48
NORTHEL MİLLİ RÜZGAR TÜRBİN TEKNOLOJİSİ

NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

NORTHELMİLLİ RÜZGAR TÜRBİN TEKNOLOJİSİ

Page 2: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

2020

2,6 MW güçte rüzgar türbinimiz

1,2 MW güçte türbin tasarım çalışmaları tamamlanmıştır.

300 kW güçte türbin üretimi devam etmektedir.

KISA TARİHÇE

0,2 MW

0,3 MW

1,2 MW

2,6 MW

UFA

K G

ÜÇ

TE RÜ

ZGA

R TÜ

RB

İNİ

UYG

ULA

MA

LAR

I

1993

Northel Elektromekanik, mekanik cihaz tasarımıve üretimi amacıyla kuruldu.

2004 İlk enerji depolamalı sistemini Söke’de Türk

Telekom radyo linklerinde uyguladı.

2015

10-250 kW güç aralığındaki uygulamaları şebeke bağlantılarını tamamladı.

2009 USA İHRACAT

İlk yerli türbin ihracatı.

15 YIL YERLİ TÜRBİN ÜRETİM TECRUBESİ

Page 3: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

ORSA DS 75/1200

PUPA SERİSİ 4-25-50-100 kW

POYRA P36/300NORTHEL MİLLİ RÜZGAR TÜRBİNLERİ

Page 4: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

SERTİFİKASYON

AKREDİTE SERTİFİKALI İLK YERLİ TÜRBİN

Page 5: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

SERTİFİKASYON

AKREDİTE SERTİFİKALI İLK YERLİ TÜRBİN

Page 6: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

SERTİFİKASYON

AKREDİTE SERTİFİKALI İLK YERLİ TÜRBİN

© LinkedInAhmet Cem YalçınBaş Tasarımcı / Yönetim Kurulu Başkanı / Kurucu 1993

2016 yılında, Sn.Alper Türedi beyin sözü ile başlayan, Sn.Alper Veyisoğlu ile ilerleyen,Sn.Mesut Duru, Sn.Mehmet Aykutalpoğlu, Sn.Levent Önal'ın yakın takibi ve fiilen tümsüreçleri aylarca yönetip sertifikasyon kriterleri açısından sahada bizlerle çalışan değerliMakine Yüksek Mühendisi Dr.Aysel Engin ve beraberindeki TSE mühendisleri sayesindeülkemizin TSEN61400 sertifikası 2017 yılında 001 numaralı ilk belge olarak alınmıştı. TSEbu ekip sayesinde akredite oldu. Onlar sayesinde Otomobil ve Uçakta dışarıdan aldığımızana ürün sertifikası için türbin üreticilerimiz artık yurt içinde belge alabiliyorlar. Siziunutturmayacağız çünkü, 2020 de 1,2 ve 2021 de 3,5 MW için hazırlanıyoruz.

Türk Standartları Enstütüsü NORTHEL Poyra Türbin ile 2017 yılında akredite olmuştur.

Page 7: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

• 14 Ağustos 2017 - 13:43 Milliyet.com.tr » İstanbul Haberleri » Haber / İhlas HA

• Yerli Rüzgar Enerjisini Kanatlandıracak Belge Çıkıyor

• Geçtiğimiz günlerde gerçekleştirilen Yenilenebilir Enerji Kaynakları (YEKA) ihalesi ile tüm dünyanın gözü Türkiye’yeçevrilmişken TSE ilk defa 61400 standart belgesini akredite olarak vermek için bir yıldır yaptığı çalışmanın sonuna geldi.

• TSE’nin akredite olabilmesi için yerli bir ürünü belgelendirmesi gerekiyordu. Aselsan -Northel iş birliği ile yüzde 100 yerliteknoloji, tasarım ve yüzde 100 yerli hammadde kullanılarak ürettiği 0,3 MW gücündeki rüzgar türbini üzerindenakreditasyon işlemi gerçekleşti. Milli sertifika kurumlarımızdan Türk Loydu’ ndan sonra TSE nin akreditasyonunun daböylece sona gelinmiş oldu. Sektörde yerli ürün için çok büyük bir öneme sahip olan türbin Bursa Büyükşehir BelediyeBaşkanı Recep Altepe ‘nin katılımı ile Mudanya’ya kuruldu.

