3.5-

54.6

(tur

noff

to

CCA

R)

1.) B

arri

ck G

old

SUP

reas

sign

men

t of

SUP

(with

the

SUP

hold

ers

agre

emen

t)

2.) M

aint

enan

ce A

gree

men

t for

Ba

rric

k G

old

N

o Se

abri

dge-

Jess

y Ch

aplin

54.6

km

to e

nd o

f new

co

nstr

uctio

n at

Mitc

hell

Cree

k Br

idge

88.

5 km

1.)

Coul

d be

an

amen

dmen

t to

exis

ting

Barr

ick

SUP

2.)

New

SU

P if

Barr

ick

SUP

in n

ot

reas

sign

ed

If

#2 (N

ew S

UP)

yes

FLN

RO-W

ill F

oste

r

Coul

ter C

reek

Acc

ess

Road

(C

CAR)

Th

e Fo

rest

Pra

ctic

es C

ode

of B

C an

d th

e Pr

ovin

cial

For

est U

se R

egul

atio

n ar

e th

e au

thor

izat

ion

for

the

Spec

ial

Use

Per

mit

(SU

P).

FW C

onfir

mat

ion

of

appr

opria

te p

erm

its in

Th

ere

will

be

4 O

LTC’

s fo

r KSM

1.

Cou

lter

Cree

k A

cces

s 2.

Tre

aty

Cree

k A

cces

s 3.

PTM

A-P

roce

ss P

lant

and

Tai

ling

Man

agem

ent A

rea

4.M

ine

Site

Pack

age

Publ

ic C

onsu

ltatio

n fo

r acc

ess,

SU

P an

d as

soci

ated

OLT

C’s

can

be d

one

at o

ne ti

me.

SUP

� O

LTC

MFR

Off

icia

l Not

ices

web

site

.1

FLRN

O-W

ill F

oste

r

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

O

ccup

ant L

icen

ce to

Cut

Fish

erie

s A

ct-R

evie

w S

UP

for

Pend

ing

Conf

irmat

ion

No

DFO

-Pat

Lim

FNR-2013-00423 Page 158FNR-2013-00423 Page 158

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

3 |

Pa

ge

oper

atio

nal s

tate

men

ts fo

r str

eam

cr

ossi

ng

Wor

ksaf

e BC

Act

- Not

ice

of F

ores

try

Ope

ratio

ns F

orm

ht

tp:/

/ww

w.w

orks

afeb

c.co

m/i

nsur

ance

/man

agin

g_yo

ur_a

cco

unt/

notic

e_of

_pro

ject

/def

ault.

asp

No

WSB

C Te

rrac

e

Wild

life

Act

- Wild

life

salv

age

and

rem

oval

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/pas

b/fw

_per

mre

g.ht

ml

No

PASB

-Con

tact

TBD

Unu

k Ri

ver

Brid

ge

Nav

igab

le W

ater

s Pr

otec

tion

Act

-N

avig

able

Str

eam

Cro

ssin

g

http

://w

ww

.tc.

gc.c

a/en

g/pa

cific

/mar

ine-

nwpp

-app

licat

ions

-13

37.h

tm

No

NW

P-Jo

hn M

acki

e

CCA

R La

ydow

n A

reas

, Log

La

ndin

gs a

nd B

orro

w A

reas

Th

e Fo

rest

Pra

ctic

es C

ode

of B

C an

d th

e Pr

ovin

cial

For

est U

se R

egul

atio

n ar

e th

e au

thor

izat

ion

for

the

Spec

ial

Use

Per

mit

(SU

P).

Thes

e ar

eas

are

to b

e w

ithin

the

SUP

boun

dary

sup

plie

d as

a

shap

e fil

e to

FLN

RO.

Mos

t of t

hese

are

as a

re w

ithin

the

75 m

RO

W.

Whe

re la

nd o

utsi

de o

f the

75

ROW

is r

equi

red,

it

is c

lear

ly id

entif

ied

on m

aps.

Yes,

to b

e in

clud

ed in

Cou

lter

Cree

k A

cces

s Ro

ad S

UP

appl

icat

ion

Pack

age

FLN

RO-W

ill F

oste

r

FNR-2013-00423 Page 159FNR-2013-00423 Page 159

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

4 |

Pa

ge

Cou

lter

Cre

ek C

onst

ruct

ion

Cam

ps

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t Ca

mp

#3 E

skay

Cre

ek M

ine

Site

Sta

ging

(50p

l)

Land

Act

–In

dust

rial

Lic

ence

of

Occ

upat

ion

ht

tp:/

/ww

w.a

gf.g

ov.b

c.ca

/cla

d/D

ocum

ents

/LPS

B/Po

licie

s/in

dust

rial

_gen

.pdf

Ye

s ht

tp:/

/ww

w.fo

r.go

v.bc

.ca/

Land

_Ten

ures

/doc

um

ents

/cab

inet

/adv

ertis

ing.

pdf

Cam

Ben

tley

Drin

king

Wat

er P

rote

ctio

n A

ct-

Cons

truc

tion

Perm

it (H

20-C

) W

ater

Con

stru

ctio

n Pe

rmit

Proc

ess.

pdf

Indu

stria

l Cam

p R

equi

rem

ents

- H

ealth

NH

A A

pplic

atio

n fo

r W

ater

wor

ks C

onst

ruc

NH

A A

PPLI

CA

TIO

N

WA

TER

0504

14.p

dfN

HA

%20

App

licat

ion

%20

for%

20W

ater

wo

App

licat

ion

for

Hea

lth A

ppro

val.p

df

No

NH

A-S

hane

Wad

den

D

rinki

ng W

ater

Pro

tect

ion

Act

- Co

nstr

uctio

n Pe

rmit

(H20

-O)

Publ

ic H

ealth

Act

-Sew

age

Perm

it

10-4

60-3

038

- G

uidl

ines

for

Ind

ustr

ia

Publ

ic H

ealth

Act

-Foo

d Pe

rmit

Ope

ning

a N

ew F

ood

Prem

ise

NH

.pdf

W

ater

Act

-Gro

undw

ater

Wel

l Re

gist

ratio

n

http

://w

ww

.env

.gov

.bc.

ca/w

sd/p

lan_

prot

ect_

sust

ain/

grou

ndw

ater

/ind

ex.h

tml

Envi

ronm

enta

l Man

agem

ent A

ct-

Ope

n Bu

rnin

g Re

quir

ed o

nly

if op

en b

urni

ng is

req

uire

d, 1

per

mit

can

be is

sued

fo

r min

e si

te.

http

://w

ww

.bca

irqu

ality

.ca/

topi

cs/b

urni

ng-o

utdo

ors.

htm

l ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/was

te_d

isch

arge

_aut

h/ap

p_fo

rms

/ind

ex.h

tm

No

MoE

- Jea

nien

Ca

rmod

y -Fa

llow

s

FNR-2013-00423 Page 160FNR-2013-00423 Page 160

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

5 |

Pa

ge

O

Ca

mp

#7 U

nuk

Nor

th (4

0pl)

Sam

e pe

rmit/

info

rmat

ion

requ

irem

ents

for

Cam

p #3

Esk

ay C

amp

Min

es S

ite

Cam

p #8

Unu

k Ri

ver

Stag

ing

(40p

l) Sa

me

perm

it/in

form

atio

n re

quir

emen

ts fo

r Ca

mp

#3 E

skay

Cre

ek M

ine

site

Sta

ging

Cam

p (5

0pl).

Tre

aty

Cree

k Co

nst

ruct

ion

Cam

ps

Cam

p #1

2 H

wy

37 (6

0pl)

Priv

ate

Agr

eem

ent (

Seab

ridge

inte

nds

to u

se e

xist

ing

cons

truc

tion

cam

ps a

long

Hig

hway

37,

and

will

mak

e ar

rang

emen

ts w

ith th

em).

Cam

p #1

1 Tr

eaty

Cre

ek

Mar

shal

ling

(60p

l) Sa

me

perm

it/in

form

atio

n re

quir

emen

ts fo

r Ca

mp

#3 E

skay

Cre

ek M

ine

site

Sta

ging

Cam

p (5

0pl).

*Min

us L

icen

ce o

f Occ

upat

ion,

this

cam

p is

to b

e pe

rmitt

ed u

nder

the

Min

es A

ct.

OLT

C th

at c

over

s th

e SU

P an

d LO

O w

ill c

over

the

cam

p lo

catio

n.

Tre

aty

Cree

k A

cces

s R

oad

Sp

ecia

l Use

Per

mit

an

d S

up

por

tin

g P

erm

its

Trea

ty C

reek

Acc

ess

Road

s (t

o Pl

ant S

ite a

nd T

reat

y Sa

ddle

Po

rtal

)

The

Fore

st P

ract

ices

Cod

e of

BC

and

the

Prov

inci

al F

ores

t Use

Re

gula

tion

are

the

auth

oriz

atio

n fo

r th

e Sp

ecia

l Use

Per

mit

(SU

P).

FW C

onfir

mat

ion

of

appr

opria

te p

erm

its in

Yes

FLRN

O-W

ill F

oste

r

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

O

ccup

ant L

icen

ce to

Cut

ht

tp:/

/ww

w.fo

r.go

v.bc

.ca/

dsi/

MTe

nure

s_Sa

lvag

e.ht

m#L

icen

se_t

o_C

ut-L

TC

Ther

e w

ill b

e 4

OLT

C’s

for K

SM

1. C

oulte

r Cr

eek

Acc

ess

2. T

reat

y Cr

eek

Acc

ess

3. P

TMA

-Pro

cess

Pla

nt a

nd T

ailin

g M

anag

emen

t Are

a 4.

Min

e Si

te

Wor

ksaf

e BC

Act

- Not

ice

of

Fore

stry

Ope

ratio

ns F

orm

ht

tp:/

/ww

w.w

orks

afeb

c.co

m/i

nsur

ance

/man

agin

g_yo

ur_a

ccou

nt/n

otic

e_of

_pro

ject

/def

ault.

asp

No

WSB

C Te

rrac

e

Wild

life

Act

- Wild

life

Salv

age

and

Rem

oval

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/pas

b/fw

_per

mre

g.ht

ml

No

PASB

Hig

hway

s A

ct-P

rovi

ncia

l Pub

lic

Hig

hway

Per

mit

App

licat

ion

- Co

nnec

tion

to H

wy

37

http

://w

ww

.th.

gov.

bc.c

a/pe

rmits

/H00

20.a

sp

No

MoT

I-She

rri

App

lega

te

Bell-

Irvi

ng R

iver

Bri

dge

Fish

erie

s A

ct (D

FO)-

Aut

horiz

atio

n of

Bel

l Irv

ing

Brid

ge c

ross

ing

Pe

ndin

g Co

nfirm

atio

n fr

om D

FO

? D

FO-P

at L

im

Fi

sher

ies

Act

(DFO

)- R

evie

w S

UP

for

Ope

ratio

nal S

tate

men

ts fo

r st

ream

cro

ssin

gs

Pend

ing

Conf

irmat

ion

from

DFO

?

Wat

er A

ct-N

otifi

catio

n (S

ectio

n 9)

ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/wsd

/wat

er_r

ight

s/lic

ence

_app

licat

ion/

No

FLRN

O-E

mily

Bu

lmer

FNR-2013-00423 Page 161FNR-2013-00423 Page 161

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

6 |

Pa

ge

sect

ion9

/

Und

er s

ectio

n 44

(2) o

f the

Wat

er R

egul

atio

n, a

n A

ppro

val o

r N

otifi

catio

n is

not

req

uire

d fo

r in

stre

am w

orks

rel

ated

to fo

rest

ac

tiviti

es w

here

a s

tand

ard

or re

gula

tion

exis

ts u

nder

the

Fore

st

and

Rang

e Pr

actic

es A

ct o

f Bri

tish

Colu

mbi

a. T

his

is p

rovi

ded

that

th

e ch

ange

is m

ade

by a

mun

icip

ality

or p

erso

n w

ho:

� ho

lds

an a

gree

men

t or

road

use

per

mit

unde

r the

For

est A

ct,

an a

gree

men

t und

er th

e Ra

nge

Act

, or a

spe

cial

use

per

mit

unde

r th

e Fo

rest

Pra

ctic

es C

ode

of B

ritis

h Co

lum

bia

Act

, or

N

avig

able

Wat

ers

Prot

ectio

n A

ct-

Nav

igab

le S

trea

m C

ross

ing

ht

tp:/

/ww

w.t

c.gc

.ca/

eng/

paci

fic/m

arin

e-nw

pp-a

pplic

atio

ns-

1337

.htm

N

o N

WP-

John

Mac

kie

Layd

own

Are

as, L

og L

andi

ngs

and

Borr

ow A

reas

Th

e Fo

rest

Pra

ctic

es C

ode

of B

C an

d th

e Pr

ovin

cial

For

est U

se

Regu

latio

n ar

e th

e au

thor

izat

ion

for

the

Spec

ial U

se P

erm

it (S

UP)

.

Thes

e ar

eas

are

to b

e w

ithin

the

SUP

boun

dary

sup

plie

d as

a

shap

e fil

e to

FLN

RO.

Mos

t of t

hese

are

as a

re w

ithin

the

75 m

RO

W.

Whe

re la

nd o

utsi

de o

f the

75

ROW

is r

equi

red,

it is

cle

arly

id

entif

ied

on m

aps.

No

FLRN

O-W

ill F

oste

r

Tran

smis

sion

Lin

e Ri

ght o

f W

ay

Land

Act

- Util

ity- L

icen

se o

f O

ccup

atio

n ht

tp:/

/ww

w.fo

r.go

v.bc

.ca/

Land

_Ten

ures

/ten

ure_

prog

ram

s/pr

ogr

ams/

utili

ties/

inde

x.ht

ml

Yes

FLN

RO-C

am

Bent

ley

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t Ca

mp

#5Tr

eaty

Pla

nt C

amp

(800

pl)

Min

es A

ct –

Perm

it ht

tp:/

/ww

w.e

mpr

.gov

.bc.

ca/M

inin

g/Pe

rmitt

ing-

Recl

amat

ion/

Page

s/de

faul

t.as

px

Yes

MEM

-Dia

ne H

owe

Fo

rest

and

Ran

ge P

ract

ices

Act

Occ

upan

t Lic

ence

to C

ut

http

://w

ww

.for.

gov.

bc.c

a/ds

i/M

Tenu

res_

Salv

age.

htm

#Lic

ense

_to

_Cut

-LTC

T

here

will

be

4 O

LTC’

s fo

r KSM

1.

Cou

lter

Cree

k A

cces

s 2.

Tre

aty

Cree

k A

cces

s 3.

PTM

A-P

roce

ss P

lant

and

Tai

ling

Man

agem

ent A

rea

4.M

ine

Site

Yes

FLRN

O-W

ill F

oste

r

Envi

ronm

enta

l Man

agem

ent A

ct-

Mun

icip

al W

aste

wat

er

Regu

latio

n

FW c

amps

EM

A

perm

ittin

g sp

ecifi

catio

No

MoE

- Jea

nien

Ca

rmod

y -Fa

llow

s

Envi

ronm

enta

l Man

agem

ent A

ct-

http

://w

ww

.env

.gov

.bc.

ca/e

pd/m

un-w

aste

/was

te-

No

FNR-2013-00423 Page 162FNR-2013-00423 Page 162

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

7 |

Pa

ge

Was

te D

isch

arge

(Lan

dfill

) so

lid/l

andf

ills/

crite

ria-la

ndfil

ls.h

tm

En

viro

nmen

tal M

anag

emen

t Act

-W

aste

Dis

char

ge (I

ncin

erat

or)

http

://w

ww

.env

.gov

.bc.

ca/e

pd/w

aste

_dis

char

ge_a

uth/

app_

form

s/i

ndex

.htm

FW F

ollo

w u

p to

Pr

e-re

gist

ratio

n M

eet

� A

pub

lic n

otic

e of

app

licat

ion

to b

e pl

aced

in th

e BC

Gaz

ette

and

loca

l new

s m

edia

30 d

ay p

ublic

not

ifica

tion

peri

od

� A

pplic

atio

n fe

es (c

onta

ct n

eare

st

Min

istr

y Re

gion

al O

ffic

e)

� A

fina

l Tec

hnic

al A

sses

smen

t Rep

ort m

ay

be r

equi

red

� Co

nsul

tatio

n Re

port

D

rinki

ng W

ater

Pro

tect

ion

Act

- Co

nstr

uctio

n Pe

rmit

(H20

-C)

See

Cam

p #3

Esk

ay C

reek

Min

e si

te S

tagi

ng C

amp

(50p

l) fo

r pe

rmit/

info

rmat

ion

requ

irem

ents

.

Drin

king

Wat

er P

rote

ctio

n A

ct-

Cons

truc

tion

Perm

it (H

20-O

) Pu

blic

Hea

lth A

ct-F

ood

Perm

it W

ater

Act

-Gro

undw

ater

Wel

l Re

gist

ratio

n

Cam

p #6

Tre

aty

Sadd

le C

amp

(120

pl)

Sam

e re

quir

emen

ts a

s ab

ove:

Cam

p#5

Trea

ty P

lant

Cam

p pl

us

Cam

p #6

: Tre

aty

Sadd

le r

equi

res

a Li

cenc

e of

Occ

upat

ion

whi

ch is

und

er r

evie

w s

ince

Sep

t 20,

201

2. L

ands

File

No:

640

8448

W

ater

Act

-Not

ifica

tion

(Sec

tion

9)

http

://w

ww

.env

.gov

.bc.

ca/w

sd/w

ater

_rig

hts/

licen

ce_a

pplic

atio

n/se

ctio

n9/

No

FLRN

O-E

mily

Bul

m

Bat

ch 1

Min

e Si

te &

Pro

cess

ing

and

Tai

lin

g M

anag

emen

t A

rea

(PT

MA

) Li

mit

ed S

ite

Con

stru

ctio

n

Proj

ect C

ompo

nent

St

atut

e/Pe

rmit

Com

men

ts/R

equi

rem

ents

Pu

blic

Con

sulta

tion?

Co

ntac

t La

ydow

n A

reas

, Log

Lan

ding

s an

d Bo

rrow

Are

as

Min

e Si

te ti

mbe

r cle

arin

g

PTM

A ti

mbe

r cle

arin

g

Min

e Si

te ro

ad c

onst

ruct

ion

PTM

A S

ite r

oad

cons

truc

tion

Min

es A

ct –

M -

Perm

it O

ne P

erm

it fo

r KSM

Pro

ject

incl

udin

g th

e M

ine

Site

and

PTM

A-

Proc

ess

Plan

t and

Tai

ling

Man

agem

ent A

rea

http

://w

ww

.em

pr.g

ov.b

c.ca

/Min

ing/

Perm

ittin

g-Re

clam

atio

n/Pa

ges/

defa

ult.

aspx

Yes

MEM

-Dia

ne H

owe

Fore

st a

nd R

ange

Pra

ctic

es A

ct –

O

ccup

ant L

icen

ce to

Cut

O

ne O

LTC

Amen

dmen

t for

Min

e Si

te a

nd o

ne O

LTC

Amen

dmen

t fo

r PTM

A

Ther

e w

ill b

e 4

OLT

C’s

for K

SM

1. C

oulte

r Cr

eek

Acc

ess

2. T

reat

y Cr

eek

Acc

ess

3. P

TMA

-Pro

cess

Pla

nt a

nd T

ailin

g M

anag

emen

t Are

a

Yes

FLN

RO-W

ill F

oste

r

FNR-2013-00423 Page 163FNR-2013-00423 Page 163

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

8 |

Pa

ge

Min

e Si

te C

amps

: Ca

mp

#2: T

ed M

orri

s Ca

mp

#4: M

itche

ll N

orth

Ca

mp

#9/1

0: M

itche

ll in

itial

/sec

onda

ry

Cam

p

Wat

er S

tora

ge D

am (W

SD)

site

pre

para

tion

(in th

e M

ine

Site

)

Mitc

hell-

Trea

ty T

win

ned

Tunn

els

(MTT

) Mitc

hell

Port

als

cons

truc

tion

(in th

e M

ine

Site

)

MTT

Tre

aty

Port

als

cons

truc

tion

(in th

e PT

MA

)

MTT

Tre

aty

Sadd

le P

orta

l co

nstr

uctio

n (a

t the

Tre

aty

Sadd

le)

4.M

ine

Site

EM

A-W

aste

Dis

char

ge

One

EM

A P

erm

it fo

r Min

e Si

te a

nd P

TMA

CON

RETE

PLA

NTS

– a

re th

ey p

lann

ed a

nd w

here

?

