2
The Nordic team
Louise Skordby
Maximo Nordic Service Area Leader
Peter Hargne
Maximo SWG Sales
Bengt Brander
Maximo BusinessSolution Manager
Riku Ahlroth
Maximo SWG Sales
Henrik Tofft
Maximo SWG Sales
Oyvind Prytz
Maximo SWG Sales Norway
Staffan Olsson
Maximo SWG Presales
Finland
Denmark
Mikka Kallio
Maximo GBS Focal Point
Norway
Nordic Maximo GTM
Ulla Francke (acting)
Maximo GBS Focal Point
Peer Ehrstedt
Maximo GBS Focal Point
Sweden
Louise Skordby
Maximo GBS Focal Point
Ulla Francke
Maximo Nordic GBS Sales
© 2010 IBM Corporation
IBM Global Business Services
3
Nya kunder / affärer
Nokia översyn Maximo installation och användning Outotec Utrullning MTAB/LKAB Uppgradering Fingrid Ny installation, systemförnyelse
Go Lives
Korsnäs Domsjö Fortsatt utrullning på IKEA
© 2010 IBM Corporation
IBM Global Business Services
4 IBM CONFIDENTIAL
ELVIS architecture overview
Elvis
WebSphere Application Server
WebSphere Application Server
WebSphere Application Server
FinGrid Elvis ArchitectureVersion: 1.0.3
Date: 18.01.2012
IBMFinGrid Elvis Architecture
Maximo
SchedulerMaximo Adap. For Primavera
Mobile Work Manager SE
Maximo Linear
ODMS
Asset Hierac. Import
Calculation Export
Connectivity Import
Topological Processing
Syclo
Work Manager Asset Auditor
Primavera
Maximo Adaptor
IPS
Relay ModelsRemote Access
PSS/E
Short Circuit, Load Flow
PSS/E Import/Export
IPS Remote
Basic Work Management
Relay Testing
I-02 Work Order Synch(Agentry)
Data Access Layer
Operational Data Import
Basic Work Management
Maximo Spatial
Oracle DB
CIM SchemaSQL
I-05 Asset HierarchyCIM Messaging
(WS/HTTP)
SQL
I-03 Project Synchronization(WS/HTTP)
3.1 Lightning information from Meteorological Institute (external)
3.2 Weather information from Meteorological Institute (external)
Lightning Data(Web Service)
Weather Data(Web Service)
Transmission Line Info(Web Service)
Outage Info(Web Service)
3.5Interface of project
information (www.fingrid.fi)
Project Info(Web Service)
Invoicing Data(Web Service)
3.8Interface of fuel tank
information (PI)
Fuel(Web Service)
3.9Interface of reserve
power machine information (PI)
Reserve Power(Web Service)
3.10Interface of status
information on switching devices (PI)
3.11Interface of power
information on connection points (PI)
Disturbance Info(Web Service)
3.13Interface of energy info on connection
points (LTJ)
Invoicing Data(Web Service)
MAPI(Web Service)
3.16Document interface
(ProjectWise)
Disturbance Info(File)
Data Warehousing(SQL)
3.20Interface of e-mail distribution list (MS
Outlook)
MAPI(Web Service)
3.21MS Excel import (Excel Import)
Bulk Data Creation(Excel)
Device informationJob and work programme
Failure information(SQL)
3.23PSS/E
PSS/E File(PSS/E file)
I-08 RAW(File/HTTP)
3.24 Terrain database
(Terrain database of National Land Survey)
Terrain DataManual DL or online,
WMS (bitmap)WFS (GML feature geo objects)
3.26Land Register (Land register of National
Land Survey)
Land Register Data(Web Service)
3.27SYKE (Data sys. and materials of Finnish Environment Inst.)
