15
ESPIAS PROPOSAL Energy Smart Public Infrastructures through Automated Systems CIP CALL 2012, ICT- PSP FOR SMART CITIES

ESPIAS PROPOSAL Energy Smart Public Infrastructures through Automated Systems CIP CALL 2012, ICT- PSP FOR SMART CITIES

Embed Size (px)

Citation preview

ESPIAS PROPOSALEnergy Smart Public Infrastructures through Automated Systems CIP CALL 2012, ICT- PSP FOR SMART CITIES

CONTENTS

1. GENERAL INFO OF THE CALL: CIP-2012 ICT- PSP FOR SMART CITIES Objectives Consortium requirements Funding scheme

2. ESPIAS PROPOSAL Objectives Current Status Next Steps

GENERAL INFO- OBJECTIVES OF THE CALL

Smart urban digital services for energy efficiency (CIP-2012 ICT- PSP FOR SMART CITIES)

STIMULATE THE CREATION, PROVISION AND USE OF INNOVATIVE DIGITAL SERVICES SUPPORTING ENERGY-EFFICIENT, LOW-CARBON ACTIVITIES IN AN URBAN CONTEXT.

THOSE SERVICES SHOULD BUILD ON AND INTEROPERATE WITH EXISTING INFRASTRUCTURES. THEY MAY INCLUDE:

DIGITAL SOLUTIONS TO FACILITATE ENERGY-EFFICIENT SMART PROCESSES TRANSFORMATIONAL APPROACHES TO DRIVE NEW VALUES AND NEW BEHAVIOURS.

DO NOT SUPPORT RESEARCH ACTIVITIES.

USER FRIENDLY ICT PILOTS (FOR DATA COLLECTION, STORAGE, EXECUTION OF INNOVATIVE MANAGEMENT AND CONTROL ALGORITHMS AND USER FRIENDLY INTERACTION) FOR ACHIEVING SYSTEMIC ENERGY EFFICIENCIES AND EMISSIONS REDUCTION IN CITIES

THE OBJECTIVE IS TO ENSURE THAT ENERGY SAVINGS FROM ICT ENABLED NEW BUSINESS MODELS ARE GREATER THAN THE COST FOR THE PROVISION OF THOSE SERVICES.

GENERAL INFO- CONSORTIUM COMPOSITION

CONSORTIUM CHARACTERISTICS: ALL NECESSARY STAKEHOLDERS IN THE VALUE-CHAIN FOR DEPLOYING

THE SERVICE (E.G. SERVICE AND CONTENT PROVIDERS, INDUSTRIES INCLUDING SMES, END-USER REPRESENTATIVES, ETC).

SMES ARE CONSIDERED IMPORTANT CONTRIBUTORS TO INNOVATION. TYPE OF MANDATORY PARTNERS (TARGET GROUP!):

ESCOs ICT PROVIDERS BUILDING MANAGERS ENSURE ACCEPTANCE AND UPTAKE, INVOLVING PUBLIC AUTHORITIES

(LEVEL: NATIONAL, REGIONAL OR LOCAL) A MINIMUM OF FOUR MUTUALLY-INDEPENDENT LEGAL ENTITIES FROM

FOUR DIFFERENT EU MEMBER STATES OR ICT PSP ASSOCIATED COUNTRIES.

GENERAL INFO- FUNDING SCHEME

FUNDING INSTRUMENT: EU FUNDING FOR THE PILOT TYPE B 2-4 M€. THE EU FUNDS THE 50% OF THE TOTAL COSTS OF THE PROJECT

ELEGIBLE COSTS: PERSONNEL SUBCONTRACTING OTHER SPECIFIC DIRECT COSTS TO IMPLEMENT THE PILOT B INDIRECT COSTS: 30% OF PERSONNEL COSTS

DEADLINE: MAY 15TH, 2012 AT 17:00 (GMT+1)

ESPIAS PROPOSAL- OBJECTIVES (1)

CONTEXT:

PUBLIC BUILDINGS (TARGET BUILDINGS FOR ESPIAS) USUALLY ARE LACKING: EFFICIENT HOT WATER PRODUCTION EFFICIENT AIR CONDITIONING SYSTEMS EFFECTIVE ILUMINATIONS SYSTEMS EFFICIENT RENEWAL OF AIR.

MAIN OBJECTIVE:

IMPLEMENT PILOTS ON PUBLIC BUILDINGS BY USING AUTOMATED COMMERCIAL OVER-THE-COUNTER SYSTEMS (COTS) IN ORDER TO OPTIMIZE ENERGY- EFFICIENCY RELATED PARAMETERS.

ESPIAS PROPOSAL- OBJECTIVES (2)

DETAILED OBJECTIVES OF ESPIAS: CREATE NEW ENERGY SERVICES

BASED ON THE USER-FRIENDLY ICT-BASED CENTRALIZED SOLUTION EMMOS IN ORDER TO REDUCE ENERGY CONSUMPTION IN PUBLIC BUILDINGS,

THROUGH MONITORING BUILDINGS. TESTING THE SERVICES IN DIFFERENT ENVIRONMENTS (CLUSTERS) IN

ORDER TO REFINE AND CUSTOMIZE THEM.

