134
최종보고서 신재생 전원설비의 전력수급계획 적용방안 Incorporating the Power Generation Capacities of New and Renewable Energy into Long-Term Electricity Supply Planning 2005831연구수행기관 아주대학교 산 업 자 원 부

신재생 전원설비의 전력수급계획 적용방안eml.ajou.ac.kr/suduk/teach/contents/RNE_power_050822.pdf · 최종보고서 신재생 전원설비의 전력수급계획 적용방안

Embed Size (px)

Citation preview

  • Incorporating the Power Generation Capacities of New and

    Renewable Energy into Long-Term Electricity Supply Planning

    2005 8 31

  • .

    2005 8

    :

    :

    : ,

    : ,

    ,

    ,

    ,

    ,

  • - i -

    1. 1

    . 1

    . 1

    . 2

    2. 5

    . 5

    (1) 5

    (2) 6

    (3) 6

    (4) 7

    (5) OECD 8

    (6) 8

    . 11

    (1) 11

    (2) 13

    (3) 18

    3. 20

    . 22

    . LDC 24

    (1) 8760 Load Profile 26

    . WASP 27

    (1) 27

    (2) 28

    (3) WASP 29

    (4) 32

    . 33

    4. IGCC, LFG, , , 35

    . IGCC, LFG, , 36

    . 37

  • - ii -

    (1) 37

    (2) 41

    5. 44

    . 44

    . 45

    . 51

    . 51

    6. 60

    . 60

    . 62

    (1) (, declination) 63

    (2) 63

    (3) 64

    (4) 64

    (5) PV 66

    . 67

    . 70

    7. 78

    . 78

    . 81

    . 82

    . 88

    8. 96

    . (L-R) 97.5% 100

    . (L-R) 2.5% 106

    9. 112

    10. 116

  • - iii -

    1. WASP LOADSY 123

    . (1-1) WASP LOADSY 123

    . (1-2) WASP LOADSY 131

    . (1-3) WASP LOADSY 137

    . (1-4) WASP LOADSY 143

    . (1-5) WASP LOADSY 149

    2. WASP LOADSY 155

    . (2-3) WASP LOADSY 155

    . (2-4) WASP LOADSY 161

    . (2-5) WASP LOADSY 167

    3. 173

    4. 178

    --------- ---------

    5. () 186

    . (Reliability) 186

    . (Power System Reliability) 191

    1) 191

    2) 192

    3) 192

    4) 196

    . (Capacity credit) 198

    1) 198

    2) (Chronological approach) 200

    3) 203

    4) 208

    5) Chronological VS. Probabilistic method 217

  • - iv -

    6) 218

    6. () 224

    . 224

    . 224

    1) 224

    2) 224

    3) 1 225

    4) 2 225

    . 225

    1) 225

    2) WASP 226

    3) 226

    4) 226

    5) 227

    . 228

    1) 228

    2) CO2 228

    3) 229

    7. () 266

    . 266

    . 267

    1) 267

    2) 269

    . 271

    1) 272

    2) 273

    3) 273

    4) 273

    5) 274

    . 274

    . 280

    8. , () 282

    . 282

    . 282

  • - v -

    . 283

    . 283

    1) 283

    2) : 284

    3) 284

    . 285

    1) 285

    2) 287

    9. DME () 314

    . 314

    . 314

    . 318

    . 324

  • - vi -

    6

    6

    7

    8

    OECD 8

    9

    1998 (euros/kWh) 10

    10

    2002 11

    12

    (2003) 12

    18

    19

    19

    2 ( ) 33

    2 34

    (2003 9 ) 35

    36

    - 37

    38

    39

    40

    21kW 46

    dpt 52

    (2001~2004) 61

    63

    PV 66

    (2003 , : MW) 80

    - 84

    (2003) 85

    (2005) 85

    (2008 ) 86

    96

  • - vii -

    96

    97

    (: MW) 98

    (: %) 98

    (: %) 99

    99

    2000 173

    2001 174

    2002 175

    2003 176

    2004 177

    180

    , FITs () 181

    , FITs ( ) 181

    , FITs () 182

    , FITs ( ) 182

    187

    Series Parallel 220

    220

    226

    227

    227

    227

    WASP 228

    228

    CO2 229

    267

    268

    269

    283

    EL. -1.0m, 12, 6 288

    DME 320

    DME 322

  • - viii -

    [ 2-1] 1 10

    [ 2-2] 11

    [ 3-1] Load Duration Curve 25

    [ 3-2] 28

    [ 3-3] WASP 29

    [ 3-4] 30

    [ 3-5] 31

    [ 3-6] 3 32

    [ 4-1] () 38

    [ 4-2] 41

    [ 5-1] 19kW 47

    [ 5-2] 49

    [ 5-3] 49

    [ 5-4] 50

    [ 5-5] 50

    [ 5-6] 2006 53

    [ 5-7] 2007 53

    [ 5-8] 2008 54

    [ 5-9] 2009 54

    [ 5-10] 2010 55

    [ 5-11] 2011 55

    [ 5-12] 2012 56

    [ 5-13] 2013 56

    [ 5-14] 2014 57

    [ 5-15] 2015 57

    [ 5-16] 2016 58

    [ 5-17] 2017 58

    [ 5-18] , 59

    [ 6-1] 60

    [ 6-2] 61

    [ 6-3] 62

    [ 6-4] (2000 9 12 0 2001 9 11 24) 68

    [ 6-5] (2000 9 12 0 2001 9 11 24) 69

  • - ix -

    [ 6-6] (2000 9 12 0 2001 9 11 24) 69

    [ 6-7] (2000 9 12 0 2001 9 11 24) 69

    [ 6-8] (2000 9 12 0 2001 9 11 24) 70

    [ 6-9] 2006 72

    [ 6-10] 2007 72

    [ 6-11] 2008 73

    [ 6-12] 2009 73

    [ 6-13] 2010 74

    [ 6-14] 2011 74

    [ 6-15] 2012 75

    [ 6-16] 2013 75

    [ 6-17] 2014 76

    [ 6-18] 2015 76

    [ 6-19] 2016 77

    [ 6-20] 2017 77

    [ 7-1] 79

    [ 7-2] 87

    [ 7-3] 8 fitting 87

    [ 7-4] 2006 90

    [ 7-5] 2007 90

    [ 7-6] 2008 91

    [ 7-7] 2009 91

    [ 7-8] 2010 92

    [ 7-9] 2011 92

    [ 7-10] 2012 93

    [ 7-11] 2013 93

    [ 7-12] 2014 94

    [ 7-13] 2015 94

    [ 7-14] 2016 95

    [ 7-15] 2017 95

    [ 8-1] 2006 (L-R) 97.5% 100

    [ 8-2] 2007 (L-R) 97.5% 100

    [ 8-3] 2008 (L-R) 97.5% 101

    [ 8-4] 2009 (L-R) 97.5% 101

    [ 8-5] 2010 (L-R) 97.5% 102

    [ 8-6] 2011 (L-R) 97.5% 102

    [ 8-7] 2012 (L-R) 97.5% 103

  • - x -

    [ 8-8] 2013 (L-R) 97.5% 103

    [ 8-9] 2014 (L-R) 97.5% 104

    [ 8-10] 2015 (L-R) 97.5% 104

    [ 8-11] 2016 (L-R) 97.5% 105

    [ 8-12] 2017 (L-R) 97.5% 105

    [ 8-13] 2006 (L-R) 2.5% 106

    [ 8-14] 2007 (L-R) 2.5% 106

    [ 8-15] 2008 (L-R) 2.5% 107

    [ 8-16] 2009 (L-R) 2.5% 107

    [ 8-17] 2010 (L-R) 2.5% 108

    [ 8-18] 2011 (L-R) 2.5% 108

    [ 8-19] 2012 (L-R) 2.5% 109

    [ 8-20] 2013 (L-R) 2.5% 109

    [ 8-21] 2014 (L-R) 2.5% 110

    [ 8-22] 2015 (L-R) 2.5% 110

    [ 8-23] 2016 (L-R) 2.5% 111

    [ 8-24] 2017 (L-R) 2.5% 111

    [ ]