Materials Data(Web Service)
URL
3.25Land Use Plan Info
(Land use plan info of National Land Survey)
3.29Measurement Batch
Measurement Data(File)
Safety declaration(SQL or WS)
Terrain DataManual DL or online,
WMS (bitmap)WFS (GML feature geo objects)
3.32Component Information
Component Data(Excel)
3.33Signal Information
(RTU Signals)
Signal information on RTUs(Excel)
3.34Map feedback
information (Map feedback system)
ESRI
JavaScript REST API
ArcFM
Fiber Network Editing Tools
Schematics
I-01 Asset Synchronization(WS/HTTP)
(Shared SQL)
I-04 Grid ConnectivityCIM Messaging
(WS/HTTP)
Comms links failures(PI Interface)
3.7Interface of
transmission line info (www.fingrid.fi)
3.4 Interface of outage
information (www.fingrid.fi)
3.14 Invoicing information (Invoicing Workflow)
3.12Interface of info on
data communications connections (PI)
3.3 Interface of grid disturbance info (www.fingrid.fi)
3.15 Invoicing initiative(Verkkolasku.fi or
contractor's inv. sys.)
3.19 Interface of sending of
e-mail (Elvis)
3.17 SMS interface of grid
disturbance information
3.18 Cognos (Cognos)
3.22Ubiware
3.28 Application Link
3.30Safety Declaration (Safety declaration
system)
Oracle DB
ESRI Schema
SQL
SQL
Oracle DBMaximo Schema
SQL
MS SQL Server
Shared Schema
Oracle DBPrimavera Schema
I-13 Work Order Synch.(WS/HTTP)
Switching State(Web Service)
SCADA Measuremetns(Web Service)
Energy Metering(Web Service)
IPS Schema
BizTalk
Biz
Ta
lkB
izT
alk
BizTalk
Biz
Tal
k
2. GIS3. Electrical
Modeling8. Grid
Development
1. Asset Register
4. Work Management
6. Outage Management
7. Maintenance
10. Disturb. Management
11. Failure Management
5. Cost Management
9. Program Management
WebSphere ESB
System User
External Interface
Infrastructure
Component
Legend
12. Relay Management
Module
Active Directory
Relay Testing(SQL Merge Replication)
3.6Interface of growth
clearance information (www.fingrid.fi)
Growth Clearance(Web Service)
Relay Testing(SQL Merge Replication)
3.31Safety Declaration (Safety declaration
system)
Safety declaration(SQL or WS)
Map feedback data(SQL or WS)
CAPE
Secondary Relay Calc
SQL
Primary Relay Calculation
Relay Models
© 2010 IBM Corporation
IBM Global Business Services
5
Oiyvind Johansen Jan- Hugo Lundberg Sofia Stenegård Andrew Jeffery Hanna Selkirk Håkan Redgert Mikko Vuorensola Peter Flem Sverre Sveum Moen Mikko Vuorensola Eero Eloranta
Nya konsulter
© 2010 IBM Corporation
IBM Global Business Services
6
Prioriteringar
Bygga upp vår verksamhet i Norden – Oslo, Stavanger, Helsingfors
Bygga upp erfarenhet av införande av Maximo 7.5
Certifieringar framförallt Certified Deployment Professional
Satsning på Tririga/ Facilities Management
Vidareutveckla våra förvaltnings tjänster på Nordisk bas
© 2011 IBM Corporation
Let’s Build a Smarter Planet: Smarter Buildings from the Earth up
7
Operations Management
• Asset mgmt• Work mgmt• Inventory mgmt• Supply chain• Contracts• Key mgmt
Space & Facilities
Management
• Space utilization
• Capacity planning
• Move, add, change
• Reservations
Real Estate Portfolio
Management
• Strategic RE portfolio planning
• Budgeting & forecasting RE expense drivers
• Lease & contract admin
Datacenter Infrastructure Management
• Space, power and cooling optimization
• Allocation planning
• Move, Add, Change
• Cable mgmt
Service Management
• Facilities service desk
• Service level agreements
• Contracted services
• Customer billing
Energy and Environment Sustainability
• Utility tracking• Environmental
opportunity analysis
• Carbon output measurement
Capital Project Management
• Condition assessment
• Capital planning• Budgeting • Construction
estimates • Project mgmt
IBM Maximo TRIRIGA
Seven closely-connected sets of business functions are needed to reduce real estate costs and improve facilities operations.
