Muir, Deanna CSNR:EX
From: Sent: To: Cc: Subject:
Importance:
Hello Jessy and Elizabeth,
Paterson, Genevieve FLNR:EX Monday, October 1, 201210:54AM 'Jessy Chaplin '; '[email protected]' Stalker, Jennifer L FLNR:EX KSM-Setting the date for 1st MDRC meeting
High
Hope you both had a nice weekend!
Now that Chief Inspectors Office has given us the go ahead to convene the Mine Development Review Committee (yahoo!) let's work on setting a date!
MPO purposed dates: October 18th or 24th.
Let me know what day works best, we are open to an alternative date if necessary.
Cheers,
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
1 FNR-2013-00423 Page 1FNR-2013-00423 Page 1
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Subject: Attachments :
Hi there,
query from the District office
Mon 2012-10-0112:00 AM Tue 2012-10-0212:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [email protected] Monday, October 1, 2012 12:44 PM Paterson, Genevieve FLNR:EX; Stalker, Jennifer L FLNR:EX query from the District office Treaty Creek Access Road Oct_l_2012.pdf
Will Foster relayed a message to me that the District has requested air photo coverage of the proposed Treaty Creek Access Road (see map). I know that Lands has/had all the air photo coverage of Skeena Region, is it possible that Gen could try to find the air photos - hard copy - in the Lands File room? The 1 :50,000 mapsheet is 104N12.
It would be beneficial, because we used field data (walking the road alignments) and Lidar data (very high detail mapping) for the road design, not stereo air photos. It will take several weeks for me to order these new photos for the District office. And it seems redundant if they are available, just filed away.
Thanks
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
1 FNR-2013-00423 Page 2FNR-2013-00423 Page 2
Muir. Deanna CSNR:EX
From: Sent: To:
Jessy Chaplin [email protected]] Monday, October 1, 2012 3:04 PM Paterson, Genevieve FLNR:EX
Cc: Subject:
Stalker, Jennifer L FLNR:EX; [email protected] RE: KSM-Setting the date for 1 st MDRC meeting
Attachments: KSM MDRC invite oct 1 2012.docx
Hi Gen, Nov 6
th or 8
th•
I had a few word changes to keep the language consistent with other KSM materials. Thanks for the chance to review Jessy
From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Monday, October 01, 2012 1:50 PM To: 'Jessy Chaplin' Cc: Stalker, Jennifer L FLNR:EX; '[email protected]' Subject: RE: KSM-Setting the date for 1st MDRC meeting Importance: High
Hi Jessy,
Can you pick two potential dates that work for Sea bridge and then we can send those out to the MDRC to see what date works best.
Tuesday October 30th
Tuesday November 6th
Wed Nov 7'h or
Thurs Nov 8th "
Sense were not meeting till next week, I'm going to scratch the review of the first MDRC email off the agenda. I' m going to send it out by the end of the week so please provide any feedback on the draft email attached by no later than Wed this week.
Also we require a target date as to when Seabridge is planning to submit applications and EA Application (beginning/ midi or late November).
Thanks!
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
From: Paterson, Genevieve FLNR:EX Sent: Monday, October 1, 2012 10:54 AM To: 'Jessy Chaplin '; '[email protected]' Cc: Stalker, Jennifer L FLNR:EX
1 FNR-2013-00423 Page 4FNR-2013-00423 Page 4
Subject: KSM-Setting the date for 1st MDRC meeting Importance: High
Hello Jessy and Elizabeth,
Hope you both had a nice weekend!
Now'that Chief Inspectors Office has given us the go ahead to convene the Mine Development Review Committee (yahoo !) let's work on setting a.date!
MPO purposed dates: October 18'h or 24'h.
Let me know what day works best, we are open to an alternative date if necessary.
Cheers,
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Op·erations Major Projects Office, Skeena Region 250-847-7268
2 FNR-2013-00423 Page 5FNR-2013-00423 Page 5
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Kerr-Sulphurets-Mitchell (KSM)KSM Mine Project:
Seabridge Gold Inc. is expected to submit an application for an Environmental Assessment Certificate (EA
Application) and Applications for provincial permits and aAuthorizations under the BC EAO C‘concurrently’Approvals Regulation in mid- November 2012
I would like to introduce myself as the Project Manager for the KSM Project with the Major Projects Office – Ministry of Forests, Lands and Natural Resource Operations (FLNRO) out of the Skeena Region. The Major Projects Office is a division within the organization to help streamline authorizations (via the One Process model) for various natural resource projects, including major mines (assisting the Provincial agencies in coordinating the authorizations and First Nations engagement for the project). My role with the MDRC will be to coordinate the authorizations for the KSM Mmine site and the access to the mine site; as well as coordinate and chair upcoming MDRC meetings for this project. The initial MDRC meeting is scheduled for October 24,November 6th, 2012 (details below). This is the first E-mail out to this distribution list to confirm members of this MDRC and provide the date/ location of this first meeting. Additional materials will be sent out within the next couple of weeks (i.e. Terms of Reference, agenda, meeting materials).
KERR-SULPHURETS-MITCHELL (KSM)KSM MINE PROJECT
MINE DEVELOPMENT REVIEW COMMITTEE MEETING
CARIBOU BOARDROOM, 2nd FLOOR 3726 ALFRED AVENUE, NORA BUILDING
(check-in @ reception)
SMITHERS, BC
October 24November 6th, 2012
Teleconference dial in:Vancouver local:
Conference IDPurpose of the Meeting:
� Outline/ present the coordinated EA/MDRC process � Provide an overview of activities intended for concurrent permitting � Confirm concurrent permit information requirements
� Confirm what permits will be required for what activities � Confirm information requirements for permits � Identify opportunities to avoid submitting duplicate information
� Identify potential issues Major Projects Office – Skeena
� KSM Mine Project – Project Management Team
� Jen Stalker – Project Manager/ MDRC Chair
� James Cuell – Strategic Lead
� Jason Pope – Consultation Coordinator (permitting)
� Genevieve Paterson – Project Coordinator/ SharePoint Site Contact
Formatted: Superscript
Formatted: Superscript
Comment [J1]: Take out concurrent as it is already in the bullet above. “concurrent” permits do not have different information requirements from other permits.
FNR-2013-00423 Page 6
s.17, s.15
s.17, s.15
FNR-2013-00423 Page 6
Batch #1 Authorizations (expected to be submitted by Seabridge concurrently with the EA application) – detailed list of all authorizations permit applications will be provided in a later E-mail.
� Access:
o Special Use Permit (SUP) for the construction of the Coulter Creek Access Road (CCAR) and construction camps-related authorizations related to road construction;
o SUP for the construction of the Treaty Creek Access Road (TCAR) and construction camps related to road construction authorizations
� Mine Site: o Obtain authorizations for construction camps to begin– equipment staging and mine site
construction; o Mines Act Permit and Environmental Management Act Permit (MA & EMA) – pioneering access
trails in the Mmine Area and in the Treaty Process Plant area and Ttailings mManagement fFacility Aarea to begin site preparation, and construction of project components such as the water storage dam and water treatment plant in the Mitchell Valley.
Thank You! Look forward to working with you all on this project. Jen Stalker, RPF Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeena Region - Smithers, BC Phone: (250) 847-7506 Fax: (250) 847-7347 Email: [email protected]
FNR-2013-00423 Page 7FNR-2013-00423 Page 7
Muir, Deanna CSNR:EX
Subject:
Start: End:
Recurrence:
Organizer:
From: Sent: To: Subject:
Done.
Genevieve Paterson
Project Coordinator
RE: query from the District office
Mon 2012-10-01 8:00 AM Mon 2012-10-01 8:30 AM
(none)
Paterson, Genevieve FLNR:EX
Paterson, Genevieve FLNR:EX Monday, October 1, 2012 8:04 PM 'Jessy Chaplin'; Stalker, Jennifer L FLNR:EX RE: query from the District office
Ministry of Forests, Lands and Natural ~esource Operations
Major Projects Office, Skeena Region
250-847-7268
From: Jessy Chaplin fmailto:[email protected]] Sent: Monday, October 1, 2012 12:44 PM To: Paterson, Genevieve FLNR:EX; Stalker, Jennifer L FLNR:EX Subject: query from the District office
Hi there,
Will Foster relayed a message to me that the District has requested air photo coverage of the proposed Treaty Creek Access Road (see map). I know that Lands has/had all the air photo coverage of Skeena Region, is it possible that Gen could try to find the air photos - hard copy - in the Lands File room? The 1:50,000 mapsheet is 104A112.
1 FNR-2013-00423 Page 8FNR-2013-00423 Page 8
It would be beneficial, because we used field data (walking the road alignments) and Lidar data (very high detail mapping) for the road design, not stereo air photos. It will take several weeks for me to order these new photos for the District office. And it seems redundant if they are available, just filed away.
Thanks
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge ~old Inc. 1235 Main Street ·
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
2 FNR-2013-00423 Page 9
s.22
FNR-2013-00423 Page 9
Muir, Deanna CSNR:EX
From: Sent:
Paterson, Genevieve FLNR:EX Friday, October 5,20129:35 AM
To: 'Jessy Chaplin'; '[email protected]'; Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX
Cc: Subject:
Cuell, James W.FLNR:EX RE: KSM-Touching Base
Just to give some flexibility on when the meeting could start.
Let me know what time works best for you.
Cheers,
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
From: Jessy Chaplin [mailto:[email protected]] Sent: Friday, October 5, 2012 9:34 AM To: Paterson, Genevieve FLNR:EX; [email protected]; Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX Cc: Cuell, James W FLNR: EX Subject: RE: KSM-Touching Base
Hi Gen, Just wondering why this has expanded to 2 hrs from half an hour which is what we planned for "update" meetings?
Jessy
-----Origlnal Appointment-----From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Friday, October 05, 2012 8:44 AM To: 'Jessy Chaplin '; '[email protected]'; Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX Cc: Cue II, James W FLNR:EX Subject: KSM-Touching Base When: Wednesday, October 10, 2012 1:00 PM-3:00 PM (UTC-08:00) Pacific Time (US & Canada). Where: Seabridge Office or Nora Building?
When: Wednesday, October 10, 2012 1:00 PM-3:00 PM (GMT-08:00) Pacific Time (US & Canada) . Where: Seabridge Office or Nora Building?
Note: The GMT offset above does not reflect daylight saving time adjustments.
Updates to Agenda
1 FNR-2013-00423 Page 10FNR-2013-00423 Page 10
Hi Jessy and Elizabeth, I'm sorry that we have to reschedule this meeting, I hope that this time works.
Hello KSM team!
Jessy I forgot I have on Tues and Wed so I hope that Thursday works for you and Elizabeth. Also where is your preference to meet, Sea bridge office or Nora Building?
Agenda
• Review of Sept 26 update email from Jennifer
• Discuss draft email to be sent to Mine Development Review Committee
• First Nations Consultation-Jason
• MDRC
• Updated Permit list/Submission Dates
• Information Requirements
• Application submissions digital vs. hardcopy
~ Review/update outstanding action items
• licence of Occupation-Tunnel Update
« Message: KSM - Update (September 26, 2012) (19.5 KB)>> «Message: KSM - MORe E-mail (40.4 KB)>>
2 FNR-2013-00423 Page 11
s.22
FNR-2013-00423 Page 11
Muir, Deanna CSNR:EX
From: Sent: To:
Paterson, Genevieve FLNR:EX Friday, October 5,20129:37 AM 'Jessy Chaplin'
Subject: RE: KSM-Touching Base
My most recent invite should have the updated agenda.
Planning on sending out the invite to MDRC today.
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations
Major Projects Office, Skeena Region 250-847-7268
From: Jessy Chaplin [mailto:[email protected] Sent: Friday, October 5, 2012 9:36 AM To: Paterson, Genevieve FLNR:EX Subject: RE: K5M-Touching Base
Hi Gen, I noticed attached to the invitation you sent out yesterday the old agenda with the wrong name for KSM on it. Has that been revised and has the invitation to the MDRC gone out7
lessy Chaplin, MSc. RPBio Permitting Coordinator Seabridge Gold Illc. 1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell.
-----Original Appointment-----From: Paterson, Genevieve FLNR:EX [mailto:Genevi<[email protected]] Sent: Friday, October OS, 2012 8:44 AM To: 'Jessy Chaplin '; '[email protected]'; Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX Cc: Cuell, James W FLNR:EX Subject: KSM-Touching Base When: Wednesday, October 10, 2012 1:00 PM-3:00 PM (UTC-08:00) Pacific Time (US & Canada). Where: Seabridge Office or Nora Building?
When: Wednesday, October 10, 2012 1:00 PM-3:00 PM (GMT-08:00) Pacific Time (US & Canada). Where: Sea bridge Office or Nora Building7
Note: The GMT offset above does not reflect daylight saving time adjustments.
1
·1
FNR-2013-00423 Page 12
s.22
FNR-2013-00423 Page 12
Updates to Agenda
Hi Jessy and Elizabeth, I'm sorry that we have to reschedule this meeting, I hope that this time works.
Hello KSM team!
Jessy I forgot I have on Tues and Wed so I hope that Thursday works for you and Elizabeth. Also where is your preference to meet, Sea bridge office or Nora Building?
Agenda
• Review of Sept 26 update email from Jennifer
• Discuss draft email to be sent to Mine Development Review Committee
• First Nations Consultation-Jason
• MDRC
• Updated· Permit List/Submission Dates
• Information Requirements
• Application submissions digital vs. hardcopy
• Review/update outstanding action Items
• Licence of Occupation-Tunnel Update
«Message: KSM - Update (September 26, 2012) (19.5 KB)>> «Message: KSM - MDRC E-mail (40.4 KB) »
2 FNR-2013-00423 Page 13
s.22
FNR-2013-00423 Page 13
Muir, Deanna CSNR:EX
From: Sent: To:
Paterson, Genevieve FLNR:EX Tuesday, October 9, 2012 3:01 PM 'Jessy Chaplin'
Subject: RE: teleconference number tomorrow 1-2 meeting
Thanks ©
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
From: Jessy Chaplin [mailto:[email protected] Sent: Tuesday, October 9,20122:59 PM To: Paterson, Genevieve FLNR:EX Cc: Rolf Schmitt Subject: teleconference number tomorrow 1-2 meeting
Hi Gen,
--.------~
Could you please send us a teleconf link for tomorrows update meeting? I've just checked in with Rescan and they should have a shape file for me to send to you today for the maximum footprint for KSM.
Thanks
lessy Chaplin, MS"c. RPBio Permitting Coordinator Sea bridge Gold Inc.
1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell.
1 FNR-2013-00423 Page 14
s.22
s.17, s.15
FNR-2013-00423 Page 14
Muir, Deanna CSNR:EX
From: Sent: To:
Subject:
Importance:
Paterson, Genevieve FLNR:EX Tuesday, October 9; 2012 4:48 PM 'Andrews, Trevor'; Applegate, Sherrie TRAN:EX; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; 'Bob Bocking'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV: EX; 'Chief Glen Williams'; 'Chief Robert Good, Chief George Daniels, Chief Phyllis Haizimsque'; 'Colin Parkinson ([email protected])'; 'DarleneBimpson'; 'DarreII,[email protected]'; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gordon Sebastian'; Grace, David H EAO:EX; Hamilton, Chris EAO:EX; Herbert, Brian FLNR:EX; Hoffman, AI MEM:EX; Howe, Diane J MEM:EX; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessy Chaplin '; 'Kathy McPherson'; 'Kyle Moselle'; Love, Mark P ENV:EX; Lutz, Carl B TRAN:EX; 'Mansell Griffin ([email protected])'; 'Norm Maclean'; Paterson, Genevieve FLNR:EX; 'Patrick Hudson'; Pesklevits, Anthony ABR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; 'Tara Marsden'; Witt, Darren L FLNR:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Invitation to KSM Mine Development Review Committee
High
KSM Mine Project:
Seabridge Gold Inc. is expected to submit an application for an Environmental Assessment Certificate rEA Application) and Applications for provincial permits and authorizations under the BC EAO Concurrent Approvals Regulation in mid
November 2012
I would like to introduce myself as the Project Manager for the KSM Project with the Major Projects Office - Ministry of Forests, Lands and Natural Resource Operations (FLNRO) out of the Skeena Region. The Major Projects Office is a
division within the organization to help streamline authorizations (via the One Process model) for various natural resource projects, including major mines (assisting the Provincial agencies in coordinating the authorizations and First Nations engagement for the project). My role with the MDRC will be to coordinate the authorizations for the KSM Mine
and access to the mine site; as well as coordinate and chair upcoming Mine Development Review Committee (MDRC) meetings for this project. The initial MDRC meeting is scheduled for November 8'h, 2012 (details below). This is the
first E-mail out to this distribution list to confirm members of this MDRC and provide the datel location of this first meeting. Additional materials will be sent out within the next couple of weeks (Le. Terms of Reference, agenda, meeting materials).
KSM MINE PROJECT
MINE DEVELOPMENT REVIEW COMMITTEE MEETING
CARIBOU BOARDROOM, 2nd FLOOR 3726 ALFRED AVENUE, NORA BUILDING
(check-in @ reception)
SMITHERS, BC
November 8'h, 2012
1 FNR-2013-00423 Page 15FNR-2013-00423 Page 15
Purpose ofthe Meeting:
Teleconference dial in: Vancouver local:
Conference 10
• Outline/ present the coordinated EA/ MORC process • Provide an overview of activities intended for concurrent permitting • Confirm permit information requirements
• Confirm what permits will be required for what activities • Confirm information requirements for permits • Identify opportunities to avoid submitting duplicate information
• Identify potential issues
Major Projects Office - Skeena. KSM Mine Project - Project Management Team
• Jen Stalker- Project Manager/ MORC Chair
• James Cuell- Strategic Lead
• Jason Pope - Consultation Coordinator (permitting)
• Genevieve Paterson - Project Coordinator/ SharePoint Site Contact
Batch #1 Authorizations (expected to be submitted by Sea bridge concurrently with the EA application) -list of permit applications will be provided in a later E-mail.
• Access: o Special Use Permit (SUP) for the Coulter Creek Access Road (CCAR) and construction camps related to
road construction; o SUP for the Treaty Creek Access Road (TCAR) and construction camps related to road construction
• Mine Site: o Obtain authorizations for construction camps to begin equipment staging and mine site construction; o Mines Act Permit and Environmental Management Act Permit (MA & EMA) - pioneering access trails in
the Mine Area and in the Treaty Process Plant area and Tailings Man'agement Facility Area to begin site preparation, and construction of project components such as the water storage dam and water treatment plant in the Mitchell Valley.
EAOReview For further information regarding the environmental assessment process, committee, timelines, and information related to the project, please visit the EAO website, http:Ual00.gov.bc.ca/appsdata/epic/htmlfdeploy/epic project home 322.html.
MORC Participants Please review the proposed MORC list and provide any necessary updates/changes to [email protected].
Environmental Protection
Diane Howe - Deputy CI Kim Bellefontaine - Sr. Environmental
Ian Sharpe - Manager Mark Love-Compliance Officer
2 FNR-2013-00423 Page 16
s.17, s.15
s.17, s.15
FNR-2013-00423 Page 16
Jeanien Carmody-Fallows - Environmental Protection Officer Scott Jackson - Regional Hydrologist Craig Stewart - Compliance Specialist Regan Fielding-Environmental Protection Officer
Ministry of Forests, Lands and Jennifer Stalker - Project ManageriChair Natural Resource Operations Genevieve Paterson - Project Coordinator
Chris Schell- Sr. Ecosystems Biologist Eric FOl'geng - Archaeology Branch Jason Pope '- Sr. First Nations Advisor Brian Herbert - Sr. First Nations Advisor Darren Witt - Natural Resources Officer Will Foster - Resource Tenure Specialist Ron Donnelly - Tenures ForesterlEngineering Specialist Matt Sakals- Research Geomorphologist Emily Bulmer - Water Stewardship Officer
MinistlY of Transportation and Carl Lutz - District Manager, Bulkley-Stikine District Inli'astructure Sherrie Applegate - Senior Development Approvals
Rosemary Barnewall- District Program Manager Ministry of Aboriginal Relations Tony Pesklevits- Regional Negotiator and Reconciliation Federal Government Canadian Environmental Garett Cooper - Project Manager Assessment Agency Natural Resources Canada Kathy McPherson - Senior Environmental Assessment Officer Transpolt Canada Colin Parkinson - Area Officer Department of Fisheries and Trevor Andrews - Habitat Biologist (FHCP) Oceans Nis/1:a'a Lisims Government
Mansell Griffin - Lands and Resources Manager Tracey McKay-Lands Manager
First Nations ". . ' .. .. \. Gitanyow wifp Malii Chief Glen Williams wifp GamlaxyeJtxw Chief Robert Good wifp Gwaas Hlaam Chief George Daniels wifp Gwimiu Chief Phyllis Haizimsque Tahltan Nation- Norm Maclean-THREAT Coordinator Tahltan Heritage Resources Environmental Assessment Team (THREAT) Gitxsan (Wifps as identified by Gordon Sebastian- Executive Director the Gitxsan Hereditary Chiefs Office) Skii Km Lax Ha Chief Darlene Simpson
Kyle Moselle-Southeast Lar e Pro'ect Coordinator 3 FNR-2013-00423
Page 17FNR-2013-00423 Page 17
Resources Local Government . Regional District ofKitimat- Andrew Webber- Manager Planning and Economic Development Stikine Northern Health DalTell Belanger - Environmental Health Officer Proponent Seabridge Gold Elizabeth Miller - Proiect Manager
Jessy Chaplin-Project Manager Rolf Schm itt-Consultant
KSM SharePoint Site The KSM Share point site will be the venue for information sharing between Provincial permitting agencies and the MDRC.
External clients require a BCelD account to access Share Point to create a BCelD please select this link: https:/Iwww.bceid.cai
Instructions for setting up a basic bceid:
• Visit: https:/Iwww.bceid.ca
• Click "Begin Registration"
• Click "Basic BCeID" • Click "Register without specifying an online service"
• Enter your details & OK. • Provide BCelD user name to [email protected] once you have been added to the
sharepoint site access list you will receive an automated notification.
Thank You! I look forward to working with you all on this project.
Jen Stalker, RPF Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeena Region - Smithers, BC Phone: (250) 847-7506 Fax: (250) 847-7347
4 FNR-2013-00423 Page 18
s.17, s.15
FNR-2013-00423 Page 18
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc: Subject: Attachments:
Hi Gen,
FW: Update - KSM Project Footprint Shape File
Wed 2012-10-10 12:00 AM Thu 2012-10-1112:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [email protected] Wednesday, October 10, 2012 10:15 AM Paterson, Genevieve FLNR:EX; Stalker, Jennifer L FLNR:EX Pope, Jason FLNR:EX; Herbert, Brian FLNR:EX; Rolf Schmitt FW: Update - KSM Project Footprint Shape File KSM Footprint map Oct 10 2012 - maximum extent. pdf; FOOTPRINT_AIIPhases_Dissolved_2012_10_09.zip
As requested, shape files for the KSM Project footprint. Seabridge is providing MPO with this footprint shape-file so that MPO will provide Seabridge with a letter and map, as per the "Guide to Involving Proponents When Consulting First Nations, based on the Updated Procedures for Meeting Legal Obligations when Consulting First Nations (March 2011)" directing Seabridge to which Treaty and First Nations the Crown intends to delegate some procedural aspects of consultation to Seabridge during Permitting of the KSM Project.
The map which Seabridge has requested is the KSM Project footprint shape-file overlaying the Consultative Areas Database.
Regards,
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO 1 FNR-2013-00423
Page 19FNR-2013-00423 Page 19
Tel. (250) 847-4704
Cell.
From: Jessy Chaplin [mailto:[email protected]] Sent: Wednesday, October 10, 201210:01 AM To: [email protected] Subject: FW: Update - Project Footprint Shape Files
It works (UTM Zone 9)
Jessy
From: Jessy Chaplin [mailto:jessy@seabridgegold .net] Sent: Wednesday, October 10, 2012 8:52 AM To: [email protected] Subject: FW: Update - Project Footprint Shape Files
From: Ann Danilevich [mailto:[email protected]] Sent: Tuesday, October 09,20126:01 PM To: Jessy Chaplin ([email protected]) Subject: Update - Project Footprint Shape Files
Hi Jessy,
There has just been a small update to the Project footprint. If you haven't sent off the Shape files I sent you earlier, please use these.
With thanks,
Ann
2 FNR-2013-00423 Page 20
s.22
FNR-2013-00423 Page 20
KSM Footprint Oct 10 2012
0 5.25 10.5 km.
Legend
This map is a user generated static output from an Internet mapping site and is for generalreference only. Data layers that appear on this map may or may not be accurate, current, orotherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATION.
Scale: 1:296,290Map center: 56°34' N, 130°5' W
--"",,, ... , o.U\lII.
MineralTicles Online
D Indian Reserves
D National Parks
D Conservancy Areas
D Parks
D Federal Transfer Lands
D First Nations Treaty Related Lands
D First Nations Treaty Lands
D BeGS Grid
Annotation (1 :250K)
Transportation - Points (1 :250K)
+- Airfield +- Anchorage. Seaplane F Ferry Route ® Heliport +- Seaplane Base
+- Air Field +- Airport +- Air Feature· Condition Unknown +- Airport.Abandoned
Transportation - Lines (1 :250K)
/ / Ferry Route ~ Aerial Cableway /' Road (Gravel Undivided) • 1 Lane ~ Road (Gravel Undivided) • 3 Lanes
p Road· PavedJanes.2or More.Divided p Road (Paved Undivided) - Not Elevated·
1 Lane p Road (Paved Undivided) - Not Elevated -
2 Lanes
p Road - PavedJanes.30r More.Undivided ~ Road (Unimproved) /' =~~~ ;l~'~"~~~.:~~~~S Dry Weather
,
$
FNR-2013-00423 Page 22FNR-2013-00423 Page 22
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Subject: Attachments:
Hi Gen,
KSM Master Permit lists V2 October 10_2012.xlsx
Thu 2012-10-1112:00 AM Fri 2012-1 0-12 12:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [email protected] Thursday, October 11, 2012 3:35 PM Paterson, Genevieve FLNR:EX KSM Master Permit lists V2 October 10_2012.xlsx KSM Master Permit lists V2 October 10_2012.xlsx
Here's the excel file for the KSM master permit list - Batch 1
Cheers
Jessy
1 FNR-2013-00423 Page 23FNR-2013-00423 Page 23
1
# of
pe
rmits
App
licat
ion
Dat
e:PE
RMIT
APP
LICA
TIO
NST
ATU
SLe
gisl
atio
n
1M
ines
Act
Exp
lora
tion
Perm
it (M
X - 1
-571
) - K
SM c
laim
sA
ctiv
eM
ines
Act
2
Expl
osiv
es P
erm
it - (
MX-
1-5
71) -
KSM
cla
ims
(ren
ewed
ann
ually
)A
ctiv
eM
ines
Act
3
Fore
st A
ct O
ccup
ant L
icen
ce to
Cut
(OLT
C 48
517)
KSM
- on
min
e fo
otpr
int a
nd a
cces
s ro
ads
Act
ive
Fore
st A
ct4
Min
es A
ct E
xplo
ratio
n Pe
rmit
(MX-
1-76
3) -
Seeb
ee c
laim
sA
ctiv
eM
ines
Act
5
Expl
osiv
es P
erm
it - (
MX-
1-7
63) -
Sea
bee
clai
ms
(ren
ewed
ann
ually
)A
ctiv
eM
ines
Act
6
Fore
st A
ct O
ccup
ant L
icen
ce to
Cut
(OLT
C L4
8259
) Sea
bee-
TM
F fo
otpr
int a
nd a
cces
s ro
ads
Act
ive
Fore
st A
ct
710
-Dec
-09
Min
ing
Leas
e KS
M C
laim
s in
pro
gres
sM
iner
al T
enur
e A
ct8
29-M
ay-1
2M
iner
al T
enur
es A
ct -
Cond
ition
al R
egis
trat
ion
Rese
rve
for M
itche
ll-Tr
eaty
Tun
nel
alig
nmen
t in
pro
gres
sM
iner
al T
enur
e A
ct
9Se
pt 2
1 20
12La
nd A
ct L
icen
ce o
f Occ
upat
ion
for S
tatu
tory
righ
t-of
-way
alo
ng th
e M
TT a
lignm
ent f
rom
M
itche
ll Va
lley
to P
lant
Site
, inc
ludi
ng T
reat
y Sa
ddle
Cam
p #6
in p
rogr
ess
Land
Act
Com
pone
nt 1
: SU
P Co
ulte
r Cre
ek A
cces
s Ro
ad (C
CAR)
10Fo
rest
Pra
ctic
es C
ode
of B
C A
ct S
peci
al U
se P
erm
it (S
UP)
for
min
e ro
ad in
pro
vinc
ial f
ores
t -Co
ulte
r Cr A
cces
s Ro
ad (C
CAR)
Fore
st P
ract
ices
of B
C A
ct
11Fo
rest
Act
Occ
upan
t Lic
ence
to C
ut (O
LTC)
- CC
AR
Fore
st A
ct12
Not
ice
of F
ores
try
Ope
ratio
ns F
orm
to W
orkS
afe
BC, T
erra
ce o
ffic
eW
orks
afe
BC A
ct13
Wild
life
Act
Per
mit
to d
estr
oy n
ests
(Act
ive
duri
ng O
LTCs
)W
ildlif
e A
ct14
Seab
ridg
e ag
reem
ent w
ith A
ltaG
as to
use
Esk
ay M
ine
Road
km
4-4
3.5
n/a
15Se
abri
dge
agre
emen
t with
Bar
rick
Gol
d In
c to
use
Esk
ay M
ine
Road
km
43.
5-en
dn/
a
16Fi
sher
ies
Act
(DFO
) - S
ectio
n 9
auth
oriz
atio
n of
Unu
k br
idge
cro
ssin
gFi
sher
ies
Act
17Fi
sher
ies
Act
(DFO
) - R
evie
w S
UP
for O
pera
tiona
l Sta
tem
ents
for s
trea
m c
ross
ings
- CC
AR
Fish
erie
s A
ct
18Tr
ansp
ort A
ct (T
rans
Can
ada)
- N
avig
able
Wat
ers
Prot
ectio
n A
ct -
Nav
igab
le s
trea
m
cros
sing
s CC
AR
Nav
igab
le W
ater
s Pr
otec
tion
Act
19H
erita
ge C
onse
rvat
ion
Act
Sec
tion
12 a
ltera
tion
perm
it (if
requ
ired
)H
erita
ge C
onse
rvat
ion
Act
KSM
Per
mit
Mas
ter
List
: Dra
ft -
Oct
ober
12,
201
2
FNR-2013-00423 Page 24FNR-2013-00423 Page 24
2
Com
pone
nt 2
: SU
P Tr
eaty
Cre
ek A
cces
s Ro
ad (T
CAR)
20
Hig
hway
s A
ct -
perm
it fo
r acc
ess
road
con
nect
ion
to H
ighw
ay 3
7NH
ighw
ays
Act
21
Fore
st A
ct O
ccup
ant L
icen
ce to
Cut
(OLT
C) -
Trea
ty C
r Acc
ess
Road
Fore
st A
ct22
Fore
st P
ract
ices
Cod
e of
BC
Act
Spe
cial
Use
Per
mit
(SU
P) f
or m
ine
road
in p
rovi
ncia
l for
est -
Trea
ty C
r Acc
ess
Road
and
TM
F an
d Pl
ant S
ite
- up
to m
ine
foot
prin
t and
acc
ess
road
s
Fore
st P
ract
ices
of B
C A
ct
23N
otic
e of
For
estr
y O
pera
tions
For
m to
Wor
kSaf
e BC
, Ter
race
off
ice
Wor
ksaf
e BC
Act
24La
nd A
ct L
icen
ce o
f Occ
upat
ion
for a
tran
smis
sion
line
righ
t-of
-way
par
alle
l to
the
Trea
ty
Cree
k SU
P to
the
Plan
t Site
and
TM
FLa
nd A
ct
25W
ildlif
e A
ct P
erm
it to
des
troy
nes
ts (A
ctiv
e du
ring
OLT
Cs) (
TCA
R)W
ildlif
e A
ct26
Fish
erie
s A
ct (D
FO) -
Sec
tion
9 au
thor
izat
ion
of B
ell I
rvin
g br
idge
cro
ssin
g (T
CAR)
Fish
erie
s A
ct
27Se
ctio
n 9
Wat
er A
ct A
ppro
val f
or w
orks
in a
nd a
bout
a s
trea
m (b
ridg
e in
stal
latio
n) T
CAR
Wat
er A
ct S
ectio
n 9
28Fi
sher
ies
Act
(DFO
) - R
evie
w S
UP
for O
pera
tiona
l Sta
tem
ents
for s
trea
m c
ross
ings
- TC
AR
Fish
erie
s A
ct
29H
erita
ge C
onse
rvat
ion
Act
Sec
tion
12 a
ltera
tion
perm
it (if
requ
ired
)H
erita
ge C
onse
rvat
ion
Act
Com
pone
nt 3
: Con
stru
ctio
n Ca
mps
Se
e Sh
eet #
2 Co
nstr
uctio
n Ca
mps
Com
pone
nt 4
: Min
es A
ct a
nd E
MA
Act
Per
mit
for C
onst
ruct
ion
30M
ines
Act
(MA
) and
Env
iron
men
tal M
anag
emen
t Act
(EM
A) P
erm
it fo
r Site
Con
stru
ctio
n A
ctiv
ities
: Bat
ch 1
Min
es A
ct
31M
ines
Act
(MA
) and
Env
iron
men
tal M
anag
emen
t Act
(EM
A) P
erm
it fo
r Site
Con
stru
ctio
n A
ctiv
ities
: Bat
ch 1
Envi
ronm
enta
l Man
agem
ent A
ct
32M
iner
al T
enur
es A
ct -
Min
ing
Leas
e fo
r TM
F an
d Pl
ant S
iteM
iner
al T
enur
es A
ct33
Wat
er A
ct -
Sect
ion
9 W
ater
lice
nce
for u
p to
8 n
on-c
onta
ct d
iver
sion
s in
the
Min
e A
rea
- Pu
rpos
e: C
onse
rvat
ion
and
Land
Impr
ovem
ent U
seW
ater
Act
34W
ater
Act
- Se
ctio
n 9
Wat
er li
cenc
e fo
r up
to 8
non
-con
tact
div
ersi
ons
in th
e Pr
oces
s Pl
ant
and
TMF
Are
a - P
urpo
se: C
onse
rvat
ion
and
Land
Impr
ovem
ent U
seW
ater
Act
35W
ater
Act
- Se
ctio
n 9
Wat
er li
cenc
e fo
r non
-con
tact
div
ersi
on a
t the
Sad
dle
Port
al -
Purp
ose:
Con
serv
atio
n an
d La
nd Im
prov
emen
t Use
Wat
er A
ct
36EM
A- W
aste
Man
agem
ent P
erm
it - A
ir (i
ncin
erat
ors
at c
amps
>10
0 pe
rson
s)En
viro
nmen
tal M
anag
emen
t Act
37EM
A- E
nvir
onm
enta
l Man
agem
ent A
ct P
erm
it -S
olid
Was
te a
utho
riza
tion
for a
land
fill i
n th
e M
ine
Are
aEn
viro
nmen
tal M
anag
emen
t Act
38EM
A- E
nvir
onm
enta
l Man
agem
ent A
ct P
erm
it -S
olid
Was
te a
utho
riza
tion
for a
land
fill i
n th
e Pr
oces
s Pl
ant a
nd T
MF
Are
aEn
viro
nmen
tal M
anag
emen
t Act
FNR-2013-00423 Page 25FNR-2013-00423 Page 25
3
39EM
A- E
nvir
onm
enta
l Man
agem
ent A
ct P
erm
it -S
olid
Was
te a
utho
riza
tion
for a
co
ntam
inat
ed s
oils
land
farm
in th
e M
ine
Are
aEn
viro
nmen
tal M
anag
emen
t Act
40EM
A- E
nvir
onm
enta
l Man
agem
ent A
ct P
erm
it -S
olid
Was
te a
utho
riza
tion
for a
co
ntam
inat
ed s
oils
land
farm
in th
e Pr
oces
s Pl
ant &
TM
F A
rea
Envi
ronm
enta
l Man
agem
ent A
ct
41EM
A- E
nvir
onm
enta
l Man
agem
ent A
ct p
erm
it - S
peci
al W
aste
Reg
ulat
ions
-Was
te O
il ge
nera
tor p
erm
itEn
viro
nmen
tal M
anag
emen
t Act
Com
pone
nt 5
: Fed
eral
Per
mits
42
Inte
rnat
iona
l Riv
er Im
prov
emen
ts R
egul
atio
ns -
wat
er s
tora
ge fa
cilit
y po
tent
ially
alte
r se
ason
al fl
ows
to th
e U
nuk
Rive
r abo
ve th
resh
old
crite
ria
of 0
.3 m
3/se
c ha
ve to
che
ck th
is
as T
MF
disc
harg
e no
long
er g
oes
to T
eige
n Cr
eek
(Unu
k Ri
ver t
ribu
tary
)43
Tran
spor
t Can
ada
Nav
igab
le W
ater
s A
ct A
utho
riza
tions
Nav
igab
le W
ater
s Pr
otec
tion
Act
44
Fish
erie
s A
ct S
ectio
n 36
(2):
Fis
h H
abita
t Com
pens
atio
n Pl
an
Fish
erie
s A
ct45
Fish
erie
s A
ct S
ectio
n 36
(2):
Met
al M
inin
g Ef
fluen
t Reg
ulat
ions
Fish
erie
s A
ct46
Cana
da E
xplo
sive
s A
ct -
Expl
osiv
es F
acto
ry L
icen
ce
Cana
da E
xplo
sive
s A
ct47
Cana
da T
rans
port
atio
n A
ct -
Am
mon
ium
Nitr
ate
Stor
age
faci
litie
sCa
nada
Tra
nspo
rtat
ion
Act
FNR-2013-00423 Page 26FNR-2013-00423 Page 26
Muir. Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc: Subject:
Genevieve
"
RE: KSM Master Permit lists V2 October 10_2012.xlsx
Thu 2012-10-1112:00 AM Fri 2012-10-1212:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [email protected] Thursday, October 11, 2012 3:59 PM Paterson, Genevieve FLNR:EX Rolf Schmitt; [email protected] RE: KSM Master Permit lists V2 October 10_2012.xlsx
One more action Item - MPO to write a letter to Sea bridge directing Seabridge to the First Nations Sea bridge is to engage with on the Project. We requested this letter several months ago and still have not received direction from FLNRO on permit applications engagement with First Nations. For example, there are several MOE permits which require us to consult (their word) with First Nations, stakeholders and the Public. Please send us a letter with a map with the KSM Project shape file overlaying the Consultative Areas Database so that Seabridge can fulfill the legal requirements for applying for provincial permits.
Thanks
Jessy Chaplin, MSc. RPBio Permitting Coordinator Sea bridge Gold Inc. 1235 Main Street P.O. Box 2536 Smithers, BC VOJ 2NO Tel. (250) 847-4704 Cell.
-----Original Message-----From: Paterson, Genevieve FLNR:EX [mailto:[email protected] Sent: Thursday, October 1 ~, 2012 3:36 PM To: 'Jessy Chaplin' Subject: RE: KSM Master Permit lists V2 October 10_2012.xlsx
. Cool, thanks :)
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
From: Jessy Chaplin [mailto:[email protected]
1 FNR-2013-00423 Page 27
s.22
FNR-2013-00423 Page 27
Sent: Thursday, October 11,20123:35 PM To: Paterson, Genevieve FLNR:EX Subject: KSM Master Permit lists V2 October 10_2012.xlsx
Hi Gen, Here's the excel file for the KSM master permit list - Batch 1 Cheers Jessy
2 FNR-2013-00423 Page 28FNR-2013-00423 Page 28
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc: Subject:
Hi Gen,
RE: Seabridge/ MPO Meeting Agenda (October 30,2012)
Tue 2012-10-30 12:00 AM Wed 2012-10-3112:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [email protected]] Tuesday, October 30, 2012 8:45 AM Paterson, Genevieve FLNR:EX; 'Elizabeth Miller' Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Cue Ii, James W FLNR:EX RE: Seabridgej MPO Meeting Agenda (October 30,2012)
Thanks for the agenda and email.
Elizabeth and I are up against some deadlines today, could we meet "by teleconference"?
If you could send us the proposed Nov 8 Agenda for discussion, that would be great.
We are reviewing the permit list and will have comments for you by 1 :00.
Thanks
Jessy
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, Be VOJ 2NO
Tel. (250) 847-4704
1 FNR-2013-00423 Page 29FNR-2013-00423 Page 29
Cell.
From: Paterson, Genevieve FLNR:EX [i'nailto:[email protected] Sent: Monday, October 29,20123:28 PM To: 'Jessy Chaplin '; 'Elizabeth Miller' Cc: Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Cuell, James W FLNR:EX Subject: Seabridge/ MPO Meeting Agenda (October 30, 2012)
Hi Jessy & Elizabeth
Here is our proposed agenda for tomorrow's meeting, scheduled for 1 :00..,. 3:00 at the Nora Building. .
KSM Mine Project - Sea bridge/ MPO Meeting
Date: Tuesday October 30th, 1 :00 - 3:00 PM
Location: Ptarmigan Room, 1st Floor - Nora Building
Conference Call Info:
Dial In:
1.0. #:
Participants:
Jessy Chaplin, Seabridge ..
Elizabeth Miller, Seabridge
Rolf Schmitt, Rescan
Jen Stalker (Chair), FLNRO
Genevieve Paterson, FLNRO
James Cuell, FLNRO
2 FNR-2013-00423 Page 30
s.22
s.17, s.15
FNR-2013-00423 Page 30
Jason Pope, FLNRO
A) Process Co-ordination
Update on Coordinated MDRC and EAO Process
Update on Coordinated Consultation (Jason)
* EMA permits and First Nations Engagement (follow-up)
B) Co-ordinated Authorizations (Genevieve)
Authorizations list (attached) Still draft as I am waiting to hear back from our Archeology branch and DFO on permits required.
o One template, one list
C) MDRC Meeting (Nov. 8th)
Draft Agenda
D) Operational
Action Items
Next meeting
Please feel free to add additional items that you would like to discuss.
Thanks,
Genevieve Paterson
Project Coordinator
3 FNR-2013-00423 Page 31FNR-2013-00423 Page 31
Ministry of Forests, Lands and Natural Resource Operations
Major Projects Office, Skeena Region
250-847-7268
4 FNR-2013-00423 Page 32FNR-2013-00423 Page 32
Muir, Deanna CSNR:EX
From: Sent: To:
Paterson, Genevieve FLNR:EX Tuesday, October 3D, 2012 1 :31 PM 'Jessy Chaplin'; 'Elizabeth Miller'
Subject: Attachments:
RE: Sea bridge/ MPO Meeting Agenda (October 3D, 2012) Concurrent Review Process - DRAFT(V O.4).pdf
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
From: Jessy Chaplin [mailto:jessy@seabridgegold,net) Sent: Tuesday, October 30, 2012 8:45 AM To: Paterson, Genevieve FLNR:EX; 'Elizabeth Miller' Cc: Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Cuell, James W FLNR:EX Subject: RE: Seabridgej MPO Meeting Agenda (October 30, 2012)
Hi Gen, Thanks for the agenda and email. Elizabeth and I are up against some deadlines today, could we meet "by teleconference"? If you could send us the proposed Nov 8 Agenda for discussion, that would be great. We are reviewing the permit list and will have comments for you by 1:00.
Thanks Jessy
Jessy Chaplin, MSc. RPBio Permitting Coordinator Sea bridge Go ld Illc.
1235 Main Street P.O. Box 2536 Smithers, Be VOJ 2NO Tel. (250) 847-4704 Cell.
From: Paterson, Genevieve FLNR:EX [mailto:[email protected]) Sent: Monday, October 29, 2012 3:28 PM To: 'Jessy Chaplin '; 'Elizabeth Miller' Cc: Stalker, Jennifer L FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Cue II, James W FLNR:EX Subject: Seabridgej MPO Meeting Agenda (October 30, 2012)
Hi Jessy & Elizabeth
Here is our proposed agenda for tomorrow's meeting, scheduled for 1:00 - 3:00 at the Nora Building.
KSM Mine Project - Seabridgej MPO Meeting Date: Tuesday October 30th, 1:00 - 3:00 PM Location: Ptarmigan Room, lSI Floor - Nora Building
1 FNR-2013-00423 Page 33
s.22
FNR-2013-00423 Page 33
Conference Call Info: Dial In:I.D. #:
Participants:
Jessy Chaplin, Seabridge Elizabeth Miller, Sea bridge
Rolf Schmitt, Rescan Jen Stalker (Chair), FLNRO Genevieve Paterson, FLNRO James Cuell, FLNRO Jason Pope, FLN RO
A) Process Co-ordination Update on Coordinated MDRC and EAO Process Update on Coordinated Consultation (Jason)
* EMA permits and First Nations Engagement (follow-up)
B) Co-ordinated Authorizations (Genevieve) Authorizations list (attached) Still draft as I am waiting to hear back from our Archeology branch and DFO on permits required.
o One template, one list
C) MDRC Meeting (Nov. 8th)
Draft Agenda
D) Operational Action Items Next meeting
Please feel free to add additional items that you would like to discuss.
Thanks,
Genevieve Paterson Project Coordinator
. Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
2 FNR-2013-00423 Page 34
s.17, s.15
FNR-2013-00423 Page 34
Env
ironm
enta
lA
sses
smen
tOffi
ce
(EA
App
licat
ion)
Maj
orP
roje
cts
Offi
ce
(MD
RC
–P
erm
ittin
g)
OC
TOB
ER
2012
NO
VE
MB
ER
2012
(mid
)
JULY
2013
JUN
E20
13M
AY
2013
MA
RC
H20
13FE
BR
UA
RY
2013
JAN
UA
RY
2013
DE
CE
MB
ER
2012
AP
RIL
2013
AU
GU
ST
2013
SE
PTE
MB
ER
2013
DE
CE
MB
ER
2013
NO
VE
MB
ER
2013
EAO
APP
LIC
ATI
ON
SUB
MIT
TED
(PR
OPO
NEN
T)
With
in75
Day
saf
tert
heE
AO
acce
pts
the
appl
icat
ion,
MP
Ono
tifie
sth
epr
opon
enta
ndE
AO
inw
ritin
gof
any
addi
tiona
linf
orm
atio
nre
quire
men
ts(fr
omth
eM
DR
C)i
nor
dert
oco
mpl
ete
the
revi
ew
“PR
E M
DR
C
ME
ETI
NG
”(N
OV
EM
BE
R8TH
) AP
PLI
CA
TIO
NS
SU
BM
ITTE
D(P
RO
PO
NE
NT)
(as
perS
ectio
n15
.4of
the
Sec
tion
11O
rder
–sa
me
time
asth
eE
AA
pplic
atio
n)
60da
ysto
reso
lve
outs
tand
ing
issu
es,
draf
tRec
omm
enda
tions
Rep
ort(
3w
eeks
)for
MD
RC
revi
ewan
dco
mm
ent(
2w
eeks
),dr
aftp
erm
itsre
view
(2w
eeks
),an
d su
bmit
to S
DM
’s fo
r dec
isio
n.
30D
AY
SCR
EEN
ING
(mid
Nov
.–m
idD
ec.)
EAO
PRO
VID
ESN
OTI
FIC
ATI
ON
ON
EAA
PPLI
CA
TIO
N(B
ASE
DO
N30
DA
YSC
REE
NIN
G)
IfE
AO
acce
pts
appl
icat
ion,
EA
Ow
illpr
ovid
ew
ritte
nno
tice
toth
epr
opon
enta
ndM
PO
Ifth
eap
plic
atio
nis
noti
nre
spec
tofa
nel
igib
leap
prov
alor
was
notd
eliv
ered
ontim
e,th
eex
ecut
ive
dire
ctor
(EA
O)m
ust
notif
yth
epr
opon
enti
nw
ritin
gth
atth
eap
plic
atio
nis
refu
sed
MD
RC
Tech
nica
lRev
iew
KS
MM
INE
PR
OJE
CT
–C
ON
CU
RR
EN
TR
EV
IEW
PR
OC
ES
S(E
A/M
DR
C)
DR
AFT
(V0.
4)
Key
Com
pone
nts
(EA
O/M
PO)
*O
neIs
sues
Trac
ker
*O
neC
onsu
ltatio
nR
epor
t*
Join
tCon
sulta
tion
Stra
tegy
(EA
O/M
PO
)
Pro
pone
ntto
subm
ital
lap
plic
atio
nsdi
gita
llyto
MP
O-P
roje
ctM
anag
er(J
enS
talk
er)a
ndP
roje
ctC
oord
inat
or(G
enev
ieve
Pat
erso
n)to
post
toth
eS
hare
poin
tSite
forM
DR
Cac
cess
/rev
iew
.
Pro
pone
ntre
spon
sibl
eto
prov
ide
agen
cies
with
requ
ired
hard
copi
es.
Pro
pone
ntto
prov
ide
MP
Oa
listo
fhar
dcop
ies
and
agen
cies
/Firs
tNat
ions
requ
estin
gha
rdco
pies
.
EA
O–
prim
ary
poin
tofc
onta
ctw
ithFi
rstN
atio
nsdu
ring
the
EA
revi
ew.
Man
ages
Issu
estra
ckin
gan
dco
nsul
tatio
nre
cord
durin
gth
eE
Are
view
proc
ess.