• 200 ayrı testten geçti

• Northel’ in tasarımını yaparak, geliştirdiği rüzgar türbini, TSE tarafından 61400 standartlarına uygun olarak 16 ana başlık ve200 ün üzerinde alt başlıktaki tüm testlerden geçerek sertifikalandırıldı. Yenilenebilir enerji sektörü için büyük bir aşamaolarak nitelendirilen bu belgenin yerli sektöre büyük bir hareketlilik kazandıracağı belirtildi.

• %100 yerli ve milli teknoloji ve yüzde 100 yerli hammadde ile üretilen türbin için alınan TS EN 61400 belgesinin ülkeekonomisi, sektör ve sektöre yatırım yapan yerli teknoloji şirketlerinin gelişimi açısından çok büyük önemi olduğunun altınıçizen Northel Elektromekanik Baş Tasarımcısı ve Yönetim Kurulu Başkan Yardımcısı Cem Yalçın;"Yıllardır, ithal türbinler yurtdışından sağladıkları belgeler ile ulusal şebekemize bağlanabilme izni aldıklarından, ayrıca ulusal bir sertifika kurumunaihtiyaç duyulmuyordu, bu nedenle yerli şirketlerin bu belgeyi alabilmelerinin önü kapalıydı. Bu konuda önce Türk Loyduardından da TSE nin konuya milli ve yerli olarak yaklaşması üzerine Aselsan-Northel işbirliği ile üretilen türbin, bu belgeyialabilmek için gerekli test ortamına, yöntemlerine de örnek teşkil ederek, MW türbinlerin bir yıl içinde yüzde 100 yerliüretimine ortam sağlamış oldu" dedi.

AKREDİTE - SERTİFİKASYON

Page 8: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction
Page 9: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction
Page 10: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

TÜMÜYLE MİLLİ NORTHEL

TEKNOLOJİSİ

Page 11: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

NORTHEL milli teknoloji adına öz kaynak kullanarak 36.363.000,- TL proje değeri tescil etmiştir.• NORTHEL Türkiye’nin ilk yatay eksen TÜBİTAK türbin projesini 2006 yılında tamamlamıştır.

• NORTHEL ilk rüzgar türbin sertifikasını 001 numaralı olarak ülkemize kazandırmıştır.

• NORTHEL projeleri, TÜRKAK tarafından akredite belgelidir.

• NORTHEL Amerika Birleşik Devletlerine 2009 yılında türbin ihraç etmiştir, halen şebekeye bağlıdır.

• NORTHEL BURSA-BUSKİ tesislerine kurduğu türbin ile 3 yıl sürecek olan TIP onay sürecine başlamıştır.

• NORTHEL Türkiye’nin ilk 4 m çapında ve 1,3 MW alternatörünü ICCI Fuarında sunmuştur.

• NORTHEL 16 MW Yurt dışı proje ön protokolünü yapmış, Türk Eximbank tarafından LOI sunmuştur.

• NORTHEL 1 MW Lisansız Hibrit Enerji depolamalı RES projesi 2020 yılında teslim edilecektir.

• NORTHEL Dünyanın ilk 20 kW altı aktif pitch sistemli türbinlerini PUPA modeli olarak 2020 de satışa sunacaktır.

Page 12: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

Sanayi Bakanlığı tarafından Yılın İnovasyon Ödülüne layık görülmüştür. 2018 ve 2019 süreciiçerisinde henüz projelendirilmemiş olan 2 uluslararası patent Yeni Şirket üzerinekazandırılacaktır. Bunun yanı sıra, özellikle pazarın doğru yönlenmesi, yerli ürün ve mevzuataçısından devletin üst düzey yönetimini bilgilendirmek NORTHEL in misyonudur. Firmakurucusu ve tasarımcısı Ahmet Cem YALÇIN enerji cihazlarının yerlileşmesinin yanı sıra, milliteknoloji ile üretilmesinin şart olduğunu düşünmektedir.