REQ

UIR

E RE

GIS

TRA

TIO

N U

ND

ER C

ON

CRET

E CO

DE

– do

esn’

t hav

e to

be

done

with

Con

curr

ent –

but n

eed

to g

et d

one

earl

y in

co

nstr

uctio

n ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/was

te_d

isch

arge

_aut

h/re

gist

ratio

n/in

dex.

htm

E

NV

IRO

NM

EN

TAL

MAN

AG

EM

EN

T A

CT

- app

licat

ions

with

re

quire

d ap

plic

atio

n fe

es ($

200

per a

pplic

atio

n ) t

o be

sen

t to:

Env

ironm

enta

l Man

agem

ent B

ranc

h M

inis

try O

f Env

ironm

ent

PO

Box

937

7 S

tn P

rov

Gov

t V

icto

ria, B

C V

8W 9

M1

Or D

ELI

VE

R b

y co

urie

r to:

3r

d Fl

oor,

2975

Jut

land

Roa

d, V

icto

ria, B

C V

8T 5

J9

Yes-

One

Pub

lic C

onsu

ltatio

n Pa

ckag

e fo

r M

ine

Site

A p

ublic

not

ice

of a

pplic

atio

n to

be

plac

ed in

the

BC G

azet

te a

nd lo

cal n

ews

med

ia

� 30

day

pub

lic n

otifi

catio

n pe

riod

**

Any

requ

irem

ents

for

publ

ic c

onsu

ltatio

n fr

om th

e EA

are

dup

licat

ed fo

r an

y EM

A

appl

icat

ions

.

FW F

irst

Nat

ions

C

onsu

ltatio

n w

ith E

MA

� A

pub

lic n

otic

e of

app

licat

ion

to b

e pl

aced

in th

e BC

Gaz

ette

and

loca

l new

s m

edia

30 d

ay p

ublic

not

ifica

tion

peri

od

� A

pplic

atio

n fe

es (c

onta

ct n

eare

st M

inis

try

Regi

onal

Off

ice)

A fi

nal T

echn

ical

Ass

essm

ent R

epor

t may

be

req

uire

d Co

nsul

tatio

n Re

port

MoE

-Jea

nien

Ca

rmod

y -Fa

llow

s

Min

ing

Leas

e –

for t

he M

ine

Site

Min

ing

Leas

e -f

or th

e PT

MA

Min

eral

Ten

ures

Act

-Min

ing

Leas

e fo

r th

e M

ine

Site

App

licat

ion

unde

r re

view

sin

ce M

arch

200

9.

In p

rogr

ess

Min

eral

Ten

ures

Br

anch

-–Tr

acy

Mar

tin

Min

eral

Ten

ures

Act

-Min

ing

Leas

e to

be

appl

ied

for t

he P

TMA

Min

eral

Ten

ures

Br

anch

–Tr

acy

Mar

tin

r

Min

e A

rea

- Non

-Con

tact

W

ater

Act

and

the

Wat

er

http

://w

ww

.env

.gov

.bc.

ca/w

sd/w

ater

_rig

hts/

licen

ce_a

pplic

atio

n/N

o FL

RNO

-Em

ily

FNR-2013-00423 Page 164FNR-2013-00423 Page 164

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

9 |

Pa

ge

Div

ersi

ons

PTM

A –

Non

-con

tact

di

vers

ions

Prot

ectio

n A

ct-W

ater

Lic

ence

in

dex.

htm

l N

on-c

onta

ct d

iver

sion

s ar

ound

the

Min

e Si

te a

nd P

TMA

do

requ

ire

appr

oval

s.

Wor

ks T

hat D

o N

ot R

equi

re a

n A

ppro

val o

r Not

ifica

tion

Und

er s

ectio

n 44

(2) o

f the

Wat

er R

egul

atio

n, a

n A

ppro

val o

r N

otifi

catio

n is

not

req

uire

d fo

r in

stre

am w

orks

rel

ated

to fo

rest

ac

tiviti

es w

here

a s

tand

ard

or re

gula

tion

exis

ts u

nder

the

Fore

st

and

Rang

e Pr

actic

es A

ct o

f Bri

tish

Colu

mbi

a. T

his

is p

rovi

ded

that

th

e ch

ange

is m

ade

by a

mun

icip

ality

or p

erso

n w

ho:

• ho

lds

an a

gree

men

t or

road

use

per

mit

unde

r the

For

est A

ct, a

n ag

reem

ent u

nder

the

Rang

e A

ct, o

r a s

peci

al u

se p

erm

it un

der

the

Fore

st P

ract

ices

Cod

e of

Brit

ish

Colu

mbi

a A

ct, o

r

• is

aut

hori

zed

to c

onst

ruct

or m

odify

a r

oad

unde

r th

e Co

al A

ct,

the

Geo

ther

mal

Res

ourc

es A

ct, t

he M

ines

Act

, the

Min

ing

Righ

t of

Way

Act

or

the

Petr

oleu

m a

nd N

atur

al G

as A

ct.

Und

er s

ectio

n 44

(3) o

f the

Wat

er R

egul

atio

n a

chan

ge m

ay a

lso

be m

ade

in a

nd a

bout

a s

trea

m b

y a

pers

on w

ho h

olds

a p

erm

it un

der

sect

ion

10 o

f the

Min

es A

ct, w

ithou

t obt

aini

ng a

n A

ppro

val

or N

otifi

catio

n, if

the

pers

on c

ompl

ies

with

: •

Part

11

of th

e H

ealth

, Saf

ety

and

Recl

amat

ion

Code

for M

ines

in

Briti

sh C

olum

bia,

and

All

cond

ition

s in

the

perm

it re

spec

ting

chan

ges

in a

nd a

bout

a

stre

am.

Bulm

er

Land

Fill

and

Con

tam

inat

ed

Soils

Lan

d Fa

rm

� M

ine

Site

PTM

A

Envi

ronm

enta

l Man

agem

ent A

ct-

Was

te D

isch

arge

(Lan

dfill

) ht

tp:/

/ww

w.e

nv.g

ov.b

c.ca

/epd

/mun

-was

te/w

aste

-so

lid/l

andf

ills/

crite

ria-la

ndfil

ls.h

tm

Yes

MoE

-Jea

nien

Ca

rmod

y -Fa

llow

s

Tem

pora

ry E

xplo

sive

Sto

rage

at

the

Min

e Si

te

Tem

pora

ry E

xplo

sive

Sto

rage

BC M

ines

Act

– E

xplo

sive

s St

orag

e an

d U

se P

erm

it

BC M

ines

Act

and

Reg

ulat

ions

(HSR

CBC,

200

8) re

quire

s us

ers

to

appl

y an

nual

ly fo

r an

exp

losi

ves

stor

age

and

use

perm

it

No

Reg

iona

l Min

es

Off

ice

– D

oug

Flyn

n, S

cott

Par

ker

FNR-2013-00423 Page 165FNR-2013-00423 Page 165

KSM

Con

curr

ent P

erm

ittin

g Ph

ase

I (KS

M L

imite

d Si

te C

onst

ruct

ion)

10 |

Pa

ge

at th

e PT

MA

Perm

anen

t Exp

losi

ve F

acto

ry

at th

e M

ine

Site

Ex

plos

ives

Act

- Ex

plos

ives

Fa

ctor

y Li

cenc

e

http

://w

ww

.nrc

an.g

c.ca

/min

eral

s-m

etal

s/ex

plos

ives

/375

2

Thro

ugh

the

Expl

osiv

es R

egul

ator

y D

ivis

ion,

ESS

B pr

ovid

es

serv

ices

and

sup

port

to th

e m

embe

rs o

f the

exp

losi

ves

indu

stry

in

clud

ing

man

ufac

ture

rs, t

rans

port

ers,

impo

rter

s, s

elle

rs a

nd

user

s of

exp

losi

ves.

N

R Ca

n-M

elan

ie

Cam

pbel

l

Wat

er T

reat

men

t Fac

ility

disc

harg

e at

the

Min

e Si

te

Inte

rnat

iona

l Riv

er

Impr

ovem

ents

Act

-IRIA

Lic

ence

ht

tp:/

/ww

w.e

c.gc

.ca/

Publ

icat

ions

/def

ault.

asp?

lang

=En&

xml=

529

428D

8-8E

9B-4

F5E-

9BD

5-81

2723

95F9

E7

Yes

Env

Can-

June

Yoo

Ri

fkin

Mit

chel

l-T

reat

y T

win

Tu

nn

el

Mitc

hell-

Trea

ty T

win

Tun

nel

Land

s A

ct –

Lic

ence

of

Occ

upat

ion

App

licat

ion

subm

itted

thro

ugh

Fron

t Cou

nter

BC

Sept

embe

r,

2012

. Th

is a

pplic

atio

n w

ill b

e re

view

ed a

nd p

roce

ssed

as

part

of

Phas

e 1

perm

its.

Yes

Cam

Ben

tley

FNR-2013-00423 Page 166FNR-2013-00423 Page 166

KSM direct correspondence

Appliaction: Electronic/ Hardcopy/ Both

Spatial: ShapefileYes or No

Name

To Hardcopy & Electronic Al Hoffman

To Electronic Diane Howe

To Electronic Kim Bellefontaine

To Electronic Tanya Demchuck

To Electronic Heather Narynski

To Electronic George Warnock

To Electronic Kathie Wagar

To Electronic Ian Sharpe

To Electronic YesJeanien Carmody-

Fallows To Electronic Scott JacksonTo Electronic Craig Stewart

To Electronic Regan Fielding

To Electronic Patrick Williston

To Electronic Yes Jennifer Stalker

To Electronic No Chris Schell

To Electronic Yes Cam Bentley

To Electronic No Emily Bulmer

No

No

Ministry of Forests

M

Ministry o

FNR-2013-00423 Page 167FNR-2013-00423 Page 167

To Electronic Yes Eric Forgeng

To Will Foster

CC Ron Donnelly

CC Matt Sakals

CC Howard Debeck

To Rosemary Barnewall

CC Sherrie Applegate

To Electronic No Tara Marsden

To Electronic No Frederic Tolmie

To Electronic No Tracey McKayTo Electronic Yes Mansell Griffin

To Chief Darlene Simpson

Electronic X2 Hardcopy Yes

Ministry of

Electronic No

FNR-2013-00423 Page 168FNR-2013-00423 Page 168

To Both No Nalaine Morin

To Garett Cooper

To June Yoo Rifkin

To Jessica Coulson

To Electronic NoMelanie Campbell

To Both No John Mackie

To Both No Pat Lim

CC Electronic YesKyle Moselle

To Andrew Webber

To Shane WaddenBoth No

Canadian En

N

Region

Alaska De

Depart

FNR-2013-00423 Page 169FNR-2013-00423 Page 169

CC Azreer Gill

FNR-2013-00423 Page 170FNR-2013-00423 Page 170

Title Contact email address Phone Number

Chief Inspector of Mines [email protected] 250-952-0494

Deputy Chief Inspector [email protected] 250-952-0183Sr. Environmental

Geoscientist [email protected] 250-952-0489

Sr. Environmental Geoolgist

[email protected] 250-952-0417

Geotechnical Inspector [email protected] 250-387-0883

Geotechnical Engineering Manager

[email protected] 250-565-4327

Director -Northwest Regional Mines Office

[email protected] 250-847-7653

Regional Manager [email protected] 250-847-7251Environmental Protection

[email protected] 250-847-7273

Regional Hydrologist [email protected] 250-847-7507Compliance Specialist [email protected] 250-847-7416

Environmental Protection Officer

[email protected] 250-847-7353

Impact Assessment Biologist

[email protected] 250-847-7454

Project Manager [email protected] 250-847 -506

Sr. Ecosystems Biologist [email protected] 250 847-7389

Land Tenures Specialist [email protected] 250-847-7388

Water Stewardship Officer

Emily,[email protected] 250-847-7350

, Lands and Natural Resource Operations

Ministry of Environment

of Energy, Mines and Natural Gas

FNR-2013-00423 Page 171FNR-2013-00423 Page 171

Heritage Resource Specialist

[email protected] 250-953-3362

Resource Tenure Specialist

[email protected] 250-847-6309

Tenures Forester/Engineering

[email protected] 250-847-6378

Research Geomorphologist

[email protected] 250-847-6322

Field Engineer [email protected] 250-847-6397

District Program Manager [email protected] 250-847-7404

Senior Development Approvals

[email protected] 250-847-7396

Gitanyow Huwilp Lax'yip Implementation

[email protected] 250- 849-5373

Chief Executive Officer [email protected] 250-633-3002

Lands Manager [email protected] 250-633-3000Lands Manager [email protected] 250-633-3000

Chief 250-842-5651

Transportation and Infastructure

Tahltan

Skii km Lax Ha

Nisga'a Nation

Gitanyow

FNR-2013-00423 Page 172

s.22

FNR-2013-00423 Page 172

Chair 778- 834-6292

Project Manager [email protected] 604-666-3688

Sr.Air Quality Planner [email protected] 604-666-7829

Team Leader [email protected] 613-947-1591Senior Policy Analyst [email protected] 613-995-6971

Major Projects Management Officer

[email protected] 604-775-8890

Environmental Analyst [email protected] 604-666-6529

Large Project Coordinator [email protected] 907-465-6849

Manager Planning and Economic Development

[email protected] 250-615-6100

Public Health Protection [email protected] 250-847-6410

Northern Health

Environment Canada

nvironmental Assessment Agency

atural Resouces Canada

nal District of Kitimat-Stikine

epartment of Natural Resource

ment of Fisheries and Oceans

Transport Canada

FNR-2013-00423 Page 173

s.22

FNR-2013-00423 Page 173

Environmental Health Officer

[email protected]

FNR-2013-00423 Page 174FNR-2013-00423 Page 174

Contact Address

Chief Inspectors Office6th Floor 1810 Blanshard

Victoria, BC V8W 9N3

Same as above

Same as above

Same as above

Same as above

Suite 350 - 1011 4th Avenue

Prince George, BC V2L 3H9

3726 Alfred AvenueSmithers BC

V0J 2N0

Same as above

Same as above

Same as aboveSame as above

Same as above

Same as above

Same as above

Same as above

Same as above

Same as above

FNR-2013-00423 Page 175FNR-2013-00423 Page 175

#3 - 1250 Quadra StreetPO BOX 9816 STN PROV

GOVTVictoria BC V8W 2K7

3333 Tatlow RoadSmithers BC

V0J 2N0

Same as above

Same as above

Same as above

3726 Alfred Avenue Smithers, BC

V0J 2N0

Same as above

Gitanyow Hereditary Chiefs

PO Box 148Kitwanga, BC V0J 2A0

PO Box 321, 2000 Lisims Government

New Aiyansh, BC V0J 1A0

Same as aboveSame as above

Chief Darlene SimpsonSkii km Lax Ha

Box 17Hazelton, BC V0J 1Y0

Please phone for pick up: 250-842-5651

FNR-2013-00423 Page 176FNR-2013-00423 Page 176

Tahltan Central CouncilPO Box 69

Dease Lake, BC V0C 1L0

Navigable Waters Protection ProgramTransport Canada

Suite 620 - 800 Burrard Street

Vancouver BC V6Z 2J8

Ecosystem Management Branch Pacific Region Fisheries and Oceans

Canada Suite 200, 401 Burrard

Street Vancouver, BC V6C 3S4

400 Willoughby Ave. Ste. 400 Juneau, AK 99801

Suite 3004545 Lazelle Avenue

Terrace, B.C.V8G 4E1

Northern Health Suite 600, 299 Victoria St.

Prince George, BC,

FNR-2013-00423 Page 177FNR-2013-00423 Page 177

Same as above

FNR-2013-00423 Page 178FNR-2013-00423 Page 178

Muir, Deanna CSNR:EX

Subject:

Start: End:

Recurrence:

Organizer:

From: Sent: To: Cc: Subject:

Hi Jessy,

Application Distribution ListiShapefiles

Thu 2013-04-25 8:00 AM Thu 2013-04-25 8:30 AM

(none)

Paterson, Genevieve FLNR:EX

Paterson, Genevieve FLNR:EX Thursday, April 25, 2013 10:05 AM 'Jessy Chaplin' Stalker, Jennifer L FLNR:EX Application Distribution List!Shapefiles

Here is the updated distribution list.

Still waiting to hear back from Garret, will let you know his preference once I hear back from him.

In preparation for lands application submissions, Front Counter wanted me to pass on these notes on application requirements: .

• Need shapefile of the exact footprint of the application, not the entire project.

• In the case where an area needs access, we also need the road to be part of the application.

• If there is a permit or tenure for the access already, please indicate in the application.

Thanks,

C;~ PMvr5-01'V Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

FNR-2013-00423 Page 179FNR-2013-00423 Page 179

Muir, Deanna CSNR:EX

Subject:

Start: End:

Recurrence:

Organizer:

From: Sent: To:

Cc: Subject:

Hi,

RE: KSM Project: Tues May 28 --uploading permit applications to Sharepoint

Tue 2013-05-28 8:00 AM Tue 2013-05-28 8:30 AM

(none)

Paterson, Genevieve FLNR:EX

Paterson, Genevieve FLNR:EX Tuesday, May 28, 2013 10:11 AM

Jessy Chaplin; Stalker, Jennifer L FLNR:EX Rolf Schmitt (ERM-Rescan); [email protected]: 'Elizabeth Miller'

RE: KSM Project: Tues May 28 --uploading permit applications to Sharepoint

If you could please forward me the applications I will ensure they are uploaded to the appropriate venue (sharepoint) for the MRC to review.

You can send me the applications via FTP site or USB, I will leave it up to you and your team to decide what will be most convenient.

Thanks,

GP

Sent from my iPhone using Mail+ for Outlook

From: Jessy Chaplin Sent: 2013-05-28 8:56 AM To: Stalker, Jennifer L FLNR:EX Cc: [email protected], Rolf Schmitt (ERM-Rescan), [email protected], 'Elizabeth Miller' Subject: KSM Project: Tues May 28 --uploading permit applications to Sharepoint

Hi Jen and Gen,

1 FNR-2013-00423 Page 180FNR-2013-00423 Page 180

Just wondering if you got the sharepoint questions sorted out, Rescan is ready to start uploading electronic permit application files directly to the Sharepoint. Who do we speak to at Government to get access to the Sharepoint?

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc.

1235 Main Street

. P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell .

2 FNR-2013-00423 Page 181

s.22

FNR-2013-00423 Page 181

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

Categories:

From: Sent: To: Cc: Subject: Attachments:

Categories:

Hi Jen,

FW: Table - Limited Site Construction Permits

Tue 2013-05-28 12:00 AM Wed 2013-05-29 12:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Input for Comm TO

Jessy Chaplin [[email protected] Tuesday, May 28, 2013 4:54 PM Stalker, Jennifer L FLNR:EX Paterson, Genevieve FLNR:EX; 'Rolf Schmitt' FW: Table - Limited Site Construction Permits Table - Limited Site Construction Permit List_to be embedded.pdf; Table - Limited Site Construction Permit List_to be embedded.docx

Input for Comm TO

The KSM Batch 1 permit list in Word as you requested.

Thanks

Jessy

Jessy Chaplin, MSc. RP,Bio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

1 FNR-2013-00423 Page 182

s.22

FNR-2013-00423 Page 182

From: Rolf Schmitt [mailto:[email protected]] Sent: Tuesday, May 28,20134:31 PM To: [email protected] Subject: Table - Limited Site Construction Permits

Rolf Schmitt, M.Sc., P.Geo

Director

Rescan Environmental Services Ltd. an ERM company

Sixth Floor 11111 West Hastings Street

Vancouver I BC 1 Canada 1 V6E 2J3

Description: cid:[email protected] +1 6046899460

Description: cid:[email protected] +1 778628 1840

Description: cid:[email protected] [email protected]

Description: cid: image004. jpg@01 C E4 7E7. 984095BO

Description: cid: image005. jpg@01 C E4 7E7. 984095BO

www.erm.comIThe world's leading sustainability consultancy.

P Please consider the environment before printing .

. This message contains information which may be confidential, proprietary, privileged, or otherwise protected by law from disclosure or use by a third party. If you have received this message in error, please notify the sender immediately and take the steps necessary to delete the message completely from your computer system. Any other use of this e-mail is prohibited. Thank you.

