contents
ATYRAU REFINERY / kazakhstaN ---------------------------- p. 06AwA pAloUkoU platFoRm / coNgo ------------------------ p. 07bAkU Tbilisi ceYhAn pIpElINE / azERbaIjaN aNd gEoRgIa -- p. 08chileAn lng / chIlE ----------------------------------------- p. 09 chinARevskoYe FIEld / kazakhstaN ---------------------- p. 10coRinTh REFINERY / gREEcE --------------------------------- p. 11djeno powER gENERatIoN plaNt / coNgo ---------------- p. 12fpso osx2 / bRazIl ------------------------------------------ p. 13hAnnibAl soUR gas / tUNIsIa ------------------------------- p. 14kiTinA And zAp platFoRms / coNgo ---------------------- p. 15lAggAn ToRMoRe / NoRth sEa (Uk) ------------------------ p. 16MopUsToR YMe / NoRwaY ----------------------------------- p. 17nizhnekAMsk REFINERY / RUssIa --------------------------- p. 18sATAh FUll FIEld / UaE -------------------------------------- p. 19ToUT lUi fAUT REFINERY / sURINamE ----------------------- p. 20UTbs / algERIa ------------------------------------------------ p. 22
iTAlY - MAin pRojecTs oNshoRE | oFFshoRE ------------ p. 23
golden eAgle / NoRth sEa (Uk) ---------------------------- p. 28jAsMine dEvElopmENt / NoRth sEa (Uk) ------------------ p. 30kARAchAgAnAk / kazakhstaN ----------------------------- p. 34kAshAgAn / kazakhstaN ------------------------------------ p. 38ogd iii / UaE --------------------------------------------------- p. 48QAfco 5-6 / QataR ------------------------------------------- p. 50Tengiz / kazakhstaN ---------------------------------------- p. 54
clienTs And TesTiMoniAl -------------------------- addENdUm
main projects
top projects
+ inFo
“the projeCts we work on are in-variably Complex, often sited in re-mote areas with extreme ClimatiC Conditions, and are CritiCal to the suCCess of the businesses involved. our mission is to implement these projeCts by delivering state-of-the-art produCts and solutions, enCompassing everything from en-gineering all the way to Commis-sioning, and to work with our Cli-ents throughout the whole proCess. always bearing in mind that our objeCtive is to enable them to reaCh their objeCtives.”
elisabetta CerveglieriviCe president
mai
npr
ojeC
ts
alph
abet
ical
or
der
a-z05
saIpEm was awaRdEd thE coNtRact FoR thE ENgINEERINg, pRocUREmENt, coNstRUctIoN aNd IN-
stallatIoN oF a platFoRm aNd assocIatEd pIpElINEs FoR thE dEvElopmENt oF thE awa paloU-
koU FIEld, locatEd oFF thE coast oF thE REpUblIc oF coNgo IN 2,730 FEEt (832 m) oF watER.
thIs Is thE sEcoNd dEEpEst watER dEpth FIxEd platFoRm pRojEct IN thE woRld.
Epc coNtRactoR: sAipeM / ENd UsER: eni congo
thE atYRaU REFINERY Is thE oldEst pEtRolEUm REFININg plaNt IN kazakhstaN, bUIlt moRE thaN 60 YEaRs ago.
thE REcoNstRUctIoN oF thE REFINERY staRtEd IN maRch 2003, as paRt oF thE tURNkEY coNtRact, whIch was
woN to jgc coRpoRatIoN as maIN coNtRactoR, IN coopERatIoN wIth maRUbENI coRpoRatIoN. thE scopE oF
thE pRojEct was to pRodUcE oIl pRodUcts that FUlFIll modERN staNdaRds aNd EcologIcal REQUIREmENts.
thE total pRocEssINg capacItY oF thE REFINERY Is oF 4.3 mIllIoN toNs oF oIl pER YEaR.
Epc coNtRactoR: jgc coRpoRATion / ENd UsER: kAzMUnAigAs
solUTions deliveRed
skema was awarded a contract for
the supply of:
medium voltage switchgear >
(11 columns)
power motor control centers >
(28 columns, 147 drawers)
RtU (4 columns) >
Integrated protection and >
control system
a dual redundant local control Unit
(lcU) based on redundant plcs, is in-
stalled in the Normal Electrical Room.
this lcU is connected, via a redun-
dant modbus on multimode fiber op-
tic, to a Remote control Unit (RcU)
installed in the Emergency Electri-
cal Room. the lcU communicates,
via redundant Ethernet network on
multimode fiber optic, with an Indus-
trial pc installed in the main Electri-
cal Room.
solUTions deliveRed
working closely with its Uralsk-based
partner in kazakhstan, skema was re-
sponsible for the provision of the pmcc
switchboards for the atyrau Refinery.
the project proved to be a success
thanks both to the experience ac-
quired by skema in the kazakh market
since 1998, which it was able to
leverage fully, and to the important
technology transfer program es-
tablished with its kazakh partner.
the commissioning was carried out
by local electrical engineers, un-
der the supervision of skema’s site
services manager.
skema’s supply included:
power centers (32 columns) >
motor control centers >
(57 columns, 371 drawers)
AwA pAloUkoU plATfoRM / coNgo
ATYRAU RefineRY / kazakhstaN
kAzAkhsTAn
congo
caspian sea
Uzbekistan
kyrgyzstan
gabon
angola
democratic Republic of the congo
06 07
a
atyr
au
awa
palo
ukou
a
thE chIlEaN lNg pRojEct coNsIsts oF a NEw gRass-Roots lNg REcEIvINg tERmINal locatEd at QUINtERo baY, ap-
pRoxImatElY 160 km NoRthwEst oF saNtIago, chIlE. lNg caRRIER shIps UNload at a NEw jEttY bUIlt at QUINtERo,
INto two stoRagE taNks. pRocEss FacIlItIEs aRE INstallEd to ENablE thE lNg to bE pUmpEd FRom thE stoRagE
taNks, vapoRIzEd aNd ExpoRtEd INto thE ExIstINg tRaNsmIssIoN sYstEm vIa a NEw pIpElINE. thE tERmINal Is ExpEct-
Ed to mEEt 40% oF chIlEaN gas dEmaNd, wIth aN ovERall aNNUal sUpplY capacItY oF 2.5 mIllIoN toNNEs oF lNg.
epc contractor: cb&i / end user: gnl QUinTeRo / a jv between: british gas, endesa chile, enap, metrogas
solUTions deliveRed
skema’s provision included 380v
switchgear, interface panels and pow-
er transformers:
10 power motor control centers >
(47 columns and 205 drawers)
5 Interface panels >
4 power transformers >
For this supply, skema’s pmccs were
successfully tested for seismic load
for the following values:
peak horizontal >
ground acceleration: 0.83 g
peak vertical >
ground acceleration: 0.59 g
seismic design code: >
ascE 7/Ibc 2000
the strength of the structures was
tested for:
Resistance and stability for indi- >
vidual modules and for the vari-
ous configurations
ground anchors >
links between modules (bolts) >
Internal links to modules (rivets) >
solUTions deliveRed
Engineering, manufacturing, testing
and commissioning of pmcc type lv
switchgear and bus ducts.
skema supplied switchgear for pump
stations ps-g2 and ps-g1 and for the
intermediate pigging Ip-a1.
skema’s supply included:
power motor control centers >
(137 columns, 436 drawers)
3 dc panels >
bus ducts >
thE bakU-tbIlIsI-cEYhaN pIpElINE tRaNspoRts cRUdE 1,760 km (1,094 mIlEs) FRom thE azERI-chIRag-gUNEsh-
lI oIl FIEld IN thE caspIaN sEa to thE mEdItERRaNEaN sEa. It passEs thRoUgh bakU, thE capItal oF azERba-
IjaN; tbIlIsI, thE capItal oF gEoRgIa; aNd cEYhaN, a poRt oN thE soUth-EastERN mEdItERRaNEaN coast oF
tURkEY, hENcE Its NamE. It Is thE sEcoNd loNgEst oIl pIpElINE IN thE woRld aNd oNE oF thE bIggEst ENgI-
NEERINg pRojEcts.
epc contractor: peTRofAc / end user: bRiTish peTRoleUM
“All in all the Skema service was very satisfactory.”
Contracts Administrator
chileAn lng / chIlEbAkU Tbilisi ceYhAn pipeline / azERbaIjaN aNd gEoRgIa
chileargentina
south pacific ocean
paraguay
Uruguay
geoRgiA
AzeRbAijAn
caspian seablack sea
turkey
IranIraq
syria
08 09
B C
baku
tbi
lisi
cey
han
chil
ean
lng
kAzAkhsTAn
gReece
caspian seaUzbekistan
kyrgyzstan
turkey
bulgaria
Romania
albania
black sea
solUTions deliveRed
skema’s supply included the design,
manufacturing, testing and supply
of medium voltage switchboards
and Intelligent power motor control
centers, including:
6 kv mv switchboards >
(31 sections)
Intelligent motor control centers >
(69 columns, 279 drawers)
power centers (24 columns) >
capacitors panels >
10
C
chinARevskoYefield / kazakhstaNchINaREvskoYE FIEld, appRoxImatElY 324 sQUaRE kIlomEtERs IN sIzE, Is sItUatEd closE to thE cItY oF URalsk
IN wEst kazakhstaN aNd Is oNlY 60 km FRom thE boRdER wIth thE RUssIaN FEdERatIoN. thE FIEld coNsIsts
oF aN oIl pRocEssINg FacIlItY capablE oF pRocEssINg 400,000 tpa oF cRUdE oIl, mUltIplE oIl gathERINg aNd
tRaNspoRtatIoN lINEs, a gas powEREd ElEctRIcItY gENERatIoN sYstEm, majoR waREhoUsE FacIlItIEs FoR thE
stoRagE oF oIl, matERIals, machINERY aNd chEmIcals UsEd IN cRUdE oIl pRodUctIoN, aN EmploYEE FIEld camp
FoR 180 pEoplE as wEll as 14 ExIstINg wElls aNd 4 ExploRatIoN wElls UNdER dRIllINg aNd tEst opERatIoNs.
epc contractor: exTeRRAn/belleli eneRgY / end user: zhAikhMUnAi llp
coRinTh RefineRY / gREEcE
thE coRINth REFINERY wIth Its aNcIllaRY plaNts aNd oFFsItE FacIlItIEs Is coNsIdEREd as oNE oF thE
most modERN REFINERIEs IN EURopE. dUE to Its FlExIbIlItY It caN pRocEss cRUdE oIls oF vaRIoUs chaR-
actERIstIcs aNd pRodUcE a FUll RaNgE oF pEtRolEUm pRodUcts, complYINg wIth thE most stRINgENt
INtERNatIoNal spEcIFIcatIoNs, sERvINg majoR pEtRolEUm maRkEtINg compaNIEs IN gREEcE aNd abRoad.
thE REFINERY pRodUctIoN opERatIoNs aRE locatEd IN agII thEodoRI, IN thE pRovINcE oF coRINth, aboUt
70 km oUtsIdE athENs.
epc contractor: Technip / end user: MoToR oil hellAs
solUTions deliveRed
skema was awarded the contract for
the design, engineering, manufactur-
ing and installation of low voltage
switchgear for the new crude distilla-
tion Unit complex of the refinery.
skema provided for the project:
power motor control centers >
(53 columns, 188 drawers)
distribution panels >
bus ducts >
power Factor correction system >
11
C
chin
arev
skoy
e
cori
nth
campos basIN Is a pEtRolEUm RIch aREa locatEd oFFshoRE oF RIo dE jaNEIRo. It has a total aREa oF 100,000
sQUaRE kIlomEtERs. thE Fpso osx2 wIll bE UsEd IN thE campos basIN, bRazIl, oN oNE oF a stRINg oF hEavY
oIlFIElds dIscovEREd bY ogx. thE osx2 wIll bE ablE to pRodUcE Up to 100,000 baRREls pER daY oF oIl, wIth
stoRagE capacItY FoR 1.3 mIllIoN baRREls.
epc contractor: sbM offshoRe / end user: osx-gRUpo ebx
solUTions deliveRed
skema was awarded the contract for
the design, manufacturing, inspection
and testing of power motor control
centers, as detailed below:
4 power centers >
(14 columns)
1 motor control center >
(66 columns, 275 drawers)
the switchgear supplied by skema,
that feature a rated current of 5000 a
and rated short-time withstand current
of 100 ka, comply with the most strin-
gent requirements of the offshore ma-
rine applications: compact dimensions
for limited space, handles on the front
of the switchgear to prevent person-
nel’s injuries in case of sudden move-
ments, anti-vibration basement against
marine solicitations. skema used the
bender system, to monitor the electrical
network and to reveal defect and prob-
lems on the network that can compro-
mise the functioning of the switchgear.
solUTions deliveRed
skema was responsible for the de-
sign, manufacturing, supply, inspec-
tion, testing, export packing, super-
vision of commissioning on site of
low voltage switchgear and Intelli-
gent motor control centers.
skema supply included:
power centers (7 columns) >
motor control centers >
(12 columns, 19 drawers)
auxiliary services switchboards >
thE thERmoElEctRIc powER plaNt IN djENo, NEaR poINt NoIR IN coNgo, has a 25 mEgawatt powER capacItY.
thE powER plaNt Is FIREd wIth assocIatEd gas FRom thE oFFshoRE plaNts oF kItINa, djambala aNd FoUkaN-
da, locatEd 65 km FRom thE coast aNd pRodUcINg a total oF 26,000 baRREls oF oIl pER daY. gas Is sEpa-
RatEd oNshoRE at thE djENo tERmINal closE to thE NEw powER plaNt. thE pRojEct REpREsENts thE FIRst
ExamplE oF UsE aNd ExploItatIoN oF assocIatEd gas othERwIsE FlaREd. thE pRojEct aIms at REdUcINg gas
FlaRINg aNd at UsINg It IN powER gENERatIoN wIth sIgNIFIcaNt socIal, EcoNomIc aNd ENvIRoNmENtal bENEFIts.
epc contractor: Renco / end user: eni congo
fpso osx2 / bRazIl
djeno poweR geneRATion plAnT / coNgo
congo
bRAzil
gabon
angola
bolivia
paraguay
surinameguyana
democratic Republic of the congo
French guiana
D f
12
djen
o
Fpso
osx
2
13
solUTions deliveRed
skema was awarded the contract for
the detailed design, supply and instal-
lation of a prefabricated metal local
Equipment Room (lER) fully assem-
bled, wired and tested in skema’s fac-
tory in cesano maderno, for installa-
tion on site. the lER is composed of:
> weather-tight enclosure and
supporting structure
Electrical equipment room >
Instrumentation equipment room >
small power distribution within >
the building
hvac systems >
pa/ga loudspeaker system facilities >
Fire & gas detection >
co >2 flood system
pabx telephone system facilities >
Normal lighting system, includ- >
ing external door lighting
Escape lighting system on emer- >
gency exits and routes
cable trays/racks >
Earthing system >
portable fire extinguishers >
thE haNNIbal soUR gas plaNt locatEd 20 kIlomEtERs soUth oF sFax pRocEssEs thE hYdRocaR-
boNs bRoUght oNshoRE FRom thE mIskaR gas FIEld, locatEd 125 kIlomEtERs oFFshoRE IN thE
gUlF oF gabEs, tUNIsIa. thIs FIEld Is 100% opERatEd bY bg tUNIsIa. soUR gas FRom tEN wElls Is sENt
thRoUgh a pIpElINE aNd pRocEssEd at thE haNNIbal plaNt aNd sUpplIEd to thE socIété tUNIsI-
ENNE dE l’ElEctRIcIté Et dU gaz (stEg), tUNIsIa’s statE ElEctRIcItY aNd gas compaNY. dURINg Its lIFE-
tImE, It Is EstImatEd that thE mIskaR FIEld wIll pRodUcE moRE thaN 700 bIllIoN cUbIc FEEt oF gas.
epc contractor: woRleYpARsons / end user: bg TUnisiA
skEma paRtIcIpatEd IN thE REvampINg oF thE pmcc swItchgEaR FoR thE kItINa aNd zap platFoRms, oFF-
shoRE IN coNgo, aRoUNd 50 km FRom poINt NoIRE. thE pREvIoUs swItchgEaR was sUpplIEd bY NUo-
va Q.E.m. QUadRI ElEttRIcI mIlaNo, FRom whIch skEma acQUIREd thE ExpERtIsE, thE woRk oRdER doc-
UmENtatIoN aNd spaRE paRts FoR ovERall pRojEcts, IN ItalY aNd abRoad. thIs acQUIsItIoN allows
skEma to pRovIdE maINtENaNcE, ExtENsIoNs, ExpaNsIoN aNd REvampINg sERvIcEs FoR low voltagE swItch-
gEaR sUpplIEd bY NUova Q.E.m. thUs gUaRaNtEEINg opERatIoNal coNtINUItY FoR INstallEd pRodUcts.
epc contractor: Renco / end user: eni congo
solUTions deliveRed
skema was awarded the con-
tract for the engineering, manu-
facturing, commissioning, test and
assistance on site of Intelligent
low voltage switchgear, in detail:
1 power center >
2 motor control centers >
the switchgear was engineered for
the integration with existing switch-
gear, and was commissioned by
skema’s personnel on site.
skema is available for documentation
consultation, and to provide any addi-
tional information to design, support,
provision of spare parts and evalu-
ation of proposed systems that in-
volve the integration of skema prod-
ucts with those previously installed by
Nuova Q.E.m. Quadri Elettrici milano.
hAnnibAl soUR gAs / tUNIsIa
a
14
kiTinA And zAp plATfoRMs / coNgo
congo
TUnisiAgabon
angola
democratic Republic of the congo
lybiaalgeria
morocco
H k
hann
ibal
kiti
na a
nd z
ap
14 15
solUTions deliveRed
skema was awarded the contract for
the design, manufacturing, inspec-
tion and testing of 81 low voltage
distribution boards.
the supply included:
26 indoor, arc internal proof distri- >
bution boards, with Esd function-
ality and Ip31 grade of protection
3 outdoor distribution boards, >
Ip65 grade of protection
all electrical details and require- >
ments (short circuit, dielectric,
etc.), as per IEc 60439
laggaN aNd toRmoRE aRE two gas aNd coNdENsatE FIElds sItUatEd aboUt 125 km NoRth-wEst oF thE shEt-
laNd IslaNds IN thE Uk. thE laggaN aNd toRmoRE pRojEct INvolvEs thE dEvElopmENt oF thE two FIElds aNd
coNstRUctIoN oF a gas pRocEssINg plaNt aNd ExpoRt pIpElINE. hERE, watER dEpths dEscENd RapIdlY FRom
aN avERagE oF 120 m to 600 m aNd bEYoNd. It Is a UNIQUElY challENgINg ENvIRoNmENt IN whIch to opERatE,
bUt also oNE wIth gREat potENtIal.
epc contractor: peTRofAc / end user: ToTAl
thE pRojEct coNsIsts oF thE dEvElopmENt oF a pRodUctIoN UNIt FoR thE YmE pRojEct. thE YmE FIEld Is lo-
catEd IN thE EgERsUNd basIN IN thE NoRth sEa, appRoxImatElY 110 km oFFshoRE IN thE NoRwEgIaN coNtI-
NENtal shElF. thE YmE FIEld coNsIsts oF two maIN REsERvoIRs, bEta aNd gamma, whIch aRE appRoxImatE-
lY 12 km apaRt. thE YmE RE-dEvElopmENt pRojEct Is basEd oN a mopUstoR, whIch Is a mobIlE oFFshoRE
pRodUctIoN UNIt wIth a sUbsEa stoRagE taNk. thE mopUstoR wIll bE locatEd at thE gamma REsER-
voIR wIth sURFacE complEtIoN oF thE gamma wElls aNd tIE back oF thE complEtEd sUbsEa bEta wElls.
epc contractor: sbM-gUsTo Msc / end user: TAlisMAn eneRgY noRge As
solUTions deliveRed
skema supply included pmcc switch-
gear, specifically:
power centers (11 columns) >
motor control centers >
(51 columns, 283 drawers)
lAggAn ToRMoRe / NoRth sEa (Uk)
MopUsToR YMe / NoRwaY
“Skema’s performance in terms of the delivery of hardware and the submis-sion of documents was excellent. Particularly in relation to the close-out of
the final documentation (Manufacturing Record Books and Technical Operat-ing and Maintenance Manuals), Skema was an example to other suppliers. We would like to take this opportunity to thank Skema for all their efforts in
ensuring a successful close-out of the purchase order.”
Project Expeditors
“We are delighted to work with Skema and the kind of support you extend to us in the critical
phase of the project.”
Senior Electrical Engineer
UniTedkingdoM
noRwAY
Ireland
France
germany
Finland
sweden
l m
lagg
an t
orm
ore
mop
usto
r ym
e
16 17
solUTions deliveRed
skema was awarded the contract for
the supply of:
power centers (124 columns) >
motor control centers >
(600 columns, 2,529 drawers)
lv distribution boards >
skema has been operating actively
in Russia, supplying its products for
use on projects in an array of differ-
ent industries: oil & gas, petrochem-
ical, energy and utilities, processing
and manufacturing.
thE REFININg aNd pEtRochEmIcal complEx IN NIzhNEkamsk, REpUblIc oF tataRstaN, 250 km FRom thE capItal
cItY oF kazaN, Is oNE oF thE most ambItIoUs oIl & gas pRojEcts IN RUssIa, whIch doUblEd thE REFINEd cRUdE
RUN FRom aNNUal 7 to 14 mIllIoN toNs. thE REFINERY has aRomatIcs UNIts aNd a dEEp coNvERsIoN sEctIoN
wIth a FlUIdIzEd catalYtIc cRackER, a dIstIllatE hYdRocRackER, a dElaYEd cokER, aNd a gasIFIcatIoN plaNt.
thE pEtRochEmIcal plaNt INclUdEs pURIFIEd tEREphthalIc acId, polYEthYlENE tEREphthalatE, lINEaR alkYl-
bENzENE aNd polYpRopYlENE UNIts, plUs thE assocIatEd powER gENERatIoN FacIlItIEs.
end user: TAneco
satah FUll FIEld Is locatEd 200 km NoRthwEst oF abU dhabI, UNItEd aRab EmIRatEs. thE satah FUll FIEld
dEvElopmENt pRojEct’s objEctIvE Is to maxImIzE cRUdE oIl pRodUctIoN aNd oIl REcovERY bY REdUcINg thE
wEll hEads’ back pREssURE aNd INtRodUcINg oF gas INjEctIoN aNd gas lIFt FacIlItIEs. thE pRojEct scopE IN-
volvEs oFFshoRE bRowNFIEld woRks to thE ExIstINg wEll hEad platFoRms aNd pRodUctIoN maNIFold plat-
FoRm, INstallatIoN oF INFIEld pIpElINEs, as wEll as modIFIcatIoNs aNd INstallatIoN oF NEw FacIlItIEs at thE
oNshoRE satah plaNt at zIRkU IslaNd.
epc contractor: npcc-Technip consoRTiUM / end user: zAkUM developMenT coMpAnY (zAdco)
solUTions deliveRed
skema was awarded the contract for
the design, manufacturing, inspection
and testing of power and lighting dis-
tribution boards and lighting panels
(safe area) for the onshore portion of the
project. the distribution boards provid-
ed for the project are for both indoor and
outdoor usage, they have Ip42 degree
of protection, meet special requirements
for saline ambient and are equipped
with a very large number of cables.
skema supplied for the project:
14 distribution boards >
cable boxes and glands >
nizhnekAMsk RefineRY / RUssIa
sATAh fUll field / UaE
“We have been fully content with Skema’s support given to us in
any aspect of our activity. Skema’s state-of-the-art products are of
great interest to Russian design-engineering organizations and
end users. High professional skills of Skema’s specialists team that
conduct the training sessions is worth mentioning”.
Managing Director
RUssiA
kazakhstan
IranIraq
saudi arabia
Yemen
oman
UAeQatar
kuwait
n S
nizh
neka
msk
sata
h
18 19
thE staatsolIE maatschappIj sURINamE N.v. Is locatEd IN sURINamE, NEaR paRamaRIbo, IN thE waNIca dIs-
tRIct. thE pRojEct Is a majoR ExpaNsIoN to thE ExIstINg REFINERY, aNd thE objEctIvE Is to INcREasE thE
cRUdE capacItY at thE FacIlItY to 15,000 baRREls pER daY. ElEctRIcal loads FoR thE abovE UNIts shall bE
FEd FRom thE NEw ElEctRIcal sUbstatIoN IN thE l-01 plaNt.
epc contractor: sAipeM / end user: sTAATsolie MAATschAppij sURinAMe n.v.
solUTions deliveRed
skema was awarded the contract for
the design, manufacturing, inspection
and testing of the medium voltage
and low voltage switchboards and
the Electrical Integrated control and
monitoring system as detailed below:
5 power motor control centers >
(94 mcc, 15 pc type, 461 starters)
8 bus duct lines 3200 a >
2 mv 6 kv switchgear >
(24 columns)
3 mv 12.3 kv switchgear >
(35 columns)
3 RtUs >
Ecms system >
the Ecms is based on a redundant
RtU which operates as a gateway
between the electrical users and the
dcs. the dcs controls all the proc-
ess motors via a redundant Ethernet
link over modbus/tcp; the motor ac-
tivation time is shorter than 200 ms,
while the total loop response time is
shorter than 400 ms.
lv swiTchgeAR /
inTelligenT Mccs
the low voltage switchgear and
Intelligent mccs supplied for the
project are equipped with smart
relays that communicate with the
Ecms using the IEc 61850 protocol,
which affords a number of benefits,
such as interoperability between all
the devices in the substations re-
gardless of the manufacturer, and
free allocation of real functions on
all levels, allowing for the construc-
tion of flexible and open, yet tailored,
solutions that are future-proofed to
deal with upcoming advances in
communication technology.
the IEc 61850 standard provides
long-term validity through the di-
viding of applications and commu-
nications, and support throughout
the life cycle thanks to the intro-
duction of a standardized substa-
tion configuration language (scl).
the result is an appreciable reduc-
tion in costs for the secondary system
over its life cycle. the lv bus duct is of
the compact type with copper lines; it
provides a complete solution for con-
nections between power stations and
transformers and the main panel board.
lv switchgear features:
13 Incomers REF 615 >
5 bus-tie REF 630 >
352 ltmR motor managers >
Mv swiTchgeAR
the medium voltage switchgear for the
project is equipped with a metal enclo-
sure suitable for indoor installations.
since the switchgear is highly modular,
the selection of components required
by any application is very simple.
the switchgear’s functional units are
guaranteed arc-proof in accordance
with IEc 62271-200 standards, ap-
pendix aa, class a accessibility, crite-
ria 1 to 5. all the installation, operation
and maintenance operations can be
carried out from the front of the unit.
the switchgear and earthing switches
are operated from the front, with the
door closed. the communication pro-
tocol for the mv protection relays is IEc
61850, as it is for the lv switchgear.
mv switchgear features:
Rated current 1250 a >
1 REF 630 >
(used for protection and ats)
17 REF 615 >
“I would like to express my complete satisfaction for the activities per-
formed by you during engineering andconstruction of equipment.”
Field Electrical Engineer
sURinAMe
brazil
bolivia
paraguay
guyanaFrench guiana
ToUT lUi fAUT RefineRY / sURINamE
t t
tout
lui
Fau
t
tout
lui
Fau
t
20 21
O
22
solUTions deliveRed
skema was awarded the contract for
the design, manufacturing, supply,
inspection, testing and commis-
sioning of 9 power motor control
centers switchgear, in detail:
power centers (11 columns) >
motor control centers >
(63 columns, 279 drawers)
bus ducts >
5 distribution boards >
thE Utbs (UNIté dE tRaItEmENt dE bRUt à hassI mEssaoUd) coNsIsts oF thREE IdENtIcal tREatmENt tRaINs,
Each wIth capacItY oF 100,000 baRREls pER daY, FoUR 50,000 m3 pRodUct stoRagE vats, two aERIal ElEctRIc
lINEs oF 30 kv, a statIoN oF 30 kv aNd 45 km pIpElINEs tRaNspoRtINg oIl, watER aNd gas. thE pRojEct, whIch
aIms to ImpRovE cRUdE oIl QUalItY aNd pRodUctIoN RatEs, sIgNIFIcaNtlY coNtRIbUtEs to soNatRach’s hassI
mEssaoUd FIEld optImIzatIoN pRodUctIoN pRogRam, gIvEN thE ExtENt oF thE FIEld’s REsERvEs, thEIR QUalItY
aNd thEIR complExItY. thE FacIlItY Is dEsIgNEd to tREat aNd tRaNspoRt cRUdE oIl FRom sIx FIElds soUth oF thE
maIN FIEld to a stoRagE cENtER at haoUd El hamRa. hassI mEssaoUd Is algERIa’s oldEst aNd laRgEst FIEld.
epc contractor: sAipeM / end user: sonATRAch
UTbs / algERIa
mai
npr
ojeC
ts
ons
hore
offs
hore
italy
AlgeRiA
morocco
western sahara
mauritania
lybia
tunisia
U italy
utbs
mai
n pr
ojec
ts
22 23
01
13
14
23
175331
03
30
33
07
32
4327
0547
55
04
41
1215
62
38
10
24
20
28
39
58 61
59
49
11
51
46
3657
21 52 19
16
63
42
09
50
34
65
37
06
6040
56 29
18
02
4544
26
54
35
25
22
08
48
64
01 arluno
02 augusta
03 bagnolo mella
04 benevento
05 bordolano
06 brindisi
07 brunico
08 busalla
09 candela
10 carassai
11 casalborsetti
12 cassino
13 casteggio
14 caviaga
15 cavone
16 contarina
17 cortemaggiore
18 crotone
19 dosso degli angeli
20 Falconara
21 Ferrara
22 Ferrera
23 gaggiano
24 gagliano
25 gela
26 giaurone
27 glorenza
28 grottammare
29 hera lacinia
30 livorno
31 mantova
32 marlengo
33 medesano
34 melfi
35 milazzo
36 minerbio
37 monte alpi
38 Nera montoro
39 pineto
40 pisticci
41 pomigliano
42 porto marghera
43 prati di vizze
44 priolo gargallo
45 Ragusa
46 Ravenna
47 Ripalta
48 Rivalta
49 Roseto
50 Rotello
51 Rubicone
52 sabbioncello
53 sarmato
54 sarroch
55 sergnano
56 simeri crichi
57 s. potito
58 s. salvo
59 sulmona
60 taranto
61 termoli
62 torrevaldaliga
63 torviscosa
64 trecate
65 val d’agri
sINcE Its FoUNdatIoN IN 1974, skEma has bEEN oNE oF ItalY’s lEadINg NamEs FoR oNshoRE aNd oFF-
shoRE applIcatIoNs: oIl & gas plaNts, REFINERIEs, powER plaNts, oFFshoRE platFoRms, shIp-
pINg, pIpElINEs aNd, moRE gENERallY, pRocEssINg, maNUFactURINg aNd sERvIcEs pRojEcts.
end users: skema’s longstanding end users For projects in italy include: Agip, edison, enel,
enicheM, eni gRoUp, eRg, fiAT engineeRing, fosTeR wheeleR, ilvA, sAipeM, sARAs, snAMpRogeTTi, TechinT,
Technip, TecniMonT
offshoRe pRojecTs
agostino a agostino b agostino c amelia b amelia c amelia danemone bangela angelina angela cluster annabella antares antonella arianna aarmida barbara a barbara b
barbara d barbara E barbara F barbara g barbara h barbara t barbara t2basil calpurniacervia b cervia c cervia E daria b Eleonora garibaldi agaribaldi c
garibaldi kgela 1 giovanna luna apca pcbpc-wa pc80 bIsRavennaRegina
onshoRe pRojecTs
power plantplatform
oil plant
gas plant
Refinery / plant
italy
mai
n pr
ojec
ts
24 25
italy
mai
n pr
ojec
ts
dIscovEREd IN 2007, thE goldEN EaglE aREa (whIch Is madE Up oF REsERvoIRs goldEN EaglE, hobbY aNd
pEREgRINE), Is locatEd IN appRoxImatElY 113 m watER dEpth IN thE Uk sEctoR oF thE NoRth sEa 70 km oFF-
shoRE (19 km NoRth oF thE bUzzaRd FIEld, 21 km NoRthwEst oF thE EttRIck FIEld aNd 4 km soUth oF thE
atlaNtIc FIEld). thE FIEld Is dEvElopEd UsINg two platFoRms - a wEllhEad platFoRm aNd a pRodUctIoN,
UtIlItY aNd QUaRtERs (pUQ) platFoRm. thE two platFoRms aRE coNNEctEd bY a 70 m bRIdgE. thE FacIlI-
tIEs bEINg bUIlt at goldEN EaglE caN act as a FUtURE hUb FoR tIEbacks. opERatoR NExEN has EstImatEd
thE goldEN EaglE aREa coNtaINs 140-150 mIllIoN baRREls oF oIl EQUIvalENt IN gRoss REcovERablE coN-
tINgENt REsoURcEs, makINg It oNE oF thE laRgEst oIl dIscovERIEs IN thE Uk NoRth sEa IN REcENt YEaRs.
epc contractor: cb&i / end user: nexen peTRoleUM
skeMA MoToR conTRol And
MAnAgeMenT sYsTeM (McMs)
the motor control and manage-
ment system (mcms) developed for
the platforms integrates the intelli-
gent motor control centers made by
skema with the process control sys-
tem (pcs), the power management
system (pms) and the distribution
management system (dms), and en-
ables an integrated and safe man-
agement of all the electrical users.
the integration is achieved thanks
to the communication capabili-
ties of the dcUs which operate as
gateways between the upstream
pcs/pms/dms and the IEds with-
in the downstream switchgear.
the dcUs allow concurrent commu-
nication via redundant modubus-RtU
and opc between the different sys-
tems. such integration completely ex-
ploits the capabilities of the 400 IEds
(supplied by different manufacturers)
which measure, protect and control
all the users connected to the mcms.
Importantly, the mcms not only helps
the operator to control the users, but
is of great significance to the electrical
engineer in verifying the performances
of the electrical networks by means of
continuous monitoring of the param-
eters set in the IEds with special at-
tention to those which influence the
reliability/maintenance of the plant.
the mcms records the running hours,
the number of operations of each
feeder circuit and analyzes the most
frequent causes of tripping/alarms,
so that the engineer can plan proac-
tive counter measures to avoid future
plant problems which may cause eco-
nomic losses and, in the worst cas-
es, safety risks to the plant/personnel.
this type of intelligent reporting is piv-
otal in ensuring a proactive and cost ef-
fective maintenance regime of the plant.
all the dcUs components are dual
redundant and can survive any in-
dividual component failure. the se-
rial links communicating with the
downstream IEds via modbus-RtU
ring (motor managers, measuring
devices and protection relays) can
survive a fault where the serial ca-
ble is broken between two devices.
system response times are of ut-
most importance, the mcms is de-
signed for ultimate performance. a
command received from the pcs is
actuated by the IEds in less than
100 ms and the change of status
is available to the pcs in less than
1 second. these performances are
achieved while the dcUs communi-
cate concurrently with the pcs via
modbus-tcp, with the pms via mod-
bus-RtU and with the dms via opc.
solUTions deliveRed
skema was awarded the contract for the
design, engineering and manufacturing
of Intelligent low voltage switchgear
and the motor control and manage-
ment system (mcms) for the project.
the supply consists of:
Intelligent motor control centers >
(72 columns, 341 drawers)
power centers (14 columns) >
4 dual Redundant >
data concentrator Units (dcUs)
distribution boards >
motor control and management >
system (mcms)
golden eAgle / NoRth sEa (Uk)
UniTedkingdoM
Ireland
France
germany
gg
gold
en e
agle
gold
en e
agle
28 29
jasmINE Is a gas coNdENsatE REsERvoIR that lIEs IN somE 80 m oF watER at a dEpth oF 4,115 m bElow thE
sEabEd, aNd Is locatEd 240 km soUth-East oF abERdEEN. thE jasmINE dEvElopmENt compRIzEd a wEllhEad
platFoRm tIEd back to thE coNocophIllIps opERatEd jUdY platFoRm, whIch Is appRoxImatElY 9 km wEst
oF thE jasmINE FIEld, vIa a mUltIphasE pIpElINE aNd RIsER platFoRm coNNEctEd to thE ExIstINg jUdY plat-
FoRm vIa a lINkINg bRIdgE.
epc contractor: woRleYpARsons / end user: conocophillips
solUTions deliveRed
skema was awarded the con-
tract for the design, engineering
and manufacturing of 7 low volt-
age switchboards and the Integrat-
ed protection and control system.
skema supply included:
Intelligent motor control centers >
(69 columns, 377 drawers)
power centers (27 columns) >
3 Remote terminal Units >
(RtUs)
Integrated protection and >
control system (Ipcs)
skeMA noMinee foR The AwARd
foR excellence
on 22nd February 2012 skema was
invited to attend the jasmine supplier
awards for Excellence ceremony, as
a Nominee among the 15 excellent
suppliers (out of the over 160 suppli-
ers for the project) to the conocophil-
lips jasmine development project.
conocophillips launched the jasmine
supplier awards for Excellence pro-
gramme in january 2011, with the aim
to develop and recognize the project’s
principal suppliers through setting key
metrics, evaluating business perform-
ance, identifying gaps and opportu-
nities for improvement and recog-
nizing and rewarding excellence.
being one of the best suppliers to
conocophillips is a matter of pride
for skema, whose nomination in the
“planning and delivery” category
was motivated by conocophillips
as follows: “skema was a bright
star in jasmine’s electrical success.
their embrace of sap’s ERp prior to
jasmine was evident in their planning,
scheduling, detailed design, material
availability, along with the lv switch-
gear’s and mcc’s fabrication.”
“Many thanks for all your good efforts in making this happen.
Skema’s proactive approach towards resolving and expediting really helps
us and is very much appreciated by the Project.”
Senior Expeditor
jAsMinedevelopMenT / NoRth sEa (Uk)
UniTedkingdoM
Ireland
France
germany
jj
jasm
ine
jasm
ine
30 31
kARAchAgAnAk, The enoRMoUs gAs field - thE kaRachagaNak FIEld, locatEd oNshoRE IN wEstERN ka-
zakhstaN (aRoUNd 150 km to thE East oF thE cItY oF URalsk), was dIscovEREd IN 1979 aNd Is oNE oF thE
laRgEst gas coNdENsatE FIElds IN thE woRld. covERINg aN aREa oF 280 km2 aNd holdINg ovER 1.2 bIllIoN
toNs oF oIl aNd coNdENsatE aNd 1.35 tRIllIoN m3 oF gas, thE gIaNt kaRachagaNak FIEld pRodUcEs aN av-
ERagE oF 150,000 baRREls oF coNdENsatE aNd 20 mIllIoN m3 oF gas pER daY. thE ExpaNsIoN oF thE FIEld
has INvolvEd aN INvEstmENt oF ovER $ 5.5 bIllIoN.
epc contractor: jv bechTel lTd And snAMpRogeTTi Uk
end user: kARAchAgAnAk peTRoleUM opeRATing b.v.(kpo) / a consortium oF: british gas, eni, lukoil, chevron
solUTions deliveRed
skema supplied for the project:
9 packaged substations, com- >
plete with mv switchboards,
transformers, 400 v switchgear/
motor control centers, battery
and battery charger, distribution
boards, hvac system, Fire and
safety and the lighting system
lv switchgear and motor control >
centers (20 switchboards, more
than 250 panels and 1300
motor starters)
Mv And lv swiTchgeAR
key features of skema’s Intelligent
motor control centers are its draw-
ers and incomers equipped with
microprocessor relays. In addi-
tion skema developed the Electri-
cal control system for the karach-
aganak project in kpc and Unit 2.
Each station is equipped with a Re-
mote terminal Unit (RtU), which col-
lects data from the switchboards
and interfaces with dms and dcs.
the accumulated data is then made
available for visualization on Ews
and on plan dms. skema has sup-
plied a total of nine packaged sub-
stations for Early works, two 6 kv
packaged substations for Unit 3, a
packaged substation for a Flash gas
compressor control Room, and a se-
ries of eight packaged substations
for a waste management complex.
as for the switchgear, skema supplied
the karachaganak project alone with
some 123 mv panels, 622 lv panels,
38 RtUs, 24 110v dc panels, more
than 250 relays, and 2,559 drawers.
kARAchAgAnAk / kazakhstaN
“Skema provided an excellent serv-ice in assisting with the commission-
ing of their supplied equipment on site here in Karachaganak. I can say that the work completed was carried
out in a timely manner, to high stand-ards, often in arduous conditions.
The working relationship that devel-oped with Skema personnel was ex-
cellent, as they were always pre-pared to go the extra mile to resolve any anomaly that arose on site and meet the end user’s expectations.”
Electrical Commissioning Engineer, KPO
kAzAkhsTAn
caspian seaUzbekistan
kyrgyzstan
kara
chag
anak
kara
chag
anak
kk
34 35
k
36 3736
4Th sTAbi-lizATion & sweeTening TRAinEpc coNtRactoRs: peTRofAc
ENd UsER: kARAchAgAnAk
peTRoleUM opeRATing b.v.(kpo)
/ a coNsoRtIUm oF: bRItIsh gas,
ENI, lUkoIl, chEvRoN
the karachaganak 4th stabilization &
sweetening train project aims to increase
the capacity of the existing karachaga-
nak processing complex (kpc) facilities
through the addition of a fourth train.
solUTions deliveRed
skema was responsible for the de-
sign, manufacturing, supply, in-
spection, testing, export packing
and supervision of testing and com-
missioning of:
power centers (12 columns) >
Intelligent lv switchgear/motor >
control centers
(78 columns, 266 drawers)
bus ducts >
RtUs (6 columns) >
In tegra ted pro tec t ion and >
control system
wAsTe MAnAgeMenT coMplexENd UsER: kARAchAgAnAk
peTRoleUM opeRATing b.v.
(kpo) / a coNsoRtIUm oF:
bRItIsh gas, ENI, lUkoIl,
chEvRoN
as part of its long-term commit-
ment to health, safety and environ-
mental protection, the kpo consor-
tium has completed construction of
a new Eco-centre (waste manage-
ment complex), which houses state-
of-the-art technology and enables
the recycling, treatment and safe dis-
posal of drilling fluids and wastes.
solUTions deliveRed
skema was awarded the contract
for the design, engineering, manu-
facturing, inspection and testing of:
1 transformer >
packaged substation
1 lv switchgear >
packaged substation
the transformers and substations were
housed within a two-hour fire-rated
enclosure, and were supplied as com-
plete pre-wired and assembled mod-
ular self-contained units, installed on
concrete leg foundations 1,400 mm
above ground, and equipped with
bolt-on stairs and access platforms.
the transformers package included
two 6/0.72 kv, 3 mva each, to allow
maintenance of one unit while the oth-
er is in service, as well as power and
auxiliary cables for interconnection to
the packaged lv substation. the lv
substation package included a tcc
690v switchboard, two 690/420 v,
400 kva each, transformers and a
tcc 400 v switchgear.
kk
kara
chag
anak
kara
chag
anak
36 37
The giAnT kAshAgAn - kashagaN, 80 km soUth-East oF atYRaU, IN thE NoRth caspIaN sEa, Is thE laRgEst oIl FIEld
dIscovEREd ovER thE last thIRtY YEaRs woRldwIdE aNd ExtENds ovER a sURFacE aREa oF appRoxImatElY 75 km bY 45
km. Its dEvElopmENt REpREsENts oNE oF thE gREatEst challENgEs FacEd bY thE pEtRolEUm INdUstRY, gIvEN thE dEEp,
hIgh-pREssURE REsERvoIR, thE hIgh sUlFUR coNtENt, thE shallow watERs that FREEzE IN wINtER aNd thE maRkEd shIFts
IN tEmpERatURE (FRom -30°c to +40°c). thE potENtIal daIlY avERagE pRodUctIoN amoUNts to 1.2 mIllIoN baRREls,
wIth EstImatEd REsERvEs oF 38 bIllIoN baRREls. thE kashagaN pRojEct coNsIsts oF two dEvElopmENts: oFFshoRE
complEx (aRtIFIcIal IslaNds IN thE caspIaN sEa) aNd oNshoRE complEx (bolashak oNshoRE pRocEssINg FacIlItY).
end user: Agip kco
/ a consortium oF: conocophillips - eni - exxonmobil - inpex - kazmunaigas - shell - total
solUTions deliveRed
skema supplied for the kashagan
project local Equipment Rooms,
medium and low voltage com-
plete packaged substations, proc-
ess and Uti l i t ies buildings, al l
lv switchgear/Intell igent power
motor control centers, RtUs, lms/
dms (onshore) and the Integrat-
ed protection and control system.
190 km2 total area of onshore operations =
the size of amsterdam
120,000 tons
total weight of steel items and struc-
tures used = 1.5 times the weight of the
golden gate bridge in san Francisco
510 km total length of pipelines = almost the dis-
tance between New York and montreal
5,000 km total length of electric and instrumen-
tation cables = about the distance
between almaty and Rome
50,000 m3
volume of concrete structures used
= the size of the landmark 88-floor
building of petronas towers in kuala
lumpur, malaysia
kAshAgAn / kazakhstaN
“Company congratulates Contractor with the big
achievement of meeting the requested delivery date, and thanks for its good work and
cooperation.”
Contract Holder
kAzAkhsTAn
caspian seaUzbekistan
kyrgyzstan
kk
kash
agan
kash
agan
38 39
Mv/lvpAckAged sUbsTA-TionsoNshoRE
skema was in charge of the engineering,
manufacturing, testing and commis-
sioning of 9 mv/lv packaged substa-
tions. the substations feed the infra-
structure utilities for the kashagan field
and are part of the Early works of the
kashagan Experimental programme.
