Angola

Acknowledgments

The (I)NDC Content Briefs were produced by the Climate Policy

Team of the World Bank Climate Change Group. The team was led

by Sebastian Wienges and Ana Bucher under the supervision of

Stephen Alan Hammer. Detail analysis of country (I)NDC was

provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation

components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation

components). The team is grateful for all comments and

suggestions received from regional and sector specialists

regarding the presentation and synthesis of relevant information.

© 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org

Climate Policy Team | World Bank Group

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

Introduction      In response to a growing interest in understanding (Intended) Nationally DeterminedContributions ((I)NDCs) and with regard to the ultimate goal of supporting countries'implementation of their national climate targets, the World Bank Climate Policy Team (WB­CPT) has

reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief

aims to provide a summary analysis of existing and instead country mitigation and adaptation

policies and plans, commitments and targets, implementation strategies and sector priorities,

associated costs and conditionalities, and stated gaps and needs, among other issues. 

      The (I)NDC content briefs are created solely on the basis of information from submitted(I)NDCs and makes no inferences about robustness, quality, or viability of intended policiesor actions. 

The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify

and familiarize with a range of country priorities in terms of sectoral engagement, and needs in

terms of capacity building, technology transfer, and financing. Based on this comprehensive

mapping exercise, the WBG will develop a useful, easy­to­use, and interactive database and briefs

of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including

the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks

(CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices

(GPs), regions, and country units for the identification of potential development opportunities,

analytical studies and technical assistance to support countries' implementation of planned policies

and actions. In­depth summaries of (I)NDCs by sectors and regions will be prepared at a later stage. 

      In regards to Adaptation, although no global adaptation mechanism is established, the ParisAgreement parties are required to engage in adaptation planning and implementation of actions

which include preparation of adaptation plans. The Adaptation section of a large number of

submitted (I)NDCs, aims to increase development planning and scale the ability of countries to

adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse

gas emissions development, in a manner that does not threaten sustainable development. In

addition to requested finance, the implementation of country commitments is largely tied to

significant amounts of external assistance to support development and execution of adaptation

plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component,

the process will ensure increased resilience is recognized under the UNFCCC and climate finance

mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows.

Climate Policy Team | World Bank Group

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

Table of Contents

I Overall Planning and Preparation Process 

II  Mitigation

  Economy­wide Targets

  Economy­wide Policies

  Mitigation Actions and Policies

III  Adaptation

  Adaptation Targets

  Adaptation Context

  Adaptation Actions and Policies

Acronyms

BAU Business as Usual NAMA Nationally Appropriate MitigationActions

CIF­PPCR Climate Investment Funds ­ PilotProgram for Climate Resilience

NAP National Adaptation Plan

DRM Disaster Risk Management NAPA National Adaptation Programmesof Action

INDC Intended Nationally DeterminedContributions

REDD+ Reducing emissions fromdeforestation and forestdegradation and the role ofconservation, sustainablemanagement of forests andenhancement of forest carbonstocks in developing countries

LEDS Low Emission DevelopmentStrategy

LULUCF Land Use and Land Use Changeand Forestry

|

|

|

Climate Policy Team | World Bank Group

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

Overall Planning and

Preparation Process

How reliable is the prioritization of the (I)NDC? How serious is thegovernment about implementing policies and actions to achieve the (I)NDCtargets?

Political decision of adoption of INDC at:Head of state level

Interministerial level

Parliament

Ministry Level

MINISTRY OFENVIRONMENTMINISTRY OF ENERGYAND WATER

Technical development of INDC through a participatory processStakeholder involvement YES

Multisector commision

Have development benefits been assessed and considered in the planningprocess?

YES

Are there climate policies and actions already in place/under development?

LEDS

NAMAS

NAPA YES

Climate Policy Team | World Bank Group

$15.70

(in Billion USD)

TOTAL COST OF

IMPLEMENTATION (mitigation and adaptation)

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

Existing policies:Strategic Plan for Disaster Risk Management (2011)

National Afforestation and Reforestation Strategy (2010)

National Strategy for Climate Change (2008)

Strategy to Fight Poverty (SFP)

National Adaptation Programmes of Action for Climate Change (NAPA)

Has the INDC development been supported by a development partner?

Technical supportFRANCE THROUGH EXPERTISE FRANCEGERMANY THROUGH GIZ

Financial support

Implementation Plans and Needs

Specific requests for international provision of means of implementation:

Technology Transfer YES

Financial support YES

Capacity Building YES

Does the INDC intend the private sector to be involved in theimplementation of the NDC?

Are carbon pricing/international market mechanisms intended?YES

Are there any barriers identified?