EA
Ofin
alIs
sues
Trac
ker
and
Con
sulta
tion
Rec
ord
prov
ided
toM
PO
for
man
agin
gis
sues
/tra
ckin
gco
nsul
tatio
nat
the
MD
RC
leve
l.O
neC
onsu
ltatio
nR
epor
tand
Issu
esTr
acke
rsu
bmitt
ed to
SD
M’s
with
R
ecom
men
datio
nsR
epor
t(M
DR
C)
Dec
isio
nw
ithin
45D
ays
MD
RC
Tech
nica
lRev
iew
com
plet
e(to
leav
etim
eto
reso
lve
outs
tand
ing
issu
esan
dP
M(M
PO
)to
prep
are
Rec
omm
enda
tions
Rep
ort)
OC
TOB
ER
2013
One
Con
sulta
tion
Rep
ort
and
Issu
esTr
acke
rsu
bmitt
ed to
SD
M’s
with
R
ecom
men
datio
nsR
epor
t(M
DR
C)
FLN
RO
–pr
imar
ypo
into
fcon
tact
with
Firs
tNat
ions
durin
gth
eM
DR
Cre
view
.M
anag
esIs
sues
track
ing
and
cons
ulta
tion
reco
rddu
ring
the
MD
RC
revi
ewpr
oces
s.
KIC
K–
OFF
MD
RC
Mee
ting
Pro
pone
ntto
wal
kag
enci
esth
roug
hth
eap
plic
atio
nssu
bmitt
ed
MD
RC
ME
ETI
NG
MD
RC
ME
ETI
NG
Mov
ein
tote
chni
calr
evie
won
ceal
linf
orm
atio
nre
quire
men
tsar
esu
bmitt
ed
INTE
RN
AL
CEN
TRA
LIN
FOR
MA
TIO
NSH
AR
ING
POR
TAL
(EA
O/F
LNR
O)
*IS
SU
ES
TRA
CK
ER
(ON
EIS
SU
ES
TRA
CK
ER
FOR
EA
AN
DM
DR
C)
*IN
FOR
MA
TIO
NS
HA
RIN
GM
ATE
RIA
L/D
OC
UM
EN
TS(i.
e.S
OC
’s)
AC
CE
SS
:C
hris
Ham
ilton
,Dav
idG
race
Jen
Sta
lker
,Jas
onP
ope,
Gen
evie
veP
ater
son
180
DA
YEA
APP
LIC
ATI
ON
REV
IEW
AN
DD
ECIS
ION
PAC
KA
GE
FOR
MIN
ISTE
RS
FNR-2013-00423 Page 35FNR-2013-00423 Page 35
Muir, Deanna CSNR:EX
Subject: Location:
Start: End:
Recurrence:
Meeting Status:
Organizer: Required Attendees:
Optional Attendees:
~ ~
MDRe Agenda -,ovember 8, 2012.
Good morning,
Copy: KSM Mine Development Review Committee Meeting Smithers, Nora Bulding (3726 Alfred Ave) Cariboo Room, Con Call D
Thu 2012-11-0810:30AM Thu 2012-11-084:00 PM
(none)
Not yet responded
Paterson, Genevieve FLNR:EX , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX; CarmodyFallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'Mackie, John'; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin'; [email protected]; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO: I N Norm Ringstad; 'Rina Freed'; 'Frederic Tolmie'; Pardoe, Jill A EMNG:EX; Flynn, Doug EMNG:EX
Please find attached the agenda for the KSM, Mine Development Review Committee meeting being held November 8th,
2012. Please note the time has changed to 10:30-4:00 to accommodate for those folks flying in from out of town.
Other meeting materials (i.e. any PowerPoint slides etc ... ) will be sent prior to the meeting.
Morning snacks and coffee etc plus lunch to be provided. Please confirm attendance, including if you plan on attending in person or via conference call.
MORe Participants Please review the revised MDRC list and nrrlvirllp
Ministry of Energy and MinesChief Inspectors Office AI Hoffman - Chief Inspector (CI)
Diane Howe - Deputy CI Kim Bellefontaine ~ Sr. Environmental Geoscientist Tanya Demchuk- Senior Environmental Geologist
1 FNR-2013-00423 Page 36
s.17, s.15
s.17, s.15
FNR-2013-00423 Page 36
Northwest Regional Mines Office Kathie \Vagar ·Director Ministry of Environment-Environmental Protection Mark Love-Head of Environmental Management Section
Ian Sharpe - Regional Manager . Jeanien Carmody-Fallows ~ Environmental Protection Officer Scott Jackson ~ Regional Hydrologist Craig Stewart - Compliance Specialist Regan Fielding-Environmental Protection Officer Patrick Williston, Impact Assessment Biologist
Ministry of Forests, Lands and Natural Resource Operations
Major Projects Office James CueIl-Director Jennifer Stalker - Project Manager/Chair Genevieve Paterson - Project Coordinator Jason Pope - Sr. First Nations Advisor Brian Herbert·Sr, First Nations Advisor
Archaeology Branch Eric Forgeng - Heritage Resource Specialist
Ecology Chris Schell- Sr. Ecosystems Biologist
Lands Cam Bentley - Land Tenures Specialist
Forests Will Foster - Resource Tenure Specialist Howard Debeck-Ficld Engineer Ron Donnelly - Tenures Forester/Engineering Specialist
Water Matt Sakals- Research Geomorphologist
Emily Bulmer - Water Stewardship Officer Ministry of Transportation and Sherrie Applegate - Senior Development Approvals Infrastructure Rosemary Barnewall- District Program Manager Federal Government Canadian Environmental Assessment Garett Cooper - Project Manager Agent)' NaturAl Resources Canada Jessica Cou l son~ Team Leader
Melanie Camobell- Senior Policy Anall'st Transport Canada-Navigable \Vaters Protection John Mackie- Major Projects Management Officer Department of Fisheries and Oceans Pat Lim - Environmental Analyst Ni~a!a Lisims Government .
Mansell Griffin - Lands and Resources Manager Tracey McKay-Lands ManaRer
First Nations ........ ;< .; .... .~,
Gitanyow (lVilps to be identified by the Gitanyow Hereditary Chiefs Office)
Tahltan Nation-Tahltan Heritage Resources Nalaine Morin-THREAT Co-Chair Environmental Assessment Team (THREAn Skii Km Lax Ha Chief Darleno Simpson International Jurisdictions ... . ...
Alaska Department of Natural Resources Kyle Moselle-Southeast Large Project Coordinator
2 FNR-2013-00423 Page 37FNR-2013-00423 Page 37
KSM Share Point Site The KsM sharepoint site will be the venue for information sharing between Provincial permitting agencies and the MDRe.
External clients require a BCelD account to access Share Point to create a BCelD please select this link: https:!(www.bceid .ca(
Instructions for setting up a basic bceid:
• Visit: https:/lwww.bceid.ca • Click "Begin Registration"
• Click "Basic BCeID" • Click " Register without specifying an online service"
• Enter your details & OK. • Provide BCelD user name to [email protected] once you have been added to the
sharepoint site access list you will receive an automated notification.
Thank you,
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, skeena Region 250-847-7268
3 FNR-2013-00423 Page 38
s.17, s.15
FNR-2013-00423 Page 38
KSM MINE PROJECT
MINE DEVELOPMENT REVIEW COMMITTEE (MDRC) MEETING
CARIBIOU BOARDROOM, 2nd FLOOR3726 ALFRED AVENUE, NORA BUILDING
(check-in @ reception)
SMITHERS, BC
November 8, 2012
Teleconference dial in:Conference ID:
(All Times listed below - Pacific Standard Time)
1 Welcome and Introductions Jen Stalker/ All 10:30 – 10:45
2 KSM Project Seabridge 10:45 –12:00Project Description and Project Planning Update
Lunch (Provided)12:00 – 1:00
Authorizations and Information Requirements
Permit applications to be applied for under the EA Current Approvals Regulation will be available/ posted throughout the day/ over lunch – agencies and Seabridge available for any questions
3 Coordinated Authorizations Process Jen Stalker 1:00 – 1:30
4 First Nations Consultation Jason Pope 1:30 – 1:50
5 Concurrent Permitting – Concurrent Approval Regulation (What does this mean for the MDRC/
EA/ KSM Project?)
Jen Stalker1:50 – 2:00
6 MDRC Timelines, Milestones, Next Steps Jen Stalker 2:00 – 2:20
7 MDRC Information Sharing Genevieve Paterson
2:20 – 2:30
Break 2:30 - 2:45
8 Authorization Applications – Distribution Seabridge (Jen Stalker)
2:45 – 3:00
9 Next Steps/ Questions Period Jen Stalker 3:00 – 3:45
10 Closing Remarks/ Adjourn Jen Stalker 3:45 – 4:00
FNR-2013-00423 Page 39
s.17, s.15
s.17, s.15
FNR-2013-00423 Page 39
Muir, Deanna CSNR:EX
Subject:
Start: End:
Recurrence:
Organizer:
From: Sent: To: Subject: Attachments:
RE: Proposed KSM Project - EA Update & Working Group Confirmation Request
Tue 2012-11-06 8:00 AM Tue 2012-11-06 8:30 AM
(none)
Paterson, Genevieve FLNR:EX
Paterson, Genevieve FLNR:EX Tuesday, November 6, 2012 9:46 AM 'Jessy Chaplin' RE: Proposed KSM Project - EA Update & Working Group Confirmation Request Oct 112012_Application Screening Distribution List.xls
Thanks Jessy. I've added her to the MORC and invited her to the meeting.
Attached is EAO's list for tracking how to distribute, thought you may want to adapt for your use.
Cheers,
Genevieve Paterson
Project Coordinator
Ministry of Forests, Lands and Natural Resource Operations
Major Projects Office, Skeena Region
250-847-7268
From: Jessy Chaplin [mailto:[email protected]] Sent: Monday, November 5,20124:45 PM To: Paterson, Genevieve FLNR:EX Cc: Stalker, Jennifer L FLNR:EX Subject: FW: Proposed KSM Project - EA Update & Working Group Confirmation Request
1 FNR-2013-00423 Page 40FNR-2013-00423 Page 40
Gen.
As per our discussions on the agenda/distribution list today, there are 3 Environment Canada reps on the EAO working group list who may be interested in participating in the MPO MDRC.
The lead for EC is [email protected]
Others involved in the KSM project under June's lead are
I think that overall Garrett could give you more direction.
Regards,
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Sea bridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell
From: Vinette, Nicole EAO:EX [mailto:[email protected]] Sent: Wednesday, October 03,20123:25 PM To: Schell, Chris FLNR:EX; '[email protected]'; '[email protected]'; Stewart, Craig ENV:EX; '[email protected]'; '[email protected]'; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN;
2 FNR-2013-00423 Page 41
s.22
s.22
FNR-2013-00423 Page 41
'kenwyn.george@a/aska.gov'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; Bellefontaine, Kim MEM:EX; Huang, Li ENV:EX; XT:Nyce, Harry FLNR:IN; Downie, AJ ENV:EX; Loughran, Tony D AVED:EX; Ollenberger, Lance J OGC:IN; Tamblyn, Greg C ENV:EX; XT:Rudis,
. Deborah United States Fish and Wildlife Service EAO:IN; Applegate, Sherrie TRAN:EX; 'maxine.azak@nisgaa:net'; '[email protected]'; '[email protected]'; '[email protected]' ; Demchuk, Tania MEM:EX; '[email protected]'; Donnelly, Ron FLNR:EX; Sakiyama, Steve ENV:EX; Weinstein , Ben ENV:EX; '[email protected]'; '[email protected]'; '[email protected]'; Warnock, George MEM:EX; '[email protected]'; '[email protected]'; '[email protected]';
; Moi, Art W FLNR:EX; '[email protected]'; Foster, Will iam J FLNR:EX; Moody, Anne MEM:EX; Herbert, Brian FLNR:EX; Barnewall , Rosemary C TRAN:EX; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]'; '[email protected]' ; '[email protected]';
'[email protected]'; '[email protected]'; '[email protected]' ; Rollo, Andrew MEM:EX; '[email protected]';; Hamilton, Chris EAO:EX; Stalker, Jennifer L FLNR:EX; '[email protected]'; '[email protected]'; XT:McKay, Tracey FOR: IN; Jackson, Scott ENV:EX; Grace, David H EAO:EX; '[email protected]'; '[email protected]'; '[email protected]'; XT:District, Stewart, Mayor TRAN:IN; '[email protected]'; Bulmer, Emily M FLNR:EX; Staplin , Sean FLNR:EX; Cc: 'Elizabeth Miller ([email protected])' ; '[email protected]';
; Hamilton, Chris EAO:EX; Grace, David H EAO:EX; Van Doorn, Mark EAO:EX; Matsko, Nataliya EAO:EX Subject: Proposed KSM Project - EA Update & Working Group Confirmation Request
Dear Working Group ,members,
Please see below for a link to a letter from Seabridge Gold to the Environmental Assessment Office (EAO) posted on the EAO website regarding a commitment to submit consultation summary reports prior to submitting the application for an environmental assessment (EA) certificate for the proposed KSM Project (Project),
http://a100.gov.bc.calappsdatalepic/documents/p322/134930211 0373_ad64facfd9b 75134dcfe3e14fc 6b 7ff44b 7f178521 fdc707d790ca5fa2828da4.pdf
FNR-2013-00423 Page 42
s.22s.22
s.22 s.22
s.22
s.22
s.22
s.22
s.22
s.22
s.22
FNR-2013-00423 Page 42
I would also like to take this opportunity to confirm the Working Group membership and contact information in order to ensure that we have a complete and accurate list of everyone who should be on the distribution list to receive updates re: the EA of the proposed Project.
Please contact me by October 24.2012 at [email protected] to indicate:
• whether there have been any changes in responsibilities in your agency/organization for the EA of the proposed Project, and whether anyone should be removed from/added to our distribution list
• whether you would like to remain on the distribution list or be removed • whether your contact information (particularly e-mail) has changed and should be updated in our
distribution list
Thanks in advance, and if there are any questions, please feel free to contact me ([email protected] or 250-356-5311) or any of the following team members from EAO:
Chris Hamilton
Executive Project Director and EAO's Project Lead
250-387-1032
David Grace
Project Assessment Manager
David. [email protected]
250-387-1417
Mark Van Doorn
Project Assessment Officer
250-387-0291 4
FNR-2013-00423 Page 43FNR-2013-00423 Page 43
-Nicole
Nicole Vinette Project Assessment Officer Environmental Assessment Office
(250) 356-5311 [email protected]
5 FNR-2013-00423 Page 44FNR-2013-00423 Page 44
Muir. Deanna CSNR:EX
From: Sent: To:
Cc: Subject: 'Attachments:
Importance:
Good afternoon,
Paterson, Genevieve FLNR:EX Wednesday, November 7,2012 11:57 AM , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX; CarmodyFallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; De Beck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin '; [email protected]; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian 0 ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN 'Norm Ringstad' KSM Mine Development Review Committee Meeting Materials for November 8th. KSM MDRC Agenda - November 8, 2012.docx.docx.docx; One Process MDRC Slides KSM Projectpptx; KSM Concurrent Review Process - DRAFT(V 0.5) Nov 7 2012.pdf; KSM Permitting Requirements (Draft) .docx
High
Please find meeting materials attached for tomorrow's meeting. Please see KSM MDRC Agenda for all meeting location/call in information.
For those of you joining by conference call please expect an email from myself tomorrow morning with Sea bridge's presentation.
Just a reminder that the meeting time has changed to 10:30-4:00 PST.
If you have any questions please contact myself or [email protected]
Thank you,
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
1 FNR-2013-00423 Page 45FNR-2013-00423 Page 45
KSM MINE PROJECT
MINE DEVELOPMENT REVIEW COMMITTEE (MDRC) MEETING
CARIBIOU BOARDROOM, 2nd FLOOR
3726 ALFRED AVENUE, NORA BUILDING (check-in @ reception)
SMITHERS, BC
November 8, 2012
Teleconference dial in
Conference ID:
(All Times listed below - Pacific Standard Time)
1 Welcome and Introductions Jen Stalker/ All 10:30 – 10:45 2 KSM Project Seabridge 10:45 –12:00 Project Description and Project Planning Update
Lunch (Provided) 12:00 – 1:00
Authorizations and Information Requirements
Permit applications to be applied for under the EA Current Approvals Regulation will be available/ posted throughout the day/ over lunch – agencies and Seabridge available for any questions
3 Coordinated Authorizations Process Jen Stalker 1:00 – 1:30 4 First Nations Consultation Jason Pope 1:30 – 1:50
5
Concurrent Permitting – Concurrent Approval Regulation (What does this mean for the MDRC/
EA/ KSM Project?)
Jen Stalker 1:50 – 2:00
6 MDRC Timelines, Milestones, Next Steps Jen Stalker 2:00 – 2:20 7
MDRC Information Sharing
Genevieve Paterson
2:20 – 2:30
Break 2:30 - 2:45 8
Authorization Applications – Distribution
Seabridge (Jen Stalker)
2:45 – 3:00
9 Next Steps/ Questions Period Jen Stalker 3:00 – 3:45
10 Closing Remarks/ Adjourn Jen Stalker 3:45 – 4:00
FNR-2013-00423 Page 46FNR-2013-00423 Page 46
s.17, s.15
Env
ironm
enta
lA
sses
smen
tOffi
ce
(EA
App
licat
ion)
Maj
orP
roje
cts
Offi
ce
(MD
RC
–P
erm
ittin
g)
NO
VE
MB
ER
2012
JULY
2013
JUN
E20
13M
AY
2013
MA
RC
H20
13FE
BR
UA
RY
2013
JAN
UA
RY
2013
DE
CE
MB
ER
2012
AP
RIL
2013
AU
GU
ST
2013
SE
PTE
MB
ER
2013
DE
CE
MB
ER
2013
NO
VE
MB
ER
2013
EAO
APP
LIC
ATI
ON
SUB
MIT
TED
(PR
OPO
NEN
T)
With
in75
Day
saf
tert
heE
AO
acce
pts
the
appl
icat
ion,
MP
Ono
tifie
sth
epr
opon
enta
ndE
AO
inw
ritin
gof
any
addi
tiona
linf
orm
atio
nre
quire
men
ts(fr
omth
eM
DR
C)i
nor
dert
oco
mpl
ete
the
revi
ew
“PR
E M
DR
C
ME
ETI
NG
”(N
OV
EM
BE
R8TH
) AP
PLI
CA
TIO
NS
SU
BM
ITTE
D(P
RO
PO
NE
NT)
(as
perS
ectio
n15
.4of
the
Sec
tion
11O
rder
–sa
me
time
asth
eE
AA
pplic
atio
n)
60da
ysto
reso
lve
outs
tand
ing
issu
es,
draf
tRec
omm
enda
tions
Rep
ort(
3w
eeks
)for
MD
RC
revi
ewan
dco
mm
ent(
2w
eeks
),dr
aftp
erm
itsre
view
(2w
eeks
),an
d su
bmit
to S
DM
’s fo
r dec
isio
n.
30D
AY
SCR
EEN
ING
EAO
PRO
VID
ESN
OTI
FIC
ATI
ON
ON
EAA
PPLI
CA
TIO
N(B
ASE
DO
N30
DA
YSC
REE
NIN
G)
IfE
AO
acce
pts
appl
icat
ion,
EA
Ow
illpr
ovid
ew
ritte
nno
tice
toth
epr
opon
enta
ndM
PO
Ifth
eap
plic
atio
nis
noti
nre
spec
tofa
nel
igib
leap
prov
alor
was
notd
eliv
ered
ontim
e,th
eex
ecut
ive
dire
ctor
(EA
O)m
ust
notif
yth
epr
opon
enti
nw
ritin
gth
atth
eap
plic
atio
nis
refu
sed
MD
RC
Tech
nica
lRev
iew
KS
MM
INE
PR
OJE
CT
–C
ON
CU
RR
EN
TR
EV
IEW
PR
OC
ES
S(E
A/M
DR
C)-
DR
AFT
(V0.
5)–
Nov
embe
r7,2
012
**N
OTE
–Ti
mel
ine
and
deta
ilsin
the
follo
win
gpr
oces
sdi
agra
mar
esu
bjec
tto
chan
ge
Pro
pone
ntto
subm
ital
lap
plic
atio
nsdi
gita
llyto
MP
O-P
roje
ctM
anag
er(J
enS
talk
er)a
ndP
roje
ctC
oord
inat
or(G
enev
ieve
Pat
erso
n)to
post
toth
eS
hare
poin
tSite
forM
DR
Cac
cess
/rev
iew
.
Pro
pone
ntre
spon
sibl
eto
prov
ide
agen
cies
with
requ
ired
hard
copi
es.
Pro
pone
ntto
prov
ide
MP
Oa
listo
fhar
dcop
ies
and
agen
cies
/Firs
tNat
ions
requ
estin
gha
rdco
pies
.
EA
O–
prim
ary
poin
tofc
onta
ctfo
rFirs
tNat
ions
Con
sulta
tion
durin
gth
eE
Are
view
.M
anag
esIs
sues
track
ing
(forE
AR
evie
w)a
ndC
onsu
ltatio
nR
ecor
ddu
ring
the
EA
revi
ewpr
oces
s.
All
EA
OIs
sues
and
stat
ustra
cked
and
EA
O’s
C
onsu
ltatio
nR
ecor
dpr
ovid
edto
MP
O
Dec
isio
nw
ithin
45D
ays
MD
RC
Tech
nica
lRev
iew
com
plet
e(to
leav
etim
eto
reso
lve
outs
tand
ing
issu
esan
dP
M(M
PO
)to
prep
are
Rec
omm
enda
tions
Rep
ort)
OC
TOB
ER
2013
DE
CIS
ION
PA
CK
AG
ETO
SD
M’s
to in
clud
e (n
otlim
ited
to):
*M
DR
CR
ecom
men
datio
nsR
epor
t(w
ithIs
sues
Trac
ker
that
incl
udes
both
the
EA
proc
ess
and
MD
RC
proc
ess
com
bine
d)
*E
AO
Con
sulta
tion
Rep
ort
and
MD
RC
Con
sulta
tion
Rep
ort
FLN
RO
–pr
imar
ypo
into
fcon
tact
forF
irstN
atio
nsco
nsul
tatio
ndu
ring
the
MD
RC
revi
ew.
Man
ages
Issu
estra
ckin
gan
dC
onsu
ltatio
nR
ecor
ddu
ring
the
MD
RC
revi
ewpr
oces
s.
KIC
K–
OFF
MD
RC
Mee
ting
Pro
pone
ntto
wal
kag
enci
es/
Firs
tNat
ions
thro
ugh
the
appl
icat
ions
subm
itted
MD
RC
ME
ETI
NG
MD
RC
ME
ETI
NG
Mov
ein
tote
chni
calr
evie
won
cein
form
atio
nre
quire
men
tsar
esu
bmitt
ed/p
rovi
ded
(com
plet
eap
plic
atio
ns)
INTE
RN
AL
INFO
RM
ATI
ON
SHA
RIN
GLO
CA
TIO
N/S
ITE
(EA
O/F
LNR
O)
*IS
SU
ES
TRA
CK
ER
*IN
FOR
MA
TIO
NS
HA
RIN
GM
ATE
RIA
LS/D
OC
UM
EN
TSTH
AT
BO
THE
AO
and
FLN
RO
RE
QU
IRE
AC
CE
SS
TOD
UR
ING
THE
RE
VIE
WP
RO
CE
SS
F
AC
CE
SS
:C
hris
Ham
ilton
,Dav
idG
race
Jen
Sta
lker
,Jas
onP
ope,
Gen
evie
veP
ater
son
180
DA
YEA
APP
LIC
ATI
ON
REV
IEW
AN
DD
ECIS
ION
PAC
KA
GE
FOR
MIN
ISTE
RS
JAN
UA
RY
2014
FNR-2013-00423 Page 47FNR-2013-00423 Page 47
KSM
Con
curr
ent P
erm
ittin
g Pr
iori
ties
(KSM
Con
stru
ctio
n St
art A
ctiv
ities
)
Con
ten
ts
Coul
ter C
reek
Acc
ess
Road
Spe
cial
Use
Per
mit
and
Supp
ortin
g Pe
rmits
.....
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
. 2
Trea
ty C
reek
Acc
ess
Road
Spe
cial
Use
Per
mit
and
Supp
ortin
g Pe
rmits
.....
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
.. 4
Oth
er C
amps
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
.. 5
Phas
e 1
Min
e Si
te C
onst
ruct
ion
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
.. 6
FNR-2013-00423 Page 48FNR-2013-00423 Page 48
KSM
Con
curr
ent P
erm
ittin
g Pr
iori
ties
(KSM
Con
stru
ctio
n St
art A
ctiv
ities
)
Cou
lter
Cre
ek A
cces
s R
oad
Sp
ecia
l Use
Per
mit
an
d S
up
por
tin
g P
erm
its
Pr
ojec
t Com
pone
nt
Stat
ute/
Perm
it Co
mm
ents
/Req
uire
men
ts
Publ
ic C
onsu
ltatio
n Co
ntac
t Es
kay
Acc
ess
Road
Km
0-4
Bob
Qui
nn F
SR
Road
Use
Per
mit
FS10
9-R
UPA
pp.d
oc
Mai
nten
ance
Agr
eem
ent w
ith A
ltaG
as
FW R
oad
Use
A
gree
men
t.m
sg
No
Alta
Gas
-Lau
ren
Kelly
FL
RNO
-Will
Fos
ter
Km 4
-43.
5 A
lta G
as S
UP
S253
18
1.)
Ass
ignm
ent o
f SU
P if
that
is w
hat
Alta
Gas
wan
ts o
ther
wis
e;
2.)
Mai
nten
ance
Agr
eem
ent w
ith A
ltaG
as
If
#1 (N
ew S
UP)
yes
Km 4
3.5-
End
of ro
ad
1.) B
arri
ck G
old
SUP
reas
sign
men
t of S
UP
(with
the
SUP
hold
ers
agre
emen
t)
2.) M
aint
enan
ce A
gree
men
t for
Bar
rick
Gol
d
N
o Se
abri
dge-
Jess
y Ch
aplin
End
of ro
ad to
end
of n
ew c
onst
ruct
ion
1.)
Coul
d be
an
amen
dmen
t to
exis
ting
Barr
ick
SUP
2.)
New
SU
P if
Barr
ick
SUP
in n
ot re
assi
gned
If
#2 (N
ew S
UP)
yes
FL
NRO
-Will
Fos
ter
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
(See
Cou
lter-
Sulp
hret
s Ro
ad)
http
://w
ww
.for.
gov.
bc.c
a/ds
i/M
Tenu
res_
Salv
age.
htm
#Lic
ense
_to_
Cut-
LTC
Yes
Coul
ter –
Sul
phre
ts R
oad
Th
e Fo
rest
Pra
ctic
es C
ode
of B
C an
d th
e Pr
ovin
cial
For
est U
se R
egul
atio
n ar
e th
e au
thor
izat
ion
for t
he S
peci
al U
se P
erm
it (S
UP)
.
FW C
onfir
mat
ion
of
appr
opria
te p
erm
its in
Pack
age
Pu
blic
Con
sulta
tion
for a
cces
s, S
UP
and
asso
ciat
ed O
LTC’
s ca
n be
don
e at
one
tim
e.
� SU
P �
OLT
C
FLRN
O-W
ill F
oste
r
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
Fish
erie
s A
ct-R
evie
w S
UP
for o
pera
tiona
l st
atem
ents
for
stre
am c
ross
ing
Pend
ing
Conf
irmat
ion
? D
FO-P
at L
im
Wor
ksaf
e BC
Act
- Not
ice
of F
ores
try
Ope
ratio
ns F
orm
ht
tp:/
/ww
w.w
orks
afeb
c.co
m/i
nsur
ance
/man
agi
ng_y
our_
acco
unt/
notic
e_of
_pro
ject
/def
ault.
asp
No
WSB
C Te
rrac
e
Wild
life
Act
- des
troy
ing
part
icul
ar ty
pes
of
bird
nes
ts o
r eg
gs
http
://w
ww
.env
.gov
.bc.
ca/p
asb/
fw_p
erm
reg.
htm
l N
o PA
SB
Unu
k Ri
ver
Brid
ge
Fish
erie
s A
ct-A
utho
riza
tion
of U
nuk
brid
ge
cros
sing
Pe
ndin
g Co
nfirm
atio
n ?
DFO
-Pat
Lim
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
To
be
cove
red
unde
r Co
ulte
r –
Sulp
hret
s Ro
ad
OLT
C Ye
s-Pa
rt o
f Pub
lic C
onsu
ltatio
n on
Acc
ess
Pack
age
FLRN
O-W
ill F
oste
r
Nav
igab
le W
ater
s Pr
otec
tion
Act
-Nav
igab
le
Stre
am C
ross
ing
ht
tp:/
/ww
w.t
c.gc
.ca/
eng/
paci
fic/m
arin
e-nw
pp-a
pplic
atio
ns-1
337.
htm
NW
P-Jo
hn M
acki
e
Wat
er A
ct-N
otifi
catio
n of
Wor
ks In
and
A
bout
a s
trea
m
http
://w
ww
.env
.gov
.bc.
ca/w
sd/w
ater
_rig
hts/
lic
ence
_app
licat
ion/
sect
ion9
/ N
o W
SD-E
mily
Bul
mer
Layd
own
Are
as, G
rave
l Pits
, and
Bor
row
Are
as
The
Fore
st P
ract
ices
Cod
e of
BC
and
the
Prov
inci
al F
ores
t Use
Reg
ulat
ion
are
the
auth
oriz
atio
n fo
r the
Spe
cial
Use
Per
mit
(SU
P).
Thes
e ar
eas
are
to b
e w
ithin
the
SUP
(75m
) ar
ea.
Yes,
to b
e in
clud
ed in
Cou
lter
– Su
lphr
ets
Road
SU
P Co
nsul
tatio
n Pa
ckag
e FL
NRO
-Will
Fos
ter
FNR-2013-00423 Page 49FNR-2013-00423 Page 49
KSM
Con
curr
ent P
erm
ittin
g Pr
iori
ties
(KSM
Con
stru
ctio
n St
art A
ctiv
ities
)
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t Ca
mp
#3 E
skay
Cre
ek M
ine
Site
Sta
ging
(50p
l)
Land
Act
–In
dust
rial
Lic
ence
of O
ccup
atio
n
http
://w
ww
.agf
.gov
.bc.
ca/c
lad/
Doc
umen
ts/L
PSB
/Pol
icie
s/in
dust
rial
_gen
Ye
s ht
tp:/
/ww
w.fo
r.go
v.bc
.ca/
Land
_Ten
ures
/doc
um
ents
/cab
inet
/adv
ertis
ing.
Cam
Ben
tley
Drin
king
Wat
er P
rote
ctio
n A
ct- C
onst
ruct
ion
Perm
it (H
20-C
) W
ater
Con
stru
ctio
n Pe
rmit
Proc
ess.
Indu
stria
l Cam
p R
equi
rem
ents
- H
ealth
NH
A A
pplic
atio
n fo
r W
ater
wor
ks C
onst
ruc
NH
A A
PPLI
CA
TIO
N
WA
TER
0504
14.p
df
NH
A%
20A
pplic
atio
n%
20fo
r%20
Wat
erw
oA
pplic
atio
n fo
r H
ealth
App
rova
l.pdf
No
NH
A-S
hane
Wad
den
D
rinki
ng W
ater
Pro
tect
ion
Act
- Con
stru
ctio
n Pe
rmit
(H20
-O)
Publ
ic H
ealth
Act
-Sew
age
Perm
it
10-4
60-3
038
- G
uidl
ines
for
Ind
ustr
ia
Publ
ic H
ealth
Act
-Foo
d Pe
rmit
Ope
ning
a N
ew F
ood
Prem
ise
NH
W
ater
Act
and
the
Wat
er P
rote
ctio
n A
ct-
Wat
er L
icen
ce
http
://w
ww
.env
.gov
.bc.
ca/w
sd/w
ater
_rig
hts/
lic
ence
_app
licat
ion/
inde
x.ht
ml
No
FL
NRO
-Em
ily B
ulm
er
W
ater
Act
-Gro
undw
ater
Wel
l Reg
istr
atio
n
http
://w
ww
.env
.gov
.bc.
ca/w
sd/p
lan_
prot
ect_
sust
ain/
grou
ndw
ater
/ind
ex.h
tml
Wat
er A
ct-N
otifi
catio
n (S
ectio
n 9)
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/wsd
/wat
er_r
ight
s/l
icen
ce_a
pplic
atio
n/se
ctio
n9/
Envi
ronm
enta
l Man
agem
ent A
ct-O
pen
Burn
ing
Requ
ired
onl
y if
open
bur
ning
is r
equi
red:
ht
tp:/
/ww
w.b
cair
qual
ity.c
a/to
pics
/bur
ning
-ou
tdoo
rs.h
tml
http
://w
ww
.env
.gov
.bc.
ca/e
pd/w
aste
_dis
char
ge_a
uth/
app_
form
s/in
dex.
htm
No
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
Envi
ronm
enta
l Man
agem
ent A
ct-S
olid
W
aste
O
nly
requ
ired
if la
ndfil
l is
plan
ned
at th
is
loca
tion:
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/was
te_d
isch
arge
_aut
h/gu
idan
ce/i
ndex
.htm
Yes
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
To
be
cove
red
unde
r Co
ulte
r –
Sulp
hret
s Ro
ad
OLT
C Ye
s FL
NRO
-Will
Fos
ter
FNR-2013-00423 Page 50FNR-2013-00423 Page 50
KSM
Con
curr
ent P
erm
ittin
g Pr
iori
ties
(KSM
Con
stru
ctio
n St
art A
ctiv
ities
)
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t Ca
mp
#8 U
nuk
Rive
r St
agin
g (4
0pl)
Sam
e pe
rmit/
info
rmat
ion
requ
irem
ents
for
Cam
p #3
Esk
ay C
reek
Min
e si
te S
tagi
ng C
amp
(50p
l).
Cam
p #1
1 Tr
eaty
Cre
ek M
arsh
allin
g (6
0pl)
Sam
e pe
rmit/
info
rmat
ion
requ
irem
ents
for
Cam
p #3
Esk
ay C
reek
Min
e si
te S
tagi
ng C
amp
(50p
l).*M
inus
Lic
ence
of O
ccup
atio
n, p
erm
itted
und
er e
xist
ing
Min
es A
ct P
erm
it
Tre
aty
Cree
k A
cces
s R
oad
Sp
ecia
l Use
Per
mit
an
d S
up
por
tin
g P
erm
its
Trea
ty C
reek
Acc
ess
Road
s (t
o Pl
ant S
ite a
nd
Port
al T
unne
l) Th
e Fo
rest
Pra
ctic
es C
ode
of B
C an
d th
e Pr
ovin
cial
For
est U
se R
egul
atio
n ar
e th
e au
thor
izat
ion
for t
he S
peci
al U
se P
erm
it (S
UP)
.
FW C
onfir
mat
ion
of
appr
opria
te p
erm
its in
Publ
ic C
onsu
ltatio
n fo
r acc
ess,
SU
P an
d as
soci
ated
OLT
C’s
can
be d
one
at o
ne ti
me.
Pa
ckag
e to
als
o in
clud
e Co
ulte
r Cr
eek
Acce
ss
SUP
& O
LTC.
�
SUP
� O
LTC
FLRN
O-W
ill F
oste
r
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
ht
tp:/
/ww
w.fo
r.go
v.bc
.ca/
dsi/
MTe
nure
s_Sa
lva
ge.h
tm#L
icen
se_t
o_Cu
t-LT
C
Wor
ksaf
e BC
Act
- Not
ice
of F
ores
try
Ope
ratio
ns F
orm
ht
tp:/
/ww
w.w
orks
afeb
c.co
m/i
nsur
ance
/man
agi
ng_y
our_
acco
unt/
notic
e_of
_pro
ject
/def
ault.
asp
No
http
://w
ww
.wor
ksaf
ebc.
com
/con
tact
_us/
regi
onal
_loc
atio
ns/c
on_1
0_90
.asp
W
SBC
Terr
ace
Wild
life
Act
- des
troy
ing
part
icul
ar ty
pes
of
bird
nes
ts o
r eg
gs
http
://w
ww
.env
.gov
.bc.
ca/p
asb/
fw_p
erm
reg.
htm
l N
o PA
SB
Hig
hway
s A
ct-P
rovi
ncia
l Pub
lic H
ighw
ay
Perm
it A
pplic
atio
n - C
onne
ctio
n to
Hw
y37
http
://w
ww
.th.
gov.
bc.c
a/pe
rmits
/H00
20.a
sp
No
MoT
I-She
rri A
pple
gate
Her
itage
Con
serv
atio
n A
ct-In
vest
igat
ion
Perm
it If
com
plet
e av
oida
nce
of s
ites
HdT
m-7
, HdT
n-1,
HdT
n -2,
and
HdT
o-6
is n
ot p
ossi
ble,
and
gr
ound
dis
turb
ance
with
in th
e si
te b
ound
arie
s ca
nnot
be
avoi
ded,
then
add
ition
al
arch
aeol
ogic
al e
xcav
atio
ns w
ill b
e ne
cess
ary
to
miti
gate
the
dest
ruct
ion
of th
e si
tes .
Perm
it 20
08-0
1-28
M
ap 1
No
FLN
RO-E
ric
Forg
eng
Bell-
Irvi
ng R
iver
Bri
dge
Fish
erie
s A
ct (D
FO)-
Aut
horiz
atio
n of
Bel
l Ir
ving
Bri
dge
cros
sing
Pe
ndin
g Co
nfirm
atio
n
DFO
-Pat
Lim
Fish
erie
s A
ct (D
FO)-
Rev
iew
SU
P fo
r O
pera
tiona
l Sta
tem
ents
for s
trea
m c
ross
ings
Pe
ndin
g Co
nfirm
atio
n
Wat
er A
ct-N
otifi
catio
n (S
ectio
n 9)
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/wsd
/wat
er_r
ight
s/l
icen
ce_a
pplic
atio
n/se
ctio
n9/
No
FLRN
O-E
mily
Bul
mer
Layd
own
Are
as, G
rave
l Pits
, and
Bor
row
Are
as
The
Fore
st P
ract
ices
Cod
e of
BC
and
the
Prov
inci
al F
ores
t Use
Reg
ulat
ion
are
the
auth
oriz
atio
n fo
r the
Spe
cial
Use
Per
mit
(SU
P).
Thes
e ar
eas
are
to b
e w
ithin
the
SUP
(75m
) ar
ea.
FL
RNO
-Will
Fos
ter
Tran
smis
sion
Lin
e Ri
ght o
f Way
Fo
rest
and
Ran
ge P
ract
ices
Act
– O
ccup
ant
Lice
nce
to C
ut
To b
e in
clud
ed a
s pa
rt o
f the
Tre
aty
Cree
k A
cces
s Ro
ad O
LTC
Ye
s-Pa
rt o
f SU
P &
OLT
C pa
ckag
e
Land
Act
- Util
ity- S
tat R
oW
http
://w
ww
.for.
gov.
bc.c
a/La
nd_T
enur
es/t
enu
re_p
rogr
ams/
prog
ram
s/ut
ilitie
s/in
dex.
htm
l Ye
s FL
NRO
-Cam
Ben
tley
FNR-2013-00423 Page 51FNR-2013-00423 Page 51
KSM
Con
curr
ent P
erm
ittin
g Pr
iori
ties
(KSM
Con
stru
ctio
n St
art A
ctiv
ities
)
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t Ca
mp
#5Tr
eaty
Pla
nt C
amp
(800
pl)
Min
es A
ct –
Perm
it ht
tp:/
/ww
w.e
mpr
.gov
.bc.
ca/M
inin
g/Pe
rmitt
ing-
Recl
amat
ion/
Page
s/de
faul
t.as
px
Yes
MEM
-Dia
ne H
owe
Fo
rest
and
Ran
ge P
ract
ices
Act
– O
ccup
ant
Lice
nce
to C
ut
Ther
e w
ill b
e 4
OLT
C’s
for
KSM
1.
Cou
lter
Cree
k A
cces
s 2.
Tre
aty
Cree
k A
cces
s 3.
TIA
4.
Min
e Si
te
Yes
FLRN
O-W
ill F
oste
r
Envi
ronm
enta
l Man
agem
ent A
ct-W
aste
W
ater
FW
cam
ps E
MA
pe
rmitt
ing
spec
ifica
tio
No
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
Envi
ronm
enta
l Man
agem
ent A
ct-W
aste
D
isch
arge
(Inc
iner
ator
) ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/was
te_d
isch
arge
_aut
h/ap
p_fo
rms/
inde
x.ht
m
FW F
ollo
w u
p to
Pr
e-re
gist
ratio
n M
eet
� A
pub
lic n
otic
e of
app
licat
ion
to b
e pl
aced
in
the
BC G
azet
te a
nd lo
cal n
ews
med
ia
� 30
day
pub
lic n
otifi
catio
n pe
riod
�
App
licat
ion
fees
(con
tact
nea
rest
Min
istr
y Re
gion
al O
ffic
e)
� A
fina
l Tec
hnic
al A
sses
smen
t Rep
ort m
ay
be r
equi
red
� Co
nsul
tatio
n Re
port
D
rinki
ng W
ater
Pro
tect
ion
Act
- Con
stru
ctio
n Pe
rmit
(H20
-C)
See
Cam
p #3
Esk
ay C
reek
Min
e si
te S
tagi
ng C
amp
(50p
l) fo
r pe
rmit/
info
rmat
ion
requ
irem
ents
.
Drin
king
Wat
er P
rote
ctio
n A
ct- C
onst
ruct
ion
Perm
it (H
20-O
) Pu
blic
Hea
lth A
ct-F
ood
Perm
it W
ater
Act
and
the
Wat
er P
rote
ctio
n A
ct-
Wat
er L
icen
ce
Wat
er A
ct-G
roun
dwat
er W
ell R
egis
trat
ion
En
viro
nmen
tal M
anag
emen
t Act
-Sol
id
Was
te
Wat
er A
ct-N
otifi
catio
n (S
ectio
n 9)
En
viro
nmen
tal M
anag
emen
t Act
-Ope
n Bu
rnin
g Ca
mp
#6 T
reat
y Sa
ddle
Cam
p (2
0pl)
Sam
e pe
rmit/
info
rmat
ion
requ
irem
ents
for
Cam
p #3
Esk
ay C
reek
Min
e si
te S
tagi
ng C
amp
(50p
l).
Cam
p #7
Unu
k N
orth
(40p
l)
Cam
p #1
2 H
wy
37 (6
0pl)
Oth
er C
amp
s Pr
ojec
t Com
pone
nt
Stat
ute/
Perm
it Co
mm
ents
/Req
uire
men
ts
Publ
ic C
onsu
ltatio
n?
Cont
act
Cam
p #1
Gra
nduc
Sta
ging
(80p
l) Pr
ivat
e A
gree
men
t N
/A
No
Seab
ridg
e-Je
ssy
Chap
lin
Cam
p #2
Ted
Mor
ris (8
0pl)
Sam
e pe
rmit/
info
rmat
ion
requ
irem
ents
for
Cam
p #3
Esk
ay C
reek
Min
e si
te S
tagi
ng C
amp
(50p
l).
Cam
p #4
Mitc
hell
Nor
th (1
25pl
) Sa
me
perm
it/in
form
atio
n re
quir
emen
ts fo
r Ca
mp
#5Tr
eaty
Pla
nt C
amp
(800
pl)
Ca
mp
#9 M
itche
ll In
itial
Cam
p (1
40pl
) Ca
mp
#10
Mitc
hell
Seco
ndar
y (4
00pl
) M
itche
ll O
pera
tions
Cam
p (3
50pl
)
FNR-2013-00423 Page 52FNR-2013-00423 Page 52
KSM
Con
curr
ent P
erm
ittin
g Pr
iori
ties
(KSM
Con
stru
ctio
n St
art A
ctiv
ities
)
Trea
ty O
pera
tions
Cam
p (2
50pl
) Sa
me
perm
it/in
form
atio
n re
quir
emen
ts fo
r Ca
mp
#5Tr
eaty
Pla
nt C
amp
(800
pl)
Ph
ase
1 M
ine
Site
Con
stru
ctio
n
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t La
ydow
n A
reas
, Gra
vel P
its a
nd B
orro
w A
reas
M
ines
Act
–Pe
rmit
One
Per
mit
for M
ine
Site
and
TIA
ht
tp:/
/ww
w.e
mpr
.gov
.bc.
ca/M
inin
g/Pe
rmitt
ing
-Rec
lam
atio
n/Pa
ges/
defa
ult.
aspx
Yes
MEM
-Dia
ne H
owe
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
O
ne O
LTC
for M
ine
Site
Ye
s FL
NRO
-Will
Fos
ter
Land
Act
–In
dust
rial
Lic
ence
of O
ccup
atio
n
http
://w
ww
.agf
.gov
.bc.
ca/c
lad/
Doc
umen
ts/L
PSB/
Polic
ies/
indu
stri
al_g
en.p
df
Yes
http
://w
ww
.for.
gov.
bc.c
a/La
nd_T
enur
es/d
ocum
ents
/cab
inet
/adv
ertis
ing.
FLN
RO-C
am B
entle
y
Min
e Si
te W
ater
Tre
atm
ent P
lant
M
ines
Act
-Per
mit
One
MA
Perm
it fo
r Min
e Si
te
M
EM-D
iane
How
e EM
A—
Efflu
ent P
erm
it O
ne P
erm
it fo
r Min
e Si
te
FW K
SM -
gen
eral
M
ines
Act
per
mitt
ing
r
� A
pub
lic n
otic
e of
app
licat
ion
to b
e pl
aced
in
the
BC G
azet
te a
nd lo
cal n
ews
med
ia
� 30
day
pub
lic n
otifi
catio
n pe
riod
**
Any
requ
irem
ents
for
publ
ic c
onsu
ltatio
n fr
om th
e EA
are
dup
licat
ed fo
r an
y EM
A
appl
icat
ions
.
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
Min
e Si
te W
ater
Sto
rage
Pon
ds
EMA
-Was
te D
isch
arge
O
ne E
MA
Per
mit
for M
ine
Site
M
oE- J
eani
en C
arm
ody-
Fallo
ws
Min
eral
Ten
ures
Act
-Min
ing
Leas
e
Wat
er A
ct a
nd th
e W
ater
Pro
tect
ion
Act
-W
ater
Lic
ence
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/wsd
/wat
er_r
ight
s/lic
ence
_app
licat
ion/
inde
x.ht
ml
No
FLRN
O-E
mily
Bul
mer
TMF-
Clea
ring
and
Gru
bbin
g M
ines
Act
-Per
mit
One
MA
Perm
it fo
r Min
e Si
te
Yes-
One
Pub
lic C
onsu
ltatio
n Pa
ckag
e fo
r M
ine
Site
BC
Gaz
ette
30
Day
s Lo
cal P
aper
30
Day
s
MEM
-Dia
ne H
owe
Min
eral
Ten
ures
Act
-Min
ing
Leas
e
Co
ntac
t?
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
O
ne O
LTC
for T
IA
Yes-
One
Pub
lic C
onsu
ltatio
n Pa
ckag
e fo
r M
ine
Site
FL
NRO
-Will
Fos
ter
TMF-
Eart
hwor
ks
Min
es A
ct-P
erm
it O
ne M
A Pe
rmit
for M
ine
Site
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
MEM
-Dia
ne H
owe
Min
eral
Ten
ures
Act
-Min
ing
Leas
e
? ?
Land
Act
–In
dust
rial
Lic
ence
of O
ccup
atio
n
http
://w
ww
.agf
.gov
.bc.
ca/c
lad/
Doc
umen
ts/L
PSB/
Polic
ies/
indu
stri
al_g
en.p
df
Yes
http
://w
ww
.for.
gov.
bc.c
a/La
nd_T
enur
es/d
ocum
ents
/cab
inet
/adv
ertis
ing.
FLN
RO-C
am B
entle
y
TMF
Are
a-8
Non
-Con
tact
Div
ersi
ons
Wat
er A
ct a
nd th
e W
ater
Pro
tect
ion
Act
-W
ater
Lic
ence
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/wsd
/wat
er_r
ight
s/lic
ence
_app
licat
ion/
inde
x.ht
ml
No
FLRN
O-E
mily
Bul
mer
Trea
ty C
reek
Por
tal
Min
es A
ct-P
erm
it O
ne M
A Pe
rmit
for M
ine
Site
Ye
s M
EM-D
iane
How
e M
iner
al T
enur
es A
ct-M
inin
g Le
ase
Fo
rest
and
Ran
ge P
ract
ices
Act
– O
ccup
ant
Lice
nce
to C
ut
One
OLT
C fo
r TIA
sid
e of
pro
ject
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
FLN
RO-W
ill F
oste
r
EMA
-Was
te D
isch
arge
O
ne E
MA
Per
mit
for M
ine
Site
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
FNR-2013-00423 Page 53FNR-2013-00423 Page 53
KSM
Con
curr
ent P
erm
ittin
g Pr
iori
ties
(KSM
Con
stru
ctio
n St
art A
ctiv
ities
)
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t M
itche
ll-Te
igen
Sad
dle
Dec
line
Port
al &
Ven
t Ra
ises
M
ines
Act
-Per
mit
One
MA
Perm
it fo
r Min
e Si
te
Yes-
One
Pub
lic C
onsu
ltatio
n Pa
ckag
e fo
r M
ine
Site
M
EM-D
iane
How
e
Min
eral
Ten
ures
Act
-Min
ing
Leas
e
EMA
-Was
te D
isch
arge
O
ne E
MA
Per
mit
for M
ine
Site
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
Mitc
hell-
Teig
en S
addl
e (M
TT)
Min
es A
ct-P
erm
it O
ne M
A Pe
rmit
for M
ine
Site
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
MEM
-Dia
ne H
owe
Min
eral
Ten
ures
Act
-Min
ing
Leas
e
EMA
-Was
te D
isch
arge
O
ne E
MA
Per
mit
for M
ine
Site
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
Mitc
hell
Trea
ty T
unne
l EM
A-E
fflu
ent
Sepa
rate
from
EM
A M
ine
Site
Per
mit
as
this
is
to b
e pe
rmitt
ed u
nder
Lan
d A
ct; o
ne E
MA
pe
rmit
can
be is
sued
onl
y fo
r th
e m
inin
g le
ase
area
.
