Locomotive Works, Eastern Railway
Jamalpur - 811214
Railway (रेलवे) 73000 BSNL (बी.एस.एन.एल) 06344-243105 Fax (फैक्स) 06344-243205
D.O.No.F/CWM/OFF/37/MCDO Dated: 10.12.2016
Dear Shri Gupta,
Sub: MCDO for the month of November 2016.
1. CELEBRATION:
Communal Harmony Campaign Week
Communal Harmony Campaign Week (National Integration Week) was
celebrated from 19.11.16 to 25.11.16. An oath was taken on 19.11.16 on
this eve.
Second Constitution Day
Second “Constitution Day” was celebrated on 26.11.16. An oath was taken
on this eve by a large mass of Railway employees.
ए. के. ससन्हा मुख्य कारखाना प्रबन्धक
A. K. Sinha
Chief Works Manager
रेल इंजन कारखाना परू्व रेलरे्, जुालपमर ुमंगेर (राहार) 811214
2
2. GOOD WORK DONE:
Publication of Act Apprenticeship Enrolment Result for the Verification of Documents
On 30th November’16 result for the enrolment of Act apprentices was published (Enrolment Notice No.E/WSR/Act apprentice/JMP/2014-15 dated Jamalpur, November 2016) for documents verification.
Grievance Camp
Grievance Camps were organised on 03.11.16, 17.11.16 and 25.11.16 where a total of 63 grievances registered. 46 Nos. (73%) were resolved on the spot and rest 17 Nos. are under process.
Demand Draft for JMP Jacks from DRDO
A Demand Draft of ₹ 73,14,836/- (No. 187034 dated 20.10.16) received from DRDO for the manufacturing of Jamalpur Jacks.
Payment of ₹ 10,000 as Advance Salary on 19th November’16
As per directive, payment of ₹ 10,000 as an advance salary (Part) of
November’16 was paid to the employees on 19.11.16 and 21.11.16. This workshop thus stand First by disbursing this payment promptly considering staff welfare in Eastern Railway.
3
Rail Vikas Shivir
As per directive officers and supervisors were attended the proceedings of
video conference on “Rail Vikas Shivir” that had been web casted on
18.11.16 and 20.11.16 being in the Conference Room of this workshop.
Felicitation of Senior Lady Workers by ERWWO
On 18.11.16 ERWWO/Jamalpur Unit had felicitated 50 senior lady workers
of Jamalpur Workshop for their dedicated services in Railways.
Selection of Team for Inter Divisional Cultural Competition
On 24.11.16 a competitive cultural function was organised for the wards of
Railway employees to select team for the forthcoming Divisional Cultural
Competition.
4
Diesel POH
Traction Motor Armature Re-shafting
Month No. of Traction Armature Re-shafting
AUG’16 08
OCT’16 06
NOV’16 07
Total - 21
Conversion to Stiffer Cam Shaft
Month
Loco No. No. of
Conversion From Stiffer 08 Bolt
Design to 06 Bolt Design Stiffer
From FE Cam Shaft to Stiffer 06 Bolt
Design
APR’16 16105/WDM3A/JMP 13402/WDG3A/SPJ 02
MAY’16 16208/WDM3A/SPJ - 01
JUN’16 - 14143/WDM3A/HWH 01
JUL’16 16262/WDM3A/SPJ - 01
AUG’16 16395/WDM3A/PTRU 13480/WDG3A/PTRU 16430/WDM3A/BWN
- 03
SEP’16
16430/WDM3A/BWN 16328/WDM3A/UDL 16255/WDM3A/MGS 16264/WDM3A/JMP
18788/WDM3A/BWN 05
OCT’16 13471/WDG3A/UDL 16254/WDM3A/MGS 02
NOV’16 11283/WDM3D/SPJ 18772/WDM3A/BWN 02
Total - 17
Modification of 3RV Kit
Month Loco No. No. of Modification
MAY’16 16414/WDM3A/BWN 01
AUG’16 16248/WDM3A/SPJ 01
OCT’16 13471/WDG3A/UDL 01
Total - 03
Fitment of Thermal Insulator on Exhaust Manifold
Month Loco No. No. of Modification
NOV’16
13502/WDG3A/PTRU 13477/WDG3A/PTRU 18772/WDM3A/BWN 11283/WDM3D/SPJ
04
Total - 04
5
3. ASSISTANCE REQUIRED: 3.1 MATERIALS:
MATERIALS OF IMMEDIATE CONCERN:
Materials which have become constraints are indicated at Annexure 1 to 6.
Further the urgent materials are appended below for convenient appraisal –
Sl. No.
Requirement Area
Description FIR
Date Status Remarks
1.
