Upload
others
View
11
Download
0
Embed Size (px)
Citation preview
Acknowledgments
The (I)NDC Content Briefs were produced by the Climate Policy
Team of the World Bank Climate Change Group. The team was led
by Sebastian Wienges and Ana Bucher under the supervision of
Stephen Alan Hammer. Detail analysis of country (I)NDC was
provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation
components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation
components). The team is grateful for all comments and
suggestions received from regional and sector specialists
regarding the presentation and synthesis of relevant information.
© 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org
Climate Policy Team | World Bank Group
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
Introduction In response to a growing interest in understanding (Intended) Nationally DeterminedContributions ((I)NDCs) and with regard to the ultimate goal of supporting countries'implementation of their national climate targets, the World Bank Climate Policy Team (WBCPT) has
reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief
aims to provide a summary analysis of existing and instead country mitigation and adaptation
policies and plans, commitments and targets, implementation strategies and sector priorities,
associated costs and conditionalities, and stated gaps and needs, among other issues.
The (I)NDC content briefs are created solely on the basis of information from submitted(I)NDCs and makes no inferences about robustness, quality, or viability of intended policiesor actions.
The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify
and familiarize with a range of country priorities in terms of sectoral engagement, and needs in
terms of capacity building, technology transfer, and financing. Based on this comprehensive
mapping exercise, the WBG will develop a useful, easytouse, and interactive database and briefs
of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including
the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks
(CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices
(GPs), regions, and country units for the identification of potential development opportunities,
analytical studies and technical assistance to support countries' implementation of planned policies
and actions. Indepth summaries of (I)NDCs by sectors and regions will be prepared at a later stage.
In regards to Adaptation, although no global adaptation mechanism is established, the ParisAgreement parties are required to engage in adaptation planning and implementation of actions
which include preparation of adaptation plans. The Adaptation section of a large number of
submitted (I)NDCs, aims to increase development planning and scale the ability of countries to
adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse
gas emissions development, in a manner that does not threaten sustainable development. In
addition to requested finance, the implementation of country commitments is largely tied to
significant amounts of external assistance to support development and execution of adaptation
plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component,
the process will ensure increased resilience is recognized under the UNFCCC and climate finance
mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows.
Climate Policy Team | World Bank Group
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
Table of Contents
I Overall Planning and Preparation Process
II Mitigation
Economywide Targets
Economywide Policies
Mitigation Actions and Policies
III Adaptation
Adaptation Targets
Adaptation Context
Adaptation Actions and Policies
Acronyms
BAU Business as Usual NAMA Nationally Appropriate MitigationActions
CIFPPCR Climate Investment Funds PilotProgram for Climate Resilience
NAP National Adaptation Plan
DRM Disaster Risk Management NAPA National Adaptation Programmesof Action
INDC Intended Nationally DeterminedContributions
REDD+ Reducing emissions fromdeforestation and forestdegradation and the role ofconservation, sustainablemanagement of forests andenhancement of forest carbonstocks in developing countries
LEDS Low Emission DevelopmentStrategy
LULUCF Land Use and Land Use Changeand Forestry
|
|
|
Climate Policy Team | World Bank Group
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
Overall Planning and
Preparation Process
How reliable is the prioritization of the (I)NDC? How serious is thegovernment about implementing policies and actions to achieve the (I)NDCtargets?
Political decision of adoption of INDC at:Head of state level
Interministerial level
Parliament
Ministry Level
MINISTRY OFENVIRONMENTMINISTRY OF ENERGYAND WATER
Technical development of INDC through a participatory processStakeholder involvement YES
Multisector commision
Have development benefits been assessed and considered in the planningprocess?
YES
Are there climate policies and actions already in place/under development?
LEDS
NAMAS
NAPA YES
Climate Policy Team | World Bank Group
$15.70
(in Billion USD)
TOTAL COST OF
IMPLEMENTATION (mitigation and adaptation)
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
Existing policies:Strategic Plan for Disaster Risk Management (2011)
National Afforestation and Reforestation Strategy (2010)
National Strategy for Climate Change (2008)
Strategy to Fight Poverty (SFP)
National Adaptation Programmes of Action for Climate Change (NAPA)
Has the INDC development been supported by a development partner?