Yes
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
Land
Act
- Util
ity- S
tat R
oW
http
://w
ww
.for.
gov.
bc.c
a/La
nd_T
enur
es/t
enur
e_pr
ogra
ms/
prog
ram
s/ut
ilitie
s/in
dex.
htm
l Ye
s FL
NRO
-Cam
Ben
tley
MTT
Pad
M
ines
Act
-Per
mit
One
MA
Perm
it fo
r Min
e Si
te
Yes-
One
Pub
lic C
onsu
ltatio
n Pa
ckag
e fo
r M
ine
Site
M
EM-D
iane
How
e
Min
eral
Ten
ures
Act
-Min
ing
Leas
e
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
O
ne O
LTC
for M
ine
Site
sid
e Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
FLN
RO-W
ill F
oste
r
EMA
-Was
te D
isch
arge
O
ne E
MA
Per
mit
for M
ine
Site
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
Mitc
hell
Port
al
Min
es A
ct-P
erm
it O
ne M
A Pe
rmit
for M
ine
Site
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
MEM
-Dia
ne H
owe
Min
eral
Ten
ures
Act
-Min
ing
Leas
e
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
O
ne O
LTC
for M
ine
Site
sid
e Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
FLN
RO-W
ill F
oste
r
Land
Act
–In
dust
rial
Lic
ence
of O
ccup
atio
n
http
://w
ww
.agf
.gov
.bc.
ca/c
lad/
Doc
umen
ts/L
PSB/
Polic
ies/
indu
stri
al_g
en.p
df
Yes
http
://w
ww
.for.
gov.
bc.c
a/La
nd_T
enur
es/d
ocum
ents
/cab
inet
/adv
ertis
ing.
Cam
Ben
tley
McT
agg
Div
ersi
on T
unne
l M
ines
Act
-Per
mit
One
MA
Perm
it fo
r Min
e Si
te
Yes-
One
Pub
lic C
onsu
ltatio
n Pa
ckag
e fo
r M
ine
Site
M
EM-D
iane
How
e
Min
eral
Ten
ures
Act
-Min
ing
Leas
e
EMA
-Was
te D
isch
arge
O
ne E
MA
Per
mit
for M
ine
Site
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
Mitc
hell
Sadd
le P
orta
l M
ines
Act
-Per
mit
One
MA
Perm
it fo
r Min
e Si
te
Yes-
One
Pub
lic C
onsu
ltatio
n Pa
ckag
e fo
r M
ine
Site
M
EM-D
iane
How
e
Min
eral
Ten
ures
Act
-Min
ing
Leas
e
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
O
ne O
LTC
for M
ine
Site
sid
e Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
FLN
RO-W
ill F
oste
r
EMA
-Was
te D
isch
arge
O
ne E
MA
Per
mit
for M
ine
Site
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
Sadd
le P
orta
l M
ines
Act
-Per
mit
One
MA
Perm
it fo
r Min
e Si
te
Yes-
One
Pub
lic C
onsu
ltatio
n Pa
ckag
e fo
r M
ine
Site
M
EM-D
iane
How
e
FNR-2013-00423 Page 54FNR-2013-00423 Page 54
KSM
Con
curr
ent P
erm
ittin
g Pr
iori
ties
(KSM
Con
stru
ctio
n St
art A
ctiv
ities
)
Min
eral
Ten
ures
Act
-Min
ing
Leas
e
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
Occ
upan
t Li
cenc
e to
Cut
O
ne O
LTC
for M
ine
Site
sid
e Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
FLN
RO-W
ill F
oste
r
EMA
-Was
te D
isch
arge
O
ne E
MA
Per
mit
for M
ine
Site
Ye
s-O
ne P
ublic
Con
sulta
tion
Pack
age
for
Min
e Si
te
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
Wat
er A
ct a
nd th
e W
ater
Pro
tect
ion
Act
-W
ater
Lic
ence
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/wsd
/wat
er_r
ight
s/lic
ence
_app
licat
ion/
inde
x.ht
ml
No
FLRN
O-E
mily
Bul
mer
M
ine
Are
a - 8
Non
-Con
tact
Div
ersi
ons
La
nd F
ills
� M
ine
Are
a �
Proc
ess
Plan
t and
TM
F A
rea
� La
nd F
arm
and
Con
tam
inat
ed S
oils
EMA
-Was
te D
isch
arge
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/mun
-w
aste
/was
te-s
olid
/lan
dfill
s/cr
iteri
a-la
ndfil
ls.h
tm
Sepa
rate
Per
mits
– N
ot c
over
ed u
nder
EM
A
Min
e Si
te P
erm
it
� A
pub
lic n
otic
e of
app
licat
ion
to b
e pl
aced
in
the
BC G
azet
te a
nd lo
cal n
ews
med
ia
� 30
day
pub
lic n
otifi
catio
n pe
riod
�
App
licat
ion
fees
(con
tact
nea
rest
Min
istr
y Re
gion
al O
ffic
e)
� A
fina
l Tec
hnic
al A
sses
smen
t Rep
ort m
ay
be r
equi
red
� Co
nsul
tatio
n Re
port
MoE
- Jea
nien
Car
mod
y-Fa
llow
s
FNR-2013-00423 Page 55FNR-2013-00423 Page 55
MINE PROJECT ~in e/~)evel(jpl11en tRevi
(MDRC)
SMITHERS, Be
N()vember 8, 2012 .
FNR-2013-00423 Page 56FNR-2013-00423 Page 56
Provincial "One Process" Framework
Coordination initi~tive of Natural Resource Ministries (2010-2011 ) Prmt"tiveaIid integrated approach (agencies and First Nations)
ocusses()n the project as a whole
ilnter~gency committee to cartyo~t coordinated review of auth()riz~tions
FNR-2013-00423 Page 57FNR-2013-00423 Page 57
Project Manager Monitor EA process Exchange information with proponent, consultation coordinator & EA working group
(Coordinate with anyCEA) • Pre-application • Application review
First Nations consultation • Decisk>n whether to issue
EA certificate :1 F O N ° I ° Irst atlons * Consultation
EM
Coordinated Authorizations Process (Coordinate with CEA if triggered and if not coordinated with BC EA)
Process Initiation Project manager establishes & chairs MDRe
. • Liaise with FN consultation coordinator
~ Pre-Application
Project description • Scoping • First Nations consultation • Application requirements
~ Initial Submission and Screening
~ Application Review
Public review & comment FN consultation & accommodations MORe review & recommendations report
• Decisions
FN·Consultation Report
Statutory decision makers decide whether to issuel approve authorizations
Information sharing
Engagement AcctJmmodation considerations
Sharing recommendations
FNR-2013-00423 Page 60FNR-2013-00423 Page 60
DEVELOPMENT REVIEWiGOMMITT~J.:.J
(MDRG)
• Primaryforum for the coordinated authorizations process
MDRC est~blished by the Chief Inspector of Mines
GOAL:
FNR-2013-00423 Page 61FNR-2013-00423 Page 61
• Coo'rdinated Authorizations
• Coordinated Consultation > _i{--:.-·-····-· ·:·-·····-· ··--··': i· .•.. --·.-·-.··.·.-.i· .. -..• · .... -··-·· ··:'···-.. -.--.-.-- .-.: .-.-.-.-.-_.:.-•. : .•.. -. .. --.--.----- .---.- ----·-.-:· .. :.-.i·:-i-.-.: -·- -.-· .. ·-·-·:-··--
Timely Communication/ Decision ·
. Issues Management
::i.
FNR-2013-00423 Page 62FNR-2013-00423 Page 62
KSM MDRC LINKAGES Chief Inspectors Office (MEM)
Regional Mines ADM
Regional FLNRO ADM Regional Executive Director
FNR-2013-00423 Page 63FNR-2013-00423 Page 63
MDRC Phases and
• Project description, scoping, application requirements, bundling • Identify issues
• Screening to ensure all application requirements are met
• Review project as a whole • Review Authorization Applications • Issues ManagementiProject Accountability
• Technical review complete? • Duty to consult met? • Recommend to SDMs to proceed to decision-making
• Draft permits and conditions/ Rec. report! Consultation report • Review and decision • Reasons for Decision
FNR-2013-00423 Page 64FNR-2013-00423 Page 64
Guide to Coordinated Authorizations for Major Mines
Version 1.0 - August 7,2012
Ministry of Energy and Mines
Ministry of Forests, Lands, and Natural Resource Operations
Ministry of Environment
http://www.for.gov.bc.ca/ftp/major...projects/externall!publish/webl mining/Mines-Guide. pdf
FNR-2013-00423 Page 65FNR-2013-00423 Page 65
Muir, Deanna CSNR:EX
From: Sent: To: Subjec~:
For sure! Sounds good ©
Genevieve Paterson Project Coordinator
Paterson, Genevieve FLNR:EX Wednesday, November 7,20124:44 PM 'Jessy Chaplin' RE: KSM Mine Development Review Committee Meeting Materials for November 8th.
Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
From: Jessy Chaplin [mailto:[email protected]] Sent: Wednesday, November 7,20124:31 PM To: Paterson, Genevieve FLNR: EX Subject: RE: KSM Mine Development Review Committee Meeting Materials for November 8th.
Thanks Gen, Sorry I didn't get comments back to you on the permitting document draft. We will get a chance to go over it in detail in the near future, I'm sure ©
lessy Chaplin, MSc. RPBio Permitting Coordinator Seabridge Gold Inc.
1235 Main Street P.O. Box 2536 Smithers, Be VOl 2NO Tel. (250) 847-4704 Cell.
From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Wednesday, November 07, 2012 11:57 AM To: ' Melanie Campbell,'; Applegate, Sherrie TRAN:EX; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin '; [email protected]; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Cc: 'Norm Ringstad' Subject: KSM Mine Development Review Committee Meeting Materials for November 8th. Importance: High
Good afternoon,
Please find meeting materials attached for tomorrow's meeting. Please see KSM MDRC Agenda for all meeting location/call in information.
1 FNR-2013-00423 Page 66
s.22
FNR-2013-00423 Page 66
For those of you joining by conference call please expect an email from myself tomorrow morning with Sea bridge's presentation.
Just a reminder that the meeting time has changed to 10:30·4:00 PST.
If you have any questions please contact myself or [email protected]
Thank you,
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
2 FNR-2013-00423 Page 67FNR-2013-00423 Page 67
Muir, Deanna CSNR:EX
, Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To:
Cc: Subject:
Attachments:
KSM Nov 8th MDRe Meeting Minutes & Next Steps
Thu 2012-11-15 12:00 AM Fri 2012-11-1612:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Thursday, November 15, 2012 3:15 PM , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; Barnewall, Rosemary C TRAN:EX;
Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX; CarmodyFallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; De Beck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX;'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow
Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'June Yoo Rifkin'; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine
Morin '; Pat Lim; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine
EAO:IN 'Norm Ringstad' KSM Nov 8th MDRC Meeting Minutes & Next Steps
KSM MDRC Meeting Minutes -November 8, 2012.docx.docx; Sea bridge Gold MDRC presentation_Nov8_2012JINAL.pdf.pdf -
Good Afternoon KSM MORe,
Thank you to all that attended the KSM MORe meeting held on November 8,2012. Please find attached Seabridge Gold's Presentation and MORe Meeting Minutes (with action items captured and additional information -links, as requested).
Please review the minutes for anything that may have been missed! or other, and notify [email protected] for changes to be made.
Please note that another E-mail will be distributed shortly reguesting the following information from you:
1 FNR-2013-00423 Page 68FNR-2013-00423 Page 68
Identify how you would like to receive the authorization applications (Batch #1) from the proponent (i.e. hardcopy/ other). Please note that all applications will be posted digitally" as well" to the KSM Sharepoint Site for MORe access once submitted.
Identify if you will be actively part of the technical review of the authorization applications once submitted.. . "OR" .. . identify if you will just require project updatesl receive project information as we move through the authorization technical review/ decision process.
Please don't forget to create a BCelD so you can access to the KSM Sharepoint site.
Instructions for setting up a bceid:
Visit: https://www.bceid.ca
Click "Begin Registration"
Click "Basic BCeIO"
Click "Register without specifying an online service"
Enter your details & OK.
Provide BCelO user name to me ([email protected]). Once you have been added to the sharepoint site access list you will receive an automated notification that will include a direct link to the site.
Next Steps for the KSM MORC:
The following is a break down as to the next steps that the MORe can expect to see with regards to communications and process (as per the Concurrent Approval Regulation) once the authorization applications are submitted.
KSM MORe review process commences when:
EAO has accepted the EA Application (30 day screening) 2
FNR-2013-00423 Page 69FNR-2013-00423 Page 69
EAO has accepted Concurrent Permitting
Prior to the MORC Review Process Commencing:
Project Manager (Jen Stalker) will distribute an E-mail, notifying the MORC that Batch #1 applications have been submitted (submitted at the same time the EA application is submitted), and will post them to the KSM Sharepoint Site if agencies and First Nations (MDRC) want to view them at this time (proponent will be responsible for distributing hardcopy applicationsl other, as requested by agencies and First Nations)
As per the Concurrent Approval Regulation, the Project Manager will provide a letter to the Executive Director (Environmental Assessment Office) that the applications have! have not been filed in accordance
Environmental Assessment Office (EAO) begins a 30 day screening on the EA application (only)
MORC Review Process Commences:
If the EA Application is accepted, the Executive Director (EAO) will provide written notice to the proponent and Jen Stalker (Major Projects Office) that the EA application has been accepted. The MDRC review process begins.
This will trigger the commencement of a 75 day screening for Batch #1 authorization applications (Le. has the proponent provided all information requirements in order for the agencies and First Nations to conduct their review of the batch #1 authorizations applications?
The Project Manager (Jen Stalker) will notify the MDRC that the 75 day screening phase has commenced (via E-mail). All agencies and First Nations (MDRC technical reviewers) will be responsible for providing the Project Manager with any information requirements that are missing! deficient "within 60 days" (of the 75 day screening period) to ensure enough time for the Project Manager to compile and draft notification to the Environmental Assessment Office and the proponent as to whaU if additional information is required.
3 FNR-2013-00423 Page 70FNR-2013-00423 Page 70
A MORC meeting will be scheduled early on in this phase (screening) to allow the opportunity for the agencies and First Nations to ask questionsl gain clarificationl other to the proponent based on the applications, and next steps in the MORC review process.
Move into the technical review phase (after screening phase is complete - information requirements have been meU provided in order for the MDRe to conduct a full review on Batch #1 applications)
If you have any questions or concerns. please do not hesitate to contact me.
Jen Stalker, RPF
Project Manager
Ministry of Forests, Lands and Natural Resource Operations
Skeena Region - Smithers, Be
Phone: (250) 847-7506
Fax: (250) 847-7347
Email: [email protected]
4 FNR-2013-00423 Page 71FNR-2013-00423 Page 71
1 | P a g e
MEETING MINUTES
KSM Mine Development Review Committee MeetingNovember 8th, 2012 10:30AM - 4:00PM PSTCaribou Room, Nora Building, Smithers, BC
Attendees:Chair: Jennifer Stalker, Project Manager, Ministry of Forests Lands and Natural Resource OperationsMinutes: Genevieve Paterson, Project Coordinator, MFLNRO
Proponent:Jessy Chaplin, Permitting Coordinator, Seabridge GoldElizabeth Miller, Manager Environmental Affairs, Seabridge Gold
For full list of attendees please see KSM Mine Development Review Committee list attached.
Start time: 10:40
1. Project Description and Project Planning Update – Seabridge Gold � Action �Genevieve Paterson to send out Seabridge Project Presentation (PowerPoint) to
MDRC members and observers (attached).� PAG & ARD from the TIA, what are the potential impacts to Treaty and Teigen Creek? At
Treaty Saddle PAG rock will be moved to TMF. There will be one portal, temporary water treatment plant for MAG and PAG rock piles.
� When construction of MTT is complete and when the tunnel is in operation the PAG rock will be trucked over to the TMF, there will be no PAG left on site.
� How will estimation be done on the volume? We have existing Geo Tech data from parts ofthe tunnel we can access. This information will be in the application packages to be provided,it will include where geo technical drilling and sampling has occurred.
� What will the capacity of all the temporary treatment plants? Action: Seabridge to provide.� What is the estimate of water coming out of the tunnel? Seabridge: At this time uncertain so
we adopt a conservative approach.� Tahltan: We would like to go on record that we object to the TIA area location due to the
potential impacts to Treaty and Teigen Creek that flow into the Bell Irving River, including the impacts to salmon. We feel the settling pond is in the wrong area as acid generating rockis proposed to be in places that have never been before, the fish are not used to this.
� Norm: Suggests that the location of the TIA be raised at EA review level.� Tahltan: Non contact water into streams around the mine, what happens when they pass
thought Acid Generating Rock?� Total length of tunnels? 64 km.
Break for lunch 12:02 –return 1:052. Coordinated Authorizations Process
� Tahltan: Coordinated Authorization Process (diagram from Mines Guide) title is incorrect, does not involve First Nations.
FNR-2013-00423 Page 72FNR-2013-00423 Page 72
2 | P a g e
3. First Nations Consultation (1:20)� Jason will be consulting on site specific permits with the Nisga’a Nation, Tahltan, Skii Km
Lax Ha and Gitanyow First Nation. To be clear, there will be no other consultation forum outside of the Environmental Assessment (EA) Review and or the MDRC.
� Seabridge is not responsible for consultation, however to engage and share information. Engagement recorders will be shared with the Province.
� During the MDRC we will not re open closed issues dealt with/closed at the Environment Assessment Office (EAO).
� During the MDRC there may be impacts that will only affect one or more specific parties, all members are welcomed to tailor their attendance to future meetings accordingly
� Letters have been sent to the Nisga’a Nation, Tahltan, Skii Km Lax Ha and Gitanyow First Nation on the consultation process. If there are any questions or comments please contact [email protected].
4. Concurrent Permitting – Concurrent Approval Regulation (What does this mean for the MDRC/ EA/ KSM Project?)
� Action Item: Concurrent Approval Reg, send out to MDRC. Link: http://www.bclaws.ca/EPLibraries/bclaws_new/document/LOC/freeside/--%20e%20--/environmental%20assessment%20act%20sbc%202002%20c.%2043/05_regulations/10_371_2002.xml
� Enables the proponent to apply for their various provincial permits at the same time as theEA review.
� EAO Executive Director is to provide written notice to the proponent and the various provincial ministries of the status of application review i.e. accepted, rejected.
� MDRC will be the venue to review all provincial applications.� MDRC chair (Jennifer) will submit back to the proponent, in writing, the adequacy of the
information provided.� How is the concurrent different from synchronous? Concurrent is legislated and synchronous
is not.� Opportunity to streamline reporting? Yes, through staged reporting.� Tahltan: How is the concurrent approval distinct from the EA review? How can you make
permit applications without an Environmental Assessment Certificate? The EA review is at the strategic level and the MDRC is at the technical level, no permits will be approved prior to the approval of the EAC.
� Tahltan: Impact to wildlife through construction of access, no one pulls a bridge once aproject is done, example Galore. How will this group help to avoid this from happening again? FLRNO will be asking for reclamation security.
� NLG: No certainly that Seabridge will be able to sell this project, example Bruce Jack.� Gitanyow: Review timelines legislated? No under regulations. When the EAO ED made
approval for concurrent approval that was put into the Section 11 order? Yes. � Certified Project Description from EAO review becomes part of the project review at
permitting level. � THREAT: theoretically is the EAC gets issued; what agency is tasked with issues
management, and monitoring? The EAO is responsible for monitoring the EAC commitments. The EAO and FLRNO compliance officers do monitoring as part of the Auditor General’s program.
� Action Item: Capacity, need to discuss further to ensure we are all enabled to work on the permit review process.
FNR-2013-00423 Page 73FNR-2013-00423 Page 73
3 | P a g e
� Action Item: Genevieve to distribute Mines Guide. Link: http://www.for.gov.bc.ca/major_projects/mining/
5. MDRC Timelines, Milestones, Next Steps� 75 day Information Review� Technical Review� Recommendations� Prior to 75 days 30 day screening period? For EAO yes.� THREAT: Will First Nations get individual referrals, bundled, notice of intended decision or
though the MDRC? MDRC will be the forum both for consultation and discussions.� Proponent to submit all permit applications and applicable information to the entire MDRC.
6. MDRC Information Sharing & Authorization Application-Distribution � Genevieve proposing a Sharepoint site for the duration of the project� Most people have used Sharepoint in the past, but do not find it especially useful� Issues with data download� We can do both Sharepoint/E-mail� Government will be using the Sharepoint site-Posting all permit applications and project
management tools � Distribution of permit applications (large files ) is to be USB (sticks)� Small documents – direct E-mail� Action Item: Genevieve to send out how to obtain BCeID along with meeting minutes
package, BCeID is needed to access sharepoint site. � Action Item: Genevieve to attach table to be sent out with meeting minutes as to how people
would like to receive applications from Seabridge i.e. digital or hardcopy.� Action: MPO to send out note to MDRC of who will actually being doing the technical
review of applications and or who would like to be sent project updates.7. Next Steps/Questions Period
� Action: MPO to send out meeting minutes, all shared information from MDRC meeting and all noted items above to be included with meeting minute distribution. All information to also be posted to the KSM sharepoint site.
8. Closing Remarks� Next MDRC meeting? Within 75 day screening period.
Meeting AdjournedAdjourned at 3:00
FNR-2013-00423 Page 74FNR-2013-00423 Page 74
Muir, Deanna CSNR:EX
From: Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Tuesday, November 20,20121:06 PM Sent:
To: , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; DeBeck, Howard W FLNREX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNREX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'June Yoo Rifkin'; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin '; Pat Lim; Paterson, Genevieve FLNREX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN
Subject: REQUEST: KSM Mine Development'Review Committee Attachments: MDRC Application Distribution.xlsx
Importance: High
Good Morning KSM MDRC,
The proponent (Seabridge Gold) is expected to submit their EA application, and authorization applications
(Batch #1) in the very near future. As indicated in my previous E-mail (and as per the Concurrent Approval
Regulation), the KSM MDRC review process commences when:
• EAO has accepted the EA Application (30 day screening)
• EAO has accepted Concurrent Permitting
In preparation, please take one moment of your time to provide us with the following input to ensure you receive the materials/ documents and communications you require throughout the KSM MDRC application
review process.
1} Authorization Application Distribution - please indicate (by filling in the attachment above) how you
would like to receive the authorization applications from the proponent (Seabridge Gold) for review. For any changes (additions to the distribution) please email [email protected].
Please note that the proponent will be providing all authorization applications to the Major Projects Office digitally, where they will be posted to the KSM Sharepoint for your access/ review as well
2} KSM MDRC Communications! Requirements - please indicate one of the following:
a} I will be an actual technical reviewer throughout the KSM MORC application review process,
and will be providing comments based on my review of the applications submitted b} I will not be technically reviewing the applications that are submitted; however, I would like
to receive regular project updates and project information as we move through the MORe
review process c} Please take me off the KSM MORC distribution list (I will not be technically reviewing the
applications submitted during this phase, and do not wish to receive project updates)
d} Other (please indicate)
1 FNR-2013-00423 Page 75FNR-2013-00423 Page 75
Thank you.
J en Stalker, RPF Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeen. Region - Smithers, Be Phone: (250) 847-7506 Fax: (250) 847-7347 Em.il: [email protected]
2 FNR-2013-00423 Page 76FNR-2013-00423 Page 76
KSM direct correspondence
Appliaction: Electronic/ Hardcopy/ Both
Spatial: ShapefileYes or No
Name
To Al Hoffman CC Diane Howe
CC Kim Bellefontaine
CC Tanya Demchuck
CC Heather Narynski
CC George Warnock
CC Kathie Wagar
To Mark LoveCC Ian Sharpe
CC Jeanien Carmody-Fallows CC Scott JacksonCC Craig Stewart
CC Regan Fielding
CC Patrick Williston
To Jennifer Stalker
To Chris Schell
To Cam Bentley
To Emily Bulmer
Ministry of Forests, Land
Ministr
Ministry of Ener
FNR-2013-00423 Page 77FNR-2013-00423 Page 77
To Eric Forgeng
To Will Foster
To Ron Donnelly
To Matt SakalsTo Howard Debeck
To Sherrie Applegate
To Rosemary Barnewall
To Tara Marsden
To Tracey McKay
To Mansell Griffin
To Chief Darlene Simpson
Ministry of Trans
Sk
N
FNR-2013-00423 Page 78FNR-2013-00423 Page 78
To Nalane Morin
To Garett Cooper
To June Yoo Rifkin
To Jessica CoulsonTo Melanie Campbell
ToJohn Mackie
To Pat Lim
ToKyle Moselle
ToAndrew Webber
ToShane Wadden
CCAzreer Gill
No
Envir
Canadian Environ
Natura
Regional Dis
Alaska Departm
Department
Tra
FNR-2013-00423 Page 79FNR-2013-00423 Page 79
Title Contact email address Phone Number
Chief Inspector of Mines [email protected] 250-952-0494Deputy Chief Inspector [email protected] 250-952-0183Sr. Environmental Geoscientist [email protected] 250-952-0489Sr. Environmental Geoolgist [email protected] 250-952-0417
Geotechnical Inspector [email protected] 250-387-0883
Geotechnical Engineering Manager George,[email protected] 250-565-4327
Director -Northwest Regional Mines Office [email protected] 250-847-7653
Head of Environmental Managment [email protected] 250-847-7272Regional Manager [email protected] 250-847-7251Environmental Protection Officer [email protected] 250-847-7273Regional Hydrologist [email protected] 250-847-7507Compliance Specialist [email protected] 250-847-7416Environmental Protection Officer [email protected] 250-847-7353Impact Assessment Biologist [email protected] 250-847-7454
Project Manager [email protected] 250-847 -506
Sr. Ecosystems Biologist [email protected] 250 847-7389
Land Tenures Specialist [email protected] 250-847-7388Water Stewardship Officer Emily,[email protected] 250-847-7350
ds and Natural Resource Operations
ry of Environment
rgy, Mines and Natural Gas
FNR-2013-00423 Page 80FNR-2013-00423 Page 80
Heritage Resource Specialist [email protected] 250-953-3362
Resource Tenure Specialist [email protected] 250-847-6309Tenures Forester/Engineering Specialist [email protected] 250-847-6378Research Geomorphologist [email protected] 250-847-6322Field Engineer [email protected] 250-847-6397
Senior Development Approvals [email protected] 250-847-7396
District Program Manager [email protected] 250-847-7404
Gitanyow Huwilp Lax'yip Implementation Coordinator
[email protected] 250- 849-5373
Lands Manager [email protected] 250-633-3000
Lands Manager [email protected] 250-633-3000
Chief 250-842-5651
sportation and Infastructure
Tahltan
kii km Lax Ha
isga'a Nation
Gitanyow
FNR-2013-00423 Page 81
s.22
FNR-2013-00423 Page 81
Chair 778- 834-6292
Project Manager [email protected]
Sr.Air Quality Planner [email protected]
Team Leader [email protected] Senior Policy Analyst [email protected]
Major Projects Management Officer
Environmental Analyst [email protected]
Southest Large Project Coordinator
Manager Planning and Economic Development
Public Health Protection [email protected]
Environmental Health Officer
orthern Health
ronment Canada
nmental Assessment Agency
l Resouces Canada
strict of Kitimat-Stikine
ment of Natural Resource
of Fisheries and Oceans
nsport Canada
FNR-2013-00423 Page 82
s.22
FNR-2013-00423 Page 82
Contact Address
Chief Inspectors Office6th Floor 1810 BlanshardVictoria, BC V8W 9N3Same as above
Same as above
Same as above
Same as aboveSuite 350 - 1011 4th AvenuePrince George, BC V2L 3H93726 Alfred AvenueSmithers BC V0J 2N0
Same as aboveSame as above
Same as aboveSame as aboveSame as above
Same as above
Same as above
Same as above
Same as above
Same as above
Same as above
FNR-2013-00423 Page 83FNR-2013-00423 Page 83
#3 - 1250 Quadra StreetPO BOX 9816 STN PROV GOVTVictoria BC V8W 2K73333 Tatlow RoadSmithers BCV0J 2N0
Same as above
Same as aboveSame as above
3726 Alfred Avenue Smithers, BC V0J 2N0
Same as above
Gitanyow Hereditary ChiefsPO Box 148Kitwanga, BC V0J 2A0
PO Box 321, 2000 Lisims GovernmentNew Aiyansh, BC V0J 1A0
Same as above
Chief Darlene SimpsonSkii km Lax HaBox 17Hazelton, BC V0J 1Y0
Please phone for pick up: 250-842-5651
FNR-2013-00423 Page 84FNR-2013-00423 Page 84
Tahltan Central CouncilPO Box 69Dease Lake, BC V0C 1L0
I
I
FNR-2013-00423 Page 85FNR-2013-00423 Page 85
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc: Subject: Attachments:
Hi Jen,
FW: Crown Land Application - Acceptance Letter (file# 6408448)
Mon 2012-12-0312:00 AM Tue 2012-12-0412:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [[email protected] Monday, December 3, 2012 4:43 PM Stalker, Jennifer L FLNR:EX [email protected]; Paterson, Genevieve FLNR:EX FW: Crown Land Application - Acceptance Letter (file# 6408448) 6408448 ACCPT LTR.pdf
I received this letter today, and noticed tnat you and/or Gen weren't copied on it.
There is no mention of a coordinated review by Major Projects, MDRC being the venue for First Nations consultation or of any advertising requirements.
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
From: Chermesnok, Jennifer A FLNR:EX [mailto:[email protected]] Sent: Monday, December 03, ·2012 12: 15 PM To: '[email protected]' Subject: Crown Land Application - Acceptance Letter (file# 6408448)
1 FNR-2013-00423 Page 86
s.22
FNR-2013-00423 Page 86
Good Morning
Attached is your acceptance letter and advertising requirements on behalf of FrontCounter BC.
Please direct all of your questions I comments to Cam Bentley at 250-847-7388 or [email protected].
Thank You
Jennifer Chermesnok
a/Senior Natural Resource Specialist FrontCounter BC, Smithers Ministry of Forests, Lands and Natural Resource Operations Ph: 250-847-7348 Fax: 250-847-7556
P Please consider the environment before printing this email.
Your personal information may be used for reporting, referral, or survey purposes.
How Did We Do? We'd appreciate your input.
Clients of FrontCounter BC are invited to take our customer satisfaction survey.
2 FNR-2013-00423 Page 87FNR-2013-00423 Page 87
FrontCounter BC Mailing Address:Bag 50001st Floor - 3726 Alfred AvenueSmithers BC V0J 2N0
Phone: (250) 847-7356Fax: (250) 847-7556Toll Free: 1-877-855-3222Website: www.frontcounterbc.gov.bc
File/Encounter: 6408448
Date: December 3, 2012
SEABRIDGE GOLDBOX 2536 1235 MAIN STREETSMITHERS, BC V0J 2N0
Dear Ms. Chaplin:
Re: Application for a Statutory Right-of-Way Crown Land Tenure in the Cassiar LandDistrict
Thank you for your Crown land application for Utility – Tunnel purposes in the vicinity of Treaty Creek, and lying between Unuk River and Bell-Irving River, in northern BC.
FrontCounter BC (FCBC) has accepted your application on behalf of the Ministry of Forests, Lands and Natural Resource Operations (MFLNRO). Your application has been assigned to Cam Bentley who will review your proposal and make a recommendation to approve or disallow the application.
This letter does not imply tenure will be offered nor does it give you any authorization to occupy or use the Crown land under application.
During the application review, your application will be referred for comment to:� First Nations;� other government agencies having statutory responsibilities related to your
application;� local governments; and� the general public.
The application review requires the Province to undertake legally required consultation withthose First Nations which have aboriginal interests in the area of your application. In order to meet the Province’s legal obligations to First Nations, it is important to ensure an appropriate level of consultation is completed. In addition, some applications may require further study (e.g. archaeological assessments or review by other authorities such as the Environmental Assessment Office). The length of time required to complete an application review will vary and depends on: the complexity of the application; the potential for social and environmental impacts; and, the effect the proposal may have on aboriginal interests.
FNR-2013-00423 Page 88FNR-2013-00423 Page 88
This will provide you with certainty that the decision on your application is made in a manner that respects aboriginal interests, minimizes negative impacts on the environment and is in the best interests of the Province.
Based on the comments received from First Nation consultations, agency and stakeholder referrals and MFLNRO's technical review of the application you may be required to provide additional information in a form acceptable to MFLNRO. You may be contacted byMFLNRO to discuss the possibility of arranging a meeting between yourself, First Nations and MFLNRO. The intent of such a meeting would be to share your vision for the use of Crown land and to answer questions from the First Nation related to their use of the land.
If you require any further information or clarification, please contact Cam Bentley at 250-847-7388 or email to [email protected], quoting the above noted file number.
Sincerely,
Jennifer Chermesnoka/Senior Natural Resource SpecialistFrontCounter BCMinistry of Forests, Lands and Natural Resource Operations
Enclosure
FNR-2013-00423 Page 89FNR-2013-00423 Page 89
APPLYING FOR CROWN LAND – APPLICATION PROCESS FLOWCHART
Application Preparation and Submission� Complete Application Form � Complete Mapping Requirements� Prepare Program Specific Requirements (such as Development Plan,
Management Plan, Inventory List, etc.)� Submit Application Package to Regional FrontCounter BC office
(include application fees)
Application Received� Reviewed for completeness � Reviewed for prerequisites (such as
citizenship, 19 years of age)
Incomplete: Returned and changes requested
Review Process andFirst Nation Consultation
Complete Application Accepted� Notification sent to applicant� Application to Ministry of
Forests, Lands and Natural Resource Operations
Decision Process� Fair, transparent, consistent� Review relevant information� Target Time – 60 days
Concerns IdentifiedFurther information or
discussion required
Application AllowedOffer of Tenure made to applicant, specifying
terms and conditions of approval
Application DisallowedReasons clearly documentedNotification sent to applicant
Applicant Requirements� Advertising � Additional items if requested (such as
appraisal report, survey, upland owner consent)
Review Process Complete
Government Requirements� Referrals to Local, Provincial and
Federal Agencies � Policies, Procedures, Objectives� First Nation Consultation� Land use management plans, First
Nation agreements
FNR-2013-00423 Page 90FNR-2013-00423 Page 90
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Subject: Attachments:
Hi Jessy,
Distribution List
Thu 2012-12-06 12:00 AM Fri 2012-12-0712:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Paterson, Genevieve FLNR:EX Thursday, December 6, 2012 11:51 AM 'Jessy Chaplin' Distribution List MDRC Application Distribution.xlsx
Attached is the application distribution list for MORC members, still waiting to hear from a few people, will update when I hear back. Hopefully you find it useful.
Any chance of getting those comments on the permit list? If this template/list I developed doesn't work please feel free to nix it I only created it as I found discrepancies between the original list from the Concurrent Permitting Strategy and the Master List which made it difficult to determine how many permit were going to be required.
Talk to you soon,
Genevieve Paterson
Project Coordinator
Ministry of Forests, Lands and Natural Resource Operations
Major Projects Office, Skeena Region
250-847-7268
1 FNR-2013-00423 Page 91FNR-2013-00423 Page 91
KSM direct correspondence
Appliaction: Electronic/ Hardcopy/ Both
Spatial: ShapefileYes or No
Name
To Al Hoffman CC Diane Howe
CC Kim Bellefontaine
CC Tanya Demchuck
CC Heather Narynski
CC George Warnock
CC Kathie Wagar
To Mark LoveCC Ian Sharpe
CC Jeanien Carmody-Fallows CC Scott JacksonCC Craig Stewart
CC Regan Fielding
CC Patrick Williston
To Jennifer Stalker
To Chris Schell
To Cam Bentley
To Emily Bulmer
Ministry of Forests, Land
Ministr
Ministry of Ener
FNR-2013-00423 Page 92FNR-2013-00423 Page 92
To Eric Forgeng
To Will Foster
To Ron Donnelly
To Matt SakalsTo Howard Debeck
To Sherrie Applegate
To Rosemary Barnewall
To Tara Marsden
To Tracey McKay
To Mansell Griffin
To Chief Darlene Simpson
Ministry of Trans
Sk
N
FNR-2013-00423 Page 93FNR-2013-00423 Page 93
To Nalane Morin
To Garett Cooper
To June Yoo Rifkin
To Jessica CoulsonTo Melanie Campbell
ToJohn Mackie
To Pat Lim
ToKyle Moselle
ToAndrew Webber
ToShane Wadden
CCAzreer Gill
No
Envir
Canadian Environ
Natura
Regional Dis
Alaska Departm
Department
Tra
FNR-2013-00423 Page 94FNR-2013-00423 Page 94
Title Contact email address Phone Number
Chief Inspector of Mines [email protected] 250-952-0494Deputy Chief Inspector [email protected] 250-952-0183Sr. Environmental Geoscientist [email protected] 250-952-0489Sr. Environmental Geoolgist [email protected] 250-952-0417
Geotechnical Inspector [email protected] 250-387-0883
Geotechnical Engineering Manager George,[email protected] 250-565-4327
Director -Northwest Regional Mines Office [email protected] 250-847-7653
Head of Environmental Managment [email protected] 250-847-7272Regional Manager [email protected] 250-847-7251Environmental Protection Officer [email protected] 250-847-7273Regional Hydrologist [email protected] 250-847-7507Compliance Specialist [email protected] 250-847-7416Environmental Protection Officer [email protected] 250-847-7353Impact Assessment Biologist [email protected] 250-847-7454
Project Manager [email protected] 250-847 -506
Sr. Ecosystems Biologist [email protected] 250 847-7389
Land Tenures Specialist [email protected] 250-847-7388Water Stewardship Officer Emily,[email protected] 250-847-7350
ds and Natural Resource Operations
ry of Environment
rgy, Mines and Natural Gas
FNR-2013-00423 Page 95FNR-2013-00423 Page 95
Heritage Resource Specialist [email protected] 250-953-3362
Resource Tenure Specialist [email protected] 250-847-6309Tenures Forester/Engineering Specialist [email protected] 250-847-6378Research Geomorphologist [email protected] 250-847-6322Field Engineer [email protected] 250-847-6397
Senior Development Approvals [email protected] 250-847-7396
District Program Manager [email protected] 250-847-7404
Gitanyow Huwilp Lax'yip Implementation Coordinator
[email protected] 250- 849-5373
Lands Manager [email protected] 250-633-3000
Lands Manager [email protected] 250-633-3000
Chief 250-842-5651
sportation and Infastructure
Tahltan
kii km Lax Ha
isga'a Nation
Gitanyow
FNR-2013-00423 Page 96
s.22
FNR-2013-00423 Page 96
Chair 778- 834-6292
Project Manager [email protected]
Sr.Air Quality Planner [email protected]
Team Leader [email protected] Senior Policy Analyst [email protected]
Major Projects Management Officer
Environmental Analyst [email protected]
Southest Large Project Coordinator
Manager Planning and Economic Development
Public Health Protection [email protected]
Environmental Health Officer
orthern Health
ronment Canada
nmental Assessment Agency
l Resouces Canada
strict of Kitimat-Stikine
ment of Natural Resource
of Fisheries and Oceans
nsport Canada
FNR-2013-00423 Page 97
s.22
FNR-2013-00423 Page 97
Contact Address
Chief Inspectors Office6th Floor 1810 BlanshardVictoria, BC V8W 9N3Same as above
Same as above
Same as above
Same as aboveSuite 350 - 1011 4th AvenuePrince George, BC V2L 3H93726 Alfred AvenueSmithers BC V0J 2N0
Same as aboveSame as above
Same as aboveSame as aboveSame as above
Same as above
Same as above
Same as above
Same as above
Same as above
Same as above
FNR-2013-00423 Page 98FNR-2013-00423 Page 98
#3 - 1250 Quadra StreetPO BOX 9816 STN PROV GOVTVictoria BC V8W 2K73333 Tatlow RoadSmithers BCV0J 2N0
Same as above
Same as aboveSame as above
3726 Alfred Avenue Smithers, BC V0J 2N0
Same as above
Gitanyow Hereditary ChiefsPO Box 148Kitwanga, BC V0J 2A0
PO Box 321, 2000 Lisims GovernmentNew Aiyansh, BC V0J 1A0
Same as above
Chief Darlene SimpsonSkii km Lax HaBox 17Hazelton, BC V0J 1Y0
Please phone for pick up: 250-842-5651
FNR-2013-00423 Page 99FNR-2013-00423 Page 99
Tahltan Central CouncilPO Box 69Dease Lake, BC V0C 1L0
I
I
FNR-2013-00423 Page 100FNR-2013-00423 Page 100
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc: Subject:
Hi Gen,
RE: KSM - Update .
Fri 2012-12-1412:00 AM Sat 2012-12-1512:00 AM Free'
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin Uessy@seabridgegold,netj Friday, December 14, 2012 9:52 AM Paterson, Genevieve FlNR:EX Pope, Jason FLNR:EX; Herbert, Brian FLNR:EX RE : KSM - Update
Just wondering on the MORC update email Jen refers to in the attached email will be released?
Also, is there a First Nations letter for us?
We have been receiving questions from MORC reviewers asking when the EA Application was to be submitted, I had told Jen this information the week of November 16th
, do you know if she informed the MORC?
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
p,o, Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
1 FNR-2013-00423 Page 101
s.22
FNR-2013-00423 Page 101
From: Stalker, Jennifer L FLNR:EX [mailto:[email protected]] Sent: Monday, December 10, 2012 4:55 PM To: 'Jessy Chaplin' Cc: Cuell, James W FLNR:EX; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; Herbert, Brian FLNR:EX Subject: KSM - Update
Hi Jessy,
Tried giving you a shout this afternoon - sounds like you are busy, busy ...
A couple of things I wanted to touch base with you on:
First Nations letter Uoint letter from EAO and MPO)
o I had left a message with Chris Hamilton last. week (and will follow up again before Thursday). The letter is with EAO at this time. I have let Chris know and hoping to be able to finalize the letter and sign off The alternative would be that James Cuell sign
List of Authorizations distribution (Le. hardcopies .. )
o You should have received the distribution list from Genevieve. There are a couple of agencies left outstanding, of which Genevieve has committed to following up on and getting that information to you as soon as she receives it. .
Permit List
o Would like to follow up with yourself and Genevieve on this piece, to provide an update as to where we're at. We want to ensure that we have a complete list of authorizations (and their requirements) that we all agree on, of which will be coming in as Batch #1 (through concurrent permitting). We want to be able to line up! prepare in advance; FCBC, the agencies and First Nations (confirmation as to what they can be expecting to come in at the end of February 2013, should the EA application be accepted at that time).
2 FNR-2013-00423 Page 102
s.22
s.22
s.22 s.22
s.22
FNR-2013-00423 Page 102
Licence of Occupation (MTT)
o FCBC has sent an acceptance letter to Seabridge (as per your E-mail to myself, on December 3, 2012). The acceptance letter that you received is the standard letter that FCBC uses to indicate that the application has been accepted into the system. It is acknowledged through Major Projects that the Licence of Occupation for the MTT will be part of the Batch #1 authorizations, and First Nations Consultation will occur through the MDRC on this application.
I am aiming to get out a project update to the MDRC indicating that the EA Application is expected to be submitted to the EA late January 2013, and an amendment to Section 13 (through the EAO) now indicates that authorizations will be submitted once the EA Application is "accepted", of which we can expect applications to be submitted late February (if the EA application is accepted within the 30 day screening). However, I would like to see a copy of the approved amendment from the EAO before that update goes out to the MDRC.
If you have any questions or concerns, please don't hesitate to give me a call After that date, please contact James Cuell
and/ or Genevieve Paterson.
Thank you Jessy.
Jen Stalker, RPF
Project Manager
Ministry of Forests, Lands and Natural Resource Operations
Skeena Region - Smithers, BC
Phone: (250) 847-7506
Fax: (250) 847-7347
Email: [email protected]
3 FNR-2013-00423 Page 103
s.22
s.22
s.22
FNR-2013-00423 Page 103
Muir, Deanna CSNR:EX
From: Sent: To:
Subject:
Paterson, Genevieve FLNR:EX Wednesday, December 19,201211:48 AM , Melanie Campbell.' ; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'June Yoo Rifkin'; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin '; Pat Lim; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston , Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN KSM Mine Development Review Committee - Project Update
Good Afternoon Mine Development Review Committee Members,
Further to our first Mine Development Review Committee Meeting (November 8th, 2012), our office is now aware that
Sea bridge Gold will submit their Concurrent Permit Application at the time that the Environrnental Assessment Office accepts their Environmental Assessment Application for review. We expect this to be sometime towards the end of January 2013,
Seabridge Gold's Environmental Assessment Section 11 Order has been amended to allow this change, please refer to the EAO Project Information Centre (e-PIC) for details: http://alOO.gov.bc.ca! appsdata!epic!documents!p322!1355867414094 403085485d2355ebc47b4a530807b6847a8b3 87286b034bfOe51b6da2cbc8c74.pdf
I look forward to working with you all in the New Year.
Happy Holidays,
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
1 FNR-2013-00423 Page 104FNR-2013-00423 Page 104
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: . Sent:
To:
Cc:
Subject:
Hi Gen,
RE: KSM Mine Development Review Committee - Project Update
Wed 2012-12-1912:00 AM Thu 2012-12-20 12:00 AM Free·
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [[email protected] Wednesday, December 19, 2012 12:12 PM
Paterson, Genevieve FLNR:EX [email protected]: Cue II, James W FLNR:EX; Stalker, Jennifer L FLNR:EX; Brent
Murphy RE: KSM Mine Development Review Committee - Project Update
I said very clearly on the phone yesterday "January". Not We expect this to be sometime towards the end of January 2013.
In future, please do not take liberties with statements that Seabridge has provided.
I'don't expect you to make changes to this message as I appreciate your efforts. I appreciate and I am grateful that you understand the importance of communicating with the MORC and keeping the MORC members informed,
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P,O, Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
1 FNR-2013-00423 Page 105FNR-2013-00423 Page 105
Cell.
From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Wednesday, December 19, 2012 11:48 AM To: ' Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barriewall, Rosemary C TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; Herbert, Brian FLNR:EX; Hoffman, AI EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; Jessy Chaplin ; 'John Mackie '; 'June Yoo Rifkin'; 'Kyle Moselle'; Love, Mark P ENV:EX; Mansell Griffin ([email protected]); 'Nalaine Morin '; Pat Lim; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt' ; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, lanD ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Subject: KSM Mine Development Review Committee - Project Update
Good Afternoon Mine Development Review Committee Members,
Further to our first Mine Development Review Committee Meeting (November -8th, 2012), our office is
now aware that Seabridge Gold will submit their Concurrent Permit Application at the time that the Environmental Assessment Office accepts their Environmental Assessment Application for review. We expect this to be sometime towards the end of January 2013.
Seabridge Gold's Environmental Assessment Section 11 Order has been amended to allow this change, please refer to the EAO Project Information Centre (e-PIC) for details : , http://a100.gov.bc.ca/appsdata/epic/documents/p322/1355867 414094 403085485d2355ebc47b4a53 0807b6847a8b387286b034bfOe51b6da2cbc8c74.pdf
I look forward to working with you all in the New Year.
Happy Holidays,
Genevieve Paterson
Project Coordinator 2
FNR-2013-00423 Page 106
s.22
FNR-2013-00423 Page 106
Ministry of Forests, Lands and Natural Resource Operations
Major Projects Office, Skeena Region
250-847-7268
3 FNR-2013-00423 Page 107FNR-2013-00423 Page 107
Muir, Deanna CSNR:EX
From: Sent: To:
Paterson, Genevieve FLNR:EX Monday, January?, 201311:25AM 'Jessy Chaplin'
Subject: RE: KSM-Permits
Yes, lucky for us there is a room available.
See you then,
Gen
From: Jessy Chaplin [mallto:[email protected]] Sent: Monday, January 7, 2013 10:07 AM To: Paterson, Genevieve FLNR:EX Subject: RE: KSM-Permits
Hi Gen, Can I come over there? I'll bring my computer ©
-----Original Appointment-----From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Wednesday, January 02,2013 11:50 AM To: Paterson, Genevieve FLNR:EX; 'Jessy Chaplin' Subject: KSM-Permits When: Monday, January 07,2013 1:00 PM-2:30 PM (UTC-08:00) Pacific Time (US & Canada). Where: Sea bridge Office
When: Monday, January 7, 2013 1:00 PM-2:30 PM (GMT-08:00) Pacific Time (US & Canada). Where: Sea bridge Office
Note: The GMT offset above does not reflect daylight saving time adjustments.
Hi Jessy,
looking forward to working with you on thisl
• The list of bundled authorization applications to be applied for;
• Application requirements for the authorization applications to be bundled;
1 FNR-2013-00423 Page 108FNR-2013-00423 Page 108
Muir, Deanna CSNR:EX
From: Sent: To: Cc: Subject: Attachments:
Good morning Jessy,
Paterson, Genevieve FLNR:EX Tuesday, January 8,201310:52 AM 'Jessy Chaplin' Cuell, James W FLNR:EX KSM - Consultation Obligations - Draft KSM Consultation DRAFT.docx
Attached for your review and input is the letter you requested from James on the First Nations consultation obligations for KSM.
Thanks for coming in yesterday, I will have the revised version of the permit list for your review by the end of the week.
