© 2015, Fiatech
Data as Information Currency
Robin BenjaminsBechtel
© 2015, Fiatech
Peop
le, M
odel
, Mac
hine
Data Consumers and Producers“Documents and drawings are of no value to me”
“In my personal life I live in an agile, data centric world. But in
my professional life I live in a document heavy world”
© 2015, Fiatech
Repr
esen
tatio
n at
the
Cons
umer
’s D
iscr
etion
Document versus Data CentricInformation
Information as representedby document and drawings
Information as represented
by data
Data to documentgenerator
Data to viewgenerator
Unlimited views and
representations
Only 1 view and representation
Uses and creates data
© 2015, Fiatech
Step towards Data Completeness/QualityO
ne s
mal
l ste
p fo
r Eng
inee
ring,
one
gia
nt le
ap fo
r EPC
Information
Engineering
Document Control
Information
Engineering
Customer
Data to documentgenerator Data to document
generator
Current Process Proposed Process
© 2015, Fiatech
DemonstrationD
ata
Visu
aliza
tion
© 2015, Fiatech
Thank You… Are There Any Questions?
Robin BenjaminsStrategy, Architecture & [email protected]://www.bechtel.com
Chal
leng
es?
Data as Information Currency
© 2015, Fiatech
Project ProductivityDow Chemical’s Approach for Harvesting Value from Data
Standardization
© 2015, Fiatech
Presentation Flow
Dow’s Technology Roadmap Plans
Current State
Strategic Objectives
Approach & Planned Benefits
Decisions Under Consideration
Contact & More Information
Pres
enta
tion
Flow
© 2015, Fiatech
Dow
’s Cu
rren
t Sta
teQ: Why hasn’t more progress been made by Dow (or other Owners)? Full
ValueDelivery$$
A: Multiple Internal Barriers Must be overcome
Need Cross-functionalUnderstanding ofBusiness Value toBe gained throughThe Life Cycle
Have Multiple Operatingor Maintenance Systems To Place Life Cycle FacilityKnowledge within
Overcome ChangeCulture - Short termproject priorities “trump” longer termValue delivery
Resolve DataManagementDiscipline and Change ManagementChallenges
Dow Data- 2014
Documents
© 2015, Fiatech
One
Cha
lleng
e
Project Productivity – A Multi-Functional Effort
EngineeringSolutionsProjects
EngineeringInformation
ManagementAnd Tools
Operations
DSS ProjectSystems
(ERP Systems)Projects
Purchasing
Finance
MaintenanceITArchitecture
No One Function Can Deliver the Road Map AloneStrong Partnerships Are Required
Business Client
© 2015, Fiatech
Dow
’s Im
prov
emen
t Obj
ectiv
es
Engineering Solutions Strategic Objectives
© 2015, Fiatech
Valu
e Ca
seValue Overview-2020 Objectives Basis
© 2015, Fiatech
Syst
ems
Ove
rvie
w
The Systems View
© 2015, Fiatech
Impr
ovem
ent A
ppro
ach
“Data Layers” – the devil is in the details!Value
© 2015, Fiatech
Dat
a Bu
cket
s Be
ing
Anal
yzed
Primary “Groups” of Data Transfer
Within theEngineering
Tool SetBetween
Engineering And Procurement Between
Engineering / Procurement
To Construction
Project Management/ Change Management/ Progress and Material Management Monitoring
Hand-off to Operations and Maintenance
1
3
ConstructionManagement
2
© 2015, Fiatech
Team
Bas
ed A
ppro
ach
Team Management Structure
© 2015, Fiatech
Wor
kstr
eam
Str
uctu
reMaterials Management Workstream
Within SAP
Within WS
Key Inputs/ Interfaces
© 2015, Fiatech
Mat
eria
ls F
low
Acr
oss
the
Func
tions
A ProcessStep View
© 2015, Fiatech
Mat
eria
ls S
yste
m V
iew
A SystemsView
© 2015, Fiatech
AIM
plu
s H
and-
Off
and
Dat
a M
aint
enan
ceInformation and Material Flow to Construction AND Operations and Maintenance
© 2015, Fiatech
Clos
ure
of th
e Li
fe C
ycle
The Hand-Off and Data Maintenance Challenge
© 2015, Fiatech
Area
s of
Initi
al In
tere
stGen 1 (2015) Sub teams – first pass draft
© 2015, Fiatech
Curr
ent C
halle
nge
Bein
g D
iscu
ssed
One Underlying Decision Being Discussed
DataHand-offs
DataCentralization
Where’s the work process and technology sweet spot betweenData Hand-offs and Data centralization ?
© 2015, Fiatech
Clos
ing
Dis
cuss
ion
Your Advice …If you were Dow what would you do or consider ?....Or What are you doing ?
