Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
CL
30
05
10
15
20
25
35
40
50
45
55
65
60
70
75
80
CL
AU
TOCA
DThis draw
ing made by
HU
NG
ARY
VITLA LTD.G
AN
Z DAN
UBIU
S
AND
IU
BSU
381
5
Tugboats and leveling pontoon:
Tugboat (Delfi)
Built : 1979 Netherlands
Lenght : 26,17 m
Breadth : 8,5 m
Draft : 3,31 m
GRT : 196 t
Main engines : 2 x Stork Werkspoor 6FHD240
Engine power : 1340 kW
Speed : 14 kn
BP : 30 t
Propulsion : 2 x controllable pitch Conventional
Traffic area : European Trade
Tugboat (Leonardo)
Built : 1986, Netherlands
Lenght : 28.60 m
Breadth : 8,7 m
Draft : 3,45 m
GRT : 236 t
Main engines : 2 x Stork Werkspoor 6FCHD240
Engine power : 1760 kW
Speed : 14 kn
BP : 35 t
Propulsion : 2 x controllable pitch Conventional
Traffic area : European Trade
Leveling pontoon (Kampela 2)
General arrangement plan and picture attached.
S-side
Boulder
Bottom
LENGTH WATERLINE (APPROX.)
MAIN CHARACTERISTICS
LENGTH OVERALL
BREADTH, MOULDED
DEPTH, CONSTR
DRAUGHT
50.40 m
49.60 m
12.0 m
2.50 m
0.80 m
Fore
Aft Wiew
LC
Fore Wiew
LENG
TH O
VER
ALL
LENG
TH W
ATER
LINE (A
PPRO
X.)
BR
EAD
TH, M
OU
LDED
DEPTH
, CO
NSTR
DRAU
GH
TLEN
GH
T OF S
TORES
STO
RES
VO
LUM
E
MA
IN C
HA
RA
CT
ERIS
TICS
64.0 m 63.9 m11.36 m 4
.00 m3.8
0 m38.0 m940
m3
CLA
SS
NO
TATIO
N:
CO
ASTA
L TRA
DE W
ITH 1
5 NM
FRO
M S
HO
RE
Drawing number:
Metric
Drawing name:
Client:Scale:
Page: Revision:Project #:
Checked:
Designed:
FINLAND
FORESHIP LTD.
Hitsaajankatu 4 A
00810 HELSINKI
©FORESHIP LTD. 2016
FS2727 A2
GENERAL ARRANGEMENTKAMPELA 2
D1/1D.2727.1000.001
KK/ 27.06.2016
LP/ 27.06.2016
1:100
Rev Description Date Sign.
A DEPTH, CONSTR. CHANGE -2.0M, HATCHES, DECKVINSCH, DECKCRANE 2016-08-25 WD/MS
B UPDATED 2016-09-12 LP/FS
C UPDATED WITH RAILINGS AND CONTAINER 2016-22-12 MS/WD
0 #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20 #21 #22 #23
MAIN DECK
0 #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20 #21 #22 #23
MAIN CHARACTERISTICS
LENGTH OVERALL 23.12 m
LENGTH WATERLINE 22.30 m
BREADTH, MOULDED 11.00 m
DEPTH, CONSTR.2.0 m
DRAUGHT 1 m
0 #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20 #21 #22 #23
BELOW MAIN DECK
CL+4757
BW
BW
BW
BW
BW
BW
BW
BW
BW
D UPDATED PLACE FOR CONTAINER 2017-02-14 MS/WD
Names JohannisdeRijke/JohanvanVeen
Type Splithopperbarge
Classification BureauVeritas,IXHULL•MACH
Splithopperunit,unrestrictednavigation
Dredgingwithin15milesfromshore
orwithin20milesfromport
Sailing area Unrestricted
Year of construction 2004
Year of upgrading 2008/2012
Dimensions Lengthoverall 54.80m
Breadthoverall 11.18m
Mouldeddepth 4.50m
Draughtdredgingmark 4.00m
Hopper capacity 843,005m3
Deadweight 1,427tonsatdredgingmark
Tonnage 869GT-260NT
Speed loaded 6.5kn
Propulsion 708kW
Total power installed 803kW
Johannis de Rijke / Johan van Veen
Au
gu
st 2
015
Principal particulars
Van Oord
POBox8574
3009ANRotterdam
TheNetherlands
T+31888260000
F +31888265010
I www.vanoord.com
Contact
GSS M
arine Services
Marilyn MEurocarrier 2611
The Marilyn M has quickly proved her suitability for a variety of marine projects. Dredge support, cable laying, anchor handling, barge support, wind farm operations and port and harbour construction operations are all easily within her capabilities. Her modern design and specification makes her an efficient, economic vessel providing excellent accommodation and welfare facilities for her operatives.