Talk to you soon,
Ci~ p~j.C">v
Project Coordinator Ministrv of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
1 FNR-2013-00423 Page 109FNR-2013-00423 Page 109
Ministry of Forests, Lands and Natural Resource Operations
Skeena Region
Mailing Address: Bag 5000 3726 Alfred Avenue Smithers BC V0J 2N0
Location Address: 3726 Alfred Avenue Smithers BC Telephone: 250 847-7260 Facsimile: 250 847-7347
January 8, 2013 Jessy Chaplin Permitting Coordinator, KSM Project 123 Main Street, P.O. Box 2536 Smithers, BC V0J 2N0 Via e-mail: [email protected] Dear Jessy, As requested, this letter is to clarify for Seabridge Gold Inc. (Seabridge), your First Nations Engagement obligations on the permit applications for the proposed KSM Mine Project (Project). The duty to consult with First Nations on the KSM Project remains wholly with the province. With respect to your proposed application under the Environmental Assessment Act, the Environmental Assessment Office has provided direction on First Nations engagement. For the purposes of coordinating the review of permit applications for the Project, the Province has convened the KSM Mine Development Review Committee (MDRC). The Province has invited potentially affected First Nations and the Nisga’a Nation to be members of this MDRC. These First Nations include:
� Gitanyow Hereditary Chiefs Office � Nisga’a Nation � Tahltan Nation � Skii km Lax Ha
The First Nations membership may be modified over time, depending on the outcomes of KSM’s environmental assessment and which issues flow from the EA to the MDRC. The Province requests that Seabridge support this engagement with First Nations and the Nisga’a Nation in the MDRC process by undertaking the following:
- Attending MDRC meetings and providing project related information; - Meeting with the identified First Nations, outside of the MDRC meetings, possibly
with the Province, to describe how specific aspects of the project may affect the interests of First Nations and the Nisga’a Nation;
- Consider ways to avoid or mitigate impacts or concerns respecting aboriginal or treaty interests brought forward by the Nisga’a Nation or First Nation; and
FNR-2013-00423 Page 110FNR-2013-00423 Page 110
- Document engagement including details where project modifications are made to address aboriginal and treaty interests and provide this record to the Province to assist in its decision making.
This engagement is not intended to duplicate the engagement currently underway in support of the Environmental Assessment process. Jennifer Stalker is the Chair of the KSM MDRC and Jason Pope is the Consultation Coordinator. Please contact either one if you have any questions. We look forward to working with Seabridge on your KSM Project. Yours truly, James Cuell Director, Skeena Major Projects Office Ministry of Forests, Lands and Natural Resource Operations cc: Tara Marsden, Implementation Coordinator, Gitanyow Hereditary Chiefs Office Frederic Tolmie, Chief Executive Officer, Nisga’a Nation Nalaine Morin, THREAT Chair, Tahltan Nation Darlene Simpson, Chief, Skii km Lax Ha Jen Stalker, Project Manager, Major Projects Office, MFLNRO Jason Pope, Consultation Coordinator, Sr. Advisor, MFLNRO Chris Hamilton, Executive Project Director, EAO
FNR-2013-00423 Page 111FNR-2013-00423 Page 111
Muir, Deanna CSNR:EX
Subject:
Start: End:
Recurrence:
Organizer:
From: Sent: To: Subject:
Thanks Jessy,
KSM Sharepoint & First Nation Consultation Draft Letter
Tue 2013·01·1511:00 AM Tue2013·01·1511:30AM
(none)
Paterson, Genevieve FLNR:EX
Paterson, Genevieve FLNR:EX Tuesday, January 15, 2013 11:31 AM 'Jessy Chaplin' KSM Sharepoint & First Nation Consultation Draft letter
I figured out a better method of access for the committee and Seabridge as creating a BCelO just seems to be inconvenient.
I've created a generic username and password.
Here you go: https://spc-flnr.gov.bc.ca/ksm/SitePages/Home.aspx
Usernam~:
Password:
Do you have any comments or updates on the draft letter I sent last week?
Talk to you soon,
Genevieve Paterson
1 FNR-2013-00423 Page 112
s.15, s.17
FNR-2013-00423 Page 112
Project Coordinator
Ministry of Forests, Lands and Natural Resource Operations
Major Projects Office, Skeena Region
250-847-7268
From: Jessy Chaplin [mailto:jessy@seabridgegold,net] Sent: Friday, January 11, 2013 2:41 PM To: Paterson, Genevieve FLNR:EX Cc: elizabeth@seabridgegold ,net Subject: KSM mine - bceid for KMS permitting MORC sharepoint
Hi Gen,
Here's the BCeid.
is my username
Thanks
Jessy
KSM SharePoint Site
The KSM Sharepoint site will be the venue for information sharing between Provincial permitting agencies and the MORC.
https:/Ispc-flnr.gov.bc.ca/ksm/SitePages/Home.aspx
External clients require a BCelO account to access SharePoint to create a BCelO please select this link: https:/Iwww.bceid .ca/
Instructions for setting up a basic bceid:
2 FNR-2013-00423 Page 113
s.15, s.17
s.15, s.17
FNR-2013-00423 Page 113
• Visit: https://www.bceid.ca
Click "Begin Registration"
Click "Basic BCeID"
Click "Register without specifying an online service"
Enter your details & OK.
Provide BCelD user name to [email protected] once you have been added to the sharepoint site access list you will receive an automated notification.
Thank You! I look forward to working with you all on this project.
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
3
\
FNR-2013-00423 Page 114
s.22
FNR-2013-00423 Page 114
Muir. Deanna CSNR:EX
Subject: RE: KSM Sharepoint & First Nation Consultation Draft Letter
Start: End:
Recurrence:
Organizer:
Thu 2013-01-17 9:00 AM Thu 2013-01-17 9:30 AM
(none)
Paterson, Genevieve FLNREX
From: Sent: To:
Jessy Chaplin [email protected] Thursday, January 17,2013 9:54 AM Paterson, Genevieve F~NR:EX
Subject: RE: KSM Sharepoint & First Nation Consultation Draft Letter
HiGen, I do have comments, not many and can hopefully get them to you next week. Thanks Jessy
-----Original Message-----From: Paterson, Genevieve FLNR:EX [mailto:[email protected] Sent: Tuesday, January 15, 2013 11 :31 AM To: 'Jessy Chaplin' Subject: KSM Sharepoint & First Nation Consultation Draft Letter
Thanks Jessy,
I figured out a better method of access for the committee and Seabridge as creating a BCelD just seems to be inconvenient.
I've created a generic username and password.
Here you go: https:/Ispc-flnr.gov.bc.ca/ksm/SitePages/Home.aspx
Username:Password:
Do you have any comments or updates on the draft letter I sent last week?
Talk to you soon,
Genevieve Paterson Project Coordinator Ministry of Forests, Lands and Natural Resource Operations<http://www.gov.bc.ca/for/> Major Projects Office<http://www.for.gov.bc.ca/major projects/>, Skeena Region 250-847-7268
From: Jessy Chaplin [mailto:[email protected] Sent: Friday, January 11, 2013 2:41 PM To: Paterson, Genevieve FLNREX Cc: [email protected]
1 FNR-2013-00423 Page 115
s.15, s.17
FNR-2013-00423 Page 115
Subject: KSM mine - bceid for KMS permitting MORC sharepoint
Hi Gen,
Here's the BCeid. s my username
Thanks Jessy
KSM SharePoint Site The KSM Sharepoint site will be the venue for information sharing between Provincial permitting agencies and the MORC.
https:!lspc-flnr.gov.bc.calksm/SitePages/Home.aspx
External clients require a BCelO account to access SharePoint to create a BCelO please select this link: https:!lwww.bceid.ca/
Instructions for setting up a basic bceid:
* Visit: https:!lwww.bceid.ca * Click "Begin Registration" * Click "Basic BCeIO" * Click "Register without specifying an online service" * Enter your details & OK. * Provide BCelO user name to [email protected]<mailto:[email protected]> once you have been added to the sharepoint site access list you will receive an automated notification.
Thank You! I look forward to working with you all on this project.
Jessy Chaplin, MSc. RPBio Permitting Coordinator Seabridge Gold Inc. 1235 Main Street P.O. Box 2536 Smithers, BC VOJ 2NO Tel. (250) 847-4704 Cell.
2 FNR-2013-00423 Page 116
s.15, s.17
s.15, s.17
s.22
FNR-2013-00423 Page 116
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc: Subject: Attachments:
Hi Jen,
RE: KSM - MDRe Update (permit list! information requirements for Batch 1)
Wed 2013-02-13 12:00 AM Thu 2013-02-1412:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [jessy@seabridgegold .netj Wednesday, February 13, 2013 1:41 PM Stalker, Jennifer L FLNR:EX [email protected]; Rolf Schmitt; Paterson, Genevieve FLNR:EX RE: KSM - MDRC Update (permit list! information requirements for Batch 1) Feb 5 2013 - Govt KSM Permitting & Information Requirements Batch 1 .docx
Genevieve and I went over a draft in January, with a couple more changes, I think we are getting close to getting it right.
It is difficult to separate project components in last section, I left it with a list of activities in the left column and then applicable acts and regulations in the other rows. I see confusion ahead as we have an area called Mine Site which refers to the western part of the KSM Project which contains the deposits and rock storage facilities. I wasn't sure if when you were referring to the 'Mine Site' if you meant the whole Project, or not. So I made it clear where activities were within the Mine Site or PTMA (Processing and Tailing Management Area).
As you are aware, we received a time extension on the concurrent permit applications from the EAO. While the letter from the EAO states permit applications must be submitted within 7 days after the KSM EA-EIS is accepted for review, Chris H. clarified that the process is a little less simple than that. Seabridge must submit the permit applications to your office (MPO-FLNRO), they have to be accepted for review by the agencies reviewing them and the Project Manager has to confirm in writing that each application was accepted (for review) back to the EAO (with email backup). Seabridge is to be copied on the email from the MPO to the EAO.
1 FNR-2013-00423 Page 117
s.22
FNR-2013-00423 Page 117
If it is possible to talk timing, I think it would be helpful. Could you give me a call this week?Thurs or Fri this week would be good
if we can make a quick call or 1 hr meeting happen.
Regards,
Jessy Chaplin, MSc. RPBio .
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
From: Stalker, Jennifer L FLNR:EX [mailto:[email protected]] Sent: Tuesday, February 05, 20139:02 AM To: 'Jessy Chaplin' Subject: KSM - MORC Update (permit list! information requirements for Batch 1)
Jessy,
Please find attached the list of permits and information requirements for Batch 1 (KSM project) that Genevieve has provided me based on working with Seabridge and the agencies.
I will be sending out an update to the KSM MORC, where I want to include (attach) the permit! information requirements list, the ToR, and an updated timeline (permitting).
Please review the attached list of permits for Batch 1 (attached) and notify me of any discrepancies from your end before I send it out.
2 FNR-2013-00423 Page 118
s.22
s.22
s.22
FNR-2013-00423 Page 118
I would like to provide an update to the MDRC at the end of this weekI early next week.
Thank you.
Jen Stalker, RPF
Project Manager
Ministry of Forests, Lands and Natural Resource Operations
Skeena Region - Smithers, BC
Phone: (250) 847-7506
Fax: (250) 847-7347
Email: [email protected]
3 FNR-2013-00423 Page 119FNR-2013-00423 Page 119
Muir, .Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc:
Subject: Attachments:
Hi Jen,
Concurrent permit applications - submission
Mon 2013·02-25 12:00 AM Tue 2013·02·26 12:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [email protected] Monday, February 25, 2013 3:50 PM Stalker, Jennifer L FLNR:EX Paterson, Genevieve FLNR:EX; [email protected]; Rolf Schmitt; Ann Danilevich; Brent Murphy Concurrent permit applications· submission EAO _ G u idel i nes _for _ Submitti ng_ Electro n ic _ Files.pdf
It is my understanding that Seabridge is submitting the concurrent permit applications electronically to you. Do you have a format in which the applications must be in?
I ask because if the concurrent permit applications are being posted on the EAO's e-PIC site, they must be formatted as per the EAO electronic guidelines (attached).
If we submit the applications to you our preferred format will you be re-formatting them to be posted on the EAO site?
. Regards,
Jessy
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Sea bridge Gold Inc. 1235 Main Street
1 FNR-2013-00423 Page 120FNR-2013-00423 Page 120
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
I
r
2 FNR-2013-00423 Page 121
s.22
FNR-2013-00423 Page 121
ENVIRONMENTAL ASSESSMENT OFFICE Electronic Project Information Centre
Guidance to Proponents for Submitting Electronic Files
The Environmental Assessment Office (EAO) publishes environmental assessment documentation such as Terms of Reference (ToR) or Application Information Requirements (AIR) and applications for an environmental assessment certificate, project descriptions, and other related information in the electronic Project Information Centre (e-PIC).
All applicable project documentation must be submitted to EAO within the guidelines listed below. This applies to documentation prepared by both proponents and their consultants. Proponents are responsible for ensuring their consultants are aware of these guidelines.
Electronic Documentation
� All documentation must be submitted on CD, DVD or via e-mail as appropriate for the document size
and in accordance with the project requirements. � It must be in .pdf format, although other formats may also be requested by the EAO. � It must not have security limitations or passwords of any kind. � It is preferred that the electronic files do not exceed 5 MB in size but they must not exceed 10 MB.
Documentation that exceeds 10 MB may be returned to the proponent. � The table of contents must be a separate document. � Pictures can dramatically increase the file size of a document in .pdf format. Making the picture a jpeg
(.jpg) before inserting it can help to meet the size limits mentioned above. � File names must reflect the contents of the document and must not have slashes, brackets or commas. � When possible, small files of the same type should be combined and kept within the size limits
mentioned above. Format of Applications
Applications are usually large documents of several volumes with tables, figures and drawings. We have two formats that can be used when submitting applications:
Format 1: This format has all similar file types in one folder; therefore, all the drawings for all the volumes are in the drawings folder, all the figures are in the figures folder, etc. There are no sub-folders within the drawings, figures, tables, etc. folders, only files.
FNR-2013-00423 Page 122FNR-2013-00423 Page 122
Format 2: This format shows all the applicable figures, drawings, tables and additional information applicable to volume 1, within that folder.
Folders and Sub-Folders
Please note with both types of file structures, there are only two levels of folders. In Format 1, the Application level may have as many sub-folders as needed. In the next level, where folders such as “volume 1”, “appendices” or “tables” are located, those folders are to contain files only. Additional sub-folders within the “appendices”, “tables”, etc. folders are not allowed. In Format 2, the Application level may contain as many sub-folders as needed; however, the volume sub-folders are to contain all the files for each specific volume regardless of whether they are tables, figures, etc.
File Names
In Format 1, the appendices, figures, etc., are not specific to a volume, they are part of the overall application and, therefore, it is sufficient to name files “Appendix A Data Log, Figure 1-1 Lake Echo”, etc.
In Format 2, each volume has its own appendices, figures, etc. And, as it is possible to have, for example, figure 1.1 in each volume, each file needs to be named appropriately and completely for the volume it is within. Examples: Volume 1 Chapter 1 Introduction, Volume 1 Chapter 2 Table of Contents, Volume 1 Appendix A Studies of the Lake, Volume 1 Figure 2-5 Aerial View of Land.
Additional Information
For further clarification and information on these requirements, please contact the Business Applications Administrator by phone at (250) 356-7441, by fax at (250) 356-7477, or by e-mail at [email protected]
FNR-2013-00423 Page 123FNR-2013-00423 Page 123
Muir, Deanna CSNR:EX
Subject:
Start: End:
Recurrence:
Organizer:
From:
Sent: To: Cc: Subject:
Hi Jessy,
RE: Concurrent permit applications - submission
Wed 2013-02-27 8:00 AM Wed 2013-02-27 8:30 AM
(none)
Paterson, Genevieve FLNREX
Stalker, Jennifer L FLNR:EX Wednesday, February 27,2013 12:23 PM
'Jessy Chaplin' Paterson, Genevieve FLNR:EX RE: Concurrent permit applications - submission
I have checked with Shared Services (re: Sharepoint). They have confirmed that the format at which EAO outlines in the their electronic guidelines will be compatible for Sharepoint. Please submit the permit applications electronically as per the EAO electronic guidelines (formatting).
As well ... please note that we cannot post a document! single file that is over 50MB onto Sharepoint (50MB is the max per document ... not per folder). If there is an application that is over 50MB, please let us know so that we can figure out! prepare ahead of time how we can make this work on our end), or look at another option; such as a dropbox that we can make available to the MORC to view the application.
Thanks.
Jen Stalker, RPF
Project Manager
Ministry of Forests, Lands and Natural Resource Operations
Skeena Region - Smithers, BC
Phone: (250) 847-7506
1 FNR-2013-00423 Page 124FNR-2013-00423 Page 124
Fax: (250) 847-7347
Email: [email protected]
From: Jessy Chaplin [mailto:jessy@seabridgegold .netj Sent: Monday, February 25,20133:50 PM To: Stalker, Jennifer L FLNR:EX Cc: Paterson, Genevieve FLNR:EX; [email protected]; Rolf Schmitt; Ann Danilevich; Brent Murphy Subject: Concurrent permit applications - submission
Hi Jen,
It is my understanding that Seabridge is submitting the concurrent permit applications electronically to you. Do you have a format in which the applications must be in?
I ask because if the concurrent permit applications are being posted on the EAO'se-PIC site, they must be formatted as per the EAO electronic guidelines (attached).
If we submit the applications to you our preferred format will you be re-formatting them to be posted on the EAO site?
Regards,
Jessy
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Sea bridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
2 FNR-2013-00423 Page 125FNR-2013-00423 Page 125
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc: Subject: Attachments:
Jessy,
KSM Mine Project (Permitting List! Acti;Jn Items .. . )
Fri 2013-03-22 12:00 AM Sat 2013-03-2312:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Stalker, Jennifer L FLNR:EX Friday, March 22, 2013 11:04 AM 'Jessy Chaplin' Paterson, Genevieve FLNR:EX KSM Mine Project (Permitting List! Action Items ... ) KSM Permitting Information Requirements Phase I March 21 2013 (3).docx; KSM Concurrent Review Process - March 2013.pdf; KSM Permitting Timeline - March 2013.docx
Please find attached the following;
KSM Permit list (with agency comments incorporated - these comments were discussed at the meeting with Will Foster and Jeanien Carmody- Fallows on March 8, 2013) .
MRC Process map - most current (adjusting timeline as required)
KSM Permitting Timeline - hard dates will be incorporated into this table once we know "Day 1" (the day EAO accepts the EA application for review - EA screening phase complete). This timeline will be adjusted as/ if required throughout the permitting review process (as/ if timeline dates adjust).
Meeting with Sea bridge on March 8, 2013 (Jessy Chaplin, Elizabeth Miller, Jen Stalker, Will Foster, Jeanien Carmody-Fallows)
Action Items Noted:
1 FNR-2013-00423 Page 127FNR-2013-00423 Page 127
Will Foster requesting large overview map from Seabridge (outlining the project footprint and OL TC labels)
, Will Foster to check if SUP can cross over Mines Act Permit (Will Foster has confirmed that it
cannot)
Will Foster requesting notification from Seabridge (via e-mail or letter) regarding any existing OL TC's that Seabridge would like closed out (apply for new ones, rather than amending the existing ones)
Jeanien to check into flexibility around new requirements (Landfills) - Jen to follow up with Jeanien
Issues Tracker (EA process)
o EAO has delegated issues tracking for EA review to Seabridge (my understanding)
o MPO would like regular access to the issues tracker (developed during the EA review) - help determine earlier and coordinate what issues will be addressed at EA and what issues will be brought to the MRC table.
o Seabridge has confirmed that their Issues Tracker will be made available to MPO throughout the process(s).
o Jen and Gen to coordinate with Jessy as to what this will look like? (Where the Issues Tracker will be housed, and access to it).
To Note:
As discussed at the meeting held on March 8th, the Draft 'Terms of Reference' for the KSM
MRC will be distributed for review and comment once the EA starts their screening phase (to help deter any confusion around e-mails (and what process), while the EA is gearing everyone up for the EA screening phase at this time).
The next MRC meeting will be scheduled shortly after the permit applications have been submitted (and hardcopies received by those requesting hardcopies) - as we enter into the MRC screening phase (75 days after the EA application is accepted for review, agencies (MPO to coordinate) must determine! confirm that all information requirements are included in the applications to conduct a full technical review).
o As per current timelines (what we know today) - I will be looking at scheduling this in early June 2013 (if we can expect applications to be submitted mid-May)
2 FNR-2013-00423 Page 128FNR-2013-00423 Page 128
o Purpose of the next MRC (Seabridge to walk the agencies through the applications submitted, MRC process review - next steps, project update from the proponent ... )
Based on current timelines, below is a list of 'forecasted' MRC meetings for your planning purposes (subject to change)
Forecasted MRC Meetings (subject to change)
Description
Timeline
Pre-MRC Meeting
November 8,2012
Kick-Off MRC Meeting
During Screening Phase
Early June, 2013
MRC Meeting
During Technical Review Phase
September, 2013
MRC Meeting
During Technical Review Phase
November, 2013
MRC Meeting
During Technical Review Phase
As required
Close Out! Lessons Learned
3 FNR-2013-00423 Page 129FNR-2013-00423 Page 129
April,2014
Please feel free to provide any comments, or ... as always, if any questions or concerns, please don't hesitate to contact me. .
Thank you.
Jen Stalker, RPF
Project Manager
Ministry of Forests, Lands and Natural Resource Operations
Skeena Region - Smithers, Be
Phone: (250) 847-7506
Fax: (250) 847-7347
Email: [email protected]
4 FNR-2013-00423 Page 130FNR-2013-00423 Page 130
Forests, Lands and Natural Resource Operations – Major Projects Office
1
KSM MINE PROJECT
Permitting Review – Timelines
(PHASE I Permits)
March, 2013
Note: All dates are subject to change and will be updated as required
ACTIVITY DATE TIMELINE
AUTHORIZATIONS FOR:Mine Site and Processing and Tailings Management Area (site prep and
limited construction activities), Access Roads, Camps, Tunnel, Transmission Line
Proponent submits Authorizations Electronic (MPO to post to Sharepoint)
Hardcopy to those agencies/ First
Nations that requested hardcopies
EA Application 45 Day Screening (EAO) start (once all hardcopies of complete package have been received)
Expected late March, 2013
EA Application accepted for review (45 Day Screening complete)
Mid May, 2013 Day 1
Agencies provide confirmation to PM that applications have been filed in accordance (i.e. agencies have received the applications and fees paid)
Mid May, 2013 (Day 1 – Day 6)
PM Drafts letter on behalf of agencies that applications have been filed in accordance (letter addressed to EAO, cc’ proponent)
Mid May, 2013 (by) Day 7
(within 7 days after EA application has been accepted for
review)
MRC:
Application screening (to ensure that all required information is available for technical reviewers to conduct their review of the applications).
Mid (late) May – July 2013
Day 1 - Day 60
FNR-2013-00423 Page 131FNR-2013-00423 Page 131
Forests, Lands and Natural Resource Operations – Major Projects Office
2
** Comments to be provided to PM within 60 days ofEA application being accepted **
PM to draft and deliver letter to EAO (cc’ MEM and proponent) outlining any information that is still required from the proponent to conduct a full review (letter must be delivered within 75 days of EA application acceptance)
Late July, 2013 Day 75
Technical MRC Permitting Review period Starts Late July, 2013 Day 76
Technical MRC Permitting Review period winding down (buffer to resolve/ address any outstanding issues and PM to prepare Committee Report)
(once EAC has been issued)
~ Late December,2013
(once EAC has been issued)
(Day 225)
Address final issues and prepare Draft Committee Report
Late January, 2014 Day 226 – Day 256
Draft Committee Report and Draft Permits for MRC Review and Comment (2 weeks)
February, 2014 Day 257 - Day 271
PM to prepare final Committee Report March, 2014 Day 272 - Day 285
Final Decision Package submitted to SDM’s for Decision
March, 2014 Day 286
Decision
FNR-2013-00423 Page 132FNR-2013-00423 Page 132
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
1 |
Pa
ge
Con
ten
ts
Coul
ter C
reek
Acc
ess
Road
Spe
cial
Use
Per
mit
and
Supp
ortin
g Pe
rmits
.....
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
...2
Coul
ter C
reek
Con
stru
ctio
n Ca
mps
.....
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
4
Trea
ty C
reek
Con
stru
ctio
n Ca
mps
.....
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
..5
Trea
ty C
reek
Acc
ess
Road
Spe
cial
Use
Per
mit
and
Supp
ortin
g Pe
rmits
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
....5
Batc
h 1
Min
e Si
te &
Pro
cess
ing
and
Taili
ng M
anag
emen
t Are
a (P
TMA
) Lim
ited
Site
Con
stru
ctio
n ...
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
.....7
Mitc
hell-
Trea
ty T
win
Tun
nel .
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
.....
10
FNR-2013-00423 Page 133FNR-2013-00423 Page 133
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
2 |
Pa
ge
1 Alth
ough
the
AD
DER
doe
s no
t spe
cify
adv
ertis
ing
requ
irem
ents
for l
icen
ces
to c
ut, t
he c
urre
nt M
FR p
olic
y is
to a
dver
tise
oppo
rtun
ities
to o
btai
n a
com
petit
ivel
y aw
arde
d FL
TC fo
r a m
inim
um o
f 2 w
eeks
us
ing
the
MFR
Off
icia
l Not
ices
web
site
A te
mpl
ate
for a
dver
tisem
ents
to c
ompe
titiv
ely
awar
d an
FLT
C is
ava
ilabl
e at
htt
p://
gww
.for.
gov.
bc.c
a/ht
h/tim
ten/
docu
men
ts/i
nter
med
iate
-sal
vage
-ex
ampl
eadv
ertis
ing-
for-
tend
ers.
doc.
1
Cou
lter
Cre
ek A
cces
s R
oad
Sp
ecia
l Use
Per
mit
an
d S
up
por
tin
g P
erm
its
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Co
mm
ents
/Req
uire
men
ts
Publ
ic C
onsu
ltat
ion
Cont
act
Eska
y A
cces
s Ro
ad
Km 0
-4 B
ob Q
uinn
FSR
Road
Use
Per
mit
FS10
9-R
UPA
pp.d
oc
M
aint
enan
ce A
gree
men
t with
Alta
Gas
FW R
oad
Use
A
gree
men
t.m
sg
No
A
lta G
as-L
oren
Kel
ly
FLRN
O-W
ill F
oste
r
Km 4
-43.
5 Al
ta G
as S
UP
S253
18
Mai
nten
ance
Agr
eem
ent w
ith A
ltaG
as
Km 4
3.5-
54.6
(tur
noff
to
CCA
R)
1.) B
arri
ck G
old
SUP
reas
sign
men
t of
SUP
(with
the
SUP
hold
ers
agre
emen
t)
2.) M
aint
enan
ce A
gree
men
t for
Ba
rric
k G
old
N
o Se
abri
dge-
Jess
y Ch
aplin
54.6
km
to e
nd o
f new
co
nstr
uctio
n at
Mitc
hell
Cree
k Br
idge
88.
5 km
1.)
Coul
d be
an
amen
dmen
t to
exis
ting
Barr
ick
SUP
2.)
New
SU
P if
Barr
ick
SUP
in n
ot
reas
sign
ed
If
#2 (N
ew S
UP)
yes
FLN
RO-W
ill F
oste
r
Coul
ter C
reek
Acc
ess
Road
(C
CAR)
The
Fore
st P
ract
ices
Cod
e of
BC
and
the
Prov
inci
al F
ores
t Use
Reg
ulat
ion
are
the
auth
oriz
atio
n fo
r the
Spe
cial
U
se P
erm
it (S
UP)
. FW
Con
firm
atio
n of
ap
prop
riate
per
mits
in
Ther
e w
ill b
e 4
OLT
C’s
for
KSM
1.
Cou
lter
Cree
k A
cces
s 2.
Tre
aty
Cree
k A
cces
s 3.
PTM
A-P
roce
ss P
lant
and
Tai
ling
Man
agem
ent A
rea
4.M
ine
Site
Pack
age
Publ
ic C
onsu
ltatio
n fo
r acc
ess,
SU
P an
d as
soci
ated
OLT
C’s
can
be d
one
at o
ne ti
me.
�
SUP
�O
LTC
MFR
Off
icia
l Not
ices
web
site
.1
FLRN
O-W
ill F
oste
r
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
O
ccup
ant L
icen
ce to
Cut
Fish
erie
s A
ct-R
evie
w S
UP
for
Pend
ing
Conf
irm
atio
n N
o D
FO-P
at L
im
FNR-2013-00423 Page 134FNR-2013-00423 Page 134
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
3 |
Pa
ge
oper
atio
nal s
tate
men
ts fo
r str
eam
cr
ossi
ng
Wor
ksaf
e BC
Act
- Not
ice
of F
ores
try
Ope
ratio
ns F
orm
ht
tp:/
/ww
w.w
orks
afeb
c.co
m/i
nsur
ance
/man
agin
g_yo
ur_a
cco
unt/
notic
e_of
_pro
ject
/def
ault.
asp
No
WSB
C Te
rrac
e
Wild
life
Act
- Wild
life
salv
age
and
rem
oval
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/pas
b/fw
_per
mre
g.ht
ml
No
PASB
-Con
tact
TBD
Unu
k Ri
ver B
ridg
e
Nav
igab
le W
ater
s Pr
otec
tion
Act
-N
avig
able
Str
eam
Cro
ssin
g
http
://w
ww
.tc.
gc.c
a/en
g/pa
cific
/mar
ine-
nwpp
-app
licat
ions
-13
37.h
tm
No
NW
P-Jo
hn M
acki
e
CCA
R La
ydow
n A
reas
, Log
La
ndin
gs a
nd B
orro
w A
reas
Th
e Fo
rest
Pra
ctic
es C
ode
of B
C an
d th
e Pr
ovin
cial
For
est U
se R
egul
atio
n ar
e th
e au
thor
izat
ion
for t
he S
peci
al
Use
Per
mit
(SU
P).
Thes
e ar
eas
are
to b
e w
ithin
the
SUP
boun
dary
sup
plie
d as
a
shap
e fil
e to
FLN
RO.
Mos
t of t
hese
are
as a
re w
ithin
the
75 m
RO
W.
Whe
re la
nd o
utsi
de o
f the
75
ROW
is r
equi
red,
it
is c
lear
ly id
entif
ied
on m
aps.
Yes,
to b
e in
clud
ed in
Cou
lter C
reek
Acc
ess
Road
SU
P ap
plic
atio
n Pa
ckag
e FL
NRO
-Will
Fos
ter
FNR-2013-00423 Page 135FNR-2013-00423 Page 135
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
4 |
Pa
ge
Cou
lter
Cre
ek C
onst
ruct
ion
Cam
ps
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t Ca
mp
#3 E
skay
Cre
ek M
ine
Site
Sta
ging
(50p
l)
Land
Act
–In
dust
rial
Lic
ence
of
Occ
upat
ion
ht
tp:/
/ww
w.a
gf.g
ov.b
c.ca
/cla
d/D
ocum
ents
/LPS
B/Po
licie
s/in
dust
rial
_gen
Ye
s ht
tp:/
/ww
w.fo
r.go
v.bc
.ca/
Land
_Ten
ures
/doc
um
ents
/cab
inet
/adv
ertis
ing.
Cam
Ben
tley
Drin
king
Wat
er P
rote
ctio
n A
ct-
Cons
truc
tion
Perm
it (H
20-C
) W
ater
Con
stru
ctio
n Pe
rmit
Proc
ess.
Indu
stria
l Cam
p R
equi
rem
ents
- H
ealth
NH
A A
pplic
atio
n fo
r W
ater
wor
ks C
onst
ruc
NH
A A
PPLI
CA
TIO
N
WA
TER
0504
14.p
dfN
HA
%20
App
licat
ion
%20
for%
20W
ater
wo
App
licat
ion
for
Hea
lth A
ppro
val.p
df
No
NH
A-S
hane
Wad
den
D
rinki
ng W
ater
Pro
tect
ion
Act
- Co
nstr
uctio
n Pe
rmit
(H20
-O)
Publ
ic H
ealth
Act
-Sew
age
Perm
it
10-4
60-3
038
- G
uidl
ines
for
Ind
ustr
ia
Publ
ic H
ealth
Act
-Foo
d Pe
rmit
Ope
ning
a N
ew F
ood
Prem
ise
NH
W
ater
Act
-Gro
undw
ater
Wel
l Re
gist
ratio
n
http
://w
ww
.env
.gov
.bc.
ca/w
sd/p
lan_
prot
ect_
sust
ain/
grou
ndw
ater
/ind
ex.h
tml
Envi
ronm
enta
l Man
agem
ent A
ct-
Ope
n Bu
rnin
g Re
quir
ed o
nly
if op
en b
urni
ng is
requ
ired
, 1 p
erm
it ca
n be
issu
ed
for m
ine
site
. ht
tp:/
/ww
w.b
cairq
ualit
y.ca
/top
ics/
burn
ing-
outd
oors
.htm
l ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/was
te_d
isch
arge
_aut
h/ap
p_fo
rms
/ind
ex.h
tm
No
MoE
- Jea
nien
Ca
rmod
y-Fa
llow
s
Cam
p #7
Unu
k N
orth
(40p
l) Sa
me
perm
it/in
form
atio
n re
quir
emen
ts fo
r Cam
p #3
Esk
ay C
amp
Min
es S
ite
Cam
p #8
Unu
k Ri
ver
Stag
ing
(40p
l) Sa
me
perm
it/in
form
atio
n re
quir
emen
ts fo
r Cam
p #3
Esk
ay C
reek
Min
e si
te S
tagi
ng C
amp
(50p
l).
FNR-2013-00423 Page 136FNR-2013-00423 Page 136
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
5 |
Pa
ge
Tre
aty
Cree
k C
onst
ruct
ion
Cam
ps
Cam
p #1
2 H
wy
37 (6
0pl)
Priv
ate
Agr
eem
ent (
Seab
ridg
e in
tend
s to
use
exi
stin
g co
nstr
uctio
n ca
mps
alo
ng H
ighw
ay 3
7, a
nd w
ill m
ake
arra
ngem
ents
with
them
). Ca
mp
#11
Trea
ty C
reek
M
arsh
allin
g (6
0pl)
Sam
e pe
rmit/
info
rmat
ion
requ
irem
ents
for C
amp
#3 E
skay
Cre
ek M
ine
site
Sta
ging
Cam
p (5
0pl).
*Min
us L
icen
ce o
f Occ
upat
ion,
this
cam
p is
to b
e pe
rmitt
ed u
nder
the
Min
es A
ct.
OLT
C th
at c
over
s th
e SU
P an
d LO
O w
ill c
over
the
cam
p lo
catio
n.
Tre
aty
Cree
k A
cces
s R
oad
Sp
ecia
l Use
Per
mit
an
d S
up
por
tin
g P
erm
its
Trea
ty C
reek
Acc
ess
Road
s (t
o Pl
ant S
ite a
nd T
reat
y Sa
ddle
Po
rtal
)
The
Fore
st P
ract
ices
Cod
e of
BC
and
the
Prov
inci
al F
ores
t Use
Re
gula
tion
are
the
auth
oriz
atio
n fo
r the
Spe
cial
Use
Per
mit
(SU
P).
FW C
onfir
mat
ion
of
appr
opria
te p
erm
its in
Yes
FLRN
O-W
ill F
oste
r
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
O
ccup
ant L
icen
ce to
Cut
ht
tp:/
/ww
w.fo
r.go
v.bc
.ca/
dsi/
MTe
nure
s_Sa
lvag
e.ht
m#L
icen
se_t
o_C
ut-L
TC
Ther
e w
ill b
e 4
OLT
C’s
for
KSM
1.
Cou
lter
Cree
k A
cces
s 2.
Tre
aty
Cree
k A
cces
s 3.
PTM
A-P
roce
ss P
lant
and
Tai
ling
Man
agem
ent A
rea
4.M
ine
Site
W
orks
afe
BC A
ct- N
otic
e of
Fo
rest
ry O
pera
tions
For
m
http
://w
ww
.wor
ksaf
ebc.
com
/ins
uran
ce/m
anag
ing_
your
_acc
ount
/not
ice_
of_p
roje
ct/d
efau
lt.as
p N
o W
SBC
Terr
ace
Wild
life
Act
- Wild
life
Salv
age
and
Rem
oval
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/pas
b/fw
_per
mre
g.ht
ml
No
PASB
Hig
hway
s A
ct-P
rovi
ncia
l Pub
lic
Hig
hway
Per
mit
App
licat
ion
- Co
nnec
tion
to H
wy
37
http
://w
ww
.th.
gov.
bc.c
a/pe
rmits
/H00
20.a
sp
No
MoT
I-She
rri
App
lega
te
Bell-
Irvi
ng R
iver
Bri
dge
Fish
erie
s A
ct (D
FO)-
Aut
hori
zatio
n of
Bel
l Irv
ing
Brid
ge c
ross
ing
Pe
ndin
g Co
nfir
mat
ion
from
DFO
?
DFO
-Pat
Lim
Fish
erie
s A
ct (D
FO)-
Rev
iew
SU
P fo
r Ope
ratio
nal S
tate
men
ts fo
r st
ream
cro
ssin
gs
Pend
ing
Conf
irmat
ion
from
DFO
?
Wat
er A
ct-N
otifi
catio
n (S
ectio
n 9)
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/wsd
/wat
er_r
ight
s/lic
ence
_app
licat
ion/
sect
ion9
/
Und
er s
ectio
n 44
(2) o
f the
Wat
er R
egul
atio
n, a
n A
ppro
val o
r N
otifi
catio
n is
not
requ
ired
for i
nstr
eam
wor
ks re
late
d to
fore
st
activ
ities
whe
re a
sta
ndar
d or
regu
latio
n ex
ists
und
er th
e Fo
rest
No
FLRN
O-E
mily
Bu
lmer
Com
men
t [G
1]:
Will
Fos
ter
adde
d
FNR-2013-00423 Page 137FNR-2013-00423 Page 137
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
6 |
Pa
ge
and
Rang
e Pr
actic
es A
ct o
f Bri
tish
Colu
mbi
a. T
his
is p
rovi
ded
that
th
e ch
ange
is m
ade
by a
mun
icip
ality
or p
erso
n w
ho:
�ho
lds
an a
gree
men
t or r
oad
use
perm
it un
der t
he F
ores
t Act
, an
agr
eem
ent u
nder
the
Rang
e A
ct, o
r a s
peci
al u
se p
erm
it un
der
the
Fore
st P
ract
ices
Cod
e of
Brit
ish
Colu
mbi
a A
ct, o
r
Nav
igab
le W
ater
s Pr
otec
tion
Act
-N
avig
able
Str
eam
Cro
ssin
g
http
://w
ww
.tc.
gc.c
a/en
g/pa
cific
/mar
ine-
nwpp
-app
licat
ions
-13
37.h
tm
No
NW
P-Jo
hn M
acki
e
Layd
own
Are
as, L
og L
andi
ngs
and
Borr
ow A
reas
Th
e Fo
rest
Pra
ctic
es C
ode
of B
C an
d th
e Pr
ovin
cial
For
est U
se
Regu
latio
n ar
e th
e au
thor
izat
ion
for t
he S
peci
al U
se P
erm
it (S
UP)
.
Thes
e ar
eas
are
to b
e w
ithin
the
SUP
boun
dary
sup
plie
d as
a
shap
e fil
e to
FLN
RO.
Mos
t of t
hese
are
as a
re w
ithin
the
75 m
RO
W.
Whe
re la
nd o
utsi
de o
f the
75
ROW
is r
equi
red,
it is
cle
arly
id
entif
ied
on m
aps.
No
FLRN
O-W
ill F
oste
r
Tran
smis
sion
Lin
e Ri
ght o
f W
ay
Land
Act
- Util
ity- L
icen
se o
f O
ccup
atio
n ht
tp:/
/ww
w.fo
r.go
v.bc
.ca/
Land
_Ten
ures
/ten
ure_
prog
ram
s/pr
ogr
ams/
utili
ties/
inde
x.ht
ml
Yes
FLN
RO-C
am
Bent
ley
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t Ca
mp
#5Tr
eaty
Pla
nt C
amp
(800
pl)
Min
es A
ct –
Perm
it ht
tp:/
/ww
w.e
mpr
.gov
.bc.
ca/M
inin
g/Pe
rmitt
ing-
Recl
amat
ion/
Page
s/de
faul
t.as
px
Yes
MEM
-Dia
ne H
owe
Fo
rest
and
Ran
ge P
ract
ices
Act
–
Occ
upan
t Lic
ence
to C
ut
http
://w
ww
.for.
gov.
bc.c
a/ds
i/M
Tenu
res_
Salv
age.
htm
#Lic
ense
_to
_Cut
-LTC
T
here
will
be
4 O
LTC’
s fo
r KS
M
1. C
oulte
r Cr
eek
Acc
ess
2. T
reat
y Cr
eek
Acc
ess
3. P
TMA
-Pro
cess
Pla
nt a
nd T
ailin
g M
anag
emen
t Are
a 4.
Min
e Si
te
Yes
FLRN
O-W
ill F
oste
r
Envi
ronm
enta
l Man
agem
ent A
ct-
Mun
icip
al W
aste
wat
er
Regu
latio
n
FW c
amps
EM
A
perm
ittin
g sp
ecifi
catio
No
MoE
- Jea
nien
Ca
rmod
y-Fa
llow
s
Envi
ronm
enta
l Man
agem
ent A
ct-
Was
te D
isch
arge
(Lan
dfill
) ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/mun
-was
te/w
aste
-so
lid/l
andf
ills/
crite
ria-
land
fills
.htm
No
Envi
ronm
enta
l Man
agem
ent A
ct-
Was
te D
isch
arge
(Inc
iner
ator
) ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/was
te_d
isch
arge
_aut
h/ap
p_fo
rms
/ind
ex.h
tm
�A
pub
lic n
otic
e of
app
licat
ion
to b
e pl
aced
in th
e BC
Gaz
ette
and
loca
l new
s m
edia
FNR-2013-00423 Page 138FNR-2013-00423 Page 138
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
7 |
Pa
ge
FW F
ollo
w u
p to
Pr
e-re
gist
ratio
n M
eet
�30
day
pub
lic n
otifi
catio
n pe
riod
�
App
licat
ion
fees
(con
tact
nea
rest
M
inis
try
Regi
onal
Off
ice)
�
A fi
nal T
echn
ical
Ass
essm
ent R
epor
t may
be
requ
ired
�
Cons
ulta
tion
Repo
rt
Drin
king
Wat
er P
rote
ctio
n A
ct-
Cons
truc
tion
Perm
it (H
20-C
) Se
e Ca
mp
#3 E
skay
Cre
ek M
ine
site
Sta
ging
Cam
p (5
0pl)
for p
erm
it/in
form
atio
n re
quir
emen
ts.
Drin
king
Wat
er P
rote
ctio
n A
ct-
Cons
truc
tion
Perm
it (H
20-O
) Pu
blic
Hea
lth A
ct-F
ood
Perm
it W
ater
Act
-Gro
undw
ater
Wel
l Re
gist
ratio
n
Cam
p #6
Tre
aty
Sadd
le C
amp
(120
pl)
Sam
e re
quir
emen
ts a
s ab
ove:
Cam
p#5
Trea
ty P
lant
Cam
p pl
us
Cam
p #6
: Tre
aty
Sadd
le r
equi
res
a Li
cenc
e of
Occ
upat
ion
whi
ch is
und
er r
evie
w s
ince
Sep
t 20,
201
2. L
ands
File
No:
640
8448
W
ater
Act
-Not
ifica
tion
(Sec
tion
9)
http
://w
ww
.env
.gov
.bc.
ca/w
sd/w
ater
_rig
hts/
licen
ce_a
pplic
atio
n/se
ctio
n9/
No
FLRN
O-E
mily
Bu
lmer
Bat
ch 1
Min
e Si
te &
Pro
cess
ing
and
Tai
lin
g M
anag
emen
t A
rea
(PT
MA
) Li
mit
ed S
ite
Con
stru
ctio
n
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t La
ydow
n A
reas
, Log
Lan
ding
s an
d Bo
rrow
Are
as
Min
e Si
te ti
mbe
r cl
eari
ng
PTM
A ti
mbe
r cle
arin
g
Min
e Si
te ro
ad c
onst
ruct
ion
PT
MA
Site
road
con
stru
ctio
n M
ine
Site
Cam
ps:
Cam
p #2
: Ted
Mor
ris
Cam
p #4
: Mitc
hell
Nor
th
Min
es A
ct –
M -
Perm
it O
ne P
erm
it fo
r KSM
Pro
ject
incl
udin
g th
e M
ine
Site
and
PTM
A-
Proc
ess
Plan
t and
Tai
ling
Man
agem
ent A
rea
http
://w
ww
.em
pr.g
ov.b
c.ca
/Min
ing/
Perm
ittin
g-Re
clam
atio
n/Pa
ges/
defa
ult.
aspx
Yes
MEM
-Dia
ne H
owe
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
O
ccup
ant L
icen
ce to
Cut
O
ne O
LTC
Am
endm
ent f
or M
ine
Site
and
one
OLT
C A
men
dmen
t fo
r PTM
A
Ther
e w
ill b
e 4
OLT
C’s
for
KSM
1.
Cou
lter
Cree
k A
cces
s 2.
Tre
aty
Cree
k A
cces
s 3.
PTM
A-P
roce
ss P
lant
and
Tai
ling
Man
agem
ent A
rea
4.M
ine
Site
Yes
FLN
RO-W
ill F
oste
r
EMA
-Was
te D
isch
arge
O
ne E
MA
Per
mit
for M
ine
Site
and
PTM
A
CON
RETE
PLA
NTS
– a
re th
ey p
lann
ed a
nd w
here
?
Yes-
One
Pub
lic C
onsu
ltatio
n Pa
ckag
e fo
r M
ine
Site
MoE
- Jea
nien
Ca
rmod
y-Fa
llow
s C
omm
ent
[G2
]: JC
F ad
ded,
ad
ditio
nal i
nfor
mat
ion
need
ed.
FNR-2013-00423 Page 139FNR-2013-00423 Page 139
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
8 |
Pa
ge
Ca
mp
#9/1
0: M
itche
ll in
itial
/sec
onda
ry
Cam
p
Wat
er S
tora
ge D
am (W
SD)
site
pre
para
tion
(in th
e M
ine
Site
) M
itche
ll-Tr
eaty
Tw
inne
d Tu
nnel
s (M
TT) M
itche
ll Po
rtal
s co
nstr
uctio
n (in
the
Min
e Si
te)
MTT
Tre
aty
Port
als
cons
truc
tion
(in th
e PT
MA
) M
TT T
reat
y Sa
ddle
Por
tal
cons
truc
tion
(at t
he T
reat
y Sa
ddle
)
REQ
UIR
E RE
GIS
TRA
TIO
N U
ND
ER C
ON
CRET
E CO
DE
– do
esn’
t hav
e to
be
done
with
Con
curr
ent –
but n
eed
to g
et d
one
earl
y in
co
nstr
uctio
n ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/was
te_d
isch
arge
_aut
h/re
gist
ratio
n/in
dex.
htm
E
NV
IRO
NM
EN
TAL
MA
NA
GE
ME
NT
ACT
-app
licat
ions
with
re
quire
d ap
plic
atio
n fe
es ($
200
per a
pplic
atio
n ) t
o be
sen
t to:
Env
ironm
enta
l Man
agem
ent B
ranc
hM
inis
try O
f Env
ironm
ent
PO
Box
937
7 S
tn P
rov
Gov
tV
icto
ria, B
C V
8W 9
M1
Or D
ELI
VER
by
cour
ier t
o:3r
d Fl
oor,
2975
Jut
land
Roa
d, V
icto
ria, B
C V
8T 5
J9
�A
pub
lic n
otic
e of
app
licat
ion
to b
e pl
aced
in th
e BC
Gaz
ette
and
loca
l new
s m
edia
�
30 d
ay p
ublic
not
ifica
tion
peri
od
**A
ny re
quir
emen
ts fo
r pub
lic c
onsu
ltatio
n fr
om th
e EA
are
dup
licat
ed fo
r any
EM
A
appl
icat
ions
.
FW F
irst
Nat
ions
C
onsu
ltatio
n w
ith E
MA
�A
pub
lic n
otic
e of
app
licat
ion
to b
e pl
aced
in th
e BC
�
Gaz
ette
and
loca
l new
s m
edia
�
30 d
ay p
ublic
not
ifica
tion
peri
od
�A
pplic
atio
n fe
es (c
onta
ct n
eare
st M
inis
try
Regi
onal
Off
ice)
�
A fi
nal T
echn
ical
Ass
essm
ent R
epor
t may
be
requ
ired
Co
nsul
tatio
n Re
port
Min
ing
Leas
e –
for t
he M
ine
Site
M
inin
g Le
ase
-for
the
PTM
A
Min
eral
Ten
ures
Act
-Min
ing
Leas
e fo
r the
Min
e Si
te A
pplic
atio
n un
der
revi
ew s
ince
Mar
ch 2
009.
In
pro
gres
s
Min
eral
Ten
ures
Br
anch
-–Tr
acy
Mar
tin
Min
eral
Ten
ures
Act
-Min
ing
Leas
e to
be
appl
ied
for t
he P
TMA
Min
eral
Ten
ures
Br
anch
–Tr
acy
Mar
tin
r
Min
e A
rea
- Non
-Con
tact
D
iver
sion
s PT
MA
– N
on-c
onta
ct
dive
rsio
ns
Wat
er A
ct a
nd th
e W
ater
Pr
otec
tion
Act
-Wat
er L
icen
ce
http
://w
ww
.env
.gov
.bc.
ca/w
sd/w
ater
_rig
hts/
licen
ce_a
pplic
atio
n/in
dex.
htm
l N
on-c
onta
ct d
iver
sion
s ar
ound
the
Min
e Si
te a
nd P
TMA
do
requ
ire
appr
oval
s.
No
FLRN
O-E
mily
Bu
lmer
FNR-2013-00423 Page 140FNR-2013-00423 Page 140
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
9 |
Pa
ge
Wor
ks T
hat D
o N
ot R
equi
re a
n A
ppro
val o
r Not
ifica
tion
Und
er s
ectio
n 44
(2) o
f the
Wat
er R
egul
atio
n, a
n A
ppro
val o
r N
otifi
catio
n is
not
requ
ired
for i
nstr
eam
wor
ks re
late
d to
fore
st
activ
ities
whe
re a
sta
ndar
d or
regu
latio
n ex
ists
und
er th
e Fo
rest
an
d Ra
nge
Prac
tices
Act
of B
ritis
h Co
lum
bia.