Critical business processes address the total building life cycle from construction, design, and project management to leasing, portfolio management, datacenter infrastructure management, maintenance management, energy and environmental sustainability and asset disposition.
By merging TRIRIGA and Maximo solutions, customers can accomplish these business processes from one suite.
TRIRIGA and IBM will address a total view of facilities and real estate management
© 2010 IBM Corporation
IBM Global Business Services
8
Maximo kringtjänster från IBM
Maximo Hälsocheck
– Hur mår ditt Maximo system egentligen? Med IBM´s hälsocheck tar vi temperaturen på ditt Maximo system och ordinerar lämplig medicin alternativt friskförklarar det.
Maximo Monitorering
– Vill du hellre ha en hälsocheck i litet format så bistår vi även med det. Maximo Mobile & Everyplace
– Hotta upp ditt Maximo system med en mobil handenhet eller varför inte en iPhone? Utbildning
– Hur effektivt använder ni ert Maximo system? Ta chansen att lära känna våra ypperliga utbildare. KPI
– Har du den uppdaterade information du behöver? Vi kan KPI både i Maximosystemet och för din specifika bransch.
Change Management
– Har du processerna på papper och behöver förverkliga dem? Vi hjälper till. Benefit Matrix
– Gömda skatter i förrådet? Effektivisera dina inköp? Kontraktsstyrning? Downtime reduction? Vi har svaren på dina önskemål.
© 2010 IBM Corporation
IBM Global Business Services
9
Produktinformation
– End of Marketing: – On July 10, 2012, The remaining IBM Maximo 6.x versions , will be withdrawn from
Marketing.This means that the 6.x versions of software will not be sold effective July 10,2012
End of Service:The remaining Maximo 6.x versions will reach End of Service effective September 30, 2013 This means that the fixes, patches, and telephone support will not be provided for Maximo 6.x versions and add-ons effective Sept 30,2013.However, Customers on 6.x will still be able to get Extended Support contract until 2016 "Extended Support Contracts for Maximo are signed through GTS/MTS, and the Product will be serviced by Tivoli Maximo Support/Development team"
End of marketing announcement– Primavera adapter
Maxavera adapter för Primavera. Partner produkt från ww.pipelinesoftware.com
© 2010 IBM Corporation
IBM Global Business Services
10
Dokumentation uppgradering
Maximo 7.5 Upgrade Documentation
What's New in version 7.5 http://bit.ly/iH1Pwu
Maximo 7.1 to 7.5 Upgrade Guide
mam
_7.5_upgrade_guide.pdf
Database differences between Maximo 7.1.1.8 and 7.5
DBdiff75Comparedto7118.xls
Database differences between Maximo 7.1.1.7 and 7.5
DBdiff75Comparedto7117.xls
Maximo 7.1 Upgrade Documentation
What's New in version 7.1 Guide
what's new in release 71.pdf
Maximo 6 to 7.1 Upgrade Guide
6_to_7_up
grade_e16.pdf
http://www-304.ibm.com/support/docview.wss?uid=swg21266217
© 2010 IBM Corporation
IBM Global Business Services
11
Maximo fridays
Aktuella presentationer på Maximo och Tririga tema – varje fredag– Webmöte– Kostnadsfritt– Kan laddas ned i efterhand– Fredagar 17.00-18.00.......
Maila mig på [email protected] så ser jag till att ni får inbjudan.
