Upload
evangeline-ramsey
View
217
Download
0
Tags:
Embed Size (px)
Citation preview
© 2014 HDR, all rights reserved.
Picture or Color Block
Picture or Color Block
And How the South Platte BIP Ties Into the Colorado Water Plan
Picture or Color Block
Picture or Color Block
South Platte Basin Implementation Plan
Picture or Color BlockPicture or Color Block
3
Picture or Color BlockPicture or Color Block
oOverarching Themes:
• “A Good Colorado Plan Needs a Good South Platte Plan”
• Solutions must be pragmatic, balanced, and consistent with Colorado law and property rights
• The South Platte River Basin will continue its leadership role in efficient use and management of water
• A balanced program is needed to investigate, preserve, and develop Colorado River options
5
Municipal & Industrial (M&I) Water Supply Gap in the South Platte Basin
2050 Gap
Existing Supply
*Based on SWSI 2010 Medium Water Demands
2008 2010 2020 2030 2040 20500
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
Acre-Fee
t/Ye
ar
736,000 AF/Y
428,000 AF/Y
Section 4: Projects and Methods
Picture or Color BlockPicture or Color Block
88% success rate for Metro IPPs65% success rate for South Platte IPPs
Modified IPP Success Rates
7
South Platte Irrigated Acres
Approximately 831,000 irrigated acres (SWSI 2010)
• 56% Surface Water Only (SPDSS 2005)
• 26% Surface and Groundwater (SPDSS 2005)
• 18% Groundwater
Only (SPDSS 2005)
9
Picture or Color BlockPicture or Color Block
Enjoyment of environmental and recreational valueso South Platte Basin is a gateway to tourism throughout the
Stateo South Platte Basin is home to the most visited State Parkso Environment and recreational opportunities important to
quality of life
Various Attributes of Importance within the Basino State endangered, threatened, or species of special concerno Important Riparian Habitato Migratory Bird Viewing/Huntingo Fishing (including Gold Medal fisheries)o Recreation (including skiing and whitewater and flatwater
boating)
Environmental and Recreational
10
11 Plan Elements for the South Platte BIP
Section 5: Implementation Strategies for Projects and Methods
Picture or Color BlockPicture or Color Block
13
Risk Management, Process Improvement and New Research
elements
Water Supply & Management Elements
Process: 2nd Draft of Colorado Water Plan (CWP) Released July 7th, 2015 Final Public Comments due September 17th, 2015SPBRT and Metro RT Interaction: Immediate comments from SPBRT and Metro RT on IBCC Conceptual Framework and Chapter
6.3.1 (Conservation Stretch Goal) ahead of IBCC August 25th meeting Joint common roundtable comments from SPBRT and Metro RT – in progress
o Introduction o Water Supply Uncertainties o Storageo Conservation: Conservation Stretch Goalo Efficiency: Municipal and Agricultural – impactso Environmental and Recreational – additions needed (better assess gap, addressing gap with multi
purpose projects and funding)o Interbasin Projects and Agreements – continue forward with collaborative effort.o Further strengthen framework for more efficient water project permitting processes.o Consider cost implications and increase awareness and support for funding throughout the CWP.o Add or revise specific action items in Section 10 (Critical Action Plan) to follow up on main points.
South Platte and Metro Interaction with Water Plan
Picture or Color BlockPicture or Color Block
© 2014 HDR, all rights reserved.
Picture or Color Block
Picture or Color Block Picture or Color Block
Picture or Color Block
Questions and Comments?