29
VISHNU PRABHAN EDUCATION Instrumentation & Electrical QA/QC Engineer & Cathodic Protection QA/QC Inspector B-Tech in Instrumentation & Control Engineering Calicut University, Kerala ,India - June 2008 to March 2011 Email @ [email protected] Mob:- +966 590541056 (KSA) Skype @ VISHNUPRABHAN89 Diploma in Instrument Technology Kerala State Technical Education, India - June 2005 to March 2008 EXPERIENCE (5.5 years) TRAININGS AND PROGRAMS Instrumentation & Electrical QA/QC Engineer & Cathodic Protection QA/QC Inspector (1 year - Oct 2015 to Present) Saudi Aramco Onshore Maintain Potential Program Contractor:-Nasser S. Al Hajri Corporation, Saudi Arabia STRENGTHS ❶For the execution of Instrumentation , Electrical & Cathodic Protection activities in Saudi Aramco Onshore Oil Wells , Water Injection/Supply Wells and manifold stations. ❷Setting up of new RTU Communication System and up gradation of SCADA System. ❸Execution of 13.8 KV Over Head Power Pole & its interconnection at Onshore well pad Equipments. LANGUAGES ❹Implementiaton of Galvanic & Impress current type Cathodic Protection for Onshore well heads, pipelines and structures. ❺Pre-comissioning , Comissioning & Startup activities of Onshore Oil Production wells. Instrumentation QA/QC Engineer (4 Months - May 2015 to Sept 2015) SABIC-KEMYA-Saudi Elastomers Project, EPDM & PBR Facilities Main Contractor:-Technicas Reunidas Gulf,Saudi Arabia PROFESSIONAL EXPERTISE Sub-Contractor:-Nasser S. Al Hajri Corporation, Saudi Arabia ❶Pre-comissioning QA/QC Inspector for Instrumentation Loop checking and pre-comissioning activities. ❷Authentication of loop folder package for the final approval from client. Instrumentation & Electrical Engineer (5 Months - October 2014 to March 2015) SABIC-YANSAB- Yanbu National Petrochemical Company - Turnaround Project for the Installation of MOV’S & Thermal Relief Valve Contractor:-Nasser S. Al Hajri Corporation, Saudi Arabia ❶Bidding of material quantities and manpower based on company norms and policies. ❷Planning, Scheduling and Organizing of pre-turnaround and turnaround activities. ❸Planning and monitoring manpower mobilization and demobilization up to the final settlement. ❹Preparing material take off and Purchase request for the deployment of the project. Instrumentation Planning & QA/QC Engineer (1.5 Years - Feb 2013 to Oct 2014) ACHIVEMENTS Yanbu Aramco Sinopec Refinery (YASREF)-Delayed Coker Unit, EPC- 1 Main Contractor:-Technicas Reunidas Gulf,Saudi Arabia © Saudi Aramco approved Instrumentation , Electrical & Cathodic Protection QA/QC Inspector. Sub-Contractor:-Nasser S. Al Hajri Corporation, Saudi Arabia © SABIC(Saudi Arabian Basic Industries Company) approved Instrumentation QA/QC Inspector. ❶Execution of Instrumentation Panels and systems in Process Control Building. © Yanbu Aramco Sinopec Refinery (YASREF) approved Instrumentation QA/QC Inspector. ❷Fire and Gas system installation and Precomissioning activities. PERSONAL DETAILS ❸Monitoring of Instrumentation Bench calibration & Field calibration activities. ❹Implementing field Instrumentation activities in Furnace,Coke drums,Fractionator & Compressors , etc. ❺Engaged in Precomissioning and comissioning activities. Instrumentation Engineer (1 Year - Nov 2011 to Jan 2013) Indian Oil Corporation Limited, (IOCL) Panippat, India,Butadiene Extraction Unit (BEU) Project. Sub-Contractor:-A-Z Instrument Services,Vadodara. ❶Involved in Instrument loop checking activites. ❷Instrument hook up and impulse tubing activities. ❸Cable pulling,Glanding and Termination activities. Instrumentation Engineer (6 months - Apr 2011 to Oct 2011) REFERENCES AUTOCAL SOLUTIONS PVT LTD, Mumbai. Availiable upon request ❶Calibration of transmitters such as pressure, temperature, flow, level , etc. ❷Endorsing of instrument calibration certificates as per NABL standards. RESUME Hardworking (15/24) , Persuasive , Motivator & Leader , Quality control and Quality Assurance , Unity , Very Communicative , Competetive © Process Automation Using PLC & SCADA, HMI (AB SLC500 & RS VIEW 32). © Oracle Primavera P6 Project & Portfolio management. © Microsoft office and Microsoft Project. © Saudi council of Engineers approved Engineer. (Membership number: 174874). English ••••• Hindi •••• Malayalam ••••• Tamil ••• Arabic Name : Vishnu Prabhan Date of Birth : 12/08/1989 Nationality : Indian Marital Status : Single Passport No. : J 8827554 Date of Issue : 17/06/2011 Date of Expiry : 16/06/2021 Address : Vishnu Prabhan, Kallingal House, Ganga Nagar, Kallingal Jn., Thiruvalathur.p.o, Palakkad-678551 Kerala, India. 15% 40% 25% 20% Execution Quality Control & Quality Assurance Pre-com & Comissioning Planning

# CARRICULUM VITAE

Embed Size (px)

Citation preview

Page 1: # CARRICULUM VITAE

VISHNU PRABHAN EDUCATION

Instrumentation & Electrical QA/QC Engineer & Cathodic

Protection QA/QC InspectorB-Tech in Instrumentation & Control Engineering Calicut University, Kerala ,India - June 2008 to March 2011