Wagon POH
Striker Casting Wear Plate, PL No. 38136168
21.09.16
i) 10117 PO 21.15.1065.1.05893 dt. 29.12.15 on M/S Melbrow Engg. Works, Kol within 08 month (10.9.16) Terminal DP upto 25.09.16 vide MA dt.18.01.16 ii) 11013 PO 21.16.1064.1. 04962 dt. 08.11.16 on M/S Melbrow Engg Works, Kol within 10 month (08.09.17).
i) DP failed on 25.09.16. ii) DP up to 08.09.17. 500 Nos. under collection from KGP. Present stock below 1 month.
2. Air Cyl. with Jam Nut PL No. 38163445
23.11.16
i) 175 PO 21.15.1116.1.01460 dt. 02.02.16/09.02.16 on M/S Oscrop Industries Pvt. Ltd. /HWH after 01.04.16 but within 31.08.16. DP extended upto 02.01.17. ii) 1345 CST 05.16.06.3021 dt.06.06.16, CP 01.04.17 to 31.03.18
i) Present stock 35. Supply expected by 20.12.16.
3. Key Nut with Bolt for BOXN PL No. 38106188
03.10.16
i) 43734 Nos. PO. 21.15.1249.1. 04796 dt.13.10.16 on M/s Eastern Hardware Mart, Kol. DP within 3 months (13.01.17) ii) 10934 Nos. PO. 21.15.1249.1. 04796 dt.13.10.16 on M/s Raj Industrial Corpn, HWH. DP within 6 months (13.04.17)
i) Supply expected by 20.12.16. ii) DP in April'17 Present stock Nil.
4. Safety Hook Assly for BOBR/ BOBRN PL No. 38450227
06.09.16
i) 220 PO 21.14.1169.1. 03496 dt.16.07.15 on M/S Melbrow Engg. Works, Kol. DP within 06 months i.e. 20.01.16 ii) 384 PO 21.15.1238.1. 04887 dt. 27.10.16 on M/S Ramkrishna Engg. Industries HWH, DP within 03 months i.e. 27.01.17
i) DP failed on 20.01.16. Present stock nil.
5. Wagon
Manufacturing
Component of Bogie Mounted Brake System Reqn. No. 911400822 dt.27.08.15
-
TC No.21.15.6007, Qty. 238 Sets, Case was sent to HQ on 06.11.15, case was under process & purchase proposal was also prepared under approval of competent authority. After this case returned by HQ on 12.07.16, for making fresh separate requisition of RDSO & Non RDSO restricted items. Requisition again sent to HQ on 26.10.16, after reply of remark. TOD-30.12.16. Item is required for manufacturing of 238 BOXN-HL Wagon.
Materials are urgent
6
Sl. No.
Requirement Area
Description FIR
Date Status Remarks
6.
Component of CBC arrangement. Reqn. No. 911400801 dt:05.05.14
-
TC No. 21.14.6021, Qty. 238 Sets, PO No.21.14.6021.1.41426 dt.26.11.15, issued against M/s Melbrow Engg. Works, KKK. DP expired on 10.08.16. No MA issued. In this connection letter of dated 17.08.16, 26.09.16 & 11.11.16 given to COS & CWE. Case U/RP, fresh TOD on 17.12.16. Item is required for manufacturing of 238 BOXN-HL Wagon.
7.
Component of Body arrangement. Reqn. No. 911400806 dt.06.05.14
-
TC No. 21.14.6024, Qty. 238 Sets. PO No.21.14.6024.1.41224 dt.14.07.15, issued against M/s Melbrow Engg. Works, KKK. DP expired on 27.03.16. No MA issued. In this connection letter of dated 11.05.16, 17.08.16, 26.09.16 & 11.11.16 given to COS & CWE. Case U/RP, fresh TOD on 17.12.16. Item is required for manufacturing of 238 BOXN-HL Wagon.
8.
Diesel POH
Driver seat PL No. 11457934
04.02.16
i) PC 19-15-1262 dt:10-08-15, Qty.107, PD - 01.08.16 to 31.07.17 ii) PC 19-16-1066 dt:10-05-16, Qty.116 PD - 01.04.17 to 31.03.18
Materials are urgent
9. V-Belt BX-78, cogged raw edge moulded PL No. 11270895
04.02.16 TC 19-15-1144, Qty.26 PD - 01.08.16 to 31.07.17
10. Repair kit for valve autodrain (EMD Type) as per annexure. PL No. 17390059
29.06.16 SRS 19-15-1406 dt:10-12-15, Qty. 23, PD - 01.12.16 to 30.11.17
11. Repair kit for vaporid air dryer, consisting 17 items as per ann. PL No. 11891786
07.09.16
i) SRS 19-15-1340 dt:10-08-15, Qty.24 PD - 01.08.16 to 31.07.17 ii) PC 19-16-1328 dt:10-08-16, Qty.18, PD - 01.08.17 to 31.07.18
12. Power finger assembly PL No. 12318085
13.06.16 PC 09-15-1180 dt:11-05-15, Qty.255, PD - 01.04.16 to 31.03.17
7
Crane Organization
a) Material Constraints
Procurement of materials as given in Annexure-3 against work orders (A) 66911614 (06 Nos. MLR 140T New design crane) (B) 66911615 (09 Nos. Spl. MLR 140 T Old design crane) (C) 66911616 (Manufacturing of 04 Nos. 140 T New Design Crane) (D) Rate Contract Items for maintenance of 140T Gottwald Crane (E) 57175510 & 66911313 (POH/Retrofitment of 20T crane) is requested.