    [ 1-1] 1 LDC (2004.1 - 2017.1) 127

    [ 1-2] 2 LDC (2004.2 - 2017.2) 128

    [ 1-3] 3 LDC (2004.3 - 2017.3) 129

    [ 1-4] 4 LDC (2004.4 - 2017.4) 130

    [ 1-5] 1 LDC (2006.1 - 2017.1) 133

    [ 1-6] 2 LDC (2006.1 - 2017.1) (1-2) 134

    [ 1-7] 3 LDC (2006.1 - 2017.1) (1-2) 135

    [ 1-8] 4 LDC (2006.1 - 2017.1) (1-2) 136

    [ 1-9] 1 LDC (2006.1 - 2017.1) (1-3) 139

    [ 1-10] 2 LDC (2006.1 - 2017.1) (1-3) 140

    [ 1-11] 3 LDC (2006.1 - 2017.1) (1-3) 141

    [ 1-12] 4 LDC (2006.1 - 2017.1) (1-3) 142

    [ 1-13] 1 LDC (2006.1 - 2017.1) (1-4) 145

    [ 1-14] 2 LDC (2006.1 - 2017.1) 146

    [ 1-15] 3 LDC (2006.1 - 2017.1) (1-4) 147

    [ 1-16] 4 LDC (2006.1 - 2017.1) (1-4) 148

  • - xi -

    [ 1-17] 1 LDC (2006.1 - 2017.1) 151

    [ 1-18] 2 LDC (2006.1 - 2017.1) 152

    [ 1-19] 3 LDC (2006.1 - 2017.1) 153

    [ 1-20] 4 LDC (2006.1 - 2017.1) 154

    [ 2-1] 1 LDC (2006.1 - 2017.1) 157

    [ 2-2] 2 LDC (2006.1 - 2017.1) 158

    [ 2-3] 3 LDC (2006.1 - 2017.1) 159

    [ 2-4] 4 LDC (2006.1 - 2017.1) 160

    [ 2-5] 1 LDC (2006.1 - 2017.1) 163

    [ 2-6] 2 LDC (2006.1 - 2017.1) 164

    [ 2-7] 3 LDC (2006.1 - 2017.1) 165

    [ 2-8] 4 LDC (2006.1 - 2017.1) 166

    [ 2-9] 1 LDC (2006.1 - 2017.1) 169

    [ 2-10] 2 LDC (2006.1 - 2017.1) 170

    [ 2-11] 3 LDC (2006.1 - 2017.1) 171

    [ 2-12] 4 LDC (2006.1 - 2017.1) 172

    [ 3-1] 2000 173

    [ 3-2] 2001 174

    [ 3-3] 2002 175

    [ 3-4] 2003 176

    [ 3-5] 2004 177

    [ 4-1] 188

    [ 5-2] (A ) 195

    [ 5-3] (B ) 195

    [ 5-4] 197

    [ 5-5] A. (Chronological method) 202

    [ 5-6] B (Chronological method) 203

    [ 5-7] (1980) 206

    [ 5-8] (1982) 206

    [ 5-9] (1984) 207

    [ 5-10] (1990) 207

    [ 5-11] (Chronological) 209

    [ 5-12] 209

    [ 5-13] 210

    [ 5-14] 212

    [ 5-15] 215

    [ 5-16] (A) 216

  • - xii -

    [ 5-17] (A) 217

    [ 5-18] 218

    [ 5-19] Series Parallel 221

    [ 7-1] capacity credit 277

    [ 8-1] ( ) 286

    [ 8-2] , 287

    [ 9-1] 316

    [ 9-2] IGCC 316

    [ 9-3] 317

    [ 9-4] 318

    [ 9-5] 318

    [ 9-6] DME 319

    [ 9-7] IGCC DME Co-production 319

    [ 9-8] IGCC+DME co-production ( ) 321

    [ 9-9] IGCC+DME co-production ( ) 322

  • 1.

    - 1 -

    1.

    .

    ,

    ,

    . ,

    , .

    , 2 6 24 48

    40%

    .

    , ,

    ( )

    () . ,

    .

    .

    ,

    ,

    .

    .

    : ,

    .

  • - 2 -

    .

    : ,

    .

    .

    :

    . CO2

    .

    : , ,

    .

    .

    :

    .

    .

    .

    , 1997

    11 38 20082012

    1990 5.2%

    . 2001

    (Marrakech Accords)

    (IET, International Emissions Trading),

    (JI,

    Joint Implementation),

    CER(Certified Emission Reduction)

    CDM(Clean Development Mechanism)

    .

  • 1.

    - 3 -

    ,

    .

    (1) , (2) , (3)

    , (4) ,

    .

    , (penetration)

    ,

    .

    (intermittency)

    dispach ,

    .

    .

    .

    .

    .

    .

    .

    .

    . R&D ,

    .

    .

    .

  • - 4 -

    capacity value .

    .

    ,

    ,

    .

    , .

    .1)

    .

    ,

    IGCC(Integrated

    Gasification Combined Cycle, ), LFG(Landfill Gas), (

    20% ), , 2)

    .

    , 80%

    .

    1 687 .

    ,

    , ,

    .

    ,

    1) WASP ,

    .

    .

    2)

    , .

  • 2.

    - 5 -

    ,

    . 2004-2005

    ()

    . .

    .

    must-run (Load Duration Curve) WASP

    .

    , WASP

    .

    2. .

    (1)

    , ,

    ,

    ( ) .

    2001 7

    , 2002 .

  • - 6 -

    1990 1995 1996 1997 1998 1999 2000

    1927.24 2088.12 2140.47 2163.41 2181.54 2247.79 2299.67 1.8

    (B) 273.56 305.97 313.95 315.76 327.13 334.46 344.24

    (C) 100.91 108.16 113.63 112.25 111.13 113.33 110.39 0.9

    (RE) 29.43 33.68 37.03 37.88 34.74 32.38 28.53

    RE/B100 10.8% 11.0% 11.8% 12.0% 10.6% 9.7% 8.3%

    RE/C100 29.2% 31.1% 32.6% 33.7% 31.3% 28.6% 25.8%

    : , ,

    : IEA, 2002

    ( : Mtoe)

    (2)

    2001 11 RPS ()

    ,

    . ,

    RPS

    RPS .

    1990 1995 1996 1997 1998 1999 2000

    438.85 497.81 511.12 517.86 511.10 515.55 524.71 1.8

    (B) 73.16 84.33 86.02 88.33 89.10 90.89 93.03

    (C) 15.89 16.95 17.37 18.67 17.41 16.81 16.98 0.7

    (RE) 9.27 9.03 8.98 9.93 9.56 9.12 9.22

    RE/B100 12.7% 10.7% 10.4% 11.2% 10.7% 10.0% 9.9%

    RE/C100 58.3% 53.3% 51.7% 53.2% 54.9% 54.3% 54.3%

    : , ,

    : IEA, 2002

    ( : Mtoe)

    (3)

    ,

    , ,

    , ,

  • 2.

    - 7 -

    . 2001 4

    .

    1990 1995 1996 1997 1998 1999 2000

    87.57 94.38 100.94 103.04 104.01 107.69 110.17 2.3

    (B) 13.27 14.88 15.25 15.72 16.82 17.45 17.89

    (C) 5.07 5.53 6.15 6.44 6.23 6.32 6.72 2.9

    (RE) 1.27 1.43 1.44 1.54 1.46 1.53 1.60

    RE/B100 9.6% 9.6% 9.5% 9.8% 8.7% 8.8% 8.9%

    RE/C100 25.0% 25.8% 23.5% 24.0% 23.4% 24.2% 23.8%

    : , ,

    : IEA, 2002

    ( : Mtoe)

    (4)

    1991 ,

    , 97 1 ,

    . , 2000

    ,

    .

    ,

    ,

    , ,

    . ,

    , (), 2000

    , .

  • - 8 -

    1990 1995 1996 1997 1998 1999 2000

    355.53 339.87 351.29 347.30 344.77 341.05 339.64 -0.5

    (B) 47.09 45.80 47.34 47.12 47.50 47.32 48.76

    (C) 5.83 6.51 6.74 7.70 8.31 7.97 8.95 4.4

    (RE) 1.76 2.35 2.40 2.10 2.28 2.48 3.07

    RE/B100 3.7% 5.1% 5.1% 4.5% 4.8% 5.2% 6.3%

    RE/C100 30.2% 36.0% 35.6% 27.3% 27.4% 31.2% 34.3%

    : , ,

    : IEA, 2002

    ( : Mtoe)

    (5) OECD

    OECD

    .

    1990 1995 1996 1997 1998 1999 2000

    4514.72 4884.46 5042.77 5088.97 5111.35 5213.43 5316.93 1.6

    (B) 650.04 731.54 751.88 762.77 781.68 800.58 827.97

    (C) 266.62 294.85 303.81 307.05 307.80 313.54 317.71 1.8

    (RE) 111.07 124.98 128.49 131.66 128.61 128.39 129.47

    RE/B100 17.1% 17.1% 17.1% 17.3% 16.5% 16.0% 15.6%

    RE/C100 41.7% 42.4% 42.3% 42.9% 41.8% 40.9% 40.8%

    : , ,

    : IEA, 2002

    OECD

    ( : Mtoe)

    (6)

    ( SBC) ( Fossil Fuel Levy)

    , .

  • 2.

    - 9 -

    1991 1 1 (EFL) ,

    1998 5%

    , , 90%,

    500kW , , 80% .

    2000 4, (EEG) ,

    ,

    , , .

    (2000 ) (: /kWh)

    2000 2001 2002 2003

    *

    99.0 99.0 94.1 89.3

    **

    500kW 20.0 20.0 19.8 19.8

    501kW~5MW 18.0 18.0 17.8 17.6

    5MW~20MW 17.0 17.0 16.8 16.7

    ***

    1~5 17.8 17.8 17.5 17.5

    6~20 12.1 12.1 13.0 13.0

    500kW 15.0 15.0 15.0 15.0

    500kW 13.0 13.0 13.0 13.0

    20MW 17.5 17.5 17.5 17.5

    20MW 14.0 14.0 14.0 14.0: (2004), (2003)

    : * 2002 1 1 5% .

    ** 2002 1 1 1% .

    *** 2002 1 1 1.5% .

    (Average bidding prices)

    .

    .

    (, , )

    .

  • - 10 -

    Feed-in tariffs Average bidding prices

    German Denmark Spain UK France

    0.086 0.079 0.068 0.041 0.048: European Commission(1999)

    1998 (euros/kWh)

    (MW, 2000)

    (MW, 2000)

    Feed-in tariffs

    Germany 6113 1668

    Spain 2402 872

    Denmark 2297 555

    Total 10812 3095

    Bidding systems

    United Kingdom 409 53

    Ireland 118 45

    France 79 56

    Total 606 154 : WindPower Monthly(2002)

    [ 2-1] 1

    : IEA, 2002

  • 2.

    - 11 -

    [ 2-2]

    : IEA, 2002

    .

    (1)

    1000TOE, TOE , .

    1993 1

    .

    0.097%, 0.89%

    .3)

    LFG (A) (B) (A/B)%

    (A) 6,735 3,720 2,732,515 116,790 27,645 2,887,405

    (B) 510 1,279 8,221 6,086 9,508 25,605 26,352,025 0.097164

    (B/A)(%) 7.57 34.39 0.30 5.21 34.39 0.89

    (h) 5,927 14,880 95,612 70,783 110,579 297,781 306,474,064 0.097164

    : 1h= 859845.2= 0.08598452 TOE

    : 2002 (, 2003. 4)

    2002

    ( : TOE)

    3) 2002 TOE .

    .