Technical supportFRANCE THROUGH EXPERTISE FRANCEGERMANY THROUGH GIZ
Financial support
Implementation Plans and Needs
Specific requests for international provision of means of implementation:
Technology Transfer YES
Financial support YES
Capacity Building YES
Does the INDC intend the private sector to be involved in theimplementation of the NDC?
Are carbon pricing/international market mechanisms intended?YES
Are there any barriers identified?
Link list:• Angola INDC Factsheet (projected per capita emissions): http://www.climateenergycollege.net/files/site1/factsheets/Angola_INDCFactsheet_UoMPRIMAP_GWPAR4.pdf
Climate Policy Team | World Bank Group
-35%
n/a
additional -15%
n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
Mitigation
ECONOMY-WIDE TARGETS
Conditionality: INDC page link
Unconditional part of mitigation target:Estimated costs for implementation:
Conditional part of mitigation target:Estimated costs for implementation:
Coverage of Gases: CO , CH , N O
Other Targets:
POLICIES:
TARGET YEAR
2030TARGET TYPE
-50%Relative Emission Reduction
Compared to BAU (%)
14.70(in Billion USD)
COST OFIMPLEMENTATION
2 4 2
Climate Policy Team | World Bank Group
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESINDUSTRIES Plans:
Industries: General P. 9
Climate Policy Team | World Bank Group
n/a
n/a
n/a
Increase carbon sink to 5 MtCO2e per year by2030
n/a
n/a
n/a
n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESLULUCF/FORESTRY
Targets: INDC page link
Increase carbon sink to 5 MtCO2e per year by 2030 P. 9
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIESAGRICULTURE Plans:
Agriculture: General P. 12
Climate Policy Team | World Bank Group
cost for each project is listed
n/a
n/a
n/a
13 (681 MW) wind energy projects
n/a
n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: WINDActions: INDC page link
13 (681 MW) wind energy projects P. 8
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
cost for each project is listed
n/a
n/a
n/a
14 (2 Municipal solid waste, 11 wasteforest, 640MW) biomass projects
n/a
n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: BIOFUELSActions: INDC page link
14 (2 Municipal solid waste, 11 wasteforest, 640 MW) biomass projects P. 11
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
cost for each project is listed
n/a
n/a
n/a
18 (438 MW) solar projects
n/a
n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: SOLARActions: INDC page link
18 (438 MW) solar projects P. 11
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
cost for each project is listed
n/a
n/a
n/a
25 (6,732 MW) hydroelectric projects
n/a
n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: HYDROActions: INDC page link
25 (6,732 MW) hydroelectric projects P. 11
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
$11.346 billion
n/a
n/a
n/a
681 MW wind energy projects; 438 MW solarprojects; 640 MW biomass projects; 6,732 MWhydroelectric projects
$11.346 billion
n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
MITIGATION ACTIONS AND POLICIES
RENEWABLE
ENERGYActions: INDC page link
681 MW wind energy projects; 438 MW solar projects; 640 MW biomassprojects; 6,732 MW hydroelectric projects
P. 10
Estimated total costs for implementation:
Capacity building needs:
Technology needs:
Unconditional part of mitigation target:
Estimated costs for implementation:
Conditional part of mitigation target:
Estimated costs for implementation:
Emission reduction potential:
Climate Policy Team | World Bank Group
USD 0.5 Billion
USD 0.5 Billion
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
Adaptation
ADAPTATION TARGETS
ADAPTATION CONTEXT
Existing National Development/Resilience Policies and Plans
National Communications
NAPs
NAPAS YES
CIF-PPCRs
Sectoral Strategies
STRATEGY TO FIGHT POVERTY(SFP)
NATIONAL AFFORESTATION ANDREFORESTATION STRATEGY (2010)
STRATEGIC PLAN FOR DISASTERRISK MANAGEMENT (2011)
Cross-cuttingNATIONAL STRATEGY FORCLIMATE CHANGE (2008)
Conditionality:
Unconditional part of adaptation implementation
Conditional part of adaptation implementation
Conditional upon international provision of meansof implementation
YES
TARGET YEAR
20301.00
(in Billion USD)
COST OFIMPLEMENTATION
Climate Policy Team | World Bank Group
n/a
ministry of energy and water & nationaldirectorate of renewable energy
usd 150 million (to 2025)
Total Implementation Cost for UnconditionalActions: usd 150.00 million
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
ENERGY
RENEWABLE
ENERGY: SOLAR
Target: INDC page link
Produce 100 megawatts of solar power to all rural areas by 2025
Actions:
UNCONDITIONAL ACTIONS: INDC page link
The "Solar Village" Programme.