b) Releasing of Overdue POH 20 T Crane
20T Crane No.001/052001050/W.C.Rly, Kota (Featured in the Calling-in
Programme of 2015-16), has not been sent for POH to Jamalpur though several reminders have been served.
3.2 ASSISTANCE - STAFF:
RRB indents
Posting against RRB indents needs to be cleared urgently. Filling of DR quota vacancies of technical supervisors (JE & SSE) – Mech (Workshop) as given underneath will be of great help.
Status of Indents
Sl. No.
Category Indent Placed
on No. of post indented
Panel Receipt Date
No. of Candidates in the panel
Candidates Reported
1 JE (WS) 25.08.14 11 04.09.14 02 02
2 SSE/DWG 04.02.15 03 05.08.15 02 02
3 JE/DWG 04.02.15 08 Nil Nil Nil
4 Clerk Gr. II 21.03.15 01 Nil Nil Nil
5 SSE (WS) 08.05.15 35 Nil Nil Nil
6 JE (WS) 08.05.15 11 Nil Nil Nil
7 CMA 31.05.13 17 29.06.15 & 10.08.15
14 + 02 15
Filling up of total 13 Vacancies [Console Operator (JE/IT) - 2 & Sr.DEO/DEO (JE/IT) - 11] in EDP Centre.
Further restoration of 04 SE/IT posts taken away from EDP Centre/JMP – considering the present situation restoring back of the 04 posts transferred out vide O.O. dated 06.03.13 is greatly in need (This has been appraised to FA&CAO vide my D.O.No.F/CC/Pol/G/04 dated 18.03.13). [02 Nos. of JE(IT) appointed through DR Quota have been posted at EDP Centre/JMP vide Office Order No.A/IT-Admin/037/2015 dated 22.01.15, but only one has reported.]
8
4. MODERNIZATION OF JAMALPUR WORKSHOP:
Sanctioned vide P.B. item No.418 of 2008-09 on 03.04.2008. Estimate sanctioned by GM on 10.5.10 (Estimate No.24/CAO/CON of 2010-11, P.B No.527 of 2010-11). Total Estimated cost is ₹ 117.46 Cr. The project cost break up is as under:
Civil : ₹ 55.53 Cr.
Mechanical : ₹ 48.89 Cr.
Electrical : ₹ 13.04 Cr.
Allotment
(Figures in thousands of Rupees)
PBI No.
Year Name of Work Outlay
CAP DRF Total
527 2010-11 Jamalpur – Modernization of Workshop 1,00,00 1,00,00 2,00,00
561 2011-12 Jamalpur – Modernization of Workshop 1,52,13 67,51 2,19,64
569 2012-13 Jamalpur – Modernization of Workshop 2,00,00 3,00,00 5,00,00
592 2013-14 Jamalpur – Modernization of Workshop 3,85,00 Nil 3,85,00
513 2014-15 Jamalpur – Modernization of Workshop 7,62,00 1,27,00 8,89,00
470 2015-16 Jamalpur – Modernization of Workshop 6,00,00 40,00 6,40,00
487 2016-17 Jamalpur – Modernization of Workshop 8,50,00 4,60,00 13,10,00
Total 30,49,13 10,94,51 41,43,64
Sanctioned Cost 117,46,00
Scope of Work
Exte
nsio
n
of
Shed
(m 2
)
Heavy
Duty
Flo
orin
g
(m 2
)
New
flo
orin
g
(m 2
)
Nort
h
Lig
ht
gla
ss
(m 2
)
Perp
lex
Sheet
(m 2
)
Alu
min
ium
Sheet
(m 2
)
Pain
tin
g
(m 2
)
SS
E
Cham
ber
/Build
ing
(m2
)
Dra
in
repairin
g
(m)
1 Wagon POH & Rebuilding 2000 6000 1000 670 1030 2000 6000 100 500
2 BST HMRS 2000 4000
300 100
3 Diesel POH Shop
5000
400 500 1200
250 400
4 Component mfg & Repair shop 2000 3000 1000
4000 100
5 Crane POH & manufacturing* 3000 3000
1200 4000
250
6 Bogie fabrication shop (ICF & EMU)
400 300 600 2000 200
7 Trainee, Security communi-cation & Staff welfare
3830 2000 100 200 600 3000 1500 400
8 CMT/LAB
50 100 300
200 100
9 Store
4000 400 225 225 300 1000 200
Total EsttQty 9000 28830 4400 1845 2355 6200 20000 2850 1750
* Heavy Duty road 2375 m2
CIVIL ENGG WORKS
Item Ecological park
(m2)
Conc Road (m
2)
Cycle stand (m
2)
Toilets (m
2)
Drainage (m
2)
Roof rep (m
2)
Bitumin Road(m
2)
Canteen (m
2)
Modern of Bld (m
2)
DI pipe (m)
Qty 1000 4000 500 833 2728 20000 20000 200 5000 1200m
The Civil Engineering work is being executed through two contracts.
