01500 Contractor Temporary Facilities

Embed Size (px)

Citation preview

  • 7/30/2019 01500 Contractor Temporary Facilities

    1/10

    CERTIFIED

    _ _____ ___ __DATE: ________

    PROJECTENGINEER

    ________ ____DATE

    DISCIPLINEENGINEER

    __ ________ ___DATE: ______

    Saudi Aramco 2616-ENG (3/99)

    SAUDI ARAMCO OIL COMPANY

    15-Sep-07

    OPERATIONS

    ____ _________DATE:_________

    _

    REV.

    NO.

    DATEJO

    B/EWO

    DESCRIPTION

    ENGG

    CERT

    PMT

    OPERNS.

    SAUDI ARABIA

    PLANT NO.CONSTRUCTION SPECIFICATIONS

    CONSTRUCTIONAGENCY

    ____ ____ ______DATE:

    __

    COMMUNITY SUPPORT BUILDINGS

    Section 01500

    SHT.NO.

    1OF10

    INDEX REV. NO.DWG. TYPE DRAWING NO.

    J OB/EWO#

    RABIGH

    KAUST TOWN CENTER RESIDENTIAL &K55 A VE-417361

    BI-25-00002

    00

    DOC

    EDSD

    VERIFICATION

    CONTROLNUMBER

    By:

    Date:

    REVISION

    CERTIFICATION

    THISINDICATESTHATREV.

    NO.________

    OFTHISDRAWINGISCOVERED,

    FORALL

    APPROVAL/CERTIFICATIONREQUIREMENTS,,

    BYDRAWINGCOMPLETIONCERTIFICATE

    (DCC)NO.:__________________________

    SECTION 01500

    CONTRACTOR'S TEMPORARY FACILITIES

    SUBSECTION INDEX

    Part 1 - General

    1.01 Description1.02 General Requirements1.03 Related Sections1.04 Reference Standards1.05 Submittals

    Part 2 - Products

    2.01 Sanitary Facilities

    2.02 Toilets2.03 Drinking Water2.04 Project Sign2.05 Contractor's Field Office & Accommodations Facilities2.06 Saudi Aramcos Field Offices2.07 Fire and Safety Standards2.08 Health and Sanitation Standards2.09 Medical Facilities2.10 Temporary Electricity and Lighting2.11 Non-Electric Utilities

    Part 3 - Execution

    3.01 Operation3.02 Termination and Removal3.03 Project Identification and Temporary Signs3.04 Environmental Protection

    PART 1 - GENERAL

    1.01 Description

    A. This section specifies Contractors temporary services and accommodations,

    office and support facilities, including utilities, construction and support facilities.Provide facilities ready for use, maintain, expand and modify as needed. Removewhen no longer needed.

    1.02 General Requirements

  • 7/30/2019 01500 Contractor Temporary Facilities

    2/10

    CERTIFIED

    _ _____ ___ __DATE: ________

    PROJECTENGINEER

    ________ ____DATE

    DISCIPLINEENGINEER

    __ ________ _DATE: ________

    Saudi Aramco 2616-ENG (3/99)

    SAUDI ARAMCO OIL COMPANY

    15-Sep-07

    OPERATIONS

    ____ _________DATE:_________

    _

    REV.

    NO.

    DATEJO

    B/EWO

    DESCRIPTION

    ENGG

    CERT

    PMT

    OPERNS.

    SAUDI ARABIA

    PLANT NO.CONSTRUCTION SPECIFICATIONS

    CONSTRUCTIONAGENCY

    ____ ____ ______DATE:

    __

    COMMUNITY SUPPORT BUILDINGS

    Section 01500

    SHT.NO.

    2OF10

    INDEX REV. NO.DWG. TYPE DRAWING NO.

    J OB/EWO#

    RABIGH

    KAUST TOWN CENTER RESIDENTIAL &K55 A VE-417361

    BI-25-00002

    00

    DOC

    EDSD

    VERIFICATION

    CON

    TROLNUMBER

    By:

    Date:

    REVISION

    CERTIFICATION

    THISINDICATESTHATREV.

    NO.________

    OFTHISDRAWINGISCOVERED,

    FORALL

    APPROVAL/CERTIFICATIONREQUIREMENTS,,

    BYDRAWINGCOMPLETIONCERTIFICATE

    (DCC)NO.:__________________________

    A. Keep facilities clean and neat. Operate in a safe and efficient manner. Takenecessary fire prevention measures. Do not overload, or permit facilities tointerfere with progress. Do not allow hazardous, uncertainty conditions todevelop or persist on site.

    B. Inspection: Arrange for Saudi Aramco Representative to inspect and test each

    temporary utility before use. Obtain required approval and permits.

    C. Cost or use changes for Contractors temporary facilities are not chargeable toSaudi Aramco and will not be accepted as a basis of claim for a change order.

    1.03 Related Sections

    A. All applicable Sections in Division 1.

    B. Section 02110 - Clearing and Grubbing.

    C. Section 02200 - Earthwork.

    D. Section 02210 - Excavation, Trenching, Backfilling and Compacting.

    E. Section 02444 - Chain Link Fence and Gates.

    1.04 Reference Standards

    A. Saudi Aramco Engineering Standards & Procedure (SAES) (SAEP):

    1. SAES-A-104, Wastewater Treatment, Reuse and Disposal.

    2. SAES-B-017, Fire Water System Design.

    3. SAES-K-001, Heating, Ventilating and Air Conditioning (HVAC).

    4. SAES-K-100, Saudi Aramco Mechanical (HVAC) Code.

    5. SAES-L-105, Piping Material Specifications.

    6. SAES-M-006, Saudi Aramco Security and General Purpose Fencing.

    7. SAES-M-100, Saudi Aramco Building Code.

    8. SAES-S-007, Solid Waste Landfill Standard.

    9. SAES-S-010, Sanitary Sewers.

    10. SAES-S-040, Saudi Aramco Water Systems.

    11. SAES-S-060, Saudi Aramco Plumbing Code.

  • 7/30/2019 01500 Contractor Temporary Facilities

    3/10

    CERTIFIED

    _ _____ ___ __DATE: ________

    PROJECTENGINEER

    ________ ____DATE

    DISCIPLINEENGINEER

    __ ________ ___DATE: ______

    Saudi Aramco 2616-ENG (3/99)

    SAUDI ARAMCO OIL COMPANY

    15-Sep-07

    OPERATIONS

    ____ __________DATE:_________

    REV.

    NO.

    DATEJO

    B/EWO

    DESCRIPTION

    ENGG

    CERT

    PMT

    OPERNS.

    SAUDI ARABIA

    PLANT NO.CONSTRUCTION SPECIFICATIONS

    CONSTRUCTIONAGENCY

    ____ ____ ______DATE:

    __

    COMMUNITY SUPPORT BUILDINGS

    Section 01500

    SHT.NO.

    3OF10

    INDEX REV. NO.DWG. TYPE DRAWING NO.

    J OB/EWO#

    RABIGH

    KAUST TOWN CENTER RESIDENTIAL &K55 A VE-417361

    BI-25-00002

    00

    DOC

    EDSD

    VERIFICATION

    CON

    TROLNUMBER

    By:

    Date:

    REVISION

    CERTIFICATION

    THISINDICATESTHATREV.

    NO.________

    OFTHISDRAWINGISCOVERED,

    FORALL

    APPROVAL/CERTIFICATIONREQUIREMENTS,,

    BYDRAWINGCOMPLETIONCERTIFICATE

    (DCC)NO.:__________________________

    12. SAES-S-070, Installation of Utility Piping Systems.

    13. SAEP-327, Disposal of Wastewater from Cleaning,Flushing and Dewatering Pipelines and Vessels.

    B. Saudi Aramco Materials Systems Specifications (SAMSS):

    1. 12-SAMSS-021, Saudi Aramco Security and General Purpose Fencing(Galvanized).

    C. Saudi Aramco Construction Safety Manual.

    D. Standard Drawing AB-036899 - Standard Specification for Shoring Trenches.

    E. GI.0430.001, Waste Management.

    F. IBC, International Building Code 2003.

    G. IPC, International Plumbing Code.

    H. NFPA, National Fire Protection Association.

    I. NEC, National Electric Code.

    J . NEMA, National Electric Manufacturers Association.

    K. NESC, National Electric Safety Code.

    L. SACSM, Saudi Aramco Construction Safety Manual.

    M. SALPM, Saudi Aramco Loss Prevention Manual.

    N. Saudi Aramco Sanitary Code.

    1.05 Submittals

    A. Submit reports of tests, inspections and similar procedures performed ontemporary utilities. Submit a schedule showing implementation and termination ofeach temporary utility within 15 days of commencement of the work.

    PART 2 - PRODUCTS

    2.01 Sanitary Facilities

    A. Include temporary toilets, wash facilities and drinking water fixtures. Comply withthe regulations and health codes of Saudi Aramco Sanitary Code for type,number, location, operation and maintenance of fixtures. Provide toilet tissues,

  • 7/30/2019 01500 Contractor Temporary Facilities

    4/10

    CERTIFIED

    _ _____ ___ __DATE: ________

    PROJECTENGINEER

    ________ ____DATE

    DISCIPLINEENGINEER

    __ ________ _DATE: ________

    Saudi Aramco 2616-ENG (3/99)

    SAUDI ARAMCO OIL COMPANY

    15-Sep-07

    OPERATIONS

    ____ __________DATE:_________

    REV.

    NO.

    DATEJO

    B/EWO

    DESCRIPTION

    ENGG

    CERT

    PMT

    OPERNS.

    SAUDI ARABIA

    PLANT NO.CONSTRUCTION SPECIFICATIONS

    CONSTRUCTIONAGENCY

    ____ ____ ________DATE:

    COMMUNITY SUPPORT BUILDINGS

    Section 01500

    SHT.NO.

    4OF10

    INDEX REV. NO.DWG. TYPE DRAWING NO.

    J OB/EWO#

    RABIGH

    KAUST TOWN CENTER RESIDENTIAL &K55 A VE-417361

    BI-25-00002

    00

    DOC

    EDSD

    VERIFICATION

    CON

    TROLNUMBER

    By::

    Date

    REVISION

    CERTIFICATION

    THISINDICATESTHATREV.

    NO.________

    OFTHISDRAWINGISCOVERED,

    FORALL

    APPROVAL/CERTIFICATIONREQUIREMENTS,,

    BYDRAWINGCOMPLETIONCERTIFICATE

    (DCC)NO.:__________________________

    paper towels, paper cups and similar disposable materials for each facility.Provide covered waste containers for used materials.

    2.02 Toilets

    A. Install self contained toilet units of the chemical, aerated recirculation, or

    combustion type, properly vented and fully enclosed. Toilets shall be inaccordance with the applicable reference as listed in Section 1.04 ReferenceStandards.

    2.03 Drinking Water

    A. Provide containerized tap-dispensers bottled-water type drinking water units.

    2.04 Project Sign

    A. Construct, install and maintain project signs as specified in Section 01580.

    2.05 Contractor's Field Office & Accommodation Facilities

    A. The Contractor shall provide and maintain a temporary field office,accommodations and support facilities in a location designated by Saudi Aramcofor his own use during the period of construction at which readily accessiblecopies of all contract documents are available. The office shall be located whereit will not interfere with the progress of the work. In charge of this office there shallbe a competent superintendent of the Contractor. The office and allaccommodation facilities shall conform to the applicable Codes listed in Section1.04 Reference Standards.

    2.06 Saudi Aramcos Field Offices

    A. Scope

    Contractor shall provide and maintain during the construction phase, on landprovided by Saudi Aramco, adjacent to schools sites, office facilities includingcatering and all required support services and facilities for Saudi Aramcopersonnel and/or Saudi Aramco designated personnel to a level of qualitygenerally acceptable to the construction industry as determined by the SaudiAramco Representative. PMT Temporary Site Facilities shall be provided priorto commencement of construction until Project Completion andCommissioning. "Contractor Provided Site Facilities" refers to the PMT

    Temporary Site Facilities and any other facilities provided by or for Contractor's

    use at the WORK Site.

    B. PMT Temporary Site Facilities

    The PMT Temporary Site Facilities shall consist of:

    1. Office facilities at each of the schools site.

  • 7/30/2019 01500 Contractor Temporary Facilities

    5/10

    CERTIFIED

    _ _____ ___ __DATE: ________

    PROJECTENGINEER

    ________ ____DATE

    DISCIPLINEENGINEER

    __ ________ _DATE: ________

    Saudi Aramco 2616-ENG (3/99)

    SAUDI ARAMCO OIL COMPANY

    15-Sep-07

    OPERATIONS

    ____ __________DATE:_________

    REV.

    NO.

    DATEJO

    B/EWO

    DESCRIPTION

    ENGG

    CERT

    PMT

    OPERNS.

    SAUDI ARABIA

    PLANT NO.CONSTRUCTION SPECIFICATIONS

    CONSTRUCTIONAGENCY

    ____ ____ ______DATE:

    __

    COMMUNITY SUPPORT BUILDINGS

    Section 01500

    SHT.NO.

    5OF10

    INDEX REV. NO.DWG. TYPE DRAWING NO.

    J OB/EWO#

    RABIGH

    KAUST TOWN CENTER RESIDENTIAL &K55 A VE-417361

    BI-25-00002

    00

    DOC

    EDSD

    VERIFICATION

    CON

    TROLNUMBER

    By::

    Date

    REVISION

    CERTIFICATION

    THISINDICATESTHATREV.

    NO.________

    OFTHISDRAWINGISCOVERED,

    FORALL

    APPROVAL/CERTIFICATIONREQUIREMENTS,,

    BYDRAWINGCOMPLETIONCERTIFICATE

    (DCC)NO.:__________________________

    2. Shaded Parking Area.

    Once the Contractor Provided Site Facilities are no longer required under thisContract, and Saudi Aramco has so agreed in writing, Contractor shall removeall such Contractor Provided Site Facilities and restore the land to as-found

    condition, unless Saudi Aramco and Contractor have otherwise mutuallyagreed in writing.

    C. ServicesContractor shall provide the following services:

    1. Contractor shall furnish all offices toilets with the following toiletaccessories: warm air hand dryer, soap dispenser, toilet paper holder,toilet seat cover dispenser paper towel dispenser with waste receptacle,and framed mirror.

    2. Contractor shall furnish all offices with marker board, waste paperbasket, in/out trays and other standard desktop equipment.

    3. Contractor shall provide the kitchenette of Saudi Aramco offices withcold/hot bottled drinking water facility, refrigerator, coffee machine,microwave oven and kettle.

    4. Contractor shall supply complete office stationery to the Saudi Aramcooffices. Stationery shal be supplied, throughout the Contract duration,in sufficient amounts and quantities for the numbers of person required.

    This is to include, but not be limited to, paper for photocopiers (withpaper selection of A4/A3 and letter sizes), facsimiles and printers,

    writing pads, pens, pencils, in/out trays, staplers, tape, rubber bands,erasers, 2 and 3 hole punchers, files and folders and other accessoriesand supplies for the listed office equipment.

    5. Contractor shall be responsible for the completekitchenette furnishing and to provide two (2) office boys (SaudiNational) per office building for servicing and to include the supply ofrefreshment (assorted fruit juice, soft drinks, bottled mineral water, etc.),coffee,Arabic coffee, tea and suger with crockery, zaatar and cheesefatayer, cutlery and heating utensils and any other necessary tools fordrinking and food serving at all time and throughout the Contractduration, in sufficient amounts and quantities for Saudi Aramco required

    number of person.

    6. Contractor shall be responsible to supply completesanitary requirements for the toilet facilities and to be kept clean andprovided with all necessary toilet paper, towels, cleaning and detergentsagents, refreshing at all time.

  • 7/30/2019 01500 Contractor Temporary Facilities

    6/10

    CERTIFIED

    _ _____ ___ __DATE: ________

    PROJECTENGINEER

    ________ ____DATE

    DISCIPLINEENGINEER

    __ ________ _DATE: ________

    Saudi Aramco 2616-ENG (3/99)

    SAUDI ARAMCO OIL COMPANY

    15-Sep-07

    OPERATIONS

    ____ __________DATE:_________

    REV.

    NO.

    DATEJO

    B/EWO

    DESCRIPTION

    ENGG

    CERT

    PMT

    OPERNS.

    SAUDI ARABIA

    PLANT NO.CONSTRUCTION SPECIFICATIONS

    CONSTRUCTIONAGENCY

    ____ ____ ________DATE:

    COMMUNITY SUPPORT BUILDINGS

    Section 01500

    SHT.NO.

    6OF10

    INDEX REV. NO.DWG. TYPE DRAWING NO.

    J OB/EWO#

    RABIGH

    KAUST TOWN CENTER RESIDENTIAL &K55 A VE-417361

    BI-25-00002

    00

    DOC

    EDSD

    VERIFICATION

    CON

    TROLNUMBER

    By:te:

    Da

    REVISION

    CERTIFICATION

    THISINDICATESTHATREV.

    NO.________

    OFTHISDRAWINGISCOVERED,

    FORALL

    APPROVAL/CERTIFICATIONREQUIREMENTS,,

    BYDRAWINGCOMPLETIONCERTIFICATE

    (DCC)NO.:__________________________

    7. Contractor shall provide first aid facilities within theoffices, for the first line treatment of Saudi Aramco designatedpersonnel.

    D. Site Facilities Plan

    As part of the Project Execution Plan, Contractor shall prepare for SaudiAramco review and approval, a comprehensive site facilities plan which detailsall Contractor provided site facilities and the procedures to be used to maintainand administer them. This plan shall address, at a minimum, the following:

    Plot plans and building layouts Specific descriptions of furniture and equipment Proposed typical menus Water supply and handling Fire protection Security Medical care and evacuation plan Sanitation Refuse handling Solid waste land fill and construction debris site. (Prior approval is

    required by Saudi Aramco).

    Contractor will present this plan to Saudi Aramco within fourteen (14) days fromeffective date of the Contract to allow for Saudi Aramco review and forContractor to respond to any comments or recommendations that may bemade by Saudi Aramco.

    E. Standard

    1. Contractor Provided Site Facilities shall be built and operated consistentwith all Labor and Workmen's Laws in the Kingdom of Saudi Arabia andapplicable Saudi Aramco standards.

    2. The facilities shall also be in compliance with Saudi Aramco ContractorCamps Standards, Class I Camps, unless otherwise provided in thisAttachment.

    3. Contractor furnished building units shall be manufactured by ATCO,Atlantic, Red Sea, New Fab or equivalent, as approved by SaudiAramco Representative. Units shall be new and shall be suitable for usein the Central Province areas of Saudi Arabia. Units shall meet thefollowing minimum requirements:

    a. Welded steel skids or attached running gear.

    b. All wall framing mortise and tenon; glued and pinnedconstruction.

  • 7/30/2019 01500 Contractor Temporary Facilities

    7/10

    CERTIFIED

    _ _____ ___ __DATE: ________

    PROJECTENGINEER

    ________ ____DATE

    DISCIPLINEENGINEER

    __ ________ _DATE: ________

    Saudi Aramco 2616-ENG (3/99)

    SAUDI ARAMCO OIL COMPANY

    15-Sep-07

    OPERATIONS

    ____ __________DATE:_________

    REV.

    NO.

    DATEJO

    B/EWO

    DESCRIPTION

    ENGG

    CERT

    PMT

    OPERNS.

    SAUDI ARABIA

    PLANT NO.CONSTRUCTION SPECIFICATIONS

    CONSTRUCTIONAGENCY

    ____ ____ ________DATE:

    COMMUNITY SUPPORT BUILDINGS

    Section 01500

    SHT.NO.

    7OF10

    INDEX REV. NO.DWG. TYPE DRAWING NO.

    J OB/EWO#

    RABIGH

    KAUST TOWN CENTER RESIDENTIAL &K55 A VE-417361

    BI-25-00002

    00

    DOC

    EDSD

    VERIFICATION

    CON

    TROLNUMBER

    By:

    Date:

    REVISION

    CERTIFICATION

    THISINDICATESTHATREV.

    NO.________

    OFTHISDRAWINGISCOVERED,

    FORALL

    APPROVAL/CERTIFICATIONREQUIREMENTS,,

    BYDRAWINGCOMPLETIONCERTIFICATE

    (DCC)NO.:__________________________

    c. Aluminum bonded to plywood exterior walls.

    d. 4-inch wall thickness.

    e. Fully insulated.

    f. Aluminum roof covering.

    g. Vinyl linoleum floor covering for office facilities and carpet floorcovering for living accommodations.

    h. Paneled interior walls.

    i. Vinyl-covered ceilings.

    j. 7-foot wall height.

    k. Fiberglass sound attenuation blanket for all interior walls.

    l. Completely wired and plumbed with concealed wiring andplumbing.

    m. Built-in circuit breaker panel and exterior electrical connection.

    n. Ground fault interruption device.

    o. Air conditioning and heating with individual controls to maintain

    temperature between 70 and 75 F. The A/C shall be of thesplit type.

    Alternative types of structures meeting internationallyrecognized standards of quality, durability, safety, sanitation,and reliability maybe proposed by Contractor for considerationby Saudi Aramco. Proposals for alternative structures shallinclude manufacturer's name, address, phone and facsimilenumbers, and sufficient product information to enable SaudiAramco to evaluate the suitability of such structures. SaudiAramco may select to accept such alternative structures atSaudi Aramco sole option.

    F. Contractor shall provide electrical power, 110 volt, 60 HZ and 220 volts.

    60 HZ as needed, communications capabilities and systems for thePMT Temporary Site offices on a 24 hour per day, 7 days a week basis.

    G. Contractor shall provide furnished office space for each of the schoolsconstruction site to accommodate Saudi Aramco and/or Saudi Aramcodesignated personnel. The office space provided shall consist of one (1)

  • 7/30/2019 01500 Contractor Temporary Facilities

    8/10

    CERTIFIED

    _ _____ ___ __DATE: ________

    PROJECTENGINEER

    ________ ____DATE

    DISCIPLINEENGINEER

    __ ________ _DATE: ________

    Saudi Aramco 2616-ENG (3/99)

    SAUDI ARAMCO OIL COMPANY

    15-Sep-07

    OPERATIONS

    ____ __________DATE:_________

    REV.

    NO.

    DATEJO

    B/EWO

    DESCRIPTION

    ENGG

    CERT

    PMT

    OPERNS.

    SAUDI ARABIA

    PLANT NO.CONSTRUCTION SPECIFICATIONS

    CONSTRUCTIONAGENCY

    ____ ____ ________DATE:

    COMMUNITY SUPPORT BUILDINGS

    Section 01500

    SHT.NO.

    8OF10

    INDEX REV. NO.DWG. TYPE DRAWING NO.

    J OB/EWO#

    RABIGH

    KAUST TOWN CENTER RESIDENTIAL &K55 A VE-417361

    BI-25-00002

    00

    DOC

    EDSD

    VERIFICATION

    CON

    TROLNUMBER

    By:

    Date:

    REVISION

    CERTIFICATION

    THISINDICATESTHATREV.

    NO.________

    OFTHISDRAWINGISCOVERED,

    FORALL

    APPROVAL/CERTIFICATIONREQUIREMENTS,,

    BYDRAWINGCOMPLETIONCERTIFICATE

    (DCC)NO.:__________________________

    management office with an adjacent secretary room, with visitors sittingroom, six (6) single occupancy offices, conference rooms, and an openspace for clerks, copy machines, file cabinets, drawing racks, and otherstorage. The contractor shall provide eight (8) shaded parking spacesfor each office building. Office areas shall be adequately lighted andfreshly painted. Office' sizes, arrangements and furniture quality shall

    be to generally accepted international standards and suitable for theintended use as determined by the Saudi Aramco Representative. Alloffice areas shall be lockable and provided with adequate western andeastern restroom facilities, bottled drinking water (hot and cold) and acanteen. Each office shall be fully equipped with a desk, referencetable, telephone, one computer, one (1) swivel desk chair and two guestchairs. Open space shall be equipped with two (2) four drawer filecabinets and computer desk, waste basket and all office supplies.Visitors sitting room shall be equipped with sofas and tables.Conference rooms shall provide comfortable seating for a minimum oftwenty (20) persons at a conference table and shall be equipped withone (1) large dry marker board.

    1. Minimum specification of supplied furniture and equipment shall be asfollows:

    a. Conference table will be 120 cm x 500 cm.

    b. Desk will be 76 cm x 153 cm and supplied with trash basket.

    c. Secretary desk 76 cm x 153 cm with typewriter attachment desk.

    d. Reference table will be 76 x 153 cm.

    e. File cabinets will be lockable four drawer cabinets.

    f. Desk chair will be swivel, movable and padded.

    g. Voltage stabilizers and uninterruptible power supplies for allpersonal computers used by Saudi Aramco personnel inContractor provided office irrespective of who supplied or ownthe computer, Facsimile Machines and Photocopiers.

    2. Contractor shall provide computers and maintenance of computerfacilities in the provided Saudi Aramco temporary site office facilities forSaudi Aramco office facilities.

    3. Contractor shall provide the following computer equipment for use bySaudi Aramco and Saudi Aramco designated personnel per officebuilding.

    4. Eight (8) personal computers of the latest type available in the marketwith all features and 17 monitor

  • 7/30/2019 01500 Contractor Temporary Facilities

    9/10

    CERTIFIED

    _ _____ ___ __DATE: ________

    PROJECTENGINEER

    ________ ____DATE

    DISCIPLINEENGINEER

    __ ________ ___DATE: ______

    Saudi Aramco 2616-ENG (3/99)

    SAUDI ARAMCO OIL COMPANY

    15-Sep-07

    OPERATIONS

    ____ _________DATE:_________

    _

    REV.

    NO.

    DATEJO

    B/EWO

    DESCRIPTION

    ENGG

    CERT

    PMT

    OPERNS.

    SAUDI ARABIA

    PLANT NO.CONSTRUCTION SPECIFICATIONS

    CONSTRUCTIOAGENCY

    ____ ____ ______DATE:

    N

    __

    COMMUNITY SUPPORT BUILDINGS

    Section 01500

    SHT.NO.

    9OF10

    INDEX REV. NO.DWG. TYPE DRAWING NO.

    J OB/EWO#

    RABIGH

    KAUST TOWN CENTER RESIDENTIAL &K55 A VE-417361

    BI-25-00002

    00

    DOC

    EDSD

    VERIFICATION

    CON

    TROLNUMBER

    By:

    Date:

    REVISION

    CERTIFICATION

    THISINDICATESTHATREV.

    NO.________

    OFTHISDRAWINGISCOVERED,

    FORALL

    APPROVAL/CERTIFICATIONREQUIREMENTS,,

    BYDRAWINGCOMPLETIONCERTIFICATE

    (DCC)NO.:__________________________

    5. Six (6) Laser Printer that shall be Dell Laser Printer 3000 CN PersonalColor Network Capable Printers, complete with power supply.

    6. Two (2) Laser Printer that shall be Dell Laser 5100 Color NetworkPrinter with duplexer, complete with power supply.

    7. One (1) Facsimile Machine shall be RICOH 2050L, equivalent or better,supplied with all consumable materials and maintenance. The facsimilemachine shall be located in a lockable room.

    8. One (1) Photocopier shall be RICOH high capacity Copier withautomatic document feed and multiple copy sorter, equivalent, or better,supplied with all paper, consumable material and maintenance.

    9. One (1) PC connected Scanner that shall be Visioneer 9650 USBScanner, ADF, 12 PPM, 600 x 1200 DPI, or equivalent, complete withpower supply and operating software.

