134
MONTHLY REPORT TO THE COMMUNITY AND FINANCE REPORT AUGUST 2015

012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

MONTHLY REPORTTO THE

COMMUNITY ANDFINANCE REPORT

AUGUST 2015

Page 2: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

Your Councillors

0 1 2 3 4 5 km

Page 3: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

Effective - August 2014

Page 4: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

TABLE OF CONTENTSUnit Summaries

Chief Executive Officer’s Group 1

1. Chief Executive Officer’s Summary 22. Economic Development 33. Corporate Planning 64. Governance 7

Corporate Services 8

5. Chief Financial Officer 96. Director Communities 117. Child, Youth and Family Care 128. Aged and Disability Services 149. Libraries, Arts and Culture 1610. Information Services 1811. Finance 2012. Property and Valuation 2113. Communications and Events 2314. Human Resources15. Environment Protection

25

27

Infrastructure and Planning 30

16. Chief Operating Officer 3117. Strategic Planning 3218. Statutory Planning 3519. Building and Planning Compliance 3720. Infrastructure Strategy 3821. Infrastructure Maintenance 4022. Infrastructure Projects 4223. Renewable Resources 4324. Building Facilities 45

Capital Works Overview 47

The Monthly Report to the Community summarises, for the information of the community and other interested stakeholders, all of the many activities of the Shire for the preceding month, ranging from policy development and implementation through to service delivery, the provision of infrastructure, and the Shire’s financial position.

Given the scope of the Shire’s wide ranging activities, there is a great deal to report. Every effort is made to provide information in a readily understandable, easy-to-read form.

Any resident, ratepayer or other stakeholder seeking further information should contact the relevant Shire manager or director, or in the first instance can contact:

Communications Ph. 5950 1200

Page 5: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

CHIEF EXECUTIVE OFFICER’S GROUP

Reporting direct to the Council, the Chief Executive Officer (CEO) leads the entire Shire administration and his key reports include the Chief Financial Officer (as the head of the Corporate Services Group) and the Chief Operating Officer (as the head of the Infrastructure and Planning Group).

Other direct reports to the CEO who, along with their teams, form the Chief Executive’s Group are:

Governance (Governance and Mayor & Councillor Support) Economic Development & Tourism Corporate Planning Customer Service

Page 6: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

CHIEF EXECUTIVE OFFICER’S SUMMARY

Dear Ratepayers and Residents of Mornington Peninsula Shire,

I am pleased to provide for your information the Monthly Report for August 2015. The Monthly report also contains the Finance report for the Shire and is an important measure as to how effectively we are managing the financial resources for the community. As you know, we take the proper management of the finances very seriously, to ensure that we deliver in all areas of our operations, value to the ratepayer and resident of the Shire.

Our operations for the month of August 2015 continue apace as we work hard to deliver on the significant capital program approved by Council. As you may know, for various reasons there was a significant amount of carry forward capital projects brought into the new financial year from last year. Through our Chief Operating Officer’s team in Infrastructure, a significant amount of work has gone into the development of a new project delivery model which is designed to improve the Shire’s ability to successfully deliver more projects on time and catch up the backlog of works. I am very confident that the work being carried out will deliver the approved projects and a large proportion of the backlog. I will keep you posted on this throughout the financial year.

As some of you may know, there is significant activity within the Shire amongst staff on our SeeChange Project. This is the short name we have selected to represent what we are working on within the Shire to transform the customer service experience that you all have when you deal with the Shire on any matters. We know from some great feedback that we get from the community that we do some things really well at the Shire but we acknowledge that in many areas we are not performing to the best of our ability for you and we are working hard to change that. This will show itself over time in better use of smart technology but fundamentally it is about all of us at the Shire understanding and committing to working for you the ratepayers and residents of the Shire who pay us! From the CEO down, within the staff structure, we are very focused on everyone’s involvement in working for the residents of our Shire. Again I will bring you many more updates on behalf of our Council throughout 2015/16 financial year on what we are achieving for you.

We welcome any feedback you care to give us and will continue to strive for improvement in serving the communities’ needs.

Page 7: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

ECONOMIC DEVELOPMENT

ECONOMIC DEVELOPMENT

Business Networking & TrainingFMP Business Breakfast Series The August breakfast held at Frankston Arts Centre was attended by over 250 people who heard from guest speaker Kevin Sheedy. Kevin spoke about the potential to look at challenges as opportunities for businesses based on his extensive football industry experience.

Small Business Mentoring Clinics Six small businesses took advantage of the one on one mentoring sessions offered this month.

Commercial Activities on Footpaths

Type of Permit Approved PermitsPermits Pending Expired/Cancelled

Liquor Licence Permits 1Footpath Permits Renewals (373 posted) 33 18

Footpath Permits New Applications 5 2

Chamber SupportMornington Main Street Activity Centre Special Charge Scheme The Special Charge Scheme 2015-2020 for Mornington has been declared by Council. Letters have been sent to all owners and occupiers informing them of Council’s decision to declare a Special Charge Scheme. Property owners and tenants have a 30 day period to object to this decision with VCAT.

Business EngagementRye Beach Business Association Economic Development are providing support and mentoring to the Rye Beach Business Association to implement a number of activities including a brochure to promote businesses and initiatives to encourage people to visit the town during the winter months.

Rye Industrial Estate Consultation was undertaken with businesses in the Rye Industrial Estate to obtain their feedback on areas they would like assistance with and the potential of establishing a business group. Actions identified to support businesses included the potential to have signage promoting the estate and businesses, of which Economic Development will be working with businesses to implement.

Rosebud Business Estate Support has been provided to businesses in the Rosebud Industrial Estate to establish their own representative body. The group will be developing marketing material to promote businesses in the estate, advocate for improve signage and ongoing networking with businesses.

Agritourism Following the three successful Agritourism forums held over the year, the final session was held this month. This session provided a report back to the participants on the key themes which were evident through the series. In addition actions were identified to develop and assist businesses based on the feedback in the previous forums.

Page 8: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

TOURISM

Destination PromotionIndustry Partnerships (ie membership) for Mornington Peninsula Regional Tourism (MPRT) 2015- 16 has now closed with 330 businesses signing up.

Find Your Way This new marketing campaign highlights key regional attributes of: Inland/Outdoors; Coastal/Aquatic; Shopping/Markets; Spa/Wellbeing; Arts/Culture; Golf. 27 businesses are participating in this campaign. Businesses will be featured in activities such as themed eNewsletter promotions, themed eMagazines, media profiling, video vignettes and public relations activities throughout the year. A web portal for social media feeds will also be developed along with a new destination feature video.

Wine Food Farmgate 76 businesses are participating in phase three of this very successful campaign. This phase includes businesses featured in social media posts, eNewsletters, eMagazines, video vignettes and public relations throughout the year. Each business has a feature listing on the website and a specialised recipe card created to encourage interaction between businesses and consumers.

Visit Victoria Online Visit Victoria (State Government visitor based website) is launching a new intrastate campaign aimed at encouraging Victorians to travel within their own state. Regional tourism groups have been encouraging their businesses to participate in this campaign. Our region has 42 businesses that will be showcased on the website along with associated special offers and eNewsletters.

Industry DevelopmentThe following Industry Development activities were conducted during August:

Tourism Awards mentoring session with five attendees. Fourteen businesses have entered submissions into the 2015 Victorian Tourism Awards;

Four businesses presented alongside MPRT in Melbourne at a Visit Victoria briefing Star Ratings Australia held a workshop for accommodation providers with eight attendees; A Country Fire Authority fire preparedness session with 12 attendees; A Product Knowledge workshop with 12 Volunteer Ambassadors An Industry Networking event was held at Portsea Village Resort with 29 attendees; and The regional booking Service team conducted two one:one training sessions during August

assisting accommodation providers with the process of upgrading to ‘instant online availability’.

Business EventsBusiness Events Mornington Peninsula hosted three key familiarisation tours

An Incentives Group tour with five professional conference organisers dedicated to developing incentive tours across seven venues;

A general tour for Executive Assistants and Professional Conference Organisers with seven attendees visiting six venues; and

A visit from Tourism Australia’s New Zealand Manager to five venues along with an afternoon tea session where six additional businesses had the opportunity to meet and greet.

Visitor ServicesVisitor Information Centre Summit Mornington Peninsula was host to the 15th Annual Victorian Visitor Information Centre Summit for 2015. The conference was held over three days and offered visitor information centre staff the opportunity to learn from best practice examples and exchange visitor servicing ideas. The region welcomed over 100 delegates from the accredited visitor information centre network across Victoria who also enjoyed tours around the region experiencing everything our region has to offer.

Page 9: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

Comments from delegates have been very positive with some saying this year has been the best summit ever and look forward to coming back to the Peninsula!

Visitor Information Centre StatisticsMonth Walk Ins Phone CallsAug-15 1871 641Aug-14 1478 607Variance % 27% 6%

Regional Booking Service The overall value of bookings made during August 2015 was $12,984 – a decrease of 65% on August last year. The average length of stay per booking was 1.6 nights only a slight decrease on the July average of 1.7. The average $ spend per night did increase from $183pn (July 2015) to$229pn for August. There was also a 37% drop in the number of bookings that came through online when compared to August 2014.

Page 10: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

6

CORPORATE PLANNING

This month the Corporate Planning team;

Corporate Reporting

Participated and coordinated annual Victorian Auditor General Office audit of the Performance Statement.

Finalised Performance Statement and Local Government Performance Indicators for inclusion in the draft Report of Operations.

Tested processes for draft upload data to the state government’s “Know your Council” website.

Advocacy

Prepared submission to the state on the Port of Melbourne Lease Transaction

Prepared advocacy information packs for Councillors and Shire website.

Contributed to the Interface Council’s group submission to Essential Services Commission on rate capping.

Developed a public Wi-Fi strategic map that prioritises economic/tourism/business hot spots and existing infrastructure capital works delivery opportunities.

Supported Mayor and CEO meeting with local MPs.

Developed Interface Growth Fund 2016/17 - Project Priorities/List.

Other Projects

Participated on the review panel for assessment of Flexi Grants applications.

Coordinated submission for the State government’s 2015 Urban Development Program.

Hosted LGPRO Corporate Planners Meeting at the Mornington office, attended by 40 corporate planners from metropolitan Melbourne.

Page 11: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

7

GOVERNANCE

GOVERNANCE

Council received a proposal from a group of residents to change the name of Rosebud West to Capel Sound. The group conducted a door- knock survey across eight areas of residential and business properties with the 3940 postcode. Governance Officers have consulted with the Office of Geographic Names (OGN) to agree upon the steps required to ensure the correct statutory process will be followed. A briefing will be presented to Council in September, 2015.

Australia Day Local Awards The 2015 Australia Day Local Award nominations have opened in the following categories:

Citizen of the Year; Young Citizen of the Year; and Community Event of the Year;

Nominations will remain opened until 13 November, 2015.

MAYOR AND COUNCILLOR SUPPORT

Councillors were in attendance at two productive meetings with Members of Parliament this month, Mr Neale Burgess MP and Mr David Morris MP arranged by Councillor Support.

Councillors have been kept busy attending many a community event including the Heritage Awards Ceremony; National Meals on Wheels Delivery Rounds; Norm Clarke Wall Mural Unveiling; Creative Peninsula Flags Project Days; Site Visit to Hillview Quarry; Order of Australia Association Recognition Event; and the Annual Vic Roads Municipal Liaison Meeting.

Councillor Support also assisted Councillors in hosting community meetings in both the Red Hill and Seawinds Wards.

FREDOM OF INFORMATION

Freedom of Information Requests Requests in progress at the start of the month 14New requests during the month 4Withdrawn Requests 2Non valid requests 1Requests resolved 5Requests in progress at the end of month 10

Freedom of Information Commissioner Reviews & ComplaintsReviews in progress at the start of the month 0New Reviews during the month 0Reviews resolved 0Complaints 0

Page 12: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

8

CORPORATE SERVICES

The Corporate Services Group is led by the Chief Financial Officer (CFO) and includes the following units and teams:

Corporate

Information Services Finance Property & Valuations Communications and Events Human Resources Environment Protection

Communities Directorate

Child, Youth and Family Care Aged and Disability Services Libraries, Arts and Culture Social Planning and Community Development

Page 13: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

9

CHIEF FINANCIAL OFFICER

The July 2015 monthly report included details of all Carry Forward projects from 2014/15 to 2015/16 that were proposed by Officers. At the Council meeting during August those Carry Forward projects ($14.17M net of contributions) were ratified by Council as an adjustment to the full year Adopted Budget for 2015/16. This is reflected in the full year Adjusted Budget columns in the monthly financial report section. Full year variances between the adopted and adjusted budget amounts have been identified and relate only to items carried forward from 2014/15.

As August is the second month of the 2015/16 financial year additional columns have also been added to the financial reports for Year to Date (YTD) figures so that cumulative variances between forecast and actual performance can be monitored. These reveal (in the Corporate Performance Statement) that while the performance for August was $335k unfavourable to forecast; the YTD position remains $1.36M favourable.

The major contributor to unfavourable performance in August was the shortfall ($818k) in grants commission receipts during the month. This is directly attributable to the unbudgeted receipt on the 30th June 2015 (last financial year and received after the adoption of the 2015/16 budget) of the prepayment of half of the anticipated 2015/16 grants commission funding. The timing of the prepayment being received in the last financial year from the Victoria Grants Commission has a two-fold impact on the August monthly variance due to (a) the reduced amount actually received and (b) the inflated forecast amount {due to the assumption that the entire budgeted 100% would be received in 4 equal instalments throughout the financial year}. Significant off-setting favourable variances ($368k) were experienced in the Corporate Services Group (which includes the Communities Directorate) due to deferred payments of some grants and subsidies, changes to IT maintenance expenditure and lower than anticipated employment costs in Aged and Disability Services for the month.

During August, Victorian Auditor-General’s Office (VAGO) staff were on-site conducting field work for the annual financial statements audit which will be included in the upcoming Annual Report. In addition, the audited financial statements for the Mornington Cemetery Trust were signed off without issue or qualification.

98,690 Rates and Valuation Notices were delivered to ratepayers during the first week of August incorporating changes to the State Fire Service Levy and waste vouchers. It is anticipated that changes to the layout of this year’s notices will result in greater clarity of the amount owed and consequently reduce the volume of inadvertent short payments. Options for contemporary payment methods such as BPay, direct debit and the use of QR codes have also been enhanced.

Other items of interest that occurred within the Corporate Services Group for the month include: Recruitment activity – 5 positions were advertised and a total of 54 applications were received indicating strong interest by potential employees in working for the Shire.

An OHS incident occurred involving a community care worker at a client’s premises. The staff member sustained lacerations to her hand from a dog bite which required hospital treatment. WorkSafe investigated and concluded (after reviewing the Shire’s thorough actions in response to the incident) that no further action was required on their behalf.

A Wifi access point was setup at David Collings Leisure Centre enabling patrons to access the internet via their portable devices.

A new standardised corporate signature block was deployed for all Shire email users which is just one early step towards presenting a consistent and unified image of the Shire to stakeholders.

The August edition of Peninsula-Wide was printed and distributed and 16 media releases were issued.

Page 14: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Another milestone in the 2016 General Valuation was successfully met on-time with Stage 3A (Specialised Valuations) lodged for certification on the due date of 31/8/2015.

The Municipal Fire Management Planning Committee held its third quarterly meeting and topics for discussion included the Arthurs Seat Skylift Emergency Management and Bushfire Emergency Plans, fire risk profiling for the Shire and Fire Safety Strategies for the Red Hill Ward.

Our Library commenced Sunday trading hours on 2nd August which will continue through until the end of November. The launch event attracted 1,176 visitors across the various branches.

A “Battle of the Bands” competition was hosted at the Peninsula Community Theatre with the winners now progressing to the regional finals later this year to be held in the City of Stonnington.

Page 15: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

DIRECTOR – COMMUNITIES

Our Library is now open to the public on Sundays. This commenced on Sunday, 2 August 2015 and will continue until Sunday, 29 November 2015. Our Library will be open from 11.00 a.m. to3.00 p.m. Councillor Antonella Celi and Councillor David Garnock officially launched “Spring into Sundays @ Our Library” on Sunday, 2 August 2015 and the event attracted 1,176 visitors across Our Library branches.

During August, Mornington Peninsula Regional Gallery exhibited “Storm in a Teacup” and “Ways to Draw”.

National Meals on Wheels Day was celebrated on Wednesday, 26 August 2015. Morning teas were held at our three despatch points so that the volunteers across the Shire could attend. Thanks were offered from several Councillors. Key rings with LED lights donated by Meals on Wheels Victoria were also given to the volunteers.

On Friday, 21 August 2015, the Freeza Impackt Committee hosted the Battle of the Bands at the Peninsula Community Theatre. Eight local bands and individual performers competed. They performed to a full audience. The winners were “Elements” and they will now go on to the Regional Finals in the City of Stonnington later this year. The Freeza Impackt Committee is led by youth of the Peninsula.

The Mornington Township Mobility Map is now available at all Customer Service Offices of Council and online.

As part of National Homelessness Prevention Week, the Peninsula Housing Network teamed together to arrange a Homelessness Sleep Out. This was held on 4 August at the Salvation Army Corp in Rosebud West. More than 60 people attended. Councillor Celi and Councillor Garnock both participated in the formalities of the evening.

A corporate volunteer day was conducted at Willum Warrain involving volunteers implementing the Landscape Plan. Senior Executive from the Department of Environment, Water, Land and Primary Industry attended. A site visit at a coastal shell midden in Mount Martha to look at coastal erosion processes and human threats to the registered midden was then undertaken.

A Community Grants Information Session was held at Rosebud for prospective grant seeker organisations. Approximately 34 people attended.

Current grant rounds that are open are:

Community Support Grants. Creative Communities Grants. Flexi Grants.

Page 16: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

CHILD, YOUTH AND FAMILY CARE

YOUTH SERVICESOn Friday, 21 August, the youth led Freeza Impakt Committee hosted the Battle of the Bands at the Peninsula Community Theatre. Approximately eight local bands and individual performers fought it out in front of a packed audience of family and friends. Winning the battle was “Elements” consisting of young people from Dromana and Tootgarook. This band now goes on to the Regional Finals in the City of Stonnington later this year

Following the event, the Freeza Committee received the following correspondence from a patron reaffirming the success of the event and effort put in by the Youth Committee:

“Hello Impakt Freeza team

Thank you for organising such a fun, safe and welcoming event for Battle of the Bands on Friday August 21st.

My husband, daughter and myself were excited to be part of the audience at Battle of the Bands, to support our son and his friends who formed two of the bands that performed.

The event was so well organised with security staff, St. John's Ambulance in attendance, professional staging and lighting, professional photographers, and young volunteers ensuring the evening was fun and safe for the peninsula's youth. We loved the free earplugs that were offered!

We talked with a number of other supporting parents who were present, and they shared our views of the well organised and welcoming environment.

It was a thrill to be part of the evening. Thank you for supporting such an occasion”.

SOCIAL PLANNING AND COMMUNITY DEVELOPMENT

Place Making GrantsThe ModBOX Shire Placemaking Grant given to the Westernport Chamber of Commerce and Industry (WCCI) is underway in the development of ModBOXes to beautify High Street Hastings.ModBOXes will be given to seven local traders who can choose their own plants from donations given by Haar’s Nursery. Local traders will then have 3 months to care for their plants and be creative in designing their ModBOXes before winners are judged at an iconic Community event being held on the 11 December from 4pm onwards.