Email @ [email protected] Mob:- +966 590541056 (KSA)

Skype @ VISHNUPRABHAN89Diploma in Instrument Technology Kerala State Technical Education, India - June 2005 to March 2008

EXPERIENCE (5.5 years) TRAININGS AND PROGRAMS

Instrumentation & Electrical QA/QC Engineer & Cathodic Protection

QA/QC Inspector (1 year - Oct 2015 to Present)

Saudi Aramco Onshore Maintain Potential ProgramContractor:-Nasser S. Al Hajri Corporation, Saudi Arabia STRENGTHS❶For the execution of Instrumentation , Electrical & Cathodic Protection activities in Saudi Aramco

Onshore Oil Wells , Water Injection/Supply Wells and manifold stations.

❷Setting up of new RTU Communication System and up gradation of SCADA System.

❸Execution of 13.8 KV Over Head Power Pole & its interconnection at Onshore well pad Equipments. LANGUAGES❹Implementiaton of Galvanic & Impress current type Cathodic Protection for Onshore well heads,

pipelines and structures.

❺Pre-comissioning , Comissioning & Startup activities of Onshore Oil Production wells.

Instrumentation QA/QC Engineer (4 Months - May 2015 to Sept 2015)

SABIC-KEMYA-Saudi Elastomers Project, EPDM & PBR Facilities

Main Contractor:-Technicas Reunidas Gulf,Saudi Arabia PROFESSIONAL EXPERTISESub-Contractor:-Nasser S. Al Hajri Corporation, Saudi Arabia

❶Pre-comissioning QA/QC Inspector for Instrumentation Loop checking and pre-comissioning activities.

❷Authentication of loop folder package for the final approval from client.

Instrumentation & Electrical Engineer (5 Months - October 2014 to March

2015)

SABIC-YANSAB- Yanbu National Petrochemical Company - Turnaround Project for

the Installation of MOV’S & Thermal Relief Valve

Contractor:-Nasser S. Al Hajri Corporation, Saudi Arabia

❶Bidding of material quantities and manpower based on company norms and policies.

❷Planning, Scheduling and Organizing of pre-turnaround and turnaround activities.

❸Planning and monitoring manpower mobilization and demobilization up to the final settlement.

❹Preparing material take off and Purchase request for the deployment of the project.

Instrumentation Planning & QA/QC Engineer (1.5 Years - Feb 2013 to Oct

2014)ACHIVEMENTS

Yanbu Aramco Sinopec Refinery (YASREF)-Delayed Coker Unit, EPC-1

Main Contractor:-Technicas Reunidas Gulf,Saudi Arabia © Saudi Aramco approved Instrumentation , Electrical & Cathodic Protection QA/QC Inspector.

Sub-Contractor:-Nasser S. Al Hajri Corporation, Saudi Arabia © SABIC(Saudi Arabian Basic Industries Company) approved Instrumentation QA/QC Inspector.

❶Execution of Instrumentation Panels and systems in Process Control Building. © Yanbu Aramco Sinopec Refinery (YASREF) approved Instrumentation QA/QC Inspector.

❷Fire and Gas system installation and Precomissioning activities. PERSONAL DETAILS

❸Monitoring of Instrumentation Bench calibration & Field calibration activities.

❹Implementing field Instrumentation activities in Furnace,Coke drums,Fractionator & Compressors ,

etc.

❺Engaged in Precomissioning and comissioning activities.

Instrumentation Engineer (1 Year - Nov 2011 to Jan 2013)

Indian Oil Corporation Limited, (IOCL) Panippat, India,Butadiene Extraction

Unit (BEU) Project.

Sub-Contractor:-A-Z Instrument Services,Vadodara.

❶Involved in Instrument loop checking activites.

❷Instrument hook up and impulse tubing activities.

❸Cable pulling,Glanding and Termination activities.

Instrumentation Engineer (6 months - Apr 2011 to Oct 2011) REFERENCES

AUTOCAL SOLUTIONS PVT LTD, Mumbai. Availiable upon request

❶Calibration of transmitters such as pressure, temperature, flow, level , etc.

❷Endorsing of instrument calibration certificates as per NABL standards.

RESUME

Hardworking (15/24) , Persuasive , Motivator & Leader , Quality control and Quality Assurance , Unity ,

Very Communicative , Competetive

© Process Automation Using PLC & SCADA, HMI (AB SLC500 & RS VIEW 32).

© Oracle Primavera P6 Project & Portfolio management.

© Microsoft office and Microsoft Project.

© Saudi council of Engineers approved Engineer. (Membership number: 174874).

English •••••

Hindi ••••

Malayalam •••••

Tamil •••

Arabic •

Name : Vishnu Prabhan

Date of Birth : 12/08/1989

Nationality : Indian

Marital Status : Single

Passport No. : J 8827554

Date of Issue : 17/06/2011

Date of Expiry : 16/06/2021

Address : Vishnu Prabhan, Kallingal House, Ganga Nagar,

Kallingal Jn., Thiruvalathur.p.o,

Palakkad-678551

Kerala, India.

