31
Company Vol. 02 OUR TOP PROJECTS

02 our top projeCts - · PDF fileAwA pAloUkoU platFoRm / coNgo ... Epc coNtRactoR: sAipeM ... thE total pRocEssINg capacItY oF thE REFINERY Is oF 4.3 mIllIoN toNs oF oIl pER YEaR

Embed Size (px)

Citation preview

Com

pany

Vol

. 02

our top projeCts

contents

ATYRAU REFINERY / kazakhstaN ---------------------------- p. 06AwA pAloUkoU platFoRm / coNgo ------------------------ p. 07bAkU Tbilisi ceYhAn pIpElINE / azERbaIjaN aNd gEoRgIa -- p. 08chileAn lng / chIlE ----------------------------------------- p. 09 chinARevskoYe FIEld / kazakhstaN ---------------------- p. 10coRinTh REFINERY / gREEcE --------------------------------- p. 11djeno powER gENERatIoN plaNt / coNgo ---------------- p. 12fpso osx2 / bRazIl ------------------------------------------ p. 13hAnnibAl soUR gas / tUNIsIa ------------------------------- p. 14kiTinA And zAp platFoRms / coNgo ---------------------- p. 15lAggAn ToRMoRe / NoRth sEa (Uk) ------------------------ p. 16MopUsToR YMe / NoRwaY ----------------------------------- p. 17nizhnekAMsk REFINERY / RUssIa --------------------------- p. 18sATAh FUll FIEld / UaE -------------------------------------- p. 19ToUT lUi fAUT REFINERY / sURINamE ----------------------- p. 20UTbs / algERIa ------------------------------------------------ p. 22

iTAlY - MAin pRojecTs oNshoRE | oFFshoRE ------------ p. 23

golden eAgle / NoRth sEa (Uk) ---------------------------- p. 28jAsMine dEvElopmENt / NoRth sEa (Uk) ------------------ p. 30kARAchAgAnAk / kazakhstaN ----------------------------- p. 34kAshAgAn / kazakhstaN ------------------------------------ p. 38ogd iii / UaE --------------------------------------------------- p. 48QAfco 5-6 / QataR ------------------------------------------- p. 50Tengiz / kazakhstaN ---------------------------------------- p. 54

clienTs And TesTiMoniAl -------------------------- addENdUm

main projects

top projects

+ inFo

“the projeCts we work on are in-variably Complex, often sited in re-mote areas with extreme ClimatiC Conditions, and are CritiCal to the suCCess of the businesses involved. our mission is to implement these projeCts by delivering state-of-the-art produCts and solutions, enCompassing everything from en-gineering all the way to Commis-sioning, and to work with our Cli-ents throughout the whole proCess. always bearing in mind that our objeCtive is to enable them to reaCh their objeCtives.”

elisabetta CerveglieriviCe president

mai

npr

ojeC

ts

alph

abet

ical

or

der

a-z05

saIpEm was awaRdEd thE coNtRact FoR thE ENgINEERINg, pRocUREmENt, coNstRUctIoN aNd IN-

stallatIoN oF a platFoRm aNd assocIatEd pIpElINEs FoR thE dEvElopmENt oF thE awa paloU-

koU FIEld, locatEd oFF thE coast oF thE REpUblIc oF coNgo IN 2,730 FEEt (832 m) oF watER.

thIs Is thE sEcoNd dEEpEst watER dEpth FIxEd platFoRm pRojEct IN thE woRld.

Epc coNtRactoR: sAipeM / ENd UsER: eni congo

thE atYRaU REFINERY Is thE oldEst pEtRolEUm REFININg plaNt IN kazakhstaN, bUIlt moRE thaN 60 YEaRs ago.

thE REcoNstRUctIoN oF thE REFINERY staRtEd IN maRch 2003, as paRt oF thE tURNkEY coNtRact, whIch was

woN to jgc coRpoRatIoN as maIN coNtRactoR, IN coopERatIoN wIth maRUbENI coRpoRatIoN. thE scopE oF

thE pRojEct was to pRodUcE oIl pRodUcts that FUlFIll modERN staNdaRds aNd EcologIcal REQUIREmENts.

thE total pRocEssINg capacItY oF thE REFINERY Is oF 4.3 mIllIoN toNs oF oIl pER YEaR.

Epc coNtRactoR: jgc coRpoRATion / ENd UsER: kAzMUnAigAs

solUTions deliveRed

skema was awarded a contract for

the supply of:

medium voltage switchgear >

(11 columns)

power motor control centers >

(28 columns, 147 drawers)

RtU (4 columns) >

Integrated protection and >

control system

a dual redundant local control Unit

(lcU) based on redundant plcs, is in-

stalled in the Normal Electrical Room.

this lcU is connected, via a redun-

dant modbus on multimode fiber op-

tic, to a Remote control Unit (RcU)

installed in the Emergency Electri-

cal Room. the lcU communicates,

via redundant Ethernet network on

multimode fiber optic, with an Indus-

trial pc installed in the main Electri-

cal Room.

solUTions deliveRed

working closely with its Uralsk-based

partner in kazakhstan, skema was re-

sponsible for the provision of the pmcc

switchboards for the atyrau Refinery.

the project proved to be a success

thanks both to the experience ac-

quired by skema in the kazakh market

since 1998, which it was able to

leverage fully, and to the important

technology transfer program es-

tablished with its kazakh partner.

the commissioning was carried out

by local electrical engineers, un-

der the supervision of skema’s site

services manager.

skema’s supply included:

power centers (32 columns) >

motor control centers >

(57 columns, 371 drawers)

AwA pAloUkoU plATfoRM / coNgo

ATYRAU RefineRY / kazakhstaN

kAzAkhsTAn

congo

caspian sea

Uzbekistan

kyrgyzstan

gabon

angola

democratic Republic of the congo

06 07

a

atyr

au

awa

palo

ukou

a

thE chIlEaN lNg pRojEct coNsIsts oF a NEw gRass-Roots lNg REcEIvINg tERmINal locatEd at QUINtERo baY, ap-

pRoxImatElY 160 km NoRthwEst oF saNtIago, chIlE. lNg caRRIER shIps UNload at a NEw jEttY bUIlt at QUINtERo,

INto two stoRagE taNks. pRocEss FacIlItIEs aRE INstallEd to ENablE thE lNg to bE pUmpEd FRom thE stoRagE

taNks, vapoRIzEd aNd ExpoRtEd INto thE ExIstINg tRaNsmIssIoN sYstEm vIa a NEw pIpElINE. thE tERmINal Is ExpEct-

Ed to mEEt 40% oF chIlEaN gas dEmaNd, wIth aN ovERall aNNUal sUpplY capacItY oF 2.5 mIllIoN toNNEs oF lNg.

epc contractor: cb&i / end user: gnl QUinTeRo / a jv between: british gas, endesa chile, enap, metrogas

solUTions deliveRed

skema’s provision included 380v

switchgear, interface panels and pow-

er transformers:

10 power motor control centers >

(47 columns and 205 drawers)

5 Interface panels >

4 power transformers >

For this supply, skema’s pmccs were

successfully tested for seismic load

for the following values:

peak horizontal >

ground acceleration: 0.83 g

peak vertical >

ground acceleration: 0.59 g

seismic design code: >

ascE 7/Ibc 2000

the strength of the structures was

tested for:

Resistance and stability for indi- >

vidual modules and for the vari-

ous configurations

ground anchors >

links between modules (bolts) >

Internal links to modules (rivets) >

solUTions deliveRed

Engineering, manufacturing, testing

and commissioning of pmcc type lv

switchgear and bus ducts.

skema supplied switchgear for pump

stations ps-g2 and ps-g1 and for the

intermediate pigging Ip-a1.

skema’s supply included:

power motor control centers >

(137 columns, 436 drawers)

3 dc panels >

bus ducts >

thE bakU-tbIlIsI-cEYhaN pIpElINE tRaNspoRts cRUdE 1,760 km (1,094 mIlEs) FRom thE azERI-chIRag-gUNEsh-

lI oIl FIEld IN thE caspIaN sEa to thE mEdItERRaNEaN sEa. It passEs thRoUgh bakU, thE capItal oF azERba-

IjaN; tbIlIsI, thE capItal oF gEoRgIa; aNd cEYhaN, a poRt oN thE soUth-EastERN mEdItERRaNEaN coast oF

tURkEY, hENcE Its NamE. It Is thE sEcoNd loNgEst oIl pIpElINE IN thE woRld aNd oNE oF thE bIggEst ENgI-

NEERINg pRojEcts.

epc contractor: peTRofAc / end user: bRiTish peTRoleUM

“All in all the Skema service was very satisfactory.”

Contracts Administrator

chileAn lng / chIlEbAkU Tbilisi ceYhAn pipeline / azERbaIjaN aNd gEoRgIa

chileargentina

south pacific ocean

paraguay

Uruguay

geoRgiA

AzeRbAijAn

caspian seablack sea

turkey

IranIraq

syria

08 09

B C

baku

tbi

lisi

cey

han

chil

ean

lng

kAzAkhsTAn

gReece

caspian seaUzbekistan

kyrgyzstan

turkey

bulgaria

Romania

albania

black sea

solUTions deliveRed

skema’s supply included the design,

manufacturing, testing and supply

of medium voltage switchboards

and Intelligent power motor control

centers, including:

6 kv mv switchboards >

(31 sections)

Intelligent motor control centers >

(69 columns, 279 drawers)

power centers (24 columns) >

capacitors panels >

10

C

chinARevskoYefield / kazakhstaNchINaREvskoYE FIEld, appRoxImatElY 324 sQUaRE kIlomEtERs IN sIzE, Is sItUatEd closE to thE cItY oF URalsk

IN wEst kazakhstaN aNd Is oNlY 60 km FRom thE boRdER wIth thE RUssIaN FEdERatIoN. thE FIEld coNsIsts

oF aN oIl pRocEssINg FacIlItY capablE oF pRocEssINg 400,000 tpa oF cRUdE oIl, mUltIplE oIl gathERINg aNd

tRaNspoRtatIoN lINEs, a gas powEREd ElEctRIcItY gENERatIoN sYstEm, majoR waREhoUsE FacIlItIEs FoR thE

stoRagE oF oIl, matERIals, machINERY aNd chEmIcals UsEd IN cRUdE oIl pRodUctIoN, aN EmploYEE FIEld camp

FoR 180 pEoplE as wEll as 14 ExIstINg wElls aNd 4 ExploRatIoN wElls UNdER dRIllINg aNd tEst opERatIoNs.

epc contractor: exTeRRAn/belleli eneRgY / end user: zhAikhMUnAi llp

coRinTh RefineRY / gREEcE

thE coRINth REFINERY wIth Its aNcIllaRY plaNts aNd oFFsItE FacIlItIEs Is coNsIdEREd as oNE oF thE

most modERN REFINERIEs IN EURopE. dUE to Its FlExIbIlItY It caN pRocEss cRUdE oIls oF vaRIoUs chaR-

actERIstIcs aNd pRodUcE a FUll RaNgE oF pEtRolEUm pRodUcts, complYINg wIth thE most stRINgENt

INtERNatIoNal spEcIFIcatIoNs, sERvINg majoR pEtRolEUm maRkEtINg compaNIEs IN gREEcE aNd abRoad.

thE REFINERY pRodUctIoN opERatIoNs aRE locatEd IN agII thEodoRI, IN thE pRovINcE oF coRINth, aboUt

70 km oUtsIdE athENs.

epc contractor: Technip / end user: MoToR oil hellAs

solUTions deliveRed

skema was awarded the contract for

the design, engineering, manufactur-

ing and installation of low voltage

switchgear for the new crude distilla-

tion Unit complex of the refinery.

skema provided for the project:

power motor control centers >

(53 columns, 188 drawers)

distribution panels >

bus ducts >

power Factor correction system >

11

C

chin

arev

skoy

e

cori

nth

campos basIN Is a pEtRolEUm RIch aREa locatEd oFFshoRE oF RIo dE jaNEIRo. It has a total aREa oF 100,000

sQUaRE kIlomEtERs. thE Fpso osx2 wIll bE UsEd IN thE campos basIN, bRazIl, oN oNE oF a stRINg oF hEavY

oIlFIElds dIscovEREd bY ogx. thE osx2 wIll bE ablE to pRodUcE Up to 100,000 baRREls pER daY oF oIl, wIth

stoRagE capacItY FoR 1.3 mIllIoN baRREls.

epc contractor: sbM offshoRe / end user: osx-gRUpo ebx

solUTions deliveRed

skema was awarded the contract for

the design, manufacturing, inspection

and testing of power motor control

centers, as detailed below:

4 power centers >

(14 columns)

1 motor control center >

(66 columns, 275 drawers)

the switchgear supplied by skema,

that feature a rated current of 5000 a

and rated short-time withstand current

of 100 ka, comply with the most strin-

gent requirements of the offshore ma-

rine applications: compact dimensions

for limited space, handles on the front

of the switchgear to prevent person-

nel’s injuries in case of sudden move-

ments, anti-vibration basement against

marine solicitations. skema used the

bender system, to monitor the electrical

network and to reveal defect and prob-

lems on the network that can compro-

mise the functioning of the switchgear.

solUTions deliveRed

skema was responsible for the de-

sign, manufacturing, supply, inspec-

tion, testing, export packing, super-

vision of commissioning on site of

low voltage switchgear and Intelli-

gent motor control centers.

skema supply included:

power centers (7 columns) >

motor control centers >

(12 columns, 19 drawers)

auxiliary services switchboards >

thE thERmoElEctRIc powER plaNt IN djENo, NEaR poINt NoIR IN coNgo, has a 25 mEgawatt powER capacItY.

thE powER plaNt Is FIREd wIth assocIatEd gas FRom thE oFFshoRE plaNts oF kItINa, djambala aNd FoUkaN-

da, locatEd 65 km FRom thE coast aNd pRodUcINg a total oF 26,000 baRREls oF oIl pER daY. gas Is sEpa-

RatEd oNshoRE at thE djENo tERmINal closE to thE NEw powER plaNt. thE pRojEct REpREsENts thE FIRst

ExamplE oF UsE aNd ExploItatIoN oF assocIatEd gas othERwIsE FlaREd. thE pRojEct aIms at REdUcINg gas

FlaRINg aNd at UsINg It IN powER gENERatIoN wIth sIgNIFIcaNt socIal, EcoNomIc aNd ENvIRoNmENtal bENEFIts.

epc contractor: Renco / end user: eni congo

fpso osx2 / bRazIl

djeno poweR geneRATion plAnT / coNgo

congo

bRAzil

gabon

angola

bolivia

paraguay

surinameguyana

democratic Republic of the congo

French guiana

D f

12

djen

o

Fpso

osx

2

13

solUTions deliveRed

skema was awarded the contract for

the detailed design, supply and instal-

lation of a prefabricated metal local

Equipment Room (lER) fully assem-

bled, wired and tested in skema’s fac-

tory in cesano maderno, for installa-

tion on site. the lER is composed of:

> weather-tight enclosure and

supporting structure

Electrical equipment room >

Instrumentation equipment room >

small power distribution within >

the building

hvac systems >

pa/ga loudspeaker system facilities >

Fire & gas detection >

co >2 flood system

pabx telephone system facilities >

Normal lighting system, includ- >

ing external door lighting

Escape lighting system on emer- >

gency exits and routes

cable trays/racks >

Earthing system >

portable fire extinguishers >

thE haNNIbal soUR gas plaNt locatEd 20 kIlomEtERs soUth oF sFax pRocEssEs thE hYdRocaR-

boNs bRoUght oNshoRE FRom thE mIskaR gas FIEld, locatEd 125 kIlomEtERs oFFshoRE IN thE

gUlF oF gabEs, tUNIsIa. thIs FIEld Is 100% opERatEd bY bg tUNIsIa. soUR gas FRom tEN wElls Is sENt

thRoUgh a pIpElINE aNd pRocEssEd at thE haNNIbal plaNt aNd sUpplIEd to thE socIété tUNIsI-

ENNE dE l’ElEctRIcIté Et dU gaz (stEg), tUNIsIa’s statE ElEctRIcItY aNd gas compaNY. dURINg Its lIFE-

tImE, It Is EstImatEd that thE mIskaR FIEld wIll pRodUcE moRE thaN 700 bIllIoN cUbIc FEEt oF gas.

epc contractor: woRleYpARsons / end user: bg TUnisiA

skEma paRtIcIpatEd IN thE REvampINg oF thE pmcc swItchgEaR FoR thE kItINa aNd zap platFoRms, oFF-

shoRE IN coNgo, aRoUNd 50 km FRom poINt NoIRE. thE pREvIoUs swItchgEaR was sUpplIEd bY NUo-

va Q.E.m. QUadRI ElEttRIcI mIlaNo, FRom whIch skEma acQUIREd thE ExpERtIsE, thE woRk oRdER doc-

UmENtatIoN aNd spaRE paRts FoR ovERall pRojEcts, IN ItalY aNd abRoad. thIs acQUIsItIoN allows

skEma to pRovIdE maINtENaNcE, ExtENsIoNs, ExpaNsIoN aNd REvampINg sERvIcEs FoR low voltagE swItch-

gEaR sUpplIEd bY NUova Q.E.m. thUs gUaRaNtEEINg opERatIoNal coNtINUItY FoR INstallEd pRodUcts.

epc contractor: Renco / end user: eni congo

solUTions deliveRed

skema was awarded the con-

tract for the engineering, manu-

facturing, commissioning, test and

assistance on site of Intelligent

low voltage switchgear, in detail:

1 power center >

2 motor control centers >

the switchgear was engineered for

the integration with existing switch-

gear, and was commissioned by

skema’s personnel on site.

skema is available for documentation

consultation, and to provide any addi-

tional information to design, support,

provision of spare parts and evalu-

ation of proposed systems that in-

volve the integration of skema prod-

ucts with those previously installed by

Nuova Q.E.m. Quadri Elettrici milano.

hAnnibAl soUR gAs / tUNIsIa

a

14

kiTinA And zAp plATfoRMs / coNgo

congo

TUnisiAgabon

angola

democratic Republic of the congo

lybiaalgeria

morocco

H k

hann

ibal

kiti

na a

nd z

ap

14 15

solUTions deliveRed

skema was awarded the contract for

the design, manufacturing, inspec-

tion and testing of 81 low voltage

distribution boards.

the supply included:

26 indoor, arc internal proof distri- >

bution boards, with Esd function-

ality and Ip31 grade of protection

3 outdoor distribution boards, >

Ip65 grade of protection

all electrical details and require- >

ments (short circuit, dielectric,

etc.), as per IEc 60439

laggaN aNd toRmoRE aRE two gas aNd coNdENsatE FIElds sItUatEd aboUt 125 km NoRth-wEst oF thE shEt-

laNd IslaNds IN thE Uk. thE laggaN aNd toRmoRE pRojEct INvolvEs thE dEvElopmENt oF thE two FIElds aNd

coNstRUctIoN oF a gas pRocEssINg plaNt aNd ExpoRt pIpElINE. hERE, watER dEpths dEscENd RapIdlY FRom

aN avERagE oF 120 m to 600 m aNd bEYoNd. It Is a UNIQUElY challENgINg ENvIRoNmENt IN whIch to opERatE,

bUt also oNE wIth gREat potENtIal.

epc contractor: peTRofAc / end user: ToTAl

thE pRojEct coNsIsts oF thE dEvElopmENt oF a pRodUctIoN UNIt FoR thE YmE pRojEct. thE YmE FIEld Is lo-

catEd IN thE EgERsUNd basIN IN thE NoRth sEa, appRoxImatElY 110 km oFFshoRE IN thE NoRwEgIaN coNtI-

NENtal shElF. thE YmE FIEld coNsIsts oF two maIN REsERvoIRs, bEta aNd gamma, whIch aRE appRoxImatE-

lY 12 km apaRt. thE YmE RE-dEvElopmENt pRojEct Is basEd oN a mopUstoR, whIch Is a mobIlE oFFshoRE

pRodUctIoN UNIt wIth a sUbsEa stoRagE taNk. thE mopUstoR wIll bE locatEd at thE gamma REsER-

voIR wIth sURFacE complEtIoN oF thE gamma wElls aNd tIE back oF thE complEtEd sUbsEa bEta wElls.

epc contractor: sbM-gUsTo Msc / end user: TAlisMAn eneRgY noRge As

solUTions deliveRed

skema supply included pmcc switch-

gear, specifically:

power centers (11 columns) >

motor control centers >

(51 columns, 283 drawers)

lAggAn ToRMoRe / NoRth sEa (Uk)

MopUsToR YMe / NoRwaY

“Skema’s performance in terms of the delivery of hardware and the submis-sion of documents was excellent. Particularly in relation to the close-out of

the final documentation (Manufacturing Record Books and Technical Operat-ing and Maintenance Manuals), Skema was an example to other suppliers. We would like to take this opportunity to thank Skema for all their efforts in

ensuring a successful close-out of the purchase order.”

Project Expeditors

“We are delighted to work with Skema and the kind of support you extend to us in the critical

phase of the project.”

Senior Electrical Engineer

UniTedkingdoM

noRwAY

Ireland

France

germany

Finland

sweden

l m

lagg

an t

orm

ore

mop

usto

r ym

e

16 17

solUTions deliveRed

skema was awarded the contract for

the supply of:

power centers (124 columns) >

motor control centers >

(600 columns, 2,529 drawers)

lv distribution boards >

skema has been operating actively

in Russia, supplying its products for

use on projects in an array of differ-

ent industries: oil & gas, petrochem-

ical, energy and utilities, processing

and manufacturing.

thE REFININg aNd pEtRochEmIcal complEx IN NIzhNEkamsk, REpUblIc oF tataRstaN, 250 km FRom thE capItal

cItY oF kazaN, Is oNE oF thE most ambItIoUs oIl & gas pRojEcts IN RUssIa, whIch doUblEd thE REFINEd cRUdE

RUN FRom aNNUal 7 to 14 mIllIoN toNs. thE REFINERY has aRomatIcs UNIts aNd a dEEp coNvERsIoN sEctIoN

wIth a FlUIdIzEd catalYtIc cRackER, a dIstIllatE hYdRocRackER, a dElaYEd cokER, aNd a gasIFIcatIoN plaNt.

thE pEtRochEmIcal plaNt INclUdEs pURIFIEd tEREphthalIc acId, polYEthYlENE tEREphthalatE, lINEaR alkYl-

bENzENE aNd polYpRopYlENE UNIts, plUs thE assocIatEd powER gENERatIoN FacIlItIEs.