  • - 12 -

    93 94 95 96 97 98 99 00 01 021(A)

    (TOE) 126,879 137,234 150,437 165,209 180,639 165,932 181,365 192,888 198,410 209,112

    (%) 9.4 8.2 9.6 9.8 9.3 8.1 9.3 6.4 2.8 5.4

    (C) 649.6 777.9 908.5 1,161.90 1,421.30 1,715.70 1,900.60 2,131.00 2,457.6 2,922.30

    (%) 17.6 19.8 16.8 27.9 22.3 20.7 10.8 12.1 15.3 18.9

    C/A100(%) 0.5 0.6 0.6 0.7 0.8 1 1.1 1.1 1.2 1.4

    14,141 16,839 22,083 32,016 45,543 43,957 42,105 41,689 37,174 34,777

    2,016 2,153 2,245 2,560 3,078 3,747 4,486 5,051 5,911 6,735

    58,830 57,239 59,174 50,421 67,582 63,178 64,949 82,004 82,457 116,790

    545,550 678,832 804,496 1,056,440 1,282,457 1,577,194 1,760,510 1,977,662 2,308,001 2,732,515

    28,785 22,538 20,435 20,349 22,451 27,228 27,123 20,456 20,933 27,645

    313 303 108 87 202 369 1,460 4,171 3,148 3,720

    - - - - - - - - - 122

    649,635 777,904 908,541 1,161,873 1,421,313 1,715,673 1,900,633 2,131,033 2,457,624 2,922,304

    : 2002

    ( : TOE)

    OECD 99

    3.9% 2010 4.9%

    10.4%, 7.0%, 4.3% 1.9%

    .

    .

    .

    2002, 2003 TOE

    .

    2002 2,732.5 811.8 116.8 34.8 3.7 1.7 0.1 3,701.4

    (%) 73.8 21.9 3.2 0.9 0.1 0.1 0.0 100

    2003 3,039.3 1,225.6 131.1 32.9 5.2 1.9 0.4 4,436.4

    (%) 68.5 27.6 3.0 0.7 0.1 0.1 0.0 100

    306.8 414.2 14.3 1.9 1.5 0.2 0.3 735.4: (2003)

    * 2003 , , ( 02

    )

    (2003)

    ( : TOE)

  • 2.

    - 13 -

    , , .

    93.5%

    .

    ,

    .

    2004 1.9% 2011 5%

    , ,

    . , ,

    , 100 ,

    10, , 3

    . ,

    (2002.5), .

    (2)

    ()

    1) (2004.12.31)4)

    2) ( 2003-37, '03.4.9)

    3) ('03.5.9)

    () 5) , ,

    , , .

    4) 1

    5) (2004),

  • - 14 -

    1)

    -

    -

    ""

    "",

    - 5 ()

    - 2002.01.05 3949 ()

    - 2004-1 ()

    - :

    - : (100%), (70%),

    (80%)

    -

    -

    -

    -

    2)

    -

  • 2.

    - 15 -

    - 2004-110,

    - 5%

    3)

    -

    - 9(

    ) :

    .

    - 2003 ( 2002

    239)

    - , , A/S

    ,

    - ,

    - : 100%

    15,000

    - (3 5 , , 5 10 )

    - , A/S ,

    : 90% 500 (1

  • - 16 -

    2 )

    - : 100% 300/(2 3

    )

    4)

    -

    - 17(

    )

    - (2002-108, '02.5.29)

    - (: /kWh)

    -

    3 716.40 10 SMP+CP 107.66 3 SMP+CP 73.69 20, 2050 SMP+CP 20MW 65.20

    20MW50MW 61.80

    (RDF) 20 SMP+CP

  • 2.

    - 17 -

    5) 6)

    -

    -

    - 27 :

    ,

    .

    - : 80%

    - : 70%

    -

    -

    - : ,

    - :

    )

    : ,

    : , ,

    : , , ,

    6) 2001 .

  • - 18 -

    ( )

    ()

    100m2

    300m2 292

    -

    -

    -

    ()

    - : 80%

    ( + )

    : 20KW

    : 30RT

    : 100m2

    657

    () 5KW-10KW 550 - (/

    )

    - ; ,

    50%

    - ; ,

    70%

    300m2 1,094

    100RT 1,715

    20KW 388

    - 3,747

    - 4,696 - : ,

    )

    - : 1-5KW

    - : 20-100KW 10

    : 70%

    (3)

    (2003.5.27 ; 06885)

    , (2002, 2004)

    . ,

    .

    .

    = ( - )

  • 2.

    - 19 -

    (/h)

    716.40

    (SMP) +

    (CP)107.66

    (SMP) +

    (CP)73.69

    62.81

    (SMP) +

    (CP)20 65.20

    2050 61.80

    (RDF )

    (SMP) + (CP)

    : (2002)

    : 1) 31 2, 19 2

    50% .

    , , ,

    .

    5

    .

    2004 2005 2006 2007 2008 2009 2010 2011 2012

    950 1,130 1,405 1,625 2,025 2,460 2,895 3,335 3,820 19,645

    - 650 755 1,005 1,110 1,275 1,560 1,945 2,300 2,670 13,270

    - 200 225 235 315 450 550 600 650 700 3,925

    - 100 150 165 200 300 350 350 385 450 2,450

    1,670 2,110 3,412 3,824 5,352 7,217 8,888 12,108 14,280 58,861

    - 105 485 827 1,319 2,217 3,297 4,918 7,643 9,445 30,256

    - 1,565 1,625 2,585 2,505 3,135 3,920 3,970 4,465 4,835 28,605

    2,620 3,240 4,817 5,449 7,377 9,677 11,783 15,443 18,100 78,506

    900 1,340 1,800 2,280 3,300 4,100 6,300 10,600 9,600 40,220

    3,520 4,580 6,617 7,729 10,677 13,777 18,083 26,043 27,700 118,726

    1,300 4,900 7,000 9,000 12,400 18,300 21,700 28,500 30,100 133,200

    : (2003)

    ( : )

  • - 20 -

    , ,

    , ,

    . , IGCC, LFG

    .

    . ,

    ,

    , .

    3.

    , (intermittency)

    dispach

    .

    (NREC: North American Electric Reliability Council)

    .

    =(Installed capacity) x (capacity factor)

    , Castro Ferreira [3]7)

    .

    , Weibull

    (Weibull distribution) . ,

    7)

  • 3.

    - 21 -

    (Normal distribution) , , (Typical

    power curve) .

    .

    R , L , W

    , , P

    (, )

    , .

    P(RL)=

    r0 rW (R) ,

    r0 rW

    ,

    .

    P(r0L)=, P(rWL-W)=

    , (Capacity credit)

    .

    cW=r0-rW

    , cW .

    (capacity factor)

    - , , , pv ,

    -

    ,

    .

  • - 22 -

    .

    .

    . IGCC(Integrated

    Gasification Combined Cycle, ), LFG(Land Fill Gas),

    .

    . IGCC

    DME ( )

    .

    1. IGCC, LFG, (), ,

    2. ()

    3.

    4.

    . 1. IGCC, LFG, (), ,

    8760

    , 2. , 3.

    . 8) , 35

    ,

    .

    8) 2003 35, 10

    .

  • 3.

    - 23 -

    -------------------------------------------------------------------------------------

    -------------------------------------------------------------------------------------

    ( 1469)) 2003.10.28 - 2005.2.28

    ( 216, 136) 2002. 7.27 - 2005.2.28

    ( 98) 2002. 7.27 - 2005.2.28

    -------------------------------------------------------------------------------------

    3

    ,

    .

    .

    20% , 80%

    (Head Difference)

    29.53059 (, ) .

    10 12

    .

    ,

    . 2011 , ,

    .

    .

    ,

    .

    9) .

  • - 24 -

    .

    - .

    1.

    2.

    , , ,

    . LDC(Load Duration Curve) ,

    .

    (, ,

    ) 1000 ,

    2.5%, 97.5%

    .10)

    . LDC

    (Load Duration Curve; LDC)

    .

    8760 Load Duration Curve

    .

    Load Duration Curve WASP

    LOADSY DATA ,

    .

    10) x% load pattern

    x% x% y%

    .

  • 3.

    - 25 -

    [ 3-1] Load Duration Curve

    2000 2004 LDC LDC

    . 2004 8760

    load profile LDC .

    .

    1. 2 ()

    *

    2. 8760 load

    profile

    3. 3 LDC ,

    5 WASP .

  • - 26 -

    4.

    (1) 8760 Load Profile

    () 2004 Load Profile

    : load

    : load profile

    : load profile

    :

    2004 load profile

    (1)

    .

    () 2004 Load Profile

    2004

    load profile , load profile

    (2)

    ,

    (3)

    ,

  • 3.

    - 27 -

    ,

    .11)

    . WASP

    (1)

    ,

    .

    , ,

    , ,

    . [ 3-2] .

    , ,

    ,

    .

    .

    ,

    WASP(Wien Automatic System Planning) .

    11) ,

  • - 28 -

    MW

    G1

    G2G1

    G2

    MW

    G1

    G2G1

    G2

    [ 3-2]

    (2)

    WASP .

    TVAdml R.T. Jenkins ORNL Davis Toy TVA SAGE (System

    Analysis Generation Expension) ,

    (IAEA) .

    WASP [ 3-3] .

    LOADSY(Load System Description)

    , 5

    , Trucation

    . FIXSYS(Fixed System Description)

    , . VARSYS(Variable

    System Description) .

    CONGEN(Configuration Generator)

    . MERSIM

    (Merge and Simulate)

    (Probabilistic Simulation)

    LOLP . DYNPRO(Dynamic Programming Optimization)

    WASP (Dynamic

  • 3.

    - 29 -

    Programming) .

    LOADSY

    ()

    FIXSYS

    (/ )

    VARSYS

    ()

    CONGEN

    ( )

    MERSIM

    ()

    DYNPRO

    ()

    YES

    NO

    [ 3-3] WASP

    (3) WASP

    ()

    . ,

    , , , .

    ,

    .

    ()

    (chronological load curve)

    , , .

    (Load Duration Curve; LDC) ,

    , ,

  • - 30 -

    . [ 3-4]

    (inverted load duration curve) ,

    .

    DT

    DT: (, )

    (MW)

    DT

    (MW)

    (Inverted Load Duration Curve)

    DT

    DT: (, )

    (MW)

    DT

    DT: (, )

    (MW)

    DT

    (MW)

    DT

    (MW)

    (Inverted Load Duration Curve)

    [ 3-4]

    Truncation WASP

    .

    (convolution) (deconvolution)

    .

    .

    ()

    ()

    , ( ) ( ) (2),

    (3) .

  • 3.