2 FNR-2013-00423 Page 183FNR-2013-00423 Page 183

<SET CLIENT NAME IN CUSTOM PROPERTIES> 1

KSM Limited Site Construction Permit List: Final - May 28, 2013

Application

Date Permit Application Legislation status

10-Dec-09 Mining Lease KSM Claims Mineral Tenure Act in progress

29-May-12 Mineral Tenures Act - Conditional Registration Reserve for Mitchell-Treaty Tunnel alignment

Mineral Tenure Act in progress

Sept 21 2012 Land Act Licence of Occupation for Statutory right-of-way along the MTT alignment from Mitchell Valley to

Plant Site, including Treaty Saddle Camp #6

Land Act in progress

# of permits Permit Office Permit Application Legislation status

1 District S-S CCAR - Forest Practices Code of BC Act Special Use Permit (SUP) - Coulter Cr Access Road (CCAR) from

Eskay turnoff to Mine Site

Forest Practices of BC Act submitted May 28 2013

2 District S-S CCAR - Forest Act Occupant Licence to Cut (OLTC) - for (CCAR right of way, Camp 3: Eskay Staging Camp,

Camp 7: Unuk North, Camp 8: Unuk South, Mitchell Operating Camp)

Forest Act submitted May 28 2013

3 District S-S TCAR - Forest Practices Code of BC Act Special Use Permit (SUP) - Treaty Creek Access Road (TCAR) from

Highway 37 to Plant Site

Forest Practices of BC Act submitted May 28 2013

4 District S-S TCAR Forest Act Occupant Licence to Cut (OLTC) - for (TCAR right of way, Camp 11: Treaty Marshalling Yard,

Camp 6: Treaty Saddle)

Forest Act submitted May 28 2013

5 MOTI -Skeena TCAR - Highways Act Provincial Public Highway Permit Application - connection to Highway 37

Highways Act submitted May 28 2013

6 FrontCounter BC

Land Act Licence of Occupation for Treaty Transmission Line - right-of-way parallel to the Treaty

Creek SUP to the Plant Site

Land Act submitted May 28 2013

7 MEMNG - Skeena

KSM Project Mines Act (MA) and Environmental Management Act (EMA) Permit Application for Limited

Site Construction

Mines Act submitted May 28 2013

8 MOE - Skeena KSM Project Mines Act (MA) and Environmental Management Act (EMA) Permit Application for Limited

Site Construction

Environmental Management Act

submitted May 28 2013

9 MOE - Skeena Mine Site Landfill & Landfarm - EMA Refuse (Solid Waste) Discharge Permit

Environmental Management Act

submitted May 28 2013

10 MOE - Skeena PTMA Landfill & Landfarm - EMA Refuse (Solid Waste) Discharge Permit

Environmental Management Act

submitted May 28 2013

11 NHA Camp 2: Ted Morris Camp (80 persons) - Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

12 NHA Camp 2: Ted Morris Camp (80 persons) - Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

13 NHA Camp 2: Ted Morris Camp (80 persons) - Sewage Permit and Filing of Certification Letter (PHA-S) for camps

<100 people

Public Health Act submitted May 28 2013

14 FrontCounter BC

Camp 3: Eskay Staging Camp (50 pers) Licence of Occupation - Industrial Camp

Land Act submitted May 28 2013

15 NHA Camp 3: Eskay Staging Camp (50 pers) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

16 NHA Camp 3: Eskay Staging Camp (50 pers) Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

FNR-2013-00423 Page 184FNR-2013-00423 Page 184

2RESCAN ENVIRONMENTAL SERVICES LTD. (PROJ#<CUSTM PROPERTY>/REV <CUSTM PROPERTY>) <MONTH YYYY CUSTM PROPERTY>

17 NHA Camp 3: Eskay Staging Camp (50 pers) Sewage Permit and Filing of Certification Letter (PHA-S) for camps

<100

Public Health Act submitted May 28 2013

18 NHA Camp 4: Mitchell North (125 pers) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

19 NHA Camp 4: Mitchell North (125 pers) Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

20 MOE Camp 4: Mitchell North (125 pers) Sewage Permit - EMA, MWR

Environmental Management Act, Municipal

Wastewater Regulation

submitted May 28 2013

21 FrontCounter BC

Camp 4: Mitchell North (125 pers) Water Licence Purpose: Work Camps (02137)

Water Act and Water Protection Act

submitted May 28 2013

22 MOE - Skeena Camp 4: Mitchell North (125 pers) EMA- Waste Management Permit - Air (incinerators at camps

>100 persons)

Environmental Management Act, Waste

Discharge Regulation

submitted May 28 2013

23 NHA Camp 5: Treaty Plant (800 pers) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

24 NHA Camp 5: Treaty Plant (800 pers)Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

25 MOE Camp 5: Treaty Plant (800 pers) Sewage Permit - EMA, MWR

Environmental Management Act, Municipal

Wastewater Regulation

submitted May 28 2013

26 MOE Camp 5: Treaty Plant (800 pers) EMA- Waste Management Permit - Air (incinerators at camps

>100 persons)

Environmental Management Act, Waste

Discharge Regulation

submitted May 28 2013

27 NHA Camp 6: Treaty Saddle (120 pers) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

28 NHA Camp 6: Treaty Saddle (120pers) Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

29 MOE Camp 6: Treaty Saddle (120 pers) Sewage Permit Environmental Management Act, Municipal

Wastewater Regulation

submitted May 28 2013

30 FrontCounter BC

Camp 6: Treaty Saddle (120 pers) Water Licence Purpose: Work Camps (02137)

Water Act and Water Protection Act

submitted May 28 2013

31 MOE Camp 6: Treaty Saddle (120 pers) EMA- Waste Management Permit - Air (incinerators at camps

>100 persons)

Environmental Management Act, Waste

Discharge Regulation

submitted May 28 2013

32 NHA Camp 7: Unuk North (40 pers) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

33 NHA Camp 7: Unuk North (40 pers) Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

34 NHA Camp 7: Unuk North (40 pers) Sewage Permit and Filing of Certification Letter (PHA-S) for camps <100 people

Public Health Act submitted May 28 2013

35 FrontCounter BC

Camp 7: Unuk North (40 pers) Licence of Occupation (combined with Camp 8: Unuk South)

Land Act submitted May 28 2013

36 NHA Camp 8: Unuk South (40 pers) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

37 NHA Camp 8: Unuk South (40 pers) Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

38 NHA Camp 8: Unuk South (40 pers) Sewage Permit and Filing of Certification Letter (PHA-S) for camps <100 people

Public Health Act submitted May 28 2013

39 NHA Camp 9: Mitchell Initial (140 pers) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

FNR-2013-00423 Page 185FNR-2013-00423 Page 185

<SET CLIENT NAME IN CUSTOM PROPERTIES> 3

40 NHA Camp 9: Mitchell Initial (140 pers) Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

41 MOE Camp 9: Mitchell Initial (140 pers) and Camp 10: Mitchell Secondary - Sewage Permit – EMA MWR

Environmental Management Act, Municipal

Wastewater Regulation

submitted May 28 2013

42 MOE Camp 9: Mitchell Initial (140 pers) and Camp 10: Mitchell Secondary - EMA Waste Management Permit -

Air (incinerators at camps >100 persons)

Environmental Management Act, Waste

Discharge Regulation

submitted May 28 2013

43 NHA Camp 10: Mitchell Secondary (400 pers) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

44 NHA Camp 10: Mitchell Secondary (400 pers)Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

45 NHA Camp 11: Treaty Marshalling (60 pers) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

46 NHA Camp 11: Treaty Marshalling (60 pers) Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

47 NHA Camp 11: Treaty Marshalling (60 pers) Sewage Permit and Filing of Certification Letter (PHA-S) for camps

<100 per

Public Health Act submitted May 28 2013

48 FrontCounter BC

Mitchell Operating Camp (350 pers) Licence of Occupation

Land Act submitted May 28 2013

49 NHA Mitchell Operating Camp (350 pers) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

50 NHA Mitchell Operating Camp (350 pers) Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

51 MOE Mitchell Operating Camp (350 pers) Sewage Permit – EMA MWR

Environmental Management Act, Municipal

Wastewater Regulation

submitted May 28 2013

52 MOE Mitchell Operating Camp (350 pers)- EMA Waste Management Permit - Air (incinerators at camps

>100 persons)

Environmental Management Act, Waste

Discharge Regulation

submitted May 28 2013

53 NHA Treaty Operations Camp (250 persons) Construction Permit (H20-C)

Drinking Water Protection Act and Regulation

submitted May 28 2013

54 NHA Treaty Operations Camp (250 persons) Operating Permit (H20-O)

Drinking Water Protection Act and Regulation

submitted May 28 2013

55 MOE Treaty Operations Camp (250 persons) Sewage Permit – EMA MWR

Environmental Management Act, Municipal

Wastewater Regulation

submitted May 28 2013

FNR-2013-00423 Page 186FNR-2013-00423 Page 186

Muir, Deanna CSNR:EX

Subject: Seabridge - FTP (Applications for uploading)

Start: End: Show Time As:

Recurrence:

Organizer:

Tue 2013-05-2812:00 AM Wed 2013-05-2912:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

From: Jessy Chaplin [mallto:[email protected]] Sent: Tuesday, May 28, 2013 4:53 PM To: Stalker, Jennifer L FLNR:EX Cc: Paterson, Genevieve FLNR:EX; [email protected]; Brent Murphy; 'Rolf Schmitt'; 'Ann Danllevich'; Clem Pelletier Subject: RE: KSM Project: Tues May 28 - uploading permit applications on FTP

Dear Jen Stalker,

Sea bridge is pleased to inform you that the Concurrent Permit Applications for the KSM Project are available on the following Rescan FTP site and will be available for downloading.

There are four components:

CCAR - SUP (available) Construction Camps Applications (uploading) TCAR - SUP (to be uploaded Tues/Wed) MA&EMA Permit Application (to be uploaded Tues/Wed)

As soon as the applications are completely uploaded to the FTP site, Rescan will be loading the complete Concurrent Permit Applications package onto memory sticks for each MDRC member and mailing them to each member of the MDRC (as per the list provided to Seabridge on April 17, 2013). Paper copies will follow. A Sea bridge cover letter, officially applying for these permits, is attached.

FTP SITE INSTRUCTIONS

An account has been created on Rescan's Secure File Transfer System for transfer of the information noted. To download files from Rescan or upload files to Rescan, please follow the instructions below:

1. Using Internet Explorer, go to https:llclients.rescan.com (you may need to enter this address manually) and enter the username

2. On your first login, you will be prompted to install the ActiveX Wizard (if you are using Internet Explorer) or the Java Wizard (for most browsers including Internet Explorer). Please follow the on-screen instructions to install the wizard. You will only have to do this once, and it is not mandatory.

You will see a list of files/folders you have access to, as well .as a mechanism for transferring files to and from Rescan's Secure File Transfer System. Please e-mail [email protected] you are having problems using the system.

Files uploaded to this site will be auto-deleted on June 10, 2013. Please retain a copy of the files you upload for your own records, as there is no long-term backup system for your account.

Jessy Chaplin, MSc. RPBio Permitting Coordinator

1 FNR-2013-00423 Page 187

s.15

FNR-2013-00423 Page 187

Seabl'idge Gold Inc. 1235 Main Street P.O. Box 2536

Smithers, BC VOJ 2NO Tel. (250) 847-4704 Cell.

-----Original Message-----

From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Tuesday, May 28,2013 10:11 AM

To: Jessy Chaplin; Stalker, Jennifer L FLNR:EX Cc: Rolf Schmitt (ERM-Rescan); [email protected]; 'Elizabeth Miller'

Subject: RE: KSM Project: Tues May 28 --uploading permit applications to Sharepoint

Hil If you could please forward me the applications I will ensure they are uploaded to the appropriate venue (share point) for the MRC to review.

You can send me the applications via FTP site or USB, I will leave it up to you and your team to decide what will be most convenient. Thanks,

GP Sent from my iPhone

2 FNR-2013-00423 Page 188

s.22

FNR-2013-00423 Page 188

Muir, Deanna CSNR:EX

Subject: RE: Updated Application Distribution List

Start: End: Show Time As:

Recurrence:

Organizer:

Thu 2013-05-30 12:00 AM Fri 2013-05-31 12:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

From: Sent: To:

Paterson, Genevieve FLNR:EX Thursday, May 30, 2013 10:44 AM 'lessy Chaplin'

Cc: Subject:

Pope, Jason FLNR:EX; Stalker, Jennifer L FLNR:EX RE: Updated Application Distribution List

Hi lessy,

My apologies, I have more updates for the application distribution table.

Updates include:

• As per my previous note below, Pascale Mera has been added to Ski km Lax Ha.

• Nisga'a Lisims Gov't MRC member change, Frederic Tolmie has been replaced with Colliar Azak.

• Gitanyow Hereditary Chiefs Office has two additional members that have been added to the MRC: • Kevin Koch, Fish and Wildlife Biologist

• Mark Cleveland, Head Biologist

You will find details of application distribution preferences (all above prefer electronic via USB), along with contact info in the updated table:

If you have any questions please feel free to call.

Thank you,

Ci~ plJ.;/vrJ.01'V

Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-726

From: Paterson, Genevieve FLNR:EX Sent: Thursday, May 30, 2013 9:25 AM To: 'Jessy Chaplin' Cc: Pope, Jason FLNR:EX; Stalker, Jennifer L FLNR:EX Subject: Updated Application Distribution List

1 FNR-2013-00423 Page 189FNR-2013-00423 Page 189

Good morning Jessy,

We have added a new contact to the KSM Mine Review Committee, Pascale Mera, Pascale is working with Skii Km Lax Ha.

Could you please forward the applications for the KSM project to Pascale on a USB?

Attached is the updated application distribution list with Pascale's mailing address. « File: MDRC Application Distribution.xlsx»

Thank you,

Ci~ Po.-fe.v><Wv Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

2 FNR-2013-00423 Page 190FNR-2013-00423 Page 190

Muir, Deanna CSNR:EX

Subject:

Start: End:

Recurrence:

Organizer:

From: Sent: To: Cc: Subject:

Hi Genevieve,

FW: KSM Permitting Files to FTP

Thu 2013-05-306:50 PM Thu 2013-05-306:50 PM

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [email protected]] Thursday, May 30, 2013 6:50 PM Paterson, Genevieve FLNR:EX; Stalker, Jennifer L FLNR:EX 'Rolf Schmitt'; [email protected]; Brent Murphy; 'linn Danilevich' FW: KSM Permitting Files to FTP

The MA&EMA Permit Application is loaded onto the Rescan FTP site (I have re-sent the FTP link below). This completes the electronic files upload for the Seabridge Concurrent Permit Applications required by the Major Projects Office of FLNRO.

Regards,

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Sea bridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

From: Rolf Schmitt [mailto:[email protected] Sent: Tuesday, May 28,20133:14 PM

1 FNR-2013-00423 Page 191

s.22

FNR-2013-00423 Page 191

To: [email protected] Subject: FW: KSM Permitting Files to FTP

An account has been created on Rescan's Secure File Transfer System for transfer of the information noted. To download files from Rescan or upload files to Rescan, please follow the instructions below:

1. Using Internet Explorer, go to https:llclients.rescan.com (you may need to enter this address manually) and enter the username

2. On your first login, you will be prompted to install the ActiveX Wizard (if you are using Internet Explorer) or the Java Wizard (for most browsers including Internet Explorer) . Please follow the on-screen instructions to install the wizard. You will only have to do this once, and it is not mandatory.

You will see a list of files/folders you have access to, as well as a mechanism for transferring files to and from Rescan's Secure File Transfer System. Please phone Rolf Schmitt at 604-689-9460 if you are having problems using the system.

Files uploaded to this site will be auto-deleted after June 10th, 2013. Please retain a copy of the files

you upload for your own records, as there is no long-term backup system for your account.

Laura

2

FNR-2013-00423 Page 192

s.15

FNR-2013-00423 Page 192

Muir. Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc:

Subject: Attachments:

Hi Rosemary,

RE: KSM - MoTI -location of proposed TeAR turn~ff along Hwy 37

Fri 2013-06-0712:00 AM Sat 2013-06-0812:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [email protected]] Friday, June 7, 2013 10:33 AM Barnewall, Rosemary C TRAN:EX Stalker, Jennifer L FLNR:EX; Paterson, Genevieve FLNR:EX; Randy Ollenberger; [email protected] RE: KSM - MoTI -location of proposed TCAR turnoff along Hwy 37 TCAR turnoff Hwy 37-google screen capture.pdf; 100 m north of TCAR turnoff looking south along Hwy 37 (800x600}.jpg; from TCAR turnoff looking north along Hwy 37 (800x600}.jpg; from TCAR turnoff looking south along Hwy 37 (800x600}.jpg; Hwy 37 Glacier Creek round metal culvert view ds (800x600}.jpg

Thanks for the information on the MOTI permit applications.

For Sherrie's trip next week, I measured distances off of Google Earth, and attached a screen clip. I've been there 3 -4 times, and have attached a couple of photos for you.

The existing road turnoff is just before the large round metal culvert crossing of Glacier Creek. It is located 20 km south of Bell II, approximately 3.3 km south of the Skowkill MOTI gravel pit, and about 8.5 km north of Deltaic Creek (there is a MOTI gravel pit on the left just before Deltaic Creek.)

The approach from the south is straight for 2.2 km and mostly flat with a slight incline up to Glacier Creek. Past the turnoff, the highway runs straight for another 680 m and then there is a gradual turn east.

At the turnoff, the 600 m of existing gravel road is drivable to the Bell Irving river, the old logging road bridge abutments are visible when the river has low water levels and from the air you can see the -3 km of existing road and cutblocks on the western side.

1 FNR-2013-00423 Page 193FNR-2013-00423 Page 193

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

From: Barnewall, Rosemary C TRAN:EX [mailto:[email protected] Sent: Thursday, June 06,20131:50 PM To: 'Jessy Chaplin' Cc: Paterson, Genevieve FLNR:EX; Stalker, Jennifer L FLNR:EX Subject: RE: KSM - MoTI

Hi Jessy,

I just had a look at the figure for the transmission line, and a permit will also be required for the temporary access road.

If possible, could you send me more details on the location? Sherrie will be heading up highway 37 next week, and would like to take a look.

Thanks,

Rosemary

2 FNR-2013-00423 Page 194

s.22

FNR-2013-00423 Page 194

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To:

KSM Camps-Shapefiles

Man 2013-06-10 12:00 AM Tue 2013-06-1112:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Paterson, Genevieve FLNR:EX Monday, June 10, 2013 2:13 PM

'Jessy Chaplin'

Cc: Subject:

Stalker, Jennifer L FLNR:EX; Lefrancois, Marie-Lou FLNR:EX

KSM Camps-Shapefiles

Hi Jessy,

For the Licences of Occupation for work camps FCBC requires shapes that outline to exact footprint of the camp location.

FBCB tried to match the shapefiles received with the application to their management plans and are having troubles. See below for visuals.

Please let me know if you have any questions.

Talk to you later,

Genevieve Paterson

Project Coordinator

Ministry of Forests. Lands and Natural Resource Operations

Major Projects Office, Skeena Region

250-847-7268

1 FNR-2013-00423 Page 195FNR-2013-00423 Page 195

Eskay

Trying to match this:

To that:

Uiluk

Trying to match this:

To that:

Mitchell north camp

Trying to match this:

to that ... :

,

2 FNR-2013-00423 Page 196FNR-2013-00423 Page 196

Or this?:

Marie-Lou Lefrancois, M.Sc. FIT

Resource Information Technician

Forest, Lands and Natural Resources Operations

Front Counter BC, Smithers

250-847-7335

3 FNR-2013-00423 Page 197FNR-2013-00423 Page 197

Muir, Deanna CSNR:EX

From: Sent: To:

Subject:

Good morning,

Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Thursday, July 18, 2013 9:05 AM , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C · TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; De Beck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'G itanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J EMNG:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; Mansell Griffin ([email protected]); 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M EMNG:EX; Page, Steven FLNR:EX; 'Pascale Mera '; Pat Lim; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian 0 ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L EMNG:EX; Warnock, George EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN KSM Mine Review Committee Draft Meeting Minutes of June 27th, 2013 & Updated Terms of Reference-For Review

Both the draft meeting minutes from the June 27'h Mine Review Committee meeting, along with the draft Terms of Reference (ToR) are available for review and comment.

'Please note there are three sets of notes that have been posted from this meeting: 1. KSM Meeting Notes June 27, 2013 (FLNRO Draft Notes) - Taken by Steve Kiiskila, Advisor First Nation Relations, MFLNRO. 2. MRC_MeetingNotes_June 27 _Final (Rescan) - Notes taken by Anna Danilevich, Project Assistant, Rescan. 3. KSM Mine Review Committee Meeting Minutes June 27, 2013 - Drafted by myself, a combination of both Steve and Anna's notes.

Both the meeting minutes and ToR will become final in two weeks time. Please forward your comments to me by end of day August 1" , 2013.