end user: TAneco

satah FUll FIEld Is locatEd 200 km NoRthwEst oF abU dhabI, UNItEd aRab EmIRatEs. thE satah FUll FIEld

dEvElopmENt pRojEct’s objEctIvE Is to maxImIzE cRUdE oIl pRodUctIoN aNd oIl REcovERY bY REdUcINg thE

wEll hEads’ back pREssURE aNd INtRodUcINg oF gas INjEctIoN aNd gas lIFt FacIlItIEs. thE pRojEct scopE IN-

volvEs oFFshoRE bRowNFIEld woRks to thE ExIstINg wEll hEad platFoRms aNd pRodUctIoN maNIFold plat-

FoRm, INstallatIoN oF INFIEld pIpElINEs, as wEll as modIFIcatIoNs aNd INstallatIoN oF NEw FacIlItIEs at thE

oNshoRE satah plaNt at zIRkU IslaNd.

epc contractor: npcc-Technip consoRTiUM / end user: zAkUM developMenT coMpAnY (zAdco)

solUTions deliveRed

skema was awarded the contract for

the design, manufacturing, inspection

and testing of power and lighting dis-

tribution boards and lighting panels

(safe area) for the onshore portion of the

project. the distribution boards provid-

ed for the project are for both indoor and

outdoor usage, they have Ip42 degree

of protection, meet special requirements

for saline ambient and are equipped

with a very large number of cables.

skema supplied for the project:

14 distribution boards >

cable boxes and glands >

nizhnekAMsk RefineRY / RUssIa

sATAh fUll field / UaE

“We have been fully content with Skema’s support given to us in

any aspect of our activity. Skema’s state-of-the-art products are of

great interest to Russian design-engineering organizations and

end users. High professional skills of Skema’s specialists team that

conduct the training sessions is worth mentioning”.

Managing Director

RUssiA

kazakhstan

IranIraq

saudi arabia

Yemen

oman

UAeQatar

kuwait

n S

nizh

neka

msk

sata

h

18 19

thE staatsolIE maatschappIj sURINamE N.v. Is locatEd IN sURINamE, NEaR paRamaRIbo, IN thE waNIca dIs-

tRIct. thE pRojEct Is a majoR ExpaNsIoN to thE ExIstINg REFINERY, aNd thE objEctIvE Is to INcREasE thE

cRUdE capacItY at thE FacIlItY to 15,000 baRREls pER daY. ElEctRIcal loads FoR thE abovE UNIts shall bE

FEd FRom thE NEw ElEctRIcal sUbstatIoN IN thE l-01 plaNt.

epc contractor: sAipeM / end user: sTAATsolie MAATschAppij sURinAMe n.v.

solUTions deliveRed

skema was awarded the contract for

the design, manufacturing, inspection

and testing of the medium voltage

and low voltage switchboards and

the Electrical Integrated control and

monitoring system as detailed below:

5 power motor control centers >

(94 mcc, 15 pc type, 461 starters)

8 bus duct lines 3200 a >

2 mv 6 kv switchgear >

(24 columns)

3 mv 12.3 kv switchgear >

(35 columns)

3 RtUs >

Ecms system >

the Ecms is based on a redundant

RtU which operates as a gateway

between the electrical users and the

dcs. the dcs controls all the proc-

ess motors via a redundant Ethernet

link over modbus/tcp; the motor ac-

tivation time is shorter than 200 ms,

while the total loop response time is

shorter than 400 ms.

lv swiTchgeAR /

inTelligenT Mccs

the low voltage switchgear and

Intelligent mccs supplied for the

project are equipped with smart

relays that communicate with the

Ecms using the IEc 61850 protocol,

which affords a number of benefits,

such as interoperability between all

the devices in the substations re-

gardless of the manufacturer, and

free allocation of real functions on

all levels, allowing for the construc-

tion of flexible and open, yet tailored,

solutions that are future-proofed to

deal with upcoming advances in

communication technology.

the IEc 61850 standard provides

long-term validity through the di-

viding of applications and commu-

nications, and support throughout

the life cycle thanks to the intro-

duction of a standardized substa-

tion configuration language (scl).