    - 31 -

    ,

    (ELDC : Equivalent Load Duration Curve) .

    .

    ,

    .

    , [ 3-5]

    .

    (LOLP) .

    ,

    .

    ,

    .

    ( >=X)

    (M W )

    F10(x)

    Unit1 Un it2 Un it3 Un it4 Un it5 Un it9Un it8Un it6 Un it7

    ( )

    1 F3(x)F2(x)F1(x)F(x)

    F6(x)F5(x)

    F4(x)

    F9(x)F8(x)F7(x)

    Un it10

    +

    ( )

    [ 3-5]

  • - 32 -

    (4)

    stage( ) state

    ( ) . state

    . [ 3-6] WASP

    .

    .

    INITIALCONDITIO

    N

    STATE 1 STATE 3

    STATE 4STATE 2 STATE 7

    STATE 6

    STATE 5

    STAGE 1 STAGE 2 STAGE 3

    [ 3-6] 3

    .

    (+) ( ) .

    LDC

    LDC LDC data

    () , (LOLP) , (BEST-MIX)

    ,

    .

    ,

    .

  • 3.

    - 33 -

    .

    2 ()

    .

    .

    (: GWh, MW)

    2003 293599 47385

    2004 312067 51264

    2005 328051 55023

    2006 339804 57413

    2007 349529 59697

    2008 358410 61916

    2009 366801 63981

    2010 374452 66028

    2011 381703 67995

    2012 388775 69921

    2013 395496 71748

    2014 401731 73619

    2015 407338 75553

    2016 412313 77397

    2017 416486 79266

    ** 2004 339,153 GWh

    ** 2 2004 312,063 GWh

    2 ( )

  • - 34 -

    2

    .

    LNG /

    2003 18.315,716 14,740 14,518 4,320 312 1,191 3,877 1,379 56,053

    (28.0) (26.3) (25.9) (7.7) (0.6) (2.1) (6.9) (2.5) (100.0)

    2004 16.716,716 16,340 15,714 4,349 312 1,125 3,879 1,395 59,830

    (27.9) (27.3) (26.3) (7.3) (0.5) (1.9) (6.5) (2.3) (100.0)

    2005 16.317,716 16,840 16,339 4,349 354 1,125 4,382 1,615 62,720

    (28.2) (26.8) (26.1) (6.9) (0.6) (1.8) (7.0) (2.6) (100.0)

    2006 17.617,716 17,340 17,786 4,449 357 1,125 5,482 1,649 65,904

    (26.9) (26.3) (27.0) (6.8) (0.5) (1.7) (8.3) (2.5) (100.0)

    2007 20.0

    17,716 18,840 17,786 4,549 359 1,125 5,482 2,181 68,038

    (26.0) (27.7) (26.1) (6.7) (0.5) (1.7) (8.1) (3.2) (100.0)

    2008 21.6

    17,716 21,640 17,786 4,549 359 1,125 5,482 2,736 71,393

    (24.8) (30.3) (24.9) (6.4) (0.5) (1.6) (7.7) (3.8) (100.0)

    2009 23.417,716 22,940 17,786 4,549 359 1,325 5,482 2,988 73,145

    (24.2) (31.4) (24.3) (6.2) (0.5) (1.8) (7.5) (4.1) (100.0)

    2010 22.319,716 22,940 17,786 4,549 359 1,325 6,282 2,988 75,945

    (26.0) (30.2) (23.4) (6.0) (0.5) (1.7) (8.3) (3.9) (100.0)

    2011 22.023,116 22,440 17,786 3,829 194 1,325 6,282 2,988 77,960

    (29.7) (28.8) (22.8) (4.9) (0.2) (1.7) (8.1) (3.8) (100.0)

    2012 23.324,516 22,440 17,398 3,829 194 1,325 6,282 3,288 79,272

    (30.9) (28.3) (21.9) (4.8) (0.2) (1.7) (7.9) (4.1) (100.0)

    2013 21.523,837 22,440 17,398 3,429 194 1,200 6,282 3,288 78,068

    (30.5) (28.7) (22.3) (4.4) (0.2) (1.5) (8.0) (4.2) (100.0)

    2014 16.723,837 22,440 17,398 2,129 194 800 6,282 3,288 76,368

    (31.2) (29.4) (22.8) (2.8) (0.3) (1.0) (8.2) (4.3) (100.0)

    2015 16.925,237 23,040 16,898 2,129 194 800 6,282 3,288 77,868

    (32.4) (29.6) (21.7) (2.7) (0.2) (1.0) (8.1) (4.2) (100.0)

    2016 17.926,637 23,040 16,898 3,129 194 800 6,282 3,288 80,268

    (33.2) (28.7) (21.1) (3.9) (0.2) (1.0) (7.8) (4.1) (100.0)

    2017 16.826,637 23,040 16,898 3,129 194 800 6,282 3,288 80,268

    (33.2) (28.7) (21.1) (3.9) (0.2) (1.0) (7.8) (4.1) (100.0)

    2

  • 4. IGCC, LFG, , ,

    - 35 -

    2 (03.9)

    ( : GWh)

    2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

    8 16 39 88 158 262 410 767 1,365 1,793 2,152 2,470 2,705 2,821 2,906

    53 153 274 504 920 1,445 2,606 3,526 5,246 6,639 7,970 9,148 10,017 10,444 10,761

    202 224 248 445 681 918 1,194 1,470 1,786 2,140 2,568 2,948 3,228 3,366 3,468

    IGCC 79 79 79 2,138 4,356 6,336 7,606 8,730 9,560 9,967 10,269

    LFG 616 1,233 1,849 2,465 3,081 3,384 3,698 4,000 4,314 4,616 5,541 6,361 6,965 7,262 7,482

    1 1 5 13 42 175 894 1,711 2,622 3,147 3,612 3,956 4,124 4,249

    3 3 573 573 843 1,726 1,726 2,072 2,378 2,604 2,715 2,797

    879 1,626 2,410 3,509 4,935 6,703 8,735 13,638 20,503 25,872 31,056 35,647 39,036 40,698 41,932

    288,594 299,981 311,051 321,179 330,452 339,452 347,673 355,321 362,924 369,973 395,496 401,731 407,338 412,313 416,486

    2 293,599 312,067 328,051 339,804 349,529 358,410 366,801 374,452 381,703 388,775 395,496 401,731 407,338 412,313 416,486

    (%) 0.30 0.50 0.80 1.10 1.50 2.00 2.50 3.90 5.60 6.99 7.85 8.87 9.58 9.87 10.07

    2 (%) 0.30 0.52 0.73 1.03 1.41 1.87 2.38 3.64 5.37 6.65 7.85 8.87 9.58 9.87 10.07

    4,264 4,271 4,268 4,327 4,233 4,363 4,435 4,644 4,851 5,067

    5,143 5,897 6,678 7,836 9,168 11,066 13,170 18,282 25,354 30,938

    (%) 1.80 2.00 2.10 2.40 2.80 3.30 3.80 5.20 7.00 8.40 8.40 8.40 8.40 8.40 8.40

    : 2012 2 .

    (2003 9 )

    4. IGCC, LFG, , ,

    IGCC(Integrated

    Gasification Combined Cycle, ), LFG(Land Fill Gas),

    .

  • - 36 -

    . IGCC, LFG, 8760

    .

    ,

    .

    ,

    .

    20%

    .

    . IGCC, LFG, ,

    1. ,

    2. (2017 IGCC, LFG, )

    3. ,

    , .

    (: MW)

    2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

    IGCC0.0000 0.0000 0.0000 0.0000 9.0410 9.0410 9.0410 244.110 497.260 723.288 868.234 996.572 1091.319 1137.788 1172.289

    0.0000 0.0000 0.0000 0.0000 0.0150 0.0150 0.0140 0.3700 0.7310 1.0340 1.2100 1.3540 1.4440 1.4700 1.4790

    LFG70.354 140.708 211.050 281.404 351.758 386.267 422.112 456.621 492.454 526.975 632.580 726.085 795.116 828.972 854.110

    0.1480 0.2740 0.3840 0.4900 0.5890 0.6240 0.6600 0.6920 0.7240 0.7540 0.8820 0.9860 1.0520 1.0710 1.0780

    0.0000 0.0910 0.0680 0.5250 1.4380 4.8170 20.023 102.089 195.308 299.281 359.257 412.360 451.564 470.792 485.068

    0.0000 0.0000 0.0000 0.0010 0.0020 0.0080 0.0310 0.1550 0.2870 0.4280 0.5010 0.5600 0.5980 0.6080 0.6120

    70.354 140.799 211.119 281.929 362.237 400.126 451.176 802.820 1185.023 1549.543 1860.071 2135.016 2338.000 2437.552 2511.467

    0.1480 0.2750 0.3840 0.4910 0.6070 0.6460 0.7050 1.2160 1.7430 2.2160 2.5930 2.9000 3.0950 3.1490 3.1680

  • 4. IGCC, LFG, , ,

    - 37 -

    (: MW)

    2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

    IGCC0.000 0.000 0.000 0.000 9.041 9.041 9.041 244.110 497.260 723.288 868.234 996.572 1091.319 1137.788 1172.289

    0.000 0.000 0.000 0.000 0.015 0.015 0.014 0.370 0.731 1.034 1.210 1.354 1.444 1.470 1.479

    LFG70.354 140.708 211.050 281.404 351.758 386.267 422.112 456.621 492.454 526.975 632.580 726.085 795.116 828.972 854.110

    0.148 0.274 0.384 0.490 0.589 0.624 0.660 0.692 0.724 0.754 0.882 0.986 1.052 1.071 1.078

    0.000 0.091 0.068 0.525 1.438 4.817 20.023 102.089 195.308 299.281 359.257 412.360 451.564 470.792 485.068

    0.000 0.000 0.000 0.001 0.002 0.008 0.031 0.155 0.287 0.428 0.501 0.560 0.598 0.608 0.612

    0.000 0.000 0.000 0.068 0.068 13.082 13.082 19.247 39.406 39.406 47.303 54.296 59.458 61.989 63.869

    0.000 0.000 0.000 0.000 0.000 0.021 0.020 0.029 0.058 0.056 0.066 0.074 0.079 0.080 0.081

    70.354 140.799 211.119 281.998 362.306 413.208 464.258 822.066 1224.429 1588.950 1907.374 2189.312 2397.458 2499.541 2575.336

    0.148 0.275 0.384 0.491 0.607 0.667 0.726 1.245 1.801 2.272 2.658 2.974 3.173 3.230 3.249

    -

    .