15%

40% 25%

20%

Execution

Quality Control &Quality Assurance

Pre-com &Comissioning

Planning

Page 2: # CARRICULUM VITAE

VISHNU PRABHAN –INSTRUMENTATION & ELECTRICAL QA/QC ENGINEER (CATHODIC PROTECTION INSPECTOR)

Email @ [email protected] , Skype @ VISHNUPRABHAN89, Mob: - +966 590541056 (KSA)

CURRICULLUM VITAE CAREER OBJECTIVE:

I am looking for a good position in the field of Instrumentation & Electrical Engineering including

Cathodic Protection system in order to establish my professional goals and skills to the fulfillment of my

employer requirement. I possess effective organizational skills and the ability to utilize a team and

develop the final output. SYNOPSIS: INSTRUMENTATION QA/QC ENGINEER:- Working in detailed Erection, Procurement, Pre-commissioning, Commissioning and Quality

control of Instrumentation activities in pure Oil & Gas construction plant for more than 5 & ½

years.

Pre-commissioning, Commissioning & Functional Check activities of Instrument Control

systems.

Have well known knowledge about SATIP (Saudi Aramco Typical Inspection Plan), SAIC

(Saudi Aramco Inspection Check list), SATR (Saudi Aramco Test reports), SAMSS (Saudi

Aramco Material Standards and Specifications), Etc.

Familiarized with Engineering standards ISA, IEEE, ASTM, NAMUR, ASME, ANSI, NEMA,

API, IEC, SAES, SAMSS, SES, Etc.

Have an experience for witnessing of Factory Acceptance Test of new Remote Terminal Unit

(RTU) cabinet, SSV/SSSV Hydraulic Local Control Panel and its ESD system.

Well familiar with PRESSURE, LEVEL, FLOW, and TEMPARATURE instruments, its

calibration, installation, trouble shooting and its system configuration.

Handled latest field calibrator (HART & FF communicator Emerson-475, Honeywell

communicator SFC, etc.).

Experience in Instrument Installation of all fire and gas equipment such as manual call points,

beacon light, horn, smoke detectors and various gas detectors (toxic, combustible, h2s, etc.) at

indoor and outdoor locations.

Monitor the installation, calibration, and commissioning activities of Oxygen analyzers, Sulphur

analyzers, Opacity analyzers and gas detectors (toxic, combustible and H2S).

Review of all instrumentation documents includes Control & DCS graphic philosophies, P&I

diagrams, cause & effect diagrams, instruments and flow chart, functional logic diagrams, DCS

& ESD I/O lists, instrument hook up, ILD, wiring diagrams, cable schedules, etc.

Providing technical input to site queries and reviewing all instrument design changes and liaise

with other engineering disciplines to provide technical solutions to engineering problems.

Page 3: # CARRICULUM VITAE

VISHNU PRABHAN –INSTRUMENTATION & ELECTRICAL QA/QC ENGINEER (CATHODIC PROTECTION INSPECTOR)

Email @ [email protected] , Skype @ VISHNUPRABHAN89, Mob: - +966 590541056 (KSA)

Worked in the project hand over department team for the final closing out of all the mechanical

completion punch items, pending check sheets and the final quality Dossier submission.

ELECTRICAL QA/QC ENGINEER:- Execution and Inspection activities of 4-1/2 Km of 13.8KV Over Head Tangent Pole Power

distribution line installation, ACSR cable pulling, Installation of Guys and members, Lightning

Surge arrestors, Insulators, Cutout Fuses Etc.

Installation, Testing and Commissioning of Pad mounted type and Oil Cooled type

Transformers.

Inspection activities of Medium voltage cable Installation, Glanding, Termination & High

potential testing, Etc.

Setting up of UPS Power supply system and batteries in RTU.

Installation of Light fixtures and Luminaries in Inside & outside plant area.

Installation, Testing and Energization of Switch racks and its associated panels.

Installation of Receptacles and Cord Connected Equipment.

CATHODIC PROTECTION QA/QC INSPECTOR:- Installation of Impressed Current Anodes; Deep bed and Swallow bed for Cathodic Protection in

Onshore well pad.

Installation of temporary and permanent type Galvanic Anodes or Sacrificial Anodes Cathodic

Protection system for buried pipe lines and structures.

Installation of Galvanic Anodes at Thrust Anchors, Pipe line road crossing & Camel Crossing for

UG and AG cross country pipe lines and piling supports.

Installation of Galvanic Anode 3-Pin Test Station, Positive Anode JB, Negative JB, Bond box,

etc.

Assessing of drill stem resistance and test anode resistance measurements during drilling of the

deep bed anode hole.

Cathodic Protection Onshore Rectifier Installation and its Commissioning including remote

monitoring system using SCADA.

PROFESSIONAL EXPERIENCE:

1. Name of Company : Nasser S. Al Hajri Corporation, Saudi Arabia Project : Saudi Aramco Onshore Maintain Potential Program Client : Saudi Aramco Position Held : Instrumentation – Electrical QA/QC Engineer & Cathodic

Protection Inspector Duration : From October 2015 to Present.

Page 4: # CARRICULUM VITAE

VISHNU PRABHAN –INSTRUMENTATION & ELECTRICAL QA/QC ENGINEER (CATHODIC PROTECTION INSPECTOR)

Email @ [email protected] , Skype @ VISHNUPRABHAN89, Mob: - +966 590541056 (KSA)

Responsibilities:

Quality control and Quality assurance of E&I inspection activities including the Preparation of

Project Quality Control Procedures, Procurement Procedures, Quality plan, Preparation of ITP’s,

Etc.

Execution in the up gradation of the SCADA based control system in Onshore Oil wells, Water

Injection and Water supply wells.

Upgrading the I/O modules, Analog and Digital Interface cards in the existing Remote Terminal

Unit (RTU).

Installation, Precomissioning and Commissioning of new Remote Terminal Unit (RTU) and

interface with SCADA system.

Installation and Commissioning of UPS systems for the new Remote Terminal Unit (RTU)

control building.

