About Luminous ETS Objective of NLRMP Proposed Methodology GIS in NLRMP Luminous ETS Projects
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Luminous Engineering & Technology (LETS) is part of SAR Group having HQ in New Delhi, India
Direct presence in India, USA, Canada and Europe while presence through associates in Australia, Middle East and Far East
Luminous ETS’s state-of-the-art conversion techniques and methodologies provide one-stop services in GEOMATICS like:
GIS
Remote Sensing
Photogrammetry
Application Development
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Multi-disciplinary Engineering Design
Civil Engineering
Structural Engineering
MEP
TransportationParent Company: Luminous Power Technology Pvt. Ltd.
SAR Group’s Flagship company
Provides End-to-End Solutions in Enterprise-wide
- Power & Connectivity Solutions
Associates: Vandana Aviation & Aviotronics (P) Ltd.
Empanelled as an Aerial Photographic Agency by MoD, GOI
First in India to Introduce ‘Airborne Laser Terrain Mapping’ & ‘Digital Photography’
About Luminous ETS Objective of NLRMP Proposed Methodology GIS in NLRMP Luminous ETS Projects
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Develop a Modern, Comprehensive and Transparent Land Records Management System in the Country
About Luminous ETS Objective of NLRMP Proposed Methodology GIS in NLRMP Luminous ETS Projects
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Scope of Work: Divided into 4 phases
› Phase-I:Creation of Ortho Rectified Aerial Photographs
› Phase-II : Creation of Preliminary Land record database (it is core GIS activity)
› Phase-III : Creation of Secondary LRDB (it is core GIS activity)
› Phase-IV : Creation of Final LRDB and in consultation with DOLR & Title owner (it is core GIS activity)
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
About Luminous ETS Objective of NLRMP Proposed Methodology GIS in NLRMP Luminous ETS Projects
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
GIS is a major component of this program
Going to play very vital role in NLRMP
GIS Work includes
Creation of soft copy maps of land records
Attachment of ownership mutation data to each Khasra
(Plot)
Updation of land records both spatially and Textually
Two Major Components1. Creation of land record
boundaries Map from Ortho Aerial Imagery Boundary capturing from their
actual position Accurate classification of
Land parcels Other features will be
extracted as per their actual shape like Road, rail network, Water body and reserved areas
Topology creation, Labeling and dimensioning of all sides
2. Creation of ROR data from existing textual records ROR (Records of rights)
database created by existing textual and Mutation Records
Linking of Land Record database with ROR Database
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Data Completeness Check
Topological / Geometric Checks
Visual check / Logical Checks
Report Generation Comparison with ROR Records
- If Error Limit is more than Allowable Limit, Then Ground Verification Can be Done
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Seamless Land Record Database with ROR data Linked in the form of Preliminary LRDB covering the AOI
Report tables of the land records with their dimensions (beyond the allowable limits); such data shall be highlighted for ground verification or resolution in consultation with DoLR authorities
The detailed soft copy as well as hard copy examination and Quality Control (QC) reports carried out by the team leaders shall be handed over to DOLR for verifications.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Seamless Land Record Database with ROR data Linked in the form of Preliminary LRDB covering the AOI
BONGDA
SURUA
PIMPI
KISNI
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Comparison of Land Records with ROR in ALL aspects› Dimensions (Both Length & Width)› Area
Error Limit is within limits – No Issue
More than Allowable Limit › 2nd Round of Ground Verification will be Done
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
The objective of this phase is to validate the features extracted during the Phase-II› Parcel having errors in
dimension beyond the allowable limits shall be verified by:
Field Survey Collected data to be
Verified Updation of Corrected
features ROR database will be
updated with ground reality
Link between Secondary LRDB and ROR database will be confirmed
Topological and Logical checks will be validated on Updated data
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Data in GIS Environment
Roads
Property
Plots
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Field Surveyed Data Checks:› Check to ensure all required information from Field is validated and corrected information is
captured in required format.› Check to ensure that all mandatory fields attribute data is collected.› Collected information is logically correct in terms of their relevance with features.› Complete check to ensure the connectivity and adjacency of the features after proposed
corrections.