Page 13: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction
Page 14: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

Türbin Gücü Yıl Bölge Müşteri

300 kW 2017 Bursa BUSKİ

250kw 2015 Balıkesir Yücel Çeltik

100kw 2015 Tokat Bemsa Tekstil

Savonius Türbin 2014 İ stanbul Çağlayan Adliye Sarayı Projesi

100kW 2014 İ zmir Gediz Üniversitesi

100kw 2014 Tokat Yalçın

50kW 2014 Karaburun Karaburun Belediyesi

50kw 2014 Bozhöyük Saraycık Petrol

20kw 2014 İ zmir Katip Çelebi Üniversitesi

250kW 2013 Balıkesir/Bandırma Kerse Çiv i

150kW 2012 Balıkesir/Ayvalık Ekbir Zeytincilik

50kW 2012 Eskişehir Geçit Kuşağı Tarımsal Araştırma Enstitütüsü

20kW 2012 Eskişehir Hisarlar Makine

20kW 2012 Çanakkale/Assos Alev Gerçeker

100kW 2011 Balıkesir Rayim Bele

20kW 2009 İ zmir/Dikili Merpisa

20kW 2008 Çanakkale/Behramkale Murat Koray

100kW 2008 Balıkesir/Ayvalık Pelikan

Başlangıç özveri gerektirir, tecrübe için ise uygulama şarttır.2003 – 2015 / Elli ayrı tasarım ile milli teknololji geliştirme çalışmaları.

Page 15: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

01 Numaralı TS EN 61400 belgesi Northel’e verilmiştir.

TÜRKAK akreditasyonlu IEC61400 sertifikaları

Page 16: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

1,39 MW Alternatör tümü yerli tasarım ve prototip hazırlığı

1,39 MW ( Direct Drive ) alternatör sargıları ve aksamı seri imalata hazırdır.

Page 17: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

ICCI 2017 Fuarı-1,2 MW alternatörün bir bölümü- YEGM Genel Müdürü Oğuz Can ve Genel Müdür

Yardımcısı Sebahattin Öz – Ahmet Cem Yalçın açıklamalarda bulunuyor.

Page 18: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

Projelendirme ve uygulama süreci / 1,2 MW 2019 – üzeri güçler 2020

Page 19: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

ÜRETİM VE SERTİFİKASYON TEST ÇALIŞMALARI

Page 20: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

Seracılık, yüksek ısı ihtiyacı olan fabrika ve uygulamalar için geliştirilmiştir. Her bir ünite 25.000 kcal-h kapasiteli olup. Yaklaşın 3 mm sapma ile iki eksende AZİMUTH takibi yapabilmekte ve ortalama 200 C derece yüksek ısı üretmektedir. Tasarım tümüyle özgün olup, diğer projeler gibi CY tarafından tasarlanmış seri üretime hazır duruma getirilmiştir.

Page 21: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction
Page 22: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

ŞEBEKEYE OLMAYAN BÖLGE ÇÖZÜMLERİ

RÜZGAR TÜRBİNLERİ PV PANEL

ENERJİ DEPOLAMA (5-300 kVA) JENERATOR

NORTHEL PUPA & POYRA WIND TURBINES

Page 23: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

Rüzgar Hızı

4 – 7 m/sec.

300

kW TURBINE

100

kW PV PANEL

100

kW PV PANEL

ŞEBEKE

2 x 500 kVA Enerji

Depolama

500 kVA

Jenerator

500 EV VE SERA 300

kW

1 MW DEPOLAMALI ENERJİ SİSTEMİ RUSYA VE KIBRIS PROJESİ

Page 24: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

Düşük Rüzgar Hızı 2,5 – 5 m/sec. 4 kW TURBIN

6 kW PV PANEL

50 kW ENERJİ

DEPOLAMA

0,15 kWh ENERJİ TÜKETİMİ

3 LED LAMBA

1 BUZDOLABI

10 – 15 EV

0,5 kW SULAMA

5 kW DESTEK

ENERJİ SU

GAZI

UFAK ÖLÇEKLİ ENERJİ DEPOLAMA SİSTEMLERİ-AFRİKA VE RUSYA

Page 25: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

PUPA 4-25-50-100 kW

POYRA P36/300

NORTHEL ENERJİ SİSTEMLERİ

15 kW SEYYAR ENERJİ SİSTEMİ

Page 26: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

Küçük türbin sınıfında kanat açı kontrolü olan dünyada tek türbin.