© 2015, Fiatech
Thank You… Are There Any Questions?
Deborah J. McNeilProject Productivity Program ManagerThe Dow Chemical [email protected]
Cont
act &
Mor
e In
form
ation
Project ProductivityDow Chemical’s Approach for Harvesting Value from Data
Standardization
© 2015, Fiatech
BP InteroperabilityProof of Concept
© 2015, FiatechPres
enta
tion
Take
away
s/D
eliv
erab
les
Overview - BP Interoperability PoC
• The BP PoC demonstrates the capability to deliver integrity of asset information across operations systems
• Collaboration is required across vendors and owner operators, to ensure interoperability based on open standards
• Lessons from the PoC are to be shared through the Standards Leadership Council and owner operator advisory panel
© 2015, Fiatech
Opp
ortu
nitie
s Be
ing
Addr
esse
d
Delivering integrity through the 4 way matchWhyPositive verification of equipment is safety critical
WhatEngineering information, work management and control of work systems must be aligned to assets in the field
HowTag and equipment data must be managed in systems of record and reflected in all secondary systems systematically
Compelling Image Here(If Possible)
© 2015, Fiatech
Opp
ortu
nitie
s Be
ing
Addr
esse
d
Enabling disciplined choices
• Improved decision making
• Simplified aggregation and analysis of data globally
• Elimination of labor intensive data reconciliation processes
Compelling Image Here(If Possible)
© 2015, Fiatech
Opp
ortu
nitie
s Be
ing
Addr
esse
d
Simplify and standardize for efficiency
• Effective, efficient data improvement
• Reduced integration costs
• Delivering safe, cost effective and competitive projects
Compelling Image Here(If Possible)
Interoperability
© 2015, Fiatech
Interoperability through the asset lifecycle
Compelling Image Here
• A system of systems must interoperate through major projects and operations
• Reference data is critical, but does not deliver interoperability alone
• Standard connectors are required to deliver interoperability
• Commercially available ‘interoperability’ solutions depend on fragile, expensive and proprietary integration
Cons
trai
nts
& B
arrie
rs
© 2015, Fiatech
The BP interoperability PoC
Compelling Image Here
• BP has funded technical delivery management of PoC based on the Open Industrial Interoperability Ecosystem (OIIE)
• The objective is to deliver logical integrity of tag and equipment data across major projects and operations systems
• Software vendors funding delivery of industry standard product adaptors for their solutions
Appr
oach
& B
enefi
ts R
ealiz
ed
© 2015, FiatechAppl
icati
on A
rchi
tect
ure
and
Dat
a Fl
ows
Reference DataBP Upstream Master Class Library
SAP XI ISBMAssetricity SimpleISBM
(SAP AS & HANA)
Bentley eB
Assetricity Register
OSIsoft PI
IBM Maximo
ISO 15926
CCOMSync Breakdown
StructureConnections
Use Case 1 - Handover Use Case 2 - Field Changes Use Case 10 - Provisioning
CCOMSync Breakdown
StructureConnections
CCOMSync Breakdown
StructureConnections
The BP interoperability PoC
© 2015, Fiatech
The BP interoperability PoC
Compelling Image Here
• Testing has demonstrated capability to deliver interoperability through shared reference data and standard connectors
• Fully integrated testing of PoC scope is ongoing as vendors complete development of standard product adaptors
• We have proved the concept, but collaboration required to deliver benefits at industrial scale
Appr
oach
& B
enefi
ts R
ealiz
ed
© 2015, Fiatech
Future work and industry adoption
Compelling Image Here
• BP seeking to leverage an industry standard architecture as the basis for our systems and tools strategy
• Our goal is to deploy capabilities delivered through the PoC
• Lessons will be shared through the Oil & Gas Standards Leadership Council (SLC) and Owner Operator Advisory Panel
• BP is working to deliver shared reference data libraries which are standardized across owner operators
Futu
re W
ork
& In
dust
ry A
dopti
on
© 2015, Fiatech
Thank You… Any Questions?
Mark BruntonLead Architect, Global [email protected]
Photo
Cont
act &
Mor
e In
form
ation BP Interoperability PoC
© 2015, Fiatech
Standardized InformationMethodologies
37
© 2015, Fiatech “Knowledge Is Power”
scientia potentia est ~Francis Bacon
scientia potentia est ~Francis Bacon
011000110110100101100101011011100111010001101001011000010010000001110000011011110111010001100101011011100111010001101001011000010010000001100
1010111001101110100
01100011
38
© 2015, Fiatech
Copyright 2015. All rights reserved.
What is Asset Management?ISO 5500 defines asset management as the "coordinated activity of an organization to realize value from assets". In turn, assets are defined as "an item, thing or entity that has potential or actual value to an organization" – with qualifying notes.