Feel free to contact me, as always, if you have any troubles accessing the sharepoint site.

Have a nice day,

C;~ Povfw),O'Y'v Project Coordinator Ministrv of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

1 FNR-2013-00423 Page 198FNR-2013-00423 Page 198

Muir, Deanna CSNR:EX

From: Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Thursday, August 15, 2013 2:46 PM Sent:

To:

Cc:

, Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; DeBeck, Howard W

·FLNR:EX; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessica Coulson'; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected]),; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; 'Pat Lim'; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN 'Jessy Chaplin '; 'Elizabeth Miller'; 'Rolf Schmitt'; Cuell, James W FLNR:EX; Hanchard, Jevan FLNR:EX; Love, Bobby FLNR:EX

Subject: KSM MRC Update - Permit Application Screening Phase has begun Attachments:

Importance:

103242_Letterto Proponent re 180Timeline.pdf; KSM MRC TOR_Draft O.4_Aug 14, 2013.docx; KSM Concurrent Review Process - August 2013.pdf; KSM Permitting Timeline­August 2013.docx

High

Good Afternoon KSM Mine Review Committee,

** The Permit Application Screening Phase for the KSM Mine Project has now begun **

The Environmental Assessment Office (EAO) has just released a letter to Seabridge Gold Inc. (now posted to the EAO website) that the EAO hasreceived the revised application for the EA application for the proposed KSM project from Sea bridge Gold Inc. on August 12, 2013; and that the lS~-day review of the application has begun (letter attached). As discussed at the last Mine Review Committee (MRC) meeting held in Smithers on June 27tt1, this then triggers the 'Permit Application Screening Phase'.

Batch I permit applications for screening' review: • Mine Site/ Processing and Tailings Management Area • Camps • Access Roads (Coulter Creek/ Treaty Creek) • Transmission Line • Mitchell-Treaty Tunnel

Screening Timelines: • Within 75 days of the EAO accepting the EA application for review (as per the Concurrent Approval

Regulation), agencies must notify the proponent and the EAO in writing of any additional information that the ministry anticipates it will require from the proponent in order to conduct the technical review.

o MPO Project Manager (PM) will coordinate the MRC comments and draft a letter to the EAO (and notify the proponent), on behalf of the technical reviewers, of any additional information required to conduct the review.

o Project Manager is requesting that all comments from agencies are provided on' or before Day 60 in order for PM to compile and draft letter to EAO by Day 75.

** MRC Technical Reviewers to provide permit application screening comments to Jennifer,Stalker@gov,bc,ca on/ by October 10, 2013 (Day 60) **

1 FNR-2013-00423 Page 199FNR-2013-00423 Page 199

KSM MRC Terms of Reference - For Final Review and Comment (1 Week): • Mine Review Committee Draft Terms of Reference

o Identifies the purpose of the Mine Review Committee and the roles and responsibilities of its members

o Comments have been received from the MRC and considered in this updated Terms of Reference ... thank you to those that provided comments.

o Please review and provide comments to len Stalker [email protected] on/ by August 23'd, 2013.

• Next MRC Meeting o Early - mid October 2013 (date to be determined) o The purpose of this meeting will be to provide an update and complete the screening phase,

answer any outstanding issues/ questions/concerns that need to be addressed (screening phase). As well, direction will be provided as to the next steps in the mine permitting review process and timelines.

Attached: * EAO Letter to Proponent (180 day EA Application review has started on August 12, 2013 ... triggers the application screening phase) * KSM MRC ToR (Updated - August 2013) - 1 week final review and comment * KSM Concurrent Review Process/ Timeline (August 2013) * KSM Permitting Timeline (Updated - August, 2013)

KSM Sharepoint Site: All Batch 1 Applications are posted Link to sharepoint : https:/Ispc-finr.gov.bc.ca/ksm/SitePages/Home.aspx

For external users who require access-if you haven't done so already-please create a BCeID account and forward your username to [email protected] .. Instructions for setting up a basic bceid: • Visit: https:/Iwww.bceid.ca

' . Click "Begin Registration" • Click "Basic BCeID" • Click "Register without specifying an online service" • Enter your details & OK.

Once you have been added as a member please remember to sign onto the sharepoint using this format: bceid\username. If you have any issues accessing the Sharepoint site, please contact Genevieve Paterson [email protected] (or by phone: 250-847-7268).

If you have any questions or concerns, please do not hesitate to contact me.

Thank you.

len Stalker, RPF Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeena Region - Smithers, BC Ph'one: (250) 847-7506 Fax: (250) 847-7347 Email: [email protected]

2 FNR-2013-00423 Page 200FNR-2013-00423 Page 200

Reference: 103242

August 12, 2013

Brent Murphy Vice President, Environmental Affairs Seabridge Gold Inc. 400-106 Front St East Toronto ON M5A 1 E1

Dear Mr. Murphy:

File: 30200-201KSMP-OS-06

Environmental Assessment Office (EAO) received the revised application for an environmental assessment certificate (Application) for the proposed KSM Project from Sea bridge Gold Inc. on August 12, 2013. The 180-day review of the Application has now begun_

Further to my letter of June 3, 2013, a 45-day public comment period on the Application is specified in the section 11 Order. We are finalizing the details of the public comment period, including the locations and schedules for public open houses with Elizabeth Miller.

If you have any questions or require further information, please contact me by telephone at 250-387-1032 or by email [email protected]. You can also contact David Grace, roject Assessment Manager, at [email protected] or by telephone at 250-387- 4 7, or Nicole Vinette, Project Assessment Officer, at '-'"""""'-"'T"'''''1'"",,,,o,,,-v.,,,,b,,,c,,,.c.,a or at 250-356-5311 . ~

Yours

L amilton ecutive Project Director

cc: Garett Cooper, Project Manager Canadian Environmental Assessment Agency

Elizabeth Miller, Manager, Environmental Affairs Seabridge Gold Inc.

Environmental Assessment Office

Mal!ing Address: PO Box 9426 Stn Prov Go'll Victoria BC V6W 9VI

location: 1" & 2"" FI- 636 Yates Street Victoria BC vaw 116

FNR-2013-00423 Page 201FNR-2013-00423 Page 201

Env

ironm

enta

lA

sses

smen

tOffi

ce

(EA

App

licat

ion)

Maj

orP

roje

cts

Offi

ce

(MR

C–

Per

mitt

ing)

EAA

PPLI

CA

TIO

NSU

BM

ITTE

D

SCR

EEN

ING

:M

RC

Tech

nica

lrev

iew

ers

topr

ovid

eco

mm

ents

toPr

ojec

tMan

ager

on/

befo

reD

ay60

toal

low

PMto

com

pile

com

men

tsan

ddr

aftl

ette

rwith

in75

days

“PR

E M

RC

M

EE

TIN

G”

(NO

VE

MB

ER

8TH)

AP

PLI

CA

TIO

NS

SU

BM

ITTE

D(P

RO

PO

NE

NT)

45D

AY

SCR

EEN

ING

+21

Day

Exet

ensi

on

(as

perS

ectio

n24

Ord

er)

MR

CTe

chni

calR

evie

w

KS

MM

INE

PR

OJE

CT

–C

ON

CU

RR

EN

TR

EV

IEW

PR

OC

ES

S–

AU

GU

ST

2013

**N

OTE

–Ti

mel

ine

and

deta

ilsin

the

follo

win

gpr

oces

sdi

agra

mar

esu

bjec

tto

chan

ge

EA

O–

prim

ary

poin

tofc

onta

ctfo

rFirs

tNat

ions

Con

sulta

tion

durin

gth

eE

Are

view

.

All

EA

OIs

sues

and

stat

ustra

cked

and

prov

ided

toM

PO

Dec

isio

nw

ithin

45D

ays

MR

CTe

chni

calR

evie

w(le

ave

time

tore

solv

eou

tsta

ndin

gis

sues

and

PM

(MP

O)t

opr

epar

eC

omm

ittee

Rep

ort)

KIC

K–

OFF

MR

CM

eetin

g

Pro

pone

ntto

wal

kM

RC

tech

nica

lrev

iew

ers

thro

ugh

appl

icat

ions

subm

itted

MR

CM

EE

TIN

GM

RC

ME

ETI

NG

Mov

ein

tote

chni

calr

evie

won

cein

form

atio

nre

quire

men

tsar

esu

bmitt

ed/p

rovi

ded

(com

plet

eap

plic

atio

ns)

INTE

RN

AL

INFO

RM

ATI

ON

SHA

RIN

G(E

AO

/FLN

RO

)

*IS

SU

ES

TRA

CK

ER

*IN

FOR

MA

TIO

NS

HA

RIN

GM

ATE

RIA

LS/D

OC

UM

EN

TSTH

AT

BO

THE

AO

and

FLN

RO

RE

QU

IRE

AC

CE

SS

TOD

UR

ING

THE

RE

VIE

WP

RO

CE

SS

180

DA

YEA

APP

LIC

ATI

ON

REV

IEW

AN

DD

ECIS

ION

PAC

KA

GE

FOR

MIN

ISTE

RS

MP

Oto

draf

tlet

tert

oE

AO

and

Pro

pone

nton

beha

lfof

the

agen

cies

that

auth

oriz

atio

nsha

vebe

enfil

edin

acco

rdan

ce(w

ithin

7da

ysof

the

EA

appl

icat

ion

bein

gac

cept

edfo

rrev

iew

)

MA

RC

H20

13A

PR

IL20

13M

AY

2013

JUN

E20

13JU

LY20

13A

UG

US

T20

13S

EP

TEM

BE

R20

13O

CTO

BE

R20

13N

OV

EM

BE

R20

13D

EC

EM

BE

R20

13JA

NU

AR

Y20

14FE

BR

UA

RY

2014

MA

RC

H20

14

FLN

RO

–pr

imar

ypo

into

fcon

tact

forF

irstN

atio

nsco

nsul

tatio

ndu

ring

the

MR

Cre

view

.

Pro

pone

ntre

spon

sibl

eto

prov

ide

tech

nica

lre

view

ers

with

requ

ired

hard

copi

es/U

SB

(for

thos

ew

hoha

vere

ques

ted)

NO

TE-P

ropo

nent

tosu

bmit

alla

pplic

atio

nsdi

gita

llyto

MP

O–

will

bepo

sted

toth

epr

ojec

tS

hare

poin

tSite

forM

RC

acce

ss/r

evie

w.

Dec

isio

nPa

ckag

eto

SD

M’s

SDM

’s m

ust m

ake

a de

term

inat

ion

onth

epe

rmit

appl

icat

ions

with

in60

days

ofth

eEA

Cbe

ing

issu

ed(C

oncu

rren

tApp

rova

lReg

)

AP

RIL

2014

MA

Y20

14JU

NE

2014

FNR-2013-00423 Page 202FNR-2013-00423 Page 202

KERR-SULPHURETS-MITCHELL (KSM) MINE REVIEW COMMITTEE

TERMS OF REFERENCE FOR THE COORDINATED AUTHORIZATION REVIEW PROCESS

Version Date Comments 0.1 June 27, 2013 Reviewed by KSM Mine Review Committee 0.2 July 16, 2013 Revisions made feedback from June 27th MRC

Meeting 0.3 July 18, 2013 2nd draft sent for review by MRC Members 0.4 Final draft sent for review by MRC Members Final Draft – Approved by MRC Members

FNR-2013-00423 Page 203FNR-2013-00423 Page 203

1 | P a g e

Table of Contents

TABLE OF CONTENTS

1.0 Goal of Committee .............................................................................................................. 2

2.0 Deliverables of Committee .................................................................................................... 2

3.0 Relationship to Environmental Assessment .................................................................... 3

3.1 Provincial Environmental Assessment Process .................................................................... 3

3.2 Federal Environmental Assessment Process ........................................................................ 3

4.0 Committee Membership ...................................................................................................... 3

5.0 Public Review and Comment ............................................................................................ 3

6.0 First Nations Consultation and Accommodation ........................................................ 4

6.1 Background ................................................................................................................................. 4

6.2 Tahltan First Nation .................................................................................................................... 5

6.3 Skii km lax ha .............................................................................................................................. 5

6.4 Gitanyow First Nation ................................................................................................................ 5

6.5 Nisga’a Nation ............................................................................................................................. 5

7.0 Roles and Responsibilities ................................................................................................ 5

7.1 Chair ............................................................................................................................................. 5

7.2 Committee Members .................................................................................................................. 6

7.3 First Nations and Treaty Nations ......................................................................................... 6

7.4 Proponent .................................................................................................................................... 6

8.0 Meetings ................................................................................................................................. 7

9.0 Issue Tracking ....................................................................................................................... 7

10.0 Definition and Resolution of Technical Issues .......................................................... 7

11.0 Limits of these Terms of Reference .............................................................................. 7

12.0 Appendices .......................................................................................................................... 8

Appendix 1: Committee Membership ......................................................................................... 9

Appendix 2: Meeting Notes Template ...................................................................................... 11

Appendix 3: Issues Tracking Template (Example) ................................................................ 13

FNR-2013-00423 Page 204FNR-2013-00423 Page 204

2 | P a g e

1.0 GOAL OF COMMITTEE The goal of the KSM Mine Review Committee, the “committee” is to provide an open, transparent, efficient and timely Coordinated Authorizations Review Process for the review of applications by Seabridge Gold Inc. (proponent) for the KSM Mine Project (project).

Coordinated Authorization Review Process: Process that harmonizes First Nations consultation and the coordination of the multiple authorizations required from the various natural resource agencies for major mines. This process is meant to improve consistency, eliminate overlap and duplication in process and information requirements by the various agencies.

The committee is established under Section 9 of the Mines Act for the technical review of mining projects. It is chaired by the Province, and serves as a forum for authorization processes related to the construction, development, operations, reclamation and closure of mines including the Mines Act permit (mine infrastructure, reclamation, bonding), Environmental Management Act permits (waste management), and others.

The purpose of the committee is to:

� Conduct a coordinated review of application information submitted by the proponent for authorizations required for each development phase of the project.

� Ensure opportunities for First Nations and Treaty Nations to be properly consulted and, where necessary, propose accommodation and mitigation, including but not limited to receiving and sharing information, and, where appropriate, contribute to the development of proposed mitigation measures for potential adverse environmental effects.

� Make recommendations to Statutory Decision Makers (SDMs) regarding applications under review including, where appropriate, accommodation of Aboriginal rights and title.

� Identify technical issues related to the project, and develop recommended solutions for those issues.

� Refer issues related to the development of the project that are raised by the committee but not within the responsibilities of the committee to the appropriate authority or forum.

2.0 DELIVERABLES OF COMMITTEE The committee will deliver the following:

� Application Information Requirements (AIR) for authorizations related to required and/or desired activities.

FNR-2013-00423 Page 205FNR-2013-00423 Page 205

3 | P a g e

� A ‘Committee Report’ regarding applications under review for consideration by SDMs, including:

o A summary of the process; o A record of issues raised and how they have been resolved; o Outstanding issues for the consideration of the SDM; o Recommendation of the committee to resolve outstanding issues; o Chair of Committee will compile the Committee Report. The Mine Review

Committee (MRC) will review and comment prior to the Report being finalized and submitted to the SDM’s for consideration.

3.0 RELATIONSHIP TO ENVIRONMENTAL ASSESSMENT

3.1 PROVINCIAL ENVIRONMENTAL ASSESSMENT PROCESS The committee will take into account the recommendations of the Environmental Assessment Office that are relevant to the specific matters before the committee, e.g. Environmental Assessment Report, Certified Project Description, Table of Conditions, etc.

3.2 FEDERAL ENVIRONMENTAL ASSESSMENT PROCESS The committee will take into account the recommendations of the Canadian Environmental Assessment Agency that are relevant to the specific matters before the committee.

4.0 COMMITTEE MEMBERSHIP The names, agencies, and contact details for all designated local, provincial and federal government representatives, as well as First Nations and Treaty Nations representatives on the committee are provided in Appendix 1.

5.0 PUBLIC REVIEW AND COMMENT Applicants for a Mines Act permit are subject to a legal requirement to advertise project proposals and make information available for public review, with 30-days available for public review and comment (Part 10.2.1 and 10.2.2 of the Mines Code).

The Public Notification Regulation under the Environmental Management Act places certain notification responsibilities on an applicant for an effluent discharge permit. The regulation is available on the Internet at http://www.bclaws.ca/.

Although members of the public do not sit on the committee, representatives of local governments in the project area are invited to sit as full committee members in order to represent the broad views of the public and to ensure that local and regional government programs and policies are taken into account in the project review.

FNR-2013-00423 Page 206FNR-2013-00423 Page 206

4 | P a g e

Individual members of the public and overlapping tenure stakeholders have several opportunities to participate in the review of a mine project and therefore potentially influence the proposed project:

� access to proponent-sponsored outreach to the public; � notification by the proponent of the application under review, access to the application

and related materials, and opportunities to review and comment; � invitations to attend proponent-sponsored informational open-houses and public

meetings organized in local communities during the application review timeline, at which the proponent explains the project, its potential for effects and proposed management plans, and where the public can ask questions and listen to proponent responses;

� opportunities to attend committee meetings, on invitation by the Chair, to discuss concerns with committee members and the proponent; and

� access to finalized meeting minutes outlining the business of the committee during a project review.

6.0 FIRST NATIONS CONSULTATION AND ACCOMMODATION

6.1 BACKGROUND Before issuing authorizations for any project activity, the Province has a legal responsibility to consult and, where appropriate, accommodate First Nations with aboriginal interests in the proposed project area. The Province also has treaty-specific responsibilities where there are established treaty rights. The scope of each responsibility is project-specific. Participation of potentially affected First Nations and Treaty Nations on the committee will contribute to the Province’s consultation and treaty obligations. Reasonable efforts will be made by the Province to provide for engagement of First Nations and Treaty Nations in the MRC activities, including preparation of committee deliverables. Capacity funding, however, is not available outside of Strategic Engagement Agreements.

Proponent-driven initiatives and committee activities can contribute to consultation process through:

� First Nations participation as members of the MRC; � Accommodation through recommendations leading to permit conditions; � Proponent outreach and information sharing; � Proponent – First Nation agreements; and � Proponent initiatives to address impacts to First Nations.

Accommodation, where appropriate, can include a range of mitigation and environmental protection and management strategies developed by the committee, or through other forums, such as the EA process. Accommodation recommendations can be developed

FNR-2013-00423 Page 207FNR-2013-00423 Page 207

5 | P a g e

through the entire review process but must be endorsed by the appropriate SDM before the accommodation is offered to a First Nation.

6.2 TAHLTAN FIRST NATION The proposed project footprint lies partially within the asserted territory of the Tahltan First Nation.

6.3 SKII KM LAX HA The proposed project footprint lies partially within the asserted territory of the Skii Km Lax Ha.

6.4 GITANYOW HUWILP The proposed project footprint lies outside of the Gitanyow asserted traditional territory. Wilp Wii Litsxw has been invited to the Mine Review Committee due to potential downstream effects.

The above First Nations have been invited to participate in the committee as their asserted territory may be directly or indirectly affected by applications, commitments, and conditions under review. Further to this, for those First Nations that have entered into Strategic Engagement Agreements (SEA’s) with the Province, issues outside of the scope of the Mine Review Committee may be brought forward to other forums as defined by their Agreements (i.e. Level 4 Working Groups).

The MRC does not discharge all consultation duties to the Gitanyow. The Gitanyow Engagement Framework (signed April 23, 2013) stipulates that the permitting for the KSM Project will be subject to a Level 4 Engagement Process. Issues beyond the scope of the MRC and EA processes will be subject to the Engagement Framework Level 4 process.

6.5 NISGA’A NATION The proposed project footprint lies partially within the Nass Area as defined within the Nisga’a Final Agreement (NFA). The Nisga’a has been invited to participate in the Mine Review Committee as they have treaty rights that may be directly or indirectly affected by applications, commitments and conditions under review. The committee will also consider the potential impacts of permit applications and authorizations with respect to residents of Nisga’a Lands, Nisga’a Lands, or Nisga’a interests set out in the Nisga’a Final Agreement.

7.0 ROLES AND RESPONSIBILITIES

7.1 CHAIR

FNR-2013-00423 Page 208FNR-2013-00423 Page 208

6 | P a g e

� Ensure the overall committee process is managed in a fair, open and transparent manner, and that the committee strives to meet target timelines.

� Manage communications and information sharing between the committee members and the proponent in an efficient and timely manner.

� Ensure that issues are either addressed by the committee or referred to the appropriate authority.

� Maintain tracking tables concerning issues and First Nations consultations. � Compile inputs and recommendations from committee members to facilitate

preparation of reports and other documentation.