    . ,

    ,

    .

    (1)

    ()

    , , .

    ,

    .

    .

    .

  • - 38 -

    2002 10MW

    , ,

    .

    [ 4-1] ()

    70

    ,

    . 10

    . 2002

    ,

    2004 73.69/kWh .

    1984 1985 1986 1991 1995 1996 1997 1998 1999 2000 2001 2002

    40.29 38.54 38.45 41.67 48.09 48.38 49.94 54.84 60.93 60.23 63.51 73.69

    : (2003)

    ( : /kWh)

    ()

    2003 35, 10

    .

    , 2003 188GWh 2001

    84GWh . 2MW 3MW

  • 4. IGCC, LFG, , ,

    - 39 -

    9, 73.3GWh 39.1%

    .

    1MW1MW~

    1MW

    1MW~

    1MW1MW

    13 10 9 3 35

    (GWh/)

    20.0(10.7%)

    45.3(24.1%)

    73.3(39.1%)

    49.0(26.1%)

    187.6(100%)

    : ()

    ,

    .

  • - 40 -

    (MWh/)

    (kW) (MW) 2001 2002 2003

    1975. 4 1300 2 2.60 4,596 8808 12,556

    1978. 6 150 3 0.45 1,003 1634 1,265

    1969. 5

    1978. 8

    600 21.40 1,967 2965 2,060 ()

    100 2

    1986. 2 495 6 2.97 3,010 4748 5,287 ()

    1986. 8 550 2 1.10 3,335 3100 5,338 ()

    1987. 7 480 5 2.40 6,707 9384 12,557 ()

    1988. 9 500 4 2.00 6,087 7388 8,668 ()

    1987. 3 530 4 2.12 7,664 9243 11,533 ()

    1989. 4 350 6 2.10 6,665 6755 11,217 ()

    1988. 3 450 3 1.35 3,114 3603 4,208 ()

    1989. 9500 1

    0.82 2,560 2400 3,914 320 1

    1987. 1 500 4 2.00 2,817 3165 5,319

    22,864

    1991.11 450 1 0.45 2,800 2788 3,317 ()

    1992. 4 400 7 2.80 225 1043 0 ()

    1993. 31000 2

    2.60 4,113 4265 6,184 ()300 2

    1993. 5 480 4 1.92 5,290 4718 2,884 ()

    1993. 6 500 6 3.00 - 1956 8,477 ()

    1995. 6 400 2 0.80 1,819 2275 4,054

    1996.10 530 2 1.06 2,318 3034 3,139 ()

    1997.12145 1

    0.70 2,523 3540 3,227 556 1

    1998. 6 193 1 0.19 1,500 1432 1,039

    1998.11 330 1 0.33 27 811 608 ()

    1999. 9500 3

    1.80 3,547 3938 6,987 ()300 1

    2000. 8 500 2 1.00 4,877 5297 6,331

    2001. 8 500 2 1.00 1,054 3881 5,263

    2001.10 650 2 1.30 299 6781 8,271

    2001. 81150 2

    4.10 3,815 - 17,584 1800 1

    2001.12 400 1 0.40 - 1517 1,665 ()

    2002. 1 36 1 0.036 - 110 100

    2002. 5 20 2 0.04 - - 10

    2003. 4 400 1 0.40 - 828

    2003. 9 500 3 1.50 - 798

    2004. 2 250 1 0.25 -

    2004.12 340 1 0.34 -

    42.4 83,734 110,579 187,612

    : ()

  • 4. IGCC, LFG, , ,

    - 41 -

    (2)

    ()

    .

    , [ 4-2]

    .

    [ 4-2]

    ()

    . Retscreen ( )

    ,

    ,

    .

  • - 42 -

    .

    .12)

    13) ( )

    , ln ()

    , , () .

    ()

    ,

    (residual flow) ,

    .

    ()

    .

    . 1

    , 1 365 .

    12) (2003)

    13) http://www.wamis.go.kr/WKW/RF_DUBRFOBS.ASPX

  • 4. IGCC, LFG, , ,

    - 43 -

    ()

    ,

    , 6

    . ,

    ,

    .

    , ,

    .

    1

    ,

    .

  • - 44 -

    ,

    .

    .

    .

    5.

    .

    , 1 687

    ( ) .

    ,

    .

    , ,

    ,

    ,

    .

    , , , , , ,

    , , 7 ( 7 ).

  • 5.

    - 45 -

    ,

    .

    .

    20%, 80% .

    ,

    .

    (2002.11) 5

    21 kW

    7.4m

    . 12(21kW), 6(12m12m)

    .

  • - 46 -

    21kW

  • 5.

    - 47 -

    [ 5-1] 19kW

    426

    433 (Starting Head Difference)

    ([ 5-1])

  • - 48 -

    . 12 (,

    423) .

    12 x 22.29(MW)=267.48(MW)

    . , ,

    .

    :

    :

    :

    :

    :

    .

    .

    , 12 x 22.29(MW)=267.48(MW)

    .

  • 5.

    - 49 -

    t-

    12.349 0.195 63.320

    35.645 0.360 99.065

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    0 0.5 1 1.5 2 2.5 3 3.5 4(: m)

    (: MWh)

    [ 5-2]

    0

    1

    2

    3

    4

    5

    6

    7

    8

    0 0.5 1 1.5 2 2.5 3 3.5 4(: m)

    (: ))

    [ 5-3]

  • - 50 -

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    0 1 2 3 4 5 6 7 8(: )

    (: MWh)

    [ 5-4]

    . 426

    .

    [ 5-5]

  • 5.

    - 51 -

    .

    20%

    . 80% ,

    29.53059 ,

    2017

    .

    .

    7-8 , 2004 5 10

    , 1 10.63

    51 + 10.63 1031 + 10.63 .

    8760 5 1 1 2881

    10 31 24 7296 .

    5, 7, 8, 10 31 6, 9 30

    4116

    . 95%

    .

    .

    1. ,

    2. ,

    ,

    3. LDC

    .

  • - 52 -

    dpt :

    7 28 15 .(5031 )

    dpt

    2006 0 4417

    2007 0 4417

    2008 0 3450

    2008 357 967

    2009 0 3479

    2009 357 938

    2010 0 3311

    2010 357 1106

    2011 0 3184

    2011 357 1233

    2012 0 3162

    2012 357 1255

    2013 0 3158

    2013 357 1258

    2013 360 1

    2014 0 3157

    2014 357 1254

    2014 360 6

    2015 -24 1

    2015 0 3119

    2015 357 1282

    2015 360 15

    2016 -24 1

    2016 0 3152

    2016 357 1250

    2016 360 14

    2017 -24 1

    2017 0 3135

    2017 357 1272

    2017 360 9

    dpt

  • 5.

    - 53 -

    [ 5-6] 2006

    [ 5-7] 2007

  • - 54 -

    [ 5-8] 2008

    [ 5-9] 2009

  • 5.

    - 55 -

    [ 5-10] 2010

    [ 5-11] 2011

  • - 56 -

    [ 5-12] 2012

    [ 5-13] 2013

  • 5.

    - 57 -

    [ 5-14] 2014

    [ 5-15] 2015

  • - 58 -

    [ 5-16] 2016

    [ 5-17] 2017

  • 5.

    - 59 -

    [ 5-18] ,

  • - 60 -

    6.

    .

    ,

    .

    (array) (storage

    battery), (power controller) (inverter)

    .

    [ 6-1]

    : (http://www.solarkorea.org)

    :

    () :

    :

    :

  • 6.

    - 61 -

    [ 6-2]

    .

    . , ,

    .

    ,

    ,14)

    , .

    .

    (kWp)

    391

    (148kW), (60kW),

    (60kW), (53kW), (30kW),

    (20kW), (10kW), (10kW)

    BIPV215

    (45kW), SDI()(60kW),

    (10kW), (100kW)

    62.8 (8kW), (4.8kW)

    .

    203.9 (1.2kW), 599(120kW)

    ()165.6

    (15.2kW), (30kW), (0.8kW)

    (46kW) : (http://www.solarkorea.org)

    (2001~2004)

    14) (1.96 cal/.min) : ,

  • - 62 -

    .

    2004-2005

    ()

    ,

    .

    [ 6-3]

  • 6.

    - 63 -

    (1) (, declination)

    (the angular position)

    23.45 . / 0

    (1221) -23.45, (6 21) +23.45 .

    1

    , .

    () ()1) ( )

    1 17 17 -20.9

    2 31+ 16 47 -13.0

    3 59+ 16 75 -2.4

    4 90+ 15 105 9.4

    5 120+ 15 135 18.8

    6 151+ 11 162 23.1

    7 181+ 17 198 21.2

    8 212+ 16 228 13.5

    9 243+ 15 258 2.2

    10 273+ 15 288 -9.6

    11 304+ 14 318 -18.9

    12 334+ 10 334 -23.0 : Duffie J. A., Beckman W. A., "Solar Engineering of Thermal Process", John Wiley &Sons,

    Inc., 1991

    1 : 3 1

    (2) ( ) ()

    (-),

  • - 64 -

    (+) , 0 15 .

    .

    8760

    .

    (3)

    ( .

    .

    "( ) ,

    0.3 0.8 .

    (4)

    ( , beam radiation) ( , diffuse

    radiation) . ,

    81.4 ,

  • 6.

    - 65 -

    81.4 .

    , PV(Photovoltaic)

    . ,

    .

    .

    PV , , ,

    .

    ,

    , ,

    . PV

    .

  • - 66 -

    (5) PV

    PV .

    .

    , , PV , , .

    PV module type (%) () (%/)

    Mono-Si 13.0 45 0.40

    Poly_Si 11.0 45 0.40

    a-Si 5.0 50 0.11

    CdTe 7.0 46 0.24

    CIS 7.5 47 0.46

    PV

    . .

  • 6.

    - 67 -

    PV

    .