Restated: Asset management is the balancing of costs, opportunities and risks to achieve optimum performance of assets for organization objectives.
Strategic Asset Lifecycle ManagementAsset Lifecycle Information Management Concept
© 2015, Fiatech
Management of Documents
Documentum
Design
Construction
Operations & Maintenance
Cost Estimating
Startup & Commissioning
ProjectWise Explorer
40
© 2015, Fiatech
Management of Data
CYGNA PDMS
AutoPlant
41
Construction
Operations & Maintenance
Cost Estimating
Startup & Commissioning
MechanicalInstrumentation & ControlsElectricalDesign
© 2015, Fiatech
Standardized Model
CYGNA PDMS
AutoPlant
42
Construction
Operations & Maintenance
Cost Estimating
Startup & Commissioning
Mechanical
Instrumentation & Controls
Electrical
Data System
© 2015, Fiatech
• Management of Change
• Flexible Architecture
Engineering Data Hub
• Data Quality Manager
43
© 2015, Fiatech
Documentum
Design
ProjectWise Explorer
CYGNA PDMS
AutoPLANTeB Data Quality
ManagerDesign
Distribution
Distribution
Drawings
Data
© 2015, Fiatech
Distribution
Drawings
Design Distribution
Data
AutoPLANT
CYGNA PDMS
ProjectWise Explorer
CAD
Report
eB Data Quality
Manager
Design
Documentum
© 2015, Fiatech
Southern Company eB Data Quality Manager
System Owners
46
eB Data Quality
Manager
CYGNA PDMS
AutoPlant
Mechanical
Instrumentation & Controls
Electrical
Information
Hierarchy Database
© 2015, Fiatech
Southern Company eB Data Quality Manager
System Owners
47
eB Data Quality
Manager
CYGNA PDMS
AutoPlant
Mechanical
Instrumentation & Controls
Electrical
Information
Hierarchy Database
Maximo
© 2015, Fiatech
Organization Chart
48
Chief Operating Officer
Chief Transmission Officer
President, Southern Power
EVP, Engineering and Construction
Services
VP, Commercial Operations &
Planning
SVP, Research and
Environmental Affairs
EVP, Chief Production Officer
GM, Project
Planning and
Services
Project Director Kemper County
IGCC Construction
VP, Engineerin
g
GM, Environmental Projects and
Construction - East
VP, Technical Services
Manager, Governance and Project Assurance
Director, Safety and Health Southern
Company Generation and Transmission
GM, DesignGeneral Manager
Manager, I&C
Manager, Electrical
Manager, Civil
Manager,Mechanical
Manager,Project
Engineering
Manager,Equipment &
Materials
Supervisor, Clean Air Major Projects
Supervisor, New Generation
Projects
Supervisor, Retrofit Projects
and Support
Supervisor, Design
Automation Team
Supervisor, Major Projects and
Retrofits - South
Supervisor, Major Projects and
Retrofits - North
© 2015, Fiatech
Construct-X Project Approach
© 2015, Fiatech
© 2015, Fiatech
Organizational Chart
51
Chief Operating Officer
Chief Transmission Officer
President, Southern Power
EVP, Engineering and Construction
Services
VP, Commercial Operations &
Planning
SVP, Research and
Environmental Affairs
EVP, Chief Production Officer
GM, Project
Planning and
Services
Manager, Performance Improvement
VP, Engineerin
g
GM, Environmental Projects and Construction
VP, Technical Services
Manager, Governance and Project Assurance
Director, Safety and Health Southern
Company Generation and Transmission
GM, DesignGeneral Manager
© 2015, Fiatech
We’re Here to Grow the Margin• Leverage Our People
– Engage and support our people as we align to a common goal– Share process and technology knowledge across the business– Optimize individual contributions
• Improve Process– Establish a baseline– Maximize value added activities and eliminate everything else– Ensure key element uniformity for all projects
• Apply Technology– Evaluate and optimize existing tools– Evaluate and implement new tools when they can add value to the business
© 2015, Fiatech
Project / Information Management (Manogue)Project Process Automation – Collaboration – Document Management
Integrated Data Requirements (Weitzman)Consistent Asset Identification – Data consistency and integrity – Link Information to Assets
Design (Barton)Leverage Asset Data for Conceptual Development
and Estimating5D Modeling (Schedule and Cost Data Integration)
Construction (Weaver)Advanced Work Packaging
Quantity Tracking and Progress ReportingEarned Value
Start-up (Williams)Automated Start-up Packaging
PSM and Configuration Management
Design Turnover Develop Start-UpProcure OperateConstruct Maintain
© 2015, Fiatech
“Remember upon the conduct of each depends the fate of all.”
Alexander the Great
54