Wallaroo Residents Action Group (WRAG) HastingsA number of residents and children from the WRAG will be attending the Tidy Towns Awards being held on 17 October in Beechworth. The group is proud to be a finalist in the community and Government Partnership category with the Mornington Peninsula Shire. The WRAG will undertake a community survey in November of the community’s needs in partnership with the Wallaroo Neighbourhood House’s annual survey.

All Abilities Consultative CommitteeThe month of August has been a rather busy one for members of the All Abilities Consultative Committee (AACC) who have been actively working with a number of stakeholders to advocate for the construction of a Changing Places Toilet. A facility presently unavailable to persons with high care needs and their carers on the Mornington Peninsula. The Changing Places - Changing Lives

Page 17: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

project is recognised for its positive contribution in the enhancement of the lived experiences of people with disability and their carer’s to access fully accessible toilet facilities, in a dignified and comfortable manner, whilst out in public.

Mornington Peninsula Human Rights Group (MPHRG)Mornington Peninsula Human Rights Group (MPHRG) had its Annual General Meeting (AGM) on Tuesday, 1 September. Though a small group, the MPHRG have been able to produce many tangible outcomes on human rights. Throughout the year the group have been involved in advocacy on asylum seeker and refugee rights; homelessness and indigenous rights. In June of this year the group presented the Victorian Department of Justice and Regulation with its submission of the Charter. The primary argument contained within the submission was the need for the addition to the Charter of a guarantee of a right to shelter. This submission has been reported to the State Attorney General on the 1 September and will then proceed to be tabled to the Victorian Parliament on 1 October 2015.

National Homelessness Prevention WeekAs part of National Homelessness Prevention Week the Peninsula Housing Network (PNH) teamed together to arrange a Homelessness Sleep Out, this was held on 4 August at the Salvation Army Corp in Rosebud West. This year was the second year running, and was strongly supported with more than 60 people including; community leaders and persons working within housing, health and sector support services. Councillor Celli and Councillor Garnockboth participated with the formalities of the evening. This event is part of a broader campaign to increase awareness and attract support for Peninsula’s residents in housing and vulnerable situations.Local children provide some entertainment for the participants at the Homelessness sleep out

Community GrantsApproximately 34 people attended the Community Grants Information Session held at Rosebud for prospective grant seeker organisations. Current grant rounds that are open - Community Support Grants, Creative Communities Grants and Flexi Grants were covered. The session also included a presentation from a previous successful grant applicant who talked about the process and steps they used to apply for the grant.

Cultural HeritageA corporate volunteer day was conducted at Willum Warrain involving volunteers implementing the landscape plan. Senior executives from the Department of Environment, Water, Land and Primary Industry attended. After volunteering at Willum Warrain, we conducted a site visit at a coastal shell midden in Mount Martha to look at coastal erosion processes and human threats to the registered midden.

This month has also included the co-ordination of revegetation works at coastal shell middens between Mount Eliza and Mornington. This has involved the Green Army with support from Laura Crilly (MPS) and the volunteer group at Mount Eliza (Williams Road Beach Friends Group) and also Transfield services.

Page 18: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

AGED AND DISABILITY SERVICES

SENIORS FESTIVAL

Now in its 31st year, the Victorian Seniors Festival (previously known as Seniors Week) celebrates the men and women over 60 years who give so much to Victorian communities. This year the festival runs from 6 to 13 October, right across Victoria. With over one thousand formal events, there’s something for everyone. To find out about the activities which are on during the Festival, you can visit the online calendar or download the program at https://www.seniorsonline.vic.gov.au or ring 1300 797 210.

For something closer to home, visit the Shire website or ring 5950 1617 for details.

To ensure a successful Victorian Seniors Festival on the Mornington Peninsula, a considerable amount of ground work occurs throughout August. This year the Shire has produced an expanded program to provide residents and visitors to the peninsula with information about many local opportunities to celebrate ageing well. The program includes many free and low cost activities and events by a wide range of community groups

and organisations. The program is being distributed widely and also highlights a number of events the Shire is offering in collaboration with organisations such as Peninsula Health, University of the Third Age, Brotherhood of St Lawrence and Monash University.

MORE THAN A MEAL

National Meals on Wheels Day is celebrated each year on the last Wednesday in August. This annual celebration highlights to the Australian people the significant contribution that is made to the community by over 700 Meals on Wheels services and some 80,000 volunteers across Australia.

To celebrate the day locally, morning teas were held at our three despatch points so that our Meals on Wheels volunteers across the Shire could hear thanks from several Councillors and enjoy delicious muffins baked by our talented Meals on Wheels chef. Volunteers also received keyrings with LED lights, donated by Meals on Wheels Victoria.

Seawinds Ward Councillors Antonella Celi and David Gibb with Meals on Wheels volunteers and staff at the Rosebud drop-off point.

Shire Mayor Councillor Bev Colomb with Meals on Wheels Volunteers and Shire staff at the Mornington drop-off point.

Meals on Wheels volunteer Vic Greetham with Cerberus Ward Councillor David Garnock at the Hastings drop-off point.

Page 19: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

AUGUST AT A GLANCE

During the month, the following services were provided to support more than 5,000 older people and people with a disability to stay living at home safely, actively and independently:

13,168 hours of home/personal/respite care. 1,166 hours of “living at home” assessment. 5,851 Meals on Wheels. 290 hours of home maintenance/modification. 1,438 Dial a Bus passenger trips. 409 hours of activity programs for people with dementia.

Page 20: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

LIBRARIES, ARTS AND CULTURE

LIBRARY SERVICES

Community Engagement and Programs Spring into Sundays @ Our Library – Our Library opened its doors to the public on

2 August and will continue to open on Sundays from 11.00am to 3.00 p.m. until 29 November. Spring into Sundays was officially launched by Councillors Antonella Celi and David Garnock, with the launch attracting 1,176 enthusiastic visitors across Our Library’s branches. Sunday activities during August included a fun-packed array of events:

Musicians. Author talk with Robert Favretto. CSI Mornington Peninusula. 3D printing demonstrations. Pilates classes. Teddy Bears Picnic at Rosebud Library. Treasure hunts.

ARTS AND CULTURE

Foyer Exhibition Space @ Mornington Library Exhibitions Program is currently showing the Painting with Parkinson’s exhibition from 7 August to 4 September.

The artsblog (www.artsonthepeninsula.com) published 24 arts and cultural events and activities this month with 594 subscribers and attracted 2,939 hits.

The Norm Clarke Mural Project painted by Red Hill artist Michael Leeworthy was launched by Councillors Gibb and Pittock on 17 August. The improvements in this laneway are the first of a series of streetscape improvements as part of Project Rosebud.

The Cultural Planner presented the 2015/16 Creative Community Grants program to 40 people at an information evening on 19 August. Alison Doherty, Marketing Manager of Rosebud Chamber of Commerce, spoke of their success as a grant recipient in 2013/14 and featured the mural in Norm Clarke Walk.

MORNINGTON PENINSULA REGIONAL GALLERY

Exhibitions and Public Programs The exhibitions Storm in a teacup and Ways to

draw attracted large numbers of visitors from local and wider communities.

Students from many schools visited the Gallery with our Young at Art program being close to bursting with more than 30 children and their parents crammed into our café area. Afterwards they enjoyed a teapot craft activity. The atmosphere in the Gallery was further enhanced with the redecorated café and scones, jam and cream on Sundays.

Page 21: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Public programs have been very well attended. These included our second After Noon program with three artist talks and a wine bar, artist Betty Greenhatch’s talk on the famous Willow Pattern which was a sell-out and the tea tasting and visit to Bespoke Tea Company. Also popular were the curator’s talk about Storm in teacup and Patricia Beggs’ lecture on tea ware at Beleura House and Garden.

Storm in a Teacup continued to receive excellent coverage in media, including Radio National, ABC radio, 6 things to do in Mornington (The Age, Spectrum), as well as local coverage in MP News and Mint magazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and two special events. Many new bookings for programs were received, with people citing having seen ads in local newspapers.

LOCAL HISTORY

An oral history brief for the 2015/16 Oral History Project has been written and endorsed by the Local History Network.

A peninsula map identified the collecting parameters of the eight historical societies has been completed.

The Digitisation Officer assisted the Nepean Historical Society in developing a visual presentation for their 50th anniversary celebrations to be held in September.

Over 100 images have been photo shopped from the Dromana and District Historical Society Museum collection for publication and exhibition purposes. Scanning of the Mornington and District Historical Society’s archives continues.

STATISTICS AND REPORTING

KPI This month Last Month 2014Library Membership *64,222 *64,222 78,213

Library Loans 101,372 120,454 110,714eBook Loans 2,600 2,422 1,789

eTalking Book Loans 978 919 483eMagazine Loans 2,257 2057 NA

Home Library Service Loans 1,359 1,584 1,030Library Visits 58,244 59,016 53,578

Public PC Reservations 6,331 6,378 5,999Library Website Visits 22,818 21,660 17,191

Library Website Unique Visitors 12,463 12,507 10,447Library Enquiries 4,682 5,243 4,209

Community Engagement Events 94 71 46Community Engagement Attendance 2,715 2,263 1,343

Gallery Attendance 5,750 2,103 5,300*Static figure – membership database currently undergoing audit and review, to be completed in October 2015.

Page 22: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

INFORMATION SERVICES

IS STRATEGY Reviewed list of supported applications and developed draft roadmap. Reviewed list of current and proposed IS projects and developed weighted assessment

criteria. Added corporate templates to Microsoft Word start menu. Setup Wifi access point at David Collings Leisure Centre. Responded to 843 helpdesk requests. Relocated team to facilitate better communication with team members. Developed 15 online forms in test environment, to be published this month for customer

use. Setup shared Prezi and SurveyMonkey accounts for use across the Shire. New governance model for procurement of computer systems (software or hardware) has

been endorsed by the ISSC. Developed suite of IS policies for review by the ISSC.

IS APPLICATION SUPPORT Finalised cash draw setup and wireless access point at David Collings Leisure Centre. Completed a review of printers and copiers and requested proposals for rationalisation from

vendors. Identified duplication of internet charges by Telstra and requested refunds. Reconfigure property & rating software for PPAR version 3 reporting as require by the state

government. Conducted staff PDR reviews. Update audio visual equipment in Mornington Council Chamber to allow wider range of

laptops to connect. Deploy Microsoft Lync to a pilot group in Information Services.

IS INFRASTRUCTURE & COMMUNICATIONS Deploy corporate signature block for all email users (quick win). Enable the ability for staff to update their own contact details in active directory. Prove the concept for deployment of staff photos to MS Outlook.

GRAPHICAL INFORMATION SYSTEMS (GIS) Improvements/changes to Geomedia Smart Client for contractors.

o email functionality developed in forms, with ability to set emails as actioned by manager/supervisor.

o workflow for Powerhead inspections created and in use by contractor.o development work for iCAN project (Intelligent Corporate Asset Notification) project.

This will contain all existing and proposed capital works.o Maps and Spatial Analysis for various departments.

Within GIS/Property & Ratingo sale of 13 properties creating 42 new properties.o 16 new subdivisions creating 44 new properties.o 29 properties reassessed (change in status of properties due to valuation

requirements) into 248 properties.o 3 M1 submissions – changes to council property information.o 2 M2 submissions – change or error to existing map base.o 22 address changes.

INFORMATION MANAGEMENT Processed 9700 pieces of inwards correspondence same day. Processed 7480 pieces of outwards correspondence same day.

Page 23: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Respond to 178 helpdesk requests. Approved the creation of 700 new files/folders in Objective. Internal courier met 100% service level compliance. Staff PDR’s completed.

Page 24: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

FINANCE

REVENUE MANAGEMENT

Rate notices this year have been designed to not only include the Fire Service Levy in the body of the notice but also have the waste vouchers attached. This will reduce the number of short payments from ratepayers who inadvertently pay the Council rates and charges without the fire service levy. Rate notices for 2015/16 were delivered in the first week of August.

Residents and ratepayers can now register to receive their rates notice electronically. This option ensures that rates notice are e-mailed which will assist ratepayers when away from home and for electronic record keeping.

Once the annual rates notice has been received residents and ratepayers can register by scanning the QR code or by registering at morningtonpeninsula.formsport.com.au click register then follow instructions. As the waste stations are unable to scan the waste vouchers, those ratepayers receiving electronic notices have received the waste vouchers in the mail.

Council introduced BPay view during the last financial year and a flyer explaining this option has been included with the rate notice. This option lets you receive, store and pay your bills all within your online banking, users of this option need to refer to their individual bank for registration and details.

There are a number of factors supporting electronic delivery of rate notices including reduced mail costs (which are set to rise significantly in coming months), guaranteed delivery of notices and lower payment transaction costs with the BPay view option. Although the numbers taking up the electronic delivery of notices is minimal at this stage (approx. 1400 in total) the number of direct debit applications is increasing.

The number of land information certificate applications has increased significantly this month which has impacted on the number of changes of ownership/address processed (an increase of 30% over the same period last year).As is usual with the rate notices being mailed, there is increased activity in the number of new pension applications.

AUDIT

The Auditor-General’s Office staff were on site reviewing the Financial Statements for the year ended 30 June 2015 and have completed their fieldwork.

Council’s Audit Committee is scheduled to review the Financial Statements at their meeting, 9 September, prior to being submitted to Council,for “in-principal” approval, before being forwarded to the Auditor-General for final sign-off.

The Financial Statements and External Audit for Mornington Cemetery Trust were signed off during the month without issue or qualification.

Page 25: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

PROPERTY AND VALUATIONS

PROPERTY

Lease to the Lions Club of Rye Inc.The Lions Club of Rye Inc. is proposing to construct a storage shed on Council land at the RJ Rowley Reserve, Rye. Council resolved to advertise its intention to enter into a lease for a term of 5 years with 2 further options of 5 years duration. The commencement rent will be $520 plus GST per annum and reviewed annually to CPI. The lease may be terminated if the shed is not completed by 30 June 2017.

Lease to Mornington Yacht ClubAt its meeting on 10 March 2015, Council resolved to advertise its intention to enter into a lease with the Mornington Yacht Club. Submissions were received regarding the proposed lease and considered at a Section 223 committee hearing on 23 June 2015. A report to Council on 24 August 2015 summarised the submissions and Council resolved to enter into the lease for a term of 21 years at a commencing rent of $41,000 plus GST per annum, reviewed to CPI annually and reviewed to market every 3 years. Council will also receive 50% of the revenue received from the sub-lease to Telstra.

Lease to the Rosebud Toy LibraryA one year lease has been issued to the Rosebud Toy Library for the occupancy of a shop at the Rosebud Central Shopping Centre. The Toy Library took possession of the property on 17 August 2015.

Zirka CircusThe Zirka Circus is an animal free circus and has obtained approval to occupy the Rosebud foreshore carnival site from 7-13 September and the Hastings foreshore from 14-20 September. The shows are 2 hours long with a 15 minute intermission. The show includes magic, contortion, juggling, balancing and clowns. Ticket prices range from $10-$40 with Family Passes available.

Progress – 2016 General Valuation

Task Description Due Date Progress to Date

Stage 1 Statistical Analysis of recent sales against the 2014 Revaluation 27/02/2015 Completed and certified 30/01/2015

Stage 2 Residential & Rural Preliminary Valuations 30/10/2015 Submission 1 certified on 05/05/2015

Submission 2 certified on 14/07/2015

Stage 3A Specialised Valuations 31/08/2015 Lodged for certification on 31/08/2015

Stage 3B Commercial, Industrial Valuations 29/01/2016

All commercial precincts inspected. Data entry and full clean-up of site and building relatives completed for all commercial precincts. Full valuation model rebuild completed with preliminary levels set for all areas.

Stage 4 Final Residential & Rural Valuations 31/03/2016 Not yet commenced

Stage 5 Valuation Return 29/04/2016 Not yet commenced

Page 26: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

Supplementary ValuationsThe Valuation team completed 255 supplementary valuations during August 2015. At the time of this report there were a total of 31 supplementary valuations outstanding.

Mornington Peninsula Shire Valuation Objections

08/092008Reval

09/102008Reval

10/112010Reval

11/122010Reval

12/132012Reval

13/142012Reval

14/152014Reval

15/162014Reval

Formal Objections 75 36 43 10 159 53 134 5

Disallowed, withdrawn & invalid 53 11 18 6 64 16 85 0

Completed – changes recommended to VGV 22 24 20 3 95 37 49 1

Incomplete as at 02/09/2015 0 0 0 0 0 0 0 4

State Revenue Office Objections – Land Tax

2009(2008level

Reval)

2010(2008level

Reval)

2011(2010level

Reval)

2012(2010level

Reval)

2013(2012level

Reval)

2014(2012level

Reval)

2015(2014level

Reval)

Formal Objections 152 17 50 13 187 49 33

Disallowed, withdrawn & invalid 106 7 38 7 118 8 14Completed – changes recommended to VGV 46 10 12 6 69 41 19

Incomplete as at 02/09/2015 0 0 0 0 0 0 0

Shire AppealsThere are no VCAT applications at this time.

Page 27: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

COMMUNICATIONS AND EVENTS

Peninsula-Wide The August edition of Peninsula-Wide was printed and distributed. Planning for the September edition of Peninsula-Wide is underway.

Media & News 16 media releases and web news items were issued in August, included: National Meals on Wheels Day Community invited to help Shire improve customer service Flying the flag for arts on the Mornington Peninsula Local young musos to battle it out Nominations open for 2015 Best Bites Planning together for the future of Tootgarook Wetland Shire’s art program brings art to the community Shire grants information session Sustainable House Day Works completed at Crib Point Celebrating volunteers – call for nominations Briars wildlife sanctuary maintenance Cr Bowden granted leave of absence Explaining our new rates notice Breast Cancer Awareness Month – October 2015 Homelessness Prevention Week

One hundred and sixteen articles relating to the Mornington Peninsula Shire and Council activities were recorded and summarised in August.

Photography & Video Gallery Redevelopment Announcement - Cr Bev Colomb Best Bites Nominations - Cr Bev Colomb Impact for Women Marketplace - Cr Bev Colomb Creative Peninsula Flags - Cr Bev Colomb, Cr Gibb, Cr Antonella Celi, Cr Hugh Fraser Rye Creative Mural National Meals on Wheels Day - Cr Bev Colomb, Cr David Gibb, Cr Antonella Celi Mornington Main Street Festival Promo - Cr Bev Colomb 2015 Heritage Awards Winners

External website External website stats for June 2015 - Visits: 70,104 and Page Views: 193,342. Mobile is 36% and tablet 14%. Top page views - Markets on the Peninsula, Advertised Planning Applications & Current Vacancies. Social media update: Shire Twitter now has 820 followers (up 10 on July).

Community and Special Events The Events team are well underway with planning for the Peninsula Pet Expo. The expression of interests closed this month with an overwhelming response. There were a total of 30 exhibitors and 8 food vendors selected to showcase their products/goods. All the programming and marketing for the event is nearing completion ready for dispersion in September.

Maria Chetcuti has commenced with the team as the Project Officer. Maria brings a wealth of knowledge and experience in event management.

Page 28: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

For the month of August, there were 11 registered events as of which Devilbend Fun Run was funded by the Shire, 1 filming application and 2 wedding ceremonies held on public open space on the Peninsula, with an estimated 3,130 event participants in attendance.

