11/21/2015 Report Part 2

http://forestsclearance.nic.in/Admin/processing_report.aspx?pid=FP%2fUK%2fOthers%2f14241%2f2015 1/3

State Serial No. of proposal : UK-‐0690/2015

1. Location of the project/Scheme : Uttarakhand

 (i) State / Union Territory : Uttarakhand

 (ii) District : Rudraprayag

 (iii) Forest Division : Rudraprayag

 (iv) Area of forest land proposed for diversion (in ha.) : 2

 (v) Category : Others

2. Legal status of forest land proposed for diversion :

5. Working plan prescription for the forest land proposed for diversion :

The area proposed for diversion is Revenue forest. Working Plan for such forests is not prepared.

6. Brief note on vulnerability of the forest area to erosion : no erosion pron zone.

7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 1.85

8. Significance of the forest land proposed for diversion from wildlife point of view :

(i).Details of wildlife present in and around the forest land proposed for diversion : Ghurad,

Kakad, Guldar etc. 

(ii).Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve,

elephant corridor, wildlife migration corridor etc. : No 

(iii).

Whether the forest land proposed for diversion is located within eco-‐sensitive zone(ESZ)

of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a

Protected Area is not notified,then,10kms distance from boundary of the Protected Area

should be treated as ESZ): No

 

(iv).

Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant

corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the

forest land proposed for diversion : No

 

(v). Whether any rare/endangered/unique species of flora and fauna found in the area : No 

Division 1. : Rudraprayag

3. District wise area to be diverted in the division :

4. Details of Vegetation available in the forest land proposed for diversion :

 (ii) Density of vegetation

S. No. District Area(ha.)

1 Rudraprayag 2

S. No. Area(in ha.) Density Eco-‐Class

1 2 0.1 Eco 5

S. No. Scientific Name Local Name (31-‐60)cm. (61-‐90)cm. (91-‐120)cm. (121-‐150)cm. (>150)cm.

1 Pinus roxburghii Chir 2 1 1 2 2

2 Misc. Species Surayi 1 0 1 0 0

S. No. Division Forest Land(ha.) Legal Status

1 Rudraprayag 2 Revenue Forest

PART-‐II

(To be filled by the concerned Deputy Conservator of Forest)

11/21/2015 Report Part 2

http://forestsclearance.nic.in/Admin/processing_report.aspx?pid=FP%2fUK%2fOthers%2f14241%2f2015 2/3

14. District Profile :

9.

Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if

any :

(i).Whether any protected archaeological/heritage site/defence establishment or any other

important monument is located in the area : No 

10. Comment as to the reasonability of the extent of the forest land proposed for diversion :

(i).Whether the requirement of forest land as proposed by the user agency is unavoidable and

bare minimum for the project : Yes 

11. Details of violation(s), if any ,committed :

(i).Whether any work in violation of the Act or guidelines issued under the Act has been

carried out : Yes 

(a)Details of violation(s): No Data 

  (b) Period of Work done(year) : 2015 

  (c) Area of forest land involved in violation (in ha.) : 0.111 

Additional information Details :

12. Whether work in violation is still in progres(Yes/No) : No

13. Details of compensatory afforestation scheme :

(ii). Total Financial Outlay for C.A: 837464.00

(iii). Whether the land identified by User Agency is suitable for CA and from managementpoint of view?: Yes

(iv).Copy of certificate regarding suitability of land identified for CA and from management point of view:

(v).Copy of detailed CA scheme including species to be planted,implementing agency,time schedule,cost structure etc.:

S.

No.

Name of person responsible for

violation

Designation & Address of person

responsible for violation

Action taken against the

person responsible for

violation

1 Official of U P Rajkiya Nirman

Nigam Ltd Nirman Unit Dehradun

Project Manager U P Rajkiya Nirman

Nigam Ltd Nirman Unit Dehradun

Notice issued and work was

stopped.

S. No. Documents Remarks

NIL

15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land :

(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))

16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason :

S.noDistrict

Name

Geographical

area of the

district (in

ha.)

Forest

area of

the

district

(in ha.)

Total

forest

area

diverted

since

1980 (in

ha.)

No. of

Approved

Cases

Forest

Land

including

penal

C.A. (in

ha.)

Progress of

compensatory

afforestation

as on(date)

A)

Forest

land (in

ha.)

B) Non-‐

forest

land (in

ha.)

1 Rudraprayag 198400.00 179099.50 578.991 151 1129.614 06/11/2015 256.066 873.548

Division

NameCircle

Site

inspected

By

Whether

site

inspected

No. of

times

site

visited

Site inspection reportDate of

visit

Rudraprayag Garhwal DFO Yes One 06/11/2015

Whether

11/21/2015 Report Part 2

http://forestsclearance.nic.in/Admin/processing_report.aspx?pid=FP%2fUK%2fOthers%2f14241%2f2015 3/3

Division Circle Recommendation

By

Recommendation Reason Letter CF

agreed

Rudraprayag Garhwal DFO Recommended The Proposal

is related

with

development.