Assisting the vendors for the execution and Commissioning of Permanent down Hole

Management System (PDHMS) in Observation wells and Oil production wells. (Schlumberger,

Halliburton, etc.).

Execution and Commissioning activities of SSV & SSSV Hydraulic Control panel, ESD panel,

for Onshore Oil wells.

Monitor all the E&I activities for the Installation of Electrical Submersible Pump skid and its

commissioning for the new Onshore Oil production wells.

Well known experience in the field of the Installation and commissioning activities of Motor

Operated Valve (MOV) in Onshore Oil production wells and Cross country pipe lines. (Rotork,

Limitork, EIM, Bernard & Controls, Auma, etc.).

Execution, Inspection & Energization activities of 4-1/2 Km of 13.8KV Over Head Tangent Pole

Power distribution line installation.

Installation, Testing and Commissioning of Pad mounted type and Oil Cooled type

Transformers.

Inspection activities of Medium voltage cable Installation, Glanding, Termination & High

potential testing, Etc.

Setting up of UPS Power supply system and batteries in RTU.

Installation of Light fixtures and Luminaries in Inside & outside plant area.

Installation, Testing and Energization of Switch racks and its associated panels.

Installation of Receptacles and Cord Connected Equipment.

Installation of Impressed Current Anodes; Deep bed and Swallow bed for Cathodic Protection in

Onshore well pad.

Installation of temporary and permanent type Galvanic Anodes or Sacrificial Anodes Cathodic

Protection system for buried pipe lines and structures.

Page 5: # CARRICULUM VITAE

VISHNU PRABHAN –INSTRUMENTATION & ELECTRICAL QA/QC ENGINEER (CATHODIC PROTECTION INSPECTOR)

Email @ [email protected] , Skype @ VISHNUPRABHAN89, Mob: - +966 590541056 (KSA)

Installation of Galvanic Anodes at Thrust Anchors, Pipe line road crossing & Camel Crossing for

UG and AG cross country pipe lines.

Installation of Galvanic Anode 3-Pin Test Station, Positive Anode JB, Negative JB, Bond box,

etc.

Assessing of drill stem resistance and test anode resistance measurements during drilling of the

deep bed anode hole.

Cathodic Protection Onshore Rectifier Installation and its Commissioning including remote

monitoring system using SCADA.

2. Name of Company : Nasser S. Al Hajri Corporation, Saudi Arabia Project : Turnaround Project for the Installation of MOV & Thermal Relief Valves. Client : YANSAB- Yanbu National Petrochemical Company, SABIC (Affiliated) Position Held : Electrical & Instrumentation Engineer Duration : From November 2014 to February 2015. Responsibilities:

Bidding of material quantities and manpower based on company norms and policies.

Planning, Scheduling and Organizing of pre-turnaround and turnaround activities.

Explain project scope of work, schedule, execution of the project, and quality control and site

project management at the time of kick off meeting with client.

Daily progress report for pre-turnaround and turnaround activities will submit to the client.

Coordinate with all the Engineering disciplines of client for the ease movement of project.

Planning and monitoring manpower mobilization and demobilization up to the final settlement.

Receiving Provisional acceptance, Final acceptance, and Mechanical completion certificate from

client after the execution of the project.

3. Name of Company : Nasser S. Al Hajri Corporation, Saudi Arabia Project : Yanbu Aramco Sinopec Refinery (YASREF)-Delayed Coker Unit, EPC-1 Client : Technicas Reunidas Gulf Position Held : Instrumentation Planning & QA/QC Engineer. Duration : February 2013 to November 2014 Responsibilities: Planning & monitoring all the instrumentation construction activities and scheduling of work

according to the manpower and work norms.

Planning & Scheduling work according to the manpower and work norms to monitor the relevant

activity progress and the actual man-hours spent vs. the earned progress.

To verify and asses the construction activities of supervisors and foreman to ensure that the work

is under 100% qualitative, quantitative and in safe manner.

Preparing main cable laying schedule for Electrical & Instrumentation Cables.

Page 6: # CARRICULUM VITAE

VISHNU PRABHAN –INSTRUMENTATION & ELECTRICAL QA/QC ENGINEER (CATHODIC PROTECTION INSPECTOR)

Email @ [email protected] , Skype @ VISHNUPRABHAN89, Mob: - +966 590541056 (KSA)

Have well known experience in installation activities of nuclear level transmitters and its sources

(Neutron & Gama) of Thermo fisher’s Kril pro and Level pro.

Scrutinize technical site queries and new engineering instructions from the client and responsible

to take proper action in the field.

Attending client meetings and discuss week by week progress in the assigned area. Discuss the

constraints that may affect the progress or free flow of the project.

Finding a solution for the design conflicts in discussion with other disciplines as to change the

design or give a suggestion of possible design change.

Coordinating & attending meetings with management, Clients, Consultant and Subcontractors.

Well known experience in design and implementation of the entire impulse hook up for various

process control instruments such as pressure, level, flow, analyzers, etc. and the pneumatic

hookup of control valves and fire water deluge systems.

Prepare the technical documentation for Instrumentation materials and service requisitions and

prepare according to internal procedures and technical evaluations.

Associated with the Engineering procurement management team for the preparation of purchase

order, bidding report, MTO & MRF based on the client approved vendors.

Preparing material take-off for procurement and bidding purpose.

Preparing material submittals & documentation for client approval.

Control and coordinate the delivery and receiving of all the equipments and materials from the

client, ensure that there is an ease of flow of all materials from store to field.

Carrying out safety instrumented functional testing and demonstration to assessment bodies.