i) Structural work - Estimated cost ₹ 35.49 Cr.
ii) Other civil work - Estimated cost ₹ 9.25 Cr.
Tenders awarded to M/s. KEC- DELCO- DUTSON (JV) of Gurgaon, Haryana on 18.11.10
& 25.11.10 respectively.
9
Status
Sl.No. Item Provision Completed % Completed
1. Renovation work of BTC Work completed
2. Construction of road 2550 m 2008 m 78.75
3. RCC flooring 35000 m2 23250 m
2 66.43
4. Renewal of roof by Aluminum sheets 27400 m2 16130 m
2 58.87
5. Ironite flooring 28900 m2 14145 m
2 48.94
6. APP membrane layering 20000 m2 9600 m
2 48.00
7. New Paint Shop Work completed.
8. Extension of Paint Shop Work completed.
9. Extension of open gantry towards south end of GIF/BLC
Work completed.
10. Extension of WRS-III Due work is Ironite flooring, of which 99% is completed.
11. Extension of WRS-IV Out of 10, casting of 06 footings done.
12. Vehicle Shed at TPT(Road) Out of 20, casting of 18 footings done. Fabrication work is also completed.
13. Extension of Crane Shop GA drawing approved, detailed drawing under process.
14. Extension of GIF (North Side) Work completed (except electric work).
Financial Progress
Year Outlay Expenditure Progress
2011-12 9.94 Crores (Including
previous allotment) 6.00 Crores 60.36%
2012-13 5.00 Crores 7.95 Crores 159.00%
2013-14 3.85 Crores Civil - 3.15 Crores, Mech. - 6.82 Crores 258.96%
2014-15 8.89 Crores Civil - 1.99 Crores, Mech. - 1.6520 Crores 40.97%
2015-16 6.40 Crores Civil - 6.21 Crores, Mech. - 0.7863 Crores 109.32%
2016-17 (Upto Nov)
13.10 Crores Civil - 2.70 Crore, Mech. - 1.3173 Crores 30.67%
STATUS OF INDENTS FOR MODERNISATION
Sl. No.
B.O's Total Nos. of Items
Finalised Under Process
Dro
pp
ed
Ite
ms
Wo
rks
Co
ntr
ac
t
Ma
teri
al
Rec
eiv
ed
P.O
Rele
as
ed
HQ
A/C
s
ve
ttin
g
pe
nd
fo
r
de
cis
ion
In
ha
nd
Wo
rks
Co
ntr
ac
t 1
Dy. CME (Prod)
22 COFMOW 15 Dispensation 01 MTS 38 = Total
0 24 0 4 0 0 0 0 10
2 Dy.CME (Wagon)
03 WRS 01 WS 04 = Total
0 1 0 2 0 0 0 0 1
3 Dy. CME
(Mfg)
06 TPT(Rd) 02 (TTS) 07 (New item) 04 D&G A/Cs 02 DSL Equip 01 DSL Infra 01 M&C Lab 23 = Total
4 11 0 1 0 0 1 2 4
4 Dy. CME (Crane)
10 (CRS) 02 (New Item) 12 = Total
0 4 0 1 0 0 0 0 7
5 Dy. CME (Diesel)
20 DSL Equip 06 DSL Infra 26 = Total
2 14 0 4 0 0 0 4 2
6 Dy. CCMT 26 1 18 0 6 0 0 0 0 1
7 Production Engineer
1 0 0 0 1 0 0 0 0 0
8 WPO 1 0 1 0 0 0 0 0 0 0
Total 131 7 73 0 19 0 0 1 6 25
Total Balance Items after dropped out items: 131 - 25 = 106
10
5. PERFORMANCE:
i) Diesel POH:
Diesel POH outturn of 06 locos achieved against the target of 6.42 in November’16.