    ,

    .

    (On-Grid) Model,

    . ,

    , .

    .

    ,

    . () .

    .

    1MW .

    50kW ,

  • - 68 -

    1MW .

    .

    PV

    .

    1

    . 2000 9 12 0 2001 9 11 24, 15),

    , , , 5

    .

    (:)

    [ 6-4] (2000 9 12 0 2001 9 11 24)

    15)

    .

  • 6.

    - 69 -

    (:)

    [ 6-5] (2000 9 12 0 2001 9 11 24)

    (:)

    [ 6-6] (2000 9 12 0 2001 9 11 24)

    (:)

    [ 6-7] (2000 9 12 0 2001 9 11 24)

  • - 70 -

    (:)

    [ 6-8] (2000 9 12 0 2001 9 11 24)

    .

    365 x 5

    24 ,

    , 2

    20 5 30 ,

    9 10 .

    . 1000 ,

    97.5% 2.5% .16)

    1. ,

    2. ,

    ,

    3. LDC

    .

    16) , 97.5% 2.5% .

  • 6.

    - 71 -

    dpt :

    7 28 15 .(5031 )

    dpt

    2006 0 1000

    2007 0 1000

    2008 0 993

    2008 357 7

    2009 0 950

    2009 357 50

    2010 0 805

    2010 357 195

    2011 0 713

    2011 357 287

    2012 0 662

    2012 357 338

    2013 0 655

    2013 357 345

    2014 0 626

    2014 357 373

    2014 360 1

    2015 0 621

    2015 357 376

    2015 360 3

    2016 0 655

    2016 357 344

    2016 360 1

    2017 0 634

    2017 357 363

    2017 360 3

  • - 72 -

    [ 6-9] 2006

    [ 6-10] 2007

  • 6.

    - 73 -

    [ 6-11] 2008

    [ 6-12] 2009

  • - 74 -

    [ 6-13] 2010

    [ 6-14] 2011

  • 6.

    - 75 -

    [ 6-15] 2012

    [ 6-16] 2013

  • - 76 -

    [ 6-17] 2014

    [ 6-18] 2015

  • 6.

    - 77 -

    [ 6-19] 2016

    [ 6-20] 2017

  • - 78 -

    7.

    .

    MW ,

    . 20

    .

    .

    Kavak(2004) RETScreen 17) Weibull

    Rayleigh , Rayleigh Weibull

    shape factor 2 . Dowell(1996) Weibull

    , Kavak(2004) Keban-Elazig

    Weibull Rayleigh .

    Jaramillo(2004) Mexico La Ventosa

    ( ) Weibull

    , bimodal (bimodal Probability Distribution

    Function)) .

    , ,

    , .

    53,000TWh

    . 2020 (25,579TWh) 2

    (EWEA, 2004).

    2.1610kWh , (/, 2001).

    ,

    17) RETScreen 'Natural Resources Canada'

    (http://www.retscreen.net/ang/menu.php)

  • 7.

    - 79 -

    ,

    ([ 7-1] ).

    .

    P=12

    C pV3A

    , Cp

    , , V , A ,

    .

    ,

    .

    [ 7-1]

    :www.awea.org/faq/tutorial/wwt_basics.html

    (cut-in wind speed)

    , 3.

    54.5m/s . (rated wind speed)

    3 ,

    . (cut- out wind speed)

    ,

    20m/s .

  • - 80 -

    ,

    (/

    , 2001).

    . EWEA 15

    2~3% , 1980 8.8 cents

    /kWh 4.1 cents/kWh 15 50% ,

    ,

    . 1 20 25kW 2.5MW

    , 3.6MW ,

    5MW (EWEA, 2003, 2004).

    AWEA(2004) 2003

    8,133MW (2002 26% ) 2003

    39,361MW ,

    19 .

    90% ,

    2003 408MW ,

    2002 .

    .

    2002

    2003

    2003

    2002

    (2003 )

    4,685 1,687 6,372 36% 16.2%

    236 81 317 34% 0.8%

    23,308 5,467 28,775 23% 73.1%

    1,702 408 2,110 24% 5.4%

    468 100 568 21% 1.4%

    414 272 686 66% 1.7%

    415 118 533 28% 1.4%

    2,999 898 3,897 30% 9.9%

    31,228

    (32,037)

    8,133

    (8,344)

    39,361

    (40,301)26% 100.0%

    *:AWEA(2004), ( ) EWEA

    (2003 , : MW)

  • 7.

    - 81 -

    .

    , Weibull

    , Weibull scale factor shape factor

    scale factor , Weibull

    shape factor .

    p(x)=kC (xC )

    k-1

    exp{-( xC )k

    } (1)

    p(x) :

    k : shape factor (13 )

    C=Vh

    (1+1h)

    : h scale factor, gamma

    Vh :

    ,

    , .

    Vh=Vm(HhHm )

    a

    Vm :

    Hh :

    Hm:

    a : wind shear exponent(0.10.4 )

    Px , , , blade icing

    .

    E= 24365 25

    x= 0P xp(x) (2)

    E :

    Px : (kW)

  • - 82 -

    , , blade icing

    (renewable).

    E re=EPmP s

    T sTm

    (1- a)(1- i)(1- d)(1- m) (3)

    Pm : (kPa)

    Ps : (103.3 kPa)

    Tm : (k)

    Ts : (288.1k)

    a : (020%)

    i : blade (0

    10%)

    d : (27%)

    m : (26%)

    .

    .

    .

    ,

    .

    ()

    Px

  • 7.

    - 83 -

    .

    . 2003, 2005

    () 2008

    .18)

    2005 2003, 2008

    2003, 2008

    . 2005

    .

    .

    .

    18) 8 .

  • - 84 -

    Vestas Vestas Vestas Vestas VestasLagerwe

    yVestas Vestas

    LAGER

    WEY

    NORWI

    N 29Suzlon

    LAGER

    WEY

    30/250

    NORWIN 29

    -STALL

    S.60/1,25

    0

    RETS RETS RETS RETS RETS RETS RETS RETS RETS *1) RETS

    2000 1750 1650 1500 850 750 660 600 250 225 1250

    0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

    1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

    2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

    3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 10.0

    4 33.4 33.3 13.5 29.8 25.5 11.0 2.9 0.0 4.4 1 26.0

    5 94.3 93.9 80.8 88.5 67.4 40.0 43.8 18.9 15.3 10 78.0

    6 178.0 178.0 169.0 182.2 125.0 85.0 96.7 57.4 30.8 29 145.0

    7 294.0 294.0 289.0 306.8 203.0 147.0 166.0 106.0 51.3 55 230.0

    8 451.0 452.0 448.0 472.0 304.0 229.0 252.0 166.0 76.6 86 350.0

    9 655.0 655.0 644.0 682.7 425.0 334.0 350.0 239.0 109.8 117 530.0

    10 901.0 900.0 858.0 951.6 554.0 465.0 450.0 320.0 151.5 145 704.0

    11 1169.0 1167.0 1069.0 1260.6 671.0 626.0 538.0 402.0 198.6 171 860.0

    12 1433.0 1418.0 1263.0 1500.0 759.0 730.0 600.0 476.0 227.5 191 980.0

    13 1667.0 1603.0 1431.0 1500.0 811.0 750.0 635.0 532.0 246.7 207 1,120.0

    14 1843.0 1702.0 1552.0 1500.0 836.0 750.0 651.0 568.0 250.0 218 1,250.0

    15 1943.0 1739.0 1617.0 1500.0 846.0 750.0 657.0 587.0 250.0 224 1,250.0

    16 1985.0 1748.0 1642.0 1500.0 849.0 750.0 659.0 595.0 250.0 228 1,250.0

    17 1997.0 1750.0 1649.0 1500.0 850.0 750.0 660.0 599.0 250.0 228 1,250.0

    18 2000.0 1750.0 1650.0 1500.0 850.0 750.0 660.0 600.0 250.0 227 1,250.0

    19 2000.0 1750.0 1650.0 1500.0 850.0 750.0 660.0 600.0 250.0 225 1,250.0

    20 2000.0 1750.0 1650.0 1500.0 850.0 750.0 660.0 600.0 250.0 222 1,250.0

    21 2000.0 1750.0 1650.0 1500.0 850.0 750.0 660.0 600.0 250.0 218 1,250.0

    22 2000.0 1750.0 1650.0 1500.0 850.0 750.0 660.0 600.0 250.0 215 1,250.0

    23 2000.0 1750.0 1650.0 1500.0 850.0 750.0 660.0 600.0 250.0 212 1,250.0

    24 2000.0 1750.0 1650.0 1500.0 850.0 750.0 660.0 600.0 250.0 212.0 1,250.0

    25 2000.0 1750.0 1650.0 1500.0 850.0 750.0 660.0 600.0 250.0 213.0 1,250.0

    -

  • 7.

    - 85 -

    Vestas Vestas Vestas Vestas Vestas Lagerwey Vestas Vestas LAGERWEY NORWIN 29 Suzlon

    2003

    LAGER

    WEY

    30/250

    NORWIN 29

    -STALLS.60/1,250

    RETS RETS RETS RETS RETS RETS RETS RETS RETS *1) RETS

    2000 1750 1650 1500 850 750 660 600 250 225 1250

    3

    5 7 2 1

    4

    1

    9 11 2 0 1 0

    0 0 0 0 0 6750 7260 1200 0 225 0

    (2003)

    Vestas Vestas Vestas Vestas Vestas Lagerwey Vestas Vestas LAGERWEY NORWIN 29 Suzlon

    2005

    LAGE

    RWEY

    30/250

    NORWIN 29

    -STALLS.60/1,250

    RETS RETS RETS RETS RETS RETS RETS RETS RETS *1) RETS

    2000 1750 1650 1500 850 750 660 600 250 225 1250

    1 4

    5 7 2 1

    6

    1

    4

    1

    24

    2

    1

    0 0 24 4 2 13 12 2 1 1 0

    0 0 39600 6000 1700 9750 7920 1200 250 225 0

    (2005)

  • - 86 -

    Vestas Vestas Vestas Vestas Vestas Lagerwey Vestas Vestas LAGERWEY NORWIN 29 Suzlon

    2008

    LAGE

    RWEY

    30/250

    NORWIN 29

    -STALLS.60/1,250

    RETS RETS RETS RETS RETS RETS RETS RETS RETS *1) RETS

    2000 1750 1650 1500 850 750 660 600 250 225 1250

    49 1 4

    5 7 2 1

    10

    1

    7 4

    1

    24

    50 2 10

    1

    3

    200

    200

    100

    10

    20

    25

    10

    14

    471 0 24 204 2 34 12 2 1 1 10

    942000 0 39600 306000 1700 25500 7920 1200 250 225 12500

    : 2008 2 .

