The Overview

Phase 1 – “the drive shaft”• Bring the completed pilot stage (Illawarra) into

‘production’• the component becomes invisible • entry assessment information > destination of the

assessment• Success & cost is non-negotiable

• no link, no feedback

Phase 2 [build selected assessments to demonstrate & train in build process]• Initially it’s humans!• Coordination needs be done ONCE for each Assessment• Costs depend on design requirements

• Not stock [e.g., graphics, then separate process] > $$• Stock [i.e., available] > can do now

• Coordinate changes • MOSAIQ DB [Clinical Assessments]• Assessments values and destination

Phase 3 - distribution• Getting the completed assessments to a repository• Moving the available assessments to the device• IT problem (all assessments on all devices?; App

Store/iTunes?)• Solve once for each device type

Phase 4 – Re-use• Problem of ingenuity

• what we write first will be inadequate; just demo• MOSAIQ is a Corporate production Environment

• Interaction with clinician – pilot demonstration or production? α $$$$

• Demonstration can be achieved now with current data

Phase 5 – Feedback• Problem of ingenuity

• what we write first will be inadequate; just demo• Requires a working system

• Data Transfer• Patient notification (TXT, email, voice)

Proposed Timing

Phase 1

Phase 2

Phase 3

Phase 5

Informatics

Clinical

Phase 4

patient use