Thi
s is
pro
vide
d th
at
the
chan
ge is
mad
e by
a m
unic
ipal
ity o
r per
son
who
: ��
����
��
���
�
���
����
����
��
�����
��
����
����
����
����
�ag
reem
ent u
nder
the
Rang
e A
ct, o
r a s
peci
al u
se p
erm
it un
der t
he
Fore
st P
ract
ices
Cod
e of
Bri
tish
Colu
mbi
a A
ct, o
r ��
���
����
���
���o
con
stru
ct o
r mod
ify a
road
und
er th
e Co
al A
ct,
the
Geo
ther
mal
Res
ourc
es A
ct, t
he M
ines
Act
, the
Min
ing
Righ
t of
Way
Act
or t
he P
etro
leum
and
Nat
ural
Gas
Act
. U
nder
sec
tion
44 (3
) of t
he W
ater
Reg
ulat
ion
a ch
ange
may
als
o be
mad
e in
and
abo
ut a
str
eam
by
a pe
rson
who
hol
ds a
per
mit
unde
r se
ctio
n 10
of t
he M
ines
Act
, with
out o
btai
ning
an
App
rova
l or
Not
ifica
tion,
if th
e pe
rson
com
plie
s w
ith:
���
����
����
��� �
�
������
� �
��
���
���
���
���
� ���
��"�
���
�Br
itish
Col
umbi
a, a
nd
���
�����
����
���
����
��e
rmit
resp
ectin
g ch
ange
s in
and
abo
ut a
st
ream
.
Land
Fill
and
Con
tam
inat
ed
Soils
Lan
d Fa
rm
�M
ine
Site
�
PTM
A
Envi
ronm
enta
l Man
agem
ent A
ct-
Was
te D
isch
arge
(Lan
dfill
) ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/mun
-was
te/w
aste
-so
lid/l
andf
ills/
crite
ria-
land
fills
.htm
Yes
MoE
- Jea
nien
Ca
rmod
y-Fa
llow
s
Tem
pora
ry E
xplo
sive
Sto
rage
at
the
Min
e Si
te
Tem
pora
ry E
xplo
sive
Sto
rage
at
the
PTM
A
BC M
ines
Act
– E
xplo
sive
s St
orag
e an
d U
se P
erm
it
BC M
ines
Act
and
Reg
ulat
ions
(HSR
CBC,
200
8) re
quir
es u
sers
to
appl
y an
nual
ly fo
r an
expl
osiv
es s
tora
ge a
nd u
se p
erm
it
No
Reg
iona
l Min
es
Off
ice
– D
oug
Flyn
n, S
cott
Par
ker
FNR-2013-00423 Page 141FNR-2013-00423 Page 141
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
10 |
Pa
ge
Perm
anen
t Exp
losi
ve F
acto
ry
at th
e M
ine
Site
Expl
osiv
es A
ct -
Expl
osiv
es
Fact
ory
Lice
nce
http
://w
ww
.nrc
an.g
c.ca
/min
eral
s-m
etal
s/ex
plos
ives
/375
2
Thro
ugh
the
Expl
osiv
es R
egul
ator
y D
ivis
ion,
ESS
B pr
ovid
es
serv
ices
and
sup
port
to th
e m
embe
rs o
f the
exp
losi
ves
indu
stry
in
clud
ing
man
ufac
ture
rs, t
rans
port
ers,
impo
rter
s, s
elle
rs a
nd
user
s of
exp
losi
ves.
N
R Ca
n-M
elan
ie
Cam
pbel
l
Wat
er T
reat
men
t Fac
ility
–
disc
harg
e at
the
Min
e Si
te
Inte
rnat
iona
l Riv
er
Impr
ovem
ents
Act
-IRIA
Lic
ence
ht
tp:/
/ww
w.e
c.gc
.ca/
Publ
icat
ions
/def
ault.
asp?
lang
=En&
xml=
529
428D
8-8E
9B-4
F5E-
9BD
5-81
2723
95F9
E7
Yes
Env
Can-
Har
p G
ill
Mit
chel
l-T
reat
y T
win
Tu
nn
el
Mitc
hell-
Trea
ty T
win
Tun
nel
Land
s A
ct –
Lic
ence
of
Occ
upat
ion
App
licat
ion
subm
itted
thro
ugh
Fron
t Cou
nter
BC
Sept
embe
r,
2012
. Th
is a
pplic
atio
n w
ill b
e re
view
ed a
nd p
roce
ssed
as
part
of
Phas
e 1
perm
its.
Yes
Cam
Ben
tley
Op
por
tun
itie
s
1.O
LTC
for a
cces
s ro
ad w
ill c
over
cam
ps a
s w
ell (
incl
uded
in c
omm
ents
abo
ve in
tabl
e)
2.A
men
dmen
t to
the
exis
ting
min
e si
te O
LTC
may
be
an o
ptio
n, o
r app
lyin
g fo
r a n
ew O
LTC
alto
geth
er (a
s di
scus
sed
at M
arch
8th
mee
ting
with
Sea
brid
ge a
nd W
ill F
oste
r)
�Se
abri
dge
to s
end
Dis
tric
t (W
ill F
oste
r) n
otifi
catio
n cl
osin
g ou
t exi
stin
g O
LTC
(if S
eabr
idge
cho
oses
to a
pply
for a
new
one
)
Com
men
t [G
3]:
Add
ed to
incl
ude
tunn
el in
Pha
se 1
FNR-2013-00423 Page 142FNR-2013-00423 Page 142
Env
ironm
enta
lA
sses
smen
tOffi
ce
(EA
App
licat
ion)
Maj
orP
roje
cts
Offi
ce
(MR
C–
Per
mitt
ing)
FEB
RU
AR
Y20
13 EAA
PPLI
CA
TIO
NSU
BM
ITTE
D
With
in75
Day
saf
tert
heE
AO
acce
pts
the
appl
icat
ion,
MP
Ono
tifie
sth
epr
opon
enta
ndE
AO
inw
ritin
gof
any
addi
tiona
linf
orm
atio
nre
quire
men
ts(fr
omth
eM
RC
)in
orde
rto
com
plet
eth
ere
view
NO
TE:
Age
ncie
sto
prov
ide
com
men
tsto
Proj
ectM
anag
eron
/bef
ore
Day
60to
allo
wPM
toco
mpi
leco
mm
ents
and
draf
tlet
ter
with
in75
days
“PR
E M
RC
M
EE
TIN
G”
(NO
VE
MB
ER
8TH)
AP
PLI
CA
TIO
NS
SU
BM
ITTE
D(P
RO
PO
NE
NT)
60da
ysto
reso
lve
outs
tand
ing
issu
es,
draf
tCom
mitt
eeR
epor
t(3
wee
ks)f
orM
RC
revi
ewan
dco
mm
ent(
2w
eeks
),dr
aftp
erm
itre
view
(2w
eeks
),an
dsu
bmit
to S
DM
’s fo
r dec
isio
n.
45D
AY
SCR
EEN
ING
(as
perS
ectio
n24
Ord
er)
MR
CTe
chni
calR
evie
w
KS
MM
INE
PR
OJE
CT
–C
ON
CU
RR
EN
TR
EV
IEW
PR
OC
ES
S–
Mar
ch20
13**
NO
TE–
Tim
elin
ean
dde
tails
inth
efo
llow
ing
proc
ess
diag
ram
are
subj
ectt
och
ange
EA
O–
prim
ary
poin
tofc
onta
ctfo
rFirs
tNat
ions
Con
sulta
tion
durin
gth
eE
Are
view
.
All
EA
OIs
sues
and
stat
ustra
cked
and
prov
ided
toM
PO
Dec
isio
nw
ithin
45D
ays M
RC
Tech
nica
lRev
iew
(leav
etim
eto
reso
lve
outs
tand
ing
issu
esan
dP
M(M
PO
)to
prep
are
Com
mitt
eeR
epor
t)
KIC
K–
OFF
MR
CM
eetin
g
Pro
pone
ntto
wal
kag
enci
es/
Firs
tNat
ions
thro
ugh
the
appl
icat
ions
subm
itted
MR
CM
EE
TIN
GM
RC
ME
ETI
NG
Mov
ein
tote
chni
calr
evie
won
cein
form
atio
nre
quire
men
tsar
esu
bmitt
ed/p
rovi
ded
(com
plet
eap
plic
atio
ns)
INTE
RN
AL
INFO
RM
ATI
ON
SHA
RIN
G(E
AO
/FLN
RO
)
*IS
SU
ES
TRA
CK
ER
*IN
FOR
MA
TIO
NS
HA
RIN
GM
ATE
RIA
LS/D
OC
UM
EN
TSTH
AT
BO
THE
AO
and
FLN
RO
RE
QU
IRE
AC
CE
SS
TOD
UR
ING
THE
RE
VIE
WP
RO
CE
SS
Chr
isH
amilt
on,D
avid
Gra
ceJe
nS
talk
er,J
ason
Pop
e,G
enev
ieve
Pat
erso
n
180
DA
YEA
APP
LIC
ATI
ON
REV
IEW
AN
DD
ECIS
ION
PAC
KA
GE
FOR
MIN
ISTE
RS
MP
Oto
draf
tlet
tert
oE
AO
and
Pro
pone
nton
beha
lfof
the
agen
cies
that
auth
oriz
atio
nsha
vebe
enfil
edin
acco
rdan
ce(w
ithin
7da
ysof
the
EA
appl
icat
ion
bein
gac
cept
edfo
rrev
iew
)
MA
RC
H20
13A
PR
IL20
13M
AY
2013
JUN
E20
13JU
LY20
13A
UG
US
T20
13S
EP
TEM
BE
R20
13O
CTO
BE
R20
13N
OV
EM
BE
R20
13D
EC
EM
BE
R20
13JA
NU
AR
Y20
14FE
BR
UA
RY
2014
MA
RC
H20
14
As
perS
ectio
n13
Ord
er:
The
prop
onen
tifa
pply
ing
forc
oncu
rren
tre
view
ofon
eor
mor
eap
plic
atio
nsfo
rapp
rova
lsun
dero
ther
enac
tmen
ts,m
usts
ubm
itth
ere
ques
tto
the
EA
OD
irect
orw
ithin
7da
ysaf
tert
heda
teon
whi
chth
eEA
OD
irect
orno
tifie
sth
epr
opon
entu
nder
sect
ion
16(4
)oft
heA
ctth
atth
epr
opon
ents
appl
icat
ion
has
been
acce
pted
forr
evie
w
(MP
Oto
draf
tlet
tert
oE
AO
and
Pro
pone
nton
beha
lfof
the
agen
cies
that
auth
oriz
atio
nsha
vebe
enac
cept
edfo
rrev
iew
with
in7
days
ofth
eE
Aap
plic
atio
nbe
ing
acce
pted
forr
evie
w)
FLN
RO
–pr
imar
ypo
into
fcon
tact
forF
irstN
atio
nsco
nsul
tatio
ndu
ring
the
MR
Cre
view
.
Pro
pone
ntre
spon
sibl
eto
prov
ide
agen
cies
with
requ
ired
hard
copi
es(fo
rth
ose
requ
estin
gha
rdco
pies
)
NO
TE-P
ropo
nent
tosu
bmit
alla
pplic
atio
nsdi
gita
llyto
MP
O–
will
bepo
sted
toth
epr
ojec
tS
hare
poin
tSite
forM
RC
acce
ss/r
evie
w.
Dec
isio
n P
acka
ge to
SD
M’s
FNR-2013-00423 Page 143FNR-2013-00423 Page 143
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc:
Subject:
Hi Will,
KSM Project Permitting: Meeting March 8 2013 with MPO and Skeena Stikine District
Fri 2013-03-2212:00 AM Sat 2013-03-2312:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [[email protected] Friday, March 22, 2013 2:37 PM Foster, William J FLNR:EX [email protected]; Stalker, Jennifer L FLNR:EX; Paterson, Genevieve FLNR:EX; Brent Murphy KSM Project Permitting: Meeting March 8 2013 with MPO and Skeena Stikine District
On March 8th, we discussed tenuring of the TeAR SUP and Mineral Tenure Act mining lease.
Seabridge understands and shares your concern about trying to overlap a Forest Act tenure and a Mineral Tenure Act mining lease. I want to clarify with you that Seabridge will not be applying for a mining lease for the PTMA (Process and Tailings Management Area) in the Batch 1 permit applications. Seabridge will not be applying for the PTMA mining lease in concurrent permitting.
The importance of this is that the TeAR SUP permit application will not be complicated by other tenure applications around the "Lower Access" or North Treaty Lower Road. The construction and operation of the North Treaty Lower Road will be applied for under the Mines Act permit application.
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, Be VDJ 2ND
1 FNR-2013-00423 Page 144FNR-2013-00423 Page 144
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From:
Sent: To:
Cc: Subject:
Attachments:
Hi Jen,
RE: KSM Draft Terms of Reference and MRC (Permitting) Update
Fri 2013-04-1912:00 AM Sat 2013-04-20 12:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [email protected]
Friday, April 19, 2013 1:15 PM Stalker, Jennifer L FLNR:EX 'Elizabeth Miller'; Paterson, Genevieve FLNR:EX RE: KSM Draft Terms of Reference and MRC (Permitting) Update
2013_Apr_19 Email udpate from JStalker to KSM Mine Review Committee.docx
Thanks for the opportunity to review. Some minor text changes.
I will provide comment at a later date on the TOR.
Were there any changes to the distribution list for permit applications from Dec 6th?
Thanks
Jessy
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc . . 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
1 FNR-2013-00423 Page 146
s.22
FNR-2013-00423 Page 146
· From: Stalker, Jennifer L FLNR:EX [mailto:[email protected]] Sent: Wednesday, April 17, 2013 6:47 PM To: 'Jessy Chaplin' Cc: 'Elizabeth Miller'; Paterson, Genevieve FLNREX Subject: KSM Draft Terms of Reference and MRC (Permitting) Update
Jessy,
I will be sending an E-mail (below) and Draft ToR out to the MRC on Friday afternoon this week (April 19th
) for review and comment. Would like to give you the opportunity to review the note prior to me sending it out. If you have any questions! concerns! comments around it, please let me know by Friday (early afternoon).
Thanks,
Jen Stalker, RPF
Project Manager
Ministry of Forests, Lar:tds and Natural Resource Operations
Skeena Region - Smithers, BC
Phone: (250) 847-7506
Fax: (250) 847-7347
Email: [email protected]
Good afternoon KSM Mine Revjew Committee (MRC);
2
.,
FNR-2013-00423 Page 147FNR-2013-00423 Page 147
As per the attached Environmental Assessment Office (EAO) amended Section 11 Order (dated November 30, 2012), Seabridge Gold will be submitting Phase I of their authorization applications at the time, or prior to the EAO accepting the Environmental Assessment application for review. Seabridge will be applying for Concurrent permitting under the Concurrent Approval Regulation.
o Concurrent Approval Regulation (Regulation the proponent will be applying under for permitting)
http://www.bclaws.ca/EP Libraries/bclaws _ new/documentll D/freeside/1 0_371_2002
** Please Note: as per the Concurrent Approval Regulation, the MRC authorization review process (screening phase) will commence when:
EA application has been accepted for review by the EAO;
Authorization applications are filed in accordance to Ministry standards, and;
Notification is provided from the EA Director to the Major Projects Office that the application for concurrent review has been accepted
In preparation for Phase I authorization applications being submitted by Seabridge Gold, please find attached the following documents for review and reference;
o Mine Review Committee Draft Terms of Reference
o Identifies the purpose of the Mine Review Committee and the roles and responsibilities of its members ..
o Please review and provide comments to Jen Stalker [email protected] by May 3, 2013.
o KSM Concurrent Review Process Map
o Highlights the MRC process (should the applications be accepted by the EAO for concurrent permitting) and key milestones/ timelines as the MRC moves through the authorization review process. Please note, this document will be adjusted throughout the review process accordingly iff when required (subject to change if timelines are adjusted)
3 FNR-2013-00423 Page 148FNR-2013-00423 Page 148
o Phase I Authorizations for the following project components (please refer to the permit list attached)
o Mine Site! Processing and Tailings Management Area
o Camps
o Access Roads (Coulter Creek! Treaty Creek)
o Transmission Line
o Mitchell-Treaty Tunnel
** Please review the application distribution list attached to ensure your contact information is up to . date and that we have captured how you would like to receive the application (hardcopy, electronic or both) correctly. If changes are required please email [email protected] .
Next Steps - (Permitting)
Within 7 days of the EAO accepting the EA application for review, agencies must confirm to the EAO that applications have been filed in accordance to Ministry standards! policy
o Project Manager (PM) will be coordinating with agencies! Front Counter BC to ensure applications have been filed in accordance (i.e. all applicable fees have been paid by the proponent)
o Project Manager will submit a letter to the EAO Director, on behalf of the agencies, stating whether or not the applications have been filed in accordance to Ministry standards
o Major Projects Office (MPO) will post all Phase I applications (electronic) to the project Sharepoint site for MRC access/ review - notification will be sent out to the MRC
As per the Concurrent Approval Regulation, Section 8 (1); if the Executive Director of EAO notifies the Ministry (Major Projects Office) that the application for concurrent review is accepted, then within 75 days of the EAO accepting the EA application for review, agencies must notify the proponent and the EAO in writing of any additional information that the ministry anticipates it will require from the proponent in order to conduct the technical review.
o MPO Project Manager (PM) will coordinate the MRC comments and draft a letter to the EAO, on behalf of the technical reviewers, of any additional information required to conduct the review.
4
I i
FNR-2013-00423 Page 149FNR-2013-00423 Page 149
o · Project Manager is requesting that all comments from agencies are provided onl or before Dav 60 in order for PM to compile and draft letter to EAO by Day 75.
Next Mine Review Committee Meeting
o As the MRC enters the screening phase of the applications (should the EA application be accepted for review, applications have been filed in accordance, and the EAO Director provides notification that the applications have been accepted for concurrent review), the next MRC meeting will be scheduled early in the screening phase (expected early June, 2013)
o The purpose of this meeting will be to review the applications (for screening purposes) with the proponent available to answer questions and provide a project update. As well, direction will be provided as to next steps in the authorization review process.
If you have any questions or concerns, please do not hesitate to contact me.
Thank you.
Jen Stalker, RPF
Project Manager
Ministry of Forests, Lands and Natural Resource Operations
Skeena Region ~ Smithers, BC
Phone: (250) 847-7506
Fax: (250) 847-7347
Email: [email protected]
•
5 FNR-2013-00423 Page 150FNR-2013-00423 Page 150
Muir, Deanna CSNR:EX
From: Stalker, Jennifer L FLNR:EX Friday, April 19, 2013 3:03 PM Sent:
To:
Cc:
, Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAI'l:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; Cuell, James W FLNR:EX; 'Darlene Simpson'; De Beck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper' ; 'Gitanyow Hereditary Chiefs Office'; Hoffman, Al EMNG:EX; Howe, Diane J EMNG:EX; Jackson, Scott ENV:EX; 'Jessica Coulson'; 'Jessy Chaplin '; 'John Mackie '; 'June Yoo Rifkin'; 'Kyle Moselle'; Love, Mark P ENV:EX; 'Mansell Griffin ([email protected])'; 'Nalaine Morin '; 'Pat Lim'; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN; Page, Steven FLNR:EX; Sakals, Matt E FLNR:EX Cuell, James W FLNR:EX; Herbert, Brian FLNR:EX; Robertson, Linda G ABR:EX; '[email protected]'
Subject: KSM Mine Project - Mine Review Committee (Permitting) Update Attachments: KSM MRC TOR_Draft.docx; Section 11 Order - Amended Nov2012.pdf; KSM Concurrent
Review Process - March 2013.pdf; KSM Permitting Information Requirements Phase I March 2013.pdf; MDRC Application Distribution.xlsx
Good afternoon KSM Mine Review Committee (MRC);
As per the attached Environmental Assessment Office (EAO) amended Section 11 Order (dated November 30, 2012), Seabridge Gold will be submitting Batch I of their authorization applications at the time, or prior to the EAO accepting the Environmental Assessment application for review. Seabridge will be applying for Concurrent permitting under the Concurrent Approval Regulation.
~ Concurrent Approval Regulation (Regulation the proponent will be applying under for permitting)
http://www.bclaws.ca/EPLibraries/bclaws new/documentllD/freeside/10 371 2002
** Please Note: as per the Concurrent Approval Regulation, the MRC review process (screening phase) will commence when:
• EA application has been accepted for review by the EAO; • MPO provides a coordinated response to the EAO that permit applications have been filed
in accordance to Ministry standards, and; • Notification is provided from the EA Director to the Major Projects Office that the
application for concurrent review has been accepted
To prepare for the MRC review process to start, please find attached the following documents for review and reference;
~ Mine Review Committee Draft Terms of Reference o Identifies the purpose of the Mine Review Committee and the roles and responsibilities
of its members, o Please review and provide comments to Jen Stalker [email protected] by May
3,2013. .
~ KSM Concurrent Review Process Map 1
FNR-2013-00423 Page 151FNR-2013-00423 Page 151
o Highlights the MRC process (should the applications be accepted by the EAO for concurrent permitting) and key milestones! timelines as the MRC moves through the authorization review process. Please note, this document will be adjusted throughout the review process accordingly if! when required (subject to change if timelines are adjusted)
> Batch I permit applications for the following project components (please refer to the permit applications list attached)
o Mine Site! Processing and Tailings Management Area o Camps o Access Roads (Coulter Creek! Treaty Creek) o Transmission Line o Mitchell-Treaty Tunnel
** Please review the application distribution list attached to ensure your contact information is up to date and that we have captured how you would like to receive the application (hardcopy, electronic or both) correctly. If changes are required please email [email protected] .
Next Steps - (Permitting)
• Within 7 days of the EAO accepting the EA application for review, agencies must confirm to the EAO that permit applications have been filed in accordance to Ministry standards! policy
o Project Manager (PM) will be coordinating with agencies! Front Counter BC to ensure permit applications have been filed in accordance (i.e. all applicable fees have been paid by the proponent)
o Project Manager will submit a letter to the EAO Director, on behalf of the agencies, stating whether or not the permit applications have been filed in accordance to Ministry standards
o Major Projects Office (MPO) will post all Batch I permit applications (electronic) to the project Sharepoint site for MRC access/ review - notification will be sent out to theMRC
• As per the Concurrent Approval Regulation, Section 8 (1); if the Executive Director of EAO notifies the Ministry (Major Projects Office) that the application for concurrent review is accepted , then within 75 days of the EAO accepting the EA application for review, agencies must notify the proponent and the EAO in writing of any additional information that the ministry anticipates it will require from the proponent in order to conduct the technical review.
o MPO Project Manager (PM) will coordinate the MRC comments and draft a letter to the EAO (and notify the proponent) , on behalf of the technical reviewers, of any additional information required to conduct the review.
o Project Manager is requesting that all comments from agencies are provided on/ or before Dav 60 in order for PM to compile and draft letter to EAO by Day 75.
• Next MRC Meeting o As the MRC enters the screening phase of the permit applications (should the EA
application be accepted for review, permit applications have been filed in accordance, and the EAO Director provides notification that the permit applications have been accepted for concurrent review), the next MRC meeting will be scheduled early in the screening phase (expected early June, 2013)
2
I
I
FNR-2013-00423 Page 152FNR-2013-00423 Page 152
o The purpose of this meeting will be to review the permit applications (for screening purposes) with the proponent available to answer questions and provide a project update. As well, direction will be provided as to the next steps in the mine permitting review process.
If you have any questions or concerns, please do not hesitate to contact me.
Thank you .
Jen Stalker, RPF
Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeena Region - Smithers, Be Phone: (250) 847-7506 Fax: (250) 847-7347 Email: [email protected]
3 FNR-2013-00423 Page 153FNR-2013-00423 Page 153
Env
ironm
enta
lA
sses
smen
tOffi
ce
(EA
App
licat
ion)
Maj
orP
roje
cts
Offi
ce
(MR
C–
Per
mitt
ing)
FEB
RU
AR
Y20
13 EAA
PPLI
CA
TIO
NSU
BM
ITTE
D
With
in75
Day
saf
tert
heE
AO
acce
pts
the
appl
icat
ion,
MP
Ono
tifie
sth
epr
opon
enta
ndE
AO
inw
ritin
gof
any
addi
tiona
linf
orm
atio
nre
quire
men
ts(fr
omth
eM
RC
)in
orde
rto
com
plet
eth
ere
view
NO
TE:
Age
ncie
sto
prov
ide
com
men
tsto
Proj
ectM
anag
eron
/bef
ore
Day
60to
allo
wPM
toco
mpi
leco
mm
ents
and
draf
tlet
ter
with
in75
days
“PR
E M
RC
M
EE
TIN
G”
(NO
VE
MB
ER
8TH)
AP
PLI
CA
TIO
NS
SU
BM
ITTE
D(P
RO
PO
NE
NT)
60da
ysto
reso
lve
outs
tand
ing
issu
es,
draf
tCom
mitt
eeR
epor
t(3
wee
ks)f
orM
RC
revi
ewan
dco
mm
ent(
2w
eeks
),dr
aftp
erm
itre
view
(2w
eeks
),an
dsu
bmit
to S
DM
’s fo
r dec
isio
n.
45D
AY
SCR
EEN
ING
(as
perS
ectio
n24
Ord
er)
MR
CTe
chni
calR
evie
w
KS
MM
INE
PR
OJE
CT
–C
ON
CU
RR
EN
TR
EV
IEW
PR
OC
ES
S–
Mar
ch20
13**
NO
TE–
Tim
elin
ean
dde
tails
inth
efo
llow
ing
proc
ess
diag
ram
are
subj
ectt
och
ange
EA
O–
prim
ary
poin
tofc
onta
ctfo
rFirs
tNat
ions
Con
sulta
tion
durin
gth
eE
Are
view
.
All
EA
OIs
sues
and
stat
ustra
cked
and
prov
ided
toM
PO
Dec
isio
nw
ithin
45D
ays M
RC
Tech
nica
lRev
iew
(leav
etim
eto
reso
lve
outs
tand
ing
issu
esan
dP
M(M
PO
)to
prep
are
Com
mitt
eeR
epor
t)
KIC
K–
OFF
MR
CM
eetin
g
Pro
pone
ntto
wal
kag
enci
es/
Firs
tNat
ions
thro
ugh
the
appl
icat
ions
subm
itted
MR
CM
EE
TIN
GM
RC
ME
ETI
NG
Mov
ein
tote
chni
calr
evie
won
cein
form
atio
nre
quire
men
tsar
esu
bmitt
ed/p
rovi
ded
(com
plet
eap
plic
atio
ns)
INTE
RN
AL
INFO
RM
ATI
ON
SHA
RIN
G(E
AO
/FLN
RO
)
*IS
SU
ES
TRA
CK
ER
*IN
FOR
MA
TIO
NS
HA
RIN
GM
ATE
RIA
LS/D
OC
UM
EN
TSTH
AT
BO
THE
AO
and
FLN
RO
RE
QU
IRE
AC
CE
SS
TOD
UR
ING
THE
RE
VIE
WP
RO
CE
SS
Chr
isH
amilt
on,D
avid
Gra
ceJe
nS
talk
er,J
ason
Pop
e,G
enev
ieve
Pat
erso
n
180
DA
YEA
APP
LIC
ATI
ON
REV
IEW
AN
DD
ECIS
ION
PAC
KA
GE
FOR
MIN
ISTE
RS
MP
Oto
draf
tlet
tert
oE
AO
and
Pro
pone
nton
beha
lfof
the
agen
cies
that
auth
oriz
atio
nsha
vebe
enfil
edin
acco
rdan
ce(w
ithin
7da
ysof
the
EA
appl
icat
ion
bein
gac
cept
edfo
rrev
iew
)
MA
RC
H20
13A
PR
IL20
13M
AY
2013
JUN
E20
13JU
LY20
13A
UG
US
T20
13S
EP
TEM
BE
R20
13O
CTO
BE
R20
13N
OV
EM
BE
R20
13D
EC
EM
BE
R20
13JA
NU
AR
Y20
14FE
BR
UA
RY
2014
MA
RC
H20
14
As
perS
ectio
n13
Ord
er:
The
prop
onen
tifa
pply
ing
forc
oncu
rren
tre
view
ofon
eor
mor
eap
plic
atio
nsfo
rapp
rova
lsun
dero
ther
enac
tmen
ts,m
usts
ubm
itth
ere
ques
tto
the
EA
OD
irect
orw
ithin
7da
ysaf
tert
heda
teon
whi
chth
eEA
OD
irect
orno
tifie
sth
epr
opon
entu
nder
sect
ion
16(4
)oft
heA
ctth
atth
epr
opon
ents
appl
icat
ion
has
been
acce
pted
forr
evie
w
(MP
Oto
draf
tlet
tert
oE
AO
and
Pro
pone
nton
beha
lfof
the
agen
cies
that
auth
oriz
atio
nsha
vebe
enac
cept
edfo
rrev
iew
with
in7
days
ofth
eE
Aap
plic
atio
nbe
ing
acce
pted
forr
evie
w)
FLN
RO
–pr
imar
ypo
into
fcon
tact
forF
irstN
atio
nsco
nsul
tatio
ndu
ring
the
MR
Cre
view
.
Pro
pone
ntre
spon
sibl
eto
prov
ide
agen
cies
with
requ
ired
hard
copi
es(fo
rth
ose
requ
estin
gha
rdco
pies
)
NO
TE-P
ropo
nent
tosu
bmit
alla
pplic
atio
nsdi
gita
llyto
MP
O–
will
bepo
sted
toth
epr
ojec
tS
hare
poin
tSite
forM
RC
acce
ss/r
evie
w.
Dec
isio
n P
acka
ge to
SD
M’s
FNR-2013-00423 Page 154FNR-2013-00423 Page 154
BRITISH COLUMBIA
File: 30200-20/KSMP-05-06
Reference: 102321
• November 30,2012
Jessy Chaplin Permitting Coordinator Seabridge Gold Inc. PO Box 2536 1235 Main St Smithers BC VOJ 2NO
Dear Ms. Chaplin:
•
This letter is in response to your letter of November 21, 2012, requesting an amendment to the November 6, 2009 Order under section 11 of the Environmental Assessment Act (Act) for the environmental assessment (EA) of the proposed KSM (Kerr-Sulphurets-Mitchell) Project (proposed Project).
Section 13 of the Act provides me with the authority to " ... vary the scope, procedures and methods determined under section 11 ... if necessary ... to complete an effective and timely assessment of the reviewable project." I consider this letter a section 13 Order for the purposes of the Act.
Section 15.4 of your section 11 Order currently states the following:
15.4 The Proponent, if applying for concurrent review of one or more applications for approvals under other enactments, must submit the request to the Project Assessment Manager no later than when the Proponent submits its Application under section 15.1 of this Order.
Pursuant to section 13 of the Act, I now order that section 15.4 of the section 11 Order be replaced with the following:
15.4 The Proponent, if applying for concurrent review of one or more applications for approvals under other enactments, must submit the request to the Executive Project Director within seven days after the date on which the Executive Project Director notifies the Proponent under section 16(4) of the Act that the Proponent's Application has been accepted for review.
Environmental Assessment Office
Mailing Address: PO Box 9426 Stn Prov Govt Victoria Be V8W 9V1
. . .12
Location: 1 st & 2nd FI - 836 Yates Street Victoria Be V8W 1 L8
FNR-2013-00423 Page 155FNR-2013-00423 Page 155
· - 2 -
If you have any questions with respect to this Order, please feel free to contact me at [email protected] or 250-387-1032, or David Grace, Project Assessment Manager, at David [email protected] or 250-387-1417, or Nicole Vinette, Project Assessment Officer, at [email protected] or 250-356-5311.
cc: Garett Cooper, Project Manager Canadian Environmental Assessment Agency
Elizabeth Miller, Manager, Environmental Affairs Seabridge Gold Inc.
FNR-2013-00423 Page 156FNR-2013-00423 Page 156
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
1 |
Pa
ge
Con
ten
tsCo
ulte
r Cre
ek A
cces
s Ro
ad S
peci
al U
se P
erm
it an
d Su
ppor
ting
Perm
its ..
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
2
Coul
ter C
reek
Con
stru
ctio
n Ca
mps
.....
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
4
Trea
ty C
reek
Con
stru
ctio
n Ca
mps
.....
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
..5
Trea
ty C
reek
Acc
ess
Road
Spe
cial
Use
Per
mit
and
Supp
ortin
g Pe
rmits
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
....5
Batc
h 1
Min
e Si
te &
Pro
cess
ing
and
Taili
ng M
anag
emen
t Are
a (P
TMA
) Lim
ited
Site
Con
stru
ctio
n ...
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
.....7
Mitc
hell-
Trea
ty T
win
Tun
nel .
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
......
.....
10
FNR-2013-00423 Page 157FNR-2013-00423 Page 157
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
2 |
Pa
ge
1 A
lthou
gh th
e A
DD
ER d
oes
not s
peci
fy a
dver
tisin
g re
quir
emen
ts fo
r lic
ence
s to
cut
, the
cur
rent
MFR
pol
icy
is to
adv
ertis
e op
port
uniti
es to
obt
ain
a co
mpe
titiv
ely
awar
ded
FLTC
for
a m
inim
um o
f 2 w
eeks
us
ing
the
MFR
Off
icia
l Not
ices
web
site
A te
mpl
ate
for a
dver
tisem
ents
to c
ompe
titiv
ely
awar
d an
FLT
C is
ava
ilabl
e at
htt
p://
gww
.for.
gov.
bc.c
a/ht
h/tim
ten/
docu
men
ts/i
nter
med
iate
-sal
vage
-ex
ampl
eadv
ertis
ing-
for-
tend
ers.
doc.
1
Cou
lter
Cre
ek A
cces
s R
oad
Sp
ecia
l Use
Per
mit
an
d S
up
por
tin
g P
erm
its
Proj
ect
Com
pone
nt
Stat
ute/
Perm
it
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sult
atio
n Co
ntac
t Es
kay
Acc
ess
Road
Km
0-4
Bob
Qui
nn F
SR
Road
Use
Per
mit
FS10
9-R
UPA
pp.d
oc
M
aint
enan
ce A
gree
men
t with
Alta
Gas
FW R
oad
Use
A
gree
men
t.m
sg
No
A
lta G
as-L
oren
Kel
ly
FLRN
O-W
ill F
oste
r
Km 4
-43.
5 A
lta G
as S
UP
S253
18
Mai
nten
ance
Agr
eem
ent w
ith A
ltaG
as
Km 4
3.5-
54.6
(tur
noff
to
CCA
R)
1.) B
arri
ck G
old
SUP
reas
sign
men
t of
SUP
(with
the
SUP
hold
ers
agre
emen
t)
2.) M
aint
enan
ce A
gree
men
t for
Ba
rric
k G
old
N
o Se
abri
dge-
Jess
y Ch
aplin
54.6
km
to e
nd o
f new
co
nstr
uctio
n at
Mitc
hell
Cree
k Br
idge
88.
5 km
1.)
Coul
d be
an
amen
dmen
t to
exis
ting
Barr
ick
SUP
2.)
New
SU
P if
Barr
ick
SUP
in n
ot
reas
sign
ed
If
#2 (N
ew S
UP)
yes
FLN
RO-W
ill F
oste
r
Coul
ter C
reek
Acc
ess
Road
(C
CAR)
Th
e Fo
rest
Pra
ctic
es C
ode
of B
C an
d th
e Pr
ovin
cial
For
est U
se R
egul
atio
n ar
e th
e au
thor
izat
ion
for
the
Spec
ial
Use
Per
mit
(SU
P).
FW C
onfir
mat
ion
of
appr
opria
te p
erm
its in
Th
ere
will
be
4 O
LTC’
s fo
r KSM
1.
Cou
lter
Cree
k A
cces
s 2.
Tre
aty
Cree
k A
cces
s 3.
PTM
A-P
roce
ss P
lant
and
Tai
ling
Man
agem
ent A
rea
4.M
ine
Site
Pack
age
Publ
ic C
onsu
ltatio
n fo
r acc
ess,
SU
P an
d as
soci
ated
OLT
C’s
can
be d
one
at o
ne ti
me.
�
SUP
� O
LTC
MFR
Off
icia
l Not
ices
web
site
.1
FLRN
O-W
ill F
oste
r
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
O
ccup
ant L
icen
ce to
Cut
Fish
erie
s A
ct-R
evie
w S
UP
for
Pend
ing
Conf
irmat
ion
No
DFO
-Pat
Lim
FNR-2013-00423 Page 158FNR-2013-00423 Page 158
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
3 |
Pa
ge
oper
atio
nal s
tate
men
ts fo
r str
eam
cr
ossi
ng
Wor
ksaf
e BC
Act
- Not
ice
of F
ores
try
Ope
ratio
ns F
orm
ht
tp:/
/ww
w.w
orks
afeb
c.co
m/i
nsur
ance
/man
agin
g_yo
ur_a
cco
unt/
notic
e_of
_pro
ject
/def
ault.
asp
No
WSB
C Te
rrac
e
Wild
life
Act
- Wild
life
salv
age
and
rem
oval
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/pas
b/fw
_per
mre
g.ht
ml
No
PASB
-Con
tact
TBD
Unu
k Ri
ver
Brid
ge
Nav
igab
le W
ater
s Pr
otec
tion
Act
-N
avig
able
Str
eam
Cro
ssin
g
http
://w
ww
.tc.
gc.c
a/en
g/pa
cific
/mar
ine-
nwpp
-app
licat
ions
-13
37.h
tm
No
NW
P-Jo
hn M
acki
e
CCA
R La
ydow
n A
reas
, Log
La
ndin
gs a
nd B
orro
w A
reas
Th
e Fo
rest
Pra
ctic
es C
ode
of B
C an
d th
e Pr
ovin
cial
For
est U
se R
egul
atio
n ar
e th
e au
thor
izat
ion
for
the
Spec
ial
Use
Per
mit
(SU
P).
Thes
e ar
eas
are
to b
e w
ithin
the
SUP
boun
dary
sup
plie
d as
a
shap
e fil
e to
FLN
RO.
Mos
t of t
hese
are
as a
re w
ithin
the
75 m
RO
W.
Whe
re la
nd o
utsi
de o
f the
75
ROW
is r
equi
red,
it
is c
lear
ly id
entif
ied
on m
aps.
Yes,
to b
e in
clud
ed in
Cou
lter
Cree
k A
cces
s Ro
ad S
UP
appl
icat
ion
Pack
age
FLN
RO-W
ill F
oste
r
FNR-2013-00423 Page 159FNR-2013-00423 Page 159
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
4 |
Pa
ge
Cou
lter
Cre
ek C
onst
ruct
ion
Cam
ps
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t Ca
mp
#3 E
skay
Cre
ek M
ine
Site
Sta
ging
(50p
l)
Land
Act
–In
dust
rial
Lic
ence
of
Occ
upat
ion
ht
tp:/
/ww
w.a
gf.g
ov.b
c.ca
/cla
d/D
ocum
ents
/LPS
B/Po
licie
s/in
dust
rial
_gen
Ye
s ht
tp:/
/ww
w.fo
r.go
v.bc
.ca/
Land
_Ten
ures
/doc
um
ents
/cab
inet
/adv
ertis
ing.
Cam
Ben
tley
Drin
king
Wat
er P
rote
ctio
n A
ct-
Cons
truc
tion
Perm
it (H
20-C
) W
ater
Con
stru
ctio
n Pe
rmit
Proc
ess.
Indu
stria
l Cam
p R
equi
rem
ents
- H
ealth
NH
A A
pplic
atio
n fo
r W
ater
wor
ks C
onst
ruc
NH
A A
PPLI
CA
TIO
N
WA
TER
0504
14.p
dfN
HA
%20
App
licat
ion
%20
for%
20W
ater
wo
App
licat
ion
for
Hea
lth A
ppro
val.p
df
No
NH
A-S
hane
Wad
den
D
rinki
ng W
ater
Pro
tect
ion
Act
- Co
nstr
uctio
n Pe
rmit
(H20
-O)
Publ
ic H
ealth
Act
-Sew
age
Perm
it
10-4
60-3
038
- G
uidl
ines
for
Ind
ustr
ia
Publ
ic H
ealth
Act
-Foo
d Pe
rmit
Ope
ning
a N
ew F
ood
Prem
ise
NH
W
ater
Act
-Gro
undw
ater
Wel
l Re
gist
ratio
n
http
://w
ww
.env
.gov
.bc.
ca/w
sd/p
lan_
prot
ect_
sust
ain/
grou
ndw
ater
/ind
ex.h
tml
Envi
ronm
enta
l Man
agem
ent A
ct-
Ope
n Bu
rnin
g Re
quir
ed o
nly
if op
en b
urni
ng is
req
uire
d, 1
per
mit
can
be is
sued
fo
r min
e si
te.
http
://w
ww
.bca
irqu
ality
.ca/
topi
cs/b
urni
ng-o
utdo
ors.
htm
l ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/was
te_d
isch
arge
_aut
h/ap
p_fo
rms
/ind
ex.h
tm
No
MoE
- Jea
nien
Ca
rmod
y -Fa
llow
s
FNR-2013-00423 Page 160FNR-2013-00423 Page 160
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
5 |
Pa
ge
O
Ca
mp
#7 U
nuk
Nor
th (4
0pl)
Sam
e pe
rmit/
info
rmat
ion
requ
irem
ents
for
Cam
p #3
Esk
ay C
amp
Min
es S
ite
Cam
p #8
Unu
k Ri
ver
Stag
ing
(40p
l) Sa
me
perm
it/in
form
atio
n re
quir
emen
ts fo
r Ca
mp
#3 E
skay
Cre
ek M
ine
site
Sta
ging
Cam
p (5
0pl).
Tre
aty
Cree
k Co
nst
ruct
ion
Cam
ps
Cam
p #1
2 H
wy
37 (6
0pl)
Priv
ate
Agr
eem
ent (
Seab
ridge
inte
nds
to u
se e
xist
ing
cons
truc
tion
cam
ps a
long
Hig
hway
37,
and
will
mak
e ar
rang
emen
ts w
ith th
em).
Cam
p #1
1 Tr
eaty
Cre
ek
Mar
shal
ling
(60p
l) Sa
me
perm
it/in
form
atio
n re
quir
emen
ts fo
r Ca
mp
#3 E
skay
Cre
ek M
ine
site
Sta
ging
Cam
p (5
0pl).
*Min
us L
icen
ce o
f Occ
upat
ion,
this
cam
p is
to b
e pe
rmitt
ed u
nder
the
Min
es A
ct.
OLT
C th
at c
over
s th
e SU
P an
d LO
O w
ill c
over
the
cam
p lo
catio
n.
Tre
aty
Cree
k A
cces
s R
oad
Sp
ecia
l Use
Per
mit
an
d S
up
por
tin
g P
erm
its
Trea
ty C
reek
Acc
ess
Road
s (t
o Pl
ant S
ite a
nd T
reat
y Sa
ddle
Po
rtal
)
The
Fore
st P
ract
ices
Cod
e of
BC
and
the
Prov
inci
al F
ores
t Use
Re
gula
tion
are
the
auth
oriz
atio
n fo
r th
e Sp
ecia
l Use
Per
mit
(SU
P).
FW C
onfir
mat
ion
of
appr
opria
te p
erm
its in
Yes
FLRN
O-W
ill F
oste
r
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
O
ccup
ant L
icen
ce to
Cut
ht
tp:/
/ww
w.fo
r.go
v.bc
.ca/
dsi/
MTe
nure
s_Sa
lvag
e.ht
m#L
icen
se_t
o_C
ut-L
TC
Ther
e w
ill b
e 4
OLT
C’s
for K
SM
1. C
oulte
r Cr
eek
Acc
ess
2. T
reat
y Cr
eek
Acc
ess
3. P
TMA
-Pro
cess
Pla
nt a
nd T
ailin
g M
anag
emen
t Are
a 4.
Min
e Si
te
Wor
ksaf
e BC
Act
- Not
ice
of
Fore
stry
Ope
ratio
ns F
orm
ht
tp:/
/ww
w.w
orks
afeb
c.co
m/i
nsur
ance
/man
agin
g_yo
ur_a
ccou
nt/n
otic
e_of
_pro
ject
/def
ault.
asp
No
WSB
C Te
rrac
e
Wild
life
Act
- Wild
life
Salv
age
and
Rem
oval
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/pas
b/fw
_per
mre
g.ht
ml
No
PASB
Hig
hway
s A
ct-P
rovi
ncia
l Pub
lic
Hig
hway
Per
mit
App
licat
ion
- Co
nnec
tion
to H
wy
37
http
://w
ww
.th.
gov.
bc.c
a/pe
rmits
/H00
20.a
sp
No
MoT
I-She
rri
App
lega
te
Bell-
Irvi
ng R
iver
Bri
dge
Fish
erie
s A
ct (D
FO)-
Aut
horiz
atio
n of
Bel
l Irv
ing
Brid
ge c
ross
ing
Pe
ndin
g Co
nfirm
atio
n fr
om D
FO
? D
FO-P
at L
im
Fi
sher
ies
Act
(DFO
)- R
evie
w S
UP
for
Ope
ratio
nal S
tate
men
ts fo
r st
ream
cro
ssin
gs
Pend
ing
Conf
irmat
ion
from
DFO
?
Wat
er A
ct-N
otifi
catio
n (S
ectio
n 9)
ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/wsd
/wat
er_r
ight
s/lic
ence
_app
licat
ion/
No
FLRN
O-E
mily
Bu
lmer
FNR-2013-00423 Page 161FNR-2013-00423 Page 161
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
6 |
Pa
ge
sect
ion9
/
Und
er s
ectio
n 44
(2) o
f the
Wat
er R
egul
atio
n, a
n A
ppro
val o
r N
otifi
catio
n is
not
req
uire
d fo
r in
stre
am w
orks
rel
ated
to fo
rest
ac
tiviti
es w
here
a s
tand
ard
or re
gula
tion
exis
ts u
nder
the
Fore
st
and
Rang
e Pr
actic
es A
ct o
f Bri
tish
Colu
mbi
a. T
his
is p
rovi
ded
that
th
e ch
ange
is m
ade
by a
mun
icip
ality
or p
erso
n w
ho:
� ho
lds
an a
gree
men
t or
road
use
per
mit
unde
r the
For
est A
ct,
an a
gree
men
t und
er th
e Ra
nge
Act
, or a
spe
cial
use
per
mit
unde
r th
e Fo
rest
Pra
ctic
es C
ode
of B
ritis
h Co
lum
bia
Act
, or
N
avig
able
Wat
ers
Prot
ectio
n A
ct-
Nav
igab
le S
trea
m C
ross
ing
ht
tp:/
/ww
w.t
c.gc
.ca/
eng/
paci
fic/m
arin
e-nw
pp-a
pplic
atio
ns-
1337
.htm
N
o N
WP-
John
Mac
kie
Layd
own
Are
as, L
og L
andi
ngs
and
Borr
ow A
reas
Th
e Fo
rest
Pra
ctic
es C
ode
of B
C an
d th
e Pr
ovin
cial
For
est U
se
Regu
latio
n ar
e th
e au
thor
izat
ion
for
the
Spec
ial U
se P
erm
it (S
UP)
.
Thes
e ar
eas
are
to b
e w
ithin
the
SUP
boun
dary
sup
plie
d as
a
shap
e fil
e to
FLN
RO.
Mos
t of t
hese
are
as a
re w
ithin
the
75 m
RO
W.
Whe
re la
nd o
utsi
de o
f the
75
ROW
is r
equi
red,
it is
cle
arly
id
entif
ied
on m
aps.
No
FLRN
O-W
ill F
oste
r
Tran
smis
sion
Lin
e Ri
ght o
f W
ay
Land
Act
- Util
ity- L
icen
se o
f O
ccup
atio
n ht
tp:/
/ww
w.fo
r.go
v.bc
.ca/
Land
_Ten
ures
/ten
ure_
prog
ram
s/pr
ogr
ams/
utili
ties/
inde
x.ht
ml
Yes
FLN
RO-C
am
Bent
ley
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t Ca
mp
#5Tr
eaty
Pla
nt C
amp
(800
pl)
Min
es A
ct –
Perm
it ht
tp:/
/ww
w.e
mpr
.gov
.bc.
ca/M
inin
g/Pe
rmitt
ing-
Recl
amat
ion/
Page
s/de
faul
t.as
px
Yes
MEM
-Dia
ne H
owe
Fo
rest
and
Ran
ge P
ract
ices
Act
–
Occ
upan
t Lic
ence
to C
ut
http
://w
ww
.for.
gov.
bc.c
a/ds
i/M
Tenu
res_
Salv
age.
htm
#Lic
ense
_to
_Cut
-LTC
T
here
will
be
4 O
LTC’
s fo
r KSM
1.
Cou
lter
Cree
k A
cces
s 2.
Tre
aty
Cree
k A
cces
s 3.
PTM
A-P
roce
ss P
lant
and
Tai
ling
Man
agem
ent A
rea
4.M
ine
Site
Yes
FLRN
O-W
ill F
oste
r
Envi
ronm
enta
l Man
agem
ent A
ct-
Mun
icip
al W
aste
wat
er
Regu
latio
n
FW c
amps
EM
A
perm
ittin
g sp
ecifi
catio
No
MoE
- Jea
nien
Ca
rmod
y -Fa
llow
s
Envi
ronm
enta
l Man
agem
ent A
ct-
http
://w
ww
.env
.gov
.bc.
ca/e
pd/m
un-w
aste
/was
te-
No
FNR-2013-00423 Page 162FNR-2013-00423 Page 162
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
7 |
Pa
ge
Was
te D
isch
arge
(Lan
dfill
) so
lid/l
andf
ills/
crite
ria-la
ndfil
ls.h
tm
En
viro
nmen
tal M
anag
emen
t Act
-W
aste
Dis
char
ge (I
ncin
erat
or)
http
://w
ww
.env
.gov
.bc.
ca/e
pd/w
aste
_dis
char
ge_a
uth/
app_
form
s/i
ndex
.htm
FW F
ollo
w u
p to
Pr
e-re
gist
ratio
n M
eet
� A
pub
lic n
otic
e of
app
licat
ion
to b
e pl
aced
in th
e BC
Gaz
ette
and
loca
l new
s m
edia
�
30 d
ay p
ublic
not
ifica
tion
peri
od
� A
pplic
atio
n fe
es (c
onta
ct n
eare
st
Min
istr
y Re
gion
al O
ffic
e)
� A
fina
l Tec
hnic
al A
sses
smen
t Rep
ort m
ay
be r
equi
red
� Co
nsul
tatio
n Re
port
D
rinki
ng W
ater
Pro
tect
ion
Act
- Co
nstr
uctio
n Pe
rmit
(H20
-C)
See
Cam
p #3
Esk
ay C
reek
Min
e si
te S
tagi
ng C
amp
(50p
l) fo
r pe
rmit/
info
rmat
ion
requ
irem
ents
.
