rORM NO" I[ RO'URI(E:LA DEVELOPMENT AUTIIORITY,UDITI{AGAR. ROURKELA-7590I2 N". 6 W /RDA, Dated. | 7" 2'Xo/7 --_.-r- Fite No. npmW RKl, /___?t_ tZ0 L7 Qenybsion ffilsr su6- section (3) of tfrc section -16 af tfre O{isfia Aan[opment Sivananda Eehera for a. Sub-divisions of lands, b) Institution of change of the use of land or building c) Re-construction of buildinglRenewal of approved building plan, d) Construction of a double storeyed building. to follorving conditionslrestrictions. Clearance from Urban Local Body regarding actual development of waste ryAer_drar_naee qvsfegl_nlLslle_gblAit_ed qld sqbrlqed to Rourkela Development Authority within one month. e) Alterations or additions in the existfrg qround floo6pec_ify)ll respect of Lay-out house ry*ff noi,:E&El.Reverue _Plot -No. =l.Sf {t} & Khata No. OS VillageAvlour Ttrana--gh:ng-- Holding No. - , Ward No. - 6l Rourkela Municipality within the Development Plan area of ROURKELA subject Autfiorities flct, 1gS2 {Odisfia flct, 19SZ) is frerefu grantef in favour of Srt /Snt t.PagntgteIg: Plot Area 1OOO sq-ft Items Annroved Use pemitted No. of Dwellingunits. Lower basement floor Upper basement floor Reeideatiat Ground floor*s61:$mr 7>4.47 gE.EE First floor '7? e -99 ss ft Resident.lal Second floor Third floor Fourth floor F.A.R 1.48 Parkins Heisht 6.85 rntrs Coverage 75.44?" Total Built up area L484.46 sq'ft Setbacks Front ?t-?l| Rear 3r-3n Left 3 r -3rr Rieht $IL tn prio"iple, specific permission for construction of - floor(s) in the first phase' in respect of the above plot/building i* p"'oi"uJ;p'"*-:' * ":T{il.t:-:l tT :::'j::T-",:-"i,:T:'T:i:J:: ;",'ffi]r"'":T#l;""ffi#".;'til;ffi;;i"'1"*1.*g..":*{try:::: tn" conditions in the approved planfletter to the applicant, the permission for next floor(s) will be considered subsequently'

Behera.pdf · Created Date: 9/13/2017 11:26:48 AM

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Behera.pdf · Created Date: 9/13/2017 11:26:48 AM

rORM NO" I[RO'URI(E:LA DEVELOPMENT AUTIIORITY,UDITI{AGAR. ROURKELA-7590I2

N". 6 W /RDA, Dated. | 7" 2'Xo/7--_.-r-Fite No. npmW RKl, /___?t_ tZ0 L7

Qenybsion ffilsr su6- section (3) of tfrc section -16 af tfre O{isfia Aan[opment

Sivananda Eehera for

a. Sub-divisions of lands, b) Institution of change of the use of land or buildingc) Re-construction of buildinglRenewal of approved building plan,

d) Construction of a double storeyed building.

to follorving conditionslrestrictions. Clearance from Urban Local Body regarding actual development of waste

ryAer_drar_naee qvsfegl_nlLslle_gblAit_ed qld sqbrlqed to Rourkela Development Authority within one month.

e) Alterations or additions in the existfrg qround floo6pec_ify)ll respect ofLay-out house ry*ff noi,:E&El.Reverue _Plot -No. =l.Sf

{t} & Khata

No. OS VillageAvlour Ttrana--gh:ng-- Holding No. - ,

Ward No. - 6l Rourkela Municipality within the Development Plan area of ROURKELA subject

Autfiorities flct, 1gS2 {Odisfia flct, 19SZ) is frerefu grantef in favour of Srt /Snt

t.PagntgteIg: Plot Area 1OOO sq-ft

Items Annroved Use pemitted No. of Dwellingunits.

Lower basement floorUpper basement floor

ReeideatiatGround floor*s61:$mr 7>4.47 gE.EE

First floor '7? e -99 ss ft Resident.lalSecond floorThird floorFourth floorF.A.R 1.48ParkinsHeisht 6.85 rntrsCoverage 75.44?"Total Built up area L484.46 sq'ftSetbacksFront ?t-?l|

Rear 3r-3nLeft 3 r -3rrRieht $IL

tn prio"iple, specific permission for construction of - floor(s) in the first phase' in

respect of the above plot/building i* p"'oi"uJ;p'"*-:' * ":T{il.t:-:l tT :::'j::T-",:-"i,:T:'T:i:J::

;",'ffi]r"'":T#l;""ffi#".;'til;ffi;;i"'1"*1.*g..":*{try:::: tn" conditions in the approved

planfletter to the applicant, the permission for next floor(s) will be considered subsequently'