© 2010 IBM Corporation
IBM Global Business Services
12
CMMS – a module in your ERP or a Best of Breed solution? Best of breed or ERP - pros and cons
IBM Global Business Services
December 2011
Bengt Brander, Business solution manager, Tel. + 46 (0)707 93 10 57, [email protected]
Bengt Brander, Business solution manager, Tel. + 46 (0)707 93 10 57, [email protected]
© 2010 IBM Corporation
IBM Global Business Services
13
Agenda
IntroductionFundamental differences between ERP and CMMS
User friendliness
Interfaces
© 2010 IBM Corporation
IBM Global Business Services
14
Introduction
ERP –Enterprise Resource Planning CMMS Computerized Maintenance Management System EAM Enterprise Asset Management – System covering all assets within an organisation, Best of Breed – term for specialised system for example CMMS
© 2010 IBM Corporation
IBM Global Business Services
15
Introduction the ERP approach
DISTRIBUTION
INVENTORY
SUPPLIERSCHEDULES
CUSTOMERORDERS
CUSTOMERSCHEDULES
PURCHASING
INVOICING
DEMANDPLANNING
REPETITIVEPRODUCTION
MANUFACTURING
SHOP FLOORREPORTING
MAKE TOPROJECT
ENGINEER TOORDER
SHOPORDER
BATCHPROCESS
COSTING
CONSTRAINT-BASED
SCHEDULING
MAKE | CONFIGURE ASSEMBLETO ORDER
HUMAN
RESOURCES
PAYROLLADMINISTRATION
EXPENSEMANAGEMENT
TRAININGMANAGEMENT
EMPLOYEE DEVELOPMENT & CERTIFICATIONS
TIME & ATTENDANCE
RECRUITMENT
SELF-SERVICE
SALES &SERVICE
SALES &MARKETING
CUSTOMER QUOTATION
FIELDSERVICE
SALESCONFIGURATOR
SERVICECONTRACT
MANAGEMENT
CALLCENTER
WEB STORE
SALESCONTRACT
MANAGEMENT
ENGINEERING
PDMCONFIGURATION
ENGINEERINGCHANGE
MANAGEMENT
ASSET DATAMANAGEMENT
PROJECTDELIVERY
FINANCIALS
CONSOLIDATEDACCOUNTS
ACCOUNTSRECEIVABLE
ACCOUNTSPAYABLE
CASHFLOW
FIXEDASSETS
BUDGETMANAGEMENT
GENERALLEDGER
eINVOICE
BUSINESS ENABLERS
EVENTMANAGEMENT
SYSTEMINTEGRATION &WEB SERVICES
MOBILE &WIRELESSSERVICES
PERSONALPORTAL
COLLABORATIVESOLUTIONS
CASEMANAGEMENT
BUSINESSREPORTING
BUSINESSPERFORMANCE
PROJECTREPORTING
DOCUMENTMANAGEMENT
PROJECTMANAGEMENT
ACCOUNTINGRULES
QUALITYMANAGEMENT
BUSINESS MODELER
MAINTENANCE
EQUIPMENTMETERING
OVERALLEQUIPMENT
EFFECTIVENESS
WORKORDER
PROCESSAUTOMATIONINTEGRATION
SCHEDULING &RESOURCE
ALLOCATIONS
EQUIPMENT
EQUIPMENTMONITORING
PREVENTIVEMAINTENANCE
MULTI-SITEPLANNING
© 2010 IBM Corporation
IBM Global Business Services
16
Asset Management
Reporting / KPIs / Analysis
Work ManagementMaterials Management
Purchasing
LocationsAssetsLinear AssetsFailure Codes Condition MonitoringMeters
Request for QuotationReceivingReceiving InspectionsRequisitionsInvoicesPurchase OrdersE-Commerce
Item MasterStoreroomsInventory • Consignment Stock• Lot Management• KittingIssues & Transfers
Job PlansRoutesService ItemsWork Order TrackingService RequestsSafetyQuick ReportingLabor • Skills• Certifications• CrewsLock-Out/Tag-Out Tools /Crafts/CompaniesPreventive Maintenance
Integrated Tooling – Configurable Data Model, Conditional User Interface, Graphical Workflow Design, Escalations and Notifications, UI Based Integration, Configuration Import/Export, Upgradeability
Contract Management
Purchasing AgreementsSoftwareLeasesRentalsServices LaborPayment Schedules
Maximo Asset Management 7
© 2010 IBM Corporation
IBM Global Business Services
19
Agenda
Introduction
Fundamental differences between ERP and CMMSUser friendliness
Interfaces
© 2010 IBM Corporation
IBM Global Business Services
20
ERP or Best of Breed – Fundamental differencies
Depth of functionality CMMS
– CMMS systems are developed with the maintenance processes in focus
– Deeper functionality for maintenance specific tasks
– Covering ”Best practice”
Depth of functionality ERP – ERP systems are built around accounting– ERP systems often takes Fixed asset module
in accounting as starting point– Covering basic mainentance functionality
© 2010 IBM Corporation
IBM Global Business Services
21
Fundamental differencies Traditional Functionality evaluation -The requirement specification – a waste of time?