Drin
king
Wat
er P
rote
ctio
n A
ct-
Cons
truc
tion
Perm
it (H
20-O
) Pu
blic
Hea
lth A
ct-F
ood
Perm
it W
ater
Act
-Gro
undw
ater
Wel
l Re
gist
ratio
n
Cam
p #6
Tre
aty
Sadd
le C
amp
(120
pl)
Sam
e re
quir
emen
ts a
s ab
ove:
Cam
p#5
Trea
ty P
lant
Cam
p pl
us
Cam
p #6
: Tre
aty
Sadd
le r
equi
res
a Li
cenc
e of
Occ
upat
ion
whi
ch is
und
er r
evie
w s
ince
Sep
t 20,
201
2. L
ands
File
No:
640
8448
W
ater
Act
-Not
ifica
tion
(Sec
tion
9)
http
://w
ww
.env
.gov
.bc.
ca/w
sd/w
ater
_rig
hts/
licen
ce_a
pplic
atio
n/se
ctio
n9/
No
FLRN
O-E
mily
Bul
m
Bat
ch 1
Min
e Si
te &
Pro
cess
ing
and
Tai
lin
g M
anag
emen
t A
rea
(PT
MA
) Li
mit
ed S
ite
Con
stru
ctio
n
Proj
ect C
ompo
nent
St
atut
e/Pe
rmit
Com
men
ts/R
equi
rem
ents
Pu
blic
Con
sulta
tion?
Co
ntac
t La
ydow
n A
reas
, Log
Lan
ding
s an
d Bo
rrow
Are
as
Min
e Si
te ti
mbe
r cle
arin
g
PTM
A ti
mbe
r cle
arin
g
Min
e Si
te ro
ad c
onst
ruct
ion
PTM
A S
ite r
oad
cons
truc
tion
Min
es A
ct –
M -
Perm
it O
ne P
erm
it fo
r KSM
Pro
ject
incl
udin
g th
e M
ine
Site
and
PTM
A-
Proc
ess
Plan
t and
Tai
ling
Man
agem
ent A
rea
http
://w
ww
.em
pr.g
ov.b
c.ca
/Min
ing/
Perm
ittin
g-Re
clam
atio
n/Pa
ges/
defa
ult.
aspx
Yes
MEM
-Dia
ne H
owe
Fore
st a
nd R
ange
Pra
ctic
es A
ct –
O
ccup
ant L
icen
ce to
Cut
O
ne O
LTC
Amen
dmen
t for
Min
e Si
te a
nd o
ne O
LTC
Amen
dmen
t fo
r PTM
A
Ther
e w
ill b
e 4
OLT
C’s
for K
SM
1. C
oulte
r Cr
eek
Acc
ess
2. T
reat
y Cr
eek
Acc
ess
3. P
TMA
-Pro
cess
Pla
nt a
nd T
ailin
g M
anag
emen
t Are
a
Yes
FLN
RO-W
ill F
oste
r
FNR-2013-00423 Page 163FNR-2013-00423 Page 163
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
8 |
Pa
ge
Min
e Si
te C
amps
: Ca
mp
#2: T
ed M
orri
s Ca
mp
#4: M
itche
ll N
orth
Ca
mp
#9/1
0: M
itche
ll in
itial
/sec
onda
ry
Cam
p
Wat
er S
tora
ge D
am (W
SD)
site
pre
para
tion
(in th
e M
ine
Site
)
Mitc
hell-
Trea
ty T
win
ned
Tunn
els
(MTT
) Mitc
hell
Port
als
cons
truc
tion
(in th
e M
ine
Site
)
MTT
Tre
aty
Port
als
cons
truc
tion
(in th
e PT
MA
)
MTT
Tre
aty
Sadd
le P
orta
l co
nstr
uctio
n (a
t the
Tre
aty
Sadd
le)
4.M
ine
Site
EM
A-W
aste
Dis
char
ge
One
EM
A P
erm
it fo
r Min
e Si
te a
nd P
TMA
CON
RETE
PLA
NTS
– a
re th
ey p
lann
ed a
nd w
here
?
REQ
UIR
E RE
GIS
TRA
TIO
N U
ND
ER C
ON
CRET
E CO
DE
– do
esn’
t hav
e to
be
done
with
Con
curr
ent –
but n
eed
to g
et d
one
earl
y in
co
nstr
uctio
n ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/was
te_d
isch
arge
_aut
h/re
gist
ratio
n/in
dex.
htm
E
NV
IRO
NM
EN
TAL
MAN
AG
EM
EN
T A
CT
- app
licat
ions
with
re
quire
d ap
plic
atio
n fe
es ($
200
per a
pplic
atio
n ) t
o be
sen
t to:
Env
ironm
enta
l Man
agem
ent B
ranc
h M
inis
try O
f Env
ironm
ent
PO
Box
937
7 S
tn P
rov
Gov
t V
icto
ria, B
C V
8W 9
M1
Or D
ELI
VE
R b
y co
urie
r to:
3r
d Fl
oor,
2975
Jut
land
Roa
d, V
icto
ria, B
C V
8T 5
J9
Yes-
One
Pub
lic C
onsu
ltatio
n Pa
ckag
e fo
r M
ine
Site
�
A p
ublic
not
ice
of a
pplic
atio
n to
be
plac
ed in
the
BC G
azet
te a
nd lo
cal n
ews
med
ia
� 30
day
pub
lic n
otifi
catio
n pe
riod
**
Any
requ
irem
ents
for
publ
ic c
onsu
ltatio
n fr
om th
e EA
are
dup
licat
ed fo
r an
y EM
A
appl
icat
ions
.
FW F
irst
Nat
ions
C
onsu
ltatio
n w
ith E
MA
� A
pub
lic n
otic
e of
app
licat
ion
to b
e pl
aced
in th
e BC
�
Gaz
ette
and
loca
l new
s m
edia
�
30 d
ay p
ublic
not
ifica
tion
peri
od
� A
pplic
atio
n fe
es (c
onta
ct n
eare
st M
inis
try
Regi
onal
Off
ice)
�
A fi
nal T
echn
ical
Ass
essm
ent R
epor
t may
be
req
uire
d Co
nsul
tatio
n Re
port
MoE
-Jea
nien
Ca
rmod
y -Fa
llow
s
Min
ing
Leas
e –
for t
he M
ine
Site
Min
ing
Leas
e -f
or th
e PT
MA
Min
eral
Ten
ures
Act
-Min
ing
Leas
e fo
r th
e M
ine
Site
App
licat
ion
unde
r re
view
sin
ce M
arch
200
9.
In p
rogr
ess
Min
eral
Ten
ures
Br
anch
-–Tr
acy
Mar
tin
Min
eral
Ten
ures
Act
-Min
ing
Leas
e to
be
appl
ied
for t
he P
TMA
Min
eral
Ten
ures
Br
anch
–Tr
acy
Mar
tin
r
Min
e A
rea
- Non
-Con
tact
W
ater
Act
and
the
Wat
er
http
://w
ww
.env
.gov
.bc.
ca/w
sd/w
ater
_rig
hts/
licen
ce_a
pplic
atio
n/N
o FL
RNO
-Em
ily
FNR-2013-00423 Page 164FNR-2013-00423 Page 164
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
9 |
Pa
ge
Div
ersi
ons
PTM
A –
Non
-con
tact
di
vers
ions
Prot
ectio
n A
ct-W
ater
Lic
ence
in
dex.
htm
l N
on-c
onta
ct d
iver
sion
s ar
ound
the
Min
e Si
te a
nd P
TMA
do
requ
ire
appr
oval
s.
Wor
ks T
hat D
o N
ot R
equi
re a
n A
ppro
val o
r Not
ifica
tion
Und
er s
ectio
n 44
(2) o
f the
Wat
er R
egul
atio
n, a
n A
ppro
val o
r N
otifi
catio
n is
not
req
uire
d fo
r in
stre
am w
orks
rel
ated
to fo
rest
ac
tiviti
es w
here
a s
tand
ard
or re
gula
tion
exis
ts u
nder
the
Fore
st
and
Rang
e Pr
actic
es A
ct o
f Bri
tish
Colu
mbi
a. T
his
is p
rovi
ded
that
th
e ch
ange
is m
ade
by a
mun
icip
ality
or p
erso
n w
ho:
• ho
lds
an a
gree
men
t or
road
use
per
mit
unde
r the
For
est A
ct, a
n ag
reem
ent u
nder
the
Rang
e A
ct, o
r a s
peci
al u
se p
erm
it un
der
the
Fore
st P
ract
ices
Cod
e of
Brit
ish
Colu
mbi
a A
ct, o
r
• is
aut
hori
zed
to c
onst
ruct
or m
odify
a r
oad
unde
r th
e Co
al A
ct,
the
Geo
ther
mal
Res
ourc
es A
ct, t
he M
ines
Act
, the
Min
ing
Righ
t of
Way
Act
or
the
Petr
oleu
m a
nd N
atur
al G
as A
ct.
Und
er s
ectio
n 44
(3) o
f the
Wat
er R
egul
atio
n a
chan
ge m
ay a
lso
be m
ade
in a
nd a
bout
a s
trea
m b
y a
pers
on w
ho h
olds
a p
erm
it un
der
sect
ion
10 o
f the
Min
es A
ct, w
ithou
t obt
aini
ng a
n A
ppro
val
or N
otifi
catio
n, if
the
pers
on c
ompl
ies
with
: •
Part
11
of th
e H
ealth
, Saf
ety
and
Recl
amat
ion
Code
for M
ines
in
Briti
sh C
olum
bia,
and
•
All
cond
ition
s in
the
perm
it re
spec
ting
chan
ges
in a
nd a
bout
a
stre
am.
Bulm
er
Land
Fill
and
Con
tam
inat
ed
Soils
Lan
d Fa
rm
� M
ine
Site
�
PTM
A
Envi
ronm
enta
l Man
agem
ent A
ct-
Was
te D
isch
arge
(Lan
dfill
) ht
tp:/
/ww
w.e
nv.g
ov.b
c.ca
/epd
/mun
-was
te/w
aste
-so
lid/l
andf
ills/
crite
ria-la
ndfil
ls.h
tm
Yes
MoE
-Jea
nien
Ca
rmod
y -Fa
llow
s
Tem
pora
ry E
xplo
sive
Sto
rage
at
the
Min
e Si
te
Tem
pora
ry E
xplo
sive
Sto
rage
BC M
ines
Act
– E
xplo
sive
s St
orag
e an
d U
se P
erm
it
BC M
ines
Act
and
Reg
ulat
ions
(HSR
CBC,
200
8) re
quire
s us
ers
to
appl
y an
nual
ly fo
r an
exp
losi
ves
stor
age
and
use
perm
it
No
Reg
iona
l Min
es
Off
ice
– D
oug
Flyn
n, S
cott
Par
ker
FNR-2013-00423 Page 165FNR-2013-00423 Page 165
KSM
Con
curr
ent P
erm
ittin
g Ph
ase
I (KS
M L
imite
d Si
te C
onst
ruct
ion)
10 |
Pa
ge
at th
e PT
MA
Perm
anen
t Exp
losi
ve F
acto
ry
at th
e M
ine
Site
Ex
plos
ives
Act
- Ex
plos
ives
Fa
ctor
y Li
cenc
e
http
://w
ww
.nrc
an.g
c.ca
/min
eral
s-m
etal
s/ex
plos
ives
/375
2
Thro
ugh
the
Expl
osiv
es R
egul
ator
y D
ivis
ion,
ESS
B pr
ovid
es
serv
ices
and
sup
port
to th
e m
embe
rs o
f the
exp
losi
ves
indu
stry
in
clud
ing
man
ufac
ture
rs, t
rans
port
ers,
impo
rter
s, s
elle
rs a
nd
user
s of
exp
losi
ves.
N
R Ca
n-M
elan
ie
Cam
pbel
l
Wat
er T
reat
men
t Fac
ility
–
disc
harg
e at
the
Min
e Si
te
Inte
rnat
iona
l Riv
er
Impr
ovem
ents
Act
-IRIA
Lic
ence
ht
tp:/
/ww
w.e
c.gc
.ca/
Publ
icat
ions
/def
ault.
asp?
lang
=En&
xml=
529
428D
8-8E
9B-4
F5E-
9BD
5-81
2723
95F9
E7
Yes
Env
Can-
June
Yoo
Ri
fkin
Mit
chel
l-T
reat
y T
win
Tu
nn
el
Mitc
hell-
Trea
ty T
win
Tun
nel
Land
s A
ct –
Lic
ence
of
Occ
upat
ion
App
licat
ion
subm
itted
thro
ugh
Fron
t Cou
nter
BC
Sept
embe
r,
2012
. Th
is a
pplic
atio
n w
ill b
e re
view
ed a
nd p
roce
ssed
as
part
of
Phas
e 1
perm
its.
Yes
Cam
Ben
tley
FNR-2013-00423 Page 166FNR-2013-00423 Page 166
KSM direct correspondence
Appliaction: Electronic/ Hardcopy/ Both
Spatial: ShapefileYes or No
Name
To Hardcopy & Electronic Al Hoffman
To Electronic Diane Howe
To Electronic Kim Bellefontaine
To Electronic Tanya Demchuck
To Electronic Heather Narynski
To Electronic George Warnock
To Electronic Kathie Wagar
To Electronic Ian Sharpe
To Electronic YesJeanien Carmody-
Fallows To Electronic Scott JacksonTo Electronic Craig Stewart
To Electronic Regan Fielding
To Electronic Patrick Williston
To Electronic Yes Jennifer Stalker
To Electronic No Chris Schell
To Electronic Yes Cam Bentley
To Electronic No Emily Bulmer
No
No
Ministry of Forests
M
Ministry o
FNR-2013-00423 Page 167FNR-2013-00423 Page 167
To Electronic Yes Eric Forgeng
To Will Foster
CC Ron Donnelly
CC Matt Sakals
CC Howard Debeck
To Rosemary Barnewall
CC Sherrie Applegate
To Electronic No Tara Marsden
To Electronic No Frederic Tolmie
To Electronic No Tracey McKayTo Electronic Yes Mansell Griffin
To Chief Darlene Simpson
Electronic X2 Hardcopy Yes
Ministry of
Electronic No
FNR-2013-00423 Page 168FNR-2013-00423 Page 168
To Both No Nalaine Morin
To Garett Cooper
To June Yoo Rifkin
To Jessica Coulson
To Electronic NoMelanie Campbell
To Both No John Mackie
To Both No Pat Lim
CC Electronic YesKyle Moselle
To Andrew Webber
To Shane WaddenBoth No
Canadian En
N
Region
Alaska De
Depart
FNR-2013-00423 Page 169FNR-2013-00423 Page 169
Title Contact email address Phone Number
Chief Inspector of Mines [email protected] 250-952-0494
Deputy Chief Inspector [email protected] 250-952-0183Sr. Environmental
Geoscientist [email protected] 250-952-0489
Sr. Environmental Geoolgist
[email protected] 250-952-0417
Geotechnical Inspector [email protected] 250-387-0883
Geotechnical Engineering Manager
[email protected] 250-565-4327
Director -Northwest Regional Mines Office
[email protected] 250-847-7653
Regional Manager [email protected] 250-847-7251Environmental Protection
[email protected] 250-847-7273
Regional Hydrologist [email protected] 250-847-7507Compliance Specialist [email protected] 250-847-7416
Environmental Protection Officer
[email protected] 250-847-7353
Impact Assessment Biologist
[email protected] 250-847-7454
Project Manager [email protected] 250-847 -506
Sr. Ecosystems Biologist [email protected] 250 847-7389
Land Tenures Specialist [email protected] 250-847-7388
Water Stewardship Officer
Emily,[email protected] 250-847-7350
, Lands and Natural Resource Operations
Ministry of Environment
of Energy, Mines and Natural Gas
FNR-2013-00423 Page 171FNR-2013-00423 Page 171
Heritage Resource Specialist
[email protected] 250-953-3362
Resource Tenure Specialist
[email protected] 250-847-6309
Tenures Forester/Engineering
[email protected] 250-847-6378
Research Geomorphologist
[email protected] 250-847-6322
Field Engineer [email protected] 250-847-6397
District Program Manager [email protected] 250-847-7404
Senior Development Approvals
[email protected] 250-847-7396
Gitanyow Huwilp Lax'yip Implementation
[email protected] 250- 849-5373
Chief Executive Officer [email protected] 250-633-3002
Lands Manager [email protected] 250-633-3000Lands Manager [email protected] 250-633-3000
Chief 250-842-5651
Transportation and Infastructure
Tahltan
Skii km Lax Ha
Nisga'a Nation
Gitanyow
FNR-2013-00423 Page 172
s.22
FNR-2013-00423 Page 172
Chair 778- 834-6292
Project Manager [email protected] 604-666-3688
Sr.Air Quality Planner [email protected] 604-666-7829
Team Leader [email protected] 613-947-1591Senior Policy Analyst [email protected] 613-995-6971
Major Projects Management Officer
[email protected] 604-775-8890
Environmental Analyst [email protected] 604-666-6529
Large Project Coordinator [email protected] 907-465-6849
Manager Planning and Economic Development
[email protected] 250-615-6100
Public Health Protection [email protected] 250-847-6410
Northern Health
Environment Canada
nvironmental Assessment Agency
atural Resouces Canada
nal District of Kitimat-Stikine
epartment of Natural Resource
ment of Fisheries and Oceans
Transport Canada
FNR-2013-00423 Page 173
s.22
FNR-2013-00423 Page 173
Contact Address
Chief Inspectors Office6th Floor 1810 Blanshard
Victoria, BC V8W 9N3
Same as above
Same as above
Same as above
Same as above
Suite 350 - 1011 4th Avenue
Prince George, BC V2L 3H9
3726 Alfred AvenueSmithers BC
V0J 2N0
Same as above
Same as above
Same as aboveSame as above
Same as above
Same as above
Same as above
Same as above
Same as above
Same as above
FNR-2013-00423 Page 175FNR-2013-00423 Page 175
#3 - 1250 Quadra StreetPO BOX 9816 STN PROV
GOVTVictoria BC V8W 2K7
3333 Tatlow RoadSmithers BC
V0J 2N0
Same as above
Same as above
Same as above
3726 Alfred Avenue Smithers, BC
V0J 2N0
Same as above
Gitanyow Hereditary Chiefs
PO Box 148Kitwanga, BC V0J 2A0
PO Box 321, 2000 Lisims Government
New Aiyansh, BC V0J 1A0
Same as aboveSame as above
Chief Darlene SimpsonSkii km Lax Ha
Box 17Hazelton, BC V0J 1Y0
Please phone for pick up: 250-842-5651
FNR-2013-00423 Page 176FNR-2013-00423 Page 176
Tahltan Central CouncilPO Box 69
Dease Lake, BC V0C 1L0
Navigable Waters Protection ProgramTransport Canada
Suite 620 - 800 Burrard Street
Vancouver BC V6Z 2J8
Ecosystem Management Branch Pacific Region Fisheries and Oceans
Canada Suite 200, 401 Burrard
Street Vancouver, BC V6C 3S4
400 Willoughby Ave. Ste. 400 Juneau, AK 99801
Suite 3004545 Lazelle Avenue
Terrace, B.C.V8G 4E1
Northern Health Suite 600, 299 Victoria St.
Prince George, BC,
FNR-2013-00423 Page 177FNR-2013-00423 Page 177
Muir, Deanna CSNR:EX
Subject:
Start: End:
Recurrence:
Organizer:
From: Sent: To: Cc: Subject:
Hi Jessy,
Application Distribution ListiShapefiles
Thu 2013-04-25 8:00 AM Thu 2013-04-25 8:30 AM
(none)
Paterson, Genevieve FLNR:EX
Paterson, Genevieve FLNR:EX Thursday, April 25, 2013 10:05 AM 'Jessy Chaplin' Stalker, Jennifer L FLNR:EX Application Distribution List!Shapefiles
Here is the updated distribution list.
Still waiting to hear back from Garret, will let you know his preference once I hear back from him.
In preparation for lands application submissions, Front Counter wanted me to pass on these notes on application requirements: .
• Need shapefile of the exact footprint of the application, not the entire project.
• In the case where an area needs access, we also need the road to be part of the application.
• If there is a permit or tenure for the access already, please indicate in the application.
Thanks,
C;~ PMvr5-01'V Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
FNR-2013-00423 Page 179FNR-2013-00423 Page 179
Muir, Deanna CSNR:EX
Subject:
Start: End:
Recurrence:
Organizer:
From: Sent: To:
Cc: Subject:
Hi,
RE: KSM Project: Tues May 28 --uploading permit applications to Sharepoint
Tue 2013-05-28 8:00 AM Tue 2013-05-28 8:30 AM
(none)
Paterson, Genevieve FLNR:EX
Paterson, Genevieve FLNR:EX Tuesday, May 28, 2013 10:11 AM
Jessy Chaplin; Stalker, Jennifer L FLNR:EX Rolf Schmitt (ERM-Rescan); [email protected]: 'Elizabeth Miller'
RE: KSM Project: Tues May 28 --uploading permit applications to Sharepoint
If you could please forward me the applications I will ensure they are uploaded to the appropriate venue (sharepoint) for the MRC to review.
You can send me the applications via FTP site or USB, I will leave it up to you and your team to decide what will be most convenient.
Thanks,
GP
Sent from my iPhone using Mail+ for Outlook
From: Jessy Chaplin Sent: 2013-05-28 8:56 AM To: Stalker, Jennifer L FLNR:EX Cc: [email protected], Rolf Schmitt (ERM-Rescan), [email protected], 'Elizabeth Miller' Subject: KSM Project: Tues May 28 --uploading permit applications to Sharepoint
Hi Jen and Gen,
1 FNR-2013-00423 Page 180FNR-2013-00423 Page 180
Just wondering if you got the sharepoint questions sorted out, Rescan is ready to start uploading electronic permit application files directly to the Sharepoint. Who do we speak to at Government to get access to the Sharepoint?
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc.
1235 Main Street
. P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell .
2 FNR-2013-00423 Page 181
s.22
FNR-2013-00423 Page 181
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
Categories:
From: Sent: To: Cc: Subject: Attachments:
Categories:
Hi Jen,
FW: Table - Limited Site Construction Permits
Tue 2013-05-28 12:00 AM Wed 2013-05-29 12:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Input for Comm TO
Jessy Chaplin [[email protected] Tuesday, May 28, 2013 4:54 PM Stalker, Jennifer L FLNR:EX Paterson, Genevieve FLNR:EX; 'Rolf Schmitt' FW: Table - Limited Site Construction Permits Table - Limited Site Construction Permit List_to be embedded.pdf; Table - Limited Site Construction Permit List_to be embedded.docx
Input for Comm TO
The KSM Batch 1 permit list in Word as you requested.
Thanks
Jessy
Jessy Chaplin, MSc. RP,Bio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
1 FNR-2013-00423 Page 182
s.22
FNR-2013-00423 Page 182
From: Rolf Schmitt [mailto:[email protected]] Sent: Tuesday, May 28,20134:31 PM To: [email protected] Subject: Table - Limited Site Construction Permits
Rolf Schmitt, M.Sc., P.Geo
Director
Rescan Environmental Services Ltd. an ERM company
Sixth Floor 11111 West Hastings Street
Vancouver I BC 1 Canada 1 V6E 2J3
Description: cid:[email protected] +1 6046899460
Description: cid:[email protected] +1 778628 1840
Description: cid:[email protected] [email protected]
Description: cid: image004. jpg@01 C E4 7E7. 984095BO
Description: cid: image005. jpg@01 C E4 7E7. 984095BO
www.erm.comIThe world's leading sustainability consultancy.
P Please consider the environment before printing .
. This message contains information which may be confidential, proprietary, privileged, or otherwise protected by law from disclosure or use by a third party. If you have received this message in error, please notify the sender immediately and take the steps necessary to delete the message completely from your computer system. Any other use of this e-mail is prohibited. Thank you.
2 FNR-2013-00423 Page 183FNR-2013-00423 Page 183
<SET CLIENT NAME IN CUSTOM PROPERTIES> 1
KSM Limited Site Construction Permit List: Final - May 28, 2013
Application
Date Permit Application Legislation status
10-Dec-09 Mining Lease KSM Claims Mineral Tenure Act in progress
29-May-12 Mineral Tenures Act - Conditional Registration Reserve for Mitchell-Treaty Tunnel alignment
Mineral Tenure Act in progress
Sept 21 2012 Land Act Licence of Occupation for Statutory right-of-way along the MTT alignment from Mitchell Valley to
Plant Site, including Treaty Saddle Camp #6
Land Act in progress
# of permits Permit Office Permit Application Legislation status
1 District S-S CCAR - Forest Practices Code of BC Act Special Use Permit (SUP) - Coulter Cr Access Road (CCAR) from
Eskay turnoff to Mine Site
Forest Practices of BC Act submitted May 28 2013
2 District S-S CCAR - Forest Act Occupant Licence to Cut (OLTC) - for (CCAR right of way, Camp 3: Eskay Staging Camp,
Camp 7: Unuk North, Camp 8: Unuk South, Mitchell Operating Camp)
Forest Act submitted May 28 2013
3 District S-S TCAR - Forest Practices Code of BC Act Special Use Permit (SUP) - Treaty Creek Access Road (TCAR) from
Highway 37 to Plant Site
Forest Practices of BC Act submitted May 28 2013
4 District S-S TCAR Forest Act Occupant Licence to Cut (OLTC) - for (TCAR right of way, Camp 11: Treaty Marshalling Yard,
Camp 6: Treaty Saddle)
Forest Act submitted May 28 2013
5 MOTI -Skeena TCAR - Highways Act Provincial Public Highway Permit Application - connection to Highway 37
Highways Act submitted May 28 2013
6 FrontCounter BC
Land Act Licence of Occupation for Treaty Transmission Line - right-of-way parallel to the Treaty
Creek SUP to the Plant Site
Land Act submitted May 28 2013
7 MEMNG - Skeena
KSM Project Mines Act (MA) and Environmental Management Act (EMA) Permit Application for Limited
Site Construction
Mines Act submitted May 28 2013
8 MOE - Skeena KSM Project Mines Act (MA) and Environmental Management Act (EMA) Permit Application for Limited
Site Construction
Environmental Management Act
submitted May 28 2013
9 MOE - Skeena Mine Site Landfill & Landfarm - EMA Refuse (Solid Waste) Discharge Permit
Environmental Management Act
submitted May 28 2013
10 MOE - Skeena PTMA Landfill & Landfarm - EMA Refuse (Solid Waste) Discharge Permit
Environmental Management Act
submitted May 28 2013
11 NHA Camp 2: Ted Morris Camp (80 persons) - Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
12 NHA Camp 2: Ted Morris Camp (80 persons) - Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
13 NHA Camp 2: Ted Morris Camp (80 persons) - Sewage Permit and Filing of Certification Letter (PHA-S) for camps
<100 people
Public Health Act submitted May 28 2013
14 FrontCounter BC
Camp 3: Eskay Staging Camp (50 pers) Licence of Occupation - Industrial Camp
Land Act submitted May 28 2013
15 NHA Camp 3: Eskay Staging Camp (50 pers) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
16 NHA Camp 3: Eskay Staging Camp (50 pers) Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
FNR-2013-00423 Page 184FNR-2013-00423 Page 184
2RESCAN ENVIRONMENTAL SERVICES LTD. (PROJ#<CUSTM PROPERTY>/REV <CUSTM PROPERTY>) <MONTH YYYY CUSTM PROPERTY>
17 NHA Camp 3: Eskay Staging Camp (50 pers) Sewage Permit and Filing of Certification Letter (PHA-S) for camps
<100
Public Health Act submitted May 28 2013
18 NHA Camp 4: Mitchell North (125 pers) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
19 NHA Camp 4: Mitchell North (125 pers) Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
20 MOE Camp 4: Mitchell North (125 pers) Sewage Permit - EMA, MWR
Environmental Management Act, Municipal
Wastewater Regulation
submitted May 28 2013
21 FrontCounter BC
Camp 4: Mitchell North (125 pers) Water Licence Purpose: Work Camps (02137)
Water Act and Water Protection Act
submitted May 28 2013
22 MOE - Skeena Camp 4: Mitchell North (125 pers) EMA- Waste Management Permit - Air (incinerators at camps
>100 persons)
Environmental Management Act, Waste
Discharge Regulation
submitted May 28 2013
23 NHA Camp 5: Treaty Plant (800 pers) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
24 NHA Camp 5: Treaty Plant (800 pers)Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
25 MOE Camp 5: Treaty Plant (800 pers) Sewage Permit - EMA, MWR
Environmental Management Act, Municipal
Wastewater Regulation
submitted May 28 2013
26 MOE Camp 5: Treaty Plant (800 pers) EMA- Waste Management Permit - Air (incinerators at camps
>100 persons)
Environmental Management Act, Waste
Discharge Regulation
submitted May 28 2013
27 NHA Camp 6: Treaty Saddle (120 pers) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
28 NHA Camp 6: Treaty Saddle (120pers) Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
29 MOE Camp 6: Treaty Saddle (120 pers) Sewage Permit Environmental Management Act, Municipal
Wastewater Regulation
submitted May 28 2013
30 FrontCounter BC
Camp 6: Treaty Saddle (120 pers) Water Licence Purpose: Work Camps (02137)
Water Act and Water Protection Act
submitted May 28 2013
31 MOE Camp 6: Treaty Saddle (120 pers) EMA- Waste Management Permit - Air (incinerators at camps
>100 persons)
Environmental Management Act, Waste
Discharge Regulation
submitted May 28 2013
32 NHA Camp 7: Unuk North (40 pers) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
33 NHA Camp 7: Unuk North (40 pers) Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
34 NHA Camp 7: Unuk North (40 pers) Sewage Permit and Filing of Certification Letter (PHA-S) for camps <100 people
Public Health Act submitted May 28 2013
35 FrontCounter BC
Camp 7: Unuk North (40 pers) Licence of Occupation (combined with Camp 8: Unuk South)
Land Act submitted May 28 2013
36 NHA Camp 8: Unuk South (40 pers) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
37 NHA Camp 8: Unuk South (40 pers) Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
38 NHA Camp 8: Unuk South (40 pers) Sewage Permit and Filing of Certification Letter (PHA-S) for camps <100 people
Public Health Act submitted May 28 2013
39 NHA Camp 9: Mitchell Initial (140 pers) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
FNR-2013-00423 Page 185FNR-2013-00423 Page 185
<SET CLIENT NAME IN CUSTOM PROPERTIES> 3
40 NHA Camp 9: Mitchell Initial (140 pers) Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
41 MOE Camp 9: Mitchell Initial (140 pers) and Camp 10: Mitchell Secondary - Sewage Permit – EMA MWR
Environmental Management Act, Municipal
Wastewater Regulation
submitted May 28 2013
42 MOE Camp 9: Mitchell Initial (140 pers) and Camp 10: Mitchell Secondary - EMA Waste Management Permit -
Air (incinerators at camps >100 persons)
Environmental Management Act, Waste
Discharge Regulation
submitted May 28 2013
43 NHA Camp 10: Mitchell Secondary (400 pers) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
44 NHA Camp 10: Mitchell Secondary (400 pers)Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
45 NHA Camp 11: Treaty Marshalling (60 pers) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
46 NHA Camp 11: Treaty Marshalling (60 pers) Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
47 NHA Camp 11: Treaty Marshalling (60 pers) Sewage Permit and Filing of Certification Letter (PHA-S) for camps
<100 per
Public Health Act submitted May 28 2013
48 FrontCounter BC
Mitchell Operating Camp (350 pers) Licence of Occupation
Land Act submitted May 28 2013
49 NHA Mitchell Operating Camp (350 pers) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
50 NHA Mitchell Operating Camp (350 pers) Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
51 MOE Mitchell Operating Camp (350 pers) Sewage Permit – EMA MWR
Environmental Management Act, Municipal
Wastewater Regulation
submitted May 28 2013
52 MOE Mitchell Operating Camp (350 pers)- EMA Waste Management Permit - Air (incinerators at camps
>100 persons)
Environmental Management Act, Waste
Discharge Regulation
submitted May 28 2013
53 NHA Treaty Operations Camp (250 persons) Construction Permit (H20-C)
Drinking Water Protection Act and Regulation
submitted May 28 2013
54 NHA Treaty Operations Camp (250 persons) Operating Permit (H20-O)
Drinking Water Protection Act and Regulation
submitted May 28 2013
55 MOE Treaty Operations Camp (250 persons) Sewage Permit – EMA MWR
Environmental Management Act, Municipal
Wastewater Regulation
submitted May 28 2013
FNR-2013-00423 Page 186FNR-2013-00423 Page 186
Muir, Deanna CSNR:EX
Subject: Seabridge - FTP (Applications for uploading)
Start: End: Show Time As:
Recurrence:
Organizer:
Tue 2013-05-2812:00 AM Wed 2013-05-2912:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
From: Jessy Chaplin [mallto:[email protected]] Sent: Tuesday, May 28, 2013 4:53 PM To: Stalker, Jennifer L FLNR:EX Cc: Paterson, Genevieve FLNR:EX; [email protected]; Brent Murphy; 'Rolf Schmitt'; 'Ann Danllevich'; Clem Pelletier Subject: RE: KSM Project: Tues May 28 - uploading permit applications on FTP
Dear Jen Stalker,
Sea bridge is pleased to inform you that the Concurrent Permit Applications for the KSM Project are available on the following Rescan FTP site and will be available for downloading.
There are four components:
CCAR - SUP (available) Construction Camps Applications (uploading) TCAR - SUP (to be uploaded Tues/Wed) MA&EMA Permit Application (to be uploaded Tues/Wed)
As soon as the applications are completely uploaded to the FTP site, Rescan will be loading the complete Concurrent Permit Applications package onto memory sticks for each MDRC member and mailing them to each member of the MDRC (as per the list provided to Seabridge on April 17, 2013). Paper copies will follow. A Sea bridge cover letter, officially applying for these permits, is attached.
FTP SITE INSTRUCTIONS
An account has been created on Rescan's Secure File Transfer System for transfer of the information noted. To download files from Rescan or upload files to Rescan, please follow the instructions below:
1. Using Internet Explorer, go to https:llclients.rescan.com (you may need to enter this address manually) and enter the username
2. On your first login, you will be prompted to install the ActiveX Wizard (if you are using Internet Explorer) or the Java Wizard (for most browsers including Internet Explorer). Please follow the on-screen instructions to install the wizard. You will only have to do this once, and it is not mandatory.
You will see a list of files/folders you have access to, as well .as a mechanism for transferring files to and from Rescan's Secure File Transfer System. Please e-mail [email protected] you are having problems using the system.
Files uploaded to this site will be auto-deleted on June 10, 2013. Please retain a copy of the files you upload for your own records, as there is no long-term backup system for your account.
Jessy Chaplin, MSc. RPBio Permitting Coordinator
1 FNR-2013-00423 Page 187
s.15
FNR-2013-00423 Page 187
Seabl'idge Gold Inc. 1235 Main Street P.O. Box 2536
Smithers, BC VOJ 2NO Tel. (250) 847-4704 Cell.
-----Original Message-----
From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Tuesday, May 28,2013 10:11 AM
To: Jessy Chaplin; Stalker, Jennifer L FLNR:EX Cc: Rolf Schmitt (ERM-Rescan); [email protected]; 'Elizabeth Miller'
Subject: RE: KSM Project: Tues May 28 --uploading permit applications to Sharepoint
Hil If you could please forward me the applications I will ensure they are uploaded to the appropriate venue (share point) for the MRC to review.
You can send me the applications via FTP site or USB, I will leave it up to you and your team to decide what will be most convenient. Thanks,
GP Sent from my iPhone
2 FNR-2013-00423 Page 188
s.22
FNR-2013-00423 Page 188
Muir, Deanna CSNR:EX
Subject: RE: Updated Application Distribution List
Start: End: Show Time As:
Recurrence:
Organizer:
Thu 2013-05-30 12:00 AM Fri 2013-05-31 12:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
From: Sent: To:
Paterson, Genevieve FLNR:EX Thursday, May 30, 2013 10:44 AM 'lessy Chaplin'
Cc: Subject:
Pope, Jason FLNR:EX; Stalker, Jennifer L FLNR:EX RE: Updated Application Distribution List
Hi lessy,
My apologies, I have more updates for the application distribution table.
Updates include:
• As per my previous note below, Pascale Mera has been added to Ski km Lax Ha.
• Nisga'a Lisims Gov't MRC member change, Frederic Tolmie has been replaced with Colliar Azak.
• Gitanyow Hereditary Chiefs Office has two additional members that have been added to the MRC: • Kevin Koch, Fish and Wildlife Biologist
• Mark Cleveland, Head Biologist
You will find details of application distribution preferences (all above prefer electronic via USB), along with contact info in the updated table:
If you have any questions please feel free to call.
Thank you,
Ci~ plJ.;/vrJ.01'V
Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-726
From: Paterson, Genevieve FLNR:EX Sent: Thursday, May 30, 2013 9:25 AM To: 'Jessy Chaplin' Cc: Pope, Jason FLNR:EX; Stalker, Jennifer L FLNR:EX Subject: Updated Application Distribution List
1 FNR-2013-00423 Page 189FNR-2013-00423 Page 189
Good morning Jessy,
We have added a new contact to the KSM Mine Review Committee, Pascale Mera, Pascale is working with Skii Km Lax Ha.
Could you please forward the applications for the KSM project to Pascale on a USB?
Attached is the updated application distribution list with Pascale's mailing address. « File: MDRC Application Distribution.xlsx»
Thank you,
Ci~ Po.-fe.v><Wv Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
2 FNR-2013-00423 Page 190FNR-2013-00423 Page 190
Muir, Deanna CSNR:EX
Subject:
Start: End:
Recurrence:
Organizer:
From: Sent: To: Cc: Subject:
Hi Genevieve,
FW: KSM Permitting Files to FTP
Thu 2013-05-306:50 PM Thu 2013-05-306:50 PM
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [email protected]] Thursday, May 30, 2013 6:50 PM Paterson, Genevieve FLNR:EX; Stalker, Jennifer L FLNR:EX 'Rolf Schmitt'; [email protected]; Brent Murphy; 'linn Danilevich' FW: KSM Permitting Files to FTP
The MA&EMA Permit Application is loaded onto the Rescan FTP site (I have re-sent the FTP link below). This completes the electronic files upload for the Seabridge Concurrent Permit Applications required by the Major Projects Office of FLNRO.
Regards,
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Sea bridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
From: Rolf Schmitt [mailto:[email protected] Sent: Tuesday, May 28,20133:14 PM
1 FNR-2013-00423 Page 191
s.22
FNR-2013-00423 Page 191
To: [email protected] Subject: FW: KSM Permitting Files to FTP
An account has been created on Rescan's Secure File Transfer System for transfer of the information noted. To download files from Rescan or upload files to Rescan, please follow the instructions below:
1. Using Internet Explorer, go to https:llclients.rescan.com (you may need to enter this address manually) and enter the username
2. On your first login, you will be prompted to install the ActiveX Wizard (if you are using Internet Explorer) or the Java Wizard (for most browsers including Internet Explorer) . Please follow the on-screen instructions to install the wizard. You will only have to do this once, and it is not mandatory.
You will see a list of files/folders you have access to, as well as a mechanism for transferring files to and from Rescan's Secure File Transfer System. Please phone Rolf Schmitt at 604-689-9460 if you are having problems using the system.
Files uploaded to this site will be auto-deleted after June 10th, 2013. Please retain a copy of the files
you upload for your own records, as there is no long-term backup system for your account.
Laura
2
FNR-2013-00423 Page 192
s.15
FNR-2013-00423 Page 192
Muir. Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc:
Subject: Attachments:
Hi Rosemary,
RE: KSM - MoTI -location of proposed TeAR turn~ff along Hwy 37
Fri 2013-06-0712:00 AM Sat 2013-06-0812:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [email protected]] Friday, June 7, 2013 10:33 AM Barnewall, Rosemary C TRAN:EX Stalker, Jennifer L FLNR:EX; Paterson, Genevieve FLNR:EX; Randy Ollenberger; [email protected] RE: KSM - MoTI -location of proposed TCAR turnoff along Hwy 37 TCAR turnoff Hwy 37-google screen capture.pdf; 100 m north of TCAR turnoff looking south along Hwy 37 (800x600}.jpg; from TCAR turnoff looking north along Hwy 37 (800x600}.jpg; from TCAR turnoff looking south along Hwy 37 (800x600}.jpg; Hwy 37 Glacier Creek round metal culvert view ds (800x600}.jpg
Thanks for the information on the MOTI permit applications.
For Sherrie's trip next week, I measured distances off of Google Earth, and attached a screen clip. I've been there 3 -4 times, and have attached a couple of photos for you.
The existing road turnoff is just before the large round metal culvert crossing of Glacier Creek. It is located 20 km south of Bell II, approximately 3.3 km south of the Skowkill MOTI gravel pit, and about 8.5 km north of Deltaic Creek (there is a MOTI gravel pit on the left just before Deltaic Creek.)
The approach from the south is straight for 2.2 km and mostly flat with a slight incline up to Glacier Creek. Past the turnoff, the highway runs straight for another 680 m and then there is a gradual turn east.
At the turnoff, the 600 m of existing gravel road is drivable to the Bell Irving river, the old logging road bridge abutments are visible when the river has low water levels and from the air you can see the -3 km of existing road and cutblocks on the western side.
1 FNR-2013-00423 Page 193FNR-2013-00423 Page 193
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
From: Barnewall, Rosemary C TRAN:EX [mailto:[email protected] Sent: Thursday, June 06,20131:50 PM To: 'Jessy Chaplin' Cc: Paterson, Genevieve FLNR:EX; Stalker, Jennifer L FLNR:EX Subject: RE: KSM - MoTI
Hi Jessy,
I just had a look at the figure for the transmission line, and a permit will also be required for the temporary access road.
If possible, could you send me more details on the location? Sherrie will be heading up highway 37 next week, and would like to take a look.
Thanks,
Rosemary
2 FNR-2013-00423 Page 194
s.22
FNR-2013-00423 Page 194
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To:
KSM Camps-Shapefiles
Man 2013-06-10 12:00 AM Tue 2013-06-1112:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Paterson, Genevieve FLNR:EX Monday, June 10, 2013 2:13 PM
'Jessy Chaplin'
Cc: Subject:
Stalker, Jennifer L FLNR:EX; Lefrancois, Marie-Lou FLNR:EX
KSM Camps-Shapefiles
Hi Jessy,
For the Licences of Occupation for work camps FCBC requires shapes that outline to exact footprint of the camp location.
FBCB tried to match the shapefiles received with the application to their management plans and are having troubles. See below for visuals.
Please let me know if you have any questions.
Talk to you later,
Genevieve Paterson
Project Coordinator
Ministry of Forests. Lands and Natural Resource Operations
Major Projects Office, Skeena Region
250-847-7268
1 FNR-2013-00423 Page 195FNR-2013-00423 Page 195
Eskay
Trying to match this:
To that:
Uiluk
Trying to match this:
To that:
Mitchell north camp
Trying to match this:
to that ... :
,
2 FNR-2013-00423 Page 196FNR-2013-00423 Page 196
Or this?:
Marie-Lou Lefrancois, M.Sc. FIT
Resource Information Technician
Forest, Lands and Natural Resources Operations
Front Counter BC, Smithers
250-847-7335
3 FNR-2013-00423 Page 197FNR-2013-00423 Page 197
Muir, Deanna CSNR:EX
From: Sent: To:
Subject:
Good morning,
Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Thursday, July 18, 2013 9:05 AM , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C · TRAN:EX; Bellefontaine, Kim EMNG:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; De Beck, Howard W FLNR:EX; Demchuk, Tania EMNG:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'G itanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J EMNG:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessica Coulson'; Jessy Chaplin; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; Mansell Griffin ([email protected]); 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M EMNG:EX; Page, Steven FLNR:EX; 'Pascale Mera '; Pat Lim; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian 0 ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L EMNG:EX; Warnock, George EMNG:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN KSM Mine Review Committee Draft Meeting Minutes of June 27th, 2013 & Updated Terms of Reference-For Review
Both the draft meeting minutes from the June 27'h Mine Review Committee meeting, along with the draft Terms of Reference (ToR) are available for review and comment.
'Please note there are three sets of notes that have been posted from this meeting: 1. KSM Meeting Notes June 27, 2013 (FLNRO Draft Notes) - Taken by Steve Kiiskila, Advisor First Nation Relations, MFLNRO. 2. MRC_MeetingNotes_June 27 _Final (Rescan) - Notes taken by Anna Danilevich, Project Assistant, Rescan. 3. KSM Mine Review Committee Meeting Minutes June 27, 2013 - Drafted by myself, a combination of both Steve and Anna's notes.
Both the meeting minutes and ToR will become final in two weeks time. Please forward your comments to me by end of day August 1" , 2013.
Feel free to contact me, as always, if you have any troubles accessing the sharepoint site.
Have a nice day,
C;~ Povfw),O'Y'v Project Coordinator Ministrv of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
1 FNR-2013-00423 Page 198FNR-2013-00423 Page 198
Muir, Deanna CSNR:EX
From: Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Thursday, August 15, 2013 2:46 PM Sent:
To:
Cc:
, Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; DeBeck, Howard W
·FLNR:EX; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessica Coulson'; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected]),; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; 'Pat Lim'; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN 'Jessy Chaplin '; 'Elizabeth Miller'; 'Rolf Schmitt'; Cuell, James W FLNR:EX; Hanchard, Jevan FLNR:EX; Love, Bobby FLNR:EX
Subject: KSM MRC Update - Permit Application Screening Phase has begun Attachments:
Importance:
103242_Letterto Proponent re 180Timeline.pdf; KSM MRC TOR_Draft O.4_Aug 14, 2013.docx; KSM Concurrent Review Process - August 2013.pdf; KSM Permitting TimelineAugust 2013.docx
High
Good Afternoon KSM Mine Review Committee,
** The Permit Application Screening Phase for the KSM Mine Project has now begun **
The Environmental Assessment Office (EAO) has just released a letter to Seabridge Gold Inc. (now posted to the EAO website) that the EAO hasreceived the revised application for the EA application for the proposed KSM project from Sea bridge Gold Inc. on August 12, 2013; and that the lS~-day review of the application has begun (letter attached). As discussed at the last Mine Review Committee (MRC) meeting held in Smithers on June 27tt1, this then triggers the 'Permit Application Screening Phase'.
Batch I permit applications for screening' review: • Mine Site/ Processing and Tailings Management Area • Camps • Access Roads (Coulter Creek/ Treaty Creek) • Transmission Line • Mitchell-Treaty Tunnel
Screening Timelines: • Within 75 days of the EAO accepting the EA application for review (as per the Concurrent Approval
Regulation), agencies must notify the proponent and the EAO in writing of any additional information that the ministry anticipates it will require from the proponent in order to conduct the technical review.
o MPO Project Manager (PM) will coordinate the MRC comments and draft a letter to the EAO (and notify the proponent), on behalf of the technical reviewers, of any additional information required to conduct the review.
o Project Manager is requesting that all comments from agencies are provided on' or before Day 60 in order for PM to compile and draft letter to EAO by Day 75.
** MRC Technical Reviewers to provide permit application screening comments to Jennifer,Stalker@gov,bc,ca on/ by October 10, 2013 (Day 60) **
1 FNR-2013-00423 Page 199FNR-2013-00423 Page 199
KSM MRC Terms of Reference - For Final Review and Comment (1 Week): • Mine Review Committee Draft Terms of Reference
o Identifies the purpose of the Mine Review Committee and the roles and responsibilities of its members
o Comments have been received from the MRC and considered in this updated Terms of Reference ... thank you to those that provided comments.
o Please review and provide comments to len Stalker [email protected] on/ by August 23'd, 2013.
• Next MRC Meeting o Early - mid October 2013 (date to be determined) o The purpose of this meeting will be to provide an update and complete the screening phase,
answer any outstanding issues/ questions/concerns that need to be addressed (screening phase). As well, direction will be provided as to the next steps in the mine permitting review process and timelines.
Attached: * EAO Letter to Proponent (180 day EA Application review has started on August 12, 2013 ... triggers the application screening phase) * KSM MRC ToR (Updated - August 2013) - 1 week final review and comment * KSM Concurrent Review Process/ Timeline (August 2013) * KSM Permitting Timeline (Updated - August, 2013)
KSM Sharepoint Site: All Batch 1 Applications are posted Link to sharepoint : https:/Ispc-finr.gov.bc.ca/ksm/SitePages/Home.aspx
For external users who require access-if you haven't done so already-please create a BCeID account and forward your username to [email protected] .. Instructions for setting up a basic bceid: • Visit: https:/Iwww.bceid.ca
' . Click "Begin Registration" • Click "Basic BCeID" • Click "Register without specifying an online service" • Enter your details & OK.
Once you have been added as a member please remember to sign onto the sharepoint using this format: bceid\username. If you have any issues accessing the Sharepoint site, please contact Genevieve Paterson [email protected] (or by phone: 250-847-7268).
If you have any questions or concerns, please do not hesitate to contact me.