Specially concentrated in all the Instrumentation based Engineering and constructional activities

of furnace/heaters and petroleum coke drums.

Coordinate with client and vendors to carry out site acceptance testing of equipment and special

instruments.

Monitoring the Preparation of loop folders prioritize on mechanical packages after the QC

inspection has been finished.

Coordinate with Pre-commissioning team to provide all the relevant engineering inputs for the

easy movement of loop checking activity.

Working within the team of Instrument Pre-com & Commissioning Engineers for the

involvement in pre-commissioning & commissioning activities including fire and gas, and safety

Instrumentation systems during construction/commissioning phase and start up.

Have good experience in the construction activities of telecommunication equipment such as

PAGA (public address and general systems), WAP, CCTV, etc.

Ensuring the technical integrity of instrument systems prior to acceptance of Mechanical

Completion certificates from the contraction contractor.

Page 7: # CARRICULUM VITAE

VISHNU PRABHAN –INSTRUMENTATION & ELECTRICAL QA/QC ENGINEER (CATHODIC PROTECTION INSPECTOR)

Email @ [email protected] , Skype @ VISHNUPRABHAN89, Mob: - +966 590541056 (KSA)

Review and monitor the preparation of 'as building' documents in accordance with project

procedure.

Demonstrating personal HSE leadership and excellent HSE behaviors at all times, and ensuring

that safety expectations are communicated and maintained, attending all mandatory training as

specified in HSE, and permit to work training schedule, and acting as a Permit To Work Area

Authority.

Attending all mandatory training as specified in HSE, and permit to work training schedule, and

acting as a Permit to Work Area Authority.

Approving instrument discipline and ensuring that all work carried out on live systems is

completed under a permit to work.

4. Name of Company : A-Z INSTRUMENT SERVICES, Vadodara, Gujarath Project : INDIAN OIL CORPORATION LIMITED, (IOCL) Panippat, INDIA Butadiene Extraction Unit (BEU) Project. Position Held : Jr.Instrumentation Engineer Duration : November 2011 TO January 2013.

Responsibilities: Checking of Instrument Index, Wiring diagrams, DCS / PLC / I/O list and Cable schedule and

Interconnection chart.

Checking of Data sheet, Alarm Trip settings, and Instrument hook –up Diagrams.

Supervision in the installation of all type of field instruments such as (transmitters, temperature

gauges, level gauges, pressure gauges, etc.) by using P&ID, location drawing & hook up

drawing.

Supervising of cable laying and cable testing activity.

Surveillance for the installation of JB and MCB as per the JB schedule and Panel layout.

Loop checking of all type of instruments such as (PT, DPT, FT, LT, Control valves, Pressure

switches, level switches and temp switches, etc.

Involved in servicing all types of valves, calibration of all types of electronic & pneumatic

instruments (flow, pressure, temperature, level transmitters and switches).

Take the permit every day to as per work area, explain to our workers about work activity.

5. Name of Company : AUTOCAL SOLUTIONS PVT LTD, Thane, Maharashtra, India. Position Held : INSTRUMENTATION ENGINEER Duration : April 2011 to October 2011. Responsibilities:

Calibration of transmitters such as pressure, temperature, flow, level by using hart

communicator, mill ampere source, loop calibrator, Rtd simulator, etc.

Page 8: # CARRICULUM VITAE

VISHNU PRABHAN –INSTRUMENTATION & ELECTRICAL QA/QC ENGINEER (CATHODIC PROTECTION INSPECTOR)

Email @ [email protected] , Skype @ VISHNUPRABHAN89, Mob: - +966 590541056 (KSA)

Assessment and report preparation of meters will be calibrated for issuing certificates as per

National and International standards.

Assisting and assigning technicians for calibration, testing and loop checking activity.

Declaration: I promise that the details furnished above by me are the latest and true to the best of my knowledge. I

know that if any details submitted by me found incorrect will lead to disqualification. Hope you will

consider my case for the required post in an esteemed organization as per my qualification, experience

and proven abilities. Place : Saudi Arabia

Date : Vishnu Prabhan

Page 9: # CARRICULUM VITAE
Page 10: # CARRICULUM VITAE
Page 11: # CARRICULUM VITAE
Page 12: # CARRICULUM VITAE

51.

1.

2.

3.

ONSHORE MAINTAIN POTENTIAL PROJECTS DEPARTMENT NORTHERN AREA OIL UPSTREAM PROJECTS DIVISION

SAPMT SITE OFFICE, Khursaniyah Tel No.: 677-0666, Fax No. : 677-3056

April16, 2016

TRANSMITTAL

OMPPD/NAOUPD/KHU-347/16

TO: Mr. BOBBY PAUL, Project Manager Nasser S. AI-Hajri Corporation (NSH)

Subject: PID REPLY LETTER

WE ARE FORWARDING: lo HEREWITH D UNDER SEPARATE COVER

n ORIGINALS D PRINTS D CD

0 FURTHER PROCESSING D FORAPPROVAL OTHERS: PID RESPONSE LETTER TO AFK CONTRACTOR.

Reference to the above subject, please find attached PID reply letter as detailed below for your reference·

Subject NAPID Letter # Review Status

QC E&l lnspector (VISHNU PRABHAN) for AFK Area OMPPIS-1 0-00060-584/2016 Accepted/ Approved

(KHU-314/16) Pressure Leakage Test (SAUDI WELL TECHNOLOGY)

OMPPIS-1 0-00060-585/2016 Reviewed & Accepted (KHU-312/16) Quality Management Report for the Month of March 2016

OMPPIS-1 0-00060-589/2016 Not Approved/Rejected (KHU-323/16)