7.2 COMMITTEE MEMBERS � Work cooperatively with other members and proponent to complete a coordinated

technical review in a timely fashion. � Identify technical, non-technical, and other public policy issues related to the

development of the proposed project. � Address identified issues to the extent allowed by the scope of the authorizations

under review. � Keep Chair updated with respect to issues, timelines and statutory authorities.

7.3 FIRST NATIONS, ABORIGINAL GOVERNMENTS AND TREATY NATIONS First Nations and Treaty Nations are members of the committee, and have a primary role as identified above. Other roles include:

� Representing interests of communities and/or members � Identifying the communities and members of the communities that the proponent

and government should contact and engage with in order to seek advice on community interests and concerns.

� Identifying First Nation, Aboriginal governments, and Treaty rights, interests and issues that need to be addressed in the application information.

� Ensuring that all direct and indirect impacts [e.g., Adverse effects on resources by hunting and large population influx] are identified and accommodations proposed;

� Ensuring that the proposed accommodations are consistent with the nature of the First Nation and/or Aboriginal group which is impacted;

� Assisting the proponent and government to understand First Nations’, Aboriginal groups’ and Treaty Nation concerns (if any) with respect to the applications;

� Working with communities, other committee members, and the proponent to address issues; and;

� Fulfilling the responsibilities of a committee member as outlined in the TOR.

7.4 PROPONENT The proponent will be expected to support the coordinated authorizations process through:

FNR-2013-00423 Page 209FNR-2013-00423 Page 209

7 | P a g e

� Attending committee meetings and providing project related information; � Meeting with the identified First Nations, outside of the committee meetings,

possibly with the Province, to describe how specific aspects of the project may affect the interests of First Nations and Treaty Nations;

� Consider ways to implement measures mitigate impacts or concerns respecting aboriginal or treaty interests brought forward by the First Nations and Treaty Nations; and

� Document engagement including details where project modifications are made to address aboriginal and treaty interests and provide this record to the Province to assist in its decision making.

� Address issues raised by committee members; and � Provide information to assist in issue resolution.

8.0 MEETINGS The Chair will convene committee meetings on an as-needed basis, and will develop agendas. A note taker will record meeting notes and distribute draft notes to the committee for review (a 2-week review period will be available to committee members). The Chair will incorporate review comments, and prepare final meeting notes, and distribute final notes to Committee Members. The Chair will then post the notes to the Sharepoint site. See Appendix 2 for a sample template for meeting notes..

9.0 ISSUE TRACKING The Chair will track issues raised by committee members throughout the coordinated authorizations process in an Issues Tracking Table (see Appendix 3 for a sample template).

10.0 DEFINITION AND RESOLUTION OF TECHNICAL ISSUES The Committee will strive for consensus when making recommendations and decisions. From time to time, however, issues may arise regarding interpretation of policy, challenges in meeting legislated time limits, or difficulty in resolving technical issues that cannot be resolved at the committee level. In the event that consensus cannot be reached by members of the committee, the following procedures will apply:

1. Members will make reasonable efforts to achieve consensus. 2. Chair will refer, as necessary, any technical issues to senior technical staff or senior

executive levels of government for early resolution, with an option for disagreeing parties to present their views on the issue.

3. Chair will refer, as necessary any non-technical issues (e.g. policy interpretation) to an issue-specific sub-committee which will have 10 working days (or longer at discretion of Chair) to resolve before referral to SDMs or senior executive levels of government for resolution. Chair may call upon senior levels to advise/support the sub-committee.

FNR-2013-00423 Page 210FNR-2013-00423 Page 210

8 | P a g e

4. At the end of the review and recommendations stages, the Chair will describe any remaining unresolved issues in the Committee Report, which will include: consensus recommendations, description of unresolved issues, and views of all parties on unresolved issues.

5. The Chair will provide the Committee Report to committee members for review and comment prior to production of final draft.

6. SDMs and/or senior executive levels of government have the option of referring issues back to the Committee at any time for further review, information-sharing, and/or resolution.

7. SDMs will provide advance notice to the Nisga’a Nation prior to final decision or approval of application or authorization.

11.0 LIMITS OF THESE TERMS OF REFERENCE Nothing in these Terms of Reference limits or abrogates the responsibilities or duties assigned to individual ministries or agencies under their own legislation. First Nations participation on the Committee will contribute to Crown’s legal responsibility to consult and, where appropriate, accommodate, but may not constitute the full level of engagement that may be required to address asserted aboriginal interests or established Treaty rights. SDMs will be provided with a Committee Report, which, combined with other information, will supplement the suite of information from which to make informed decisions.

12.0 APPENDICES

FNR-2013-00423 Page 211FNR-2013-00423 Page 211

9 | P a g e

APPENDIX 1: COMMITTEE MEMBERSHIP

AGENCY/AFFILIATION Provincial Government Ministry of Energy and Mines- Chief Inspectors Office

Diane Howe, Deputy Chief Inspector Kim Bellefontaine, Sr. Environmental Geoscientist Tanya Demchuk, Senior Environmental Geologist George Warnock, Geotechnical Engineering Manager Heather Narynski, Geotechnical Inspector Kathie Wagar, Regional Director

Ministry of Environment- Environmental Protection

Ian Sharp, Regional Manager Jeanien Carmody-Fallows, Environmental Protection Officer Scott Jackson, Regional Hydrologist Craig Stewart, Compliance Specialist Regan Fielding, Environmental Protection Officer Patrick Williston, Impact Assessment Biologist Brian Wilkes, MES, R.P.Bio – Contract, Environmental Quality

Ministry of Forests, Lands and Natural Resource Operations Major Projects Office Archaeology Branch Ecosystem Section Lands Forests Water

Jennifer Stalker, Project Manager/MDRC Chair Genevieve Paterson, Project Coordinator Jason Pope, Sr. First Nations Advisor Eric Forgeng, Heritage Resource Specialist Chris Schell, Sr. Ecosystems Biologist Cam Bentley, Land Tenures Specialist Will Foster, Resource Tenure Specialist Steve Page, Engineering Ron Donnelly, Tenures Forester/Engineering Specialist Matt Sakals, Research Geomorphologist Emily Bulmer, Water Stewardship Officer

Ministry of Transportation and Infrastructure

Sherrie Applegate, Senior Development Approvals Rosemary Barnewall, District Program Manager

Nisga’a Lisims Government Mansell Griffin, Lands and Resources Manager

Tracey McKay, Lands Manager Gitanyow Hereditary Chiefs Office Tara Marsden, Gitanyow Huwilp Lax'yip Implementation Coordinator

Kevin Koch (Gitanyow Fish & Wildlife Biologist) Mark Cleveland (Gitanyow Head Biologist) Sandra Littlewood, Technical Advisor

Tahltan Nation Tahltan Heritage Resources Environmental Assessment Team (THREAT)

Nalaine Morin, THREAT Coordinator Jerry Asp, THREAT Member Patrick Hudson, THREAT Technical Advisor

Skii Km Lax Ha Chief Darlene Simpson Pascale Mera, Technical Advisor

FNR-2013-00423 Page 212FNR-2013-00423 Page 212

10 | P a g e

International Jurisdictions Alaska Department of Natural Resource

Kyle Moselle, Southeast Large Project Coordinator

Northern Health Shane Wadden, Public Health Protection

Azreer Gill, Environmental Health Officer Federal Government Canadian Environmental Assessment Agency

Garett Cooper, Project Manager

Environment Canada Harp Gill, Sr. Environmental Assessment Officer Natural Resources Canada Melanie Campbell, Senior Policy Analyst Transport Canada- Navigable Waters Protection

John Mackie, Major Projects Management Officer

Department of Fisheries and Oceans Pat Lim, Environmental Analyst Local Government Regional District of Kitimat-Stikine Andrew Webber, Manager Planning and Economic Development-Observer

FNR-2013-00423 Page 213FNR-2013-00423 Page 213

11 | P a g e

APPENDIX 2: MEETING NOTES TEMPLATE

MEETING MINUTES Template 1

Name of team Clean Energy Project Team Date and Time:

Location: Caribou Room, Nora Building, Smithers, BC This is a suggested format for meeting minutes for clean energy and major projects

working groups Attendees: Chair: Name, Title, Affiliation, (how they attended e.g. telephone, in person) Minutes: Name, Title, Affiliation, (how they attended e.g. telephone, in person) Name, Title, Affiliation, (how they attended e.g. telephone, in person) …. Proponent: Name, Title, Affiliation, (how they attended e.g. telephone, in person) …. Regrets: Name, Title, Affiliation 1. Topic. (from the agenda)

� Provide a short summary of discussion in point from. Insert action items as required.

Make them stand out from the rest of the minutes by using italics, bold out, and bright colours such as: Action �� A presentation about the federal process will be arranged if a Federal EA is triggered (Bob Smith)

� 2. Topic. (from the agenda)

� 3. Topic. (from the agenda)

� Meeting Adjourned Adjourned at Attachments:

1) Summary of action items 2) Other…

Summary of Action Items:

FNR-2013-00423 Page 214FNR-2013-00423 Page 214

12 | P a g e

# Action Item (see the meeting notes for full context) Person Responsible

Date Required Status

FNR-2013-00423 Page 215FNR-2013-00423 Page 215

13 |

Pa

ge

AP

PE

ND

IX 3

: IS

SU

ES

TR

AC

KIN

G T

EM

PLA

TE (E

XA

MP

LE)

N

o Is

sue/

Aut

hor

Type

of I

ssue

(T

echn

ical

/Non

-Te

chni

cal/P

ublic

Po

licy)

Lead

Age

ncy/

A

utho

rizat

ion

D

ate

Ente

red

R

espo

nsib

ility

Pr

opon

ent

Res

pons

e

Act

ion

/ C

omm

itmen

ts

Com

men

ts/

Stat

us

Met

al L

each

ing

/ Aci

d R

ock

Dra

inag

e A

sses

smen

t 1.

M

L/AR

D

Pre

dict

ion

– ne

ed d

etai

led

geoc

hem

for a

ll m

ater

ials

to b

e di

stur

bed/

J Sm

ith

Tech

nica

l M

EMN

G/M

ines

A

ct P

erm

it

Dec

. 23,

20

11

____

_ In

c.

Nee

d w

orki

ng g

roup

m

eetin

g w

ith M

EM

staf

f to

disc

uss

met

hodo

logy

.

Det

aile

d ge

oche

m

desc

riptio

n to

be

in a

pplic

atio

n.

Wor

king

gr

oup

mee

ting

sche

dule

d Ja

n. 5

, 20

12.

2.

Etc.

Fish

erie

s an

d A

quat

ic R

esou

rces

1.

2.

R

ecla

mat

ion

Prog

ram

1.

2.

FNR-2013-00423 Page 216FNR-2013-00423 Page 216

Forests, Lands and Natural Resource Operations – Major Projects Office

1

KSM MINE PROJECT

Permitting Review – Timelines

(Batch I Permits)

August, 2013

Note: All dates are subject to change and will be updated as required

ACTIVITY DATE TIMELINE

AUTHORIZATIONS FOR:

Mine Site and Processing and Tailings Management Area (site prep and limited construction activities), Access Roads, Camps, Tunnel,

Transmission Line

Proponent submits Authorizations

Electronic (MPO to post to Sharepoint)

Hardcopy to those

agencies/ First Nations that

requested hardcopies

All applications are

currently posted to the Sharepoint site

EA Application 45 Day Screening (EAO) start (once all hardcopies of complete package have been received)

Expected late March, 2013

March 28, 2013

EA Application accepted for review (45 Day Screening + 21 day extension complete)

June 3, 2013

Agencies provide confirmation to PM that applications have been filed in accordance (i.e. agencies have received the applications and fees paid where required)

June 3 – June 10, 2013

PM Drafts letter on behalf of agencies that applications have been filed in accordance (letter addressed to EAO, cc’ proponent)

June 5, 2013

MRC: Application screening (to ensure that all required information is available for technical reviewers to conduct their review of the applications). ** Comments to be provided to PM within 60 days of

EA application being accepted **

August 12 – October

10, 2013

Day 1 - Day 60

FNR-2013-00423 Page 217FNR-2013-00423 Page 217

Forests, Lands and Natural Resource Operations – Major Projects Office

2

PM to draft and deliver letter to EAO (cc’ MEM and proponent) outlining any information that is still required from the proponent to conduct a full review (letter must be delivered within 75 days of EA application acceptance)

October 25, 2013

Day 75

Technical MRC Permitting Review period Starts

Expected Late October, 2013

Technical MRC Permitting Review period winding down (buffer to resolve/ address any outstanding issues and PM to prepare Committee Report)

(once EAC has been issued)

~ Mid February, 2014

Address final issues and prepare Draft Committee Report

~ Mid February, 2014

Draft Committee Report and Draft Permits for MRC Review and Comment (2 weeks)

~ Late February – Early March, 2014

PM to prepare final Committee Report

Expected March,

2014

Final Decision Package submitted to SDM’s for Decision

Expected March,

2014

Decision

FNR-2013-00423 Page 218FNR-2013-00423 Page 218

Muir, Deanna CSNR:EX

From: Sent: To: Cc: Subject: Attachments:

. Importance:

Hi Jessy,

Paterson, Genevieve FLNR:EX Thursday, August 29, 2013 4:06 PM 'Jessy Chaplin' Stalker, Jennifer L FLNR:EX KSM screening comments that have been submitted to date. RE: KSM MRC Update - Permit Application Screening Phase has begun; KSM - Air permit application review notes; KSM Municipal Wastewater Registration applications; Comments for KSM MWR Registration applications

High

Please find attached a collection of comments that have come in from Ministry of Transportation and Ministry of Environment staff. I have populated all of these comments in a issues & comments table that can be found on the KSM sharepoint site.

I will take you through how I envision this process working (sharing comments and populating the table) between you and I tomorrow. I welcome any suggestions or ideas you may have.

I look forward to meeting with you tomorrow.

Ci~ pOJ/"e-vJ.C1'V Project Coordinator Ministry of Forests. Lands and Natural Resource Operations Major Projects Office. Skeena Region 250·847-7268

1 FNR-2013-00423 Page 219FNR-2013-00423 Page 219

Muir, Deanna CSNR:EX

From: Sent:

·To: Cc: Subject:

Hi Jen,

Barnewall, Rosemary C TRAN:EX Monday, August 19, 2013 4:08 PM Stalker, Jennifer L FLNR:EX Applegate, Sherrie TRAN:EX RE: KSM MRC Update - Permit Application Screening Phase h~s begun

MoT will require the following from Seabridge for their first batch of permit:

1) For the access permit we require the design drawings for the intersection

2) For the Transmission Line Crossing permit we will require a location map, and details of the lines (for example vertical clearance, voltage, crossing angle of the line, if any infrastructure such as pole or guide wire will be within the RoW). Attached is the link to the MoT Utility Policy Manual, which will provide details on the required clearances.

http://www.th.gov.bc.ca/permits/Utility%20Permit%20Manual.pdf

3) For the temporary access for transmission line construction, we will required details on the location, site lines, drainage and grade of the access road at highway 37.

Please let me know if you have any other questions.

Regards,

Rosemary Barnewall, PGeo. District Program Manager Bulkley Stikine District Ministry ofTransportation and Infrastructure office: (250)-847-7404 cell:

From: Paterson, Genevieve FLNR:EX On Behalf Of Stalker, Jennifer L FLNR:EX Sent: Thursday, August 15, 2013 2:46 PM To: ' Melanie campbell;; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessica Coulson'; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected])'; 'Mark Cleveland ';. 'Nalaine Morin '; Narynskl, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; 'Pat Lim'; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; Sakais, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey

1 FNR-2013-00423 Page 220

s.22

FNR-2013-00423 Page 220

* EAO Letter to Proponent (180 day EA Application review has started on August 12, 2013 ... triggers the application screening phase) * KSM MRC ToR (Updated - August 2013) - 1 week final review and comment * KSM Concurrent Review Process/ Timeline (August 2013) * KSM Permitting Timeline (Updated - August, 2013)

KSM SharepQint Site: All Batch 1 ApPlicatiQns are PQsted Link to sharepoint : https:llspc-finr.gov.bc.ca/ksm/SitePages/Home.aspx

For external users who require access-if you haven't done so already-please create a BCeID account and forward your username to [email protected]. Instructions for setting up a basic bceid: . • Visit: https:flwww.bceid.ca • Click "Begin Registration" • Click "Basic BCeID" • Click "Register without specifying an online service" • Enter your details & OK.

Once you have been added as a member please remember to sign onto the sharepoint using this format: bceid\username. If you have any issues accessing the Sharepoint site, please contact Genevieve Paterson [email protected] (or by phone: 250-847-7268).

If you have any questions or concerns, please do not hesitate to contact me . .

Thank you.

Jen Stalker, RPF Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeena Region - Smithers, BC Phone: (250) 847-7506 Fax: (250) 847-7347 Email: [email protected]

3 FNR-2013-00423 Page 221FNR-2013-00423 Page 221

Muir, Deanna CSNR:EX

From: Sent: To: Cc: Subject: Attachments:

Hello Jen,

Fielding, Regan ENV:EX Thursday, August 8, 20139:25 AM Stalker, Jennifer L FLNR:EX Carmody-Fallows, Jeanien ENV:EX KSM - Air permit application review notes KSM Air permit application notes~Aug 82013_rf.docx

Attached are my comments on the five air permit (incinerator) applications.

I think that it would be more efficient for KSM and MOE for the five permit applications to be consolidated into one. I discussed this alternative permitting approach with Jessy over the phone, and she did not seem opposed. Let me know if you have any questions.

Cheers,

Regsn Fielding Environmental Protection Officer BC Ministry of Environment Environmental Protection Division Skeena Region Box 5000 Smithers, BC VOJ 2NO Phone: 250·847·7353 Fax 250·847·7591 email: [email protected]

FNR-2013-00423 Page 222FNR-2013-00423 Page 222

MOE EPD - Review Notes on Air Permit Applications for KSM Concurrent Permitting

Authorization #s': 106826, 106827, 106829, 106832, and 106833

Prepared: Aug 8, 2013 by Regan Fielding

General Permitting Approach for Air Emissions:

Five applications for air permits were submitted by the client. Three of the applications correspond to

individual camp sites, while the remaining two applications each consist of two neighboring camps with

some shared infrastructure. The applications are very similar in content.

As an alternative to the above approach, MOE EPD recognizes that all camp air emissions could be

authorized under one permit. For this approach, the information presented under the five separate

applications would need to be consolidated. Annual discharge fees would be determined from the sum

of the discharges between the seven camps. This approach would reduce the number of application fees

($200/application) and annual base fees ($lOO/permit) charged to the client. Once the construction

camps are no longer required, a minor permit amendment would be required to reduce the authorized

discharge quantity and associated discharge fees.

Alternatively, camp air emissions could also be authorized under two permits. One permit would

authorize emissions from the construction camps, while the other would authorize the emissions from

the operating camps. Once the construction camps are no longer required, then the air permit for the

construction camps would be cancelled.

I recommend that the client revise their permit application approach for air emissions and seek

authorization under one permit.

Open Burning of Clean Wood Waste:

Open burning of clean wood waste is not identified in the air permit applications. MOE requires

confirmation that there is no intention to open burn clean wood waste, as this activity requires MOE

authorization. Typically, authorization to conduct open burning of clean wood waste forms a component

of the air permit. Please note that the Open Burning Smoke Control Regulation only applies to land

clearing debris and does not allow for open burning of lumber scraps or other clean burning combustible

materials. If the intention is to open burn clean wood waste from construction activities, then the TAR

and application should contain appropriate information including but not limited to estimated monthly

volumes of waste to be open burned (maximum and average volumes), description of burn and ash

disposal locations, and description of waste to be open burned.

Generators:

Current approach of MOE EPD is that the production of electricity by the combustion of fuel, where the

rated electrical production is less than 5 MW under peak load, does not require an authorization.

C: \ Users\d m uir\App Data \Loca I\M icrosoft\ Wind ows\ Te m po ra ry Internet Files\Content.Outlook\QDEK4MD2\KSM Air permit application notes_Aug 8 2013_rf.docx Page 10f4 .

FNR-2013-00423 Page 223FNR-2013-00423 Page 223

Quantity of Waste Discharged:

3.1 Waste generation estimate - The estimate of 2.75 to 4.5 kg seems high and I believe the source

reference provided for this information is not accurate. Applications for similar camp facilities

have used a waste generation estimate of 2kg of waste/person/day that takes into a'ccount

recyclables, and other materials not suitable for incineration. Please provide information to

support the estimate and provide a single value for the estimate rather than a range of values.