Garhwal CF Recommended Goverment

polytechnic

Collage is

necessary for

villagers

Yes

Print page

11/21/2015 Report Part 1

http://forestsclearance.nic.in/Admin/Useragencyreport.aspx?pid=FP%2fUK%2fOthers%2f14241%2f2015 1/7

General DetailsA.

Project DetailsA-‐1. 

(i). Proposal No. : FP/UK/Others/14241/2015

 

(ii). Name of Project for which Forest Land is required : Construction of Govt PolytechnicChopta

 

(iii). Short narrative of the proposal and Project/scheme for which the forest land isrequired : This proposed instition situated in village Kunda Dankot (Chopta) in Distt Rudraprayag(Uttarakhand)

 

(iv). State : Uttarakhand

 

(v). Category of the Project : Others

 

(vi). Shape of forest land proposed to be diverted : Linear

 

(vii). Estimated cost of the Project(Rupees in lacs) : 410.35

 

(viii). Total Area of Forest Land proposed for diversion(in ha.): 2

 

(ix). Non-‐Forest Land required for this project(in ha.): 0

 

(x). Total period for which the forest land is proposed to be diverted(in years): NIL

Details of User AgencyA-‐2. 

(i). Name : GOVT POLYTECHNIC CHOPTA

 

(ii). Address1 : Vill. Kunda Dankot P.O. Jakhani (Chopta)

 

(iii). Address2 : Distt Rudraprayag (Uttarakhand)

 

(iv). State : Uttarakhand

 

(v). District : Rudraprayag

FORM -‐ A

Form for seeking prior approval of Central Government under section 2 of theForest(Conservation) Act,1980 for Diversion of fresh forest area

PART -‐ I(To be filled up by User Agency)

11/21/2015 Report Part 1

http://forestsclearance.nic.in/Admin/Useragencyreport.aspx?pid=FP%2fUK%2fOthers%2f14241%2f2015 2/7

 

(vi). Pin : 246442

 

(vii). Landmark : NIL

 

(viii). Email address : [email protected]

 

(ix). Landline Telephone No. : 238209

 

(x). Fax No. : NIL

 

(xi). Mobile No. : 9412126488

 

(xii). Website (if any) : NIL

 

(xiii). Details of Proposals seeking prior approval of Central Government under the Act fordiversion of forest land submitted by the User Agency in the past  

List  of  proposal  submitted  in  Past

S.noProposal

Status.

Proposal

No.

Moef

File

No.

Area  Proposed

for

Diversion(Ha.)

Area

Diverted(Ha.)

Date  of

In-­

Principle

Approval

Date  of

Final

Approval

NIL

 

(xiv). Legal status of User Agency : State Government

Details of Person Making ApplicationA-‐3. 

(i). First Name: Anil

 

(ii). Middle Name: Kumar Singh

 

(iii). Last Name: Gaur

 

(iv). Gender: Male

 

(v). Designation: Principal

 

(vi). Address 1: Vill. Kunda Dankot P.O. Jakhani (Chopta)

 

(vii). Address 2: Distt Rudraprayag (Uttarakhand)

 

(viii). State: Uttarakhand

 

(ix). District: Rudraprayag

 

11/21/2015 Report Part 1

http://forestsclearance.nic.in/Admin/Useragencyreport.aspx?pid=FP%2fUK%2fOthers%2f14241%2f2015 3/7

(x). Tehsil: Rudraprayag

 

(xi). Pin: 246442

 

(xii). Landmark: NIL

 

(xiii). Email Address: [email protected]

 

(xiv). Landline Telephone No.: 238209

 

(xv). Fax No.: NIL

 

(xvi). Mobile No.: 9412126488

 

(xvii). Copy of documents in support of the competence/authority of the person making this

application to make application on behalf of the User Agency:

Details of land required for the ProjectB.

Details of proposal seeking prior approval of Central Government under the Act fordiversion of forest land for the Project already submitted in the past

B-‐1.

 

(i). Whether any proposal seeking prior approval of Central Government under the Act fordiversion of forest land required for the project has been submitted in the past?. : No

Details of forest land proposed to be divertedB-‐2.

Details of Divisions involvedB-‐2.1

Details  of  Divisions  involved

S.no Division  Name Forest  Land(ha.)Non-­Forest

Land(ha.)

1. Rudraprayag 2 0

Details of Districts involvedB-‐2.2

District  wise  breakup

S.no District  Name Forest  Land(ha.)Non-­Forest

Land(ha.)