Should you have any question regarding the above, please call the undersigned.

cc: Letter Book File

r~~~~ DONNY AGUSTINUS, r. roJec ngmeer OMPPD/NA Oil Upstream Projects Division

Saudi Aramco: Company General Use

ACER
Highlight
Page 13: # CARRICULUM VITAE

Northern Area Projects Inspection Division letter Number

Onshore MP Projects Inspection Section OMPPIS- 10-00060 - 584 / 2016

Group: RT MP Projects Date DCN

Phone: 013 678-6277 Fax: 0 13-Apr-16 584

Name: Donny Agustinus

Position: Lead Project Engineer

To Division: OMPPD/NAOUPD

Address: SAPMT Khursaniya Site Office

Phone#: (013) 677-0381 Fax#: (013) 677-0181

Attention: Contractor: Nasser S. AI Hajri Corporation

JO: Contract # 6600033948 Title: Onshore maintain potential program Zone NA-1A

Reference: OMPPD/NAOUPD/KHU-314/16 Subject: QC E&l inspector (VISHNU PRABHAN) For AFK Areas.

Name Title Review Status

VISHNU PRABHAN. E&l QC Inspector 1 Accepted/ Approved

/ /

v /__

/ !/

L

Remarks/Comments I 1-Accepted/Approved; 2-Conditionally Approved; 3-Conditional Accepted (as Reliever); 4-Reject; 5-CV Review Accepted; Interview Required; 6-CV Candidate Rejected; 7-Revoked; 8-Reviewed

NOTE: Approval is subject to his performance in the field which shall be evaluated by Saudi Aramco on a regular basis. If his performance falls short of expectation or satisfaction of the company then Saudi Aramco shall have the right to revoke this approval at anytime.

~ Action DATE Mohammed Zamanan

~ Field Supervisor Agree 13-Apr-16 RT MP Project Inspection Unit

This is system generated "Reply Letter" signature is not req6lautli Aramco: Company General Use

ACER
Highlight
Page 14: # CARRICULUM VITAE

ONSHORE MAINTAIN POTENTIAL PROJECTS DEPARTMENT NORTHERN AREA OIL UPSTREAM PROJECTS DIVISION

SAPMT SITE OFFICE, Khursaniyah Tel No. : 677-0666, Fax No. : 677-3056

October 12, 2015

TRANSMITTAL

OMPPD/NAOUPD/KHU-1103/15

TO: Mr. BOBBY PAUL, Project Manager Nasser S. AI-Hajri Corporation (NSH)

Subject: PID REPLY LETTER

WE ARE FORWARDING: I D HEREWITH 0 UNDER SEPARATE COVER

D ORIGINALS D PRINTS D CD

n FURTHER PROCESSING 0 FOR APPROVAL D OTHERS: PID RESPONSE LETTER TO AFK CONTRACTOR.

Reference to the above subject, please find attached PID reply letter as detailed below for your reference·

Sl.# Subject NAPID Letter# Review Status

1. Hydrotest Package-01 , FDHL-620, 16 Inch PWI

OMPPIS-1 0-00060-2001/2015 Accepted w/ comments Header Line Header (KHU-1085/15)

2. Proposed QC RTR Inspector for AFK Area (ANISH

OMPPIS-1 0-00060-2003/2015 Rejected MATHEW) (KHU-1050/15)

3. Proposed E&l QC Inspector for AFK Area (VISHNU

OMPPIS-1 0-00060-2004/2015 Accepted/ Approved PRABHAN) (KHU-1071/15)

Should you have any question regarding the above, please call the undersigned.

cc: Letter Book File

Saudi Aramco: Company General Use

ACER
Highlight
Page 15: # CARRICULUM VITAE

Northern Area Projects Inspection Division :~ $ 'i•">' ..... :~~:f: --~-:· Onshore MP Projects Inspection Section OMPPIS 10 ooof.o . 1 i&o4. /201!;

Group: RT MP Projects ·"'· ;, .. ...re.l; '" -" DCN

Phone: 013 678-6277 Fax: 0 10-0 ct-15 :Z0l2 ,•

~: Donny Agustlnus

P'VJ.•~n: Lead Project Engineer

ro Dlvb.Nin: OMPPD/NAOUPD

...

.. ~,~j SAPMT Khursaniya Site Office

Palone i: (013) 677-0381 ~ (013} 677-0181

Attefi\i.t: i Renato T . Catotocan tc · ~tt~:. Nasser S. AI Hajri Corporation

l JO:,·i Contr•d II 6600033948 ....;

111" ~ Onshore maintain potential program Zone NA-lA

~: J OMPPO/NAOUPO/KHU· ~ ~~. Proposed E&l QC Inspector For AFK Area (VISHNU PRA6HAN).

1071/15 ! ·.~ ., •.. i Name \ ~ ~- rttt~· .>f' ~~ oiM .. ~~il~f- _if'l '\ .. ....... :." )Ji ';J ' '.M' ;f ~ ~ r;:,, ·~ i

VISHNU PRABHAN. Instrument QC 1 1 ~P• Accepted/Approv~d ns ector

;,,, ... .ri . ,., ' .. ...~. 1 .;;'• . l ... ~~ t• ... .:""' ....... '!'. -"'..·~ ' -..ioli...L _;.. ~ Rem

S·Ct '"= :.~ ~:.. -il. ~~- ~I[ -~-:-q If'' 2L i:. , .. "

NOTE: Approvalts subject to h1s perforrnc~n<.e 10 the held whtch shall be evaluated by Saudi Aramco on a regular basis. If h1~ performance falls short of eJCpectatlon or Mit ts faction of tht> rompany then Saudc Aramco shall have the right lo revoke this approval at anytime .