Please' state the daily maximum weight of waste to be incinerated and the corresponding

number of incinerator batches required based on full capacity at the camps. The required

number of incinerators should be based on maximum camp capacity, estimated waste

generation rates, incinerator batch capacity, and the duration of a typical incinerator batch cycle

for a full load of putrescible food waste.

The following link provides EPA published waste generation rates for the United States.

http://www .e pa .gov / osw / non ha z/ m un icipa 1/ pubs/ msw _2010 _rev _factsheet. pdf

The applications for Camps #9/#10 and Camp #5/Treaty Operating Camp were the only

applications that presented estimates for daily waste generation. However, estimates provided

{see Table 3} were based on an unsubstantiated waste generation estimate of 3.38

kg/person/day provided as a table footnote (refer to 1" paragraph in point 3.1 above).

3.2 Batch capacity and cycle times - Please clarify what the capacity of incinerator CA-600 is

{inconsistently presented as 272 kg/batch in the technical memo and 341 kg/batch in appended

fa ct sheet}.

Also, I have concerns that the estimated total cycle time (5 hours) is low and does not refh~ct

that putrescible food waste has a high moisture content and may require a longer burn cycle.

Appropriate heat-up and cool-down periods should also be accounted for. The appended

information on livestock incineration shows that for the six test cases the primary burner was on

for a minimum of 5 hours plus additional time for heat-up/cool-down, and loading/unloading.

Operating Period:

4.1 The operating period is 24 hours/day, 365 days/year.

Discharge Works:

5.1 Estimated Rate of Discharge for Incinerator (Table 2-4 or Table 2-3 depending on application)­

The numbers presented under "Frequency" show an inconsistent relationship between camp

size and the number of incineration cycles required per day. For example, based on the CA-600

incinerator, for the Mitchell operating camp (350 people), 4 to 6 incineration cycles/day is

estimated. In contrast, for the Camps #9 & #10 (540 people), only 3 to 4 incineration cycles were

C: \ Use rs\d mu ir\Ap p Data \Loca I\M icrosoft\ Wind ows\ Te m po ra ry I nte rnet Files\Content.Outlook\QDEK4MD2\KSM Air permit application notes_Aug 8 2013_rf.docx Page 3 of4

FNR-2013-00423 Page 224FNR-2013-00423 Page 224

Muir, Deanna CSNR:EX

From: Lough, Jeannette M ENV:EX Thursday, August 8,20138:02 AM Stalker, Jennifer L FLNR:EX

Sent: To: Subject: KSM Municipal Wastewater Registration applications

Hi Jennifer,

Comments I sent to you in a previous email made reference to a Technical Information Summary Sheet as well as Certification by Qualified Professionals sheet. I meant to attach these but forgot. I have provided a link to where these sheets can be found as well as direct links to each sheet.

http://www.env.gov.bc.ca!epd!mun-waste!regs!mwr!guidance!reg-msd.htm#4

1. Technical Information Summary Sheet

The Technical Information Summary Sheet (summary sheet) must be submitted with the registration package.

The purpose of the summary sheet is to satisfy Section 12 of the MWR and to provide ministry staff and facility

owners with a quick reference to key registration information. The summary sheet will also allow ministry staff

to conduct compliance activities with greater efficiency.

The summary sheet is also a valuable reference tool for wastewater treatment facility owners and operators.

2. Certification by Qualified Professionals Sheet

The Certification by Qualified Professionals Sheet (signoff sheet) must be submitted with the registration

package.

The purpose of the signoff sheet is to satisfy Section 15 of the MWR and to provide a consistent template for

professionals to use.

The intent of the signoff sheet is to provide assurance to the regulator that the design of the facility and

associated documentation meets the requirements of the regulation or requirements imposed by the director.

The signoff sheet does not replace any other professional signoff that would normally be required for individual

documents, such as design drawings or environmental impact studies.

Thanks,

Jeannette

1 FNR-2013-00423 Page 225FNR-2013-00423 Page 225

Muir, Deanna.CSNR:EX

From: Sent: To:

Lough, Jeannette M ENV:EX Wednesday, August 7, 20134:19 PM Stalker, Jennifer L FLNR:EX

Subject: Comments for KSM MWR Registration applications

i!~~ KSM MWRMOE

EPD.docx

Hi Jennifer - here are my comments for the KSM camp sewage registrations. Let me know if there is anything else you need.

Thanks,

Jeannette

Jeannette Lough Environmental Protection Officer Ministry of Environment

Environmental Protection Division Skeena Region

Box 5000 Smithers, Be VOJ 2NO Ph: 250-847-7413 Fax: 250-847-7591 email: [email protected]

..

1

FNR-2013-00423 Page 226FNR-2013-00423 Page 226

MOE EPD - Review Notes on Municipal Wastewater Regulation Registration Applications for KSM concurrent permitting

Prepared: July 31, 2013 by Jeannette Lough

Five registration applications for the Municipal Wastewater Regulation were submitted by the client. Three of the applications correspond to individual camp sites, while the remaining two applications each consist of two neighbouring camps with some shared infrastructure.

Substitutions were requested for two of the five applications - Mitchell Initial & Secondary Camps and Mitchell Operating Camp. The rationale provided for an allowance of total phosphorous to exceed the recommended limit in the MWR is sound and acceptable to the director.

Two of the camps have applied for Reclaimed Water Use - Mitchell Initial & Secondary Camps and Treaty plant Construction & Operating Camp. Please ensure that you include proof that the local Medical Health Officer was notified of or has authorized the use of reclaimed water when submitting your final application. It is assumed that you will be providing more detailed information regarding the temporary/emergency storage basins for reclaimed water (ie -location, size, design, etc.)

Some general comments for all 5 applications:

• Ensure that a copy of design drawings for each wastewater facility, including the discharge works are signed and stamped by a qualified professional and submitted with final application. Include specifications for all outfalls (refer to sec. 99 of the MWR) and be sure to contact proper authorities for works in and about a stream.

• We look forward to receiving more detailed analysis around the Initial Dilution Zone for each discharge location prior to submitting your final applications.

• Site plans showing the receiving environment monitoring sites in relation to the layout of the wastewater facilities must be submitted with final applications ..

• Provide a completed Technical Information Summary Sheet for each facility (see attached form).

• Provide proof of certification for the treatment plant operator(s) with final applications

• For those facilities that will be discharging greater than 100 m3/day to water please be reminded that the new federal wastewater regulation applies.

• I highly recommend that you have sludge disposal options in place prior to commissioning of the facilities (ie permits applied for or plans confirmed for disposing to a permitted site).

• The MWR definition for BODS is "the carbonaceous 5-day biochemical oxygen demand". Please be sure to request CBOD when submitting samples to the lab. Also please note that fecal coliforms are measured in MPN with respect to MWR requirements.

Some specific comments for Treaty Saddle Camp:

.. • Appears to be a typo in the operating plan Executive Summary pg ii - reference is made to

discharge to Ground and I believe it should be discharge to water.

FNR-2013-00423 Page 227FNR-2013-00423 Page 227

Muir. Deanna CSNR:EX

From: Sent: To:

Paterson, Genevieve FLNR:EX Wednesday, September 4, 2013 2:21 PM 'Jessy Chaplin'

Subject: RE: Seabridge Gold -Final Ad Open Houses

Thank you.

GP

-----Original Message-----From: Jessy Chaplin [mailto:[email protected]] Sent: Wednesday, September 4, 2013 1:45 PM To: Paterson, Genevieve FLNR:EX Cc: Stalker, Jennifer L FLNR:EX; [email protected] Subject: FW: Sea bridge Gold -Final Ad Open Houses Importance: High

Hi Genevieve, Enclosed is the Sea bridge advertisement for the KSM Public Review period for EAO / CEAA. Regards,

Jessy Chaplin, MSc. RPBio Permitting Coordinator Seabridge Gold Inc. 1235 Main Street P.O. Box 2536 Smithers, BC V0J 2N0 Tel. (250) 847-4704 Cell.

1

,

FNR-2013-00423 Page 228

s.22

FNR-2013-00423 Page 228

Muir, Deanna CSNR:EX

From: Sent: To: Subject:

Good afternoon Jessy,

Paterson, Genevieve FLNR:EX Monday, September 9,20131 :23 PM 'Jessy Chaplin' KSM Issues & Comment Tracking Table - Review/Update

I have populated the table with the comments that I sent over last week.

If you have any additions or updates please let me know and I will populate for next week's update .

. KSM Comments and Issues Tracki ...

Talk to you later,

Ci~ pOJ/u-J.C1'V Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

1 FNR-2013-00423 Page 229FNR-2013-00423 Page 229

Stat

us

2013

-08-

19

Rose

mar

y Ba

rnew

all,

PGeo

.D

istr

ict P

rogr

am

Man

ager

,M

oTI

Tem

pora

ry A

cess

Acc

ess

Tran

smis

son

Line

MoT

will

req

uire

the

follo

win

g fr

om S

eabr

idge

for

thei

r fir

st

batc

h of

per

mit:

1) F

or th

e ac

cess

per

mit

we

requ

ire

the

desi

gn d

raw

ings

for

the

inte

rsec

tion

2) F

or th

e Tr

ansm

issi

on L

ine

Cros

sing

per

mit

we

will

req

uire

a

loca

tion

map

, and

det

ails

of t

he li

nes

(for

exa

mpl

e ve

rtic

al

clea

ranc

e, v

olta

ge, c

ross

ing

angl

e of

the

line,

if a

ny

infr

astr

uctu

re s

uch

as p

ole

or g

uide

wir

e w

ill b

e w

ithin

the

RoW

). A

ttac

hed

is th

e lin

k to

the

MoT

Util

ity P

olic

y M

anua

l, w

hich

will

pro

vide

det

ails

on

the

requ

ired

cle

aran

ces.

http

://w

ww

.th.

gov.

bc.c

a/pe

rmits

/Util

ity%

20Pe

rmit%

20M

anua

l.pd

f

3) F

or th

e te

mpo

rary

acc

ess

for

tran

smis

sion

line

con

stru

ctio

n,

we

will

req

uire

d de

tails

on

the

loca

tion,

site

line

s, d

rain

age

and

grad

e of

the

acce

ss r

oad

at h

ighw

ay 3

7.

MRC

2013

-08-

07

Jean

nett

e Lo

ugh

Envi

ronm

enta

l Pr

otec

tion

Off

icer

M

inis

try

of

Envi

ronm

ent

Cam

psKS

M M

unic

ipal

Was

tew

ater

Reg

ulat

ion

Regi

stra

tion

appl

icat

ion

note

s_Ju

ly 3

1 20

13_j

l.

MRC

2013

-08-

08

Rega

n Fi

eldi

ng

Envi

ronm

enta

l Pr

otec

tion

Off

icer

M

oE

Cam

ps

KSM

Air

per

mit

appl

icat

ion

note

s_A

ug 8

201

3_rf

MRC

Acr

onym

s M

RC

Min

e Re

view

Com

mitt

ee

WTP

Wat

er T

reat

men

t Pla

nt

Lead

Pro

cess

(EA

or M

RC)

Repo

nse/

Prop

osed

A

ccom

mod

atio

n/M

itig

atio

nPh

ase

Cons

truc

tion

Re

clam

atio

nor

Clo

sure

(Act

ive,

clo

sed,

ac

com

mod

ated

)

Kerr

-Sul

fret

s-M

itche

ll (K

SM) C

omm

ents

& Is

sues

Tra

ckin

g D

ocum

ent

Issu

e #

Dat

eA

utho

rRi

ghts

/Tit

le/T

reat

y Cl

aim

Proj

ect

Com

pone

ntCo

ncer

n /A

naly

sis/

Dis

cuss

ion

FNR-2013-00423 Page 230FNR-2013-00423 Page 230

Muir, Deanna CSNR:EX

From: Sent: To: Cc: Subject:

. Good afternoon Jessy,

Paterson, Genevieve FLNR:EX Monday, September 16, 2013 3:09 PM 'Jessy Chaplin' Stalker, Jennifer L FLNREX KSM Issues & Comment Tracking Table - Review/Update

I have no further updates from last week.

If you have any additions or updates, please let me know and I will populate for next week's update. Do you have any additions around the responses to these screening comments?

KSM Comments and Issues Tracki...

Thanks,

Ci~ POJ/Vr>C1'V Project Coordinator Ministry of Forests. Lands and Natural Resource Operations Major Projects Office, Skeena Region 2S0-847-7268

1 FNR-2013-00423 Page 231FNR-2013-00423 Page 231

Stat

us

2013

-08-

19

Rose

mar

y Ba

rnew

all,

PGeo

.D

istr

ict P

rogr

am

Man

ager

,M

oTI

Tem

pora

ry A

cess

Acc

ess

Tran

smis

son

Line

MoT

will

req

uire

the

follo

win

g fr

om S

eabr

idge

for

thei

r fir

st

batc

h of

per

mit:

1) F

or th

e ac

cess

per

mit

we

requ

ire

the

desi

gn d

raw

ings

for

the

inte

rsec

tion

2) F

or th

e Tr

ansm

issi

on L

ine

Cros

sing

per

mit

we

will

req

uire

a

loca

tion

map

, and

det

ails

of t

he li

nes

(for

exa

mpl

e ve

rtic

al

clea

ranc

e, v

olta

ge, c

ross

ing

angl

e of

the

line,

if a

ny

infr

astr

uctu

re s

uch

as p

ole

or g

uide

wir

e w

ill b

e w

ithin

the

RoW

). A

ttac

hed

is th

e lin

k to

the

MoT

Util

ity P

olic

y M

anua

l, w

hich

will

pro

vide

det

ails

on

the

requ

ired

cle

aran

ces.

http

://w

ww

.th.

gov.

bc.c

a/pe

rmits

/Util

ity%

20Pe

rmit%

20M

anua

l.pd

f

3) F

or th

e te

mpo

rary

acc

ess

for

tran

smis

sion

line

con

stru

ctio

n,

we

will

req

uire

d de

tails

on

the

loca

tion,

site

line

s, d

rain

age

and

grad

e of

the

acce

ss r

oad

at h

ighw

ay 3

7.

MRC

2013

-08-

07

Jean

nett

e Lo

ugh

Envi

ronm

enta

l Pr

otec

tion

Off

icer

M

inis

try

of

Envi

ronm

ent

Cam

psKS

M M

unic

ipal

Was

tew

ater

Reg

ulat

ion

Regi

stra

tion

appl

icat

ion

note

s_Ju

ly 3

1 20

13_j

l.

MRC

2013

-08-

08

Rega

n Fi

eldi

ng

Envi

ronm

enta

l Pr

otec

tion

Off

icer

M

oE

Cam

ps

KSM

Air

per

mit

appl

icat

ion

note

s_A

ug 8

201

3_rf

MRC

Acr

onym

s M

RC

Min

e Re

view

Com

mitt

ee

WTP

Wat

er T

reat

men

t Pla

nt

Lead

Pro

cess

(EA

or M

RC)

Repo

nse/

Prop

osed

A

ccom

mod

atio

n/M

itig

atio

nPh

ase

Cons

truc

tion

Re

clam

atio

nor

Clo

sure

(Act

ive,

clo

sed,

ac

com

mod

ated

)

Kerr

-Sul

fret

s-M

itche

ll (K

SM) C

omm

ents

& Is

sues

Tra

ckin

g D

ocum

ent

Issu

e #

Dat

eA

utho

rRi

ghts

/Tit

le/T

reat

y Cl

aim

Proj

ect

Com

pone

ntCo

ncer

n /A

naly

sis/

Dis

cuss

ion

FNR-2013-00423 Page 232FNR-2013-00423 Page 232

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

Categories:

KSM Advertising Requirements

Wed 2013-09-1112:00 AM Thu 2013-09-12 12:00 AM Free

(none)

Paterson, Genevieve FLNREX

Awaiting Response

From: Sent: To:

Paterson, Genevieve FLNR:EX Wednesday, September 11, 2013 2:39 PM 'Jessy Chaplin'

Cc: Subject:

'Elizabeth Miller'; Stalker, Jennifer L FLNR:EX; Carmody-Fallows, Jeanien ENV:EX KSM Advertising Requirements

Categories: . Awaiting Response

Good afternoon Jessy,

As per our discussion this morning, I'm developing a template for the public advertising requirements for the batch 1 applications, and I need your assistance.

The requirements for the lands, forestry and mines authorizations are straight forward, the EMA ad requires much more detail. Can you please fill out the template (link below) and I will try and merge the info into the existing template I've started for the lands, mines and forestry auth's. If the ad becomes too large we may require the EMA ad to be posted separately.

Let me know if you have any questions.

Thank you,

C;~ Po.-+vrJhYV Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeen a Region 250·847-7268

From: Carmody-Fallows, Jeanien ENV:EX Sent: Monday, September 9, 2013 2:07 PM To: Paterson, Genevieve FLNR:EX Subject: RE: EAO Ad Requirements

http:Uwww.env.gov.bc.ca!epd!waste discharge auth!guidance!pdf!applications,pdf Guidance Document http:Uwww.env.gov.bc.ca!epd!waste discharge auth!app forms!pdflnew-app.pdf Template

1 FNR-2013-00423 Page 233FNR-2013-00423 Page 233

KSM will need to complete for the water treatment plants, the landfills and the air permit applications. (MWR registrations do not require publication).

Jeanien Carmody-Fallows P.Eng. Environmental Protection Officer

Ministry of Environment Environmental Protection Division Skeena Region Box 5000 Smithers, Be VOJ 2NO Ph: 250-847-7273 Fax: 250-847-7591 email: [email protected]

2 FNR-2013-00423 Page 234FNR-2013-00423 Page 234

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence;

Organizer:

Categories:

From: Sent:

To: Cc: Subject:

Categories:

Hi Gen,

Public Consultation/Issues Tracking.

Tue 2013-09-1712:00 AM Wed 2013-09-18 12:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Awaiting Response

Jessy Chaplin [[email protected] Tuesday, September 17, 2013 6:00 AM Paterson, Genevieve FLNR:EX Stalker, Jennifer L FLNR:EX

Re: KSM Issues & Comment Tracking Table - Review/Update

Awaiting Response

I will have comments to insert next week. Also, the EMA notifications ad will take a week, there is very specific information required for each application. Jessy

Sent from my iPhone Seabridge Gold Inc

Jessy Chaplin

On 2013-09-16, at 3:08 PM, "Paterson, Genevieve FLNR:EX" <[email protected]> wrote:

Good afternoon Jessy,

I have no further updates from last week.

If you have any additions or updates, please let me know and I will populate for next week's update. Do you have any additions around the responses to these screening comments?

Thanks,

C;~ Po..{t.y~

Project Coordinator

1 FNR-2013-00423 Page 235FNR-2013-00423 Page 235

Ministry of Forests. Lands and Natural Resource Operations Major Projects Office. Skeena Region 250-847-7268

<KSM Comments and Issues Trackjng Updated 2013-09-05.pdf>

2 FNR-2013-00423 Page 236FNR-2013-00423 Page 236

Muir, Deanna CSNR:EX

Subject:

Start: End:

Recurrence:

Organizer:

From: Sent: To: Cc:

Subject:

Good morning Jessy,

KSM-Front Counter BC Application Acceptance Letter for Industrial Camps and Transmission Line

Fri 2013-09-20 8:00 AM Fri 2013-09-20 8:30 AM

(none)

Paterson, Genevieve FLNR:EX

Paterson, Genevieve FLNR:EX Friday, September 20, 2013 11:25 AM 'Jessy Chaplin' Schieder, Judith FLNR:EX; Stalker, Jennifer L FLNR:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX KSM-Front Counter BC Application Acceptance Letter for Industrial Camps and Transmission Line

The attached acceptance letter is the replacement to the June 29'h, 2013 letter sent from Front Counter Be.

Revision have been made to the timeframes and the process of referrals and consultation.

If you have any questions please feel free for email or call me.

Thanks,

C;~ Po.#YJ.&Vv Project Coordinator Ministry of Forests. Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

1 FNR-2013-00423 Page 237FNR-2013-00423 Page 237

Muir, Deanna CSNR:EX

Subject:

Start: End:

Recurrence:

Organizer:

From: Sent: To: Subject: Attachments:

Hi Jessy,

FW: KSM MRC Update! Screening Comments Due October 10, 2013

Tue 2013-09-24 8:00 AM Tue 2013-09-24 8:30 AM

(none)

Paterson, Genevieve FLNR:EX

Paterson, Genevieve FLNR:EX Tuesday, September 24, 2013 10:47 AM 'Jessy Chaplin' FW: KSM MRC Update/ Screening Comments Due October 10, 2013 KSM Comments and Issues Tracking Updated 2013-09-24.pdf

My apologies for being tardy.