1. Rudraprayag 2 0

Village wise breakupB-‐2.3

Villages  wise  breakup

S.no Village Forest  Land(ha.)Non-­Forest

Land(ha.)

1 Kunda  Dankot 2 0

11/21/2015 Report Part 1

http://forestsclearance.nic.in/Admin/Useragencyreport.aspx?pid=FP%2fUK%2fOthers%2f14241%2f2015 4/7

Component wise breakupB-‐2.4

Component  wise  breakup

S.no Component Forest  Land(ha.)Non-­Forest

Land(ha.)

1 Other  (Building) 2 0

Maps of forest land proposed to be divertedC.

Division 1. : Rudraprayag

 

(i). Area of forest land proposed to be diverted(in ha.) : 2

 

(ii). : Linear

 

(b). No. of Segments : One

Segment  wise  details

Segments Segment  Area(in  ha.) Kml  File  of  Segments

1. 2         View  File

 

(iii). Copy of Survey of India Toposheet indicating boundary of forest land

proposed to be diverted:

 

(iv). Scanned copy of the Geo-‐referenced map of the forest land

proposed to be diverted prepared by using GPS or Total Station:

Justification for locating the Project in forest land and details of

alternatives examined:D.

 

(i). Copy of note containing justification for locating the Project in forest land:

 

(ii). Whether a copy of map indicating location of alternative examine is required to beprovided: No

 

(a). Reason for not providing such map Alternate Land not as per Norms

Employment likely to be generatedE.

 

(i). Whether the Project is likely to generate employment ?: Yes

 

(ii). Permanent/Regular Employment(Number of persons): 20

 

(iii). Temporary Employment(Number of person-‐days): 50

11/21/2015 Report Part 1

http://forestsclearance.nic.in/Admin/Useragencyreport.aspx?pid=FP%2fUK%2fOthers%2f14241%2f2015 5/7

Displacement of People due to the Project, if anyF.

 

(i). Whether Project involves displacement?: No

Details of Cost-‐Benefit analysis for the ProjectG.

 

(i). Whether the Project requires Cost-‐Benefit analysis?: No

Status of Environmental ClearanceH.

 

(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :No

Status of Wildelife ClearanceI.

 

(i). Whether the Project or a part thereof is located in any Protected Area or their Ecosensitive zone? : No

Applicability of special provisions governing Scheduled AreasJ.

 

(i).Whether the Project or a part thereof is located in a Scheduled Area? : No

Status of settlement of rights under the Forest Rights Act,2006 on the

forest land proposed to be divertedK.

 

(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on theforest land proposed to be diverted has been completed? : Yes

 

(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights

Act,2006 on the forest land proposed to be diverted:

Details of land identified for Compensatory AfforestationL.

 

(i). Whether non-‐forest or Revenue forest land is required to be provided by User Agency?:Yes

 

(ii). Whether the area of non-‐forest land or Revenue forest land required to be provided byUser Agency for raising Compensatory Afforestation is less than area of forest land proposedto be diverted ?: No

 

(iii). No. of districts involved for raising Compensatory Afforestation: 1

 

(iv). No. of patches: One

District 1. : Rudraprayag

 

(a). Village: Swari Gwas

 

11/21/2015 Report Part 1

http://forestsclearance.nic.in/Admin/Useragencyreport.aspx?pid=FP%2fUK%2fOthers%2f14241%2f2015 6/7

 

(b). Area(in ha.): 4

 

(c). Copy of KML file of the patch:      View File

 

(d). Khasra details: 3319, 4158, 3308, 4059

 

(e). Present owner: Others

 

(f). Copy of ownership proof:

 

(g). Copy of Mou/agreement executed between the Present owner and

the User Agency:

 

(h). Copy of non encumberence certificate for the forest land:

(v). Scanned copy of the map of the land identified for creation of Compensatory

Afforestation prepared by using GPS ot Total Station:

 

(vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land

identified for creation of Compensatory Afforestation:

Additional information Details

Documents

S.No DocumentsRemarks

1 Cover  page,  Fact  sheet,Report,  Part  I  to  V

2 G.O.

3 Alternate,  Khasra  details

4 Joint  survey  &  siteinspection  report

5 Khasara  details

6 Min  demand  of  land,Land  schedule,  BxB  ofproject,  Bar  chart,  No  of

Trees  etc

7 Value  of  Trees,  Nationalpark  etc

8 Lay  out  Plan

9 Geological  Report,  Taskforce,  Manak  Rule

10 Historical  place,  Value  ofLand,  CA  patch  etc

11 Other,  Plantation  on

11/21/2015 Report Part 1

http://forestsclearance.nic.in/Admin/Useragencyreport.aspx?pid=FP%2fUK%2fOthers%2f14241%2f2015 7/7

blank  space,  Muck  Plan,NPV,  RCC  pillar  etc