PUPA SERİSİ ÖZEL TÜRBİNLER 4 – 10 – 25 - 50 kW

Page 27: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

PUPA SERİSİ ÖZEL TÜRBİNLER 4 – 10 – 25 - 50 kW

Uzaktan izleme, yazılım, -50 C derecede çalışma

Page 28: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

PUPA SERİSİ ÖZEL TÜRBİNLER 4 – 10 – 25 - 50 kW

ASKERİ AMAÇ - Uzaktan izleme, yazılım, -50 C derecede çalışma

Page 29: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

PUPA SERİSİ ÖZEL TÜRBİNLER 4 – 10 – 25 - 50 kW

ASKERİ AMAÇ - Uzaktan izleme, yazılım, -50 C derecede çalışma

Page 30: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

MOBİL ENERJİ SİSTEMLERİ-AFAD-KIZILAY

Page 31: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

ASELSAN İÇİN TASARLANAN MOBİL ENERJİ SİSTEMİ

Page 32: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

YURT İÇİ PAZAR

Page 33: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

1MW ALTI POTANSİYEL LİSANSSIZ PAZAR HEDEFİ

1. BELEDİYELER: Türkiye’nin rüzgar verimi açısından potansiyel olan bölgelerinde

yer alan 11 ilde 132 adet belediye bulunmaktadır. Bu belediyelerin her birinin 5

MW kurulu güç hakkı vardır. Toplam potansiyel 660 MW.

BELEDİYELER 20 MW %3

2. SULAMA BİRLİKLERİ: Türkiye’nin rüzgar açısından verimli olan 7 bölgesinde 38

adet sulama birliği bulunmaktadır. Bu birliklere kayıtlı olan 665,508 adet kullanıcı

bulunmaktadır. SULAMA BİRLİKLERİ 665 MW %01

3. KOBİ ler: 2015 yılı verilerine göre kayıtlı KOBİ sayısı 199.151’dir. Kobilerin dağılımı

%38 ve %17 olacak şekilde Marmara ve Ege bölgesinde yer almaktadır.

MARMARA 72.637 %01 72 MW

EGE 32.495 %01 32 MW 789 MW

Page 34: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

YURT DIŞI PAZARLAR

Page 35: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

1. USA PAZARI

2. DİĞER PAZARLAR

Page 36: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

NORTHEL’İN PAZAR KONUMU

NORTHEL USA5772 Bear

Hollow Rd. SE Newark

Sales & Marketing

O&M

Page 37: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

2018 yılı içindeki ekonomik potansiyelinin 42 GW olduğu öngörülmektedir. (NREL)

2016 yılında ABD’de raporlanmış 22 adet türbin üreticisi bulunmaktadır.

Bunlardan 8 tanesi 1 kW ve altındaki güçlerde üretim yapmakta, 12 tanesi 1-10 kW arasında ve 2

tanesi de 11-100 kW’a kadar üretim yapmaktadır.

Geniş bir coğrafyaya sahip oldukları için devletin öz tüketim esaslı ufak ve orta güçlerdeki türbin

uygulamalarına verdikleri destek oranları yüksektir. Bu destekler nedeni ile watt başına türbin fiyatları 3,5-

6 USD arasında değişmektedir.

UFAK VE ORTA GÜÇTE RÜZGAR PAZARI

USA

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 38: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

Northel-USA / AUSA Meeting. Commanders of El Salvador and Northel-Aselsan R.Energy Meeting

UFAK VE ORTA GÜÇTE RÜZGAR PAZARI

USA

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 39: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

WIND TURBINE GOES UP IN LICKING COUNTY

HOPEWELL TOWNSHIP -- A Turkish company built a 66-foot tall wind turbine Thursday in southeastern Licking County.

The company was founded in 1994 in Istanbul, Turkey, according to NorthelEnergy.com. The website states the company

has started organizing with partners in the U.S.

Another company, RedHawk Energy Systems, announced on its website a new partnership with Northel Energy to

provide sales and service support in the U.S. for small to midsize wind turbines.

The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330

kilowatts.

Layton Services is the construction company working with Northel to build the wind turbine, Yalcin said.