    (2008 )

    ,

    .

    .

    :

    :

    * 2005

    *

    .

  • 7.

    - 87 -

    (

    )

    .

    [ 7-2]

    [ 7-3] 8 fitting

  • - 88 -

    ()

    1

    . 2000 9 12 0 2001 9 11 24, ,

    , , , 5

    .

    .

    365 x 5

    24 ,

    , 5 9

    . 1000 ,

    97.5%

    2.5% .19)

    1. ,

    2. ,

    ,

    3. LDC

    .

    19) , 97.5% 2.5% .

  • 7.

    - 89 -

    dpt :

    7 28 15 .(5031 )

    dpt

    2006 0 942

    2006 357 58

    2007 0 813

    2007 357 187

    2008 0 724

    2008 357 276

    2009 -24 1

    2009 0 665

    2009 357 334

    2010 -24 3

    2010 0 597

    2010 357 400

    2011 -24 19

    2011 0 605

    2011 285 3

    2011 357 373

    2012 -24 47

    2012 0 539

    2012 24 4

    2012 285 4

    2012 357 406

    2013 -24 57

    2013 0 492

    2013 24 6

    2013 285 13

    2013 357 429

    2013 360 3

    2014 -24 55

    2014 0 524

    2014 24 4

    2014 285 25

    2014 333 1

    2014 357 389

    2014 360 2

    2015 -24 73

    2015 0 504

    2015 24 10

    2015 285 32

    2015 333 2

    2015 357 379

    2016 -24 64

    2016 0 495

    2016 24 8

    2016 285 19

    2016 333 2

    2016 357 412

    2017 -24 72

    2017 0 480

    2017 24 6

    2017 285 22

    2017 357 417

    2017 360 3

    W2006.bmp - W2017.bmp

  • - 90 -

    [ 7-4] 2006

    [ 7-5] 2007

  • 7.

    - 91 -

    [ 7-6] 2008

    [ 7-7] 2009

  • - 92 -

    [ 7-8] 2010

    [ 7-9] 2011

  • 7.

    - 93 -

    [ 7-10] 2012

    [ 7-11] 2013

  • - 94 -

    [ 7-12] 2014

    [ 7-13] 2015

  • 7.

    - 95 -

    [ 7-14] 2016

    [ 7-15] 2017

  • - 96 -

    8.

    . 1000 ,

    95% (2.5%, 97.5%) , ,

    2.5%, 97.5%, .

    ,

    , .

    .

    (%) 2.50% (%) 97.50% (%) (%)

    2006 10.06 0.02 11.87 0.02 117.11 0.20 175.86 0.31

    2007 16.12 0.03 19.52 0.03 194.57 0.33 310.84 0.52

    2008 25.61 0.04 31.45 0.05 276.03 0.45 458.58 0.74

    2009 45.66 0.07 57.39 0.09 505.68 0.79 722.77 1.13

    2010 58.58 0.09 75.14 0.11 628.13 0.95 954.74 1.45

    2011 88.06 0.13 111.20 0.16 940.19 1.38 1328.12 1.95

    2012 120.17 0.17 139.83 0.20 1123.61 1.61 1590.73 2.28

    2013 136.78 0.19 165.40 0.23 1343.55 1.87 1746.33 2.43

    2014 156.90 0.21 184.98 0.25 1404.31 1.91 2100.58 2.85

    2015 167.50 0.22 208.85 0.28 1594.51 2.11 2124.65 2.81

    2016 178.78 0.23 218.29 0.28 1566.72 2.02 2550.54 3.30

    2017 184.07 0.23 219.69 0.28 1712.82 2.16 2308.48 2.91

    (: MW)

    (%) 2.50% (%) 97.50% (%) (%)

    2006 15.17 0.03 21.88 0.04 43.65 0.08 48.71 0.08

    2007 25.77 0.04 38.89 0.07 78.45 0.13 83.54 0.14

    2008 40.51 0.07 67.41 0.11 130.07 0.21 147.56 0.24

    2009 43.39 0.07 101.49 0.16 201.83 0.32 210.95 0.33

    2010 110.67 0.17 185.75 0.28 370.25 0.56 387.94 0.59

    2011 174.86 0.26 318.33 0.47 647.59 0.95 710.42 1.04

    2012 308.01 0.44 425.21 0.61 853.76 1.22 929.69 1.33

    2013 144.72 0.20 510.40 0.71 1018.72 1.42 1099.92 1.53

    2014 372.62 0.51 599.11 0.81 1163.62 1.58 1246.89 1.69

    2015 421.95 0.56 626.06 0.83 1273.20 1.69 1366.45 1.81

    2016 518.28 0.67 671.92 0.87 1331.50 1.72 1473.57 1.90

    2017 318.23 0.40 690.78 0.87 1364.59 1.72 1468.21 1.85

    :

    (: MW)

  • 8.

    - 97 -

    (%) 2.50% (%) 97.50% (%) (%)

    2006 0.20 0.00 0.29 0.00 1.02 0.00 1.02 0.00

    2007 0.20 0.00 0.30 0.00 1.02 0.00 1.02 0.00

    2008 26.02 0.04 49.44 0.08 195.26 0.32 195.26 0.32

    2009 26.02 0.04 49.44 0.08 195.26 0.31 195.26 0.31

    2010 38.28 0.06 68.91 0.10 280.15 0.42 287.27 0.44

    2011 78.38 0.12 172.44 0.25 553.15 0.81 588.17 0.87

    2012 78.38 0.11 172.44 0.25 553.71 0.79 588.17 0.84

    2013 94.09 0.13 206.99 0.29 664.00 0.93 706.04 0.98

    2014 182.82 0.25 237.59 0.32 762.15 1.04 810.41 1.10

    2015 200.20 0.26 272.01 0.36 834.61 1.10 887.46 1.17

    2016 208.73 0.27 283.59 0.37 870.15 1.12 925.24 1.20

    2017 215.06 0.27 292.19 0.37 896.54 1.13 953.30 1.20

    :

    (: MW)

    .

    .

    (2-5) (1-5)

    . ,

    ,

    .

    .

  • - 98 -

    (1-1) (1-2) (1-3) (1-4) (1-5) (2-3) (2-4) (2-5)

    2006 57413 57080 57080 57058 56978 57079 57035 57008

    2007 59697 59257 59257 59218 59061 59256 59178 59062

    2008 61916 61398 61372 61304 61217 61207 61087 61024

    2009 63981 63380 63354 63250 63095 63189 63008 62953

    2010 66028 65038 65000 64810 64497 64757 64492 64239

    2011 67995 66567 66488 66136 65907 65978 65303 64893

    2012 69921 68088 68009 67549 67459 67500 66661 66441

    2013 71748 69547 69453 68893 68155 68855 67794 67541

    2014 73619 71093 70899 70240 69890 70283 69218 68351

    2015 75553 72787 72574 71880 70947 71900 70878 69627

    2016 77397 74513 74291 73566 72023 73604 72233 71480

    2017 79266 76295 76066 75324 73494 75358 73908 72747:

    (1-1) :

    (1-2) :

    (1-3) : + (2.5%)

    (1-4) : + + (2.5%)

    (1-5) : + + + (2.5%)

    (2-3) : + (97.5%)

    (2-4) : + + (97.5%)

    (2-5) : + + + (97.5%)

    (: MW)

    (1-1) (1-2) (1-3) (1-4) (1-5) (2-3) (2-4) (2-5)

    2006 100 99.42 99.42 99.38 99.24 99.42 99.34 99.29

    2007 100 99.26 99.26 99.20 98.93 99.26 99.13 98.94

    2008 100 99.16 99.12 99.01 98.87 98.85 98.66 98.56

    2009 100 99.06 99.02 98.86 98.62 98.76 98.48 98.39

    2010 100 98.50 98.44 98.16 97.68 98.08 97.67 97.29

    2011 100 97.90 97.78 97.27 96.93 97.03 96.04 95.44

    2012 100 97.38 97.27 96.61 96.48 96.54 95.34 95.02

    2013 100 96.93 96.80 96.02 94.99 95.97 94.49 94.14

    2014 100 96.57 96.31 95.41 94.93 95.47 94.02 92.84

    2015 100 96.34 96.06 95.14 93.90 95.16 93.81 92.16

    2016 100 96.27 95.99 95.05 93.06 95.10 93.33 92.36

    2017 100 96.25 95.96 95.03 92.72 95.07 93.24 91.78

    (: %)

  • 8.

    - 99 -

    (1-1) (1-2) (1-3) (1-4) (1-5) (2-3) (2-4) (2-5)

    2006 100 0.58 0.00 0.04 0.14 0.00 0.08 0.05

    2007 100 0.74 0.00 0.07 0.26 0.00 0.13 0.19

    2008 100 0.84 0.04 0.11 0.14 0.31 0.19 0.10

    2009 100 0.94 0.04 0.16 0.24 0.30 0.28 0.09

    2010 100 1.50 0.06 0.29 0.47 0.43 0.40 0.38

    2011 100 2.10 0.12 0.52 0.34 0.87 0.99 0.60

    2012 100 2.62 0.11 0.66 0.13 0.84 1.20 0.31

    2013 100 3.07 0.13 0.78 1.03 0.96 1.48 0.35

    2014 100 3.43 0.26 0.90 0.48 1.10 1.45 1.18

    2015 100 3.66 0.28 0.92 1.23 1.17 1.35 1.66

    2016 100 3.73 0.29 0.94 1.99 1.17 1.77 0.97

    2017 100 3.75 0.29 0.94 2.31 1.18 1.83 1.46

    (: %)

    .