Each substation was equipped with:
10 kv switchboards >
pmcc lv switchgear >
distribution boards >
distribution transformers >
ac and dc Ups batteries >
alarm and communication RtUs >
hvac system >
Electrical control system >
offshoRe bUildings / IN coUNtRYsolUTions deliveRed
Epc contract for 13 offshore Utilities
buildings for Island d.
keY sUccess fAcToRs:
maximum local content achieva- >
ble for modular substations
project delivered on time and >
without any punch list
complete project cycle managed >
by internal resources: from fea-
sibility studies to the design of
structures, electrical hvac and
safety systems, procurement,
construction, assembly, pre-com-
missioning, start-up, commission-
ing, load out activities and on site
supervision and installation
fRAMeAgReeMenToNshoRE /oFFshoRE
skema was awarded the frame agree-
ment for the provision of all intelligent
lv switchgear/Intelligent power mo-
tor control centers, RtUs, the Inte-
grated protection and control system
for both offshore and onshore facili-
ties and lms / dms (onshore).
5.5 km = the total length of columns
supplied by skema.
Epc coNtRactoRs:
Abb ps&s - AkeR kvAeRneR -
bATeMAn - consAfe - foRes
ge oil & gAs np – gUsTo Msc -
kAzsTRoYseRvice - liTwin -
Mss - pUnji lloYd -
sAipeM - sbM - sieMens
TURboMAchineRY -
RoseTTi MARino - Renco -
Tekfen - zAfeR
“The products supplied by Skema were able to meet the strict technical standards of the job. Skema’s project team showed competent technical skills and the ability to work
and support us at all stages of the project from engineering to commissioning.”
Project Electrical and Instrumentation Engineer
kk
40
kash
agan
kash
agan
40 41
locAleQUipMenTRooMsoFFshoREend user: Agip kco / a consor-
tium oF: conocophillips - eni -
exxonmobil - inpex - kazmun-
aigas - shell - total
skema was awarded the Epc contract
for the provision of 18 local Equip-
ment Rooms (lERs).
the scope of work includes the co-
ordination and monitoring of every
aspect of the project, from feasibili-
ty studies and cost/performance op-
timization to the design of structural,
electrical, hvac and safety systems,
procurement, construction, assembly,
commissioning, final inspection and
supervision of on-site installation.
the lERs are pre-fabricated steel-
structure modules, which have the
following systems installed: medium
and low voltage switchboards, trans-
formers, distribution switchboards,
Upss and relevant batteries, super-
vision and control equipment, hvac
with provisions for explosive/dan-
gerous gas injections, electrical net-
works, fire-detection and fire-fighting
systems and telecoms equipment.
Each lER has an average length of
50 m and weight of 1000 t.
the lERs were built in Raven-
na, shipped to the caspian sea
on barges and located on artifi-
cial islands in the caspian sea.
size of The leRs
scope of woRk diMensions (m) weighT (t)
complex a ler 36.3 x 15.3 x 8.3 800
drilling island main ler 55.2 x 15.3 x 8.3 1,050
drilling island hvac ler 35.9 x 11.3 x 8.3 500
psa1 main ler 48.6 x 15.3 x 8.3 1,000
psa1 hvac ler 42.6 x 15.3 x 8.3 800
riser island main ler 48.6 x 15.3 x 8.3 1,000
riser island hvac ler 24.6 x 15.3 x 8.3 500
psa2 main ler 48.6 x 15.3 x 8.3 1,000
psa2 hvac ler 42.6 x 15.3 x 8.3 800
pua main ler 57.5 x 15.3 x 8.3 1,150
pua hvac ler 43.7 x 15.3 x 8.3 850
lsa main ler 42.6 x 15.3 x 8.3 800
lsa hvac ler 42.6 x 15.3 x 8.3 800
lsa ibeev ler 33.8 x 17.6 x 11.8 800
drilling island east main ler 66.5 x 15.2 x 8.3 1,105
drilling island east hvac ler 48.5 x 15.2 x 8.4 947
pua emergency diesel generator ler 35.9 x 15.3 x 8.3 500
complex a emergency diesel generator ler 6.0 x 4.0 x 4.0 20
ToTAl 11,484 m2 14,422 tons
kk
kash
agan
kash
agan
“First of all congratulations at completing barge 3 and 4 pre-commissioning. Your personnel
and the support offered to them during their stay here was first class. All concerned were im-pressed – our subcontractors,
our client and all.”
Commissioning Superintendent
42 43
18 leRs
offshore
9 substations
Early works / onshore
10 pUbs offshore / built in Italy
13 pUbsoffshore / built in country
(kazakhstan)
All pMccsFrame agreement for all lv
switchgear /
Intelligent power motor control
centers and RtUs /
onshore / offshore
5.5 km the total length of columns
supplied by skema
ipcs onshore / offshore
lMs/dMs onshore
eskene wesT RAil / oNshoRE
Eskene west Rail consists of three
basic facilities linked by a common
rail system that require upgrading
works to accommodate the increased
rail traffic from Rail loading Facili-
ties (RlF) and marshalling Yard (mYd).
solUTions deliveRed
skema was awarded the contract for
the design, fabrication, supply and
delivery of medium and low voltage
switchgear, motor control centers
and RtUs.
epc contractor:
woRleYpARsons
end user: Agip kco / a consorti-
um oF conocophillips - eni - exx-
onmobil - inpex - kazmunaigas -
shell - total
skema supply included:
10 kv switchboard >
(37 columns)
6 power motor control centers >
(45 columns)
19 motor control centers >
(123 columns)
8 RtUs (16 columns) >
33 distribution boards >
51 junction boxes >
kk
kash
agan
kash
agan
46 47
thE $ 1.5 bIllIoN oNshoRE gas dEvElopmENt (ogd) III pRojEct INvolvEs thE ExpaNsIoN oF thE pRodUctIoN ca-
pacItY oF a massIvE gas-pRocEssINg plaNt IN habshaN, appRoxImatElY 130 km soUth-wEst oF abU dhabI, IN
thE UNItEd aRab EmIRatEs. thE habshaN complEx Is oNE oF thE laRgEst gas-pRocEssINg plaNts IN thE woRld.
epc contractor: bechTel / end user: gAsco
solUTions deliveRed
skema was awarded the contract
for the supply of Intelligent low
voltage switchgear compliant with
the most stringent requirements
of the oil & gas industry, the in-
ternationally recognized shell dEp.
the supply included:
21 415 v switchgear systems/ >
motor control centers (378 col-
umns, 1662 drawers)
14 RtUs >
Integrated protection and control >
system (Ipcs).
ogd iii / UaE
inTegRATed pRoTecTion And conTRol sYsTeM (Ipcs)
the Ipcs is based on IcUs (Integrat-
ed control Units) located in each
substation, which communicate with
the motor starters and the protec-
tion relays, making all the information
available for the operator worksta-
tions and the redundant servers in-
stalled in the main control Room, and
operate as a gateway with the dcs,
which sends commands and receives
feedback via the tcp/Ip interface.
the Ipcs created for the gasco ogd
III project not only displays the status
and alarms of all the components of
the electrical network but also greatly
assists the operators in maintaining the
plant because it stores the parameter
settings of all the control units (both
motor managers and protection relays)
and compiles the sequence of events
and the disturbance waves recorded by
the protection relays in case of faults.
“I appreciate all aspects of Ske-ma’s performance, and in particu-
lar: your team’s efforts in turning around accurate engineering docu-mentation in a timely fashion, Ske-ma’s proactiveness in dealing with third parties, Skema’s flexible and
adaptable manufacturing approach to accommodate EBCL’s construc-
tion priorities, and Skema’s swift clear communication with the OGD
III Project team and the overall quality of Skema’s work product. Skema’s approach to the OGD III
project has been most profession-al at all times and its high caliber
performance has been noted.”