Break-up
POH - 06 -------------------------------
Total - 06
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
77 6.42 06 51.33 52
Cycle time for November’16 is 26.17 Calendar days and 18.58 Working days for all type of repairs.
ii) Wagons POH:
Wagon POH Outturn achieved to 481 VUs (POH - 390, Unloadable ‘C’ Category Repair - 71 & Rebuilding - 20) against the target of 480 in November’16.
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
5760 480 481 3840 3709
Dropping and Fitment of Draft Gears for POH wagons (2016-17)
Month → APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR
Percentage 91 87 90 90 96 95 95 99
Cycle Time & Holding - Wagon POH
Month
2015-16 2016-17
Shop Holding Cycle Time (Working Days)
Shop Holding Cycle Time (Working Days) Target Actual Target Actual
APR
225
314.48 3.0
275
205.20 3.0
MAY 300.76 3.0 249.50 3.0
JUN 313.42 3.0 201.46 3.0
JUL 299.50 3.2 195.36 3.0
AUG 304.80 3.0 216.72 3.0
SEP 247.32 3.0 306.52 3.0
OCT 291.00 3.2 367.04 3.0
NOV 347.00 3.2 358.91 3.0
DEC 347.84 3.0
JAN 352.48 3.0
FEB 262.68 3.0
MAR 230.16 3.0
Average 300.95 262.59
11
iii) Rebuilding of Wagons:
Work Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
Complete Renewal of Roof Body Repair of BCN Wagons
240 20
8
160
18
Complete Renewal of End Wall, Side Wall and Flooring of BOXN Wagons
12 120
Upgradation of BOXN to BOXN R
0 22
Total 240 20 20 160 160
iv) Fitment of BMBS in Air Brake wagons:
Outturn is Nil in November’16 against target of 25.
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
300 25 0 200 0
v) Retrofitment of Twin Pipe into BOXN HL/BCN HL/BVZI:
Outturn is 18 in November’16 against target of 12.5.
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
150 12.50 18 100 70
vi) Manufacture of Jamalpur Jack:
13 Nos. of Jamalpur Jacks have been manufactured in November’16 against target of 12.5.
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
150 12.50 13 100 103
vii) Manufacture of 140 Ton Crane:
Estimate for 04 Nos. New Design 140 T Cranes had been sanctioned. 28 NSRs have been processed out of which 22 Nos. POs issued. Materials against 07 POs in full quantity and part quantity against another 01 PO received. POs for the rest NSRs may please be expedited for their earliest procurement.
12
viii) Manufacture of BLC wagons:
Outturn is Nil in November’16 against target of 18.75. This is due to non availability of materials (Solid MIG MAG Welding Filler Wire and HT CBCs).
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
225 (5 Rakes)
18.75 0 150 45
ix) Manufacture of BOXN HL wagons:
Outturn is Nil in November’16 against target of 25. This is due to non availability of materials (Huck Bolts, CRF, Hand Brake Arrangements and BMBS).
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
300 25 0 200 30
x) Manufacture of ICF Bogie Frame:
Outturn is Nil in November’16 against target of 8.33. Estimate for 100 Nos. of ICF Bogie is under sanction at HQ.
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
100 8.33 0 66.67 0
Zonal Distribution of ICF Bogies being manufactured against RSP
Manufacture of 13-T / 16-T ICF Bogies Sl. No.
RSP Details Qty. 13 T/16 T Status
1. MR-5/2007-08 RSP Vol-I dated 03.6.08 100 16 T Complied
2. MR-5/2009-10 RSP Vol-I dated 14.10.09 70 16 T Complied
3. 2010/M(c)/142/2/N.DLI dated 10.05.10 180 13 T Complied
4. 2011/M(c)/142/2/N.DLI dated 30.06.11 60 13 T Complied
5. 2011/M(c)/142/2/N.DLI dated 30.06.11 20 16 T Complied
6. 2012/M(c)/142/2/N.DLI dated 20.06.12 80 13 T Complied
7. 2012/M(c)/142/2/N.DLI dated 20.06.12 20 16 T Complied
Status of In-hand Order of 13-T / 16-T ICF Bogies
Sl. No.
RSP Details Qty.
Remarks 13 T 16 T Total
1. 2013/M(c)/142/2/N.DLI dated 14.06.13
82 18 100 Materials under procurement.
2. 2015/M(c)/142/2/N.DLI dated 09.06.15 & 18.06.15
69 31 100 Estimate under sanction at HQ since 31.03.16
3. 2016/M(W)/814/16/NDLS dated 09.03.16
69 31 100 Estimate under preparation.