Page 2: Behera.pdf · Created Date: 9/13/2017 11:26:48 AM

2. The building shall be used exclusively for tesidentielpurpose and the use shall not be Ci;:.:any other use without prior approval of this Authority"The deveiopment shali be undertaken strictly aceording to pians encloseel with necessary perrnr:s" .

errdorsement.Parking space measuring - sq.mtr/sft. as shown in the approved plan shall be left for parking ofvehicles and no part of it will be covered or closed or used for any other iurpose.The land over which construction is proposed is accessible by an uppior"o means of access of z0,,-0,,metre/feet in width(NH/State Highway /other major roads). Also the applicant will have to develop andconnect all infrastructures like road, drain, water supply, electricity ind sewerage system from theexisting main road/system to the plot in question at his/her orvn cost.The land in question must be in lawful ownership and peaceful possession of the applicant.The applicant shall free gift - sft./sq.mtr.and - fLet/meter wide srrip of_LCorporation/}t[unicipalityAIAC/RDAforfurtherwideningoftheroadtowidth as shown in the plan. The boundary wall of the plot must be construcred leaving this requiredspace for development of road by the concerned Authority.This permission is valid for a period of three years with effect from the date of issue. In case of renewalof the approved building plan,it is revalidated for a period of one year under Section-20 of the ODA Act,1982 with effect from the date of issue of the letter subject to the conditions and restrictions indicated inthis letter.As per the B uilding Regu I ario n,ZA lZ,Clause- 22.i) Approval of plans and acceptance of any statement or document pertaining to such plan shall notexempt. the owner or person/persons under rvhose supervision the UuilOing is construcLd from theirresponsibilities imposed undei these Regulations or under any other law for the time being in force.ii) Approval of plan would mean granting of permission to construct under these Regulitions in forceonly and shall not mean among other things.a) The title over the land or building,b) Easement rights;c) variation in area from recorded area of a piot or a buiiding;d) Structural stability;e) Workmanship and soundness of materials used in the construction of the buildings;0 Quality of building services and amenities in the construction of the. building;g) The site/area liable to flooding as a result of not taking proper drainage arrangement as per the

natural lay ofthe Iand etc. andh) Other requirements or licenses or clearances required for the site/premises or activity under various

other Laws.In case of any dispute arising out of land recor{ or in respect of right, title, interest after this permissionis granted, the permission so granted shall be treated ai automatlcally cancelled during the period ofdispute' Permission accorded under the provision of Section 16 of ODA Act, l9B2 cannot be construedas evidence in respect of right title and interest of the plot over which the permission has been accordedand plan has been approved. In case, this permission has been*obtained by the applicant(s) fromRourkela Development Authority without having proper title'on land or building this plimission issuedin the instant case, does not conform any title to1ti" applicants over the land or building covered ny tf,1spermission. If the applicant(s) does any thing without having any ritle ro rhe land/building he does so athis own risk and the permission will be treated urcur""ll.d without any liability to the RourkelaDevelopment Authority.As per the clause-2i of Building Regulation,Z0l.2,i) Neither granting of the permit nor the approval of the drawing and specification, nor inspectionsmlde by the Authority during erection of the building shall in uny *uy'relieve the owner of suchbuilding from full responsibility for carrying out the riork in accordance with requirements of NBC2005 and these regulations.

3.

4.

5.

5.

7" landthethis

to thestandard

8,

9.

10.

IL

Page 3: Behera.pdf · Created Date: 9/13/2017 11:26:48 AM

t2.

3

ii) permit the Authority to enter the building or premises for which the permission hasbeen 'granted at any reasonable time for tt . pr.por" of enforcing tr," ."guiutions;iii) obtain, wherever applicable, from the comietent Authority permissions/clearancerequired in connection with the proposed work;

iv) give written notice to the authority before commencement of work on building sitein Form-v, periodic progress report in Form-vIII, notice of completion in Form-vland notice in case of termination of services of Technical p..rorr-.ngug"i uy r,i*andv) obtain an occupancy certificate from the Authority prior to occupation of buildingin full or part.a) In case the full plot or part thereof

-on which permission is accorded is agricultural kisam, thesame must be converted-to non-agricultural kisam under Section-g of oLR Act before commencementof construction, vLr\ ^ryl Lrsrutu uummen(

b) The owner/applicant shall obtain NoC from NAAl/Environmental Clearance from Ministry ofForest and Environment, Govt. of India / Pollution control Board/ Archaeological Survey ofIndia't'{ational Highway Authority of India/ Public Health Engineering/RwSS4Vater ResourcesDepartmenustate Ground water Authority/urban Local Body/ G.p/wESColDFo, Rourkela wild LifeDivision' Forest and Envirpnment Department /Revenueb"purt."nt/State Fire prevention Departmentetc' and submit to RDA.wherever applicable, before commencement of construction.c) The owner/applicant shall gei the-structural pl"an and design vetted by the institutions identifiedby the Authority for buildingt ,orJ than 30 mtrs. height before commencement of construction.wherever tests of any material are made to ensure clnformity of the ."quir"*"nts of the regulations inforce' records of the test data shall be kept available for inspiction during the construction of buildingsand for such period thereafter as required^uy ttre autnority.