Thank you.
len Stalker, RPF Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeena Region - Smithers, BC Ph'one: (250) 847-7506 Fax: (250) 847-7347 Email: [email protected]
2 FNR-2013-00423 Page 200FNR-2013-00423 Page 200
Reference: 103242
August 12, 2013
Brent Murphy Vice President, Environmental Affairs Seabridge Gold Inc. 400-106 Front St East Toronto ON M5A 1 E1
Dear Mr. Murphy:
File: 30200-201KSMP-OS-06
Environmental Assessment Office (EAO) received the revised application for an environmental assessment certificate (Application) for the proposed KSM Project from Sea bridge Gold Inc. on August 12, 2013. The 180-day review of the Application has now begun_
Further to my letter of June 3, 2013, a 45-day public comment period on the Application is specified in the section 11 Order. We are finalizing the details of the public comment period, including the locations and schedules for public open houses with Elizabeth Miller.
If you have any questions or require further information, please contact me by telephone at 250-387-1032 or by email [email protected]. You can also contact David Grace, roject Assessment Manager, at [email protected] or by telephone at 250-387- 4 7, or Nicole Vinette, Project Assessment Officer, at '-'"""""'-"'T"'''''1'"",,,,o,,,-v.,,,,b,,,c,,,.c.,a or at 250-356-5311 . ~
Yours
L amilton ecutive Project Director
cc: Garett Cooper, Project Manager Canadian Environmental Assessment Agency
Elizabeth Miller, Manager, Environmental Affairs Seabridge Gold Inc.
Environmental Assessment Office
Mal!ing Address: PO Box 9426 Stn Prov Go'll Victoria BC V6W 9VI
location: 1" & 2"" FI- 636 Yates Street Victoria BC vaw 116
FNR-2013-00423 Page 201FNR-2013-00423 Page 201
Env
ironm
enta
lA
sses
smen
tOffi
ce
(EA
App
licat
ion)
Maj
orP
roje
cts
Offi
ce
(MR
C–
Per
mitt
ing)
EAA
PPLI
CA
TIO
NSU
BM
ITTE
D
SCR
EEN
ING
:M
RC
Tech
nica
lrev
iew
ers
topr
ovid
eco
mm
ents
toPr
ojec
tMan
ager
on/
befo
reD
ay60
toal
low
PMto
com
pile
com
men
tsan
ddr
aftl
ette
rwith
in75
days
“PR
E M
RC
M
EE
TIN
G”
(NO
VE
MB
ER
8TH)
AP
PLI
CA
TIO
NS
SU
BM
ITTE
D(P
RO
PO
NE
NT)
45D
AY
SCR
EEN
ING
+21
Day
Exet
ensi
on
(as
perS
ectio
n24
Ord
er)
MR
CTe
chni
calR
evie
w
KS
MM
INE
PR
OJE
CT
–C
ON
CU
RR
EN
TR
EV
IEW
PR
OC
ES
S–
AU
GU
ST
2013
**N
OTE
–Ti
mel
ine
and
deta
ilsin
the
follo
win
gpr
oces
sdi
agra
mar
esu
bjec
tto
chan
ge
EA
O–
prim
ary
poin
tofc
onta
ctfo
rFirs
tNat
ions
Con
sulta
tion
durin
gth
eE
Are
view
.
All
EA
OIs
sues
and
stat
ustra
cked
and
prov
ided
toM
PO
Dec
isio
nw
ithin
45D
ays
MR
CTe
chni
calR
evie
w(le
ave
time
tore
solv
eou
tsta
ndin
gis
sues
and
PM
(MP
O)t
opr
epar
eC
omm
ittee
Rep
ort)
KIC
K–
OFF
MR
CM
eetin
g
Pro
pone
ntto
wal
kM
RC
tech
nica
lrev
iew
ers
thro
ugh
appl
icat
ions
subm
itted
MR
CM
EE
TIN
GM
RC
ME
ETI
NG
Mov
ein
tote
chni
calr
evie
won
cein
form
atio
nre
quire
men
tsar
esu
bmitt
ed/p
rovi
ded
(com
plet
eap
plic
atio
ns)
INTE
RN
AL
INFO
RM
ATI
ON
SHA
RIN
G(E
AO
/FLN
RO
)
*IS
SU
ES
TRA
CK
ER
*IN
FOR
MA
TIO
NS
HA
RIN
GM
ATE
RIA
LS/D
OC
UM
EN
TSTH
AT
BO
THE
AO
and
FLN
RO
RE
QU
IRE
AC
CE
SS
TOD
UR
ING
THE
RE
VIE
WP
RO
CE
SS
180
DA
YEA
APP
LIC
ATI
ON
REV
IEW
AN
DD
ECIS
ION
PAC
KA
GE
FOR
MIN
ISTE
RS
MP
Oto
draf
tlet
tert
oE
AO
and
Pro
pone
nton
beha
lfof
the
agen
cies
that
auth
oriz
atio
nsha
vebe
enfil
edin
acco
rdan
ce(w
ithin
7da
ysof
the
EA
appl
icat
ion
bein
gac
cept
edfo
rrev
iew
)
MA
RC
H20
13A
PR
IL20
13M
AY
2013
JUN
E20
13JU
LY20
13A
UG
US
T20
13S
EP
TEM
BE
R20
13O
CTO
BE
R20
13N
OV
EM
BE
R20
13D
EC
EM
BE
R20
13JA
NU
AR
Y20
14FE
BR
UA
RY
2014
MA
RC
H20
14
FLN
RO
–pr
imar
ypo
into
fcon
tact
forF
irstN
atio
nsco
nsul
tatio
ndu
ring
the
MR
Cre
view
.
Pro
pone
ntre
spon
sibl
eto
prov
ide
tech
nica
lre
view
ers
with
requ
ired
hard
copi
es/U
SB
(for
thos
ew
hoha
vere
ques
ted)
NO
TE-P
ropo
nent
tosu
bmit
alla
pplic
atio
nsdi
gita
llyto
MP
O–
will
bepo
sted
toth
epr
ojec
tS
hare
poin
tSite
forM
RC
acce
ss/r
evie
w.
Dec
isio
nPa
ckag
eto
SD
M’s
SDM
’s m
ust m
ake
a de
term
inat
ion
onth
epe
rmit
appl
icat
ions
with
in60
days
ofth
eEA
Cbe
ing
issu
ed(C
oncu
rren
tApp
rova
lReg
)
AP
RIL
2014
MA
Y20
14JU
NE
2014
FNR-2013-00423 Page 202FNR-2013-00423 Page 202
KERR-SULPHURETS-MITCHELL (KSM) MINE REVIEW COMMITTEE
TERMS OF REFERENCE FOR THE COORDINATED AUTHORIZATION REVIEW PROCESS
Version Date Comments 0.1 June 27, 2013 Reviewed by KSM Mine Review Committee 0.2 July 16, 2013 Revisions made feedback from June 27th MRC
Meeting 0.3 July 18, 2013 2nd draft sent for review by MRC Members 0.4 Final draft sent for review by MRC Members Final Draft – Approved by MRC Members
FNR-2013-00423 Page 203FNR-2013-00423 Page 203
1 | P a g e
Table of Contents
TABLE OF CONTENTS
1.0 Goal of Committee .............................................................................................................. 2
2.0 Deliverables of Committee .................................................................................................... 2
3.0 Relationship to Environmental Assessment .................................................................... 3
3.1 Provincial Environmental Assessment Process .................................................................... 3
3.2 Federal Environmental Assessment Process ........................................................................ 3
4.0 Committee Membership ...................................................................................................... 3
5.0 Public Review and Comment ............................................................................................ 3
6.0 First Nations Consultation and Accommodation ........................................................ 4
6.1 Background ................................................................................................................................. 4
6.2 Tahltan First Nation .................................................................................................................... 5
6.3 Skii km lax ha .............................................................................................................................. 5
6.4 Gitanyow First Nation ................................................................................................................ 5
6.5 Nisga’a Nation ............................................................................................................................. 5
7.0 Roles and Responsibilities ................................................................................................ 5
7.1 Chair ............................................................................................................................................. 5
7.2 Committee Members .................................................................................................................. 6
7.3 First Nations and Treaty Nations ......................................................................................... 6
7.4 Proponent .................................................................................................................................... 6
8.0 Meetings ................................................................................................................................. 7
9.0 Issue Tracking ....................................................................................................................... 7
10.0 Definition and Resolution of Technical Issues .......................................................... 7
11.0 Limits of these Terms of Reference .............................................................................. 7
12.0 Appendices .......................................................................................................................... 8
Appendix 1: Committee Membership ......................................................................................... 9
Appendix 2: Meeting Notes Template ...................................................................................... 11
Appendix 3: Issues Tracking Template (Example) ................................................................ 13
FNR-2013-00423 Page 204FNR-2013-00423 Page 204
2 | P a g e
1.0 GOAL OF COMMITTEE The goal of the KSM Mine Review Committee, the “committee” is to provide an open, transparent, efficient and timely Coordinated Authorizations Review Process for the review of applications by Seabridge Gold Inc. (proponent) for the KSM Mine Project (project).
Coordinated Authorization Review Process: Process that harmonizes First Nations consultation and the coordination of the multiple authorizations required from the various natural resource agencies for major mines. This process is meant to improve consistency, eliminate overlap and duplication in process and information requirements by the various agencies.
The committee is established under Section 9 of the Mines Act for the technical review of mining projects. It is chaired by the Province, and serves as a forum for authorization processes related to the construction, development, operations, reclamation and closure of mines including the Mines Act permit (mine infrastructure, reclamation, bonding), Environmental Management Act permits (waste management), and others.
The purpose of the committee is to:
� Conduct a coordinated review of application information submitted by the proponent for authorizations required for each development phase of the project.
� Ensure opportunities for First Nations and Treaty Nations to be properly consulted and, where necessary, propose accommodation and mitigation, including but not limited to receiving and sharing information, and, where appropriate, contribute to the development of proposed mitigation measures for potential adverse environmental effects.
� Make recommendations to Statutory Decision Makers (SDMs) regarding applications under review including, where appropriate, accommodation of Aboriginal rights and title.
� Identify technical issues related to the project, and develop recommended solutions for those issues.
� Refer issues related to the development of the project that are raised by the committee but not within the responsibilities of the committee to the appropriate authority or forum.
2.0 DELIVERABLES OF COMMITTEE The committee will deliver the following:
� Application Information Requirements (AIR) for authorizations related to required and/or desired activities.
FNR-2013-00423 Page 205FNR-2013-00423 Page 205
3 | P a g e
� A ‘Committee Report’ regarding applications under review for consideration by SDMs, including:
o A summary of the process; o A record of issues raised and how they have been resolved; o Outstanding issues for the consideration of the SDM; o Recommendation of the committee to resolve outstanding issues; o Chair of Committee will compile the Committee Report. The Mine Review
Committee (MRC) will review and comment prior to the Report being finalized and submitted to the SDM’s for consideration.
3.0 RELATIONSHIP TO ENVIRONMENTAL ASSESSMENT
3.1 PROVINCIAL ENVIRONMENTAL ASSESSMENT PROCESS The committee will take into account the recommendations of the Environmental Assessment Office that are relevant to the specific matters before the committee, e.g. Environmental Assessment Report, Certified Project Description, Table of Conditions, etc.
3.2 FEDERAL ENVIRONMENTAL ASSESSMENT PROCESS The committee will take into account the recommendations of the Canadian Environmental Assessment Agency that are relevant to the specific matters before the committee.
4.0 COMMITTEE MEMBERSHIP The names, agencies, and contact details for all designated local, provincial and federal government representatives, as well as First Nations and Treaty Nations representatives on the committee are provided in Appendix 1.
5.0 PUBLIC REVIEW AND COMMENT Applicants for a Mines Act permit are subject to a legal requirement to advertise project proposals and make information available for public review, with 30-days available for public review and comment (Part 10.2.1 and 10.2.2 of the Mines Code).
The Public Notification Regulation under the Environmental Management Act places certain notification responsibilities on an applicant for an effluent discharge permit. The regulation is available on the Internet at http://www.bclaws.ca/.
Although members of the public do not sit on the committee, representatives of local governments in the project area are invited to sit as full committee members in order to represent the broad views of the public and to ensure that local and regional government programs and policies are taken into account in the project review.
FNR-2013-00423 Page 206FNR-2013-00423 Page 206
4 | P a g e
Individual members of the public and overlapping tenure stakeholders have several opportunities to participate in the review of a mine project and therefore potentially influence the proposed project:
� access to proponent-sponsored outreach to the public; � notification by the proponent of the application under review, access to the application
and related materials, and opportunities to review and comment; � invitations to attend proponent-sponsored informational open-houses and public
meetings organized in local communities during the application review timeline, at which the proponent explains the project, its potential for effects and proposed management plans, and where the public can ask questions and listen to proponent responses;
� opportunities to attend committee meetings, on invitation by the Chair, to discuss concerns with committee members and the proponent; and
� access to finalized meeting minutes outlining the business of the committee during a project review.
6.0 FIRST NATIONS CONSULTATION AND ACCOMMODATION
6.1 BACKGROUND Before issuing authorizations for any project activity, the Province has a legal responsibility to consult and, where appropriate, accommodate First Nations with aboriginal interests in the proposed project area. The Province also has treaty-specific responsibilities where there are established treaty rights. The scope of each responsibility is project-specific. Participation of potentially affected First Nations and Treaty Nations on the committee will contribute to the Province’s consultation and treaty obligations. Reasonable efforts will be made by the Province to provide for engagement of First Nations and Treaty Nations in the MRC activities, including preparation of committee deliverables. Capacity funding, however, is not available outside of Strategic Engagement Agreements.
Proponent-driven initiatives and committee activities can contribute to consultation process through:
� First Nations participation as members of the MRC; � Accommodation through recommendations leading to permit conditions; � Proponent outreach and information sharing; � Proponent – First Nation agreements; and � Proponent initiatives to address impacts to First Nations.
Accommodation, where appropriate, can include a range of mitigation and environmental protection and management strategies developed by the committee, or through other forums, such as the EA process. Accommodation recommendations can be developed
FNR-2013-00423 Page 207FNR-2013-00423 Page 207
5 | P a g e
through the entire review process but must be endorsed by the appropriate SDM before the accommodation is offered to a First Nation.
6.2 TAHLTAN FIRST NATION The proposed project footprint lies partially within the asserted territory of the Tahltan First Nation.
6.3 SKII KM LAX HA The proposed project footprint lies partially within the asserted territory of the Skii Km Lax Ha.
6.4 GITANYOW HUWILP The proposed project footprint lies outside of the Gitanyow asserted traditional territory. Wilp Wii Litsxw has been invited to the Mine Review Committee due to potential downstream effects.
The above First Nations have been invited to participate in the committee as their asserted territory may be directly or indirectly affected by applications, commitments, and conditions under review. Further to this, for those First Nations that have entered into Strategic Engagement Agreements (SEA’s) with the Province, issues outside of the scope of the Mine Review Committee may be brought forward to other forums as defined by their Agreements (i.e. Level 4 Working Groups).
The MRC does not discharge all consultation duties to the Gitanyow. The Gitanyow Engagement Framework (signed April 23, 2013) stipulates that the permitting for the KSM Project will be subject to a Level 4 Engagement Process. Issues beyond the scope of the MRC and EA processes will be subject to the Engagement Framework Level 4 process.
6.5 NISGA’A NATION The proposed project footprint lies partially within the Nass Area as defined within the Nisga’a Final Agreement (NFA). The Nisga’a has been invited to participate in the Mine Review Committee as they have treaty rights that may be directly or indirectly affected by applications, commitments and conditions under review. The committee will also consider the potential impacts of permit applications and authorizations with respect to residents of Nisga’a Lands, Nisga’a Lands, or Nisga’a interests set out in the Nisga’a Final Agreement.
7.0 ROLES AND RESPONSIBILITIES
7.1 CHAIR
FNR-2013-00423 Page 208FNR-2013-00423 Page 208
6 | P a g e
� Ensure the overall committee process is managed in a fair, open and transparent manner, and that the committee strives to meet target timelines.
� Manage communications and information sharing between the committee members and the proponent in an efficient and timely manner.
� Ensure that issues are either addressed by the committee or referred to the appropriate authority.
� Maintain tracking tables concerning issues and First Nations consultations. � Compile inputs and recommendations from committee members to facilitate
preparation of reports and other documentation.
7.2 COMMITTEE MEMBERS � Work cooperatively with other members and proponent to complete a coordinated
technical review in a timely fashion. � Identify technical, non-technical, and other public policy issues related to the
development of the proposed project. � Address identified issues to the extent allowed by the scope of the authorizations
under review. � Keep Chair updated with respect to issues, timelines and statutory authorities.
7.3 FIRST NATIONS, ABORIGINAL GOVERNMENTS AND TREATY NATIONS First Nations and Treaty Nations are members of the committee, and have a primary role as identified above. Other roles include:
� Representing interests of communities and/or members � Identifying the communities and members of the communities that the proponent
and government should contact and engage with in order to seek advice on community interests and concerns.
� Identifying First Nation, Aboriginal governments, and Treaty rights, interests and issues that need to be addressed in the application information.
� Ensuring that all direct and indirect impacts [e.g., Adverse effects on resources by hunting and large population influx] are identified and accommodations proposed;
� Ensuring that the proposed accommodations are consistent with the nature of the First Nation and/or Aboriginal group which is impacted;
� Assisting the proponent and government to understand First Nations’, Aboriginal groups’ and Treaty Nation concerns (if any) with respect to the applications;
� Working with communities, other committee members, and the proponent to address issues; and;
� Fulfilling the responsibilities of a committee member as outlined in the TOR.
7.4 PROPONENT The proponent will be expected to support the coordinated authorizations process through:
FNR-2013-00423 Page 209FNR-2013-00423 Page 209
7 | P a g e
� Attending committee meetings and providing project related information; � Meeting with the identified First Nations, outside of the committee meetings,
possibly with the Province, to describe how specific aspects of the project may affect the interests of First Nations and Treaty Nations;
� Consider ways to implement measures mitigate impacts or concerns respecting aboriginal or treaty interests brought forward by the First Nations and Treaty Nations; and
� Document engagement including details where project modifications are made to address aboriginal and treaty interests and provide this record to the Province to assist in its decision making.
� Address issues raised by committee members; and � Provide information to assist in issue resolution.
8.0 MEETINGS The Chair will convene committee meetings on an as-needed basis, and will develop agendas. A note taker will record meeting notes and distribute draft notes to the committee for review (a 2-week review period will be available to committee members). The Chair will incorporate review comments, and prepare final meeting notes, and distribute final notes to Committee Members. The Chair will then post the notes to the Sharepoint site. See Appendix 2 for a sample template for meeting notes..
9.0 ISSUE TRACKING The Chair will track issues raised by committee members throughout the coordinated authorizations process in an Issues Tracking Table (see Appendix 3 for a sample template).
10.0 DEFINITION AND RESOLUTION OF TECHNICAL ISSUES The Committee will strive for consensus when making recommendations and decisions. From time to time, however, issues may arise regarding interpretation of policy, challenges in meeting legislated time limits, or difficulty in resolving technical issues that cannot be resolved at the committee level. In the event that consensus cannot be reached by members of the committee, the following procedures will apply:
1. Members will make reasonable efforts to achieve consensus. 2. Chair will refer, as necessary, any technical issues to senior technical staff or senior
executive levels of government for early resolution, with an option for disagreeing parties to present their views on the issue.
3. Chair will refer, as necessary any non-technical issues (e.g. policy interpretation) to an issue-specific sub-committee which will have 10 working days (or longer at discretion of Chair) to resolve before referral to SDMs or senior executive levels of government for resolution. Chair may call upon senior levels to advise/support the sub-committee.
FNR-2013-00423 Page 210FNR-2013-00423 Page 210
8 | P a g e
4. At the end of the review and recommendations stages, the Chair will describe any remaining unresolved issues in the Committee Report, which will include: consensus recommendations, description of unresolved issues, and views of all parties on unresolved issues.
5. The Chair will provide the Committee Report to committee members for review and comment prior to production of final draft.
6. SDMs and/or senior executive levels of government have the option of referring issues back to the Committee at any time for further review, information-sharing, and/or resolution.
7. SDMs will provide advance notice to the Nisga’a Nation prior to final decision or approval of application or authorization.
11.0 LIMITS OF THESE TERMS OF REFERENCE Nothing in these Terms of Reference limits or abrogates the responsibilities or duties assigned to individual ministries or agencies under their own legislation. First Nations participation on the Committee will contribute to Crown’s legal responsibility to consult and, where appropriate, accommodate, but may not constitute the full level of engagement that may be required to address asserted aboriginal interests or established Treaty rights. SDMs will be provided with a Committee Report, which, combined with other information, will supplement the suite of information from which to make informed decisions.
12.0 APPENDICES
FNR-2013-00423 Page 211FNR-2013-00423 Page 211
9 | P a g e
APPENDIX 1: COMMITTEE MEMBERSHIP
AGENCY/AFFILIATION Provincial Government Ministry of Energy and Mines- Chief Inspectors Office
Diane Howe, Deputy Chief Inspector Kim Bellefontaine, Sr. Environmental Geoscientist Tanya Demchuk, Senior Environmental Geologist George Warnock, Geotechnical Engineering Manager Heather Narynski, Geotechnical Inspector Kathie Wagar, Regional Director
Ministry of Environment- Environmental Protection
Ian Sharp, Regional Manager Jeanien Carmody-Fallows, Environmental Protection Officer Scott Jackson, Regional Hydrologist Craig Stewart, Compliance Specialist Regan Fielding, Environmental Protection Officer Patrick Williston, Impact Assessment Biologist Brian Wilkes, MES, R.P.Bio – Contract, Environmental Quality
Ministry of Forests, Lands and Natural Resource Operations Major Projects Office Archaeology Branch Ecosystem Section Lands Forests Water
Jennifer Stalker, Project Manager/MDRC Chair Genevieve Paterson, Project Coordinator Jason Pope, Sr. First Nations Advisor Eric Forgeng, Heritage Resource Specialist Chris Schell, Sr. Ecosystems Biologist Cam Bentley, Land Tenures Specialist Will Foster, Resource Tenure Specialist Steve Page, Engineering Ron Donnelly, Tenures Forester/Engineering Specialist Matt Sakals, Research Geomorphologist Emily Bulmer, Water Stewardship Officer
Ministry of Transportation and Infrastructure
Sherrie Applegate, Senior Development Approvals Rosemary Barnewall, District Program Manager
Nisga’a Lisims Government Mansell Griffin, Lands and Resources Manager
Tracey McKay, Lands Manager Gitanyow Hereditary Chiefs Office Tara Marsden, Gitanyow Huwilp Lax'yip Implementation Coordinator
Kevin Koch (Gitanyow Fish & Wildlife Biologist) Mark Cleveland (Gitanyow Head Biologist) Sandra Littlewood, Technical Advisor
Tahltan Nation Tahltan Heritage Resources Environmental Assessment Team (THREAT)
Nalaine Morin, THREAT Coordinator Jerry Asp, THREAT Member Patrick Hudson, THREAT Technical Advisor
Skii Km Lax Ha Chief Darlene Simpson Pascale Mera, Technical Advisor
FNR-2013-00423 Page 212FNR-2013-00423 Page 212
10 | P a g e
International Jurisdictions Alaska Department of Natural Resource
Kyle Moselle, Southeast Large Project Coordinator
Northern Health Shane Wadden, Public Health Protection
Azreer Gill, Environmental Health Officer Federal Government Canadian Environmental Assessment Agency
Garett Cooper, Project Manager
Environment Canada Harp Gill, Sr. Environmental Assessment Officer Natural Resources Canada Melanie Campbell, Senior Policy Analyst Transport Canada- Navigable Waters Protection
John Mackie, Major Projects Management Officer
Department of Fisheries and Oceans Pat Lim, Environmental Analyst Local Government Regional District of Kitimat-Stikine Andrew Webber, Manager Planning and Economic Development-Observer
FNR-2013-00423 Page 213FNR-2013-00423 Page 213
11 | P a g e
APPENDIX 2: MEETING NOTES TEMPLATE
MEETING MINUTES Template 1
Name of team Clean Energy Project Team Date and Time:
Location: Caribou Room, Nora Building, Smithers, BC This is a suggested format for meeting minutes for clean energy and major projects
working groups Attendees: Chair: Name, Title, Affiliation, (how they attended e.g. telephone, in person) Minutes: Name, Title, Affiliation, (how they attended e.g. telephone, in person) Name, Title, Affiliation, (how they attended e.g. telephone, in person) …. Proponent: Name, Title, Affiliation, (how they attended e.g. telephone, in person) …. Regrets: Name, Title, Affiliation 1. Topic. (from the agenda)
� Provide a short summary of discussion in point from. Insert action items as required.
Make them stand out from the rest of the minutes by using italics, bold out, and bright colours such as: Action �� A presentation about the federal process will be arranged if a Federal EA is triggered (Bob Smith)
� 2. Topic. (from the agenda)
� 3. Topic. (from the agenda)
� Meeting Adjourned Adjourned at Attachments:
1) Summary of action items 2) Other…
Summary of Action Items:
FNR-2013-00423 Page 214FNR-2013-00423 Page 214
12 | P a g e
# Action Item (see the meeting notes for full context) Person Responsible
Date Required Status
FNR-2013-00423 Page 215FNR-2013-00423 Page 215
13 |
Pa
ge
AP
PE
ND
IX 3
: IS
SU
ES
TR
AC
KIN
G T
EM
PLA
TE (E
XA
MP
LE)
N
o Is
sue/
Aut
hor
Type
of I
ssue
(T
echn
ical
/Non
-Te
chni
cal/P
ublic
Po
licy)
Lead
Age
ncy/
A
utho
rizat
ion
D
ate
Ente
red
R
espo
nsib
ility
Pr
opon
ent
Res
pons
e
Act
ion
/ C
omm
itmen
ts
Com
men
ts/
Stat
us
Met
al L
each
ing
/ Aci
d R
ock
Dra
inag
e A
sses
smen
t 1.
M
L/AR
D
Pre
dict
ion
– ne
ed d
etai
led
geoc
hem
for a
ll m
ater
ials
to b
e di
stur
bed/
J Sm
ith
Tech
nica
l M
EMN
G/M
ines
A
ct P
erm
it
Dec
. 23,
20
11
____
_ In
c.
Nee
d w
orki
ng g
roup
m
eetin
g w
ith M
EM
staf
f to
disc
uss
met
hodo
logy
.
Det
aile
d ge
oche
m
desc
riptio
n to
be
in a
pplic
atio
n.
Wor
king
gr
oup
mee
ting
sche
dule
d Ja
n. 5
, 20
12.
2.
Etc.
Fish
erie
s an
d A
quat
ic R
esou
rces
1.
2.
R
ecla
mat
ion
Prog
ram
1.
2.
FNR-2013-00423 Page 216FNR-2013-00423 Page 216
Forests, Lands and Natural Resource Operations – Major Projects Office
1
KSM MINE PROJECT
Permitting Review – Timelines
(Batch I Permits)
August, 2013
Note: All dates are subject to change and will be updated as required
ACTIVITY DATE TIMELINE
AUTHORIZATIONS FOR:
Mine Site and Processing and Tailings Management Area (site prep and limited construction activities), Access Roads, Camps, Tunnel,
Transmission Line
Proponent submits Authorizations
Electronic (MPO to post to Sharepoint)
Hardcopy to those
agencies/ First Nations that
requested hardcopies
All applications are
currently posted to the Sharepoint site
EA Application 45 Day Screening (EAO) start (once all hardcopies of complete package have been received)
Expected late March, 2013
March 28, 2013
EA Application accepted for review (45 Day Screening + 21 day extension complete)
June 3, 2013
Agencies provide confirmation to PM that applications have been filed in accordance (i.e. agencies have received the applications and fees paid where required)
June 3 – June 10, 2013
PM Drafts letter on behalf of agencies that applications have been filed in accordance (letter addressed to EAO, cc’ proponent)
June 5, 2013
MRC: Application screening (to ensure that all required information is available for technical reviewers to conduct their review of the applications). ** Comments to be provided to PM within 60 days of
EA application being accepted **
August 12 – October
10, 2013
Day 1 - Day 60
FNR-2013-00423 Page 217FNR-2013-00423 Page 217
Forests, Lands and Natural Resource Operations – Major Projects Office
2
PM to draft and deliver letter to EAO (cc’ MEM and proponent) outlining any information that is still required from the proponent to conduct a full review (letter must be delivered within 75 days of EA application acceptance)
October 25, 2013
Day 75
Technical MRC Permitting Review period Starts
Expected Late October, 2013
Technical MRC Permitting Review period winding down (buffer to resolve/ address any outstanding issues and PM to prepare Committee Report)
(once EAC has been issued)
~ Mid February, 2014
Address final issues and prepare Draft Committee Report
~ Mid February, 2014
Draft Committee Report and Draft Permits for MRC Review and Comment (2 weeks)
~ Late February – Early March, 2014
PM to prepare final Committee Report
Expected March,
2014
Final Decision Package submitted to SDM’s for Decision
Expected March,
2014
Decision
FNR-2013-00423 Page 218FNR-2013-00423 Page 218
Muir, Deanna CSNR:EX
From: Sent: To: Cc: Subject: Attachments:
. Importance:
Hi Jessy,
Paterson, Genevieve FLNR:EX Thursday, August 29, 2013 4:06 PM 'Jessy Chaplin' Stalker, Jennifer L FLNR:EX KSM screening comments that have been submitted to date. RE: KSM MRC Update - Permit Application Screening Phase has begun; KSM - Air permit application review notes; KSM Municipal Wastewater Registration applications; Comments for KSM MWR Registration applications
High
Please find attached a collection of comments that have come in from Ministry of Transportation and Ministry of Environment staff. I have populated all of these comments in a issues & comments table that can be found on the KSM sharepoint site.
I will take you through how I envision this process working (sharing comments and populating the table) between you and I tomorrow. I welcome any suggestions or ideas you may have.
I look forward to meeting with you tomorrow.
Ci~ pOJ/"e-vJ.C1'V Project Coordinator Ministry of Forests. Lands and Natural Resource Operations Major Projects Office. Skeena Region 250·847-7268
1 FNR-2013-00423 Page 219FNR-2013-00423 Page 219
Muir, Deanna CSNR:EX
From: Sent:
·To: Cc: Subject:
Hi Jen,
Barnewall, Rosemary C TRAN:EX Monday, August 19, 2013 4:08 PM Stalker, Jennifer L FLNR:EX Applegate, Sherrie TRAN:EX RE: KSM MRC Update - Permit Application Screening Phase h~s begun
MoT will require the following from Seabridge for their first batch of permit:
1) For the access permit we require the design drawings for the intersection
2) For the Transmission Line Crossing permit we will require a location map, and details of the lines (for example vertical clearance, voltage, crossing angle of the line, if any infrastructure such as pole or guide wire will be within the RoW). Attached is the link to the MoT Utility Policy Manual, which will provide details on the required clearances.
http://www.th.gov.bc.ca/permits/Utility%20Permit%20Manual.pdf
3) For the temporary access for transmission line construction, we will required details on the location, site lines, drainage and grade of the access road at highway 37.
Please let me know if you have any other questions.
Regards,
Rosemary Barnewall, PGeo. District Program Manager Bulkley Stikine District Ministry ofTransportation and Infrastructure office: (250)-847-7404 cell:
From: Paterson, Genevieve FLNR:EX On Behalf Of Stalker, Jennifer L FLNR:EX Sent: Thursday, August 15, 2013 2:46 PM To: ' Melanie campbell;; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessica Coulson'; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected])'; 'Mark Cleveland ';. 'Nalaine Morin '; Narynskl, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; 'Pat Lim'; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; Sakais, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey
1 FNR-2013-00423 Page 220
s.22
FNR-2013-00423 Page 220
* EAO Letter to Proponent (180 day EA Application review has started on August 12, 2013 ... triggers the application screening phase) * KSM MRC ToR (Updated - August 2013) - 1 week final review and comment * KSM Concurrent Review Process/ Timeline (August 2013) * KSM Permitting Timeline (Updated - August, 2013)
KSM SharepQint Site: All Batch 1 ApPlicatiQns are PQsted Link to sharepoint : https:llspc-finr.gov.bc.ca/ksm/SitePages/Home.aspx
For external users who require access-if you haven't done so already-please create a BCeID account and forward your username to [email protected]. Instructions for setting up a basic bceid: . • Visit: https:flwww.bceid.ca • Click "Begin Registration" • Click "Basic BCeID" • Click "Register without specifying an online service" • Enter your details & OK.
Once you have been added as a member please remember to sign onto the sharepoint using this format: bceid\username. If you have any issues accessing the Sharepoint site, please contact Genevieve Paterson [email protected] (or by phone: 250-847-7268).
If you have any questions or concerns, please do not hesitate to contact me . .
Thank you.
Jen Stalker, RPF Project Manager Ministry of Forests, Lands and Natural Resource Operations Skeena Region - Smithers, BC Phone: (250) 847-7506 Fax: (250) 847-7347 Email: [email protected]
3 FNR-2013-00423 Page 221FNR-2013-00423 Page 221
Muir, Deanna CSNR:EX
From: Sent: To: Cc: Subject: Attachments:
Hello Jen,
Fielding, Regan ENV:EX Thursday, August 8, 20139:25 AM Stalker, Jennifer L FLNR:EX Carmody-Fallows, Jeanien ENV:EX KSM - Air permit application review notes KSM Air permit application notes~Aug 82013_rf.docx
Attached are my comments on the five air permit (incinerator) applications.
I think that it would be more efficient for KSM and MOE for the five permit applications to be consolidated into one. I discussed this alternative permitting approach with Jessy over the phone, and she did not seem opposed. Let me know if you have any questions.
Cheers,
Regsn Fielding Environmental Protection Officer BC Ministry of Environment Environmental Protection Division Skeena Region Box 5000 Smithers, BC VOJ 2NO Phone: 250·847·7353 Fax 250·847·7591 email: [email protected]
FNR-2013-00423 Page 222FNR-2013-00423 Page 222
MOE EPD - Review Notes on Air Permit Applications for KSM Concurrent Permitting
Authorization #s': 106826, 106827, 106829, 106832, and 106833
Prepared: Aug 8, 2013 by Regan Fielding
General Permitting Approach for Air Emissions:
Five applications for air permits were submitted by the client. Three of the applications correspond to
individual camp sites, while the remaining two applications each consist of two neighboring camps with
some shared infrastructure. The applications are very similar in content.
As an alternative to the above approach, MOE EPD recognizes that all camp air emissions could be
authorized under one permit. For this approach, the information presented under the five separate
applications would need to be consolidated. Annual discharge fees would be determined from the sum
of the discharges between the seven camps. This approach would reduce the number of application fees
($200/application) and annual base fees ($lOO/permit) charged to the client. Once the construction
camps are no longer required, a minor permit amendment would be required to reduce the authorized
discharge quantity and associated discharge fees.
Alternatively, camp air emissions could also be authorized under two permits. One permit would
authorize emissions from the construction camps, while the other would authorize the emissions from
the operating camps. Once the construction camps are no longer required, then the air permit for the
construction camps would be cancelled.
I recommend that the client revise their permit application approach for air emissions and seek
authorization under one permit.
Open Burning of Clean Wood Waste:
Open burning of clean wood waste is not identified in the air permit applications. MOE requires
confirmation that there is no intention to open burn clean wood waste, as this activity requires MOE
authorization. Typically, authorization to conduct open burning of clean wood waste forms a component
of the air permit. Please note that the Open Burning Smoke Control Regulation only applies to land
clearing debris and does not allow for open burning of lumber scraps or other clean burning combustible
materials. If the intention is to open burn clean wood waste from construction activities, then the TAR
and application should contain appropriate information including but not limited to estimated monthly
volumes of waste to be open burned (maximum and average volumes), description of burn and ash
disposal locations, and description of waste to be open burned.
Generators:
Current approach of MOE EPD is that the production of electricity by the combustion of fuel, where the
rated electrical production is less than 5 MW under peak load, does not require an authorization.
C: \ Users\d m uir\App Data \Loca I\M icrosoft\ Wind ows\ Te m po ra ry Internet Files\Content.Outlook\QDEK4MD2\KSM Air permit application notes_Aug 8 2013_rf.docx Page 10f4 .
FNR-2013-00423 Page 223FNR-2013-00423 Page 223
Quantity of Waste Discharged:
3.1 Waste generation estimate - The estimate of 2.75 to 4.5 kg seems high and I believe the source
reference provided for this information is not accurate. Applications for similar camp facilities
have used a waste generation estimate of 2kg of waste/person/day that takes into a'ccount
recyclables, and other materials not suitable for incineration. Please provide information to
support the estimate and provide a single value for the estimate rather than a range of values.
Please' state the daily maximum weight of waste to be incinerated and the corresponding
number of incinerator batches required based on full capacity at the camps. The required
number of incinerators should be based on maximum camp capacity, estimated waste
generation rates, incinerator batch capacity, and the duration of a typical incinerator batch cycle
for a full load of putrescible food waste.
The following link provides EPA published waste generation rates for the United States.
http://www .e pa .gov / osw / non ha z/ m un icipa 1/ pubs/ msw _2010 _rev _factsheet. pdf
The applications for Camps #9/#10 and Camp #5/Treaty Operating Camp were the only
applications that presented estimates for daily waste generation. However, estimates provided
{see Table 3} were based on an unsubstantiated waste generation estimate of 3.38
kg/person/day provided as a table footnote (refer to 1" paragraph in point 3.1 above).
3.2 Batch capacity and cycle times - Please clarify what the capacity of incinerator CA-600 is
{inconsistently presented as 272 kg/batch in the technical memo and 341 kg/batch in appended
fa ct sheet}.
Also, I have concerns that the estimated total cycle time (5 hours) is low and does not refh~ct
that putrescible food waste has a high moisture content and may require a longer burn cycle.
Appropriate heat-up and cool-down periods should also be accounted for. The appended
information on livestock incineration shows that for the six test cases the primary burner was on
for a minimum of 5 hours plus additional time for heat-up/cool-down, and loading/unloading.
Operating Period:
4.1 The operating period is 24 hours/day, 365 days/year.
Discharge Works:
5.1 Estimated Rate of Discharge for Incinerator (Table 2-4 or Table 2-3 depending on application)
The numbers presented under "Frequency" show an inconsistent relationship between camp
size and the number of incineration cycles required per day. For example, based on the CA-600
incinerator, for the Mitchell operating camp (350 people), 4 to 6 incineration cycles/day is
estimated. In contrast, for the Camps #9 & #10 (540 people), only 3 to 4 incineration cycles were
C: \ Use rs\d mu ir\Ap p Data \Loca I\M icrosoft\ Wind ows\ Te m po ra ry I nte rnet Files\Content.Outlook\QDEK4MD2\KSM Air permit application notes_Aug 8 2013_rf.docx Page 3 of4
FNR-2013-00423 Page 224FNR-2013-00423 Page 224
Muir, Deanna CSNR:EX
From: Lough, Jeannette M ENV:EX Thursday, August 8,20138:02 AM Stalker, Jennifer L FLNR:EX
Sent: To: Subject: KSM Municipal Wastewater Registration applications
Hi Jennifer,
Comments I sent to you in a previous email made reference to a Technical Information Summary Sheet as well as Certification by Qualified Professionals sheet. I meant to attach these but forgot. I have provided a link to where these sheets can be found as well as direct links to each sheet.
http://www.env.gov.bc.ca!epd!mun-waste!regs!mwr!guidance!reg-msd.htm#4
1. Technical Information Summary Sheet
The Technical Information Summary Sheet (summary sheet) must be submitted with the registration package.
The purpose of the summary sheet is to satisfy Section 12 of the MWR and to provide ministry staff and facility
owners with a quick reference to key registration information. The summary sheet will also allow ministry staff
to conduct compliance activities with greater efficiency.
The summary sheet is also a valuable reference tool for wastewater treatment facility owners and operators.
2. Certification by Qualified Professionals Sheet
The Certification by Qualified Professionals Sheet (signoff sheet) must be submitted with the registration
package.
The purpose of the signoff sheet is to satisfy Section 15 of the MWR and to provide a consistent template for
professionals to use.
The intent of the signoff sheet is to provide assurance to the regulator that the design of the facility and
associated documentation meets the requirements of the regulation or requirements imposed by the director.
The signoff sheet does not replace any other professional signoff that would normally be required for individual
documents, such as design drawings or environmental impact studies.
Thanks,
Jeannette
1 FNR-2013-00423 Page 225FNR-2013-00423 Page 225
Muir, Deanna.CSNR:EX
From: Sent: To:
Lough, Jeannette M ENV:EX Wednesday, August 7, 20134:19 PM Stalker, Jennifer L FLNR:EX
Subject: Comments for KSM MWR Registration applications
i!~~ KSM MWRMOE
EPD.docx
Hi Jennifer - here are my comments for the KSM camp sewage registrations. Let me know if there is anything else you need.
Thanks,
Jeannette
Jeannette Lough Environmental Protection Officer Ministry of Environment
Environmental Protection Division Skeena Region
Box 5000 Smithers, Be VOJ 2NO Ph: 250-847-7413 Fax: 250-847-7591 email: [email protected]
..
1
FNR-2013-00423 Page 226FNR-2013-00423 Page 226
MOE EPD - Review Notes on Municipal Wastewater Regulation Registration Applications for KSM concurrent permitting
Prepared: July 31, 2013 by Jeannette Lough
Five registration applications for the Municipal Wastewater Regulation were submitted by the client. Three of the applications correspond to individual camp sites, while the remaining two applications each consist of two neighbouring camps with some shared infrastructure.
Substitutions were requested for two of the five applications - Mitchell Initial & Secondary Camps and Mitchell Operating Camp. The rationale provided for an allowance of total phosphorous to exceed the recommended limit in the MWR is sound and acceptable to the director.
Two of the camps have applied for Reclaimed Water Use - Mitchell Initial & Secondary Camps and Treaty plant Construction & Operating Camp. Please ensure that you include proof that the local Medical Health Officer was notified of or has authorized the use of reclaimed water when submitting your final application. It is assumed that you will be providing more detailed information regarding the temporary/emergency storage basins for reclaimed water (ie -location, size, design, etc.)
Some general comments for all 5 applications:
• Ensure that a copy of design drawings for each wastewater facility, including the discharge works are signed and stamped by a qualified professional and submitted with final application. Include specifications for all outfalls (refer to sec. 99 of the MWR) and be sure to contact proper authorities for works in and about a stream.
• We look forward to receiving more detailed analysis around the Initial Dilution Zone for each discharge location prior to submitting your final applications.
• Site plans showing the receiving environment monitoring sites in relation to the layout of the wastewater facilities must be submitted with final applications ..
• Provide a completed Technical Information Summary Sheet for each facility (see attached form).
• Provide proof of certification for the treatment plant operator(s) with final applications
• For those facilities that will be discharging greater than 100 m3/day to water please be reminded that the new federal wastewater regulation applies.
• I highly recommend that you have sludge disposal options in place prior to commissioning of the facilities (ie permits applied for or plans confirmed for disposing to a permitted site).
• The MWR definition for BODS is "the carbonaceous 5-day biochemical oxygen demand". Please be sure to request CBOD when submitting samples to the lab. Also please note that fecal coliforms are measured in MPN with respect to MWR requirements.
Some specific comments for Treaty Saddle Camp:
.. • Appears to be a typo in the operating plan Executive Summary pg ii - reference is made to
discharge to Ground and I believe it should be discharge to water.
FNR-2013-00423 Page 227FNR-2013-00423 Page 227
Muir. Deanna CSNR:EX
From: Sent: To:
Paterson, Genevieve FLNR:EX Wednesday, September 4, 2013 2:21 PM 'Jessy Chaplin'
Subject: RE: Seabridge Gold -Final Ad Open Houses
Thank you.
GP
-----Original Message-----From: Jessy Chaplin [mailto:[email protected]] Sent: Wednesday, September 4, 2013 1:45 PM To: Paterson, Genevieve FLNR:EX Cc: Stalker, Jennifer L FLNR:EX; [email protected] Subject: FW: Sea bridge Gold -Final Ad Open Houses Importance: High
Hi Genevieve, Enclosed is the Sea bridge advertisement for the KSM Public Review period for EAO / CEAA. Regards,
Jessy Chaplin, MSc. RPBio Permitting Coordinator Seabridge Gold Inc. 1235 Main Street P.O. Box 2536 Smithers, BC V0J 2N0 Tel. (250) 847-4704 Cell.
1
,
FNR-2013-00423 Page 228
s.22
FNR-2013-00423 Page 228
Muir, Deanna CSNR:EX
From: Sent: To: Subject:
Good afternoon Jessy,
Paterson, Genevieve FLNR:EX Monday, September 9,20131 :23 PM 'Jessy Chaplin' KSM Issues & Comment Tracking Table - Review/Update
I have populated the table with the comments that I sent over last week.
If you have any additions or updates please let me know and I will populate for next week's update .
. KSM Comments and Issues Tracki ...
Talk to you later,
Ci~ pOJ/u-J.C1'V Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
1 FNR-2013-00423 Page 229FNR-2013-00423 Page 229
Stat
us
2013
-08-
19
Rose
mar
y Ba
rnew
all,
PGeo
.D
istr
ict P
rogr
am
Man
ager
,M
oTI
Tem
pora
ry A
cess
Acc
ess
Tran
smis
son
Line
MoT
will
req
uire
the
follo
win
g fr
om S
eabr
idge
for
thei
r fir
st
batc
h of
per
mit:
1) F
or th
e ac
cess
per
mit
we
requ
ire
the
desi
gn d
raw
ings
for
the
inte
rsec
tion
2) F
or th
e Tr
ansm
issi
on L
ine
Cros
sing
per
mit
we
will
req
uire
a
loca
tion
map
, and
det
ails
of t
he li
nes
(for
exa
mpl
e ve
rtic
al
clea
ranc
e, v
olta
ge, c
ross
ing
angl
e of
the
line,
if a
ny
infr
astr
uctu
re s
uch
as p
ole
or g
uide
wir
e w
ill b
e w
ithin
the
RoW
). A
ttac
hed
is th
e lin
k to
the
MoT
Util
ity P
olic
y M
anua
l, w
hich
will
pro
vide
det
ails
on
the
requ
ired
cle
aran
ces.
http
://w
ww
.th.
gov.
bc.c
a/pe
rmits
/Util
ity%
20Pe
rmit%
20M
anua
l.pd
f
3) F
or th
e te
mpo
rary
acc
ess
for
tran
smis
sion
line
con
stru
ctio
n,
we
will
req
uire
d de
tails
on
the
loca
tion,
site
line
s, d
rain
age
and
grad
e of
the
acce
ss r
oad
at h
ighw
ay 3
7.
MRC
2013
-08-
07
Jean
nett
e Lo
ugh
Envi
ronm
enta
l Pr
otec
tion
Off
icer
M
inis
try
of
Envi
ronm
ent
Cam
psKS
M M
unic
ipal
Was
tew
ater
Reg
ulat
ion
Regi
stra
tion
appl
icat
ion
note
s_Ju
ly 3
1 20
13_j
l.
MRC
2013
-08-
08
Rega
n Fi
eldi
ng
Envi
ronm
enta
l Pr
otec
tion
Off
icer
M
oE
Cam
ps
KSM
Air
per
mit
appl
icat
ion
note
s_A
ug 8
201
3_rf
MRC
Acr
onym
s M
RC
Min
e Re
view
Com
mitt
ee
WTP
Wat
er T
reat
men
t Pla
nt
Lead
Pro
cess
(EA
–
or M
RC)
Repo
nse/
Prop
osed
A
ccom
mod
atio
n/M
itig
atio
nPh
ase
Cons
truc
tion
Re
clam
atio
nor
Clo
sure
(Act
ive,
clo
sed,
ac
com
mod
ated
)
Kerr
-Sul
fret
s-M
itche
ll (K
SM) C
omm
ents
& Is
sues
Tra
ckin
g D
ocum
ent
Issu
e #
Dat
eA
utho
rRi
ghts
/Tit
le/T
reat
y Cl
aim
Proj
ect
Com
pone
ntCo
ncer
n /A
naly
sis/
Dis
cuss
ion
FNR-2013-00423 Page 230FNR-2013-00423 Page 230
Muir, Deanna CSNR:EX
From: Sent: To: Cc: Subject:
. Good afternoon Jessy,
Paterson, Genevieve FLNR:EX Monday, September 16, 2013 3:09 PM 'Jessy Chaplin' Stalker, Jennifer L FLNREX KSM Issues & Comment Tracking Table - Review/Update
I have no further updates from last week.
If you have any additions or updates, please let me know and I will populate for next week's update. Do you have any additions around the responses to these screening comments?
KSM Comments and Issues Tracki...
Thanks,
Ci~ POJ/Vr>C1'V Project Coordinator Ministry of Forests. Lands and Natural Resource Operations Major Projects Office, Skeena Region 2S0-847-7268
1 FNR-2013-00423 Page 231FNR-2013-00423 Page 231
Stat
us
2013
-08-
19
Rose
mar
y Ba
rnew
all,
PGeo
.D
istr
ict P
rogr
am
Man
ager
,M
oTI
Tem
pora
ry A
cess
Acc
ess
Tran
smis
son
Line
MoT
will
req
uire
the
follo
win
g fr
om S
eabr
idge
for
thei
r fir
st
batc
h of
per
mit:
1) F
or th
e ac
cess
per
mit
we
requ
ire
the
desi
gn d
raw
ings
for
the
inte
rsec
tion
2) F
or th
e Tr
ansm
issi
on L
ine
Cros
sing
per
mit
we
will
req
uire
a
loca
tion
map
, and
det
ails
of t
he li
nes
(for
exa
mpl
e ve
rtic
al
clea
ranc
e, v
olta
ge, c
ross
ing
angl
e of
the
line,
if a
ny
infr
astr
uctu
re s
uch
as p
ole
or g
uide
wir
e w
ill b
e w
ithin
the
RoW
). A
ttac
hed
is th
e lin
k to
the
MoT
Util
ity P
olic
y M
anua
l, w
hich
will
pro
vide
det
ails
on
the
requ
ired
cle
aran
ces.
http
://w
ww
.th.
gov.
bc.c
a/pe
rmits
/Util
ity%
20Pe
rmit%
20M
anua
l.pd
f
3) F
or th
e te
mpo
rary
acc
ess
for
tran
smis
sion
line
con
stru
ctio
n,
we
will
req
uire
d de
tails
on
the
loca
tion,
site
line
s, d
rain
age
and
grad
e of
the
acce
ss r
oad
at h
ighw
ay 3
7.