Link list:• Angola INDC Factsheet (projected per capita emissions): http://www.climate­energy­college.net/files/site1/factsheets/Angola_INDCFactsheet_UoM­PRIMAP_GWPAR4.pdf 

Climate Policy Team | World Bank Group

-35%

n/a

additional -15%

n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

Mitigation

ECONOMY-WIDE TARGETS

Conditionality: INDC page link

Unconditional part of mitigation target:Estimated costs for implementation:

Conditional part of mitigation target:Estimated costs for implementation:

Coverage of Gases: CO , CH , N O

Other Targets:

POLICIES:

TARGET YEAR

2030TARGET TYPE

-50%Relative Emission Reduction

Compared to BAU (%)

14.70(in Billion USD)

COST OFIMPLEMENTATION

2 4 2

Climate Policy Team | World Bank Group

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESINDUSTRIES Plans:

Industries: General   P. 9

Climate Policy Team | World Bank Group

n/a

n/a

n/a

Increase carbon sink to 5 MtCO2e per year by2030

n/a

n/a

n/a

n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESLULUCF/FORESTRY

Targets: INDC page link

Increase carbon sink to 5 MtCO2e per year by 2030 P. 9

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESAGRICULTURE Plans:

Agriculture: General   P. 12

Climate Policy Team | World Bank Group

cost for each project is listed

n/a

n/a

n/a

13 (681 MW) wind energy projects

n/a

n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGY: WINDActions: INDC page link

13 (681 MW) wind energy projects P. 8

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

cost for each project is listed

n/a

n/a

n/a

14 (2 Municipal solid waste, 11 wasteforest, 640MW) biomass projects

n/a

n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGY: BIOFUELSActions: INDC page link

14 (2 Municipal solid waste, 11 wasteforest, 640 MW) biomass projects P. 11

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

cost for each project is listed

n/a

n/a

n/a

18 (438 MW) solar projects

n/a

n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGY: SOLARActions: INDC page link

18 (438 MW) solar projects P. 11

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

cost for each project is listed

n/a

n/a

n/a

25 (6,732 MW) hydroelectric projects

n/a

n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGY: HYDROActions: INDC page link

25 (6,732 MW) hydroelectric projects P. 11

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

$11.346 billion

n/a

n/a

n/a

681 MW wind energy projects; 438 MW solarprojects; 640 MW biomass projects; 6,732 MWhydroelectric projects

$11.346 billion

n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGYActions: INDC page link

681 MW wind energy projects; 438 MW solar projects; 640 MW biomassprojects; 6,732 MW hydroelectric projects

P. 10

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

USD 0.5 Billion

USD 0.5 Billion

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

Adaptation

ADAPTATION TARGETS

ADAPTATION CONTEXT

Existing National Development/Resilience Policies and Plans

National Communications

NAPs

NAPAS YES

CIF-PPCRs

Sectoral Strategies

STRATEGY TO FIGHT POVERTY(SFP)

NATIONAL AFFORESTATION ANDREFORESTATION STRATEGY (2010)

STRATEGIC PLAN FOR DISASTERRISK MANAGEMENT (2011)

Cross-cuttingNATIONAL STRATEGY FORCLIMATE CHANGE (2008)

Conditionality:

Unconditional part of adaptation implementation

Conditional part of adaptation implementation

Conditional upon international provision of meansof implementation

YES

TARGET YEAR

20301.00

(in Billion USD)

COST OFIMPLEMENTATION

Climate Policy Team | World Bank Group

n/a

ministry of energy and water & nationaldirectorate of renewable energy

usd 150 million (to 2025)

Total Implementation Cost for UnconditionalActions: usd 150.00 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

ENERGY

RENEWABLE

ENERGY: SOLAR

Target: INDC page link

Produce 100 megawatts of solar power to all rural areas by 2025

Actions:

UNCONDITIONAL ACTIONS: INDC page link

The "Solar Village" Programme.

P. 16

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

ministry of energy and water & nationaldirectorate of renewable energy

n/a|usd 5 million

Total Implementation Cost for UnconditionalActions: usd 5.00 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

POWER SYSTEM

PLANNINGTarget: INDC page link

Generate 5000 megawatts power from 2013 to 2017

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Construction of hydroelectric and thermal power plants (2013 - 2017);

Extend electricity grid to rural areas.P. 16

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 1.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

RENEWABLE

ENERGY: HYDROActions:

CONDITIONAL ACTIONS: INDC page link

Study impact of climate change on hydroelectricity.

P. 18

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

undp

usd 17.884 million

Total Implementation Cost for UnconditionalActions: usd 17.88 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

BIOMASS ENERGYActions:

UNCONDITIONAL ACTIONS: INDC page link

Promotion of Sustainable Charcoal in Angola through a Value ChainApproach.

P. 16

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 0.50 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

ENERGY: GENERALActions:

CONDITIONAL ACTIONS: INDC page link

Study impact of climate change on mining

P. 18

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

usd 4 millionusd 1 millionusd 3.5 million

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 8.50 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

LULUCF/FORESTRY

LAND

DEGRADATION

Actions:

CONDITIONAL ACTIONS: INDC page link

Soil erosion control through organic methods;Map areas of erosion risk;

Promote alternative renewable energies to avoid deforestation.P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

fao

usd 15.397 million

Total Implementation Cost for UnconditionalActions: usd 15.40 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

AGRICULTURE

LAND AND SOIL

MANAGEMENT

Target: INDC page link

Disseminate sustainable land management and adaptation practices inagro-forestry and land ecology in 350 communities.