Database Updation checks:› Check to ensure all information captured in survey validation and correction will be
updated in secondary LRDB› Check to ensure mandatory dimensions and fields attribute should not be blank› Random check to ensure error free final data.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Corrected Seamless Land Record Database with ROR data Linked in the form of Secondary LRDB covering the AOI
The detailed soft copy as well as hard copy examination and Quality Control (QC) reports carried out by the team leaders
Generation of ROR along with location map for distribution to the Title owner for his verification of title and its dimensions
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
The objective of this phase is to create an accurate land record map in consultation with DoLR by resolving the disputes of Title ownerships with the involvement of actual owners as per the ROR datasets and there by creating the final LRDB › Distribution of ROR data for
verification› Correcting in case of
discrepancy in consultation with DOLR Authority
› Creation of Final DB by incorporating all the corrections
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Complete check to ensure the completeness, adjacency and
correctness of the features
Check to ensure all required information from ROR database is linked properly
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
› Digital Records are Created› Digital Records are Easy to update› Clear cut idea on current Land-use/Land-cover› Easy to retrieve› Information available at a click of mouse› Use this record for all type of future planning› Various query could be run
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
About Luminous ETS Objective of NLRMP Proposed Methodology GIS in NLRMP Luminous ETS-Projects
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Extraction of DTM, DSM & Contours› Digital Terrain Model› Digital Surface Model› Contours Classification of LiDAR Data› Classification
Roads Vegetation Industrial \Commercial Bridges
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Digital Terrain ModelDigital Surface Model
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Ortho Photo› 1008 Sq Km› GSD 10 cm› Accuracy
- X, Y: +/- 0.5m› Deliverables
- Geotiff- Quality Report
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Types of Job› Ortho-photo Generation› Mosaic Creation› Color Balancing› Tiling
No. & Types of Images› 2136› Both RGB & CIR
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Study Area Details North – 2,676 Acre South – 8,845 Acre
Location: IndiaState: JharkhandDistrict: Ranchi
Latitude: 22° 58’ to 22° 48’NLongitude: 84° 55’ to 85° 03” E
No. of villages: 14 Nos
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Geo-Reference Toposheet
LISS-IV – 5.8M
CARTOSAT 2.5M
Merge Image 2.5M
QC
QC
Digitization Parcel ID
QC
Lu/Lc Clutter Map
Base Layer
Hab Capture
Road & Water
Classification
Compilation
Subset
Refinement/QC
QA
Raster to Vector
Creation of Updated
Land Records
Acc
Rej
Parcel Map Mosaic Parcel Map
Acc
Acc
Rej
AccRej
Acc
Rej
GIS Based Query
Data Base Linking
Rej
Collection of Village Sabak Map
Collection of ROR Data
Rectified Parcel Map
Satellite Based DEM
Shipment
Acc
Ortho-Rectified Merged Image
QA
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
Legend
!R Village
Torpa_S ite
LULC_UNIT
A g ricu ltu re
A g ricu ltu re F a llo w L and
A g ricu ltu re F a llo w L and P erm anent
F orest
G ra ss La nd
In land W ater
O pen/B are
R ailw a y
R ive r
R oad
S e ason al W ater B odies
Village/Tow n
W aste Lan d
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
No. of Parcels – 200K + No. of Projects – 10 Team Size – 15 Software Used:
AutoCAD Map, Arc Info, Arc GIS
AIM:Constructing Parcel Maps & linking ownership database
TAT 2-3 Months per Project
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
No. of Buildings – 170K + No. of Projects – 2 Team Size – 10 Software Used: AutoCAD
Map, Arc GIS AIM:
Constructing Building Foot Print & Linking with Parcel ownership database
TAT 5-6 Months per Project
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
No. of Parcels – 400K + No. of Projects – 5 Team Size – 17 Software Used:
AutoCAD Map, Arc GIS AIM:
Improving the Positional accuracy of existing maps of parcels in different format
TAT 2-3 Months per Project
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.
NLRMP Tech Fair 2009 © 2009 Luminous Engineering & Technology Services (P) Ltd.