    LNG

    .

    (/kW)

    (/kWh)

    (/kWh)

    147249 86194 233443 23.14 36.9

    135627 85864 221491 89.86 22.5

    65100 83634 148734 122.17 13.49

    LNG 97414 83634 181048 74.41 8.84

    264153 91230 355383 80.31 25.3

    287733 86442 374175 6.74 0

    113281 83634 196915 60.93 8.84

    http://www.dsmcenter.org/DSM/PROJECT/main_project.aspx

    2.5% 97.5%

    .

  • - 100 -

    . (L-R) 97.5%

    [ 8-1] 2006 (L-R) 97.5%

    [ 8-2] 2007 (L-R) 97.5%

  • 8.

    - 101 -

    [ 8-3] 2008 (L-R) 97.5%

    [ 8-4] 2009 (L-R) 97.5%

  • - 102 -

    [ 8-5] 2010 (L-R) 97.5%

    [ 8-6] 2011 (L-R) 97.5%

  • 8.

    - 103 -

    [ 8-7] 2012 (L-R) 97.5%

    [ 8-8] 2013 (L-R) 97.5%

  • - 104 -

    [ 8-9] 2014 (L-R) 97.5%

    [ 8-10] 2015 (L-R) 97.5%

  • 8.

    - 105 -

    [ 8-11] 2016 (L-R) 97.5%

    [ 8-12] 2017 (L-R) 97.5%

  • - 106 -

    . (L-R) 2.5%

    [ 8-13] 2006 (L-R) 2.5%

    [ 8-14] 2007 (L-R) 2.5%

  • 8.

    - 107 -

    [ 8-15] 2008 (L-R) 2.5%

    [ 8-16] 2009 (L-R) 2.5%

  • - 108 -

    [ 8-17] 2010 (L-R) 2.5%

    [ 8-18] 2011 (L-R) 2.5%

  • 8.

    - 109 -

    [ 8-19] 2012 (L-R) 2.5%

    [ 8-20] 2013 (L-R) 2.5%

  • - 110 -

    [ 8-21] 2014 (L-R) 2.5%

    [ 8-22] 2015 (L-R) 2.5%

  • 8.

    - 111 -

    [ 8-23] 2016 (L-R) 2.5%

    [ 8-24] 2017 (L-R) 2.5%

  • - 112 -

    9.

    WASP

    , (04 ), LNG (04 )

    13(20052017)

    15

    .

    . CO2 ,

    ,

    .

    () WASP

    2005 2017 2 1 15

    (12.4%) .

    .

    , ,

    .

    ()

    ,

    .

    (RPS)

    .

    (RPA;

    Renewable Portfolio Agreement) , RPS

    (RPA) .

    RPS

    . RPA 9 , ,

    , , , , , ,

    .

    .

  • 9.

    - 113 -

    , 200kW

    .

    ()

    (Non-Dispatch)

    , . ,

    .

    ,

    . (Wind energy to

    conventional energy dispatch ratio: W to G ratio)

    .

    .

    ()

    CO2

    .

    . CDM

    .

    . 1)

    , ,

    2) ,

    3) .

  • - 114 -

    SMP 52.90134(2003-4 ) ,

    SMP

    .

    , 2011 1

    5 .

    3 6, 2 5

    .

    ,

    2020

    31 .

    (1)

    (2)

    (3)

    (4)

    .

    ,

    (penetration)

    .

    (intermittency) dispach

    .

    .

    .

    .

    .

  • 9.

    - 115 -

    .

    .

    .

    .

    . R&D ,

    .

    .

    .

    capacity value .

    .

    .

    ,

    .

    ,

    .

    .

  • - 116 -

    10.

    Ackermann, Thomas., Andersson, Gran. and Sder, Lennart., 2001, "Overview of

    government and market driven programs for the promotion of renewable

    power generation", Renewable Energy, Vol.22, 197~204

    Akpinar, E.K. and Akpinar, S., 2004, "A statistical analysis of wind speed data used

    in installation of wind energy conversation system.", Energy conversation

    and Management, In Press, Corrected Proof, Available online 2004

    AWEA, 2003, "Global Wind Energy Market Report" http://www.awea.org

    AWEA, 2004.3, Global Wind Energy Market Report.

    BLACK & VEATCH, 2003, Nebraska Photovoltaic System Case Study : Water

    Pumping Application

    Dinica, Valentina., 2004, "Support systems for the diffusion of renewable energy

    technologiesan investor perspective", Energy Policy, In Press, Corrected

    Proof, Available online 10 August 2004

    Dowell, A.C. and C.E. Oram, 1996, A hysteresis-free wind pump, Wind Energy

    Conversion 1996, Mechanical Engineering Publications Limited, 75~80

    Duffie, J., A., Beckman, W., A., 1991, "Solar Engineering of Thermal Process"John

    Wiley & Sons, Inc.

    Erge, T., Hoffmann, V.U. and Kiefer, K., 2001, "The German experience with

    grid-connected PV-systems" Solar Energy, Vol.70, 479~487

    European Commission, 1999, Electricity from renewable energy sources and the

    internal electricity market, Working Paper of the European Commission,

    SEC 99470, Bruxelles.

    EWEA, 2003, "WIND ENERGY AND THE ENVIRONMENT"

    EWEA, 2003, "WIND POWER TARGETS FOR EUROPE: 75,000 MW by 2010,"

    http://www.ewea.org

    EWEA, 2003, "WIND POWER TECHNOLOGY"

  • 10.

    - 117 -

    EWEA, 2003, Wind Energy - The Facts Vol.2 Costs & Price

    EWEA, 2004, Wind Force 12.

    Geweke, John, 1996, Monte Carlo simulation and numerical integration, in Hans

    M. Amman, David A. Kendrick and John Rust, eds., Handbook of

    Computational Economics, Volume I, Elsevier, Chapter 15.

    ISET, http://www.iset.uni-kassel.de

    ISSN, 2002, Out of the laboratory and into the market place, PV systems goal is

    to become applicances, 1473~8325

    Jaramillo, O.A. and M.A. Borja, 2004, Wind speed analysis in La Ventosa, Mexico;

    a bimodal probality distribution case, Renewable Energy, Volume 29,

    1613~1630.

    Jung, Yonghun, 2002, "Growth of Energy Demand and Supply Diversification in the

    NE Asia

    Krenz, Jerrord H., Energy Conversion and Utilization, Allyn and Bacon, Inc.,

    430~439.

    Lauber, Volkmar., 2004, REFIT and RPS: options for a harmonised Community

    framework, Energy Policy 32, 1405~1414

    Menanteau, Philippe., Finon, Dominique. and Lamy, Marie-Laure., 2003, Prices

    versus quantities: choosing policies for promoting the development of

    renewable energy, Energy Policy 31, 799~812

    Meyer N.I. and Koefoed, A.L., 2003, Danish energy reform: policy implications for

    renewables, Energy Policy 31, 597~607

    Meyer, N.I., 2003, European schemes for promoting renewables in

    liberalisedmarkets, Energy Policy 31, 665~676

    Morthorst, P.E., 2003, National environmental targets and international emission

    reduction instruments, Energy Policy 31, 73~83

    OECD, 2002. Practical Baseline Recommendations for Greenhouse Gas Mitigation

    Projects in the Electric Power Sector, Information Paper.

  • - 118 -

    RETScreen , http://www.retscreen.net/

    Rowlands, I. H., 2004, Envisaging feed-in tariffs for solar photovoltaic electricity:

    European lessons for Canada, Renewable and Sustainable Energy Reviews

    9, 51~68

    Silverman, B.W., 1986, Density Estimation for Statistics and Data Analysis,

    London: Chapman and Hall

    Stine, W., B., Geyer M., "Power From The Sun", 2001 (http://www.power-

    fromthesun.net/book.htm)

    van Rooijen, Sascha N.M. and van Wees, Mark. T., 2004 Green electricity policies

    in the Netherlands: an analysis of policy decisions, Energy Policy, In

    Press, Corrected Proof, Available online 3 August 2004

    Wilcox, Rand R., 1997, Introduction to Robust Estimation and Hypothesis Testing,

    Academic Press

    Wind Power Monthly, 2001, Vol. 17, No. 9

    Wind Power Monthly, 2002, The Windindicator, http://www.wpm.co.nz

    Wind Power Monthly, 2002, Vol. 18, No. 5

    Winkler, Harald. 2003, Renewable energy policy in South Africa : policy options

    for renewable electricity, Energy Policy 33, 27~38

    , 2003,

    , 2004. 12. , ,

    , http://www.wamis.go.kr

    , (http://www.kma.go.kr).

    , 2001, , , .

    , , , 2004, Feed-in tariffs

    2004 12 9

    , 2004,

    , 2003 5 27 ( 06885), 2004

  • 10.

    - 119 -

    3 29 ( 18344)

    2002 5 27 (

    2002-108) 2004 10. 20 ( 2004-104)

    , http://www.windpower.org

    , 2000 2 25 , 2004 4 20

    , 1991 11 , 2000 4 1

    , http://www.wind-energie.de

    , , 2003. ,

    14 1, pp. 61~68

    , 2002, 3kW PV

    , 2003, , http://www.mocie.go.kr/

    , 2004, -

    , 2004,

    , 2004,

    , 2003, ,

    http://www.portalenergy.com/

    , , , 2000, ,

    , 2003, CDM baseline .

    , 2004,

    () .

    , , http://kemco.or.kr/

    , http://www.unep.or.kr/

    http://unison.co.kr/

    , 2003. " :

    , ",

    14 1, , 269~299

    , 2004,

  • - 120 -

    , 2004, http://electric.iin.co.kr/upload/ukwan

    , 2003, http://nengjung.kit.ac.kr/~ysjang

    , , , , 2004,

    , , Vol.24, No.3

    , http://solarmon.s-energy.co.kr

    http://www.solarkorea.org/

    , http://eosweb.larc.nasa.gov/sse/RETScreen

    , (http://www.kwedo.or.kr).

    , 2004, ,

    , 16 , 389~403

    http://www.portalenergy.com/

    , 1999, http://www.kier.re.kr/

    , 2002,

    , 2002,

    ,

    , 2004.4, .