13
Manufacture of 13-T ICF Bogies (Work Order No.66971019)
Qty. On order
RSP Detail
Railways Demand
Qty. Compliance
Balance Qty.
Remarks
82 (13 T) R
ly.B
d.
L.N
o.2
013/M
(c)/
142/2
/N.D
LI
date
d 1
4.0
6.1
3
ER 20
Sets
02 18 Despatched on 14.03.16 to CWM/LLH Workshop/ER
04 14 Despatched on 27.04.16 to CWM/KPA/Carriage Workshop/ER
02 12 Despatched on 05.08.16 to CWM/LLH Workshop/ER
02 10 Despatched on 03.09.16 to CWM/LLH Workshop/ER
NCR 02
Sets
SER 26
Sets
NFR 20
Sets
NWR 14
Sets
Note: Materials are under procurement however 16 Sets are ready for despatch.
Manufacture of 16-T ICF Bogies (Work Order No.66971019)
Qty. On order
RSP Detail
Railways Demand
Qty. Compliance
Balance Qty.
Remarks
18 (16 T) R
ly.B
d.
L.N
o.2
013/M
(c)/
142/2
/N.D
LI
date
d 1
4.0
6.1
3
ECR 04
Sets
NCR 02
Sets
NFR 08
Sets
NWR 04
Sets
Note: Materials are under procurement however 06 Sets are ready for despatch.
xi) Manufacture of HCC Bogies:
02 Nos. of HCC Bogies have been manufactured & have found dimensionally suitable in final inspection done jointly by RDSO and JMP’s representatives (Joint Inspection Note No. Nil of dtd.23.02.15 to 24.02.15). As per RDSO, welding should be done by Submerged Arc Welding only thus arrangements are being done and revised estimate also prepared. No fund allotted in 2016-17.
xii) POH/SR/MLR/Spl. MLR of 140 T Cranes:
POH/SR/MLR/Spl. MLR outturn of 140 T Crane in November’16 is Nil against target of 0.67.
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
08 0.67 0 5.33 03
Further 140 T Crane No.142034/KUR/E.Co.R has been received for Special MLR. Repairing of components & Structural Audit is under progress and is waiting for some critical components/spares which are under procurement.
14
Crane No.143003/SEE/ECR - Received on 08.07.16 for MLR. Repairing of components is under progress but fitment is held up due to non availability of a large number of spares which are under procurement.
Further material procurement for 09 Nos. Spl. MLR (Old design), total 20 NSRs were generated out of which materials have been received against 11 NSRs. One NSR for Stud Bolt and Nut has been withdrawn. PO against 07 NSRs have been issued but materials have not been received due to DPs ranging from 04 months to 09 months. It is requested to issue PO for Bearing and Retainer Rings early with short DP.
xiii) POH/Retrofitment/SR of 20 T / 10 T Cranes:
POH/Retrofitment/SR outturn of 20 T Crane in November’16 is Nil against target of 0.25 due to no feed.
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
03 0.25 0 02 01
xiv) POH/SR of Tower Car:
POH of Tower car No.868/M-III/DNR/ECR has been completed in November’16 against target of 0.33.
Outturn Details : 2016-17
Yearly Target
Monthly Target
Outturn for the month
Proportionate Target
Cumulative Outturn
04 0.33 01 2.67 03
xv) Divisional Compliances:
Supply of Diesel Wheels
06 pairs of Diesel wheels have been despatched. Details as under- 06 pairs (WDM3A) - HWH
Outstanding Diesel Wheel Sets as on 01.12.16
E. Railway - 94 pairs (Including 63 pairs of WDM2)
E.C. Railway - 157 pairs (Including 68 pairs of WDM2)
Supply of BOXN Wheels
02 pairs of BOXN wheels have been despatched. Details as under- 02 pairs - SPJ
15
6. STATUS OF INCENTIVE PERFORMANCE:
Shop-Wise Incentive Earning (%) : 2016-17