Page 29: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

HUMAN RESOURCES

Corporate Learning and DevelopmentA range of corporate programs were delivered during the month, including some of the more significant programs such as Influencing Skills and How to Train Others. Feedback from both courses was very good. How to Train Others is similar to what was known in the past as ‘Train the Trainer’, whereby participants are trained in how to train small groups. This is particularly helpful for those staff who often work with small groups in the community.

RecruitmentA total of 54 applications were received during the month of August 2015 for 5 positions advertised. Total year to date (Jan – Dec) applications received amounts to 1,168.

Occupational Health and Safety IncidentsOn 22/7/2015 a Community Care Worker was entering a communal yard between a client’s granny flat and the client’s son’s home. On entering the yard, the son’s dog (normally contained in the son’s home) accessed the yard area, biting the employee on the right hand. The employee sustained lacerations to her hand, attended a GP clinic and thereafter Frankston Hospital for treatment which is ongoing.

A risk assessment for the dog had been performed but it relied on the son to contain the dog prior to and during the care worker’s attendance. On this occasion the son thought the care worker had already attended and therefore did not contain the dog. The employee did not check before entering the yard to ensure that the dog was contained.

Following the incident, a new risk assessment was completed for the dog concerned and this included input from the Shire Ranger. A fence has been installed at the premises isolating the dog and allowing access for care workers. Consultation with employees has occurred at the OHS committee meeting and ongoing development of the Community Care Worker Risk Control Measures is underway. It has been communicated to all care workers that if pets are not contained, then the worker must not enter the premises until such time that it is.

The WorkSafe Inspector was provided with copies of the Shire’s relevant policies and procedures and after her investigation, concluded that no further action to be taken by WorkSafe in the matter.

Risk and Safety ManagementThe current policies are under review and currently in the consultation phase with Health and Safety Representatives and OHS Committees:

Occupational Health and Safety Policy Contractor OHS Management Policy Occupational Violence Policy

An OHS gap analysis is currently being undertaken to determine the Shire’s compliance with OHS legislation and standard. Once complete, an implementation plan will be developed to assist the Shire to continue meeting its OHS obligations.

The Risk Management Framework is due for review in 2015/2016. The revised framework will include all areas of risk (corporate/public, OHS, compliance, environmental etc.).

Page 30: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

ENVIRONMENT PROTECTION

FIRE PREVENTION AND EMERGENCY MANAGEMENT

Emergency Management Training – Psychological First AidDuring a major emergency both the Red Cross and VCC (Victorian Council of Churches Emergency Ministries) have a role, as per the Emergency Management Manual of Victoria, to provide psychological first aid. The Mornington Peninsula Shire is fortunate in that we have a group of mental health practitioners that augment this response and have done so for about 20 years. They are one of the few teams that we are aware of that exist in Victoria. This group is known as the Emergency Management Personal Support Team (EMPST) and they have responded to many incidents over the years providing great support to those people who are affected by all kinds of emergencies on the Mornington Peninsula.

During August council officers working in the Emergency Management arena participated in training which focused on the following: Self-awareness and how to look after yourself during an emergency. Dealing with affected community members, especially at an Emergency Relief Centre or in

the field. Looking out for fellow staff during times of high stress levels.

Municipal Emergency Management Planning CommitteeThe Municipal Emergency Management Planning Committee (MEMPC) had its third quarterly meeting for 2015 on Friday 21 May 2015. Main topics discussed included: Fire prevention in Blairgowrie. The capability of the State Emergency Services, Sorrento unit. Aboriginal Cultural Heritage register and information system. Warringine Park fire ‘after action’ review. Flood management strategies. Upcoming emergency management exercises. The upcoming audit of the Municipal Emergency Management Plan. Emergency catering during the response phase for emergency service personnel.

The MEMPC has statutory responsibilities under the Emergency Management Act 1986 and Emergency Management Act 2013. The committee meets quarterly and focuses on the following: Developing and maintaining the Mornington Peninsula Municipal Emergency Management

Plan. Determining the need for and participating in functional sub-committees and working groups

to plan for specific emergencies, address issues and develop and implement projects. Assisting in the identification, analysis and evaluation of existing and new and emerging

emergency related hazards and risks. Providing input into risk treatment strategies. Preparation of risk specific response and recovery plans for the Shire. Contributing to the continuous improvement of the Mornington Peninsula Municipal

Emergency Management Plan through monitoring, review and development. Contributing to testing the Municipal Emergency Management Plan through conducting and

participating in emergency exercises.

Municipal Fire Management Planning CommitteeThe Municipal Fire Management Planning Committee (MFMPC) had its third quarterly meeting for 2015 on Monday 17 August 2015. Main agenda items included: Fire safety strategies for the Red Hill Ward. The Arthurs Seat Skylift Emergency Management Plan and Bushfire Emergency Plan. Fire prevention works on the southern peninsula freeway reservation under the management

of VicRoads.

Page 31: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

Fire risk profiling, which includes new tools available to the committee overseen by the Department of Environment, Land, Water and Planning.

DELWP Fire Operations Plan Consultation Period Now OpenEach year the Department of Environment Land Water and Planning (DELWP) develops an annual Fire Operations Plan (FOP) which prioritises where and when the State Government plans to carry out fire management works including planned burning, slashing, mowing, clearing and the maintenance of fuel breaks.

During April and May of this year, DEWLP sought input from communities and stakeholders as part of the development of the FOP. DEWLP are now providing those who contributed comments an opportunity to see how their input has been incorporated into the plan, and to respond to any final queries. If you have not yet provided comments on the 2015/16 – 2017/18 Fire Operations Plan and would like to, please visit the Department of Environment, Land, Water and Planning website at http://www.delwp.vic.gov.au/fire-and-emergencies/managing-bushfire-risk/fire-operations-planning or call them on 136 186.

ENVIRONMENTAL HEALTH

The Environmental Health Team responded to one food recall this month, which was Cottage Cheese Farm Goats Fetta Cheese due to microbial (E.coli) contamination.

One hundred and twenty three food safety assessments of fixed food businesses and 34 assessments of temporary food businesses were undertaken. The Team also processed 12 applications and 162 Statements of Trade via the online registering system known as Streatrader. It should be noted that that the number of food assessments is down due to changes in staffing and the requirement for training.

We have investigated a gastrointestinal outbreak at a nursing home that is home for 80 residents. The Environmental Health Team ensured that the premise was cleaned thoroughly. The outbreak was caused by the Norovirus.

The Shire’s Environmental Health Team has invited all local food businesses to nominate for the 2015 Best Bites Food Guide and Food Awards and has released the application kit. Nominations close on 12 October 2015.

The Best Bites program assesses and promotes local food businesses that: Provide safe and healthy food. Use environmentally sustainable practices. Provides safe and accessible premises.

The benefits of the Best Bites Program were shown by a recent health evaluation which found that 86 percent of food businesses involved in the program have provided healthier food options for their customers. This evaluation report will be made available on the Shire’s web page.

Businesses that meet the Best Bites requirements will be listed in the Best Bites Food Guide to be launched in November 2015. These businesses can also nominate for the 2015 Best Bites Food Awards in various categories.

The finalists in each category are determined from the overall score in their annual Best Bites assessment. Finalists are then judged by an independent panel of expert judges to decide the winner in each category.

Customers can also nominate their favourite food businesses for Best Bites by contacting the Shire’s Environmental Health Team at [email protected]

Page 32: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

The Environmental Health Team recently attended Annual Recognition Evenings for community groups at Bunnings Rosebud and Bunnings Mornington to discuss food safety and Streatrader requirements. Certificates of Appreciation were presented to the officers by Bunnings.

Pictured above: The Environmental Health Team gave a presentation on environmental health issues to Justice Students at Chisholm TAFE

The Shire’s Project 'Hitting the Hot Spots - A Strategic Approach to Source Point Pollution Management on the Peninsula’ has been selected as a finalist in three categories in the Stormwater Victoria Awards for Excellence. Officers from the Shire’s Environmental Health and Renewable Resources Team attended the judging interviews on 19 August 2015.

Four of the Environmental Health Team attended a very successful Allergen Awareness Training day. This training was targeted at raising the awareness of Environmental Health Officers, in investigating complaints about allergens in food, the risk of anaphylaxis reactions to allergens, sampling, analysis and food recalls and being an expert witness in Court with a focus on the Coroners Court. It was organised by Environmental Health Professional Australia, the Department of Health and Human Service.

COMMUNITY ANIMAL SHELTERThe month of A ugust saw 80 dogs come in to our temporary care and once again we had a great reuniting success rate with 61 of the dogs being reclaimed, usually within 24 to 36 hours. No dogs had to be euthanised which is a relief for the staff who work in this industry. Twenty-seven cats were impounded and whilst only one was registered, four were de-sexed and microchipped. Due to regulations if a cat’s behaviour is deemed feral or aggressive and/or it is in extremely poor health then euthanasia needs to take place and this was the case for ten cats.

Our partnership with rescue groups also continues to flourish with 28 pets ‘rescued’. This month we were assisted by; Forever Friends, Homeless Hounds, The Australian Animal Protection Society in Keysborough, Doing It For The Dogs, Second Chance Animal Rescue, Beagle Rescue, Little Whiskers, Chihuahua Rescue, Lab Rescue, Golden Retriever Rescue, Peninsula Vet Care (East Mornington), Vets for Adoption (Mornington and Rosebud) and Rescue a Cat Inc. These groups, together with our staff and volunteers, form a highly regarded partnership amongst Victorian shelters and pounds which endeavor to provide all suitable pets another chance at a new home.

Other animals cared for at the Shelter this month include two rascally rabbits.

SHIRE RANGERSThe Shire Ranger Team received and actioned 784 reactive merit cases this month. In response to this, the Team structure has been modified to make the most of the reduced operational capacity and ensure the level of response to the community is not affected.

Page 33: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

The following table shows the number of cases received this month compared to previous years.

The Shire Ranger Team this month supported other Teams in investigating and working with the owners of a restaurant in Mount Eliza where there was a range of non-compliance issues with the substantive issue being the planting out of the road reserve without approval. Whilst sensitive in nature, an appropriate outcome was achieved.

The Team prosecuted 28 matters through the courts during August; with a further six matters finalised and subsequently withdrawn prior to the hearing.

Case of InterestThe owner of a Staffordshire bull terrier dog, a smaller terrier dog and a domestic cat, all of which were unregistered and being kept at a property in Rosebud were involved in a number of animal aggression incidents. There were multiple separate incidents of the dogs rushing at and biting people walking past the property. Officers from the Shire Ranger Team responded by seizing the Staffordshire bull terrier. Investigations identified that the owner had been charged 12 months ago with 45 similar charges when living at a property in Rye.

The owner was charged with a further 11 offences to which he pleaded guilty to being the owner of unregistered animals, dogs that were found at large and dogs that had rushed and bitten people. He was found guilty of the charges and was convicted and fined $4,000, ordered to pay court costs of $117.00 and shelter fees of $550.00. The Magistrate was particularly critical of the dog owner for continuing to be irresponsible and not learning from the previous court hearing. The Shire will now decide what further action may be taken to ensure that there are further controls in place to protect the community.

Page 34: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

INFRASTRUCTURE AND PLANNING

The Infrastructure and Planning Group is led by the Chief Operating Officer (COO) and includes the following units and teams:

Strategic Planning Statutory Planning Statutory Building Planning Compliance Infrastructure Strategy Infrastructure Maintenance Infrastructure Project Management Buildings and Facilities

Page 35: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

CHIEF OPERATING OFFICERThe month of August saw the new organisational structure being announced by the CEO. This news has been met with a great deal of positivity and has facilitated increased focus for team members. The bringing together of the former directorates of infrastructure and planning has provided a significant opportunity to enhance the way in which projects and services are planned, designed and delivered within the municipality. Almost immediately after the restructure announcements were made meetings commenced at all levels within the organisation to identify how existing processes can be streamlined and how workflows can be made more efficient and effective as result of the simplification of reporting lines. Ultimately, the team are focused on they can best provide maximum value to the community in the work that they do.

Key planning initiatives that have progressed this month include the adoption of the revised Rosebud Activity Centre Structure Plan, Rosebud Activity Centre Urban Design Framework and Rosebud Coastal Management Plan, completion of the Safety Beach Coastal Management Plan and Rye Foreshore Landscape Master Plan engagement processes, commencement of the preparation of the Mornington Peninsula Biodiversity Conservation Plan and finalisation of the Jetty Road (Rosebud) Precinct Master Plan. The team is focused on completing the significant number of priority projects that have been allocated by Council in the budget this financial year.

Evidence of Council’s Capital Works Program could be seen in all parts of the municipality during August with significant activity in the upgrade of buildings, streetscapes and traffic management improvements. The Capital Works Overview section of this report contains a full summary of the infrastructure works currently being implemented. Particular projects of note include:

- Construction of Mount Martha Tennis Pavilion- Completion of Stage 1 of the Fruit Growers Reserve Sports Pavilion, Somerville- Completion of public toilets in Tyabb and Dromana- Construction of Mornington Youth Centre- Progression of master plan implementation works at Police Point Park, Portsea- Replacement of the Warringine Park Boardwalk, Bittern- Construction of Gateway Park, Mornington- Completion of road reconstruction at Loders Rd, Moorooduc- Completion of laneway upgrades in Mornington, Rosebud and Hastings- Progression of drainage upgrade works in Mornington, Mount Eliza and Flinders

In maintaining our focus on advocacy for road improvements, Councillors, CEO and Shire Officers met with VicRoads Metropolitan South East Regional management group in early August to discuss priority issues for the Mornington Peninsula. High priority issues raised included the need for improving sustainable transport options for the community via improved cycling & pedestrian facilities and the urgent need to undertake intersection safety improvements at high risk locations. These locations included the intersections of Nepean Highway and Forest Drive, Mount Martha and the Mornington Peninsula Freeway and Jetty Road, Rosebud. This meeting was highly productive with agreement reached on key priorities and a commitment to working together to ensure required solutions are identified and implemented.

Page 36: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

STRATEGIC PLANNING

STRATEGIC LAND USE PLANNING

On 24 August Council resolved to seek authorisation from the Minister for Planning to prepare and exhibit Amendment C189, to give statutory effect to the Beleura Hill (Mornington) Design Guidelines and the findings of the Birdrock/Clarkes Avenues Precinct (Mt Martha).

On 24 August Council adopted updated versions of the Rosebud Activity Centre Structure Plan, Rosebud Activity Centre Urban Design Framework and Rosebud Coastal Management Plan.

Expressions of Interest have been received from suitably qualified consultants to undertake the update of the Mornington Peninsula Activity Centres Strategy and the preparation of the Mornington Peninsula Industrial Areas Review. The consultant selection process is expected to be completed by the end of September, with the project to commence in October.

COASTAL PLANNING

Over fifty submissions have been received in response to the public exhibition of the Safety Beach Coastal Management Plan. Officers will prepare a report for Council to enable the consideration of the submissions and of the adoption of a final Plan.

Jetty Road (Rosebud) Precinct Master Plan. Officers will prepare a report for a Council meeting in October to enable the consideration of the submissions and the adoption of a final Plan. Parks Victoria has completed the refurbishment of the Rosebud Pier.

The second round of consultation for the Rye Foreshore Landscape Master Plan is now complete and the plan is undergoing final revisions prior to Council and key stakeholder final review. This plan forms the design development stage of the strategic planning process for Rye Foreshore Reserve.

Hastings Boat Ramp extension and deepening. Consultants BMT WBM have completed the feasibility study for this project. Council has now commissioned the consultants to undertake soil sampling for Coastal Acid Sulphate Soils to inform proposed designs and costings.

NATURAL SYSTEMS PLANNING

Tootgarook Wetland Management Plan: consultants BMT WBM and WetlandCare Australia have been appointed to prepare the Tootgarook Wetland Management Plan. A community information session was held in Mornington on Friday 21 August. A successful session was also held with representatives of government agencies at Rosebud in August, to seek input to the draft Tootgarook Planning Scheme Zones and Overlay controls as a component of the greater Tootgarook Wetland Management Plan. .

Tootgarook Wetland Environment Monitoring project. Birdlife Australia (BA) has submitted an annual report for year 1 of the project. BA has also provided a video with highlights of survey results, which will be uploaded to the Shire web site and associated Facebook page.

Mornington Peninsula Biodiversity Conservation Plan 2015/16. Ecology Australia P/L has been appointed to prepare the Conservation Plan. The first community engagement session was held at Mornington on 11 August with over 100 people in attendance. Dr Douglas Robinson Scientific Coordinator Trust for Nature, Victoria provided the keynote speech, followed by a project overview from the consultant team and concluding with an overview of current Shire biodiversity projects.

Page 37: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

Mornington Peninsula Biodiversity Research Highlights Report. The document was endorsed by Council on 10 August and will be made widely available.

The Shire’s Community Waterwatch Project. A successful Peninsula Waterwatch Protecting Port Phillip Bay field activity for 10 primary Schools was held at Mornington in the catchment of Tanti Creek, organised by the Dolphin Research Institute as the project consultant.

DELWP has announced a review into the Permitted Clearing Controls for Native Vegetation. The terms of reference include consideration of the extent to which the current regulations sensibly protect sensitive vegetation and the appropriateness of current offset rules to provide adequate compensation. DEWLP has also announced the commencement of the development of a State Biodiversity Strategy.

URBAN DESIGN

High Street Hastings Streetscape Design Framework, Hastings. The Draft Framework has been prepared with input from the community and stakeholders, and has also been reviewed by the Shire’s Design Advisory Panel. The Draft Framework will be presented to Council on 14 September with a recommendation to commence a comprehensive public exhibition process. .

Hastings Activity Centre Laneways Strategy. The Draft Hastings Laneways Strategy will also be presented to Council on 14 September with a recommendation to commence public exhibition in conjunction with the Draft High Street Streetscape Design Framework.

The 4 Step Guide to Context Analysis and Design Response Guidelines. Following the completion of the exhibition, officers will prepare a report for Council to enable the consideration of the submissions and of the adoption of a final Guide. The report will be presented to the Council meeting of 14 September.

Design Advisory Panel. A DAP Workshop was held on 12 August 2015 to review the proposed sculpture in Alfred Street, Hastings, and the revised design for 786 Esplanade, Mornington.

HERITAGE

An officer submission made in response to the State’s Discussion Paper about the Review of the Heritage Act 1995 will be presented for endorsement to the Council meeting of 14 September.

Mornington Peninsula Heritage Study Review – Stage 2 (Dromana, Rosebud and Rye). The heritage consultancy firm Context has been appointed for this project. They are completing the investigation and research of the approximately 60 places identified for possible heritage protection.

.Rosebud Sound Shell. A detailed survey of the structure has enabled accurate plans and elevations to be drawn, and the various works required to restore the structure to be plotted. . This documentation will form the basis of working drawings and specifications to commission works when funding becomes available, and will accompany applications for a permit to, and possible part-funding, by Heritage Victoria.

Ocean Beach Road Sorrento Heritage Policy. Following the completion of the exhibition, officers will prepare a report for Council to enable the consideration of the submissions and of the adoption of a final Policy. The report will be presented to the Council meeting of 12 October.