Attached is the updated Issues Tracking Table, the only update I have is Cam's comments (as per Jenn's email below).

As always, if you have any updates for me to populate the table with please forward them on.

Thank you,

Genevieve Paterson

Project Coordinator

Ministrv of Forests, Lands and Natural Resource Operations

Major Projects Office, Skeena Region

250-847-7268

1 FNR-2013-00423 Page 238FNR-2013-00423 Page 238

From: Stalker, Jennifer L FLNREX Sent: Monday, September 23, 20132:07 PM To: 'Jessy Chaplin' Cc: Paterson, Genevieve FLNR:EX Subject: FW: KSM MRC Updatel Screening Comments Due October 10, 2013

Jessy, please find below comments that have come in regarding the Lands applications during the screening phase. These will be tracked on our end, and anything outstanding entered into the permit Issues Tracker.

Any questions or concerns, please do not hesitate to contact me.

Jen Stalker, RPF

Project Manager

Ministry of Forests, Lands and Natural Resource Operations

Skeena Region - Smithers, BC

Phone: (250) 847-7506

Fax: (250) 847-7347

Email: [email protected]

From: Bentley, Cam FLNR:EX Sent: Monday, September 23, 20132:00 PM To: Stalker, Jennifer L FLNREX Cc: Paterson, Genevieve FLNREX Subject: RE: KSM MRC Updatel Screening Comments Due October 10, 2013

I have review the submission of materials for 6408590/Eskay camp 6408591/Mitchell Operational Camp 6408592/Unuk Camp and 64085931T1L Treaty. At this time I believe the required info is submitted.

For 64084481Tunnel, as noted in the meeting at the DSS office in summer, I still require the resubmission the of the "tunnel MP and profile" changes have occurred.

2 FNR-2013-00423 Page 239FNR-2013-00423 Page 239

Cam

From: Stalker, Jennifer L FLNR:EX Sent: Friday, September 13, 2013 11 :08 AM To: ' Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; Fielding , Regan ENV:EX; Forgeng, Eric E . FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessica Coulson'; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected]),; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; 'Pat Lim'; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FLNR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Cc: 'Jessy Chaplin '; 'Elizabeth Miller'; 'Rolf Schmitt' ; Cuell, James W FLNR:EX; Hanchard, Jevan FLNR:EX; Love, Bobby FLNR:EX Subject: KSM MRC Update! Screening Comments Due October 10, 2013 Importance: High

RE: KSM PROJECT UPDATE - PERMITTING

Good Morning KSM MRC,

Please find below project updates for permitting, and a reminder that application screening comments are due on October 10, 2013.

1) PERMIT APPLICATION SCREENING PHASE UNDERWAY - Please note that we are well into the screening phase of the KSM permit applications, submitted by Seabridge Gold Inc. on May ·28, 2013.

3 FNR-2013-00423 Page 240FNR-2013-00423 Page 240

•• Permit application screening comments are due to [email protected] on/ by October 10, 2013 (Day 60)'*

2) KSM MINE REVIEW COMMITTEE TERMS OF REFERENCE - Finalized MRC Terms of Reference is now located on the KSM project Sharepoint site

3) SCREENING COMMENTS/ISSUES TRACKING TABLE - Please note that all screening comments received to date and the Issues Tracking Table have been posted to the Sharepoint Site. These documents will be updated and available for you to access throughout the permit review process.

4) NEXT MRC MEETING - will now be scheduled early in the review phase (after screening), expected early - mid November 2013. Please note that if anything comes up as we move through the screening phase that requires addressing/ MRC discussion, a conference call will be set up as/ if required.

KSM Sharepoint Site:

Link to sharepoint : https:llspc-flnr.gov.bc.ca/ksm/SitePages/Home.aspx

For external users who require access-if you haven't done so already-please create a BCelD account and forward your username to [email protected].

Instructions for setting up a basic bceid :

Visit: https:llwww.bceid.ca

Click "Begin Registration"

Click "Basic BCeID"

Click "Register without specifying an online service"

Enter your details & OK.

4 FNR-2013-00423 Page 241FNR-2013-00423 Page 241

Once you have been added as a member please remember to sign onto the sharepoint using this format: bceid\username. If you have any issues accessing the Sharepoint site, please contact Genevieve Paterson [email protected] .(orby phone: 250-847-7268).

As always, please do not hesitate to contact me if you have any questions/ concerns.

Thank you.

Jen Stalker, RPF

Project Manager

Ministry of Forests, Lands and Natural Resource Operations

Skeena Region - Smithers, BC

Phone: (250) 847-7506

Fax: (250) 847-7347 ,

Email: [email protected]

From: Paterson, Genevieve FLNR:EX On Behalf Of Stalker, Jennifer L FLNR:EX Sent: Thursday, August 15, 2013 2:46 PM To: ' Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessica Coulson'; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected])'; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; 'Pat Lim'; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; Sakals, Mat! E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Cc: 'Jessy Chaplin '; 'Elizabeth Miller'; 'Rolf Schmitt' ; Cuell , James W FLNR:EX; Hanchard, Jevan FLNR:EX; Love, Bobby FLNR:EX

5 FNR-2013-00423 Page 242FNR-2013-00423 Page 242

Subject: KSM MRC Update - Permit Application Screening Phase has begun Importance: High

Good Morning KSM Mine Reyiew Committee,

•• The Permit Application Screening Phase for the KSM Mine Project has now begun ••

The Environmental Assessment Office (EAO) has just released a letter to Seabridge Gold Inc. (now posted to the EAO website) that the EAO has received the revised application for the EA application for the proposed KSM project from Seabridge Gold Inc. on August 12, 2013; and that the 180-day review of the application has begun (letter attached). As discussed at the last Mine Review Committee (MRC) meeting held in Smithers on June 2ih, this then triggers the 'Permit Application Screening Phase'.

Batch I permit applications for screeningl review:

Mine Site/ Processing and Tailings Management Area

Camps

Access Roads (Coulter Creek! Treaty Creek)

Transmission Line

Mitchell-Treaty Tunnel

Screening Timelines:

Within 75 days of the EAO accepting the EA application for review (as per the Concurrent Approval Regulation), agencies must notify the proponent and the EAO in writing of any additional information that the ministry anticipates it will require from the proponent in order to conduct the technical review.

o MPO Project Manager (PM) will coordinate the MRC comments and draft a letter to th€l EAO (and notify the proponent), on behalf of the technical reviewers, of any additional information required to conduct the review.

o Project Manager is requesting that all comments from agencies are provided onl or before Day 60 in order for PM to compile and draft letter to EAO by Day 75.

6 FNR-2013-00423 Page 243FNR-2013-00423 Page 243

** MRC Technical Reviewers to provide permit application screening comments to [email protected] on! by October 10, 2013 (Day 60) **

KSM MRC Terms of Reference - For Final Review and Comment (1 Week):

Mine Review Committee Draft Terms of Reference

o Identifies the purpose of the Mine Review Committee and the roles and responsibilities of its members

o Comments have been received from the MRC and considered in this updated Terms of Reference ... thank you to those that provided comments.

o Please review and provide comments to Jen Stalker [email protected] onl by August 23'd, 2013.

Next MRC Meeting

o Early - mid October 2013 (date to be determined)

o The purpose of this meeting will be to provide an update and complete the screening phase, answer any outstanding issues! questions! concerns that need to be addressed (screening phase). As well, direction will be provided as to the next steps in the mine permitting review process and timelines.

Attached:

* EAO Letter to Proponent (180 day EA Application review has started on August 12, 2013 ... triggers the application screening phase)

* KSM MRC ToR (Updated - August 2013) -1 week final review and comment

* KSM Concurrent Review Process! Timeline (August 2013)

* KSM Permitting Timeline (Updated - August, 2013)

KSM Sharepoint Site: All Batch 1 Applications are posted

Link to sharepoint : https:/Ispc-flnr.gov.bc.ca!ksm!SitePages!Home.aspx

7 FNR-2013-00423 Page 244FNR-2013-00423 Page 244

For external users who require access-if you haven't done so already-please create a BCelD account and forward your username to [email protected].

Instructions for setting up a basic bceid:

Visit: https:llwww.bceid.ca

Click "Begin Registration"

Click "Basic BCeID"

Click "Register without specifying an online service"

Enter your details & OK.

Once you have been added as a member please remember to sign onto the sharepoint using this format: bceid\username. If you have any issues accessing the Sharepoint site, please contact Genevieve Paterson [email protected] (or by phone: 250-847-7268).

If you have any questions or concerns, please do not hesitate to contact me.

Thank you .

Jen Stalker, RPF

Project Manager

Ministry of Forests, Lands and Natural Resource Operations

Skeena Region - Smithers, BC

Phone: (250) 847-7506

Fax: (250) 847-7347

Email: [email protected]

8 FNR-2013-00423 Page 245FNR-2013-00423 Page 245

Stat

us

2013

-08-

19

Rose

mar

y Ba

rnew

all,

PGeo

.D

istr

ict P

rogr

am

Man

ager

,M

oTI

Tem

pora

ry A

cess

Acc

ess

Tran

smis

son

Line

MoT

will

req

uire

the

follo

win

g fr

om S

eabr

idge

for

thei

r fir

st

batc

h of

per

mit:

1) F

or th

e ac

cess

per

mit

we

requ

ire

the

desi

gn d

raw

ings

for

the

inte

rsec

tion

2) F

or th

e Tr

ansm

issi

on L

ine

Cros

sing

per

mit

we

will

req

uire

a

loca

tion

map

, and

det

ails

of t

he li

nes

(for

exa

mpl

e ve

rtic

al

clea

ranc

e, v

olta

ge, c

ross

ing

angl

e of

the

line,

if a

ny

infr

astr

uctu

re s

uch

as p

ole

or g

uide

wir

e w

ill b

e w

ithin

the

RoW

). A

ttac

hed

is th

e lin

k to

the

MoT

Util

ity P

olic

y M

anua

l, w

hich

will

pro

vide

det

ails

on

the

requ

ired

cle

aran

ces.

http

://w

ww

.th.

gov.

bc.c

a/pe

rmits

/Util

ity%

20Pe

rmit%

20M

anua

l.pd

f

3) F

or th

e te

mpo

rary

acc

ess

for

tran

smis

sion

line

con

stru

ctio

n,

we

will

req

uire

d de

tails

on

the

loca

tion,

site

line

s, d

rain

age

and

grad

e of

the

acce

ss r

oad

at h

ighw

ay 3

7.

MRC

2013

-08-

07

Jean

nett

e Lo

ugh

Envi

ronm

enta

l Pr

otec

tion

Off

icer

M

inis

try

of

Envi

ronm

ent

Cam

psKS

M M

unic

ipal

Was

tew

ater

Reg

ulat

ion

Regi

stra

tion

appl

icat

ion

note

s_Ju

ly 3

1 20

13_j

l.

MRC

2013

-08-

08

Rega

n Fi

eldi

ng

Envi

ronm

enta

l Pr

otec

tion

Off

icer

M

oE

Cam

ps

KSM

Air

per

mit

appl

icat

ion

note

s_A

ug 8

201

3_rf

MRC

2013

-09-

23

Cam

Ben

tly,

Land

s Te

nure

s Sp

ecia

list,

M

FLN

RO

Cam

ps &

Tra

nsm

issi

on L

ine

I hav

e re

view

the

subm

issi

on o

f mat

eria

ls fo

r 64

0859

0/Es

kay

cam

p 6

4085

91/M

itche

ll O

pera

tiona

l Cam

p 64

0859

2/U

nuk

Cam

p an

d 64

0859

3/T/

L Tr

eaty

. A

t thi

s tim

e I b

elie

ve th

e re

quir

ed in

fo is

sub

mitt

ed.

For

6408

448/

Tunn

el, a

s no

ted

in th

e m

eetin

g at

the

DSS

off

ice

in s

umm

er, I

stil

l req

uire

the

resu

bmis

sion

the

of th

e “t

unne

l M

P an

d pr

ofile

” c

hang

es h

ave

occu

rred

.

MRC

Acr

onym

s

Lead

Pro

cess

(EA

or M

RC)

Repo

nse/

Prop

osed

A

ccom

mod

atio

n/M

itig

atio

n(A

ctiv

e, c

lose

d,

acco

mm

odat

ed)

Kerr

-Sul

fret

s-M

itche

ll (K

SM) C

omm

ents

& Is

sues

Tra

ckin

g D

ocum

ent

Issu

e #

Dat

eA

utho

rRi

ghts

/Tit

le/T

reat

y Cl

aim

Proj

ect

Com

pone

ntCo

ncer

n /A

naly

sis/

Dis

cuss

ion

FNR-2013-00423 Page 246FNR-2013-00423 Page 246

MRC

M

ine

Revi

ew C

omm

ittee

W

TPW

ater

Tre

atm

ent P

lant

TLTr

ansm

isso

n Li

ne

FNR-2013-00423 Page 247FNR-2013-00423 Page 247

Phas

eCo

nstr

ucti

on

Recl

amat

ion

or C

losu

re

FNR-2013-00423 Page 248FNR-2013-00423 Page 248

Muir, Deanna CSNR:EX

Subject: Location:

Start: End: Show Time As:

Recurrence: Recurrence Pattern:

Meeting Status:

Organizer: Required Attendees:

Hi Jessy,

Copy: Comments & Issues Tracking Document from MPO to Seabridge Email.

Mon 2013-09-2312:00 AM Tue 2013-09-24 12:00 AM Free

Weekly every Monday

Not yet responded

Paterson, Genevieve FLNR:EX Jessy Chaplin

This is just a calendar reminder that you can expect the issues and comments tracking doc from me each week. I will email you even if it is just a notification that there are no further updates from the previous week.

Thanks,

Ci~ po..oft,yJ.01'V

Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250·847-7268

1 FNR-2013-00423 Page 249FNR-2013-00423 Page 249

Muir, Deanna CSNR:EX

From: Sent: To:

Cc: Subject:

Importance:

Good afternoon,

Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Friday, October 4,20133:32 PM , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jeska Gagnon '; 'Jessica Coulson'; 'Jessy Chaplin '; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected]),; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock. George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FLNR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Cuell, James W FLNR:EX KSM Mine Review Committee - Screening Level Period Extension to October 25th, 2013

High

It has come to the attention of the Major Projects Office that the capacity of technical experts is being tied up in the Environmental Assessment Review and there is a need for more time to provide screening level comments on the Batch 1 Permit Applications.

The screening level comments for the Batch 1 Permit Applications are now due by the end of business day Friday October 25th

, 2013. For the screening level comments we are looking for input on whether there are any additional information requirements in order for the Mine Review Committee to conduct their review.

Y~u can expect a reminder email in one weeks time, Tuesday October 15th, 2013.

Please forward your Screening Level comments onto Project Manger [email protected] and to myself.

Updated timetable:

Thank you,

~;~ KSM Permitting Timeline - Octo ...

4~ PMt.¥J,(nN Project Coordinator Ministry of Forests. Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

1 FNR-2013-00423 Page 250FNR-2013-00423 Page 250

Forests, Lands and Natural Resource Operations – Major Projects Office

1

KSM MINE PROJECT

Permitting Review – Timelines

(Batch I Permits)

October, 2013

Note: All dates are subject to change and will be updated as required

ACTIVITY DATE TIMELINE

AUTHORIZATIONS FOR:

Mine Site and Processing and Tailings Management Area (site prep and limited construction activities), Access Roads, Camps, Tunnel,

Transmission Line

Proponent submits Authorizations

Electronic (MPO to post to Sharepoint)

Hardcopy to those

agencies/ First Nations that

requested hardcopies

All applications are currently posted to the

Sharepoint site

Proponent in the process of mailing/ distributing

hardcopies/ USB sticks (as per applications distribution list)

EA Application 45 Day Screening (EAO) start (once all hardcopies of complete package have been received)

Expected late March, 2013

March 28, 2013

EA Application accepted for review (45 Day Screening + 21 day extension complete)

June 3, 2013

Agencies provide confirmation to PM that applications have been filed in accordance (i.e. agencies have received the applications and fees paid where required)

June 3 – June 10, 2013

PM Drafts letter on behalf of agencies that applications have been filed in accordance (letter addressed to EAO, cc’ proponent)

June 5, 2013

MRC: Application screening (to ensure that all required information is available for technical reviewers to conduct their review of the applications).

**Comments to be provided to PM, Jennifer Stalker within 75 days of EA application being accepted **

August 12 – October

25, 2013

Day 1 - Day 75

FNR-2013-00423 Page 251FNR-2013-00423 Page 251

Forests, Lands and Natural Resource Operations – Major Projects Office

2

PM to draft and deliver letter to EAO (cc’ MEM and proponent) outlining any information that is still required from the proponent to conduct a full review (letter must be delivered within 75 days of EA application acceptance)

October 25, 2013

Day 75

Technical MRC Permitting Review period Starts

Expected Late October, 2013

Technical MRC Permitting Review period winding down (buffer to resolve/ address any outstanding issues and PM to prepare Committee Report)

(once EAC has been issued)

~ Mid February, 2014

Address final issues and prepare Draft Committee Report

~ Mid February, 2014

Draft Committee Report and Draft Permits for MRC Review and Comment (2 weeks)

~ Late February,

2014

PM to prepare final Committee Report

Expected March,

2014

Final Decision Package submitted to SDM’s for Decision

Expected March,

2014

Decision

FNR-2013-00423 Page 252FNR-2013-00423 Page 252

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

From: Sent: To: Cc: Subject:

Hi Cam,

KSM Project - availability of meeting on Oct 17 at 10:307

Wed 2013-10-0912:00 AM Thu 2013-10-10 12:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Jessy Chaplin [email protected] Wednesday, October 9, 2013 2:52 PM Bentley, Cam FLNR:EX; Cuell, James W FLNR:EX Stalker, Jennifer L FLNR:EX; Paterson, Genevieve FLNR:EX KSM Project - availability of meeting on Oct 17 at 10:307

Bruce and I would like to provide you an update on the KSM Project with regards to our on-going discussions with the MTT tunnel and mineral claim owners American Creek and Teuton Resources. Bruce Scott, who you met at our last meeting July 8th, has some more questions about the generic and specific clauses that would likely be presented in a licence offer to Seabridge, perhaps we could review a draft of the MTT licence?

He is available in the morning -10:30 for a meeting. Would you please let us know if you are available.

Regards,

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. 1235 Main Street

P.O. Box 2536

Smithers, BC VOJ 2NO

Tel. (250) 847-4704

Cell.

1 FNR-2013-00423 Page 253

s.22

s.22

FNR-2013-00423 Page 253

Muir, Deanna CSNR:EX

From: Sent: To:

Subject:

Importance:

Good afternoon,

Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Monday, October 21 , 2013 2: 17 PM , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill'; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jeska Gagnon '; 'Jessica Coulson'; 'Jessy Chaplin '; 'John Mackie '; 'Kevin Koch '; 'Kyle Moselle'; 'Mansell Griffin ([email protected])'; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FLNR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN RE: KSM Mine Review Committee - Screening Level Period Extension to October 25th, 2013

High

This is a reminder for KSM Mine Review Committee Members of the deadline of Friday October 25th, 2013 for all Screening Level comments on the Batch 1 Applications submitted by Sea bridge Gold.

Please forward your Screening Level comments onto Project Manger [email protected] and to myself.

Thank you,

Ci~PMt4r~

Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

From: Paterson, Genevieve FLNR:EX On Behalf Of Stalker, Jennifer L FLNR:EX Sent: Friday, October 4, 2013 3:32 PM To: ' Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William lFLNR:EX; 'Garett Cooper'; .'Gitanyow Hereditary Chiefs Office'; 'Harp Gill'; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jeska Gagnon '; 'Jessica Coulson'; 'Jessy Chaplin '; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected])'; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FLNR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Cc: Cuell, James W FLNR:EX Subject: KSM Mine Review Committee - Screening Level Period Extension to October 25th, 2013 Importance: High

Good afternoon,

1 FNR-2013-00423 Page 254FNR-2013-00423 Page 254

It has come to the attention of the Major Projects Office that the capacity of technical experts is being tied up in the Environmental Assessment Review and there is a need for more time to provide screening level comments on the Batch 1 Permit Applications.

The screening level comments for the Batch 1 Permit Applications are now due by the end of business day Friday October 25th, 2013. For the screening level comments we, are looking for input on whether there are any additional information requirements in order for the Mine Review Committee to conduct their review.

Please forward your Screening Level comments onto Project Manger [email protected] and to myself.

Updated timetable:

m ~

KSM Permitting Timeline - Octo ...