Shop APR MAY JUN JUL AUG SEP OCT
BBF 28.10 10.14 29.97 40.33 38.47 43.67 45.77
RM/WCS-I 39.98 41.09 29.33 41.88 42.54 43.02 45.17
WRS-II 24.66 17.37 22.15 30.49 27.72 21.48 44.42
WRS-I/ES & PAINT 28.16 27.79 17.94 26.44 24.52 27.59 40.85
WRS-III 21.72 14.64 4.79 18.10 17.51 3.60 39.09
DCS 17.49 37.97 47.09 42.90 50.35 36.25 38.59
BSS & SS 38.18 40.51 37.70 39.54 38.68 36.92 38.28
SMS 13.96 46.68 35.96 38.00 38.26 38.39 36.74
FS -41.70 -41.76 -39.25 -35.28 -31.87 -11.20 34.74
DSS 20.75 16.49 14.07 15.29 -83.95 8.65 29.06
WS 22.41 26.06 30.34 25.03 27.99 16.07 28.26
SF 23.02 20.75 15.71 19.59 18.14 32.94 23.84
FTS/WCS-II 29.97 31.84 26.36 24.72 35.07 23.76 20.08
BWF -57.98 -100.00 -74.23 -43.16 -54.40 -13.15 17.06
BKS 5.37 4.80 2.38 4.77 9.55 7.56 12.78
MTS/F 21.62 15.78 22.69 16.57 1.89 40.70 12.74
BST (HMRS) 31.32 7.07 24.81 11.45 23.87 12.55 12.73
MCTR -6.03 20.74 32.11 -2.82 0.07 4.16 10.84
WLD 6.24 -4.26 -0.73 2.77 24.48 -0.92 9.11
HTS -48.98 -31.32 35.71 0.66 -16.53 -13.87 -13.23
CRANE -32.86 -48.67 -5.66 -24.57 -6.08 -14.59 -15.85
MS/PMS -21.59 -2.74 -23.58 -40.15 -20.88 -28.51 -28.62
GIF 21.49 10.29 1.25 -20.24 -6.50 -5.69 -29.97
BFS -36.65 -35.40 -29.60 -28.58 24.30 21.98 -50.76
TTS -54.30 -65.44 -76.72 -79.89 -8.07 -66.46 -65.80
Total (Mech) 15.13 10.90 12.18 14.24 22.24 12.68 22.42
Electrical 49.32 48.55 49.15 48.76 48.85 48.49 49.01
Grand Total 15.21 11.00 12.27 14.30 22.31 12.79 22.49
Overall incentive performance of the workshop during October’16 is 22.49%.
16
7. राजभाषा: प्रयोग-प्रसार
1. लेखा, कासमिक, डीजल एवं वगैन कायािलयों के 54 कासमिकों को हहदंी डसे्क प्रसिक्षण देते हुए हहदंी में कायि करने हेतु सहयोग प्रदान ककया गया तथा इन्हें
सहायक साहहत्य उपलब्ध कराया गया। 2. इंजीननयररगं एवं डीजल ववभाग की राजभाषा कायि समीक्षा बठैक संपन्न
कराई गई और इन कायािलयों में राजभाषा के प्रयोग-प्रसार ववषयक मदों पर
सववस्तार चचाि की गई। 3. हदनाकं 13.11.2016 को हहदंी सिक्षण योजना के अंतगित आयोजजत हहदंी प्राज्ञ
परीक्षा का आयोजन संपन्न कराया गया। इस परीक्षा में नासमत कुल 11
हहदंीतर भाषी प्रसिक्षणार्थियों ने भाग सलया। 4. कारखाना जस्थत ववसभन्न प्रिासननक कायािलयों एवं िॉप कायािलयों का
राजभाषा ववषयक ननरीक्षण ककया गया। ननरीक्षण के दौरान पाई गई त्रहुियों को सधुारा गया।
8. (A) CUSTOMER CARE BY CRANE ORGANISATION:
Consignee Reports and their attentions:
Sl. No.
Crane No.
MFG/POH/ MLR/SR with date
Consignee Mode of
Reporting Failure as Reported
Staff moved
on
Problem rectified & date
1
143002 GHY/NFR
at HWH/ER
SR May'12
DME(P)/ ER/HWH
Telephonic message
Leakage from Pneumatic system Valve No.75
23.11.16 Rectified
on 24.11.16
2 143007/ BGA/ER
POH Feb'11
DME(D&P)/ ER/BGA/
SDAH
L.No. D/BGA/C -
18/2013 dt.08.11.16
SLI System replacement
15.11.16 Rectified
on 20.11.16
3 143001
DHN/ECR MLR
May'14 Sr.DME(P)/ ECR/DHN
L.No. MP-985/2/CMS dt.20.11.16
i) Pneumatic System not working ii) Hydraulic pressure gauge malfunctioning
23.11.16 Rectified
on 28.11.16
(B) MATERIAL ASSISTANCE TO DIVISIONS BY CRANE SHOP
Sl. No.
Material Qty. Crane based
at Letter No. & date
1 4/2 DC Valve 4WMR (New) 01 No.
DHN/ECR F/CR/140T/13/49 dt.26.11.2016
Pressure gauge (o - 40) Old 01 No.
17
9. TRAINING AND DEVELOPMENT:
To improve efficiency and to upkeep the work hands training arrangement is being made regularly through BTC, PTS and Simulator.