AMENDMENTS & PLANNING SCHEME REVIEW

On 24 August 2015 Amendment C184 Part 2 Council resolved to split the amendment into two to facilitate:

Page 38: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

o adoption and approval of the change to the Design and Development Overlay, Bungower Road, Mornington as Part 2A as recommended by the Panel; and,

o further advocacy with regard to the rezoning of the former SEW reservoir in Mount Eliza (the Panel did not support the open space and site specific housing provisions sought by Council).

Amendment C188 Part 2: including Bittern Design and Development Overlay and Tootgarook Wetland ESO30. The Panel report was received on 11 August and a follow-up report will be made to the Council meeting of 14 September.

On 24 August Council resolved to seek the Minister’s authorisation for Amendment C189. This is a new general amendment consisting of six items, including: Beleura Hill Design Guidelines implementation (a new DDO24), application of DDO2 in Birdrock Avenue area in Mount Martha (based on Mornington Peninsula Investigation Areas Study, Mount Martha Discussion Paper recommendations); amended incorporated plan for Moorooduc Coolstores, and facilitation of a three lot low density subdivision in Browns Road, Rye.

On 24 August Council resolved to support Amendment GC33, which includes updates re Peninsula Link, subject to some significant changes to include a Restructure Overlay and incorporated documents that would prohibit or restrict development on any additional lot of less than 40 hectares that have been created in the Green Wedge Zone.

PLANNING SCHEME AMENDMENT REQUESTS

There were no new planning scheme amendment requests received in August however one was foreshadowed for 856 – 858 Melbourne Rd, Sorrento being a rezoning from the General Residential Zone to a Mixed Use Zone with a combined permit application – the matter is yet to be formalised with the payment of the relevant fee.

REFERRALS AND DEMOLITION REQUESTS

Referrals from statutory planning (August 2015) 20 referrals were received and 15 were completed.

Demolition requests (August 2015) 45 requests were received and 45 were completed.

Page 39: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

STATUTORY PLANNING

Planning ApplicationsCouncil received 202 planning applications and decided 198 in the reporting month. As of the end of the month, 776 planning applications remain in hand.

Of the applications decided, 69% of applications were decided within the statutory timeframe, exceeding the Unit’s monthly target of 67% of applications to be decided in time and exceeding the State average of 64%.

Subdivision Planning applications – Council received 23 applications to create lots. Twenty-one plans were certified and 46 received a statement of compliance.

The Planning Support team received a total of 3681 telephone calls in the reporting month. Of these, 91% (target is 80%) of calls were answered within twenty seconds and 98% (target is 95%) of calls were answered within two minutes. The team also serviced approximately 768 counter enquiries this month.

The Planning Support team completed 94% of tasks within timeframe (target is 85%).

Planning S72 Amendment ApplicationsCouncil received 34 applications under Section 72 of the Planning and Environment Act to amend planning permits and decided 33 planning amendment applications. 123 planning amendment applications remain in hand.

Secondary Consent ApplicationsCouncil received 35 secondary consent planning applications and decided 28 secondary consent planning applications. 55 secondary consent applications remain in hand.

Page 40: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

Significant ApplicationsP15/0638 – 142-146 Ocean Beach Rd Sorrento This is an application for use and development of a multi-level building within the Sorrento Historic Precinct. The building proposes ground level retailing at both Ocean Beach Rd and Morce Av frontages, with residential apartments above. The application is to be reviewed by the Design Advisory Panel at its next meeting on 16th September.

P15/1036 - 397 Main Creek Road, Main Ridge This application seeks approval to upgrade two existing free range chicken sheds on the land. The site presently contains a dwelling and three chicken sheds. It is proposed to upgrade and increase the size of two of these sheds, in order to retain the existing bird capacity on the land (as a result of a change to free range, which requires a reduced stocking density). Essentially, the same number of birds are intended to be housed in larger sheds, with the upgraded sheds to contain superior technology (in terms of temperature regulation and ventilation) to that of the older style cross ventilated sheds.

P15/1472 – 95 Balnarring Road, Balnarring (Balnarring Recreation Reserve) This application seeks approval to construct a new sporting pavilion with associated external viewing areas within the existing recreation reserve. The new building is to be generally in the location of the existing building, which is to be demolished to make way for this more modern facility. The pavilion will be used in conjunction with new netball courts, cricket nets, playground and car-parking works, which were approved under a separate permit and currently under construction.

P15/1400 – 18 Brasser Avenue, Dromana This application is within the Industrial 3 Zone, and seeks approval to use the land for Materials Recycling, a Store, and a Caretakers Dwelling. Further information has been requested of the permit applicant. Once received, the application will proceed to public notification.

VCATP13/1969 – 57-59 Ocean Beach Rd Sorrento This is an appeal against Council’s refusal of a three storey, mixed use development.

A preliminary matter was raised at the initial hearing on 24 June. The matter questioned whether or not a Cultural Heritage Management Plan was required for the development of the land. Following submissions received from both permit applicant and Council, VCAT determined that a CHMP was not required. The hearing is to be listed for consideration of the merits of the application at a date to be determined.

P14/1699 – 30 Cook Street, Flinders (Flinders Motel Site) This appeal related to Planning Permit P14/1699, which granted permission for the conversion and re-use of an existing building for the purpose of a Food and Drink Premises which would be open to the wider public. Seating for 44 patrons would be provided inside the building and a further 30 seats outside within four “pavilions” to be established within the site’s Cook Street frontage. The Food and Drink Premises is intended to operate in conjunction with the existing motel use.

The permit included two conditions limiting the maximum number of seats to 50 (condition 13) and the maximum number of patrons who may consume alcohol to 50 (condition 17). These are the conditions which the permit holder is seeking to review, as they seek to have an increased number of 74 seats/patrons.

The Tribunal did not accept the Shire’s grounds for limiting patron numbers to 50, which were based upon the availability of car-parking on site and within the road reserve, and the potential for the parking shortfall to impact upon the amenity of the residential area, including nearby dwellings in Cook Street.

Page 41: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

BUILDING AND PLANNING COMPLIANCE

PLANNING COMPLIANCE

VCAT

The Planning Compliance Unit have lodged an application for an Enforcement Order at VCAT in relation to the use of land in Creswell Street, Crib Point for the purpose of pallet manufacturing and sawmill. The Planning Permit issued in 2010 which allowed the use to be conducted has expired and Council have sought that the land use ceases.

The operator sought to extend the application, however this application was subsequently refused. It is expected that an appeal may be lodged a VCAT in relation to the refusal of the permit. The resolution of the extension of time application may impact on the enforcement application. Council has written to the nearby residents to inform them of these matters. A resolution may take some months depending on the availability at VCAT to hear each matter.

Magistrates Court

3 Prosecutions have also been lodged in the Magistrates Court this month which include; removal of all vegetation on vacant land in Rye; breach of noise limits for an entertainment activity in Sorrento; placement of large volumes of fill on land in Somerville.

Infringements

There has been a higher than average amount of Planning Infringement Notices issued for the period. This appears to be partly due to repeat offences and matters where multiple breaches have occurred.

STATUTORY BUILDING

Reflective of the high level of building activity currently being experienced on the Mornington Peninsula, Applications for Report and Consent to Build on Flood Prone Land and Siting Variations have maintained record levels for yet another month, with 180 applications received in August 2015 compared with 112 applications received in August 2014.

The Statutory Building Team attended two house fires and two incidents of vehicle impacts into buildings out of hours for the month, this is also above the average of two call outs per month.

Page 42: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

INFRASTRUCTURE STRATEGY

INFRASTRUCTURE PLANNING

Peninsula Transport Assist Inc.Peninsula Transport Assist (PTA) has recently vinyl wrapped its two new mini buses to proudly display its logo and show the support given by Bendigo Bank Mt Eliza Branch and the Brotherhood of St. Laurence. The graphic below shows how the buses will look, with photos being prepared as we speak.

The organisations’ two buses are already in demand with bookings currently at 46% of capacity so early on. Community groups, organisations, schools and social groups can book the buses which are available at $95 per day. Volunteer bus drivers are also available at an additional cost. Regular users receive a discounted rate. Bookings can be made via the website www.peninsulatransportassist.org or by phoning 03)9708 8241

TRAFFIC AND ROAD SAFETY

Mornington North PlacemakingDesign work has commenced for the proposed threshold treatments in Robertson Dve in Mornington. These treatments will be designed to complement the proposed area 40km/h speed limit by physically requiring vehicles to lower their speeds but also to visually advise motorists that they are entering a local area. Once designs have been drafted the Mornington North Community Group will be consulted regarding the proposal. Prior to construction affected residents will be notified.

Private Commercial CarparksCurrent issues that have arisen in private carparks that Council has a lease arrangement with are being brought into the working group for resolution. The working group representing various Shire departments including Asset Management, Traffic & Road Safety, Property Department, Infrastructure Maintenance, Shire Rangers, Insurance and Risk Coordinator are also compiling information on all private car parks that Council has some form of lease or involvement in addition to the 4 highest priority car parks that are presently being investigated;

KMart & Aldi car parks, Hastings Safeway car park, Waterloo Pl, Mornington Coles car park, Hastings Safeway car park, Mt Eliza

Bus Stop Works - Adshel SheltersThe Traffic and Road Safety Team have been working with representatives from PTV and AdShel over the past two months to manage the installation of new bus shelter infrastructure in suitable locations around the Shire. AdShel, under contract with Public Transport Victoria, has installed 12 new Adshel Shelters for the Peninsula. This includes upgrading 10 new shelters along Point Nepean Road in Rosebud as well as installing a new shelter in Mount Eliza and one in Mount Martha.

Page 43: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

VicRoads Municipal Liaison MeetingVicRoads Metropolitan South East Regional management group headed by the Regional Director, Aidan McGann met with the Shire Councillors, CEO and Shire Officers to liaise on current priorities provided by Councillors. The following are strategic issues and some of the highest priority concerns that were discussed with VicRoads;

Sustainable transport : cycling & pedestrian facilitieso Cycles lanes proposed for Marine Dve, Safety Beach.o Sealing shoulders along the Esplanade, Mornington and Frankston Flinders Rd

between Bittern and Balnarring.o Pedestrian improvements include 5 pedestrian refuge proposals along Point Nepean

Rd from Dromana to Sorrento;o Pedestrian operated signals in Mornington Tyabb Rd near Dunns Rdo Pedestrian facilities at Main St / Barkly St, Mornington.o Missing links of the Bay Trail from Moorooduc to Mornington; at Anthony’s Nose and at

Whitecliffs, Rye.o Western Port Bay trail from Baxter to Somerville.

Intersection safety & operational improvementso Shands Rd/ Mornington Flinders Rd proposed roundabouto Nepean Hwy/ Forest Dve proposed intersection safety improvementso Coolart Rd upgrade to safety and mobility standards.o Mornington Peninsula Freeway/ Jetty Rd intersection overpass and Pedestrian

Operated Signals proposalo Rye Commercial area, Point Nepean, Rd - Rye Smart Roads programo Baxter Tooradin Rd/ Golf Links Rd roundabout upgrade and upgrade of Golf links Rd.

Maintenance & renewal of arterial network

A more comprehensive list of concerns on the arterial network was provided to VicRoads management. VicRoads also advised that they recently have undertaken an organisational transformation and have a new “Care Dare Share” approach to the way they will be working.

ASSET MANAGEMENT

Road Information Database (RID)A Road Information Database (RID) is currently being developed by the Asset Management Team which will act as a front end database to the existing Shires Asset Management System (KMS).

When fully developed RID will enable the efficient review, update and integration of the Shire’s road asset data. It will also enable more accurate, streamlined and simplified statutory and internal road reporting. RID will facilitate the availability of comprehensive road information to the wider organisation through the Shire’s GIS. Overall, RID will result in improved productivity and provide more transparency in decision making.

Page 44: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

INFRASTRUCTURE MAINTENANCEThe benefits of strategic planning and prior focus on program development has been demonstrated in the month of August, with the delivery of several significant projects.

NATURAL SYSTEMS

Landcare NewsLandcare Facilitator, Dr Jacqueline Salter received a “Highly commended” award in the Australian Government Landcare Facilitator section of the 2015 Victorian Landcare Awards. Dr Salter is currently working with the Mornington Peninsula Landcare Network to develop a Green Army Round 4 application for a project entitled “Improving Habitat on the Mornington Peninsula”. This work will take place on private properties in the Somerville, Red Hill/Dromana and Moorooduc regions of the Peninsula for landholders who have been part of the “Linking the Mornington Peninsula Landscape” project.

Community PlantingOn Sunday 23rd August 2015 approximately 300 indigenous plants were installed at Ranelagh Beach Mount Eliza by a coordinated team including Green Army, the Shires Natural Systems Team, Ranelagh Club and members of Mount Eliza Association for Environmental Care (MEAFEC). The recently formed Earimil Estuary Friends Group will maintain and monitor the plantings and will prepare future plans to extend the restoration program South toward Earimil Lookout.

Coast Helmet OrchidIn August many of the Shire’s species of orchid are emerging from the ground or even flowering. In Weeroona Reserve, Tootgarook, the Coast Helmet Orchid, Corysanthes despectans is known to flower around 6-8th August every year and sure enough on the 7th August this tiny, tiny plant was found in flower. The Coast Helmet Orchid is listed under the Flora and Flora Guarantee Act and a state government conservation plan for the species is in draft. Fire management work and bushland weeding works in this reserve are designed to avoid damage to the orchid. Some of the individual plants have been caged to prevent browsing by rabbits or swamp rats.

CLEANSING

New Bin Surrounds for Crib Point, Robertson Road Mornington & Baxter Local Shops.Working in conjunction with the Shires Infrastructure Planning Coordinator, the SIMS2 Cleansing& Drainage team has installed new and improved bin surrounds to these 3 local shopping precincts. The improvement on the ground has made a positive difference to the aesthetics in these small shopping precincts. Footpath cleansing is about to commence as the final improvement in these areas.

BUILDINGS, FURNITURE & SIGNS AND PARKS & ROADSIDES

Shire Offices Hastings – Cyclic Flooring Renewal WorksThe Building Services team has been renewing the carpet at the Shire Offices in Hastings. The old flooring had potential trip hazards and varying colours and types of carpets installed over time. Approximately 1300m2 of flooring, equivalent to three basketball courts, was replaced in four stages through an operational working environment. With staff temporarily relocated, the empty offices also provided the opportunity to re paint the facility, including additional areas not included in the flooring works.

Mt Martha – Energy Efficient Street LightingThe Furniture and Signs team have replaced ten non-standard street lighting poles at the end of their life with standard street lighting with low energy lamps. The works to replace the defective non-standard street lighting were carried out in conjunction with United Energy. Hove Road, Mt Martha was identified as a priority location after an audit of street lighting across the Peninsula.

Page 45: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

As the poles have been replaced with standard lighting they will now be fully maintained by United Energy, reducing future maintenance and operating costs to the Shire.

Uncovering Cricket WicketsThe Parks and Roadsides active sports field team have been reusing the soil from the wickets to top dress sporting ovals. The compacted soil over the concrete wicket is loaded into a soil spreader and the soil is broadcast over the damaged areas of the oval. This helps improve the playing surface by re-topping the damaged and warn areas of the oval. An estimated 120m3 of soil will now be loaded and spread on ovals across the shire, recycling the soil, reducing the requirement for new material and reducing waste creation.

Noxious Weeds Control ProgamThe Parks and Roadsides Team have been treating roadside weeds throughout the Shire, with priorities identified through a system of rating the roadsides biodiversity value. At Harrisons Road, Dromana watsonia has been controlled and blackberry also targeted. If left un-managed these weeds would spread throughout the roadside and adjacent bushland reserve having a negative impact on indigenous flora populations as well as the habitat values of the local area utilised by indigenous fauna.

SAFER LOCAL ROADS

SafetyA ‘Near Miss Reporting Hotline’ was rolled out during August as part of a national Downer initiative. The intent of this reporting line is to make it simple and easy for our teams to report near misses they see in the field. The more near miss information captured, the safer we can make our work sites by analysing the information and implementing improvements.

QualityDowner completed 29 internal quality audits in August across a range of activities including pavement works, footpath works, line marking, gravel roads and drainage works. These identified a good standard of workmanship in many activities as well as identifying some areas requiring minor improvement. The latter included parts of the unsealed road network, where the rain over the previous 6 weeks has caused potholing that the team is now working hard to address.

Downer have successfully responded to a Shire audit of edge break repairs, using the audit findings as an opportunity to completely re-examine management of this activity. After months of hard work Downer have brought this item back in-line, and a recent Shire audit found all repairs met expectations, including many examples of excellent workmanship.

ProgramsThe winter period has seen an increase in the amount of road surface potholes and failures, and as a result our road patching program commenced in August. There has been a minimum of 2 crews working of potholes throughout the month. The 2015/16 Road Resealing/Rehabilitation Program is presently being developed, with finalisation expected in late September or early October. Once finalised the program will be communicated to all key stakeholders.

Page 46: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

INFRASTRUCTURE PROJECTS

Procurement Strategy – Provision of Professional Support ServicesThe Project Delivery unit is currently working on the establishment for the provision of professional support services in line with its program delivery approach to capital works.

This will see long term arrangements with a various service providers to assist the Project Delivery team delivery the capital works program. The proposed term of the contract is for 3 years.

The service delivery efficiencies and indirect benefits to the Shire are significant when compared to tendering those services for individual projects. The advantages of a long term arrangement with service providers are numerous:

One contract to administer Greater understanding of client needs Fewer meetings required with service provider and community groups Adaption of standard design templates to multiple sites Long term relationship based on trust and shared commitment Quality improvements through specifying the right materials and fittings Reduced maintenance costs Better programming of works Flexibility in the contract to cater for variables

Capital Works ProgramThe Infrastructure Project Management unit has made significant progress with the delivery of the 2015/16 capitals works program and a more detailed update of specific projects is described in the CAPITAL WORKS section of this report.

Page 47: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

RENEWABLE RESOURCES

ECO LIVING DISPLAY CENTRE

Eco Champions for the PeninsulaThe Eco Champions for the Peninsula program aims to foster leadership for sustainability among students and teachers in the Mornington Peninsula so that they can make significant contributions to the environmental outcomes of the region. The Shire is working with Tomorrow’s Leaders for Sustainability Inc. (TLfS) who are delivering the program. A number of local groups are also involved to maximise the environmental outcomes.

As part of the Eco Champions program, the Eco Champions Schools Forum was held at Woodleigh School on 5th August. The event was attended by 100 students and fourteen teachers from eleven schools across the Peninsula. One of the unique aspects of the training was the involvement of local community groups with the schools. The full day of activities included eleven local community groups showing how they can assist with environmental education projects within schools and showing how schools can be actively involved in their local conservation projects. Connections between community groups and schools forged as part of the Forum have already resulted in positive collaborations on environment projects.

Students from Boneo Primary School developing the model for their school project

The next component of the program is the Schools Challenge, whereby local schools develop an environmental project within their school over the next three months.

Schools Education Program On the 20th August, around twenty teachers from the Mornington Peninsula and Frankston Districts met at the Eco Living Display Centre as part of the Teachers Environment Network. Liz Hubbert, our schools education contractor, demonstrated our excursions program to all participants through hands on activities, to promote the program.

Great Green Activities planned for Spring A series of community engagement workshops have been organised and promoted for spring including four at the Eco Living Display Centre. Additional workshops will also be held at the Victorian Spring Flower and Garden Festival at the Mornington Racecourse.

Page 48: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

ENERGY MANAGEMENT

Energy and Greenhouse Management Improvement PlanVoltage Optimisation A voltage power optimisation (VPO) unit has been installed at the Rosebud Municipal Office. The unit works to regulate and control energy supplied to the building and in turn will reduce electricity consumption and bills, protect vital electrical infrastructure and prolong the life of electrical equipment. The electricity consumption will be reduced by an estimated 10.7%, equating to a reduction of 90 tonnes of greenhouse gas emissions annually.

Community Building Lighting Upgrade LED lighting upgrades have been completed in 18 Shire buildings including Peninsula Community Theatre, Rosebud Memorial Hall and Tyabb Community Hall to name a few. The project will see old fluorescent tube lighting, halogen downlights and inefficient floodlights replaced with LED equivalent products. It is expected that energy use across all of the facilities will be reduced by approximately 14,600 kWh per annum resulting in an abatement of approximately 46 tonnes of greenhouse emissions per annum.

WATER MANAGEMENT

Stormwater Pollution Trial - Mt Eliza and MorningtonMornington Peninsula Shire’s submission for the Stormwater Victoria Awards for Excellence has been short-listed as a finalist for the following three categories: Excellence in Policy or Education; Excellence in Research and Innovation; and Excellence in Strategic or Master Planning. Winners will be announced on the 3rd of September. The success of becoming a finalist shows significant leadership by the Shire and its’ project partners, in innovative approaches to improving the quality of our waterways on the Peninsula.

Education materials for food businesses are ready for printing and are on schedule to be delivered to businesses in early September.

WASTE MANAGEMENT

Dates have been set for two (2) important waste events to occur during November 2015.

No-Charge Green Waste Weekend 14th and 15th November 2015 at all Resource Recovery CentresThe “No Charge” Green Waste Weekend is to encourage Shire residents or ratepayers to reduce green waste around their homes. Green waste is to be delivered only from residential vehicles and trailers. No commercial vehicles or commercial green waste accepted.

Detox Your Home – Mobile Collection When: Saturday 28th November 2015 Time: 8.00am to 4.00pmWhere: Mornington site address provided upon registration

This free mobile collection service is to encourage residents to do the right thing by their loved ones, the local community and the environment and dispose of unwanted – and potentially dangerous – household chemicals through the safe, free and easy to use Detox your Home event.

Residents are to simply register online or over the phone, then turn up on the day with your unwanted items, and the trained Detox your Home team will do the rest. Register online now to choose your preferred time slot: sustainability.vic.gov.au/detoxyourhome

Page 49: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

BUILDINGS AND FACILITIES

The newly established Buildings and Facilities team is responsible for the strategic planning of all Shire buildings & facilities; the maintenance of all Shire buildings; the operations of Pelican Park Recreation Reserve, Somerville Recreation Reserve Centre, Crib Point Pool, Hastings Community Hub, Civic reserve Recreation Centre and Mt Martha Golf Course; and the operation of Foreshore Camping and the coordination of the community halls.

Facilities PlanningThe initial focus of the Facilities Planner, Mike Scully, is the review of the Pavilion Strategy. The Pavilion strategy is a $49m project focused on improving the standard of the sporting pavilions across the Shire. The review is to ensure the strategy is achieving its original intent, and to understand what opportunities may exist to enhance the delivery of these works.

The Facilities Planner will also be identifying the requirements for a broader facilities strategy, to ensure we have a coordinated approach to the development, operation and maintenance of our facilities.

Foreshore Camping and Community HallsThe foreshore camping team has amalgamated with the community halls team to ensure we optimise our service delivery and provide integrated service delivery. The transition has identified several opportunities to enhance the delivery of these services, and Heath Gillett and the team are working hard to implement these changes. An example is a promotion of the ‘pre-season’ camping package, this promotion has provided a positive increase in booking numbers. As we are coming up on the peak season for the foreshore camping, a lot of preparation is being undertaken to ensure we can continue to enhance the experience for both the campers and the community, including tidying up the site amenities.

Building MaintenanceThe building maintenance team, led by Greg Powell, has been focusing on ramping up the painting program as we come into the warmer months. Examples of current painting works include;

The team is currently closing out the painting works at Rosebud Senior Citizens with repairs to external components of the building being completed this month including fascia, spouting and downpipes prior to final painting;

Waterfall Gully Pre-school and MCHC are currently being painted and the team is working with the pre-school committee to accommodate the extension of the verandah. These works are being undertaken by an in-kind project by a local building company; and

Painting works are close to completion at the Mornington Bowls Club.

Other works underway by the buildings team include; Upgrade of the soak pits at Boneo Recreation Reserve Toilet block has been completed; Upgrade works are being finalised at RJ Rowley Reserve; Rekeying and minor maintenance works at Dromana Community House; Maintenance works at the Old Mornington Post Office; and Improvement works, including new epoxy flooring at the Watt Rd Animal Shelter.

Sports and LeisureThe Sports and Leisure team, led by Miranda Markovic, is responsible for the daily operations of the Shire’s Aquatic and Recreation facilities. The facilities are dynamic facilities, with large number of groups and individuals attending each day.

One of Western Ports and Pelican Park Recreation Centres largest events is the Tour de France Challenge ran with great success celebrating 10 years of fun and fitness. The three week challenge consisted of 21 classes with each class representing one stage of the real Tour De France, projected as the classes’ backdrop. With a record breaking 43 enrolments this year the

Page 50: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

team managed to fundraise just under $3,000 to the Cure De Cure cause. The fundraising proceeds are the participant’s way of honouring those we have loved and lost over the past ten years, as three years ago we lost one of our riders to cancer, Michael McGivern. Michael was a foundation member of Pelican Park and rode in our Tour De France Challenge from the beginning, even in the very midst of his illness, he rode as many classes as he could. Pelican Park attracts over 2,000 participants in programs like the Tour de France a month and we look forward to next year having all the team members back to share the experience.

Page 51: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

CAPITAL WORKS OVERVIEWBUILDINGS

Mount Martha Tennis PavilionWorks continue to progress on the Mount Martha Tennis Pavilion with the completion of the decking, roof flashing and wall cladding. The next few weeks will see the completion of completion of mechanical and electrical fit off, painting, installation of joinery and the commencement of the external covered viewing area.

The new building will include a new social room, multipurpose change rooms, toilet and shower facilities, office store room, kitchen/kiosk first aid room and internal/external public disabled toilet.The existing pavilion has been demolished and will be rebuilt as a stand-alone covered viewing area within the new development. Heritage Victoria supports the reuse of the existing pavilion as its form will be retained and clearly distinguished from the new building.

Works are anticipated to be completed in November 2015.

Image: External view of pavilion

Fruit Growers Reserve Sports Pavilion, SomervilleStage one building works at Fruitgrowers Pavilion is complete. The next few weeks will see the commencement of external landscaping and fencing. Stage two civil works and demolition of the old pavilion and toilet block will commence once power is available to the site.

The new facility is being upgraded to include unisex change and toilet facilities, umpires’ change room, store rooms, internal disabled toilet, external public toilets, first aid room, disabled access, new kitchen, social areas, new energy efficient lighting, heating, ventilation and cooling systems, insulation, water saving fixtures and water tanks for capture of roof water for toilet flushing.It is anticipated stage 2 of the works will be completed in October 2015

Page 52: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

Image: Internal view of multifunctional change rooms and kitchen servery

Council Reserve Toilets, TyabbWorks to construct a new toilet on the reserve at the corner of Frankston-Flinders Road and Mornington Tyabb Road, Tyabb, have reached practical completion. The toilet will be inspected in the coming weeks for compliance with building regulations before being opened for public use.

The new toilet consists of one unisex disabled and one ambulant toilet. The style and colour chosen will complement the surrounding buildings and heritage of the area.

Image: External view of Tyabb toilet

Hillview Reserve Toilet, DromanaBuilding works for the public toilet at Hillview Reserve has reached practical completion. The toilet will be inspected in the coming weeks for compliance before being opened for public use.

The next few weeks will see South East Water install their water meter and landscaping of the surrounds.

The new toilet consists of one unisex disabled and one ambulant toilet. Water and power services have also been extended to an existing sheltered BBQ on the reserve.

Image: External view of Hillview toilet

Somerville Community HouseArchitects Williams Kaye Hofer has been engaged to undertake a detailed assessment and design of refurbishment of the former Annie Sage Child Care Centre for use by Somerville Community House. While the building condition is tired, it is structurally sound and its significant size

Page 53: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

4

(approximately 350 square metres) would potentially accommodate a variety of municipal uses. The building is currently vacant.

Image: Former Annie Sage Child Care Centre

Mornington Youth Resource Centre, Wilsons Road MorningtonConstruction activities continue to progress at the Mornington Youth Resource Centre site next to the Peninsula Community Theatre in Wilsons Road, Mornington.

The former classroom buildings are being refurbished into a much-needed youth drop in centre and a second base for the Mornington Men’s Shed. The Youth Services team intend on commencing operations from the new facility during September.

Image: New Youth Centre under construction

OPEN SPACES & RESERVES

Mornington Tennis Club, Civic Reserve, MorningtonWorks have been completed on strengthening of tennis courts fences to enable fitting of wind protection screens at Civic Reserve, Mornington. This project will improve playing conditions and is a joint initiative between Mornington Tennis Club, contractor Lloyd Group and Mornington Peninsula Shire.

Page 54: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

Image: Tennis court wind protection works

Police Point Shire Park, PortseaContracts have been awarded for works to the value of $175k including visitor car park, Moonah walking trail, open space pathways and garden beds and visitor information shelter. Construction of the visitor car park is complete in preparation for permitter landscaping works.

Image: Police Point Shire Park visitor car park

Warringine Park Boardwalk Replacement, BitternReplacement works for the boardwalk destroyed by fire on 3 January 2015 are continuing. A total of 150 lineal metres has been reconstructed with 562 metres to be completed. The wet ground conditions are challenging, however good progress is being made.

Page 55: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

Image: Warringine Park boardwalk replacement

Crib Point Recreation Reserve Netball CourtsA meeting was held at Crib Point Recreation Reserve in the last week of August to discuss the progression of the Crib Point Netball Project. The meeting was attended by Club representatives, Cr Garnock, Shire officers and Neil Burgess MP. Options were presented by Shire officers for the location of two netball courts and the advantages and disadvantages were discussed. Option 2B in the north-east of the Reserve, as shown, was selected due to its ease of access, proximity to existing change rooms and space for spectators, benches and lighting.

The timeline of this project depends heavily on the allocation of Sport & Recreation Victoria grants. However, Shire officers will begin the detailed design immediately in preparation for any grants received.

Image: Location selected for netball courts at Crib Point Recreation Reserve.

Balnarring Recreation Reserve Master Plan ImplementationBalnarring Recreation Reserve Master Plan Implementation is a project for improving sporting facilities inside the reserve for sports club users. These works are part of the State Government Funding Program.

It is proposed to construct netball courts, cricket nets, proposed access road, drainage works and other associated works in Balnarring Recreation Reserve.

The works include the following key components not limited to: Construction of three new netball courts (fenced);

Page 56: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

Relocation and construction of four new cricket nets (to be moved and upgraded from current position to allow for netball courts);

Demolition of public toilets (new toilets will be included in pavilion upgrade); Formation of new car-parking area (to replace lost car-park spaces due to location of

netball courts; Upgrade to the roadway entrance to the reserve; Drainage Works; Tree removal / re-vegetation; and Other associated works.

The contract has been recently awarded and construction works are about to commence by late October. Because of present weather condition the civil construction works are getting delayed.

At this stage, trees removing and demolition of existing cricket nets have been completed.

Image: Balnarring Reserve – Trees removals works and Demolition of existing cricket nets

Gateway Park, MorningtonConstruction of Gateway Park in Mornington (corner of Barkley and Gordon Streets) is near completion. The civil contractor undertaking these works is Maw Civil Pty Ltd. Lighting installation works, concrete pavements, terrace seating, feature rock walls, installation of street furniture and landscape works have been completed. General reinstatement works are to follow. We are awaiting the provision of electrical supply to the new installed lighting, works to be undertaken by United Energy.

The construction works include: Exposed aggregate concrete pavements Terrace seating area Feature paving edge to delineate the existing path area from the park space Future sculpture area to be temporarily granitic sand infilled Raised timber decking and seating (provisional item) Street furniture Landscape planting Ambient Park Lighting

Page 57: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

Image: Completed construction works

It is anticipated construction works will be completed early September 2015.

ROADS, STREETSCAPES & FOOTPATHS

Currawong Community Centre car parkDetailed design of the Currawong Community Centre car park (60 spaces) has commenced. This car park will be designed on water sensitive urban design principles to improve the water quality and limit the rate of stormwater fun-off into the Tanti Creek catchment. The use of concrete kerbing is being limited in keeping with the heritage setting of the original Tanti farm buildings. It is anticipated construction works will commence in early 2016.

Image: Currawong Community Centre car park preliminary design

Loders Road - Reconstruction, MoorooducConstruction works continue to progress well completing almost 95% of the total works between Graydens Road and Peninsula Link, Moorooduc. All pavement rehabilitation including asphalting works and Installation of Safety Barriers hav been completed.

Page 58: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

There is a small portion of intersection work at Graydens Road and Loders Road has been hold at this stage because of the wet weather condition.

It is anticipated that the remaining construction works are to be completed by end of this year.

Image: Loders Road Guard Rail Installation Works

Wooralla Drive Shared User Path, Mt ElizaA shared path is to be constructed along Wooralla Drive from Emil Madsen Reserve to Mountain View Road, Mt Eliza. The proposed shared path will provide a safer passage for pedestrians.

The path will be constructed from brown exposed aggregate concrete, along with raised timber boardwalks at various sections, with a footbridge over Balcombe Creek and rail crossing over the Mornington Railway.

As part of these works, the proposed footbridge had to comply with Melbourne Water conditions. Being a single spanning structure, with abutments outside the banks of the waterway.

For the construction of the proposed shared path a flora and fauna assessment was undertaken to mitigate impacts on the Balcombe Creek site, and establish management practice during and following construction for erosion and weed control.

In establishing the alignment of the shared path, it was identified some vegetation removal would be required. A Biodiversity assessment was undertaken for the approval of the Planning Permit. A Planning Permit was granted on the 20th March 2015.

In constructing the shared path, a rail crossing will be required. An application to VicTrack has been made seeking approval to construct the rail crossing. Recently Risk Workshop (as part of the approval process) with Vic Track, Mornington Tourist Railway, Public Transport Victoria and Mornington Peninsula Shire has been completed regarding the risk associated with pedestrian crossing at railway line. From the Risk Workshop, it has been advised to hold the footpath construction until the footpath at railway crossing approval.Recently outside consultant has engaged to design the pedestrian crossing at railway line.So considering time for detailed design and approval process, footpath construction works including railway crossing are scheduled for October to December 2015.

Page 59: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

Image of Railway Crossing near Emil Madsen Reserve

Eastbourne Road Traffic Management Project, RosebudThis project is for traffic improvement between Boneo Road and Jetty Road and is being funded by the Federal Government through the National Black Spot Program.The objective of the works is to improve the functionality and safety for road users (both motorists and pedestrians).

Scope of the Works: Relocation of existing traffic lanes to include a continues centre of the road right turning

lane The inclusion of bicycle lane on one side and parking on other side. Installation of at least 8 pedestrian refuges. Few intersections treatment along the sections Line marking to identify the new traffic lanes

This project is in Preliminary Design Phase for consultation. Recently Preliminary Design Phase Road Safety Audit (RSA) has been completed. Review of Design as per RSA is taking place.

Laneway 1 – Steamship Walk – Main Street, MorningtonConstruction works have commenced for Laneway 1 ‘Steamship Walk’, situated between number 7 and 13 Main Street in Mornington.

Footpath levels have been set-out following removal of the existing pavement and adjoining property fences, in preparation for the installation of exposed aggregate pavement, feature bands of contrast pavement, internally and illuminated decorative bollards.

Construction works are anticipated to take place for a three week period and be completed by the 21st September.

Image: ‘Steamship Walk’ under Construction

Page 60: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

Norm Clark Walk, RosebudThe streetscape beautification works of Norm Clark Walk in Rosebud (located adjoining the NAB Bank between the Point Nepean Rd service road and Wannaueu Place) are now complete. The civil contractor who undertook these works is Maw Civil Pty Ltd. Installations of electrical laneway lighting, construction of new concrete pavements, feature paving bands, timber screening fence, streetscape seating elements, landscape planting and the installation of artistic mural has been completed.

The laneway provides for improved connectivity and functionality from the Point Nepean Road shopping strip to the Wannaueu Place commercial precinct.

The construction works include: New exposed aggregate concrete pavement with feature paving bands Establishment of new garden beds Advanced tree and landscape planting Laneway seating Installation of an artistic mural for the full length on the adjoining brick building Laneway lighting to improve safety of night users

Image: Completed Laneway Beautification Works

Mount Eliza Way – Road and Drainage UpgradePreliminary designs are underway for the future road and drainage upgrade of Mount Eliza Way from Redbourne Ave to the Wimbourne Ave / Kenaud Ave Roundabout (currently under construction) in Mount Eliza.

Early investigations have been completed including a geotechnical investigation of the existing road pavement, and service proving / depthing to confirm underground assets and verify utility alignments.

Funding for this project is provided by the Federal Government through the Roads to Recovery Program and Shire Local Integrated Drainage Strategy.

Mornington Pier Forecourt and Traffic Management Works.A contactor has been appointed (Maw Civil Pty Ltd) to commence construction of the Mornington Forecourt and Traffic Management works. The forecourt works will complement the newly refurbished Pier by Parks Victoria. The Traffic Management works will greatly improve the traffic flow for the Cars with Boat Trailers accessing the boat ramp whilst proving pedestrian safety.

Works including the following key functions:

Page 61: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

Improvements in pavement surface Pedestrian Crossings New Toilet Block Decking with seating Public and Specialised Lighting Interpretive Signage Improved Car and Boat Trailer Access

Having recently completed refurbishment works of the Pier, Parks Victoria are vacating the site to allow commencement of the Forecourt works in September. It is anticipated the works will be delivered prior to the summer peak period.

Image: Mornington Pier Forecourt, Mornington

Truemans Road Footpath, Tootgarook – Footpath ConstructionAs part of the Mornington Peninsula Shire Footpath Strategy, the Shire has developed detailed design plans for the construction of a footpath along Truemans Road, from Booran Parade to Alma Street, in Tootgarook.

Consultation has recently been completed with directly affected properties, and advertising is currently in place notifying of a planning permit request for vegetation removal.

Cultural hermitage management matters associated with the area are currently being assessed, with a consultant to be appointed in the coming weeks to assist with the investigation.

Pending permits / approvals, it is anticipated construction of the footpath will take place at the end of the calendar year / early next year.

Page 62: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

Image: Schematic Diagram – Truemans Road Footpath, Tootgarook

DRAINAGE

Mills Beach, Esplanade, Foreshore Upgrades, MorningtonA contract has been awarded A&V Creative Concrete Pty Ltd ($250k) for the upgrade of the existing Mills Beach car park & foreshore into a high quality public space. Stage 1 will upgrade the foreshore area surrounding the lifesaving club and will also provide a link from the existing car park to the facility.

The proposed upgrade works will include, but not limited to, the following: Exposed aggregate concrete pavements, Various coloured concrete pavement patterns, Outdoor seating, Blue stone retaining wall (match to existing wall), Boat ramps, Beach access pedestrian ramp, Re-vegetation areas.

Works are planned to be competed for Stage 1 by September.

DRAINAGE

Page 63: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

Cook Street Drainage Mitigation Works, MorningtonA contract has been awarded to Comar Construction Pty Ltd ($1.2M) for the construction of Cook Street drainage mitigation works. This will involve partial reconstruction of the stormwater network that services both commercial and residential areas of the Mornington Township. As a result of the mitigation works, Cook Street, Grange Road, Franklin Place, Gordon Street, Murray Street, Barkley Street, Pearson Street, Eastern Ring Road, Main Street, Tanti Avenue and The Esplanade should see significant drainage improvement.

The Cook Street Drainage Mitigation Works as part of the “Integrated Local Flood Management and Drainage Strategy”. The strategy has several key outcomes, to flood map the entire Peninsula, to implement a capital flood mitigation program as a result of the mapping and to develop planning overlays to protect future development.

Image – Construction works underway

OTHER PROJECTS

Jetty Road / McDowell Street, RosebudTenders are currently being evaluated for the installation of Traffic Signals at the intersection of Jetty Road and McDowell Streets Rosebud.

These works will provide safety improvements for all road users. The intersection has a significant crash history and is funded by Vic Roads – Black Spot Projects. These works will also provide added benefit by provision of signalised pedestrian crossings to be utilised by the adjoining Rosebud Primary School.

Anticipated construction period September to November 2015.

PUBLIC SAFETY INFRASTRUCTURECCTV ProjectsThe Mornington, Mt Eliza and Mount Martha CCTV projects are tracking well for the October deadline.

A major milestone in the life of the project was achieved in the past week with the official United Energy approvals successfully obtained by the Mornington Peninsula Shire.

The pre configuration is being completed currently on all the equipment for the CCTV system. The installation of the Mornington CCTV system will commence shortly. First, having all the equipment in the police station installed then the equipment throughout the Mornington shopping precinct. The Mornington

Page 64: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

6

project will finish by late October. Mt Martha will only take a week thereon after and Mt Eliza the following couple of weeks.

During the installation of Mornington and Mt Martha CCTV Project components, the telecommunication poles at Mt Eliza will be installed.

Page 65: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and
Page 66: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

Monthly Financial Report

August 2015

Page 67: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

Contents

Page

Key Financial Highlights and Overview 1

Operating Performance 3

Capital Works Performance 4

Priority Works Performance 5

Priority Projects Performance 6

Asset Conversion Program 7

Borrowings 7

Group Analysis 8

Chief Executive Officer’s Group 9

Corporate Services (including Communities) 10

Infrastructure and Planning 11

Financial Statements 12

Standard Income Statement 13

Balance Sheet 14

Cash Flow Statement 15

Corporate Performance Statement 16

Project Listings 17

Capital Works 18

Priority Works 20

Priority Projects 21

Page 68: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Key Financial Highlights and OverviewFor the period ended 31 August 2015

Month Year to Date

Forecast ActualVariance

Forecast Actual Fav/(Unfav)

$'000 $'000 $'000 $'000 $'000

Variance AdoptedFull YearAdjusted Variance

Fav/(Unfav) Budget Budget Fav/(Unfav)$'000 $'000 $'000 $'000

Operating Income 4,979 4,141 (838) 160,188 159,841 (347) 196,979 196,979 0Operating Expenditure (13,131) (12,857) 274 (25,864) (24,701) 1,163 (159,762) (160,125) (364)Funds Available (8,152) (8,715) (563) 134,324 135,140 816 37,217 36,853 (364)

Other Income/ExpenditurePriority Projects (Net) (226) (153) 73 (246) (136) 110 (2,482) (4,440) (1,957)Priority Works (Net) (201) (252) (50) (257) (265) (7) (4,271) (6,157) (1,886)Capital Expenditure (2,513) (2,475) 38 (2,899) (2,897) 3 (26,536) (44,013) (17,477)Capital Grants 0 45 45 0 217 217 1,100 3,111 2,011Capital Contributions 168 211 43 337 480 143 2,025 2,478 453Special Charge Schemes 0 0 0 0 (15) (15) 944 974 31Asset Sales 0 0 0 0 26 26 0 5,017 5,017Interest Income 87 47 (40) 174 125 (50) 1,045 1,045 0New Borrowings 0 0 0 0 0 0 0 0 0Debt Servicing Principal (104) (101) 3 (1,067) (1,064) 3 (7,425) (7,424) 1Interest Expense (45) (16) 29 (81) (53) 29 (1,609) (1,609) 0Lease Payments 0 0 0 0 0 0 0 0 0Transfers from reserves 0 0 0 0 0 0 0 0 0

Total Other Income/Expenditure (2,834) (2,694) 141 (4,040) (3,583) 457 (37,210) (51,017) (13,808)

Operating Result(10,987) (11,409) (423) 130,284 131,557 1,273 7 (14,164) (14,172)

Transfers from reserves 0 0 0 0 0 0 0 0 0

Cash surplus/(deficit) (10,987) (11,409) (423) 130,284 131,557 1,273 7 (14,164) (14,172)

The above table is an excerpt from the Corporate Performance Statement and shows a high level breakdown of Operational and other expenditure before attribution of internal charges. Income and Expense is categorised either operational or capital in nature.

Operating Funds available to fund other expenditure was unfavourable by $423k, which is mainly attributable to $818k less quarterly Victoria Grants Commission income received during August. This is a result of the early payment of funding in the 2014/15 financial year.

Operating expenditure has remained favourable overall for the month of August whilst redundancy payments were made for 9 staff as part of the Organisational realignment. This is reflected in the Income Statement for employee costs and has been offset by lower expenditure in various accounts, including hardware maintenance in IT and timing of payment of community grants and subsidies.

Project expenditure in Capital and Priority works and Priority Projects has a relatively small variance due to timing of project delivery. Unbudgeted Capital Grants and Contributions have been received for projects including further works on CCTV and sport ground lighting. It is important to note that this funding will be matched by required project expenditure. These variances will be reflected in Quarter 1 forecast review adjustments, with no bottom line changes expected.

In the July monthly report, carry over projects for Capital, Priority Works and Projects as well as Whole of Life (fully externally funded programs) were included for consideration by Council. The Adjusted Budget listed above in the full year columns reflects the original Adopted Budget plus the Carry Forward amounts adopted.

Page 69: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

They are:

Capital Works - $9.966m (net of Asset Sales and external income) Priority Works - $1.888m (net of external income) Priority Projects - $1.956m (net of external income) Whole Of Life Operating Programs - $364k (fully funded in prior years)

These projects are funded from the accumulated surplus.

Further explanations regarding financial performance are included in the rest of this report.

Page 70: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

3

Operating PerformanceFor the period ended 31 August 2015

Month Year to Date

Forecast ActualVariance

Forecast Actual Fav/(Unfav)

$'000 $'000 $'000 $'000 $'000

Variance AdoptedFull YearAdjusted Variance

Fav/(Unfav) Budget Budget Fav/(Unfav)$'000 $'000 $'000 $'000

Operating IncomeRates 0 14 14 149,063 149,593 530 149,063 149,063 0Grants and Subsidies 1,076 1,055 (21) 2,946 2,989 44 12,801 12,801 0User Charges 2,293 2,280 (13) 6,570 6,467 (103) 28,676 28,676 0Grants Commission 1,610 792 (818) 1,610 792 (818) 6,438 6,438 0Other Income 0 0 0 0 0 0 0 0 0

Total Operating Income 4,979 4,141 (838) 160,188 159,841 (347) 196,979 196,979 0

Operating ExpenditureChief Executive Officer's Group (725) (704) 21 (1,501) (1,363) 139 (8,299) (8,299) 0Corporate Services Group (4,606) (4,326) 280 (10,797) (9,979) 818 (60,043) (60,407) (364)Infrastructure and Planning Group (7,800) (7,827) (27) (13,566) (13,359) 207 (91,419) (91,419) 0

0

Total Operating Expenditure 13,131 12,857 274 25,864 24,701 1,163 159,762 160,125 (364)Funds available (8,152) (8,715) (563) 134,324 135,140 816 37,217 36,853 (364)

Source: Corporate Performance Statement

The above table illustrates the breakdown of income and expenditure from the Key Financial Highlights and Overview (previous page) and is designed to show the funds available from operating activities that are available for expenditure on Capital and Priority Works, Priority Projects and debt principal repayments. It differs from the Standard Income Statement in that it does not include capital grants, contributed assets, depreciation and user fees from Special Charge schemes as these are considered to be either non-recurrent (eg capital grants) or non- cash entries (eg. depreciation).

As stated earlier in the report, half of the estimated 2015/16 allocation of Victoria Grants Commission funding was received early in June 2015. This will reduce the forecast for 2015/16 income and will be reflected in the Quarter 1 Review. The difference in quarterly funds received as at the end of August is $818k.

Major variations in expenditure are in the Corporate Services Group and reflect the timing of payments of Community Grants and Subsidies, IT maintenance costs and lower employment costs in Aged and Disability Services as the level of demand is lower than budgeted.

During the month of August redundancy payments were made for 13 staff members, as a result of Organisational review. This has resulted in an unfavourable variance in Employee Costs of $584k for the month. Analysis will be performed in preparation for the Mid Year review to determine the forecast adjustments required.

Please note the full year variance above for the Adjusted Budget relates to programs in the Communities area, for which funding received has not yet been fully expended.

Detail on individual Group performances is included later in the Group Analysis section of this report.

Page 71: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

Month

ForecastActual

Year to DateVariance

Fav/(Unfav)$'000

ForecastActual

$'000 $'000 $'000 $'000

VarianceFav/(Unfav)

$'000

AdoptedBudget$'000

Full YearAdjusted Variance Budget Fav/(Unfav)

$'000 $'000

4

Capital Works PerformanceFor the period ended 31 August 2015

IncomeSpecial Charge Schemes 0 0 0 0 (15) (15) 944 974 31Capital Grants 0 45 45 0 217 217 1,100 3,111 2,011Contributions - Subdividers 168 211 43 337 480 144 2,025 2,025 0Contributions - Capital Works 0 (0) (0) 0 (1) (1) 0 453 453

Total Income 168 256 88 337 681 344 4,069 6,563 2,494

Capital ExpenditureLand 0 (1) (1) 0 (1) (1) (36) (188) (152)Buildings (824) (867) (43) (889) (939) (49) (4,845) (7,904) (3,059)Infrastructure - Roads (915) (990) (75) (999) (1,060) (62) (10,874) (20,502) (9,628)Infrastructure - Drainage (196) (92) 104 (288) (149) 139 (3,000) (3,399) (399)Infrastructure - Other (310) (287) 23 (314) (316) (3) (5,990) (9,277) (3,287)Plant (119) (107) 12 (150) (155) (5) (257) (850) (594)Furniture and Equipment 0 (8) (8) (1) (11) (9) (35) (35) 0Artworks 0 0 0 0 0 0 0 (15) (15)Library Bookstock (150) (123) 27 (258) (266) (8) (1,500) (1,843) (343)

Total Expenditure (2,513) (2,475) 38 (2,899) (2,897) 3 (26,536) (44,013) (17,477)

Net Total (2,345) (2,219) 126 (2,563) (2,216) 347 (22,467) (37,450) (14,983)

*Note – excludes internal income and expenditure (as per Corporate Performance Statement. The full year variance is due to carry forwards included in Adjusted Budget.

The Capital Works program (net result) is showing a favourable variation of $126k to budget for the month of August. This is due in part to:

Unbudgeted funding $45k received from Department of Health and Human Services - Community Facility Funding towards lighting of Soccer grounds;

Continuing increased Contributions from Subdividers of $43k (Recreation Open Space contributions);

Infrastructure Drainage – the program is favourable primarily due to the phasing of budget in Emergency Drainage $160k fav, with no year-end impact.

Infrastructure Roads is showing an unfavourable variance due to phasing of carry forward

Page 72: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

5

expenditure on the Mornington Activity Centre implementation which will be adjusted as part of the Quarter 1 review.

Page 73: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

MonthForecast Actual Variance

Fav/(Unfav)$'000$'000$'000

Full YearAdopted Adjusted Variance BudgetBudget Fav/(Unfav)$'000$'000$'000

6

Priority Works PerformanceFor the period ended 31 August 2015

Year to Date

Forecast Actual Variance

Fav/(Unfav)$'000 $'000 $'000

IncomeGrants & Subsidies Priority Works 0 3 3 0 65 65 0 26 26Contributions Priority Works 0 6 6 0 6 6 0 0 0

Total income 0 9 9 0 71 71 0 26 26

ExpensePriority Works expense (201) (260) (59) (257) (335) (78) (4,271) (6,182) (1,911)

Total Net Cost 201 252 (50) 257 265 (7) 4,271 6,157 (1,886)

*Note – excludes internal income and expenditure (as per Corporate Performance Statement)

Priority Works are similar in nature to Capital Works, however, they are not individually material in value or do not add to the capitalised value of an asset, or they may be a contribution to another entity’s assets. The full year variance is due to carry forwards included in Adjusted Budget.

The net unfavourable variance in Priority Works of $7k is primarily due to expenditure on the following projects:

Sustainable Energy Funding ($58k), which will be fully offset by a transfer from reserve funding held for such projects;

Mt Eliza Bowls Lighting ($22k) – funding was received in the previous financial year towards upgrade of lighting - installation of two new sports lights towers and lamps; and

Colchester Road Investigation ($18k) – this project will be offset from capital works funding in the first quarter review.

There is a complete listing of Priority Works included at the end of this report.

Page 74: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

Full YearAdopted Adjusted Variance BudgetBudget Fav/(Unfav)

$'000$'000$'000

Month Year to DateForecast Actual VarianceForecast Actual Fav/(Unfav)$'000$'000$'000$'000$'000

VarianceFav/(Unfav)

$'000

7

Priority Projects PerformanceFor the period ended 31 August 2015

IncomeGrants & Subsidies 0 15 15 0 38 38 0 44 44Contributions 5 0 (5) 10 0 (10) 60 60 0External Revenue 0 30 30 0 161 161 0 119 119

Total income 5 46 41 10 199 189 60 224 164

ExpensePriority Projects expense 231 198 33 256 336 (80) 2,542 4,663 (2,121)

Total net cost 226 153 73 246 136 110 2,482 4,440 (1,957)

*Note – excludes internal income and expenditure (as per Corporate Performance Statement)

Priority Projects are generally “one-off” or at least not recurring costs. Examples are strategy development or specific funded projects. The full year variance is due to carry forwards included in Adjusted Budget.

As at the end of August, there is a favourable result as compared primarily due to unbudgeted income received from Industry members who contribute to funding Mornington Peninsula Tourism activities. This income and corresponding matching expenditure were not advised in sufficient time to be included in the adopted budget. There was also an unbudgeted grant received for the Somerville Community Recreation Centre occasional care from the Department of Education.

The forecast is proposed to be adjusted in the Quarter 1 review.

The expenditure variance for the month is due to timing of expenditure on Tourism Projects, no change to budget expected.

A complete list of Priority Projects is included at the end of this report.

Page 75: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

8

Asset Conversion ProgramFor the period ended 31 August 2015

Property Type of Asset Status Date of SaleNet Sale Proceeds

$'000

525 The Esplanade Mt Martha- cnr road splay Road Complete 23.07.2015 16Toyota Prius XFG-572 Car Complete 21.07.2015 10

Total 26

Asset Sales for 2015/16 are listed above.

BorrowingsLoans

MaturingOpening Balance

01/08/2015$'000

Principal Paid

August 2015$'000

Closing Balance Budgeted Principal Budgeted Closing

Repayments Balance31/08/2015 2015-2016 30/06/2016

$'000 $'000 $'0000 - 5 Years 18,342 0 18,342 5,797 13,2205 - 10 Years 12,569 101 12,467 1,508 11,34810+ Years 2,493 0 2,493 153 2,340

33,403 101 33,302 7,458 26,908

Loans outstanding have been categorised according to their term to maturity as at the commencement of the financial year.

During the month of August, MPS paid $101k leaving an outstanding loan principal of$33.3m. This will further reduce by 30 June 2016 to $26.9m in line with Council’s commitment to reduce borrowings.

Page 76: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

9

Group AnalysisFor the period ending 31 August 2015

Page 77: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Full Year

AdoptedAdjustedVariance BudgetBudgetFav/(Unfav)$'000$'000$'000

Month

Unit Forecast Actual

$'000

VarianceFav/(Unfav)

$'000$'000

Total Income 44 48 5

133 137 4 1,433 1,433 0

Total Expenditure (725) (704) 21

(1,501)(1,363) 139 (8,299) (8,299) 0

Total Surplus/(Deficit) (757) (723) 34

(1,526)(1,377) 149 (7,817) (7,817) 0

Group Budget PerformanceFor the period ended 31 August 2015

Chief Executive Officer’s GroupYear to Date

Forecast ActualVariance

Fav/(Unfav)

$'000 $'000 $'000

IncomeEconomic Development & Tourism 27 19 (8) 91 82 (9) 282 282 0Governance 1 1 0 1 1 0 7 7 0Customer Service 17 29 12 41 53 13 1,144 1,144 0

ExpenditureChief Executive Office (33) (33) 0 (63) (59) 3 (381) (381) 0Economic Development & Tourism (154) (209) (56) (291) (307) (15) (1,786) (1,786) 0Governance (261) (219) 42 (586) (527) 59 (2,968) (2,968) 0Corporate Planning (41) (23) 18 (125) (91) 35 (539) (539) 0Customer Service (235) (219) 16 (436) (379) 57 (2,625) (2,625) 0

Internal Income 8 9 1 16 16 1 93 93 0Internal Expenditure (84) (77) 7 (174) (168) 6 (1,044) (1,044) 0

The above table shows a high level of breakdown of Operational income and expenditure per Unit. Internal income and expense charges are shown separately as a line item for the group. They represent recharges of internal services and overheads.

The favourable result for the Chief Executive Officer’s group is mainly due to underexpenditure in Governance on council memberships and photocopier expenses.

Page 78: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Corporate Services Group

The above table shows a high level of breakdown of Operational income and expenditure per Unit. Internal income and expense charges are shown separately as a line item for the group. They represent recharges of internal services and overheads.

The Corporate Services Group has a favourable variation to budget to date due to: Phasing of Community Grants and Subsidies payments - $166k favourable, these

will occur later in the year; Employment costs were $249k less than budgeted due to the level of demand for

services in Aged in Disability; and Increased Rate income received to date of $411k.

Please note the $364k variation for the Adjusted Budget as compared to the Adopted Budget is a reflection of the take up of external funding received from the State Government in previous years but expended in the current year by the Communities area.

These items include: Best Start - $77k; Supported Parent Group and Play - $73k; and School Focussed Program - $214k.

Page 79: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Month

UnitVariance Forecast Actual Fav/(Unfav)

$'000 $'000 $'000

Year to Date

Variance Forecast Actual Fav/(Unfav)

$'000 $'000 $'000

Full Year

Adopted AdjustedVariance BudgetBudgetFav/(Unfav)

$'000 $'000 $'000

Total Income 1,759 1,806 48

7,9748,057 84 20,207 20,207 0

Total Expenditure (7,800) (7,827) (27)

(13,566) (13,359) 207 (91,419) (91,419) 0

Total Surplus/(Deficit) (6,433) (6,348) 84

(6,454) (6,097) 357 (76,253) (76,253) 0

Infrastructure and Planning Group

IncomeStrategic Planning 3 3 0 35 39 3 63 63 0Statutory Planning 134 108 (26) 269 207 (61) 1,612 1,612 0Planning Compliance 9 9 1 11 26 14 182 182 0Building Compliance 51 83 31 139 169 30 653 653 0Infrastructure Strategy 0 1 1 0 2 2 1 1 0Infrastructure Maintenance 24 11 (13) 44 28 (16) 394 394 0Infrastructure Projects 48 39 (9) 96 74 (22) 578 578 0Renewable Resources 1,183 1,239 56 4,640 4,773 133 10,101 10,101 0Buildings and Facilities 306 314 7 2,739 2,739 0 6,625 6,625 0

ExpenditureChief Operating Officer (60) (67) (7) (114) (106) 8 (692) (692) 0Strategic Planning (145) (130) 16 (273) (254) 19 (1,690) (1,690) 0Statutory Planning (444) (399) 45 (850) (674) 176 (5,059) (5,059) 0Planning Compliance (67) (81) (13) (127) (129) (3) (754) (754) 0Building Compliance (56) (87) (31) (103) (126) (23) (613) (613) 0Infrastructure Strategy (202) (188) 13 (395) (352) 44 (2,024) (2,024) 0Infrastructure Maintenance (3,349) (3,398) (50) (6,486) (6,549) (63) (37,715) (37,715) 0Infrastructure Maintenance Archive 0 3 3 0 0 0 0 0 0Infrastructure Projects (143) (158) (15) (259) (238) 21 (1,537) (1,537) 0Renewable Resources (2,040) (1,759) 281 (2,211) (2,001) 210 (24,718) (24,718) 0Buildings and Facilities (1,295) (1,563) (268) (2,748) (2,930) (182) (16,616) (16,616) 0

Internal Income 863 945 81 1,717 1,745 28 11,983 11,983 0Internal Expenditure (1,255) (1,272) (18) (2,579) (2,540) 39 (17,024) (17,024) 0

The above table shows a high level of breakdown of Operational income and expenditure per Unit. Internal income and expense charges are shown separately as a line item for the group. They represent recharges of internal services and overheads.

The Infrastructure and Planning Group’s result for the month is favourable by $84k. The most siginificant item is the redundancies in the Recreation area which now report through Buildings and Facilities.

Other items of note include the Renewable Resources favourable result is due to lower contract expenditure across a number of accounts, including mulching and new bins.

Page 80: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Financial StatementsFor the period ending 31 August 2015

Page 81: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Standard Income StatementFor the period ended 31 August 2015

Month Year to DateVariance

Fav/(Unfav)$'000

AdoptedFull Year Adjusted Variance

Budget Budget Fav/(Unfav)$'000 $'000 $'000

Revenue from ordinary activitiesRates and Charges 0 14 14 149,063 149,577 515 150,006 150,037 31Statutory Fees and Fines 300 302 2 686 658 (28) 4,687 4,687 0User Fees 1,908 1,956 48 5,245 5,351 106 21,894 22,014 119Contributions 173 217 43 347 485 138 2,088 2,541 453Contributed Assets 0 44 44 0 44 44 6,500 6,500 0Grants - Recurrent 2,686 1,866 (820) 4,555 3,885 (671) 19,240 19,310 70Grants - Capital 0 45 45 0 217 217 1,100 3,111 2,011Interest 87 47 (40) 174 125 (50) 1,045 1,045 0Other Income 84 52 (33) 638 619 (19) 2,092 2,092 0

Total revenues 5,239 4,542 (697) 160,709 160,961 252 208,652 211,336 2,684

Expenditure from ordinary activitiesEmployee Costs 5,237 5,821 (584) 11,359 11,382 (23) 67,665 67,665 0Materials and Services 7,578 6,894 684 13,992 13,151 841 93,449 97,845 (4,396)Depreciation and Amortisation 2,336 2,307 29 4,672 4,615 57 28,041 28,041 0Finance Costs 45 16 29 81 53 29 1,609 1,609 0Other Expenses 474 325 148 752 564 187 5,186 5,186 0Asset Revaluations and Adjustments 0 0 0 0 37 (37) 0 0 0

Total expenditure 15,669 15,363 306 30,855 29,801 1,054 195,950 200,346 (4,396)

Net Gain/(Loss) on Sale/Disp Assets 0 (6) (6) 0 (6) (6) 0 0 0

Surplus/(deficit) for the year (10,430) (10,827) (397) 129,854 131,154 1,300 12,702 10,990 (1,712)

Other comprehensive incomeOtherTotal comprehensive income for the year (10,430) (10,827) (397) 129,854 131,154 1,300 12,702 10,990 (1,712)

*Commentary is included in the sections Key Financial Highlights and Overview and Group Analysis.

Forecast ActualVaria

Fav/(Unce

Forecast nfav)

Actual

$'000 $'000 $'000 $'000 $'000

Page 82: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Balance SheetFor the period ended 31 August 2015

*Commentary is included in the sections ‘Key Financial Highlights and Overview’ and ‘Group Analysis’.

Page 83: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Cash Flow StatementFor the period ended 31 August 2015

MonthForecast Actual Variance

Year to DateBudget Actual

Variance AdoptedFull Year Adjusted Variance

Fav/(Unfav) Fav/(Unfav) Budget Budget Fav/(Unfav)$'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000 $'000

Cash flows from operating activitiesRates and charges 10,349 10,348 (1) 10,677 11,192 515 149,063 149,094 31User charges and other 3,154 3,517 363 5,672 6,417 745 29,616 29,735 119Contributions - monetary 174 216 42 347 485 138 2,088 2,541 453Government grants 3,078 2,305 (773) 8,894 8,440 (454) 20,340 22,421 2,081Interest received 108 67 (41) 180 130 (50) 1,045 1,045 -Net GST refund / payment 300 300 - 1,769 1,769 - 8,300 8,300 -Employee costs (4,724) (5,345) (621) (11,945) (11,968) (23) (67,665) (67,665) -Materials and services (1,870) (1,159) 711 (13,148) (12,228) 920 (101,840) (106,236) (4,396)Other payments (467) (318) 149 (737) (542) 195 (5,095) (5,095) -Net movement in deposits and bonds 972 972 - 769 769 - - - -Net cash provided by/(used in) operating activities 11,074 10,903 (171) 2,478 4,464 1,986 35,852 34,140 (1,712)

Cash flows from investing activitiesPayments for property, infrastructure, plant and

equipment(6,260) (6,213)

Proceeds from sale of property, infrastructure,plant and equipment

3 3

Sundry payables 64 64Net cash provided by/ (used in) investing activities (6,193) (6,146)

Cash flows from financing activitiesFinance costs (86) (57) 29 (359) (330) 29 (1,609) (1,609) -Proceeds from borrowings - - - - - - - - - Repayment of borrowings (105) (102) 3 (1,067) (1,064) 3 (7,425) (7,425) - Repayment of finance leases - - - - - - - - - Net cash provided by/(used in) financing activities (191) (159) 32 (1,426) (1,394) 32 (9,034) (9,034) -

Net increase/(decrease) in cash & cash

equivalents 4,690 4,598 (92) (6,560) (4,514) 2,046 282 (13,890) (14,172)

Cash and cash equivalents at the beginning of the

financial year24,677 26,815 2,138 35,927 35,927 - 24,120 24,120 -

Cash and cash equivalents at the end of the

period 29,367 31,413 2,046 29,367 31,413 2,046 24,402 10,230 (14,172)

47 (7,725) (7,723) 2 (26,536) (44,013) (17,477)

- 3 29 26 - 5,017 5,017

- 110 110 - - - -47 (7,612) (7,584) 28 (26,536) (38,996) (12,460)

Page 84: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Corporate Performance StatementFor the period ended 31 August 2015

Month Year to Date

Forecast ActualVariance

Forecast Actual Fav/(Unfav)

$'000 $'000 $'000 $'000 $'000

Variance AdoptedFull YearAdjusted Variance

Fav/(Unfav) Budget Budget Fav/(Unfav)$'000 $'000 $'000 $'000

Operating IncomeRates 0 14 14 149,063 149,593 530 149,063 149,063 0Grants and Subsidies 1,076 1,055 (21) 2,946 2,989 44 12,801 12,801 0User Charges 2,293 2,280 (13) 6,570 6,467 (103) 28,676 28,676 0Grants Commission 1,610 792 (818) 1,610 792 (818) 6,438 6,438 0

Total Operating Income 4,979 4,141 (838) 160,188 159,841 (347) 196,979 196,979 0

Operating ExpenditureChief Executive Officer's Group (725) (704) 21 (1,501) (1,363) 139 (8,299) (8,299) 0Corporate Services Group (4,606) (4,238) 368 (10,797) (9,891) 906 (60,043) (60,407) (364)Infrastructure and Planning Group (7,800) (7,827) (27) (13,566) (13,359) 207 (91,419) (91,419) 0

Total Operating Expenditure 13,131 12,769 362 25,864 24,613 1,251 159,762 160,125 (364)

Funds available(8,152) (8,627) (475) 134,324 135,228 904 37,217 36,853 (364)

Other Income/ExpenditurePriority Projects (Net) (226) (153) 73 (246) (136) 110 (2,482) (4,440) (1,957)Priority Works (Net) (201) (252) (50) (257) (265) (7) (4,271) (6,157) (1,886)Capital Expenditure (2,513) (2,475) 38 (2,899) (2,897) 3 (26,536) (44,013) (17,477)Capital Grants 0 45 45 0 217 217 1,100 3,111 2,011Capital Contributions 168 211 43 337 480 143 2,025 2,478 453Special Charge Schemes 0 0 0 0 (15) (15) 944 974 31Asset Sales 0 0 0 0 26 26 0 5,017 5,017Interest Income 87 47 (40) 174 125 (50) 1,045 1,045 0Debt Servicing Principal (104) (101) 3 (1,067) (1,064) 3 (7,425) (7,424) 1Interest Expense (45) (16) 29 (81) (53) 29 (1,609) (1,609) 0

Total Other Income/Expenditure (2,834) (2,694) 141 (4,040) (3,583) 457 (37,210) (51,017) (13,808)

Operating Result(10,987) (11,321) (335) 130,284 131,645 1,361 7 (14,164) (14,172)

Result(10,987) (11,321) (335) 130,284 131,645 1,361 7 (14,164) (14,172)

Cash surplus/(deficit)(10,987) (11,321) (335) 130,284 131,645 1,361 7 (14,164) (14,172)

*Commentary is included in the sections ‘Key Financial Highlights and Overview’ and ‘Group Analysis’.

Page 85: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Project ListingsCapital Works Priority Works

Priority Projects

Page 86: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Project

MonthForecast Actual Variance

Fav/(Unfav$'000$'000$'000

Capital Works (Expenditure only)For the period ending August 2015

Year to DateForecast Actual

Variance

Fav/(Unfav$'000 $'000 $'000

17010. Plant & Equipment Replacement 119 107 12 150 147 3 233 236 468 (236)17012. Acquisition (splays, easements & sm 0 0 0 0 0 (0) 36 152 188 (152)17016. Oval Rehab - Drainage & Sprinklers 1 3 (2) 3 7 (3) 300 104 404 (104)17027. Implementation of Toilet Strategy 105 116 (11) 106 141 (35) 650 521 1,171 (521)17031. Provision of Library Books/Material 150 123 27 258 266 (8) 1,500 343 1,843 (343)17032. Acquisitions - M'ton Pen Reg Galler 0 0 0 0 0 0 0 15 15 (15)17038. Traffic Mgt Treatments 0 1 (1) 0 1 (1) 255 94 349 (94)17050. Rehab - Walkways/bike paths/footpat 50 40 10 50 40 10 1,245 126 1,371 (126)17053. Drainage Rehabilitation 97 29 68 189 29 160 550 0 550 017054. Drainage Upgrades 55 30 25 55 62 (7) 450 0 450 017062. Signage - Traffic/Parking Areas 10 8 2 10 8 2 20 167 187 (167)17063. Signage - General 7 7 (0) 7 7 (0) 135 0 135 017065. Rehab-Foreshore Fac/Boat Ramps/Jett 29 26 3 29 26 3 350 0 350 017082. Sale of Roads 0 1 (1) 0 1 (1) 0 0 0 017187. Fruitgrowers Reserve Machinery Shed 0 0 0 0 0 0 15 0 15 017260. Playground developments 8 5 3 8 5 3 500 59 559 (59)17263. Implementation of Recreation Master 31 34 (3) 31 34 (3) 845 1,298 2,143 (1,298)17272. Hall Improvements Asset Replacement 0 0 0 0 0 0 50 0 50 017273. Reserve Improvements/ Asset Replace 0 0 0 0 0 0 45 0 45 017313. Equestrian Strategy Implementation 12 7 5 12 14 (2) 0 163 163 (163)17362. Footpath Strategy - Impl 16 29 (13) 100 29 70 1,974 1,653 3,627 (1,653)17401. Building Renovations - Major Build 83 134 (51) 83 106 (23) 407 412 819 (412)17402. Recreation Building Imp 0 0 0 2 2 0 78 0 78 017444. Hastings Com Area Parking & TMT Imp 0 0 0 0 0 0 0 43 43 (43)17465. LT - Coastal Mgt/Master Plan Impl 0 0 (0) 0 0 (0) 1,685 0 1,685 017482. Safer Local Roads Program 0 0 0 0 0 0 4,000 0 4,000 017486. Southern Peninsula Aquatic Recreati 0 0 0 0 0 0 0 738 738 (738)17489. Rye Traffic Man Strategy Implementa 5 5 0 5 5 0 50 27 77 (27)17549. Bicycle Strategy 0 0 0 0 0 (0) 100 283 383 (283)17552. Blackspot Program (Council contribu 11 11 1 11 11 1 340 7 347 (7)17554. Skate & BMX Strategy 0 0 0 0 0 0 320 219 539 (219)17556. Soccer Strategy - Implementation 0 0 0 0 0 0 370 359 729 (359)17558. Kerb and Channel - Rehabilitation 0 0 0 0 0 0 500 0 500 017584. Activity Centre Structure Plan - Im 10 84 (74) 10 98 (88) 65 927 992 (927)17593. Integrated Flood Management and Dra 39 38 1 39 58 (19) 2,000 344 2,344 (344)17606. R2R 3 Tyabb Tooradin Rd - Bridge 0 1 (1) 0 1 (1) 0 0 0 017626. Foreshore Camping Areas - Amenity B 13 12 1 63 62 1 400 0 400 017630. Peninsula DriveSafe 0 0 0 0 0 0 0 15 15 (15)17657. M'ton Youth Hub-Former Sec/College 330 327 3 330 330 0 0 453 453 (453)17659. Urban Rd Contibutory Scheme Strateg 0 0 0 0 0 0 130 918 1,048 (918)17660. Pavillion Strategy Implementation 293 279 14 305 300 5 3,145 825 3,970 (825)17665. B/Spot Shands- Mton Flind Shoreham 0 0 (0) 0 2 (2) 0 0 0 017667. Sorrento Seawall 0 0 0 0 0 0 0 119 119 (119)17671. Sorrento Policemans Point Strategy 0 1 (1) 0 3 (3) 300 0 300 017672. Neighbourhood Activity Centre Struc 4 4 0 4 4 0 325 45 370 (45)17673. Sporting Facilities Lighting Progra 0 0 0 0 0 0 265 0 265 017674. Ticketing System Foreshore B/Ramp 0 0 0 0 0 0 0 9 9 (9)17675. Tennis Strategy 7 2 5 7 7 0 0 152 152 (152)17676. Netball Strategy 0 0 0 0 0 0 100 162 262 (162)17677. BSpot Melb Rd (Canterbury Jetty Rd) 96 99 (3) 96 100 (4) 0 100 100 (100)17678. BSpot Browns Rd/Boneo Rd-Flders Rd 0 0 0 0 0 0 0 27 27 (27)17679. BSpot Marine Pd/Western Port/Skinne 0 0 (0) 0 1 (1) 0 64 64 (64)17685. Disabled Parking 0 0 0 0 1 (1) 0 0 0 017692. Bentons Square Preschool Additions 0 0 0 0 0 0 0 15 15 (15)17695. RTR - Bungower Rd / Tyabb-Tooradin 307 299 8 307 313 (6) 0 1,115 1,115 (1,115)17696. Hastings Activity Centre Structure 4 3 1 4 3 0 400 66 466 (66)17697. Rosebud Activity Centre Structure P 125 121 4 127 132 (5) 250 218 468 (218)17699. Unmade Carpark Construction Strateg 0 1 (1) 0 2 (2) 350 9 359 (9)17701. Active Sports Strategy - Impl 5 0 5 5 4 1 0 79 79 (79)17706. Alfred Street Streetscape Works 12 12 (0) 12 12 (0) 0 19 19 (19)17708. BSpot Shands/Main Creek Roundabout 0 0 0 0 0 0 0 79 79 (79)17709. BSpot Jetty/McDowell Signals 3 2 1 3 2 1 0 276 276 (276)17710. BSpot Sandy Road Fingal 0 0 0 0 0 0 0 40 40 (40)17714. Mt Martha Life Saving Club 0 0 0 0 0 0 0 37 37 (37)17716. Mens Shed Mornington 0 0 0 0 0 0 0 60 60 (60)17718. Timber Structures Renewal 0 0 0 0 0 0 250 0 250 017720. Road/Bridges & Culvert Renewal 0 0 0 0 0 0 50 0 50 017721. Residential Dwellings 0 0 0 0 0 0 100 0 100 0

Full YearApprove Carry Adjusted Variance d Budget Forward Budget Fav/(Unfav

$'000 $'000 $'000 $'000

Page 87: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

1

Project

MonthForecast Actual

Variance

Fav/(Unfav$'000 $'000 $'000

Year to DateForecast Actual

Variance

Fav/(Unfav$'000 $'000 $'000

Full Year Approve Carry Adjusted d Budget Forward Budget

$'000 $'000 $'000

Variance Fav/(Unfav

$'00017722. Somerville Pedestrain Strategy 0 1 (1) 0 3 (3) 0 40 40 (40)17723. Furniture and Equipment Replacement 0 4 (4) 1 5 (4) 35 0 35 017724. Public Transport Facility Imp 0 0 0 0 0 0 20 0 20 017725. Guardrail Renewal Program 39 39 0 39 39 0 50 0 50 017727. Storm Water Quality Program 5 0 5 5 4 1 0 55 55 (55)17728. Mills Beach Master Plan Implementat 45 44 1 45 44 1 0 198 198 (198)17730. B/spot - Mt Eliza Way 15 7 8 15 22 (7) 0 689 689 (689)17731. B/spot - Graydens road/Boes 0 0 0 0 0 0 0 1,343 1,343 (1,343)17732. B/spot - Loders Road - Moorooduc 334 337 (3) 334 341 (7) 0 800 800 (800)17733. B/spot - Browns Road - Rosebud 5 0 5 5 2 3 0 358 358 (358)17734. B/spot - Eastbourne Road - Rosebud 0 1 (1) 0 3 (3) 0 247 247 (247)17738. Police Point Management Plan 34 28 6 34 35 (1) 0 147 147 (147)17742. Pedestrian Treatments 0 0 0 0 0 0 115 52 167 (52)17743. Land Acq - 13 Ninth Avenue, Rosebud 0 0 0 0 (1) 1 0 0 0 017744. R2R 4 Mt Eliza Way 0 10 (10) 0 10 (10) 1,000 0 1,000 017745. Board Walk Warringine Park 0 3 (3) 0 4 (4) 60 0 60 017747. R2R 4 Tasman Road 0 0 0 0 4 (4) 0 95 95 (95)17748. R2R 4 Browns Rd, Bone 0 0 0 0 0 0 100 0 100 017750. CCTV Projects Activity Grouping 0 0 0 0 4 (4) 24 263 287 (263)

Total 2,513 2,475 38 2,899 2,897 3 26,536 17,477 44,013 (17,477)

Page 88: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

Project

MonthForecast Actual

$'000

VarianceFav/(Unfav$'000$'000

Priority Works (Expenditure)For the period ending August 2015

Year to DateForecast Actual

Variance

Fav/(Unfav$'000 $'000 $'000

56001. Installation of New Fire Plugs. 0 6 (6) 0 6 (6) 0 0 0 056002. Resurfacing of Cricket Pitches. 0 0 0 0 0 0 20 0 20 056003. Developer Wks - Drainage Upgrades. 0 0 0 0 0 0 0 5 5 (5)56007. N/Ball Crt Resurf (Sport Club Fund) 2 1 0 6 6 0 25 0 25 056009. Conservation Works-MPRG. 0 0 (0) 0 0 (0) 28 0 28 056012. Building Demolition. 2 1 1 2 1 1 0 39 39 (39)56013. Street Lighting Improvements. 4 0 4 20 16 4 130 0 130 056015. Half Cost Fencing 2 2 0 5 5 0 20 0 20 056026. Sewerage Connection Council Buildin 0 0 0 0 0 0 30 0 30 056030. Implement Dog free & leash areas 0 0 0 0 0 0 30 15 45 (15)56039. Disabled Facilities Council Buildin 0 0 0 0 0 0 0 45 45 (45)56044. Dredging of Boatramp at Hastings 0 0 0 0 0 0 75 0 75 056064. Minor Streetscape Works- Commer Cnt 0 0 0 0 0 0 105 0 105 056067. Coastal Reserves Biodiversity Cons. 4 14 (10) 4 14 (10) 0 111 111 (111)56105. Tree Removal Program 0 0 0 0 0 0 50 0 50 056107. Building Renovations Misc. 11 11 0 11 11 0 270 43 313 (43)56109. Minor Traffic Improvements. 6 6 0 9 8 1 75 11 86 (11)56112. Risk Mgt Initiatives former Landfil 19 18 1 19 13 6 1,152 182 1,344 (192)56123. Sustainable Energy Funds Initiative 0 58 (58) 0 58 (58) 0 0 0 056146. Infrastructure Upgrades - Landfills 26 25 1 26 25 1 150 142 292 (142)56152. Parks & Reserves (Passive) Rehab Pr 0 0 0 0 0 0 0 3 3 (3)56171. IT Systems Upgrades and Development 0 0 0 1 1 0 470 91 561 (91)56226. Landfill Cell Capping Provision 0 0 0 0 0 0 200 0 200 056228. Corporate Water Conservation Progra 45 31 14 57 43 14 100 349 449 (349)56261. Telecommunications Tower Projects 0 7 (7) 0 9 (9) 0 0 0 056274. Net Gain-Bungower Rd/The Eyrei/Art 0 0 0 0 0 0 82 0 82 056275. Long Term Coastal Management Master 14 7 7 21 14 7 370 415 785 (415)56278. Investigation of catchments 27 21 6 37 30 6 550 18 568 (18)56281. Hall Works 0 0 (0) 0 0 (0) 0 0 0 056297. Somerville Township-Amentity Works 0 0 0 0 1 (1) 0 6 6 (6)56299. Tyabb Township - Amentity Wks 0 0 0 0 0 0 0 7 7 (7)58308. The Briars Fera Exlcusion Fence 0 0 0 0 0 0 0 12 12 (12)58315. Somerville Cenotaph 1 0 1 1 1 0 0 15 15 (15)58316. Police Point Conservation & Rec Pla 4 2 2 4 4 0 0 19 19 (19)58317. Marine Drive Safety Beach 8 0 8 8 0 8 0 288 276 (276)58324. Place Making - Minor Works 1 0 1 1 0 1 100 9 109 (9)58328. Somerville/Tyabb District Heritage 0 0 0 0 0 0 0 24 24 (24)58329. Boundary Fence Repair SIMS2 0 0 0 0 0 0 90 0 90 058332. Mt Eliza Bowls Club - Lighting 0 22 (22) 0 22 (22) 0 0 0 058333. Petanque Piste Red Hill Bowls 25 27 (2) 25 27 (2) 0 25 25 (25)58334. Ocean Beach Rd Sorrento- Sculpture 0 0 0 0 0 0 0 40 40 (40)58337. Sorrento Seawall 0 0 0 0 0 0 30 0 30 058338. Waste Management - Strategy Impleme 0 0 0 0 0 0 100 0 100 058339. Minor Park Furniture Works 0 0 0 0 0 0 20 0 20 058341. Colchester Road Investigation 0 0 0 0 18 (18) 0 0 0 0

Total Expenditure 201 260 (59) 257 335 (78) 4,271 1,913 6,182 (1,911)

Income 0 9 9 0 71 71 0 26 26 26Transfers from Reserves

Net Cost of Priority Works201 252 (50) 257 265 (7) 4,271 1,888 6,157 (1,886)

Full YearApprove Carry Adjusted Variance d Budget Forward Budget Fav/(Unfav

$'000 $'000 $'000 $'000

Page 89: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

Project

MonthForecastActual Variance

Fav/(Unfav$'000$'000$'000

Full YearApprovedBudget

$'000

CarryForward$'000

Approved VarianceForecast Fav/(Unfav

$'000 $'000

Priority Projects (Expenditure)For the period ending August 2015

Year to DateForecast Actual

Variance

Fav/(Unfav$'000 $'000 $'000

6482. Rosebud Activity Centre Struct Plan 0 0 0 0 0 0 0 32 32 (32)6483. Hasting Activity Centre Struct Plan 0 0 0 0 0 0 0 6 6 (6)6496. Business Development Plan for Morni 0 0 0 0 0 0 11 0 11 06581. Events 14 2 12 26 15 12 135 0 135 06672. Responsible Gaming Strategy 0 0 0 0 0 0 0 7 7 (7)6679. Rosebud Promotional Fund 0 0 0 0 0 0 0 13 13 (13)6680. Mt Eliza Promotional Fund 0 0 0 0 0 0 0 5 5 (5)6718. Green Wedge Action Plan 0 0 0 0 0 0 15 0 15 06736. Careers Expo 0 0 0 0 0 0 0 30 30 (30)6911. Somerville Community Needs Assessme 0 0 0 0 0 0 0 8 8 (8)6915. Men's Shed 2 0 2 6 4 2 35 5 41 (6)6923. Red Hill Character Assessment and D 0 0 0 0 0 0 41 0 41 06926. Parking Precinct Plans 0 0 0 0 0 0 37 0 37 06927. Port Phillip Urban Design Framework 0 0 0 0 0 0 0 35 35 (35)6930. Stream Watch/Water Watch Program 0 0 0 0 2 (2) 0 9 9 (9)6938. WOL Comty Arts-Metro Access Project 0 1 (1) 0 1 (1) 0 3 3 (3)8603. Local Housing and Settlement Strate 0 0 0 0 0 0 0 48 48 (48)8606. Character Assessment and Design Gui 0 0 0 0 0 0 0 47 47 (47)8641. Road Safety Program Shire Wide 0 1 (1) 0 1 (1) 0 0 0 08642. Sorrento Promotional Fund SCS 0 0 0 0 23 (23) 0 0 0 08646. Provision - Matching Grant Applicat 0 0 0 0 0 0 330 0 330 08649. Parking Precinct Plan Mornington To 0 0 0 0 0 0 0 20 20 (20)8654. Early Home Learning P'ship (PRC) 0 0 0 0 0 0 0 7 7 (7)8669. Spatial Employment Strategy 0 0 0 0 0 0 0 31 31 (31)8670. Mount Eliza Town Centre Plan 0 0 0 0 0 0 0 30 30 (30)8671. Somerville Town Centre Plan 0 0 0 0 0 0 0 2 2 (2)8674. Biodiversity Action Plan Modelling 0 0 0 0 0 0 0 47 47 (47)8675. Stony Point Coastal Management/Fram 0 0 0 0 0 0 10 0 10 08678. Township Design Guideline Brochures 0 0 0 0 0 0 15 0 15 08679. Heritage Review - Area 2 0 0 0 0 0 0 0 69 69 (69)8706. Land Management Overlay Implementat 0 0 0 0 0 0 15 0 15 08724. Public Recreation Space Strategy 0 0 0 0 0 0 60 0 60 08726. Dromana Activity Centre Structure P 0 7 (7) 0 7 (7) 0 39 39 (39)8731. Local Coastal Vulnerability Assessm 0 0 0 0 0 0 0 10 10 (10)8732. Climate Change Community Engagement 5 2 3 10 6 4 40 0 40 08755. Mornington S/Centre Promotional Sch 0 0 0 0 0 0 0 10 10 (10)8757. WOL Iron Bar Project 0 0 0 0 0 0 0 19 19 (19)8759. WOL Equipment Pilot 0 0 (0) 0 0 (0) 0 13 13 (13)8760. Visitor Information Ctre Staffing 0 0 0 0 0 0 60 0 60 08761. M/ton Peninsula Branded Produce 1 1 0 1 1 0 0 20 20 (20)8762. Police Point Houses 0 0 (0) 0 0 (0) 20 0 20 08764. Mobility Maps 0 0 0 0 1 (1) 0 8 8 (8)8768. Implementation Positive Ageing 0 1 (1) 0 5 (5) 0 0 0 08777. Arts & Culture Strat Project 8 0 8 8 0 8 33 0 33 08778. Literacy Villages Project 12 11 1 12 13 (1) 64 11 75 (11)8780. Local History Digitisation Project 0 2 (2) 0 6 (6) 53 7 60 (7)8782. Reconciliation Action Plan 0 0 0 0 0 (0) 0 7 7 (7)8783. Food Access Plan 0 0 (0) 0 0 (0) 18 0 18 08789. Biodiversity Action Plan 0 0 0 0 0 0 0 60 60 (60)8790. Music Bursary Program 6 2 5 6 2 4 25 0 25 08793. Land Subject to Inundations Overlay 0 0 0 0 0 0 15 0 15 08799. Ranelagh Conservation Man Plan Impl 0 0 0 0 0 0 18 0 18 08802. External Website 0 0 0 0 0 0 0 8 8 (8)8803. WOL FREEZA (D&A Free Entertainment) 8 7 1 8 7 1 0 38 38 (38)8805. Youth Services Replace Internet 0 0 0 0 0 0 0 7 7 (7)8809. MPS Business Tourism 0 1 (1) 0 5 (5) 0 92 92 (92)8811. WOL Universal Access Planning & Cha 0 0 0 0 0 0 0 9 9 (9)8829. WOL Local Landcare Facil Initiative 0 4 (4) 0 8 (8) 0 27 27 (27)8842. Olympic Park Master Plan 0 0 0 0 0 0 0 10 10 (10)8845. WOL History of Rosebud West 0 0 0 0 0 0 0 16 16 (16)8847. Peninsula Planning Statement 0 0 0 0 5 (5) 0 46 46 (46)8849. Tootgarook Wetland Management Plan 0 0 0 0 0 0 50 49 99 (49)8852. Coastal Geotechnical Risk Assessmen 0 0 0 0 0 0 0 37 37 (37)8863. Climate Adaption Plan Priorities 0 0 0 0 0 0 0 51 51 (51)8869. Indigenous Artefacts Assessment Pro 0 0 0 0 0 0 15 0 15 08871. Sus Communities Planning Framework 0 0 0 0 0 0 0 11 11 (11)8877. WOL Smalltalk Program 0 0 0 0 0 0 0 10 10 (10)8878. WOL Willum Warrain 10 5 5 10 10 0 0 51 51 (51)8881. Packaged Liquor Licences Research 0 0 0 0 0 0 0 5 5 (5)8882. Road Safety Initiative Research an 24 24 0 24 24 0 0 24 24 (24)8892. WOL Metro Access Inclusive Respite 0 0 0 0 0 0 0 2 2 (2)8893. WOL Equine Industry Study 0 0 0 0 1 (1) 0 1 1 (1)8894. WOL MP Food Industry Reference Grp 0 0 0 0 1 (1) 0 0 0 0

Page 90: 012345 km · Web viewmagazine. A new "What’s On" ¼ page ad was introduced in MP News and Mornington Leader twice per exhibition block, listing the current major exhibition and

2

Project

Month

Forecast Actual

$'000 $'000

Variance Fav/(Unfav

$'000

Year to DateForecast Actual

Variance

Fav/(Unfav$'000 $'000 $'000

Approved Budget$'000

Full YearCarry Approved

Forward Forecast$'000 $'000

Variance Fav/(Unfav

$'0008897. Climate Discussion Presentation 0 1 (1) 0 3 (3) 0 0 0 08899. WOL Schoolies Week Project 0 0 0 0 0 0 0 5 5 (5)8900. Oral History Preservation Project 0 0 0 0 0 0 18 0 18 08902. Tyabb Airfield Precinct Plan 0 0 0 0 0 0 0 30 30 (30)8906. Slope Stability Inclinometers 0 0 0 0 0 0 0 20 20 (20)8907. Management of Closed Landfills 0 0 0 0 0 0 0 54 54 (54)8909. Bay Trail Missing Links 0 0 0 0 0 0 50 23 73 (23)8911. Relief & Recovery Centre Plan 0 0 0 0 0 0 0 10 10 (10)8912. Mton Park Local Area Traffic Strate 0 0 0 0 0 0 50 16 66 (16)8913. Prevention of Violence Charter & AP 0 0 0 0 0 0 0 4 4 (4)8914. Place Planning 0 0 0 0 0 (0) 0 18 18 (18)8915. Let's Talk About Alcohol 0 0 0 0 0 0 0 4 4 (4)8917. Emergency Management Training 0 0 (0) 0 0 (0) 0 11 11 (11)8918. Community Playgroup Initiative 0 0 0 0 0 (0) 0 14 14 (14)8919. Southern Peninsula Arts Project 14 7 7 17 13 4 60 5 65 (5)8920. Access & Equity Policy Implementati 0 1 (1) 0 2 (2) 10 5 15 (5)8921. ANZAC Commemorative Naming Project 0 0 0 0 0 0 0 2 2 (2)8922. Baxter Township Plan 0 0 0 0 0 0 40 0 40 08923. Pt Nepean Rd Streetscape Design 0 0 0 0 0 0 105 0 105 08924. Heritage Review Blairgowrie-Sorrent 0 0 0 0 0 0 60 0 60 08925. Mt Martha Coastal Management Plan 0 0 0 0 0 0 30 0 30 08926. Hastings Foreshore Landscape M/Plan 0 0 0 0 0 0 40 0 40 08927. iCAN Geomedia Smart Client 0 0 0 0 0 0 70 0 70 08928. Dam Safety Investigation & Analysis 0 0 0 0 0 0 75 0 75 08929. Financial Analysis of Waste Portfol 0 0 0 0 0 0 50 0 50 08930. Waste - Litter Education Programs 0 0 0 0 0 0 12 0 12 08931. Implement Carbon Neutrality 0 0 0 0 0 0 200 0 200 08933. Climate Ready Website 0 0 0 0 0 0 20 0 20 08934. Peninsula Short Film Festival 0 0 0 0 0 0 25 0 25 08935. MPRG Redevelopment Plan 0 1 (1) 0 1 (1) 80 0 80 08936. Community Event Education 0 0 0 0 0 0 30 0 30 08937. Dev. of Event Precinct, Master Plan 0 0 0 0 0 0 60 0 60 08938. Aboriginal Cultural Heritage W/shps 0 0 0 0 0 0 5 0 5 08939. Shire Strategic Plan 2017-2020 0 0 0 0 0 0 55 0 55 08940. Corporate Performance Reporting F/W 0 0 0 0 0 0 20 0 20 08941. WOL - Septic Tank Maintenance 0 32 (32) 0 32 (32) 0 0 0 08950. WOL Tourism Brochure Development 0 0 0 0 0 0 0 85 85 (85)8951. WOL Tourism Public Relations 19 13 6 19 18 1 0 67 67 (67)8952. WOL Tourism Exhibitions & TS 12 12 0 12 12 0 0 38 38 (38)8954. WOL Tourism Design & Artwork 25 0 25 25 25 0 0 123 123 (123)8955. WOL Tourism Advertising 3 0 3 3 2 1 0 184 184 (184)8956. WOL MPT Industry 7 19 (12) 7 21 (14) 0 7 7 (7)8957. WOL Tourism Directional Signage App 0 0 0 0 0 0 0 16 16 (16)8958. WOL Tourism Brochure Freight & Dist 0 1 (1) 0 5 (5) 0 0 0 08960. Low Income Energy Efficiency Prgm 0 5 (5) 0 9 (9) 0 0 0 08964. WOL Smoking Bans 0 1 (1) 0 2 (2) 0 11 11 (11)8966. WOL EPA Research Dumping 0 0 0 0 0 0 0 18 18 (18)8967. Forshore Community Engagement Revie 0 0 0 0 0 0 0 23 23 (23)8969. Road Asset Improvement Project 9 6 3 9 9 0 65 0 65 08970. Sustainability Festival at Briars 0 0 0 0 0 0 20 0 20 08971. F/shore Srvc & All Abilities Access 0 0 0 0 0 0 0 40 40 (40)8972. Rye Foreshore Landscape Plan 21 21 0 21 21 0 0 29 29 (29)8975. Training for CTC Groups & Committee 0 0 0 0 0 0 0 10 10 (10)8977. Community Harms Prevention Strategy 0 0 0 0 0 0 25 11 36 (11)8978. Human Services Integrated Planning 0 0 0 0 0 0 0 10 10 (10)8979. Aboriginal Cultural Heritage Dating 0 0 0 0 0 0 0 10 10 (10)8981. Chisholm SMP Connect Contribution 0 0 0 0 0 0 25 0 25 08982. Agricultural Land Use Fact Sheets 9 6 3 9 9 0 0 17 17 (17)8983. Arts & Culture Strategy Facilitator 0 2 (2) 0 4 (4) 43 21 64 (21)8985. Intl. Festival of Tennis Tournament 0 0 0 0 0 0 0 7 7 (7)8987. Infrastructure Strategy OHS Plan 0 0 0 0 0 0 0 7 7 (7)8992. WOL - A Place to Call Home 0 0 0 0 0 0 0 20 20 (20)8993. Tjaegan Wilson-Blow Reconcil Award 0 0 0 0 0 0 0 2 2 (2)8995. Contribution - Boardwalk Point Leo 4 0 4 4 0 4 16 0 16 08996. Tennis Aust Pro Tour Contribution 5 0 5 5 0 5 20 0 20 08997. Tyabb Airfield Peninsula Aero Club 13 0 13 13 0 13 50 0 50 0

Total Expenditure 231 200 32 256 337 (81) 2,542 2,120 4,663 (2,121)

Income 5 46 41 10 199 189 60 164 224 164

Total Net Cost 226 153 73 246 136 110 2,482 1,956 4,440 (1,957)