興建擋土牆 Construcon of Retaining Wall 擋土牆施工過程模擬圖 Simulaon of Retaining Wall Construcon 擋土牆地基挖掘進行中 Excavaon to Foundaon Level for Retaining Wall In Progress 我們現正興建主連接隧道外的擋土牆,工序包 括:打樁(後部分)、安裝剪力釘、地基挖掘 、打樁(前部分)、釘板扎鐵及灌注混凝土,預計 2021年第二季竣工。 搬遷沙田污水處理廠往岩洞- 工地開拓及連接隧道建造工程 Relocation of Sha Tin Sewage Treatment Works to Caverns - Site Preparation and Access Tunnel Construction www.ststwincavernss1.hk [email protected] +852 5220 0180 聯絡我們 Contact Us f STSTWinCaverns 2020年12月 Decmember 2020 地基挖掘、打樁(前部分)、釘板扎鐵及灌 注混凝土 (進行中) Foundaon Excavaon, Piling Works (Front Poron), Formwork Erecon and Rebar Fixing and Concreng (In Progress) 打樁(後部分)及安裝剪力釘(已完成) Piling Works (Back Poron) and Shear Studs Installaon (Completed) 移除模板 Dismantling Formwork 竣工 Works Completed 梅子林路 Mui Tsz Lam Road 社區聯絡中心 Community Liasion Centre 擋土牆位置 Locaon of Retaining Wall Retaining wall of Main Access Tunnel is under construcon, works include piling works (back poron), shear studs installaon, foundaon excavaon, piling works (front poron), formwork erecon and rebar fixing and concreng. The works are expected to be completed in 2nd quarter of 2021. 安裝隔音屏障; 在挖掘機頭包裹隔音布; 定期灑水防塵; 定期執行空氣及噪音監測;及 調整聲量相對較高的工序時間, 延至早上十時後才展開 Erecon of temporary noise barriers; Wrap up the breaker ps with acousc material; Spraying water at works area; Regular air and noise monitoring; and Adjust relavely more noisy works procedure from 10 am onwards 施工期間採取環保措施: Mitigation Measures Adopted:

興建擋土牆 Construction of Retaining Wall

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 興建擋土牆 Construction of Retaining Wall

興建擋土牆Construction of Retaining Wall

擋土牆施工過程模擬圖 Simulation of Retaining Wall Construction

擋土牆地基挖掘進行中Excavation to Foundation Levelfor Retaining Wall In Progress

我們現正興建主連接隧道外的擋土牆,工序包括:打樁(後部分)、安裝剪力釘、地基挖掘、打樁(前部分)、釘板扎鐵及灌注混凝土,預計2021年第二季竣工。

搬遷沙田污水處理廠往岩洞- 工地開拓及連接隧道建造工程

Relocation of Sha Tin Sewage Treatment Works to Caverns -Site Preparation and Access Tunnel Construction

[email protected]

+852 5220 0180

聯絡我們 Contact Us

f STSTWinCaverns

2020年12月Decmember 2020

地基挖掘、打樁(前部分)、釘板扎鐵及灌注混凝土 (進行中)Foundation Excavation, Piling Works (Front Portion), Formwork Erection and Rebar Fixing and Concreting (In Progress)

打樁(後部分)及安裝剪力釘(已完成)Piling Works (Back Portion) and

Shear Studs Installation (Completed)

移除模板Dismantling Formwork

竣工Works Completed

梅子林路Mui Tsz Lam Road社區聯絡中心

Community Liasion Centre

擋土牆位置Location of Retaining Wall

Retaining wall of Main Access Tunnel is under construction, works include piling works (back portion), shear studs installation, foundation excavation, piling works (front portion), formwork erection and rebar fixing and concreting. The works are expected to be completed in 2nd quarter of 2021.

安裝隔音屏障;在挖掘機頭包裹隔音布;定期灑水防塵;定期執行空氣及噪音監測;及調整聲量相對較高的工序時間,延至早上十時後才展開

Erection of temporary noise barriers;Wrap up the breaker tips with acoustic material;Spraying water at works area;Regular air and noise monitoring; and Adjust relatively more noisy works procedure from 10 am onwards

施工期間採取環保措施: Mitigation Measures Adopted: