    Optimi s ing equipm ent u t i l i sat ion andimpro ve tu rnaround t ime

    Underground Logistics Case Study Carel Coetzee, Sasol Mining

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    2/21

    copyright reserved 2007, P&TS, Sasol Mining

    Session Overview

    Project background and approach

    Monitoring and recognising improvementInformation gathering and modelling Tools and techniques

    Identifying and comparing impactsEvaluating and comparing alternatives

    Conclusions

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    3/21

    copyright reserved 2007, P&TS, Sasol Mining

    Background

    Case for ChangeOperational cost Effective vs. Efficient Safety requirementsEquipment replacement strategies

    Should we spend the money on the current system or should weredesign the logistics system?

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    4/21

    copyright reserved 2007, P&TS, Sasol Mining

    Approach

    Sasol Business Development & Implementation model (BD&I)Systematic approach for the development and implementationBased on traditional stage gate process

    Value Add Align leadership, business, operational and technical effortsHelps us to do the right thing at the right timeGuides us through a sequence of clear decision gates

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    5/21

    ProjectGov ernance

    Execution

    Provide assetsaccording toBusiness Plan

    Implement withminimum changes

    Facility & businesssystems ready forstart-up

    Owner qualityassurance

    Product qualityassurance systemsin place

    Probability of BusinessDevelopment proceeding

    Post Audit ReportRunning En ti ty The BusinessFinal Bus inessPlan

    Business PlanBu siness Case Opt imise

    b u s i n e s s &p r o d u c t

    Per formanceCertif ied

    Start-up Assistanc eTechnical I ntegrity

    Basi c Eng.Package

    Con ceptu al Eng.Proposa l

    Preliminary Eng.Proposals

    Optimis e plantsafety, reliability &

    integrityProject Close-out

    ReportProject Close-out& Review Report

    Pro ject as perExecuti on Plan

    Project ExecutionPlan

    Project ExecutionPhilosophy

    Project Execution Assessm ent

    Safe start-up of theassets andbusiness systems

    End-of jobdocumentation

    Stead y operation In specification

    product SBU acceptance

    Evaluation toensure projectmeets objectives

    Performance test Start business

    support Post project audit Product accepted

    in m arket

    Optimise opera-tion, maintenance& products

    Product Qualityassurance

    Legal &governancecompliance

    Opportunityidentification

    Technologysupport

    Technical supportAsset management

    Enduser support

    Business Planning

    Identify & assessopportunity

    Assess businessalternati ves,uncertai nties &risks

    Company Strategy Alignment Accuracy + 50%

    Facilit yP lanning

    Develop & s elect bestalternatives

    (logistics systems) Select Technolog y(equipment tosupport selectedsystem) Execution & D esign

    philosophiesDevelop Business

    opportunityAccuracy + 30%

    Project Planning

    Optimised & fullydefined scop e

    AuthorityEngineering

    Execution PlanAccuracy + 10%Productacceptance bymarket (detail

    design ofsuggested systemaccepted, incl.interfaces)

    Gov ernanceGov ernanceGov ernanceProject Charter Basic

    Developm entCharter

    Feasibility Charter CorporateGov ernance

    Business Definition Operate BusinessBusiness EstablishmentFocus:

    ContinuousImprovement

    OperationEvaluationStart-upBasicDevelopmentFeasibilityPre-

    feasibilityIdea

    Packaging

    ImplementationFront End LoadingIdeaGeneration

    r ight opportuni ty?

    continue/abort/rework

    accept nextphase plan

    strateg y fit continue /

    abort accept next

    phase plan

    right businesssolut ion?

    continue/ abort/rewor k

    principle approval

    accept nextphase plan

    project author isa t ion

    optimum projectdefinition

    continue/ re work/abort

    accept next phaseplan

    RFO approve start-up

    all objectivesmet

    acceptance of post audit &close-outreports

    beneficialoperation

    stable operatingplant

    quality product

    businessmanagementgovernance inplace?

    business contin-uation still feasible/economical ?

    Sponsor

    P h a s e o

    b j e c t

    i v e s

    T r a c k

    D e

    l i v e r a

    b l e s

    a t e

    r t e r a

    Engineering/Technical

    ProjectManagement

    Business/Operations

    Opportunityscanning

    Brainstorming

    R&D StageGate Model

    Businessenquiries

    Copyright: Sasol Technology (Pt y) Ltd 2005, revision 5, 1 June 2005

    5 64 7 8/11 2 3

    30% 50% 100% 100%70% 95% 100%

    Strategicalignment

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    6/21

    copyright reserved 2007, P&TS, Sasol Mining

    Pre-feasibi l i ty (M oni tor ing and recognis ing i mpro vements)

    Information gatheringUnderground observations / Interviews / Business information (SAP)Time studiesMaterial movement and processEquipment

    UtilisationCosts

    Safety record

    Simulation model

    Opportunity quantification

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    7/21

    copyright reserved 2007, P&TS, Sasol Mining

    Time Study

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    8/21

    copyright reserved 2007, P&TS, Sasol Mining

    Material Movem ent an d Proces s (1)

    106 logistical needs identifiedDriven by

    BreakdownsProduction

    SchedulesDeliveries

    Ad-hoc work

    Main areasMaterial movement to sections and other areasIn-section movement

    People movement

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    9/21

    copyright reserved 2007, P&TS, Sasol Mining

    Material Movem ent an d Proces s (2)

    1

    Shaft stores

    Offload (1 and 6)ForkliftManual

    Supplier delivery

    2 and 8Load (2)

    ForkliftManual

    Unhitch (1 and 9)

    NFP Tractor Empty trailer

    3

    Hitch (2)

    NFP Tractor Full trailer

    Unhitch (3)

    Mainshaft

    Hitch (4)

    4 SectionMachine /

    working face

    FP Tractor Full trailer

    Offload (3)Manual

    Load (4)LHDManual

    AUnhitch (5) LHD/SC/Manual

    Offload (5)LHDManual

    Hitch (6)FP Tractor

    56

    FP Tractor

    7FP Tractor Empty trailer

    Unhitch (7)

    Hitch (8)

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    10/21

    copyright reserved 2007, P&TS, Sasol Mining

    Equip m ent Uti l isat ion

    63.5%

    18%

    1.5%

    12%

    5%

    Number (Percent)

    N/A

    12.5%

    8.5%

    21%

    41%

    Adapted Ut i l i sa t ion

    Trailer

    Tractor

    LHD

    LDV

    FEL

    Type

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    11/21

    copyright reserved 2007, P&TS, Sasol Mining

    Equipm ent Cost

    Annual Equipment Cost

    2003/2004 2004/2005 2005/2006

    Year

    T o

    t a l c o s t

    ( R 0 0 0 ' s

    )

    Tractors

    LHDs

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    12/21

    copyright reserved 2007, P&TS, Sasol Mining

    Simulat ion Model

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    13/21

    copyright reserved 2007, P&TS, Sasol Mining

    Safety R ec ord (L ogist ics related )

    8

    6

    1

    1

    LWDC

    318 15 Grand Total 11Tools and equipment

    2 2 Slip and Fall

    1343Mobile Machinery

    12 47 Material Handling

    11Machinery

    2 1Fall of Material

    Total Medical

    Treatment First Aid

    Case Category

    Based on Sasol Mining June 05 to Feb 07

    Contributor to Sasol Mining RCR Target < 0.5

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    14/21

    copyright reserved 2007, P&TS, Sasol Mining

    Opp ortuni ty Quant i f icat ion Eq uipm ent Numb ers

    -75%

    -

    -

    -

    As-is U-frames

    -33%

    -

    -35%

    -15%

    Central ise al l

    -33%

    -

    -25%

    -10%

    Central ise non-cr i t ica l

    -75%-10%Trailer

    -25%-10%Tractor

    -10%-5%LHD

    --1.5%LDV

    Central ise U-frames

    As- is improve Type

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    15/21

    copyright reserved 2007, P&TS, Sasol Mining

    Op portun ity Quantif icat ion NPVs NPV of alternatives

    As-is As-is impr. Cent. non-crit. Cent. all As-is U-frames Cent. with U-frame

    Alternative

    N P V ( R M i l l i o n

    )U-frame bucket

    U-frame t railer

    Brakes

    Tractor capital

    LHD capital

    Trailer maint

    Tractor maint

    LHD maint

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    16/21

    copyright reserved 2007, P&TS, Sasol Mining

    Feasib i l i ty Phase (Id en tifyin g an d comp aring im pacts)

    Alternatives generationBrainstorming and interviews with end-usersBenchmark (RSA & USA)

    Conceptual design of alternatives Alternative screening Simulation models of alternatives

    Evaluation of alternatives

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    17/21

    copyright reserved 2007, P&TS, Sasol Mining

    Evaluati on Criteria

    Service levelsWaiting/delivery time of materials

    CostsUtilisationFleet size

    SafetyQualitative

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    18/21

    copyright reserved 2007, P&TS, Sasol Mining

    Summ ary of Alternat iv es

    Current system All trailers with brakesReplace tractors and LHDs with new unitsDiesel and flame-proofing in section

    More equipment Centralisation of fleetDecentralisation of transport

    Materials down at satellite shaftsOld oil and ISO at both satellite shafts

    U-frames

    Articulated tractorsCommunication systemIn-section battery scoops and/or utility vehicles24h deliveries

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    19/21

    copyright reserved 2007, P&TS, Sasol Mining

    Alternat ive Com parison (Capi tal) Capital difference (NPV)

    R 0.00

    - R 1 .0 2 -R 1.02-R 3.21

    -R 0.30

    R 8.98 R 10.18

    -R 6.08

    -R 15.92

    R 1 0.1 8 R 1 0.1 8

    R 1.68 R 2.97

    R 12.22

    -R 9.55

    -R 27.51

    -R 4.64

    -R 35.00

    -R 25.00

    -R 15.00

    -R 5.00

    R 5.00

    R 15.00

    R 25.00

    R 35.00

    A s

    i s

    U - f

    r a m e

    M a i n 1 6

    , 2

    U - f

    r a m e

    M a i n 1 2

    , 6

    U - f

    r a m e M a i n 1 2

    , 6 , L

    3 T

    U - f

    r a m e

    M a i n 1 5

    , 8

    C e n t L D V

    M a i n s h a f t

    C e n t L H D

    M a i n s h a f t

    C e n t L H D

    M a i n

    - 3

    C e n t L H D

    M a i n

    - 5

    C e n t T r a c t o r M a i n

    S h a f t

    C e n t L H D + T r a c M a i n

    s h a f t

    S t o r e s a t s h a f t s

    A r t i c u l a t e d t r a c t

    C e n t a l l a t s h a f t s

    C e n t s h a f t s -

    3 L H

    , 4 L D

    , 4 T

    C e n t s h a f t s -

    5 L H

    , 9 L D

    , 9 T

    S c h e d u l e d

    d e l i v e r i e s

    N P V ( R m

    i l l i o n

    )

    -15.0

    -10.0

    -5.0

    0. 0

    5. 0

    10 .0

    15 .0

    A v e s e r v

    i c e

    l e v e l

    d i f f e r e n c e

    ( m i n )

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    20/21

    copyright reserved 2007, P&TS, Sasol Mining

    Alternat ive Com parison (Op eratin g & Capital)

    Steady state total cost difference p er year

    R 0.00

    -R 0.52 -R 0.52 -R 0.80 -R 0.51

    R 1.53R 2.73

    -R 0.10

    -R 1.99

    R 2.73 R 2.73R1.53

    R 0.08

    R 4.77

    -R0.51

    -R 5.47

    -R 1.81

    -R 15.0 0

    -R 10.0 0

    -R 5.0 0

    R 0.00

    R 5.00

    R 10.00

    R 15.00

    A s i s

    U - f

    r a m e M a i n 1 6

    , 2

    U - f

    r a m e M a i n 1 2

    , 6

    U - f

    r a m e

    M a i n 1 2

    , 6 , L

    3 T

    U - f

    r a m e M a i n 1 5

    , 8

    C e n t L D V M a i n s h a f t

    C e n t L H D

    M a i n s h a f t

    C e n t L H D

    M a i n - 3

    C e n t L H D

    M a i n - 5

    C e n t T r a c t o r M a i n

    S h a f t

    C e n t L H D + T r a c

    M a i n

    s h a f t

    S t o r e s a t s h a f t s

    A r t i c u l a t e d t r a c t

    C e n t a l l a t s h a f t s

    C e n t s h a f t s -

    3 L H

    , 4 L D

    , 4 T

    C e n t s h a f t s -

    5 L H

    , 9 L D

    , 9 T

    S c h e d u l e d

    d e l i v e r i e s

    C o s t

    d i f f e r e n c e

    ( R m

    i l l i o n

    )

    -15.0

    -10.0

    -5.0

    0.0

    5.0

    10 .0

    15 .0

    A v e s e r v

    i c e

    l e v e

    l d i f f e r e n c e ( m

    i n )

    S S annua l dif f Cap dif fer enc e ( NP V) Ser vic e lev el

  • 8/10/2019 -Docs-Optimising Equipment Utilisation and Improve Turnaround Time v2

    21/21

    copyright reserved 2007, P&TS, Sasol Mining

    Conclus ions

    The BD&I Model provides roadmap for the process

    Pre-feasibility and feasibility work form the basis of every project

    Data integrity and analysis of data critical for decision making

    Decision criteria for every gate

    Change Management

    Application of a process Result will be optimising of LogisticsSystem and the improvement of the turnaround time of logisticsequipment.