' . . "

,. ; ~ .,., .::.::.f :""~'l!.'f ~.:~'"' ·~·i<..: .,<i, ·-~.QM'E

Mohammed Zamanan

-~ Field Supervisor Agree 10-0ct-15

RT MP Project Inspection Unit

This is system generated "R~ply letter'' s•gnc~ture i~ not 153Quide-.romco: Company General Use

ACER
Highlight
ACER
Highlight
Page 16: # CARRICULUM VITAE

Sl.

1.

2.

3.

4.

5.

6.

ONSHORE MAINTAIN POTENTIAL PROJECTS DEPARTMENT NORTHERN AREA OIL UPSTREAM PROJECTS DIVISION

SAPMT SITE OFFICE, Khursaniyah Tel No.: 677-0666, Fax No. : 677-3056

September 28, 2016

TRANSMITTAL OMPPD/NAOUPD/KHU-951/16

TO: Mr. BOBBY PAUL, Project Manager Nasser S. AI-Hajri Corporation (NSH)

Subject: PID REPLY LETTER

WE ARE FORWARDING: lo HEREWITH 0 UNDER SEPARATE COVER

0 ORIGINALS D PRINTS D CD

LJ FURTHER PROCESSING D FORAPPROVAL • OTHERS: PID RESPONSE LETTER TO AFK CONTRACTOR.

Reference to the above subject, please find attached PID reply letter as detailed below for your reference·

Subject NAPID Letter # Review Status

Hydrotest Package for KRSN-049 (Test Package# HTP-OMPPIS-1 0-00060-1501/2016 Accepted w/ comments SK-NA-1 8-KRSN-049} (KHU-919116}

Hydrotest Package for KRSN-079 (Test Package# HTP-OMPPIS-1 0-00060-1502/2016 Accepted w/ comments SK-NA-1 8-KRSN-079) (KHU-920/16)

Hydrotest Package for KRSN-600 (Test Package# HTP-OMPPIS-1 0-00060-1503/2016 Accepted w/ comments SK-NA-1 8-KRSN-600) (KHU-921/16)

Demobilization of approved QC Civil Inspector Reviewed w/ no (MAHMUHAMMAD ZAHID AND SHINES JEROM will be his OM PP I S-1 0-00060-1504/2016

reliever) (KHU-926/16) comment

Closed Nonconformance Report (NSH-SAOMPP-NCR-CI-OMPPIS-1 0-00060-1506/2016

Reviewed w/ no 083} (KHU-927116} comment Proposed Cathodic Protection Inspector for AFK area

OMPPIS-1 0-00060-1507/2016 Accepted/ Approved (VISHNU PRA8HAN) (KHU-905/16)

Should you have any question regarding the above, please call the undersigned.

l;~~ OMPPD/NA Oil Upstream Projects Division

cc: Letter Book File

Saudi Aramco: Company General Use

ACER
Highlight
Page 17: # CARRICULUM VITAE

Northern Area Projects Inspection Division letter Number

Onshore MP Projects Inspection Hection ( PPIS 10-00060- 1507 / 2016

Group: RT MP Projects Date DCN

Phone: 013 678-6277 Fax: 0 25-Sep-16 1507

Name: Donny Agustinus

Position: lead Project Engineer

To Division: OMPPD/NAOUPD

Address: SAPMT Khursaniya Site Office

Phone#: {013) 677-0381 Fax#: {013) 677-0181

Attention: Contractor: Nasser S. AI Hajri Corporation

JO: Contract# 6600033948 Title: Onshore maintain potential program Zone NA-1A

Reference: OMPPD/NAOUPD/KHU-905/16 Subject: Prc ,posed cathodic protection inspector for AFK area (VISHNU PRABHAN).

Name Title Review Status

VISHNU PRABHAN. QC Cathodic Protecti<>n

Inspector 1 Accep~ed/ Approved

---· - ---~

~ v

/ .c

/ /

/ v

L Remarks/Comments I

1-Accepted/Approved; 2-Condition<lly Approved; 3-Conditional Accepted (as Reli~Jer); 4-Reject; 5-CV Review Accepted; Interview R ~quired; 6-CV Candidate Rejected; 7-Revoked 8-Reviewed

NOTE: Approval is subject to his performance in the field which shall be evaluated by Saudi Aramco 01 a regular basis. If his performance falls short of expectation or satisfaction of the company then Sc1udi Aramco shall have the right to -evoke this approval at anytime.

..-----.... Action DATE

Mohammed Zamanan

~) Supervisor (A) Agree 25-Sep-16

RT MP Project Inspection Unit

This is system generated "Reply Letter" signature is not requioowdi Aramco Company General Use

ACER
Highlight
Page 18: # CARRICULUM VITAE

I I D I ~ -m

TO: Mr. P. SHAJESH (NSH) ATIN: NASSER S. AL HAJRI CO.

SAUDI ELASTOMERS PROJECT (SEP) PROJE-CT: -G2200

tij EPDM AND PBR FACILITIES

Site Transmittal Forms PAGE 1 OF 1 TECNICAS REUNIDAS

DOCUMENT CODE: PE-Z-4011 -PR Att 01 REV.: 0

DATE: 27/06/2015

TRANSMITIAL N°: 02200-2511 -TRC-NSH-T-07054-G / YOUR REF: 02200-2511-NSH-TRC-T-4397,4539,4545,4558-G

SUBJECT: APPROVED QC PERSONNEL

DEAR SIR ('s) :

WE ARE FORWARDING TO YOU HERE WITH THE FOLLOWING DOCUMENTS:

DOCUMENTN° REV. TITLE CODE DATE

NSH-TRC-SEP-DOC-2561 / 0 Vairamuthu. M (QAIQC Piping Supervisor)

G 24-Jun-15 { Conditionally Approved for Three (03) Months}

NSH-TRC-SEP-DOC-2620 0 M. Velmani (QAIQC Welding Inspector)

G 24-Jun-15 {APPROVED}

NSH-TRC-SEP-DOC-2624 0 Lakshman Rao. V (QC Instrument Inspector) G 24-Jun-15 {Conditionally Approved for Three (03) Months}

NSH-TRC-SEP-DOC-2629 0 Vishnu Prabhan (QC Instrument Inspector) G 24-Jun-15 {Conditionally Approved for Three (03) Months}

REMARKS : Noted as following Comments:

(***)Contractor reserves the right to revoke the approval of personnel , if an individual's field performance is found unsatisfactory.

./.).

RECEIVED

SUBCONTRACT RESPONSIBLE: NAME, DATE AND SIGNATURE

Cc: MS/AS/JT/CI/HMR/KR A ttach : (No) File : DCC Origin : HMR I kr ~

NASSER S. AL .. HAJRI C RP. SEP· EPOU & PBR FACILITIES (JR·KEIIYA PROJECT)

DISTIUIIUTION HO CIVIL

RO ST!EL STltUCTUIU

AM EQUIPMEMT

GM PIPING

PM ELECTRICll

HSE INSTRUMENTATION

CONTRACTS PAINTING

DOCUMENT INSULATION

FIREPROOF

YOURS SINCERELY

CISCO JOSE MARIN CANO GERIDEPUTY PROJECT DIRECTOR)

TECNICAS REUNIDAS

EMARKS (IF APPLICABLE)

Please confirm you have received all documents listed by the transmittal sheet signed and dated

ACER
Highlight
Page 19: # CARRICULUM VITAE

I •n• L, tij k~~ycJ T£CNICAS REUNIDAS

SEP PROJECT EPDM & PBR FACILITIES ~ ~

FROM

CONTRACTOR'S DOCUMENT TRANSMITTAL FORM TECHNICAL DOCUMENTS

NASSER S.AL-HAJRI CORPORATION TO ~Ec t:NQ~ Post Box No. 495, Dhaharan Airport 31932 Attention· AN,~C~;~~'),.,ARIN CANO

II-----Te_I..:.(0_3.:...l a_s_5_oo_o_9 _,_(1_o_L_in_es..:.) _______________ ___ __, q, Sitt~mo ~ SUBCONTRACT NUMBER: 2200-2511 .!:' R cP

~~----------------------------------------------------~ I ~ ~ TRANSMITTAL NO.: 02200·2511-NSH-TRC-T-4558-G ~ ·1 1\ 1 l ,'\\ 1'1 L~ ~ Ul ~ ISSUED BY: 1-----_:P....:~.:::i:~~~:::!~AJ,:.:M.:,::::;o::n~~H!.:::ter:..__ ___ ---l=!J~ ~"'=·,;,.,.~~~~:;:::-::. J_-+_1

_5...,-J_,.u.,.n,..·

1_5--l

1

~ . \fJl(l _;~ !:o//\ NAME SIGNATURE DATE \f}>ATE~c:t~E8~TAM,P.!W \

CONTRACTOR

TECHNICAL DOCUMENT NO. DESCRIPTION PGS REV DATE DISPOSITION cor¥=/ /

NSH-TRC-SEP-DOC-2629 RESUME OF QNQC INSPECTOR (INSTRUMENT) - VISHNU PRABHAN

13+1 00 15-Jun-15

CODE

A

B

c

D

E

FIELD ENGR.

STAMP

PROCEED

PROCEED, CHANGE AS NOTED AND RESUBMIT

DO NOT PROCEED, CHANGE AS NOTED AND RESUBMIT

REVIEW NOT REQUIRED

DRAWINGS AND/OR DATA QUALITY BELOW STANDAiRDS

APPROVAL

Discipline Name

CONSTRUCTION

SAFETY

QAJQC

ACTION BY CONTRACTOR

Proceed with work. No additional copies required

Proceed with work in accordance with marked technical document. Revise technical document as noted and resubmit for review with ten (10) working days

Do not proceed with work. Revise technical document as noted and resubmit within ten (10) working days

No action by Company.

Do not proceed with work. Revise technical document as noted and resubmit within ten (10) working days

REC'D FROM APPROVER

Signature Date

DATE RECEIPT STAMP

ACER
Highlight
ACER
Highlight
ACER
Highlight
ACER
Highlight
ACER
Highlight
Page 20: # CARRICULUM VITAE
Page 21: # CARRICULUM VITAE
Page 22: # CARRICULUM VITAE
Page 23: # CARRICULUM VITAE
Page 24: # CARRICULUM VITAE
Page 25: # CARRICULUM VITAE
Page 26: # CARRICULUM VITAE
SANDESH
Rectangle
Page 27: # CARRICULUM VITAE
Page 28: # CARRICULUM VITAE
Page 29: # CARRICULUM VITAE

YASREF(YANBU ARAMCO SINOPEC REFINERY) - ID

YANSAB(YANBU NATIONAL PETROCHEMICAL COMPANY)SABIC AFFILIATED - ID

SABIC-KEMYA - SAUDI ELASTOMER PROJECT

SAUDI ARAMCO ONSHORE MAINTAIN POTENTIAL PROGRAM