UFAK VE ORTA GÜÇTE RÜZGAR PAZARI

USA

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 40: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

Jason Lenhart/The Advocate Cem Yalcin, President and CEO of

the Turkish company Northel Energy, measures the angle of a

wind turbine blade on Thursday off Bear Hollow Road. Northel

Energy installed the wind turbine, which will help power a small

farm, to give them an entry point into American Markets.

Farmer Installs Wind Turbine To Power Farm

PUBLISHED: 04/12/12 08:04 PM EDT

UPDATED: 04/12/12 08:05 PM EDT

HEATH, Ohio

Crews installed a 66-foot wind turbine on a private farm near Heath Thursday.

The Northel-USA windmill will create energy to operate the farm, 10TV News reported.

It also could create energy that the farmer could sell back to the electic company.

Watch 10TV News and refresh 10TV.com for more information.

Mr.Tom Wilks – Energy Cooperative CheefEngineer & Mr.T.Ulrich-CEO of Red Hawk

UFAK VE ORTA GÜÇTE RÜZGAR PAZARI

USA

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 41: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

Mr.Bob Sherman - Northel-USA - Service Engineer

Net-Metering – Northel Turbine – Coupled to grid officially

Net-Metering – Northel Turbine & SMA inverters

https://www.youtube.com/watch?v=AbfT47SnFY0&t=455s

Northel Energy PresentationGreen Energy Ohio124 görüntüleme 4 yıl önceThis is the Northel Energy presentation from Green Energy Ohio'sBusiness Roundtable meeting on 6/6/13. Northel Energy is a

UFAK VE ORTA GÜÇTE RÜZGAR PAZARI

USA

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 42: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

DİĞER PAZARLAR

EL-SALVADOR

El-Salvador bölgesindeki rüzgar potansiyeli ve uygulama alternatifleri ile ilgili 2013 yılından beri temaslarımız

bulunmaktadır. Bölgenin kalkınma ajansı PROESA tarafından yapılan davetler üzerine bölgeye

gidilmiş ve saha ziyaretleri yapılmıştır. EL SALVADOR Başbakan Yardımcısı.

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 43: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

DİĞER PAZARLAR

GUETEMALA

El-Salvador, özellikle Northel CSP teknolojisinin kahve, yağ ve gıda hammadde üretiminde

kullanılması hedeflenmiş ve görüşülmüştür. Northel bu ülkelerde doğru temasları olan bir şirkettir.

GUETAMALA Kahveciler Birliği Görüşmeleri

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 44: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

ÜRÜN GELİŞTİRME

CSP

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 45: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

ÜRÜN GELİŞTİRME

CSP

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 46: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

DİĞER PAZARLAR

ÖZBEKİSTAN

Türkiye ve Özbekistan devletleri arasındaki pozitif ilişkiler dolayısı ile Özbekistan hükümetinin 100-150 MW’lık

rüzgar santrali projesini Türk bir firma ile yapma talebi Northel’e ulaşmıştır.

Bunun üzerine Türkiye’deki ilgili kişilerle Northel tesislerinde bir araya gelinmiştir.

İlgili tanıtım dosyası hazırlanarak doğrudan Özbekistan Başbakan yardımcısına gönderilmiştir.

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 47: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

DİĞER PAZARLAR

RUSYA

Rusya, yenilenebilir enerji alanında yatırım kararları almıştır.

2018-2022 yılları arasında toplam kurulu güçleri 1,65 GW olacak 43 projeye yatırım izni verilmiştir.

Aynı zamanda yerli rüzgar türbini üretimi konusunda da girişimleri bulunmaktadır. Bu çalışma nükleer şirketi

Rosatom ile planlanmaktadır. NORTHEL, 2019 yılı itibarıyla, orta sınıf türbin ve enerji

depolama konularında iş birliği için ön mutabakat sağlamıştır.

FAALİYET BAŞLATILMIŞ ÜLKELER

Page 48: NORTHEL...2019/08/25  · The Northel wind turbines are smaller than some of those in northern Ohio. The turbines vary from 7.5 kilowatts to 330 kilowatts. Layton Services is the construction

‘SADECE,

KÜÇÜK BİR ESİNTİ

YETER’’

[email protected]

www.northel.com.tr

TEŞEKKÜRLER