Resource planning 5300 FulfillCommunication 5400 Partly Fulfill
Planera arbete Preparation 5500 Not Fulfill
Work Planning Requirement Group 5 Vendors answersReq.level User Requirement Category #
Business The user shall be able to plan maintenance work in the CMMS General 5101
Användaren ska kunna planera underhållsarbete i UH-systemet
Business The user shall be able to prepare planned assignments in the CMMS Preparation 5501
Användaren ska kunna bereda planerade uppdrag i uh-systemet
User- The user shall be able to prioritize assignments Time scheduling 5201
Användaren ska kunna prioritera uppdrag
User- The user shall be able to change an assignments priority Time scheduling 5202
Användaren ska kunna ändra prioritet på uppdrag
User- The user shall be able to change the status of assignments Time scheduling 5203
Användaren ska kunna ändra status på uppdrag
User-The user shall be able to see on-going assignments for choosen machines/people/department etc
Time scheduling 5204
Användaren ska kunna se pågående uppdrag för valda maskiner
User- The user shall be able to see queued assignments Time scheduling 5205
Användaren ska kunna se uppdrag på kö
User- The user shall be able to see the production's priorities of the day Time scheduling 5206
Användaren ska kunna se dagens prioriteringar i produktion
User-The user shall receive a proposal for the prioritizing of queued assignments
Time scheduling 5207
© 2010 IBM Corporation
IBM Global Business Services
22
The requirement analysis
Vendor 1 98,3% Vendor 2 97,9% Vendor 3 98,5% Vendor 4 96,1% ....
Vendor Score
© 2010 IBM Corporation
IBM Global Business Services
23
Fundamentals – How to evaluate functionality
Create scenarios– Include live data– Identify the 10 most important processes– Include different role perspectives on the process
• The planner• The operator• The Maintenance worker• The Maintenance manager• The plant manager• Finance• Inventory manager• Purchaser• Requestor• The system administrator
– How well does the system support the different roles?– What is the effort behind configuring the scenaro
Do not forget to evaluate the people that will implement
© 2010 IBM Corporation
IBM Global Business Services
24
ERP or Best of Breed – Fundamental differencies
Development focus ERP– Maintenance module is not focus –
considered as one module among others– Much effort inte covering legal aspects of
SCM,, Finance, HR– Developed for the typical office worker role
Development focus CMMS– Aligned with and following new
maintenance concepts– Emerging into Work force management– Covering all Asset classes– All development resources
concentrated on Maintenance functionality
– Industry solutions for specific industry needs
– Developed for the typical Maintenance oriented roles
– Evolving inte EAM
© 2010 IBM Corporation
IBM Global Business Services
25
All asset classes in one system
Special functionality for adressing the needs of many asset classes within the same system
Production assets
Transport assets
Facilities/Buildings
IT Hardware and licenses
“Linear assets” networks, tubes, pipelines, railroad, road etc
© 2010 IBM Corporation
IBM Global Business Services
26
Maximo Industry Solutions
Life Sciences Pharmaceuticals
Utilities
Nuclear Power Generation
Oil & Gas
Transportation / Fleet
Government (2007)
© 2010 IBM Corporation
IBM Global Business Services
27
ERP or Best of Breed – Fundamental differencies
Third party partners ERP
– Third party implementation partners focusing on core modules such as Finance, SCM, Production
Upgradability
– Upgrading the ERP solution is a major project effecting the whole organisation
Third party partners CMMS
– Focusing on Maintenance specific value adding content ie planning modules, mobility, reporting, rounding etc.