Project Director
IranIraq
saudi arabia
Yemen
oman
UAeQatar
kuwait
OO
ogd
iii
ogd
iii
48 49
thE QataR FERtIlIzER compaNY (QaFco) sItE Is locatEd aboUt 40 km soUth oF doha cItY aNd 7 km soUth oF
thE REsIdENtIal aREa oF mEsaIEEd. thE pRojEct FacIlItIEs INclUdE two ammoNIa plaNts wIth a total daI-
lY pRodUctIoN capacItY oF 4,600 toNs aNd a UREa plaNt wIth a daIlY pRodUctIoN capacItY oF 3,850 toNs,
aloNg wIth othER sUppoRt UtIlItIEs. wIth thEsE hUgE pRodUctIoN capacItIEs, QaFco Is coNsIdEREd to bE thE
laRgEst ammoNIa aNd UREa pRojEct aNYwhERE IN thE woRld, aNd also thE most INvEstmENt-INtENsIvE.
epc contractor: sAipeM / end user: QAfco
solUTions deliveRed
skema was awarded the contract
for the design, manufacturing, in-
spection, testing and supervision of
the on-site commissioning of high-
performance, reliable, flexible so-
lutions. the supply of Intelligent
low voltage switchgear included:
5 power centers >
(193 columns)
29 motor control centers >
(1,223 columns with 1,608
drawers)
distribution lv switchboards >
(274 columns)
11 Interface monitoring >
systems (Ims)
1.5 km = the total length of pmcc
columns supplied by skema.
inTelligenT pMccs
the Intelligent motor control centers
were equipped with an on-board touch-
screen operator interface to operate
the switchboards and compile data on
trends, alarms and event sequences.
this operator interface acts as a gate-
way to the dcs (distributed control
system) to allow the process con-
trol system to start/stop motors and
record the activation of alarms.
the pmcc switchboards were de-
signed to prevent any risk of a short
circuit and internal arc fault at 75 ka-
690 v for 0.3 seconds – to this end,
they were fully type-tested by an in-
dependent laboratory.
QAfco 5-6 / QataR
wATch The video!
saudi arabia
Yemen
oman
UaE
IranIraq
QATAR
kuwait
qaFc
o 5-
6
qaFc
o 5-
6
50 51
field sUbsTATion ReplAceMenT
the Field substation Replacement
project aims to upgrade and ration-
alize the existing Field power supply
system by replacing 6 existing field
substations with 3 new substations.
solUTions deliveRed
skema was awarded the contract for
the design, manufacturing, inspec-
tion and testing of hv switchboards
and Remote terminal Units (RtUs):
3 35 kv, 1250 a, gas insulated >
switchboards (26 columns)
3 6 kv, 1250 a, 20 ka, 1 sec., air insu- >
lated switchgear units (74 columns)
4 redundant RtUs (10 columns) >
and Electrical control systems -
based on plc
switchgear continuous thermal >
monitoring solution
arc fault protection system >
tENgIz FIEld (tENgIz Is kazakh FoR “sEa”), IN wEstERN kazakhstaN, Is locatEd IN thE low-lYINg wEtlaNds
aloNg thE NoRthEast shoREs oF thE caspIaN sEa aNd Is oNE oF thE bIggEst oIl FIElds IN thE woRld. dIs-
covEREd IN 1979, tENgIz coNtaINs 24 bIllIoN baRREls oF hIgh QUalItY oIl aNd sIx to NINE bIllIoN baRREls
(1 km³ aNd 1.4 km³) oF REcovERablE oIl. It Is dEEp, havINg a taRgEt dEpth oF 4,500 m. It also coNtaINs
sIgNIFIcaNt gas REsERvEs (18,000 bIllIoN m3). thE pRocEssINg plaNt Is madE Up oF bUIldINg blocks.
end user: TengizchevRoil / a consortium oF: chevron, exxonmobil, lukarco
solUTions deliveRed
skema supplied its products and so-
lutions for the tengiz field, and in par-
ticular for the central power station,
the central distribution substation, for
ktl 1 and ktl 2 load Relief substa-
tions, sulfur Forming, train 2.3 power
station Upgrade, plant Nitrogen sys-
tem and kulsary Rip sera Rail Yard.
skema supplied for the project:
10 mv switchgear (83 sections) >
Intelligent power motor control >
centers switchgear (140 col-
umns, more than 759 drawers)
power centers (43 columns) >
4 Remote terminal Units >
lv distribution panels >
(210 boards)
Tengiz / kazakhstaN
“On behalf of TCO I would like to thank you for your professionalism in all kind of
arrangements and communication, adher-ence to the original shipment dates and
for high quality documentation.”
Interface Coordinator
kAzAkhsTAn
caspian sea
Uzbekistan
kyrgyzstan
tt
teng
iz
teng
iz
54 55
inTegRATed pRoTecTion And
conTRol sYsTeM
the Integrated protection and con-
trol system (Ipcs) for the project
was designed to monitor and con-
trol hv and lv switchgear located in-
side the different packaged substa-
tions (North, south and west). Each
packaged substation is equipped
with a redundant Interface control
Unit (IcU) controlling 33 kv and 6.6
kv switchgear with protocol IEc-
61850, low voltage switchgear and
other utilities (hvac, Ups, F&g) via
modbus and hardwired interfaces.
a scada system is installed in the
Field control Room to control and
supervise the electrical network.
Every substation is also equipped
with 4 video cameras and a vo-
ca l c ommun i ca t i o n s y s t em .
this allows to control the unat-
tended substations (both through
cabled alarms and alarms gen-
erated by the video cameras reg-
istering unexpected movements),
and to communicate with the op-
erators, giving them directions.
data are recorded and are availa-
ble in real time for an asset lifetime
management system (maintenance
and energy efficiency management
of the plant and its components).
swiTchgeAR conTinUoUs TheR-
MAl MoniToRing solUTion
skema provided tco with Exer-
therm™, a continuous thermal moni-
toring solution which allows to moni-
tor, in real time, the thermal health and
status of key bus bar joints and critical
cable connections. this is achieved
by installing small plastic, non-con-
tact, non-powered, lifetime calibrat-
ed infrared and cable sensors within
the main electrical panels supplied.
this solution provides numerous tan-
gible benefits over traditional periodic
scans, including greatly increased lev-
els of safety and integrity protection
and reliability assurance throughout
the lifecycle of the electrical panels.
the integrity protection was further
enhanced by utilising a load-map™
software module which enables tco to
dynamically adjust the thermal alarm
levels applicable to the load on the
circuit being monitored, which provid-
ed tco with a level of integrity protec-
tion even at lower utilized load levels.
ARc fAUlT pRoTecTion sYsTeM
the 6 kv switchgear supplied for the
project has been equipped with a REa
arc fault protection system, which can
operate as a stand-alone device or in
combination with other modules, like
the REF relays. the REa arc fault pro-
tection system function is based on de-
tecting the intense light of an electric
arc, alone or on a detection of light and
simultaneous phase or neutral over-
current. on detection of an arc fault,
the REa protection system delivers
trip commands in less than 2.5 ms to
all circuit breakers that feed the fault
zone. Furthermore, the system opera-
tion indicators help localizing faults by
selectively guiding the maintenance
staff to the fault zone, that was identi-
fied by the arc fault protection system.
the REa module supplied for the
project features: two high-speed, gal-
vanically isolated, insulated gate bi-
polar transistor (Igbt) outputs (hso1
and hso2) for cb tripping purpos-
es; it offers one heavy-duty relay out-
put (tRIp3) to be used, for example,
as a circuit-breaker failure protection
(cbFp) output for an upstream cir-
cuit-breaker, or as an alarm output;
it features an adjustable three-phase
overcurrent or two-phase and neu-
tral overcurrent condition monitoring
function, which enhances the reliabil-
ity of the arc fault detection by elim-
inating unwanted cb tripping caused
by light not related to any arc fault,
e.g. flash light used in photography.
“Finally a word of thanks to you and your team for an excellent performance and outstanding custom-
er service on our project.”
E/I Project Engineer
tt
teng
iz
teng
iz
56 57