P. 16
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
ministry of energy and water & nationaldirectorate of renewable energy
n/a|usd 5 million
Total Implementation Cost for UnconditionalActions: usd 5.00 million
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
POWER SYSTEM
PLANNINGTarget: INDC page link
Generate 5000 megawatts power from 2013 to 2017
Actions:
UNCONDITIONAL ACTIONS: INDC page link
Construction of hydroelectric and thermal power plants (2013 - 2017);
Extend electricity grid to rural areas.P. 16
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 1.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
RENEWABLE
ENERGY: HYDROActions:
CONDITIONAL ACTIONS: INDC page link
Study impact of climate change on hydroelectricity.
P. 18
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
undp
usd 17.884 million
Total Implementation Cost for UnconditionalActions: usd 17.88 million
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
BIOMASS ENERGYActions:
UNCONDITIONAL ACTIONS: INDC page link
Promotion of Sustainable Charcoal in Angola through a Value ChainApproach.
P. 16
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 0.50 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
ENERGY: GENERALActions:
CONDITIONAL ACTIONS: INDC page link
Study impact of climate change on mining
P. 18
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
usd 4 millionusd 1 millionusd 3.5 million
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 8.50 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
LULUCF/FORESTRY
LAND
DEGRADATION
Actions:
CONDITIONAL ACTIONS: INDC page link
Soil erosion control through organic methods;Map areas of erosion risk;
Promote alternative renewable energies to avoid deforestation.P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
fao
usd 15.397 million
Total Implementation Cost for UnconditionalActions: usd 15.40 million
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
AGRICULTURE
LAND AND SOIL
MANAGEMENT
Target: INDC page link
Disseminate sustainable land management and adaptation practices inagro-forestry and land ecology in 350 communities.
Actions:
UNCONDITIONAL ACTIONS: INDC page link
Land Rehabilitation and Rangelands Management in Small HoldersAgropastoral Production Systems in Soutwestern Angola (Project RETESA).
P. 15
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
fao
usd 16.520 million
Total Implementation Cost for UnconditionalActions: usd 16.52 million
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
FISHERIES AND
AQUACULTUREActions:
UNCONDITIONAL ACTIONS: INDC page link
Enhancing climate change resilience in the Benguela current fisheriessystem (regional project: Angola, Namibia and South Africa).
P. 15
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
afdb|fao
usd 24.831 million|usd 32.143 million
n/a
n/a
usd 3 millionusd 5 million
Total Implementation Cost for UnconditionalActions: usd 56.97 million
Total Implementation Cost for ConditionalActions: usd 8.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
FOOD SECURITYActions:
UNCONDITIONAL ACTIONS: INDC page link
Integrating climate change into environment and sustainable landmanagement practices;Integrating Climate Resilience into Agricultural and AgropastoralProduction Systems through Soil Fertility Management in Key Productiveand Vulnerable Areas Using the Farmers Field School Approach.
P. 15
Funder
Implementing Agency
Cost Estimation
CONDITIONAL ACTIONS: INDC page link
Implement water-harvesting system in drought-prone areas;Promote SLM for increased agricultural yields.