    10. Contractor shall supply, install and maintain throughout the Contractduration the identified computer system requirements with DELL laserprinter, facsimile machine and photocopier, supplies and accessories toinclude, but not be limited to, duplex printing papers, toner kits as perthe quantities provided below at the Saudi Aramco office facilities only.

    2.07 Fire and Safety Standards

    A. Fire-fighting equipment shall be in accordance with SAES-B-017. Providepressurized 2-1/2 U.S. gallon water extinguishers for ordinary combustibles. Afixed fire protection shall be provided for kitchen hood.

    B. Fire Detection: Provide fire alarm system according to IBC 907.2.10.3.

    2.08 Health and Sanitation Standards

    A. Refer to Schedule "D" of the Contract Schedules for requirements pertaining tohousing facilities, dining and food handling facilities, and waste management.

    2.09 Medical Facilities

    A. Refer to Schedule "D" of the Contract Schedules.

    2.10 Temporary Electricity, Lighting and Communications

    A. The Contractor shall provide, supply, install and maintain service required forpower, lighting and communications.

    B. Provide adequate artificial lighting for all areas of work when natural light is notadequate for work and for areas accessible to the public.

  • 7/30/2019 01500 Contractor Temporary Facilities

    10/10

    CERTIFIED

    _ _____ ___ __DATE: ________

    PROJECTENGINEER

    ________ ____DATE

    DISCIPLINEENGINEER

    __ ________ ___DATE: ______

    Saudi Aramco 2616-ENG (3/99)

    SAUDI ARAMCO OIL COMPANY

    15 Sep 07

    OPERATIONS

    ____ __________DATE:_________

    REV.

    NO.

    DATEJO

    B/EWO

    DESCRIPTION

    ENGG

    CERT

    PMT

    OPERNS.

    SAUDI ARABIA

    PLANT NO.CONSTRUCTION SPECIFICATIONS

    CONSTRUCTIOAGENCY

    ____ ____ ______DATE:

    N

    __

    COMMUNITY SUPPORT BUILDINGS

    Section 01500

    SHT.NO.

    10OF10

    INDEX REV. NO.DWG. TYPE DRAWING NO.

    J OB/EWO#

    RABIGH

    KAUST TOWN CENTER RESIDENTIAL &K55 A VE-417361

    BI-25-00002

    00

    DOC

    EDSD

    VERIFICATION

    CON

    TROLNUMBER

    By:

    Date:

    REVISION

    CERTIFICATION

    THISINDICATESTHATREV.

    NO.________

    OFTHISDRAWINGISCOVERED,

    FORALL

    APPROVAL/CERTIFICATIONREQUIREMENTS,,

    BYDRAWINGCOMPLETIONCERTIFICATE

    (DCC)NO.:__________________________

    C. Lighting and power of the Contractor Camp, accommodation and SaudiAramco offices shall conform to the applicable Standards listed in Section 1.04Reference Standards and all Saudi Aramco Standards under P index.

    2.11 Non-Electric Utilities

    A. All non-electric utilities supply, installation, testing, flushing anddisinfection shall be the responsibility of the Contractor and shall be inaccordance with the applicable references listed in Section 1.04 ReferenceStandards.

    PART 3 - EXECUTION

    3.01 Operation

    A. Enforce strict discipline in use of temporary facilities. Limit availability to intended

    use to minimize abuse. Maintain facilities in good operating condition untilremoval.

    3.02 Termination and Removal

    A. Coordinate with Saudi Aramco to remove each temporary facility when the needhas ended. Temporary facilities are the property of the Contractor.

    3.03 Project Identification and Temporary Signs

    A. Prepare project identification signs as specified in section 01580 and install whereindicated. Prepare signs to provide directional information to construction

    personnel and visitors. The signs shall be erected in locations as directed bySaudi Aramco Representative.

    3.04 Environmental Protection

    A. Operate temporary facilities and conduct construction by methods that complywith environmental regulations to minimize the possibility that air and subsoilmight be contaminated or polluted.

    - END OF SECTION -