Upgradadability
– Limited effect – easier to take advantage of new versions
© 2010 IBM Corporation
IBM Global Business Services
28
Maximo: Partner Eco-System
Horizontal Mobile Partners:
MaximoEnterprise
SuiteOil & Gas
Utilities T & D Nuclear
Federal /Public Sector
Transportation
LifeSciences
ITSM
Banking &Fin. Services
Manufacturing
© 2010 IBM Corporation
IBM Global Business Services
29
Agenda
Introduction
CMMS market overview
Fundamental differences between ERP and CMMS
User friendlinessInterfaces
© 2010 IBM Corporation
IBM Global Business Services
30
User friendliness
User Friendliness is always a requirement.– What does it mean? 362 000 000 hits in google....– Det ska vara lätt att göra rätt
•och svårt att göra fel....
© 2010 IBM Corporation
IBM Global Business Services
32
Functionality on paper or in practice?
Max
imo
func
tions
SA
P fu
nctio
ns
Max
imo
func
tions
impl
emen
ted
SA
P f
unct
ions
impl
emen
ted
The MaximoValue!
The MaximoValue!
© 2010 IBM Corporation
IBM Global Business Services
33
User friendliness - Configurable for personal roles
© 2010 IBM Corporation
IBM Global Business Services
41
Agenda
Introduction
CMMS market overview
Fundamental differences between ERP and CMMS
User friendliness
Interfaces
© 2010 IBM Corporation
IBM Global Business Services
42
Interfaces - EAM-ERP Integration Scenarios Scenario 1
Maximo Work & Asset Management
SAP General Ledger, SAP Inventory, SAP Purchasing, SAP Accounts Payable Scenario 2
Maximo Work & Asset Management, Materials Management
SAP General Ledger, SAP Purchasing, SAP Accounts Payable Scenario 3.1
Maximo Work & Asset Management, Materials Management, MRO Purchasing
SAP General Ledger, SAP Accounts Payable invoice matching Scenario 3.2
As 3.1 but invoice matching in MAXIMO
SAPPurchasing
Inventory
MaximoPurchasing
InventoryInventory
Purchasing
SAPPurchasing
Inventory
MaximoInventory
SAPPurchasing
MaximoInventory
SAP MaximoPurchasing
Inventory
Purchasing
© 2010 IBM Corporation
IBM Global Business Services
43
Interfaces - Recommendations
Scenario 1 Purchase & Inventory in SAP– Recommended if Inventory and Purchase are already implemented in SAP for
MRO type materials Scenario 2 Purchase in SAP
– Consider the purchase organisation – same purchase for both maintenance/technical as for production?
Scenario 3– Consider if purchase is separated between mantenance/technical and production– Consider invoice entry solution – scanning? Manual entry? Using MAXIMO
workflow for the approval process?
© 2010 IBM Corporation
IBM Global Business Services
45
Interfaces - production interfaces
CMMS
system
CMMS
system
Scada
system
Scada
system
Sensors Sensors
RFID RFID
GIS GIS
Construction Construction
Document Document
Project Project
Asset
discovery
Asset
discovery
© 2010 IBM Corporation
IBM Global Business Services
46
Thank You
MerciGrazie
Gracias
Obrigado
Danke
Japanese
English
French
Russian
German
Italian
Spanish
Brazilian Portuguese
Arabic
Traditional Chinese
Simplified Chinese
Thai
Korean
Kiitos Finnish
dziekuje Polish
© 2010 IBM Corporation
IBM Global Business Services
47
Summary
Evaluate the whole process – not function by function.– Evaluate the likelyhood for acceptance by all user categories
Consider the vendor viability– Focus on maintenance?– Global reach– Partner network