Thank you,

Ci~ Po.-fe-t-)QVV Project Coordinator Ministry of Forests. Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268

2 FNR-2013-00423 Page 255FNR-2013-00423 Page 255

Muir, Deanna CSNR:EX

From: Sent: To:

Paterson, Genevieve FLNREX Tuesday, October 29, 20132:22 PM 'Jessy Chaplin'

Cc: Stalker, Jennifer L FLNR:EX Subject: KSM-Issue and Comment Tracking Table Updated and Posted to Sharepoint

Hi Jessy,

The table have been updated to include:

• All of the comments Seabridge has provided in response to screening level comments from MRC members and • Review comments that have been submitted by MRC members.

https:/lspc-flnr.gov.bc.ca/ksm/SitePages/Home.aspx

If you have any questions please let me know.

Thank you,

Project Coordinator Major Projects Office, Skeen a Region Ministrv of Forests. Lands and Natural Resource Operations 250·847-7268

1 FNR-2013-00423 Page 256FNR-2013-00423 Page 256

Muir, Deanna CSNR:EX

From: Sent: To:

Paterson, Genevieve FLNR:EX Wednesday, Oclober 30, 2013 8:58 AM 'Jessy Chaplin'

Subject: RE: KSM Mine Project - Seabridge response to MOE-EPD screening comments

Thank you Jessy.

Moving forward may I please be cc'd on all responses, I just noticed I was missed on the original submission.

Thanks again, have a nice day. ©

GP

From: Jessy Chaplin [mailto:[email protected] Sent: Tuesday, October 29, 2013 3:07 PM To: Paterson, Genevieve FLNR:EX Cc: 'Rolf Schmitt'; Stalker, Jennifer L FLNR:EX Subject: FW: KSM Mine Project - Sea bridge response to MOE-EPD screening comments

Hi Genevieve, Missing from the tracking table are the responses from Sea bridge to the MOE- Environmental Protection Division Air and Effluent comments (document attached). There are two documents with four pieces of information to respond to the MOE-EPD comments:

1) attached cover letter and table of responses to screening comments (.pdf pages 1-7); 2) The KSM Domestic and Industrial Waste. Management Plan (.pdf pages 8-22); 3) The Revised Air Emissions EMA Application form (pages 23-36); 4} The Air Emissions EMA Technical Assessment Report (the document you have uploaded to the sharepoint).

All four form the whole response to the comments.

I am also wondering if you have a tracking table where each comment is tracked, as opposed to each submission?

Thanks Jessy

lessy Chaplin, MSc, RPBio Permitting Coordinator Sea bridge Go ld Inc. 1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell.

._---- .- _._-From: Jessy Chaplin [mailto:[email protected] Sent: Friday, October 25, 2013 10:20 PM To: 'jeannette,[email protected]' Subject: FW: KSM Mine Project - Sea bridge response to MOE-EPD screening comments

Re-sent 1 FNR-2013-00423

Page 257

s.22

FNR-2013-00423 Page 257

From: Jessy Chaplin [mailto:[email protected] Sent: Friday, October 25, 2013 9:47 PM To: '[email protected]' Cc: Jeanien CarmodyFaliows (Jeanien.CarmodyFallows@gov,bc,ca); Jen Stalker. (Jennlfer.Stalker@goy,bc.ca); [email protected] Subject: KSM Mine Project - Seabridge response to MOE-EPD screening comments

Good day Jeanette,

Enclosed are Sea bridge Gold Inc. responses to the comments from MOE-EPD received August 29, 2013. Enclosed are responses to the comments and questions raised, a copy of the Environmental Management Plan Domestic and Industrial Waste Management Plan for construction and a revised application form for air emissions. A revised technical assessment report to encompass all five air emission permits for the site is included in a second email due to the size.

We look forward to your comments and further discussions.

Jessy Chaplin, MSc. RPBio Permitting Coordinator Sea bl'idge Gold Inc. 1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell

2 FNR-2013-00423 Page 258

s.22

FNR-2013-00423 Page 258

Muir, Deanna CSNR:EX

From: Sent: To:

Paterson, Genevieve FLNR:EX Monday, November 4,20133:57 PM 'Jessy Chaplin'

Cc: 'Rolf Schmitt'; Stalker, Jennifer L FLNR:EX Subject: RE: KSM Mine Project - Sea bridge response to MOE-EPD screening comments

Hi Jessy,

As per your comment below, you can expect a revised version of the KSM Issues and Comment Tracking Doc by the end of day Wed.

It will be revised to capture each individual comment along with a hyperlink to the document.

Talk to you later,

-Gen

Project Coordinator Major Projects Office, Skeena Region Ministry of Forests. Lands and Natural Resource Operations 250-847-7268

From: Jessy Chaplin [mailto:[email protected] Sent: Tuesday, October 29, 2013 3:07 PM To: Paterson, Genevieve FLNR:EX Cc: 'Rolf Schmitt'; Stalker, Jennifer L FLNR:EX Subject: FW: KSM Mine Project - Seabridge response to MOE-EPD screening comments

Hi Genevieve, Missing from the tracking table are the responses from Sea bridge to the MOE- Environmental Protection Division Air and Effluent comments (document attached). There are two documents with four pieces of information to respond to the MOE-EPD comments:

1) attached cover letter and table of responses to screening comments (.pdf pages 1-7); 2) The KSM Domestic and Industrial Waste Management Plan (.pdf pages 8-22); 3) The Revised Air Emissions EMA Application form (pages 23-36); 4) The Air Emissions EMA Technical Assessment Report (the document you have uploaded to the sharepoint).

All four form the whole response to the comments.

I am also wondering if you have a tracking table where each comment is tracked, as opposed to each submission?

Thanks Jessy

Jessy Chaplin, MSc. RPBio Permitting Coordinator

1 FNR-2013-00423 Page 259FNR-2013-00423 Page 259

Seabridge Gold Illc. 1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell.

From: Jessy Chaplin [mailto:[email protected]] Sent: Friday, October 25, 2013 10:20 PM To: '[email protected]' Subject: FW: KSM Mine Project - Sea bridge response to MOE-EPD screening comments

Re-sent

From: Jessy Chaplin [mailto:jessy@seabridgegold,netl Sent: Friday, October 25, 2013 9:47 PM To: '[email protected]' Cc: Jeanien carmodyFaliows ([email protected]); Jen Stalker ([email protected]); [email protected] Subject: KSM Mine Project - Sea bridge response to MOE-EPD screening comments

Good day Jeanette,

Enclosed are Sea bridge Gold Inc. responses to the comments from MOE-EPD received August 29, 2013. Enclosed are responses to the comments and questions raised, a copy of the Environmental Management Plan Domestic and Industrial Waste Management Plan for construction and a revised application form for air emissions. A revised technical assessment report to encompass all five air emission permits for the site is included in a second email due to the size.

We look forward to your comments and further discussions.

Jessy Chaplin, MSc. RPBio Permitting Coordinator Seabridge Gold Inc. 1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell

2 FNR-2013-00423 Page 260

s.22

s.22

FNR-2013-00423 Page 260

Muir, Deanna CSNR:EX

Subject:

Start: End: Show Time As:

Recurrence:

Organizer:

Categories:

From: Sent: To: Cc: Subject:

Categories:

Hi Jen,

Request from Seabrdige to Postpone MRC ReviewMtg

Tue 2013-11-1212:00 AM Wed 2013-11-1312:00 AM Free

(none)

Paterson, Genevieve FLNR:EX

Print/File

Jessy Chaplin [[email protected] Tuesday, November 12, 2013 5:02 PM Stalker, Jennifer L FLNR:EX Paterson, Genevieve FLNR:EX; [email protected]; Brent Murphy MRC meeting Dec 2013

Print/File

If you could give me a call tomorrow Wed 13 Nov, I'd like to discuss the MRC meetings for which Gen sent out an invitation today. In order for Seabridge to respond fully to greater than 250 permit application screening/permit review comments received, I am requesting a delay until mid-January for the proposed December 4/5 MRC meetings.

Thanks

Jessy

Jessy Chaplin, MSc. RPBio

Permitting Coordinator

Seabridge Gold Inc. Smithers, BC

Tel. (250) 847-4704

Cell.

www.ksmproject.com

1 FNR-2013-00423 Page 261

s.22

FNR-2013-00423 Page 261

Muir, Deanna CSNR:EX

From: Sent: To: Cc: Subject:

Tracking:

Good afternoon Jessy,

Paterson, Genevieve FLNR:EX Monday, November 18, 20134:07 PM 'Jessy Chaplin' Stalker, Jennifer L FLNR:EX Comments and Issues Tracking Doc-Updated.

Recipient

'Jessy Chaplin'

Stalker, Jennifer L FLNR:EX

Recall

Failed: 2013-11-18 4:24 PM

Please find the updated Comments and Issues Tracking Table posted on the Project sharepoint site.

If you have any questions please let know. I hope that the change in format suits your needs.

Thank you,

C;~ p(lJ/'e.yscw Project Coordinator Major Projects Office, Skeena Region Ministry of Forests, Lands and Natural Resource Operations 250-847-7268

1 FNR-2013-00423 Page 262FNR-2013-00423 Page 262

Muir, Deanna CSNR:EX

From: Sent: To: Cc: Subject:

Hi Jessy,

Paterson, Genevieve FLNR:EX Thursday, December 5,20139:56 AM 'Jessy Chaplin' Stalker, Jennifer L FLNR:EX Updated Issues and Comments Tracking Table

I've updated the IT table to include the comment from Ministry of Transportation around the intersection of the Treaty Creek access road.

Hope you' re doing well,

Project Coordinator Major Projects Office, Skeena Region Ministry of Forests. Lands and Natural Resource Operations 250·847-7268

1 FNR-2013-00423 Page 263FNR-2013-00423 Page 263

Muir, Deanna CSNR:EX

From: Sent: To:

Paterson, Genevieve FLNR:EX Thursday, December 5, 2013 11 :44 AM 'Jessy Chaplin'

Subject: RE: Updated Issues and Comments Tracking Table

Yes please more snow! I'm sad that Washington and Whistler are both getting lots and we aren't ® .

From: Jessy Chaplin [mallto:[email protected]] Sent: Thursday, December 5, 2013 11:42 AM To: Paterson, Genevieve FLNR:EX Subject: RE: Updated Issues and Comments Tracking Table

Hi Genevieve, Thanks for updating the table. I am well, thanks. I like the sunny weather, even if it is cold © Now for some snow ...

Jessy

.-~---~-.-.-.- -------... -- .---~----.-----From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Thursday, December 05,2013 9:56 AM To: 'Jessy Chaplin' Cc: Stalker, Jennifer L FLNR:EX Subject: Updated Issues and Comments Tracking Table

Hi Jessy,

I've updated the IT table to include the comment from Ministry of Transportation around the intersection of the Treaty Creek access road.

Hope you're doing well ,

Ci~P~~

Project Coordinator Major Projects Office. Skeena Region Ministry of Forests, lands and Natural Resource Operations 250-847-7268

1 FNR-2013-00423 Page 264FNR-2013-00423 Page 264

Muir, Deanna CSNR:EX

From: Sent: To:

Paterson, Genevieve FLNREX Wednesday, December 11, 20131:20 PM 'Jessy Chaplin'

Cc: . Stalker, Jennifer L FLNR:EX Subject: FW: Updated Issues and Comments Tracking Table

Hi Jessy,

The IT table has been updated to include comments from Ecosystems (Chris Schell).

Thanks,

Project Coordinator Major Projects Office, Skeena Region Ministry of Forests. Lands and Natural Resource Operations 250-847-7268

From: Paterson, Genevieve FLNR:EX Sent: Thursday, December 5, 2013 9:56 AM To: 'Jessy Chaplin' Cc: Stalker, Jennifer L FLNR:EX Subject: Updated Issues and Comments Tracking Table

Hi Jessy,

I've updated the ITtable to include the comment from Ministry of Transportation around the intersection of the Treaty Creek access road.

Hope you're doing well,

Ci~P~jQW Project Coordinator Major Projects Office, Skeena Region

Ministry of Forests. Lands and Natural Resource Operations 250-847-7268

1 FNR-2013-00423 Page 265FNR-2013-00423 Page 265

Muir, Deanna CSNR:EX

From: Sent: To: Cc: Subject: Attachments:

Good morning Jessy,

Paterson, Genevieve FLNR:EX Monday, December 16, 2013 8:59 AM 'Jessy Chaplin' Stalker. Jennifer L FLNR:EX FW: KSM review comments - Air permit TAR rf comments_KSM Permit Applications Air Emissions TAR - All Camp Memo 22_0ct_ 2013.pdf

Please find attached Regan Fielding's comments on applications for air emissions.

You can expect the Issues and Comment tracking table to be updated, and posted to the KsM Share point site by the end of the day.

Have a good day,

Project Coordinator Major Projects Office, Skeena Region Ministry of Forests, Lands and Natural Resource Operations 250-847-7268

1 FNR-2013-00423 Page 266FNR-2013-00423 Page 266

MOE EPD - Review Notes on Air Permit Applications for KSM Concurrent Permitting

Authorization #s’: 106826, 106827, 106829, 106832, and 106833

Prepared: Aug 8, 2013 by Regan Fielding

General Permitting Approach for Air Emissions:

Five applications for air permits were submitted by the client. Three of the applications correspond to individual camp sites, while the remaining two applications each consist of two neighboring camps with some shared infrastructure. The applications are very similar in content.

As an alternative to the above approach, MOE EPD recognizes that all camp air emissions could be authorized under one permit. For this approach, the information presented under the five separate applications would need to be consolidated. Annual discharge fees would be determined from the sum of the discharges between the seven camps. This approach would reduce the number of application fees ($200/application) and annual base fees ($100/permit) charged to the client. Once the construction camps are no longer required, a minor permit amendment would be required to reduce the authorized discharge quantity and associated discharge fees.

Alternatively, camp air emissions could also be authorized under two permits. One permit would authorize emissions from the construction camps, while the other would authorize the emissions from the operating camps. Once the construction camps are no longer required, then the air permit for the construction camps would be cancelled.

I recommend that the client revise their permit application approach for air emissions and seek authorization under one permit.

Open Burning of Clean Wood Waste:

Open burning of clean wood waste is not identified in the air permit applications. MOE requires confirmation that there is no intention to open burn clean wood waste, as this activity requires MOE authorization. Typically, authorization to conduct open burning of clean wood waste forms a component of the air permit. Please note that the Open Burning Smoke Control Regulation only applies to land clearing debris and does not allow for open burning of lumber scraps or other clean burning combustible materials. If the intention is to open burn clean wood waste from construction activities, then the TAR and application should contain appropriate information including but not limited to estimated monthly volumes of waste to be open burned (maximum and average volumes), description of burn and ash disposal locations, and description of waste to be open burned.

Generators:

Current approach of MOE EPD is that the production of electricity by the combustion of fuel, where the rated electrical production is less than 5 MW under peak load, does not require an authorization.

.

FNR-2013-00423 Page 267

The largest camp (Construction Camp #5 combined with Treaty Operating Camp), has a proposed electrical production capacity of 1.635 MW from diesel fired generators. Consequently, in accordance with the approach above, emissions from electrical generation at this camp do not require MOE authorization. Similarly, as other construction and operating camps also have proposed electrical production capacity that is significantly less than 5MW under peak load, the air emissions from electrical generation do not require MOE authorization.

Incinerators:

I have no major concerns with the incinerator component of the applications as the client is proposing to use reputable incinerators which should emit relatively good quality emissions provided that only appropriate materials are incinerated. However, the following comments identify areas where additional information is required, or areas that may require revision.

Source of waste:

1.1 Language needs to clearly state that incinerators will be solely used to incinerate putrescible food waste (including food contaminated packaging), paper, cardboard and clean wood waste. No wastes as defined by the Hazardous Waste Regulation shall be disposed of in the refuse incinerator. Burning of plastics will be minimized through waste reduction and recycling programs.

Proposed Treatment of Waste:

2.1 Waste Segregation - Waste segregation needs to occur at the source, using properly identified waste receptacles, to ensure that inappropriate wastes are not incinerated. Staff training will help ensure proper segregation of wastes at source. Bear proof containers should be used for temporary day storage of putrescible waste.

2.2 Description of incineration process – The incineration treatment process specific to the proposed incinerator should be described. Please present minimum operating temperatures for the primary and secondary chambers, and the secondary chamber minimum residence time.

2.3 Ash disposal – How does the proposed timeline for landfill construction relate to start of incinerator operations? If a there is a significant disparity between the two, then interim disposal locations should be identified. Incinerator ash is routinely disposed of at an open burning location along with the ash produced from open burning of clean wood waste. Prior to disposal of ash to ground, the ash should be stored in sealed containers within the fenced incinerator area.

2.4 Incinerator operation and tracking – Incinerator should only be operated by trained system operator. The operator is responsible to ensures that inappropriate waste is not incinerated and that the equipment is properly operated and maintained to avoid causing poor quality air emissions. Tracking of incinerator operation is required.

FNR-2013-00423 Page 268

Quantity of Waste Discharged:

3.1 Waste generation estimate – The estimate of 2.75 to 4.5 kg seems high and I believe the source reference provided for this information is not accurate. Applications for similar camp facilities have used a waste generation estimate of 2kg of waste/person/day that takes into account recyclables, and other materials not suitable for incineration. Please provide information to support the estimate and provide a single value for the estimate rather than a range of values. Please state the daily maximum weight of waste to be incinerated and the corresponding number of incinerator batches required based on full capacity at the camps. The required number of incinerators should be based on maximum camp capacity, estimated waste generation rates, incinerator batch capacity, and the duration of a typical incinerator batch cycle for a full load of putrescible food waste. The following link provides EPA published waste generation rates for the United States. http://www.epa.gov/osw/nonhaz/municipal/pubs/msw_2010_rev_factsheet.pdf The applications for Camps #9/#10 and Camp #5/Treaty Operating Camp were the only applications that presented estimates for daily waste generation. However, estimates provided (see Table 3) were based on an unsubstantiated waste generation estimate of 3.38 kg/person/day provided as a table footnote (refer to 1st paragraph in point 3.1 above).

3.2 Batch capacity and cycle times - Please clarify what the capacity of incinerator CA-600 is (inconsistently presented as 272 kg/batch in the technical memo and 341 kg/batch in appended fact sheet). Also, I have concerns that the estimated total cycle time (5 hours) is low and does not reflect that putrescible food waste has a high moisture content and may require a longer burn cycle. Appropriate heat-up and cool-down periods should also be accounted for. The appended information on livestock incineration shows that for the six test cases the primary burner was on for a minimum of 5 hours plus additional time for heat-up/cool-down, and loading/unloading.

Operating Period:

4.1 The operating period is 24 hours/day, 365 days/year.

Discharge Works:

5.1 Estimated Rate of Discharge for Incinerator (Table 2-4 or Table 2-3 depending on application) – The numbers presented under “Frequency” show an inconsistent relationship between camp size and the number of incineration cycles required per day. For example, based on the CA-600 incinerator, for the Mitchell operating camp (350 people), 4 to 6 incineration cycles/day is estimated. In contrast, for the Camps #9 & #10 (540 people), only 3 to 4 incineration cycles were

FNR-2013-00423 Page 269

estimated despite the need to incinerate over 50% more waste daily. Please review and revise accordingly. The frequency should state a single value that is based on maximum camp capacity, incinerator batch capacity and the estimated putrescible waste generation rate (See 3.1 above). Based on the presented incinerator cycle duration of 5 hours, only 4.8 incineration cycles can be performed per day. In contrast up to 6 cycles per day are estimated for Camp #5 and Mitchell Operating Camp, which would require the operation of two incinerators based on current estimates. The table footnote a) on the TARs for Camp #5/ Treaty Operating Plant, and Mitchell Operating Plant states that the frequency numbers are based on a theoretical maximum, that can be reduced through more intense recycling programs. In contrast, MOE’s prefers that a comprehensive recycling program be developed for site and that the estimated waste generation rates for incineration are reflective of the amount of waste diverted from incineration through recycling and alternate disposal. See point 3.1 above.

Additional Notes:

• TAR Memo - Camps #9 and #10 application– Incinerator section – The estimates presented for average number of camp occupants (270 people), are not required for the incinerator application and should be removed (Tables 2.3 and 2.5).

• TAR Memo – Estimated Daily Emissions from Camp (Table 2-4 or 2-5) – Table footnote does not reflect specifics of individual applications (same footnote on the 5 applications).

• TAR Memo - Camp #4, Camp #5/Treaty Operating, and Camp #6 applications – Incinerator - Proposed Treatment of Waste section – Mass fraction (% w/w) is typically used to describe the composition of a mixture, and does not seem suitable for describing the mass change resulting from incineration.