Head OfficeGareloch Support ServicesRhu Marina,Rhu, Argyll & Bute,G84 8LH Scotland
t. +44 (0) 1436 821277f. +44 (0) 1436 821288e. [email protected]
Netherlands OfficeGareloch Support ServicesHaven 27,3143 BC Maassluis,The Netherlands
t. +31 (0) 105 92 27 66e. [email protected]
www.gssplant.co.uk
Deck Layout
Head Office – GSS, Silverhills, Rosneath, Argyll & Bute, G84 0RW Scotlandt. +44 (0) 1436 821277 | f. +44 (0) 1436 821288 | e. [email protected]
Netherlands Office – GSS, Haven 27, 3143 BC Maassluis, The Netherlandst. +31 (0) 105 92 27 66 | e. [email protected]
www.gssplant.co.uk
Specifications
Boat Name Marilyn MPort of Registry MaassluisType or Description Eurocarrier 2611IMO NumberOfficial Number
9731523
Call Sign PCFMMMSI NumberBuild Date LOA Beam Draft Deck Space/Area Deck Load Class
Propulsion Bow Thruster Cooling Speed Bollard Pull
244700957March 201526.48 metre11 metreForward 2.8 metre (tanks 98% full) 125 metres²6 tonne per sq metreMCA Cat 1 150 miles from safe haven. Bureau Veritas 1 + hull & machinery 2 Caterpillar C32, Power 1560hp each 250hp, 360 degreeKeel cooled10 knots33 tonne
Auxiliary Engines Generator(s) 2 Caterpillar C9 400 Volt 250 KvaDeck Equipment Cranes 2
Fwd / Heila 230- 4SL25 t @ 7 metre 10.5 t @ 16.31 metreAft / Heila 140 – 3SL26 t @ 5.67 metre10 t @ 12.17 metreWinches1 x 100 tonne1 x 50 tonne1 x 15 tonne tugger
Store/Workshop AreaFuel Capacity 100 metre3 transferrable & meteredWater Capacity 60 metre3 transferrable & meteredNavigation Equipment Magnetic compass
Electronic compassRadar(D)GPSElectronic chart plotter Echo sounderWatch keeper alarmAISNavtexTalkback unitSpeed log
Comms Equipment Cell (GSM) phoneSatellite phoneMF/HF radio2 x VHF radioEmail
Other Equipment Bow rollerStern rollerDouble push bowTowing hook/bitHydraulic towing pinsHydraulic shark jawsDeck flood lights
Accommodation Number of persons 12,Number of cabins 3 single & 2 doubleMessing facilitiesHeated & air-conditioned
Crane Lifting Capacity (fwd)
Crane Lifting Capacity (aft)
Equipment
Split hopper bargesJan Blanken, Jan Leeghwater,Pieter Caland and Cornelis Lely
Dredging and Marine Contractors
Name Jan Blanken, Jan Leeghwater, Pieter Caland
and Cornelis Lely
Type Split hopper barge, self propelled
Classification Bureau Veritas, I X Hull X Mach X AUT-UMS
Sailing area unrestricted navigation
Dredging area Dredging within 15 miles from shore or within
20 miles from port, dredging over 15 miles from
shore with H.S. ≤ 2.5 m
Year of construction 2009
Dimensions Length overall 96.10 m
Breadth overall 18.03 m
Moulded depth 5.90 m
Dredging draught mark 5.10 m
Hopper capacity 2,853 m3
Deadweight 5,073 tons at dredging mark
Tonnage 3,315 GT - 994 NT
Jan Blanken, Jan Leeghwater, Pieter Caland and Cornelis Lely
Au
gu
st 2
015
Speed loaded 10.8 kn
Propulsion 2,236 kW
Total power installed 3,239 kW
Principal particulars
Van Oord
PO Box 8574
3009 AN Rotterdam
The Netherlands
T +31 88 8260000
F +31 88 8265010
I www.vanoord.com
Contact
Name Goliath
Type BackhoedredgerBackacter1100
Classification BureauVeritas,IXHull•Mach,SpecialService/
DipperdredgerAssistedpropulsion,
unrestrictednavigation
Year of construction 2008/2013
Dimensions Lengthoverall 68.35m
Breadthoverall 23.04m
Mouldeddepth 4.25m
Draughtsummer 3.23m
Tonnage 1,676GT-502NT
Excavator type Backacter1100
Dredging depth 18.00m
(boom18.0m/stick6.5m/bucket34m3)
30.00m
(boom23.8m/stick15.5m/bucket10m3)
Goliath
Jun
e 2
017
Total power installed 4,336kW
Power engines hydraulic
system excavator 3,800kW
Installed propulsion power 1,000kW-Onlyforself-manoeuvring
atdredgingsite
Principal particulars
Van Oord
POBox8574
3009ANRotterdam
TheNetherlands
T+31888260000
F +31888265010
I www.vanoord.com
Contact
2
********************************************************************************************* This email has been received from an external party and has been swept for the presence of computer viruses. ********************************************************************************************
2
AHEP Project Office St Fitticks Road Nigg Bay Aberdeen AB11 8TN
______________________________________________________________________ This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com ______________________________________________________________________ ********************************************************************************************* This email has been received from an external party and has been swept for the presence of computer viruses. ********************************************************************************************
[Redacted]
2
Further notification that the dredging works are programmed to commence on 25/4/18 subject to all necessary approvals and consents being in place Many thanks
From:Sent: 23 March 2018 05:43 To: '[email protected]' Cc:Subject: AHEP ‐ Dredging Notification Good morning Please find notification of the Contractor and vessels used for the upcoming dredging works at Aberdeen Harbour Expansion Project (AHEP). The dredging works are anticipated to commence on 23/4/18 though the equipment will be on site prior to this date for mobilisation purposes Contractor Van Oord Schaardijk 211 3063 NH Rotterdam The Netherlands Vessels Back Hoe Dredger: Goliath Split Hopper Barge: Cornelis Lely Split Hopper Barge: Johan van Veen
Marine support is provided by the following vessels Multicat: Marilyn M Survey/crew boat: Offshore Phantom Regards,
AHEP Project Office St Fitticks Road Nigg Bay Aberdeen AB11 8TN
W: www.ahep.co.uk
______________________________________________________________________ This email has been scanned by the Symantec Email Security.cloud service.
[Redacted]
[Redacted]
[Redacted]
[Redacted]
[Redacted]
2
______________________________________________________________________ This email has been scanned by the Symantec Email Security.cloud service. For more information please visit http://www.symanteccloud.com ______________________________________________________________________ ********************************************************************************************* This email has been received from an external party and has been swept for the presence of computer viruses. ********************************************************************************************