EXPECTED IMPACT OF ESPIAS : FACILITATE MANAGERS OF PUBLIC BUILDINGS TO OPTIMIZE THEIR

ENERGY COMSUPTION USING THE NEW SERVICES. ESTABLISH COMMON METHODOLOGY TO CONTROL AND MONITOR THE

ENERGY EFFICIENCY OF BUILDINGS IN DIFFERENT ECOSYSTEMS.

ESPIAS PROPOSAL- EMMOS

Energy Management and Monitoring Operational System: ICT SOLUTION TO MEET THE NEEDS OF THE ESCOs´ BUSINESS MODEL. CURRENT FUNCTIONALITIES:

Gathering Energy Consumption Data from buildings Manual and Automatic data collation. Ability to compare all buildings performance in a consistent manner Flexible Reporting with ability to quickly generate standard reports Alarm and energy monitoring Benchmarking of building performance Analysing Energy Savings Vs Investment

FUNCTIONALITIES UNDER DEVELOPMENT (2012) Different meters/systems/locations/data formats/measures Independent of an individual BMS supplier

ESPIAS, CLUSTERS

Spain (Madrid)

Italy (Napoly)

Poland (Varsaw, Gdanks)

Latvia

Ireland

Sport facilites Offices

Cluster Type of buildings

Airport, Bank Branches

Hospital

UK Offices

Offices

Offices

Offices

OfficesUniversity

Work Packages

ESPIAS, Required roles

Cluster Coordinator

EMMOS

IT

Functional

Training Deployment Monitoring Development

AMEY

FERROSER

ESCOBMS EXPERT

AMEY

ESCO-RCFERROSER

ESCO

ESCORC

AMEYIT COMP.

ESCORC

ESCO: Energy Services COmpanyRC: Research Center, UniversityIT COMP: IT COMPany

IT

Functional

RCIT COMP.

ESCO

ESCOIT COMP.

AMEY

ESCORC

ESCO

ESCORC

RCIT COMP.

AMEY

ESCORC

NEW SERVICES

Coordinator leads his cluster through managing the four teams: Training, Deployment, Monitoring and new developments.

ESPIAS- CURRENT STATUS

THE EVALUATORS HAVE DONE A PRE-CHECK IN THE PROPOSAL AND IT HAS BEEN PRE-EVALUATED AS IN LINE WITH THE EU REQUIREMENTS.

CONSORTIUM COMPOSITION: SPAIN

MADRID NETWORK: CONFIRMED CLUSTER OF RENEWABLE ENERGIES OF MADRID : CONFIRMED FERROSER: CONFIRMED INTELLIGENT INFRASTRUCTURE INNOVATION CENTER (CI3): CONFIRMED

POLAND BUDIMEX SERVICES: CONFIRMED PRO-AKADEMIA: CONFIRMED SCIENCE PARK LODZ: CONFIRMED SANTANDER BANK: TO BE CONFIRMED

ITALY TECHNAPOLI (ITALY): CONFIRMED

UK AMEY: TO BE CONFIRMED

IRELAND UNIV. LIMERICK: CONFIRMED

SERVIA ION: CONFIRMED

LATVIA Energy Efficiency Association : TO BE CONFIRMED

ESPIAS- CURRENT STATUS

CONSORTIUM COMPOSITION: PUBLIC BUILDINGS TO TEST THE PILOTS:

PUBLIC BUILDING IN WARSAW MUNICIPALITÉ (Poland) GDANKS AIRPORT (Poland): TO BE CONFIRMED. CITY HALL OF BOADILLA DEL MONTE, MADRID (SPAIN) CHAMBER OF COMMERCE OF NAPLES (ITALY) HOSPITAL IN RIGA (LATVIA)

ESPIAS- NEXT STEP

BY END OF WEEK APRIL THE 14TH: TO HAVE THE CORE CONSORTIUM DEFINED.

BY END OF WEEK OF APRIL THE 21TH: TO DEFINE WPS AND WPS´LEADERS POSSIBLE VISIT TO THE PROJECT OFFICER IN BRUSSELS TO ASK DOUBTS AND

PRESENT THE CONSORTIUM (FIRST WEEK OF MAY) TO WRITE THE NON TECHNICAL PART (MANAGEMENT, DISSEMINATION) (BY

IDCONSORTIUM) DEFINE AND DISTRIBUTE THE BUDGET

BY END OF APRIL (30TH): TO HAVE THE TECHNICAL PART FINISHED. DESCRIBE THE IMPACT OF THE PROPOSAL.

BY MAY THE 7TH, TO HAVE THE FINAL VERSION OF THE PROPOSAL

SUBMISSION OF THE PROPOSAL BY MAY, THE 12TH?

ESPIAS