P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
usd 3 millionusd 5 million
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 8.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
CROPSActions:
CONDITIONAL ACTIONS: INDC page link
Diversify crops to less climate sensitive cultures;Locally available adapted seed varieties
P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
usd 5 millionusd 3 millionusd 2 millionusd 3 million
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 13.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
WATER
WATER
MANAGEMENT
Actions:
CONDITIONAL ACTIONS: INDC page link
Increase water availability through village-level wells and boreholes;Implement water resources integrated management;Improve knowledge of hydrology;
Monitor groundwater.
P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 10.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
WATER SUPPLYActions:
CONDITIONAL ACTIONS: INDC page link
Extend water and sanitation network to rural areas.
P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 2.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
COASTAL ZONE
COASTAL
FISHERIES
Actions:
CONDITIONAL ACTIONS: INDC page link
Study the vulnerability of the fisheries sector to climate change and currentmodifications.
P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
undp
usd 17.850 million
n/a
n/a
Total Implementation Cost for UnconditionalActions: usd 17.85 million
Total Implementation Cost for ConditionalActions: usd 3.50 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
COASTAL
MANAGEMENTActions:
UNCONDITIONAL ACTIONS: INDC page link
Addressing urgent coastal adaptation needs and capacity gaps in Angola.
P. 15
Funder
Implementing Agency
Cost Estimation
CONDITIONAL ACTIONS: INDC page link
Study impacts of sedimentation and siltation rates on coastal processes.
P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
usd 10 millionusd 1 million
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 11.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
SEA-LEVEL RISE
PROTECTIONActions:
CONDITIONAL ACTIONS: INDC page link
Construct sea level protection structure;
Revise building codes to promote retreat from flood plains and coastalzones.
P. 18
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 3.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
HEALTH
HEALTH SERVICES
AND ASSESSMENT
Actions:
CONDITIONAL ACTIONS: INDC page link
Ensure basic access to health services and health monitoring.
P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 1.50 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
DISEASE
SURVEILANCE AND
CONTROL
Actions:
CONDITIONAL ACTIONS: INDC page link
Study the implication of climate change on disease patterns for humansand livestock.
P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 1.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
URBAN
BUILDINGS
Actions:
CONDITIONAL ACTIONS: INDC page link
Improve design and construction of buildings.
P. 18
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
undp
usd 37.179 million
n/a
n/a
usd 3.5 millionusd 17.5 million
Total Implementation Cost for UnconditionalActions: usd 37.18 million
Total Implementation Cost for ConditionalActions: usd 21.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
DISASTER RISK
MANAGEMENT (DRM)
EARLY WARNING
SYSTEM
Actions:
UNCONDITIONAL ACTIONS: INDC page link
Promoting climate-resilient development and enhanced adaptive capacityto withstand disaster risks in Angola's Cuvelai River Basin.
P. 15
Funder
Implementing Agency
Cost Estimation
CONDITIONAL ACTIONS: INDC page link
Create an early warning system for flooding and storms;Climate monitoring and data management system
P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
usaid/ofda
fao
usd 1.18 million (first year)
Total Implementation Cost for UnconditionalActions: usd 1.18 million
Total Implementation Cost for ConditionalActions: n/a
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
DISASTER RELIEF
AND RECOVERYActions:
UNCONDITIONAL ACTIONS: INDC page link
Disaster risk reduction/ management to support agropastoral communitiesaffected by recurrent droughts and other natural disasters in southernAngola and northern Namibia (Project PIRAN).
P. 15
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group
n/a
n/a
Total Implementation Cost for UnconditionalActions: n/a
Total Implementation Cost for ConditionalActions: usd 5.00 million
Technology Transfer:
Capacity Building: n/a
SUB-SAHARAN AFRICA | Angola | (Intended) Nationally Determined Contribution
ADAPTATION ACTIONS AND POLICIES
DISASTER
PREPAREDNESSActions:
CONDITIONAL ACTIONS: INDC page link
Construct flood protection barriers along major rivers.
P. 17
Funder
Implementing Agency
Cost Estimation
Total Implementation Cost per Subsector:
Implementation Needs:
Climate Policy Team | World Bank Group