The persons to whom a permit is issued during constructions shall keep pasted in a conspicuous place onthe property in respect of which the permit was issued u,Br' ^vv' PsDLvu l

i) A copy of the building permit and ii) a copy of the approved drawings and specifications.

If the Authority finds at any stage that the construction -is-

not being carried on according to thesanctioned plan or is in violations of any of the provisions of these ,"gutltionr, it shall notify the ownerand no further construction shall be allowed until necessary corrections in the plan are made and thecorrected plan is approved.

This permission is accorded on deposit/submission of the folrowing.

13"

14.

15.

16"

Items. Amount (in Rs.) Amount in wordsForm fee Rs. 500 .00 Fave hundredScrutiny fee Rs. L669.o0Balance scrutiny fee

I.q(l

Sanction fee Rs. 1197.00Security fee

rruleG

Fire fighting feeRetention feeShelter FundCompounding fee

Labour Cess Rs.20,764,0O r.wer]try Enousand seven hur:rou r

ixty nlne.

ighty seven.

red sixty

Page 4: Behera.pdf · Created Date: 9/13/2017 11:26:48 AM

11.

I.

Other conditions to be complied by the applicant are as per the following;

The owner/applicant/Technicai person shall strictiy adhere to the existing R.uies r.

regulatibns/norms/standards terms and conditions as prescribed and imposed in the N0C/Clearance,given by Fire Prevention officer/Irlational Airport Authority/SEIAA, Ministry of Forest anc

Environment/PHED/ Pollution Control Board/ Archaeological Survey of india/National HighwalAuthority of India/ Fublic Health Engineering/RWSS/Water Resources Department/State GroundWater Authority/Urban Local Body/ G.P/WESCOIDFO, Rourkela Wild Life Division, Forest and

Environment Department /Revenue Department/State Fire Prevention Department etc. wherever

applicable.

[I. Storm water from the premises and roof top shall be conveyed and discharged to the rain waterrecharging pits as per existing Regulation- 44 of RDA (Planning & Building Standards) Regulation,2012.

20Vo of the parking space in group housing/apartment building shall be exclusively earmarked forambulance, fire tender, physically handicapped persons and outside visitors with signage as per normsunder Regulation-3s(11X12) of RDA (Planning & Building Standards) Regulation,201.2.

Plantation over lUvol2o%o of the plot area shall be made by the applicant as per provision underregulation 28 of RDA (Planning & Building Standards)Regulation, 20L2.If the construction/development are not as per the approved plan/deviated beyond permissible norms,

the performance security shall be forfeited and action shall be initiated against theapplicant/builder/developer as per the provisions of the ODA Act, 1982 Rules and Regulation made

there under.

The Owner/Applicant/Architect/Structural Engineer are fully and jointly responsible for any structuralfailure of building due to any structuraUconstruction defects. Authority will no way be heldresponsible for the same(loss of life or property etc.) in what so ever manner. The structural stabilityand safety of the building along with fire safety shall lie with applicant(s) and the technical person

supervising the construction work without any liability on RDA.

VII. The concerned Architect/Applicant/Developer are fully responsible for 4ny deviations additions and

alternations beyond approved plan/defective construction etc. shall be liable for action as per the

provisions of the Regulation.

VI[. The applicant shall confirm the infrastructural development and subsequently their clearances withregards to development of infrastructure from Urban Local Body/RDA before commencement ofconstruction.

The number of dwelling units so approved shall not be changed in any manner.

This permission does not entitle the applicant(s) any right of passage on any private or public land. This

right of passage is subject to the approval/consent of the owner of the land.

If at a later date, it is found that any case of unauthorized construction on the approved construction is

pending in the court of the Planning Member/Secretary, RDA or in any other court prior to the date ofissue of this letter of permission, the permission so granted will be deemed to have been revoked u/s 17

of ODA Act with immediate effect automatically.

uI.

IV.

V"

VI.

x.

x.

xI.

Page 5: Behera.pdf · Created Date: 9/13/2017 11:26:48 AM

F{owevir, this permission shourd not be construed as regurarizingconstruction undertaken thereof, unless specificaily mentioned.