MRC
2013
-08-
07
Jean
nett
e Lo
ugh
Envi
ronm
enta
l Pr
otec
tion
Off
icer
M
inis
try
of
Envi
ronm
ent
Cam
psKS
M M
unic
ipal
Was
tew
ater
Reg
ulat
ion
Regi
stra
tion
appl
icat
ion
note
s_Ju
ly 3
1 20
13_j
l.
MRC
2013
-08-
08
Rega
n Fi
eldi
ng
Envi
ronm
enta
l Pr
otec
tion
Off
icer
M
oE
Cam
ps
KSM
Air
per
mit
appl
icat
ion
note
s_A
ug 8
201
3_rf
MRC
Acr
onym
s M
RC
Min
e Re
view
Com
mitt
ee
WTP
Wat
er T
reat
men
t Pla
nt
Lead
Pro
cess
(EA
–
or M
RC)
Repo
nse/
Prop
osed
A
ccom
mod
atio
n/M
itig
atio
nPh
ase
Cons
truc
tion
Re
clam
atio
nor
Clo
sure
(Act
ive,
clo
sed,
ac
com
mod
ated
)
Kerr
-Sul
fret
s-M
itche
ll (K
SM) C
omm
ents
& Is
sues
Tra
ckin
g D
ocum
ent
Issu
e #
Dat
eA
utho
rRi
ghts
/Tit
le/T
reat
y Cl
aim
Proj
ect
Com
pone
ntCo
ncer
n /A
naly
sis/
Dis
cuss
ion
FNR-2013-00423 Page 232FNR-2013-00423 Page 232
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
Categories:
KSM Advertising Requirements
Wed 2013-09-1112:00 AM Thu 2013-09-12 12:00 AM Free
(none)
Paterson, Genevieve FLNREX
Awaiting Response
From: Sent: To:
Paterson, Genevieve FLNR:EX Wednesday, September 11, 2013 2:39 PM 'Jessy Chaplin'
Cc: Subject:
'Elizabeth Miller'; Stalker, Jennifer L FLNR:EX; Carmody-Fallows, Jeanien ENV:EX KSM Advertising Requirements
Categories: . Awaiting Response
Good afternoon Jessy,
As per our discussion this morning, I'm developing a template for the public advertising requirements for the batch 1 applications, and I need your assistance.
The requirements for the lands, forestry and mines authorizations are straight forward, the EMA ad requires much more detail. Can you please fill out the template (link below) and I will try and merge the info into the existing template I've started for the lands, mines and forestry auth's. If the ad becomes too large we may require the EMA ad to be posted separately.
Let me know if you have any questions.
Thank you,
C;~ Po.-+vrJhYV Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeen a Region 250·847-7268
From: Carmody-Fallows, Jeanien ENV:EX Sent: Monday, September 9, 2013 2:07 PM To: Paterson, Genevieve FLNR:EX Subject: RE: EAO Ad Requirements
http:Uwww.env.gov.bc.ca!epd!waste discharge auth!guidance!pdf!applications,pdf Guidance Document http:Uwww.env.gov.bc.ca!epd!waste discharge auth!app forms!pdflnew-app.pdf Template
1 FNR-2013-00423 Page 233FNR-2013-00423 Page 233
KSM will need to complete for the water treatment plants, the landfills and the air permit applications. (MWR registrations do not require publication).
Jeanien Carmody-Fallows P.Eng. Environmental Protection Officer
Ministry of Environment Environmental Protection Division Skeena Region Box 5000 Smithers, Be VOJ 2NO Ph: 250-847-7273 Fax: 250-847-7591 email: [email protected]
2 FNR-2013-00423 Page 234FNR-2013-00423 Page 234
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence;
Organizer:
Categories:
From: Sent:
To: Cc: Subject:
Categories:
Hi Gen,
Public Consultation/Issues Tracking.
Tue 2013-09-1712:00 AM Wed 2013-09-18 12:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Awaiting Response
Jessy Chaplin [[email protected] Tuesday, September 17, 2013 6:00 AM Paterson, Genevieve FLNR:EX Stalker, Jennifer L FLNR:EX
Re: KSM Issues & Comment Tracking Table - Review/Update
Awaiting Response
I will have comments to insert next week. Also, the EMA notifications ad will take a week, there is very specific information required for each application. Jessy
Sent from my iPhone Seabridge Gold Inc
Jessy Chaplin
On 2013-09-16, at 3:08 PM, "Paterson, Genevieve FLNR:EX" <[email protected]> wrote:
Good afternoon Jessy,
I have no further updates from last week.
If you have any additions or updates, please let me know and I will populate for next week's update. Do you have any additions around the responses to these screening comments?
Thanks,
C;~ Po..{t.y~
Project Coordinator
1 FNR-2013-00423 Page 235FNR-2013-00423 Page 235
Ministry of Forests. Lands and Natural Resource Operations Major Projects Office. Skeena Region 250-847-7268
<KSM Comments and Issues Trackjng Updated 2013-09-05.pdf>
2 FNR-2013-00423 Page 236FNR-2013-00423 Page 236
Muir, Deanna CSNR:EX
Subject:
Start: End:
Recurrence:
Organizer:
From: Sent: To: Cc:
Subject:
Good morning Jessy,
KSM-Front Counter BC Application Acceptance Letter for Industrial Camps and Transmission Line
Fri 2013-09-20 8:00 AM Fri 2013-09-20 8:30 AM
(none)
Paterson, Genevieve FLNR:EX
Paterson, Genevieve FLNR:EX Friday, September 20, 2013 11:25 AM 'Jessy Chaplin' Schieder, Judith FLNR:EX; Stalker, Jennifer L FLNR:EX; Bentley, Cam FLNR:EX; Bulmer, Emily M FLNR:EX KSM-Front Counter BC Application Acceptance Letter for Industrial Camps and Transmission Line
The attached acceptance letter is the replacement to the June 29'h, 2013 letter sent from Front Counter Be.
Revision have been made to the timeframes and the process of referrals and consultation.
If you have any questions please feel free for email or call me.
Thanks,
C;~ Po.#YJ.&Vv Project Coordinator Ministry of Forests. Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
1 FNR-2013-00423 Page 237FNR-2013-00423 Page 237
Muir, Deanna CSNR:EX
Subject:
Start: End:
Recurrence:
Organizer:
From: Sent: To: Subject: Attachments:
Hi Jessy,
FW: KSM MRC Update! Screening Comments Due October 10, 2013
Tue 2013-09-24 8:00 AM Tue 2013-09-24 8:30 AM
(none)
Paterson, Genevieve FLNR:EX
Paterson, Genevieve FLNR:EX Tuesday, September 24, 2013 10:47 AM 'Jessy Chaplin' FW: KSM MRC Update/ Screening Comments Due October 10, 2013 KSM Comments and Issues Tracking Updated 2013-09-24.pdf
My apologies for being tardy.
Attached is the updated Issues Tracking Table, the only update I have is Cam's comments (as per Jenn's email below).
As always, if you have any updates for me to populate the table with please forward them on.
Thank you,
Genevieve Paterson
Project Coordinator
Ministrv of Forests, Lands and Natural Resource Operations
Major Projects Office, Skeena Region
250-847-7268
1 FNR-2013-00423 Page 238FNR-2013-00423 Page 238
From: Stalker, Jennifer L FLNREX Sent: Monday, September 23, 20132:07 PM To: 'Jessy Chaplin' Cc: Paterson, Genevieve FLNR:EX Subject: FW: KSM MRC Updatel Screening Comments Due October 10, 2013
Jessy, please find below comments that have come in regarding the Lands applications during the screening phase. These will be tracked on our end, and anything outstanding entered into the permit Issues Tracker.
Any questions or concerns, please do not hesitate to contact me.
Jen Stalker, RPF
Project Manager
Ministry of Forests, Lands and Natural Resource Operations
Skeena Region - Smithers, BC
Phone: (250) 847-7506
Fax: (250) 847-7347
Email: [email protected]
From: Bentley, Cam FLNR:EX Sent: Monday, September 23, 20132:00 PM To: Stalker, Jennifer L FLNREX Cc: Paterson, Genevieve FLNREX Subject: RE: KSM MRC Updatel Screening Comments Due October 10, 2013
I have review the submission of materials for 6408590/Eskay camp 6408591/Mitchell Operational Camp 6408592/Unuk Camp and 64085931T1L Treaty. At this time I believe the required info is submitted.
For 64084481Tunnel, as noted in the meeting at the DSS office in summer, I still require the resubmission the of the "tunnel MP and profile" changes have occurred.
2 FNR-2013-00423 Page 239FNR-2013-00423 Page 239
Cam
From: Stalker, Jennifer L FLNR:EX Sent: Friday, September 13, 2013 11 :08 AM To: ' Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; Fielding , Regan ENV:EX; Forgeng, Eric E . FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessica Coulson'; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected]),; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; 'Pat Lim'; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FLNR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Cc: 'Jessy Chaplin '; 'Elizabeth Miller'; 'Rolf Schmitt' ; Cuell, James W FLNR:EX; Hanchard, Jevan FLNR:EX; Love, Bobby FLNR:EX Subject: KSM MRC Update! Screening Comments Due October 10, 2013 Importance: High
RE: KSM PROJECT UPDATE - PERMITTING
Good Morning KSM MRC,
Please find below project updates for permitting, and a reminder that application screening comments are due on October 10, 2013.
1) PERMIT APPLICATION SCREENING PHASE UNDERWAY - Please note that we are well into the screening phase of the KSM permit applications, submitted by Seabridge Gold Inc. on May ·28, 2013.
3 FNR-2013-00423 Page 240FNR-2013-00423 Page 240
•• Permit application screening comments are due to [email protected] on/ by October 10, 2013 (Day 60)'*
2) KSM MINE REVIEW COMMITTEE TERMS OF REFERENCE - Finalized MRC Terms of Reference is now located on the KSM project Sharepoint site
3) SCREENING COMMENTS/ISSUES TRACKING TABLE - Please note that all screening comments received to date and the Issues Tracking Table have been posted to the Sharepoint Site. These documents will be updated and available for you to access throughout the permit review process.
4) NEXT MRC MEETING - will now be scheduled early in the review phase (after screening), expected early - mid November 2013. Please note that if anything comes up as we move through the screening phase that requires addressing/ MRC discussion, a conference call will be set up as/ if required.
KSM Sharepoint Site:
Link to sharepoint : https:llspc-flnr.gov.bc.ca/ksm/SitePages/Home.aspx
For external users who require access-if you haven't done so already-please create a BCelD account and forward your username to [email protected].
Instructions for setting up a basic bceid :
Visit: https:llwww.bceid.ca
Click "Begin Registration"
Click "Basic BCeID"
Click "Register without specifying an online service"
Enter your details & OK.
4 FNR-2013-00423 Page 241FNR-2013-00423 Page 241
Once you have been added as a member please remember to sign onto the sharepoint using this format: bceid\username. If you have any issues accessing the Sharepoint site, please contact Genevieve Paterson [email protected] .(orby phone: 250-847-7268).
As always, please do not hesitate to contact me if you have any questions/ concerns.
Thank you.
Jen Stalker, RPF
Project Manager
Ministry of Forests, Lands and Natural Resource Operations
Skeena Region - Smithers, BC
Phone: (250) 847-7506
Fax: (250) 847-7347 ,
Email: [email protected]
From: Paterson, Genevieve FLNR:EX On Behalf Of Stalker, Jennifer L FLNR:EX Sent: Thursday, August 15, 2013 2:46 PM To: ' Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; DeBeck, Howard W FLNR:EX; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jessica Coulson'; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected])'; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; 'Pat Lim'; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; Sakals, Mat! E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FOR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Cc: 'Jessy Chaplin '; 'Elizabeth Miller'; 'Rolf Schmitt' ; Cuell , James W FLNR:EX; Hanchard, Jevan FLNR:EX; Love, Bobby FLNR:EX
5 FNR-2013-00423 Page 242FNR-2013-00423 Page 242
Subject: KSM MRC Update - Permit Application Screening Phase has begun Importance: High
Good Morning KSM Mine Reyiew Committee,
•• The Permit Application Screening Phase for the KSM Mine Project has now begun ••
The Environmental Assessment Office (EAO) has just released a letter to Seabridge Gold Inc. (now posted to the EAO website) that the EAO has received the revised application for the EA application for the proposed KSM project from Seabridge Gold Inc. on August 12, 2013; and that the 180-day review of the application has begun (letter attached). As discussed at the last Mine Review Committee (MRC) meeting held in Smithers on June 2ih, this then triggers the 'Permit Application Screening Phase'.
Batch I permit applications for screeningl review:
Mine Site/ Processing and Tailings Management Area
Camps
Access Roads (Coulter Creek! Treaty Creek)
Transmission Line
Mitchell-Treaty Tunnel
Screening Timelines:
Within 75 days of the EAO accepting the EA application for review (as per the Concurrent Approval Regulation), agencies must notify the proponent and the EAO in writing of any additional information that the ministry anticipates it will require from the proponent in order to conduct the technical review.
o MPO Project Manager (PM) will coordinate the MRC comments and draft a letter to th€l EAO (and notify the proponent), on behalf of the technical reviewers, of any additional information required to conduct the review.
o Project Manager is requesting that all comments from agencies are provided onl or before Day 60 in order for PM to compile and draft letter to EAO by Day 75.
6 FNR-2013-00423 Page 243FNR-2013-00423 Page 243
** MRC Technical Reviewers to provide permit application screening comments to [email protected] on! by October 10, 2013 (Day 60) **
KSM MRC Terms of Reference - For Final Review and Comment (1 Week):
Mine Review Committee Draft Terms of Reference
o Identifies the purpose of the Mine Review Committee and the roles and responsibilities of its members
o Comments have been received from the MRC and considered in this updated Terms of Reference ... thank you to those that provided comments.
o Please review and provide comments to Jen Stalker [email protected] onl by August 23'd, 2013.
Next MRC Meeting
o Early - mid October 2013 (date to be determined)
o The purpose of this meeting will be to provide an update and complete the screening phase, answer any outstanding issues! questions! concerns that need to be addressed (screening phase). As well, direction will be provided as to the next steps in the mine permitting review process and timelines.
Attached:
* EAO Letter to Proponent (180 day EA Application review has started on August 12, 2013 ... triggers the application screening phase)
* KSM MRC ToR (Updated - August 2013) -1 week final review and comment
* KSM Concurrent Review Process! Timeline (August 2013)
* KSM Permitting Timeline (Updated - August, 2013)
KSM Sharepoint Site: All Batch 1 Applications are posted
Link to sharepoint : https:/Ispc-flnr.gov.bc.ca!ksm!SitePages!Home.aspx
7 FNR-2013-00423 Page 244FNR-2013-00423 Page 244
For external users who require access-if you haven't done so already-please create a BCelD account and forward your username to [email protected].
Instructions for setting up a basic bceid:
Visit: https:llwww.bceid.ca
Click "Begin Registration"
Click "Basic BCeID"
Click "Register without specifying an online service"
Enter your details & OK.
Once you have been added as a member please remember to sign onto the sharepoint using this format: bceid\username. If you have any issues accessing the Sharepoint site, please contact Genevieve Paterson [email protected] (or by phone: 250-847-7268).
If you have any questions or concerns, please do not hesitate to contact me.
Thank you .
Jen Stalker, RPF
Project Manager
Ministry of Forests, Lands and Natural Resource Operations
Skeena Region - Smithers, BC
Phone: (250) 847-7506
Fax: (250) 847-7347
Email: [email protected]
8 FNR-2013-00423 Page 245FNR-2013-00423 Page 245
Stat
us
2013
-08-
19
Rose
mar
y Ba
rnew
all,
PGeo
.D
istr
ict P
rogr
am
Man
ager
,M
oTI
Tem
pora
ry A
cess
Acc
ess
Tran
smis
son
Line
MoT
will
req
uire
the
follo
win
g fr
om S
eabr
idge
for
thei
r fir
st
batc
h of
per
mit:
1) F
or th
e ac
cess
per
mit
we
requ
ire
the
desi
gn d
raw
ings
for
the
inte
rsec
tion
2) F
or th
e Tr
ansm
issi
on L
ine
Cros
sing
per
mit
we
will
req
uire
a
loca
tion
map
, and
det
ails
of t
he li
nes
(for
exa
mpl
e ve
rtic
al
clea
ranc
e, v
olta
ge, c
ross
ing
angl
e of
the
line,
if a
ny
infr
astr
uctu
re s
uch
as p
ole
or g
uide
wir
e w
ill b
e w
ithin
the
RoW
). A
ttac
hed
is th
e lin
k to
the
MoT
Util
ity P
olic
y M
anua
l, w
hich
will
pro
vide
det
ails
on
the
requ
ired
cle
aran
ces.
http
://w
ww
.th.
gov.
bc.c
a/pe
rmits
/Util
ity%
20Pe
rmit%
20M
anua
l.pd
f
3) F
or th
e te
mpo
rary
acc
ess
for
tran
smis
sion
line
con
stru
ctio
n,
we
will
req
uire
d de
tails
on
the
loca
tion,
site
line
s, d
rain
age
and
grad
e of
the
acce
ss r
oad
at h
ighw
ay 3
7.
MRC
2013
-08-
07
Jean
nett
e Lo
ugh
Envi
ronm
enta
l Pr
otec
tion
Off
icer
M
inis
try
of
Envi
ronm
ent
Cam
psKS
M M
unic
ipal
Was
tew
ater
Reg
ulat
ion
Regi
stra
tion
appl
icat
ion
note
s_Ju
ly 3
1 20
13_j
l.
MRC
2013
-08-
08
Rega
n Fi
eldi
ng
Envi
ronm
enta
l Pr
otec
tion
Off
icer
M
oE
Cam
ps
KSM
Air
per
mit
appl
icat
ion
note
s_A
ug 8
201
3_rf
MRC
2013
-09-
23
Cam
Ben
tly,
Land
s Te
nure
s Sp
ecia
list,
M
FLN
RO
Cam
ps &
Tra
nsm
issi
on L
ine
I hav
e re
view
the
subm
issi
on o
f mat
eria
ls fo
r 64
0859
0/Es
kay
cam
p 6
4085
91/M
itche
ll O
pera
tiona
l Cam
p 64
0859
2/U
nuk
Cam
p an
d 64
0859
3/T/
L Tr
eaty
. A
t thi
s tim
e I b
elie
ve th
e re
quir
ed in
fo is
sub
mitt
ed.
For
6408
448/
Tunn
el, a
s no
ted
in th
e m
eetin
g at
the
DSS
off
ice
in s
umm
er, I
stil
l req
uire
the
resu
bmis
sion
the
of th
e “t
unne
l M
P an
d pr
ofile
” c
hang
es h
ave
occu
rred
.
MRC
Acr
onym
s
Lead
Pro
cess
(EA
–
or M
RC)
Repo
nse/
Prop
osed
A
ccom
mod
atio
n/M
itig
atio
n(A
ctiv
e, c
lose
d,
acco
mm
odat
ed)
Kerr
-Sul
fret
s-M
itche
ll (K
SM) C
omm
ents
& Is
sues
Tra
ckin
g D
ocum
ent
Issu
e #
Dat
eA
utho
rRi
ghts
/Tit
le/T
reat
y Cl
aim
Proj
ect
Com
pone
ntCo
ncer
n /A
naly
sis/
Dis
cuss
ion
FNR-2013-00423 Page 246FNR-2013-00423 Page 246
MRC
M
ine
Revi
ew C
omm
ittee
W
TPW
ater
Tre
atm
ent P
lant
TLTr
ansm
isso
n Li
ne
FNR-2013-00423 Page 247FNR-2013-00423 Page 247
Muir, Deanna CSNR:EX
Subject: Location:
Start: End: Show Time As:
Recurrence: Recurrence Pattern:
Meeting Status:
Organizer: Required Attendees:
Hi Jessy,
Copy: Comments & Issues Tracking Document from MPO to Seabridge Email.
Mon 2013-09-2312:00 AM Tue 2013-09-24 12:00 AM Free
Weekly every Monday
Not yet responded
Paterson, Genevieve FLNR:EX Jessy Chaplin
This is just a calendar reminder that you can expect the issues and comments tracking doc from me each week. I will email you even if it is just a notification that there are no further updates from the previous week.
Thanks,
Ci~ po..oft,yJ.01'V
Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250·847-7268
1 FNR-2013-00423 Page 249FNR-2013-00423 Page 249
Muir, Deanna CSNR:EX
From: Sent: To:
Cc: Subject:
Importance:
Good afternoon,
Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Friday, October 4,20133:32 PM , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill '; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jeska Gagnon '; 'Jessica Coulson'; 'Jessy Chaplin '; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected]),; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock. George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FLNR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Cuell, James W FLNR:EX KSM Mine Review Committee - Screening Level Period Extension to October 25th, 2013
High
It has come to the attention of the Major Projects Office that the capacity of technical experts is being tied up in the Environmental Assessment Review and there is a need for more time to provide screening level comments on the Batch 1 Permit Applications.
The screening level comments for the Batch 1 Permit Applications are now due by the end of business day Friday October 25th
, 2013. For the screening level comments we are looking for input on whether there are any additional information requirements in order for the Mine Review Committee to conduct their review.
Y~u can expect a reminder email in one weeks time, Tuesday October 15th, 2013.
Please forward your Screening Level comments onto Project Manger [email protected] and to myself.
Updated timetable:
Thank you,
~;~ KSM Permitting Timeline - Octo ...
4~ PMt.¥J,(nN Project Coordinator Ministry of Forests. Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
1 FNR-2013-00423 Page 250FNR-2013-00423 Page 250
Forests, Lands and Natural Resource Operations – Major Projects Office
1
KSM MINE PROJECT
Permitting Review – Timelines
(Batch I Permits)
October, 2013
Note: All dates are subject to change and will be updated as required
ACTIVITY DATE TIMELINE
AUTHORIZATIONS FOR:
Mine Site and Processing and Tailings Management Area (site prep and limited construction activities), Access Roads, Camps, Tunnel,
Transmission Line
Proponent submits Authorizations
Electronic (MPO to post to Sharepoint)
Hardcopy to those
agencies/ First Nations that
requested hardcopies
All applications are currently posted to the
Sharepoint site
Proponent in the process of mailing/ distributing
hardcopies/ USB sticks (as per applications distribution list)
EA Application 45 Day Screening (EAO) start (once all hardcopies of complete package have been received)
Expected late March, 2013
March 28, 2013
EA Application accepted for review (45 Day Screening + 21 day extension complete)
June 3, 2013
Agencies provide confirmation to PM that applications have been filed in accordance (i.e. agencies have received the applications and fees paid where required)
June 3 – June 10, 2013
PM Drafts letter on behalf of agencies that applications have been filed in accordance (letter addressed to EAO, cc’ proponent)
June 5, 2013
MRC: Application screening (to ensure that all required information is available for technical reviewers to conduct their review of the applications).
**Comments to be provided to PM, Jennifer Stalker within 75 days of EA application being accepted **
August 12 – October
25, 2013
Day 1 - Day 75
FNR-2013-00423 Page 251FNR-2013-00423 Page 251
Forests, Lands and Natural Resource Operations – Major Projects Office
2
PM to draft and deliver letter to EAO (cc’ MEM and proponent) outlining any information that is still required from the proponent to conduct a full review (letter must be delivered within 75 days of EA application acceptance)
October 25, 2013
Day 75
Technical MRC Permitting Review period Starts
Expected Late October, 2013
Technical MRC Permitting Review period winding down (buffer to resolve/ address any outstanding issues and PM to prepare Committee Report)
(once EAC has been issued)
~ Mid February, 2014
Address final issues and prepare Draft Committee Report
~ Mid February, 2014
Draft Committee Report and Draft Permits for MRC Review and Comment (2 weeks)
~ Late February,
2014
PM to prepare final Committee Report
Expected March,
2014
Final Decision Package submitted to SDM’s for Decision
Expected March,
2014
Decision
FNR-2013-00423 Page 252FNR-2013-00423 Page 252
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
From: Sent: To: Cc: Subject:
Hi Cam,
KSM Project - availability of meeting on Oct 17 at 10:307
Wed 2013-10-0912:00 AM Thu 2013-10-10 12:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Jessy Chaplin [email protected] Wednesday, October 9, 2013 2:52 PM Bentley, Cam FLNR:EX; Cuell, James W FLNR:EX Stalker, Jennifer L FLNR:EX; Paterson, Genevieve FLNR:EX KSM Project - availability of meeting on Oct 17 at 10:307
Bruce and I would like to provide you an update on the KSM Project with regards to our on-going discussions with the MTT tunnel and mineral claim owners American Creek and Teuton Resources. Bruce Scott, who you met at our last meeting July 8th, has some more questions about the generic and specific clauses that would likely be presented in a licence offer to Seabridge, perhaps we could review a draft of the MTT licence?
He is available in the morning -10:30 for a meeting. Would you please let us know if you are available.
Regards,
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. 1235 Main Street
P.O. Box 2536
Smithers, BC VOJ 2NO
Tel. (250) 847-4704
Cell.
1 FNR-2013-00423 Page 253
s.22
s.22
FNR-2013-00423 Page 253
Muir, Deanna CSNR:EX
From: Sent: To:
Subject:
Importance:
Good afternoon,
Paterson, Genevieve FLNR:EX on behalf of Stalker, Jennifer L FLNR:EX Monday, October 21 , 2013 2: 17 PM , Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William J FLNR:EX; 'Garett Cooper'; 'Gitanyow Hereditary Chiefs Office'; 'Harp Gill'; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jeska Gagnon '; 'Jessica Coulson'; 'Jessy Chaplin '; 'John Mackie '; 'Kevin Koch '; 'Kyle Moselle'; 'Mansell Griffin ([email protected])'; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FLNR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN RE: KSM Mine Review Committee - Screening Level Period Extension to October 25th, 2013
High
This is a reminder for KSM Mine Review Committee Members of the deadline of Friday October 25th, 2013 for all Screening Level comments on the Batch 1 Applications submitted by Sea bridge Gold.
Please forward your Screening Level comments onto Project Manger [email protected] and to myself.
Thank you,
Ci~PMt4r~
Project Coordinator Ministry of Forests, Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
From: Paterson, Genevieve FLNR:EX On Behalf Of Stalker, Jennifer L FLNR:EX Sent: Friday, October 4, 2013 3:32 PM To: ' Melanie Campbell,'; Applegate, Sherrie TRAN:EX; 'Azreer Gill '; Barnewall, Rosemary C TRAN:EX; Bellefontaine, Kim MEM:EX; Bentley, Cam FLNR:EX; 'Brian Wilkes'; Bulmer, Emily M FLNR:EX; Carmody-Fallows, Jeanien ENV:EX; 'Darlene Simpson'; Demchuk, Tania MEM:EX; Donnelly, Ron FLNR:EX; 'Elizabeth Miller'; Fielding, Regan ENV:EX; Forgeng, Eric E FLNR:EX; Foster, William lFLNR:EX; 'Garett Cooper'; .'Gitanyow Hereditary Chiefs Office'; 'Harp Gill'; Howe, Diane J MEM:EX; Hudson, Patrick; Jackson, Scott ENV:EX; 'Jerry Asp'; 'Jeska Gagnon '; 'Jessica Coulson'; 'Jessy Chaplin '; 'John Mackie '; 'Kevin Koch'; 'Kyle Moselle'; 'Mansell Griffin ([email protected])'; 'Mark Cleveland '; 'Nalaine Morin '; Narynski, Heather M MEM:EX; Page, Steven FLNR:EX; 'Pascale Mera '; Paterson, Genevieve FLNR:EX; Pope, Jason FLNR:EX; 'Rolf Schmitt'; Sakals, Matt E FLNR:EX; Schell, Chris FLNR:EX; 'Shane Wadden'; Sharpe, Ian D ENV:EX; Stalker, Jennifer L FLNR:EX; Stewart, Craig J ENV:EX; Wagar, Kathie L MEM:EX; Warnock, George MEM:EX; Williston, Patrick ENV:EX; XT:McKay, Tracey FLNR:IN; XT:Webber, Andrew Regional District of Kitimat-Stikine EAO:IN Cc: Cuell, James W FLNR:EX Subject: KSM Mine Review Committee - Screening Level Period Extension to October 25th, 2013 Importance: High
Good afternoon,
1 FNR-2013-00423 Page 254FNR-2013-00423 Page 254
It has come to the attention of the Major Projects Office that the capacity of technical experts is being tied up in the Environmental Assessment Review and there is a need for more time to provide screening level comments on the Batch 1 Permit Applications.
The screening level comments for the Batch 1 Permit Applications are now due by the end of business day Friday October 25th, 2013. For the screening level comments we, are looking for input on whether there are any additional information requirements in order for the Mine Review Committee to conduct their review.
Please forward your Screening Level comments onto Project Manger [email protected] and to myself.
Updated timetable:
m ~
KSM Permitting Timeline - Octo ...
Thank you,
Ci~ Po.-fe-t-)QVV Project Coordinator Ministry of Forests. Lands and Natural Resource Operations Major Projects Office, Skeena Region 250-847-7268
2 FNR-2013-00423 Page 255FNR-2013-00423 Page 255
Muir, Deanna CSNR:EX
From: Sent: To:
Paterson, Genevieve FLNREX Tuesday, October 29, 20132:22 PM 'Jessy Chaplin'
Cc: Stalker, Jennifer L FLNR:EX Subject: KSM-Issue and Comment Tracking Table Updated and Posted to Sharepoint
Hi Jessy,
The table have been updated to include:
• All of the comments Seabridge has provided in response to screening level comments from MRC members and • Review comments that have been submitted by MRC members.
https:/lspc-flnr.gov.bc.ca/ksm/SitePages/Home.aspx
If you have any questions please let me know.
Thank you,
Project Coordinator Major Projects Office, Skeen a Region Ministrv of Forests. Lands and Natural Resource Operations 250·847-7268
1 FNR-2013-00423 Page 256FNR-2013-00423 Page 256
Muir, Deanna CSNR:EX
From: Sent: To:
Paterson, Genevieve FLNR:EX Wednesday, Oclober 30, 2013 8:58 AM 'Jessy Chaplin'
Subject: RE: KSM Mine Project - Seabridge response to MOE-EPD screening comments
Thank you Jessy.
Moving forward may I please be cc'd on all responses, I just noticed I was missed on the original submission.
Thanks again, have a nice day. ©
GP
From: Jessy Chaplin [mailto:[email protected] Sent: Tuesday, October 29, 2013 3:07 PM To: Paterson, Genevieve FLNR:EX Cc: 'Rolf Schmitt'; Stalker, Jennifer L FLNR:EX Subject: FW: KSM Mine Project - Sea bridge response to MOE-EPD screening comments
Hi Genevieve, Missing from the tracking table are the responses from Sea bridge to the MOE- Environmental Protection Division Air and Effluent comments (document attached). There are two documents with four pieces of information to respond to the MOE-EPD comments:
1) attached cover letter and table of responses to screening comments (.pdf pages 1-7); 2) The KSM Domestic and Industrial Waste. Management Plan (.pdf pages 8-22); 3) The Revised Air Emissions EMA Application form (pages 23-36); 4} The Air Emissions EMA Technical Assessment Report (the document you have uploaded to the sharepoint).
All four form the whole response to the comments.
I am also wondering if you have a tracking table where each comment is tracked, as opposed to each submission?
Thanks Jessy
lessy Chaplin, MSc, RPBio Permitting Coordinator Sea bridge Go ld Inc. 1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell.
._---- .- _._-From: Jessy Chaplin [mailto:[email protected] Sent: Friday, October 25, 2013 10:20 PM To: 'jeannette,[email protected]' Subject: FW: KSM Mine Project - Sea bridge response to MOE-EPD screening comments
Re-sent 1 FNR-2013-00423
Page 257
s.22
FNR-2013-00423 Page 257
From: Jessy Chaplin [mailto:[email protected] Sent: Friday, October 25, 2013 9:47 PM To: '[email protected]' Cc: Jeanien CarmodyFaliows (Jeanien.CarmodyFallows@gov,bc,ca); Jen Stalker. (Jennlfer.Stalker@goy,bc.ca); [email protected] Subject: KSM Mine Project - Seabridge response to MOE-EPD screening comments
Good day Jeanette,
Enclosed are Sea bridge Gold Inc. responses to the comments from MOE-EPD received August 29, 2013. Enclosed are responses to the comments and questions raised, a copy of the Environmental Management Plan Domestic and Industrial Waste Management Plan for construction and a revised application form for air emissions. A revised technical assessment report to encompass all five air emission permits for the site is included in a second email due to the size.
We look forward to your comments and further discussions.
Jessy Chaplin, MSc. RPBio Permitting Coordinator Sea bl'idge Gold Inc. 1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell
2 FNR-2013-00423 Page 258
s.22
FNR-2013-00423 Page 258
Muir, Deanna CSNR:EX
From: Sent: To:
Paterson, Genevieve FLNR:EX Monday, November 4,20133:57 PM 'Jessy Chaplin'
Cc: 'Rolf Schmitt'; Stalker, Jennifer L FLNR:EX Subject: RE: KSM Mine Project - Sea bridge response to MOE-EPD screening comments
Hi Jessy,
As per your comment below, you can expect a revised version of the KSM Issues and Comment Tracking Doc by the end of day Wed.
It will be revised to capture each individual comment along with a hyperlink to the document.
Talk to you later,
-Gen
Project Coordinator Major Projects Office, Skeena Region Ministry of Forests. Lands and Natural Resource Operations 250-847-7268
From: Jessy Chaplin [mailto:[email protected] Sent: Tuesday, October 29, 2013 3:07 PM To: Paterson, Genevieve FLNR:EX Cc: 'Rolf Schmitt'; Stalker, Jennifer L FLNR:EX Subject: FW: KSM Mine Project - Seabridge response to MOE-EPD screening comments
Hi Genevieve, Missing from the tracking table are the responses from Sea bridge to the MOE- Environmental Protection Division Air and Effluent comments (document attached). There are two documents with four pieces of information to respond to the MOE-EPD comments:
1) attached cover letter and table of responses to screening comments (.pdf pages 1-7); 2) The KSM Domestic and Industrial Waste Management Plan (.pdf pages 8-22); 3) The Revised Air Emissions EMA Application form (pages 23-36); 4) The Air Emissions EMA Technical Assessment Report (the document you have uploaded to the sharepoint).
All four form the whole response to the comments.
I am also wondering if you have a tracking table where each comment is tracked, as opposed to each submission?
Thanks Jessy
Jessy Chaplin, MSc. RPBio Permitting Coordinator
1 FNR-2013-00423 Page 259FNR-2013-00423 Page 259
Seabridge Gold Illc. 1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell.
From: Jessy Chaplin [mailto:[email protected]] Sent: Friday, October 25, 2013 10:20 PM To: '[email protected]' Subject: FW: KSM Mine Project - Sea bridge response to MOE-EPD screening comments
Re-sent
From: Jessy Chaplin [mailto:jessy@seabridgegold,netl Sent: Friday, October 25, 2013 9:47 PM To: '[email protected]' Cc: Jeanien carmodyFaliows ([email protected]); Jen Stalker ([email protected]); [email protected] Subject: KSM Mine Project - Sea bridge response to MOE-EPD screening comments
Good day Jeanette,
Enclosed are Sea bridge Gold Inc. responses to the comments from MOE-EPD received August 29, 2013. Enclosed are responses to the comments and questions raised, a copy of the Environmental Management Plan Domestic and Industrial Waste Management Plan for construction and a revised application form for air emissions. A revised technical assessment report to encompass all five air emission permits for the site is included in a second email due to the size.
We look forward to your comments and further discussions.
Jessy Chaplin, MSc. RPBio Permitting Coordinator Seabridge Gold Inc. 1235 Main Street P.O. Box 2536 Smithers, BC VOl 2NO Tel. (250) 847-4704 Cell
2 FNR-2013-00423 Page 260
s.22
s.22
FNR-2013-00423 Page 260
Muir, Deanna CSNR:EX
Subject:
Start: End: Show Time As:
Recurrence:
Organizer:
Categories:
From: Sent: To: Cc: Subject:
Categories:
Hi Jen,
Request from Seabrdige to Postpone MRC ReviewMtg
Tue 2013-11-1212:00 AM Wed 2013-11-1312:00 AM Free
(none)
Paterson, Genevieve FLNR:EX
Print/File
Jessy Chaplin [[email protected] Tuesday, November 12, 2013 5:02 PM Stalker, Jennifer L FLNR:EX Paterson, Genevieve FLNR:EX; [email protected]; Brent Murphy MRC meeting Dec 2013
Print/File
If you could give me a call tomorrow Wed 13 Nov, I'd like to discuss the MRC meetings for which Gen sent out an invitation today. In order for Seabridge to respond fully to greater than 250 permit application screening/permit review comments received, I am requesting a delay until mid-January for the proposed December 4/5 MRC meetings.
Thanks
Jessy
Jessy Chaplin, MSc. RPBio
Permitting Coordinator
Seabridge Gold Inc. Smithers, BC
Tel. (250) 847-4704
Cell.
www.ksmproject.com
1 FNR-2013-00423 Page 261
s.22
FNR-2013-00423 Page 261
Muir, Deanna CSNR:EX
From: Sent: To: Cc: Subject:
Tracking:
Good afternoon Jessy,
Paterson, Genevieve FLNR:EX Monday, November 18, 20134:07 PM 'Jessy Chaplin' Stalker, Jennifer L FLNR:EX Comments and Issues Tracking Doc-Updated.
Recipient
'Jessy Chaplin'
Stalker, Jennifer L FLNR:EX
Recall
Failed: 2013-11-18 4:24 PM
Please find the updated Comments and Issues Tracking Table posted on the Project sharepoint site.
If you have any questions please let know. I hope that the change in format suits your needs.
Thank you,
C;~ p(lJ/'e.yscw Project Coordinator Major Projects Office, Skeena Region Ministry of Forests, Lands and Natural Resource Operations 250-847-7268
1 FNR-2013-00423 Page 262FNR-2013-00423 Page 262
Muir, Deanna CSNR:EX
From: Sent: To: Cc: Subject:
Hi Jessy,
Paterson, Genevieve FLNR:EX Thursday, December 5,20139:56 AM 'Jessy Chaplin' Stalker, Jennifer L FLNR:EX Updated Issues and Comments Tracking Table
I've updated the IT table to include the comment from Ministry of Transportation around the intersection of the Treaty Creek access road.
Hope you' re doing well,
Project Coordinator Major Projects Office, Skeena Region Ministry of Forests. Lands and Natural Resource Operations 250·847-7268
1 FNR-2013-00423 Page 263FNR-2013-00423 Page 263
Muir, Deanna CSNR:EX
From: Sent: To:
Paterson, Genevieve FLNR:EX Thursday, December 5, 2013 11 :44 AM 'Jessy Chaplin'
Subject: RE: Updated Issues and Comments Tracking Table
Yes please more snow! I'm sad that Washington and Whistler are both getting lots and we aren't ® .
From: Jessy Chaplin [mallto:[email protected]] Sent: Thursday, December 5, 2013 11:42 AM To: Paterson, Genevieve FLNR:EX Subject: RE: Updated Issues and Comments Tracking Table
Hi Genevieve, Thanks for updating the table. I am well, thanks. I like the sunny weather, even if it is cold © Now for some snow ...
Jessy
.-~---~-.-.-.- -------... -- .---~----.-----From: Paterson, Genevieve FLNR:EX [mailto:[email protected]] Sent: Thursday, December 05,2013 9:56 AM To: 'Jessy Chaplin' Cc: Stalker, Jennifer L FLNR:EX Subject: Updated Issues and Comments Tracking Table
Hi Jessy,
I've updated the IT table to include the comment from Ministry of Transportation around the intersection of the Treaty Creek access road.
Hope you're doing well ,
Ci~P~~
Project Coordinator Major Projects Office. Skeena Region Ministry of Forests, lands and Natural Resource Operations 250-847-7268
1 FNR-2013-00423 Page 264FNR-2013-00423 Page 264
Muir, Deanna CSNR:EX
From: Sent: To:
Paterson, Genevieve FLNREX Wednesday, December 11, 20131:20 PM 'Jessy Chaplin'
Cc: . Stalker, Jennifer L FLNR:EX Subject: FW: Updated Issues and Comments Tracking Table
Hi Jessy,
The IT table has been updated to include comments from Ecosystems (Chris Schell).
Thanks,
Project Coordinator Major Projects Office, Skeena Region Ministry of Forests. Lands and Natural Resource Operations 250-847-7268
From: Paterson, Genevieve FLNR:EX Sent: Thursday, December 5, 2013 9:56 AM To: 'Jessy Chaplin' Cc: Stalker, Jennifer L FLNR:EX Subject: Updated Issues and Comments Tracking Table
Hi Jessy,
I've updated the ITtable to include the comment from Ministry of Transportation around the intersection of the Treaty Creek access road.
Hope you're doing well,
Ci~P~jQW Project Coordinator Major Projects Office, Skeena Region
Ministry of Forests. Lands and Natural Resource Operations 250-847-7268
1 FNR-2013-00423 Page 265FNR-2013-00423 Page 265
Muir, Deanna CSNR:EX
From: Sent: To: Cc: Subject: Attachments:
Good morning Jessy,
Paterson, Genevieve FLNR:EX Monday, December 16, 2013 8:59 AM 'Jessy Chaplin' Stalker. Jennifer L FLNR:EX FW: KSM review comments - Air permit TAR rf comments_KSM Permit Applications Air Emissions TAR - All Camp Memo 22_0ct_ 2013.pdf
Please find attached Regan Fielding's comments on applications for air emissions.
You can expect the Issues and Comment tracking table to be updated, and posted to the KsM Share point site by the end of the day.
Have a good day,
Project Coordinator Major Projects Office, Skeena Region Ministry of Forests, Lands and Natural Resource Operations 250-847-7268
1 FNR-2013-00423 Page 266FNR-2013-00423 Page 266
MOE EPD - Review Notes on Air Permit Applications for KSM Concurrent Permitting
Authorization #s’: 106826, 106827, 106829, 106832, and 106833
Prepared: Aug 8, 2013 by Regan Fielding
General Permitting Approach for Air Emissions:
Five applications for air permits were submitted by the client. Three of the applications correspond to individual camp sites, while the remaining two applications each consist of two neighboring camps with some shared infrastructure. The applications are very similar in content.
As an alternative to the above approach, MOE EPD recognizes that all camp air emissions could be authorized under one permit. For this approach, the information presented under the five separate applications would need to be consolidated. Annual discharge fees would be determined from the sum of the discharges between the seven camps. This approach would reduce the number of application fees ($200/application) and annual base fees ($100/permit) charged to the client. Once the construction camps are no longer required, a minor permit amendment would be required to reduce the authorized discharge quantity and associated discharge fees.
Alternatively, camp air emissions could also be authorized under two permits. One permit would authorize emissions from the construction camps, while the other would authorize the emissions from the operating camps. Once the construction camps are no longer required, then the air permit for the construction camps would be cancelled.
I recommend that the client revise their permit application approach for air emissions and seek authorization under one permit.
Open Burning of Clean Wood Waste:
Open burning of clean wood waste is not identified in the air permit applications. MOE requires confirmation that there is no intention to open burn clean wood waste, as this activity requires MOE authorization. Typically, authorization to conduct open burning of clean wood waste forms a component of the air permit. Please note that the Open Burning Smoke Control Regulation only applies to land clearing debris and does not allow for open burning of lumber scraps or other clean burning combustible materials. If the intention is to open burn clean wood waste from construction activities, then the TAR and application should contain appropriate information including but not limited to estimated monthly volumes of waste to be open burned (maximum and average volumes), description of burn and ash disposal locations, and description of waste to be open burned.
Generators:
Current approach of MOE EPD is that the production of electricity by the combustion of fuel, where the rated electrical production is less than 5 MW under peak load, does not require an authorization.
.
FNR-2013-00423 Page 267
The largest camp (Construction Camp #5 combined with Treaty Operating Camp), has a proposed electrical production capacity of 1.635 MW from diesel fired generators. Consequently, in accordance with the approach above, emissions from electrical generation at this camp do not require MOE authorization. Similarly, as other construction and operating camps also have proposed electrical production capacity that is significantly less than 5MW under peak load, the air emissions from electrical generation do not require MOE authorization.
Incinerators:
I have no major concerns with the incinerator component of the applications as the client is proposing to use reputable incinerators which should emit relatively good quality emissions provided that only appropriate materials are incinerated. However, the following comments identify areas where additional information is required, or areas that may require revision.
Source of waste:
1.1 Language needs to clearly state that incinerators will be solely used to incinerate putrescible food waste (including food contaminated packaging), paper, cardboard and clean wood waste. No wastes as defined by the Hazardous Waste Regulation shall be disposed of in the refuse incinerator. Burning of plastics will be minimized through waste reduction and recycling programs.
Proposed Treatment of Waste:
2.1 Waste Segregation - Waste segregation needs to occur at the source, using properly identified waste receptacles, to ensure that inappropriate wastes are not incinerated. Staff training will help ensure proper segregation of wastes at source. Bear proof containers should be used for temporary day storage of putrescible waste.
2.2 Description of incineration process – The incineration treatment process specific to the proposed incinerator should be described. Please present minimum operating temperatures for the primary and secondary chambers, and the secondary chamber minimum residence time.
2.3 Ash disposal – How does the proposed timeline for landfill construction relate to start of incinerator operations? If a there is a significant disparity between the two, then interim disposal locations should be identified. Incinerator ash is routinely disposed of at an open burning location along with the ash produced from open burning of clean wood waste. Prior to disposal of ash to ground, the ash should be stored in sealed containers within the fenced incinerator area.
2.4 Incinerator operation and tracking – Incinerator should only be operated by trained system operator. The operator is responsible to ensures that inappropriate waste is not incinerated and that the equipment is properly operated and maintained to avoid causing poor quality air emissions. Tracking of incinerator operation is required.
FNR-2013-00423 Page 268
Quantity of Waste Discharged:
3.1 Waste generation estimate – The estimate of 2.75 to 4.5 kg seems high and I believe the source reference provided for this information is not accurate. Applications for similar camp facilities have used a waste generation estimate of 2kg of waste/person/day that takes into account recyclables, and other materials not suitable for incineration. Please provide information to support the estimate and provide a single value for the estimate rather than a range of values. Please state the daily maximum weight of waste to be incinerated and the corresponding number of incinerator batches required based on full capacity at the camps. The required number of incinerators should be based on maximum camp capacity, estimated waste generation rates, incinerator batch capacity, and the duration of a typical incinerator batch cycle for a full load of putrescible food waste. The following link provides EPA published waste generation rates for the United States. http://www.epa.gov/osw/nonhaz/municipal/pubs/msw_2010_rev_factsheet.pdf The applications for Camps #9/#10 and Camp #5/Treaty Operating Camp were the only applications that presented estimates for daily waste generation. However, estimates provided (see Table 3) were based on an unsubstantiated waste generation estimate of 3.38 kg/person/day provided as a table footnote (refer to 1st paragraph in point 3.1 above).
3.2 Batch capacity and cycle times - Please clarify what the capacity of incinerator CA-600 is (inconsistently presented as 272 kg/batch in the technical memo and 341 kg/batch in appended fact sheet). Also, I have concerns that the estimated total cycle time (5 hours) is low and does not reflect that putrescible food waste has a high moisture content and may require a longer burn cycle. Appropriate heat-up and cool-down periods should also be accounted for. The appended information on livestock incineration shows that for the six test cases the primary burner was on for a minimum of 5 hours plus additional time for heat-up/cool-down, and loading/unloading.
Operating Period:
4.1 The operating period is 24 hours/day, 365 days/year.
Discharge Works:
5.1 Estimated Rate of Discharge for Incinerator (Table 2-4 or Table 2-3 depending on application) – The numbers presented under “Frequency” show an inconsistent relationship between camp size and the number of incineration cycles required per day. For example, based on the CA-600 incinerator, for the Mitchell operating camp (350 people), 4 to 6 incineration cycles/day is estimated. In contrast, for the Camps #9 & #10 (540 people), only 3 to 4 incineration cycles were
FNR-2013-00423 Page 269
estimated despite the need to incinerate over 50% more waste daily. Please review and revise accordingly. The frequency should state a single value that is based on maximum camp capacity, incinerator batch capacity and the estimated putrescible waste generation rate (See 3.1 above). Based on the presented incinerator cycle duration of 5 hours, only 4.8 incineration cycles can be performed per day. In contrast up to 6 cycles per day are estimated for Camp #5 and Mitchell Operating Camp, which would require the operation of two incinerators based on current estimates. The table footnote a) on the TARs for Camp #5/ Treaty Operating Plant, and Mitchell Operating Plant states that the frequency numbers are based on a theoretical maximum, that can be reduced through more intense recycling programs. In contrast, MOE’s prefers that a comprehensive recycling program be developed for site and that the estimated waste generation rates for incineration are reflective of the amount of waste diverted from incineration through recycling and alternate disposal. See point 3.1 above.
Additional Notes:
• TAR Memo - Camps #9 and #10 application– Incinerator section – The estimates presented for average number of camp occupants (270 people), are not required for the incinerator application and should be removed (Tables 2.3 and 2.5).
• TAR Memo – Estimated Daily Emissions from Camp (Table 2-4 or 2-5) – Table footnote does not reflect specifics of individual applications (same footnote on the 5 applications).
• TAR Memo - Camp #4, Camp #5/Treaty Operating, and Camp #6 applications – Incinerator - Proposed Treatment of Waste section – Mass fraction (% w/w) is typically used to describe the composition of a mixture, and does not seem suitable for describing the mass change resulting from incineration.
FNR-2013-00423 Page 270