10. ENERGY MANAGEMENT:
Following action has been taken in the workshop as well as colonies for energy conservation:- Justified power regulation has been introduced to earn more benefit through energy conservation. Regular raids are being conducted to debar energy theft. In addition undernoted planning is in force to conserve energy.
i) Replacement of 40 W T/Lights and Incandescent lamps by T-5 (28W) / CFL
Description 2016-17
November Cumulative
T-5 (28 W) 85 514
CFL 225 1713
ii) Replacement of 90 W Ceiling fans & Conventional Regulators by 60 W
Ceiling fans and Electronic Regulators respectively
Description 2016-17
November Cumulative
60 W Ceiling fan 21 198
Electronic Regulator 04 51
11. POSITION REGARDING ACR/APAR, DAR CASES ETC.
1.0 ACR/APAR
A. Gazetted:
Nos. of ACRs/APARs initiated for 2015-16
Total No. of Officers
Reported Reviewed Sent to HQ for
Acceptance
44 44 44 44
B. Non-gazetted:
i) Pending ACR/APAR of previous 05 years - 158 ii)
Year Total No. of Staff
Reported Reviewed Accepted Communicated Finalized
2011-12 5840 5838 5811 5811 12 5811
2012-13 5635 5635 5598 5598 05 5598
2013-14 5586 5586 5576 5576 5530 5576
2014-15 5494 5494 5440 5440 5123 5440
2015-16 6428 5844 5844 5713 2532 5713
18
2.0 DAR and Vigilance Cases:
Case Head
Major Minor
Opening Balance
Cleared Pending
more than six months
Opening Balance
Cleared Pending
more than two months
Vigilance 02 0 02 0 0 0
D & A 0 0 0 0 0 0
3.0 Audit cases under PART- I & PART- II and Special Items:
Type Opening
balance as on 01.11.16
Accretion during Nov’16
Cleared Closing balance
Pending more than three
months Oldest cases with date
AIR Pt.I 10 1 2 9 5 AIR Pt.I -WA-JMP/2-2/ Pt-I/2014-15/179 dated 21.08.14
AIR Pt.II 27 1 0 28 25 WA-JMP/IR/Pt.II/2-5/ 2013-14/297 dt.24.10.13
Audit Note Pt.I 1 1 0 2 0 WA-JMP/26-3/AN Pt-I/ 2016-17/303 dt.24.08.16
Audit Note Pt.II Nil
Special Letter
4.0 Stock Sheets: Accounts & Audit
Type
Opening balance
as on 01.11.16
Accretion during Nov’16
Cleared Closing balance
Pending more than
three months
Oldest cases with date
Remarks
Accounts
7
(Engg. - 1 Stores - 6)
3
(Stores -1 Mech.-2)
3
(Stores -2 Engg.-1)
7
(Mech. - 2 Stores - 5)
4
Case No. 41/05/15/0028 dt.21.07.1998 and 41/05/15/0029 dt.01.08.1998 of Sri Suresh Paswan, Ex DMS/JMP now at ASN.
Stores: Write off
proposal for 03 cases, 01 awaiting for initial reply & 01 - Court case - DAR (Total cases- 05)
New Case - 02
Audit Nil
19
5.0 Use of Information Technology and ITES:
Despite being located in a remote place, Jamalpur Workshop has taken initiative to provide the following IT enabled services: i) EDP Centre has implemented Incentive Module of workshop staff in
IPAS w.e.f. May’16. ii) All category Payrolls are electronically generated including
generation of Form 16 Module etc. iii) IPAS Module has been implemented at this workshop for GPR &
APR w.e.f. June’15. iv) Various important information such as Staff Strength, Workshop
Outturns, Incentive earnings of the staff etc. are being regularly updated in the Workshop Portal of Railway Board.
v) Various workshop performances related information are being put
into the public domain by regular updating Jamalpur Workshop portion of Eastern Railway web portal.
12. FINANCE MANAGEMENT:
i) Status of WMS Balance (Comparative):
Figure in Crores of Rs.
Month Balance during 2015-16 Balance during 2016-17
April 7.46 7.84
May 7.85 4.30
June 7.90 7.49
July 8.38 7.73
August 8.59 20.86
September 21.70 39.07
October 12.50 36.04
November 10.24
December 6.47
January 9.94
February 8.84
March 3.56
20
21
Copy forwarded to (E-mailed): 1. Secretary/E.Rly./KKK for kind information of G.M.
2. AGM/E.Rly./KKK for his kind information please.
3. COS/E.Rly./KKK for his kind information please.
4. COS/JMP at KKK for his kind information.
5. CEE/E.Rly./KKK for his kind information please.
6. CMM(M)/E.Rly./KKK for information and necessary action please.
7. FA&CAO/E.Rly./KKK for his information please.
8. CPO/E.Rly./KKK for information please.
9. CWE/E.Rly./KKK for his information please.
10. Dy.CME(W)/HQ/ER/KKK for information.