XIII' The applicant(s) and the technical person must follow the rures of the ..energy efficient buldings,, andsee that the building receives the narurat lights and venrilarion to ,h; ;;*;;;; Iiut th"r. i, uminimum consumption of electricity in that building. Also the applicant is advised to use the solarelectricity/solar heater to contribute a part of electricity consumption tre applicant is advised to obtainthe GRIHA (Green Buildings Rating systems India) cerrification of the building.xIV' The applicants have to develop the building/premises with adequate rain water harvesting, ground waterrecharge system and liquid waste aispoiai systern within their own plot at their own cost. Theapplicant(s) should cover the vacant area suitably with treeslprants insiae the prot. In case, cutting ofexisting trees/plants will be necessary' prior appioval must be obtained from the concerned officer incharge, Forest and Environment Oepti. oithe;;.

t.5

any of the unauthorized

XV. The water supply arrangement and sanitarystandard in that buiiding under the supervision

installations/fixtures will be provided as per NBC/pHof a qualified technical person

xvl' The applicant must provide the (garbage) solid and,liquid yTr".-d-irposar sysrem in the bu,ding, inconformity with the standards .p"iin.iu"a i, ir; planning & building standards regularions of RDAand NBC' The liquid waste is to be disposed oi;;ly after treatm.rt of the same by the appricanr(s) inhis own premises till the same is "onn*"oia ,rrJ.ity ,"*er net work, The applicant(s) have to providesewerage Treatment Plant in

"ur" or:C*;;i#/il-d;, ffirot*. or plots having murtipre3:;1T 3 J#

t; jill "ljg*J;:,ff;*

pr * ;; ;;,;.;;ffi ffi ilr il1 fii.is ^. o;., 0." "ffi ;, gi ven by

l9_

xl/II.Hlt

**Hion has been grartedl**:^ the letter issued by the Tahasitdar vide tetter[i;;;;,#l;; .i;;.; rExecutiv;

orn;;:; tF,"1;,ffi:frH1:.fl;N; :1T,]*

;#:;il;::l B?, .Fire Offie.er ljire Qto+i^- . ,Fire Officer, Fire Station .vide letter N

31H:ffi"#,?:iffi::crearance rett"r No.. . . .....;;.........::.:.. :. ,"i

"- ",Illi,1lTlo.r,rsubmitted by the applicants.

Planning MemberRourkela Development Authority .

This permissiJn has been granted exclusively based on affidavi(s)1t{oc(S) submitted by the applicanr.The applicant(s) shall adhere to the conditions ,tiprtateoin-rrri* p". irrirr, i, i**r and spirit. In case ofar\y deviation, to any of the conditiors giver';-;hir"i"o"r'*'"[irri;;"; rhe content (s) of rheaffi*avitls)rNoc (s), .*r upprou;;;; snir ue d;";;; io r,ur" u.Ln .*".liro u, per rhe oDA Act,1982 without any liability to-tt" nourrcraoe;"t;p;;;u*onn .

Page 6: Behera.pdf · Created Date: 9/13/2017 11:26:48 AM

Memo No 6 Y{ Bp/RDA, oatealT^ zlzol*

copy forwarded along with four copies of the appr,oved plans to5ry5-1. Sivananda Behera, Flot, t+o.f,/b2, N^ear ,.TJ l4erket, Chhend,

r^,,t-Planning l(4ember

Rourkela Development Authority.

Memo No d P6 Bp/RDA, olio-; r . L. zo t L

-

Copy forwarded to the Director of rown planning, odisha, Bhubaneswar,for kind information

. pl"*ihkemberRourkela Development Authoritytsz

BP/RDA, Dated l? :2 ; 2r1 ?'

iPlanning Mifffi-.,

Rourkela Development Authority .($/r

Rourkela.

Memo No 6s"

- CopY- with 1 copy of approved plan forwarded to the Executive Officer,Rour}-cela' Municipality for information and further necessary action. He is requested to takeover the free gifted land for development and maintenance of the roads meniioned in thisletter/plan. Action may please be taken for deviation of any condition given in this approval with:intimation to the undersigned for necessary action as per oDA Act.

B,*k*:#iffi#f;,horityBl--

Copy with a copy of approved plan forwarded to the Tahasildar... .... . .......]Fire Officer/StarePollution Control Board, Rourkela lEnforcement Sguad RDA for information and further necessaryaction. The Tahasildar is requested to intimate th. urd"..igned in case of any problem in theownership status of the land in question within a month.The above

"on."*"d iepartment are

requested to please verify and intimate this office immediately within a fortnight, in case of anydeviation/violation of their Acts/rules in this approved plan. The enforcement sqrlad is hereby u.t.ito inspect the devglopment of the site periodically and report the Authority in case of auy deviationin the approved building planfletter for initiating action against the builder/developer as per theprovision of the Act and intimate immediately the undersigned and Secretary, RDA/FinanceMember, RDA for forfeiture of the security deposit.