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Land Rehabilitation and Rangelands Management in Small HoldersAgropastoral Production Systems in Soutwestern Angola (Project RETESA).

P. 15

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

fao

usd 16.520 million

Total Implementation Cost for UnconditionalActions: usd 16.52 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

FISHERIES AND

AQUACULTUREActions:

UNCONDITIONAL ACTIONS: INDC page link

Enhancing climate change resilience in the Benguela current fisheriessystem (regional project: Angola, Namibia and South Africa).

P. 15

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

afdb|fao

usd 24.831 million|usd 32.143 million

n/a

n/a

usd 3 millionusd 5 million

Total Implementation Cost for UnconditionalActions: usd 56.97 million

Total Implementation Cost for ConditionalActions: usd 8.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

FOOD SECURITYActions:

UNCONDITIONAL ACTIONS: INDC page link

Integrating climate change into environment and sustainable landmanagement practices;Integrating Climate Resilience into Agricultural and AgropastoralProduction Systems through Soil Fertility Management in Key Productiveand Vulnerable Areas Using the Farmers Field School Approach.

P. 15

Funder

Implementing Agency

Cost Estimation

CONDITIONAL ACTIONS: INDC page link

Implement water-harvesting system in drought-prone areas;Promote SLM for increased agricultural yields.

P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

usd 3 millionusd 5 million

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 8.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

CROPSActions:

CONDITIONAL ACTIONS: INDC page link

Diversify crops to less climate sensitive cultures;Locally available adapted seed varieties

P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

usd 5 millionusd 3 millionusd 2 millionusd 3 million

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 13.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

WATER

WATER

MANAGEMENT

Actions:

CONDITIONAL ACTIONS: INDC page link

Increase water availability through village-level wells and boreholes;Implement water resources integrated management;Improve knowledge of hydrology;

Monitor groundwater.

P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 10.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

WATER SUPPLYActions:

CONDITIONAL ACTIONS: INDC page link

Extend water and sanitation network to rural areas.

P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 2.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

COASTAL ZONE

COASTAL

FISHERIES

Actions:

CONDITIONAL ACTIONS: INDC page link

Study the vulnerability of the fisheries sector to climate change and currentmodifications.

P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

undp

usd 17.850 million

n/a

n/a

Total Implementation Cost for UnconditionalActions: usd 17.85 million

Total Implementation Cost for ConditionalActions: usd 3.50 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

COASTAL

MANAGEMENTActions:

UNCONDITIONAL ACTIONS: INDC page link

Addressing urgent coastal adaptation needs and capacity gaps in Angola.

P. 15

Funder

Implementing Agency

Cost Estimation

CONDITIONAL ACTIONS: INDC page link

Study impacts of sedimentation and siltation rates on coastal processes.

P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

usd 10 millionusd 1 million

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 11.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

SEA-LEVEL RISE

PROTECTIONActions:

CONDITIONAL ACTIONS: INDC page link

Construct sea level protection structure;

Revise building codes to promote retreat from flood plains and coastalzones.

P. 18

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 3.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

HEALTH

HEALTH SERVICES

AND ASSESSMENT

Actions:

CONDITIONAL ACTIONS: INDC page link

Ensure basic access to health services and health monitoring.

P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 1.50 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

DISEASE

SURVEILANCE AND

CONTROL

Actions:

CONDITIONAL ACTIONS: INDC page link

Study the implication of climate change on disease patterns for humansand livestock.

P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 1.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

URBAN

BUILDINGS

Actions:

CONDITIONAL ACTIONS: INDC page link

Improve design and construction of buildings.

P. 18

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

undp

usd 37.179 million

n/a

n/a

usd 3.5 millionusd 17.5 million

Total Implementation Cost for UnconditionalActions: usd 37.18 million

Total Implementation Cost for ConditionalActions: usd 21.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

DISASTER RISK

MANAGEMENT (DRM)

EARLY WARNING

SYSTEM

Actions:

UNCONDITIONAL ACTIONS: INDC page link

Promoting climate-resilient development and enhanced adaptive capacityto withstand disaster risks in Angola's Cuvelai River Basin.

P. 15

Funder

Implementing Agency

Cost Estimation

CONDITIONAL ACTIONS: INDC page link

Create an early warning system for flooding and storms;Climate monitoring and data management system

P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

usaid/ofda

fao

usd 1.18 million (first year)

Total Implementation Cost for UnconditionalActions: usd 1.18 million

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

DISASTER RELIEF

AND RECOVERYActions:

UNCONDITIONAL ACTIONS: INDC page link

Disaster risk reduction/ management to support agropastoral communitiesaffected by recurrent droughts and other natural disasters in southernAngola and northern Namibia (Project PIRAN).

P. 15

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 5.00 million

Technology Transfer:

Capacity Building: n/a

SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

DISASTER

PREPAREDNESSActions:

CONDITIONAL ACTIONS: INDC page link

Construct flood protection barriers along major rivers.

P. 17

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group