the result is an appreciable reduc-

tion in costs for the secondary system

over its life cycle. the lv bus duct is of

the compact type with copper lines; it

provides a complete solution for con-

nections between power stations and

transformers and the main panel board.

lv switchgear features:

13 Incomers REF 615 >

5 bus-tie REF 630 >

352 ltmR motor managers >

Mv swiTchgeAR

the medium voltage switchgear for the

project is equipped with a metal enclo-

sure suitable for indoor installations.

since the switchgear is highly modular,

the selection of components required

by any application is very simple.

the switchgear’s functional units are

guaranteed arc-proof in accordance

with IEc 62271-200 standards, ap-

pendix aa, class a accessibility, crite-

ria 1 to 5. all the installation, operation

and maintenance operations can be

carried out from the front of the unit.

the switchgear and earthing switches

are operated from the front, with the

door closed. the communication pro-

tocol for the mv protection relays is IEc

61850, as it is for the lv switchgear.

mv switchgear features:

Rated current 1250 a >

1 REF 630 >

(used for protection and ats)

17 REF 615 >

“I would like to express my complete satisfaction for the activities per-

formed by you during engineering andconstruction of equipment.”

Field Electrical Engineer

sURinAMe

brazil

bolivia

paraguay

guyanaFrench guiana

ToUT lUi fAUT RefineRY / sURINamE

t t

tout

lui

Fau

t

tout

lui

Fau

t

20 21

O

22

solUTions deliveRed

skema was awarded the contract for

the design, manufacturing, supply,

inspection, testing and commis-

sioning of 9 power motor control

centers switchgear, in detail:

power centers (11 columns) >

motor control centers >

(63 columns, 279 drawers)

bus ducts >

5 distribution boards >

thE Utbs (UNIté dE tRaItEmENt dE bRUt à hassI mEssaoUd) coNsIsts oF thREE IdENtIcal tREatmENt tRaINs,

Each wIth capacItY oF 100,000 baRREls pER daY, FoUR 50,000 m3 pRodUct stoRagE vats, two aERIal ElEctRIc

lINEs oF 30 kv, a statIoN oF 30 kv aNd 45 km pIpElINEs tRaNspoRtINg oIl, watER aNd gas. thE pRojEct, whIch

aIms to ImpRovE cRUdE oIl QUalItY aNd pRodUctIoN RatEs, sIgNIFIcaNtlY coNtRIbUtEs to soNatRach’s hassI

mEssaoUd FIEld optImIzatIoN pRodUctIoN pRogRam, gIvEN thE ExtENt oF thE FIEld’s REsERvEs, thEIR QUalItY

aNd thEIR complExItY. thE FacIlItY Is dEsIgNEd to tREat aNd tRaNspoRt cRUdE oIl FRom sIx FIElds soUth oF thE

maIN FIEld to a stoRagE cENtER at haoUd El hamRa. hassI mEssaoUd Is algERIa’s oldEst aNd laRgEst FIEld.

epc contractor: sAipeM / end user: sonATRAch

UTbs / algERIa

mai

npr

ojeC

ts

ons

hore

offs

hore

italy

AlgeRiA

morocco

western sahara

mauritania

lybia

tunisia

U italy

utbs

mai

n pr

ojec

ts

22 23

01

13

14

23

175331

03

30

33

07

32

4327

0547

55

04

41

1215

62

38

10

24

20

28

39

58 61

59

49

11

51

46

3657

21 52 19

16

63

42

09

50

34

65

37

06

6040

56 29

18

02

4544

26

54

35

25

22

08

48

64

01 arluno

02 augusta

03 bagnolo mella

04 benevento

05 bordolano

06 brindisi

07 brunico

08 busalla

09 candela

10 carassai

11 casalborsetti

12 cassino

13 casteggio

14 caviaga

15 cavone

16 contarina

17 cortemaggiore

18 crotone

19 dosso degli angeli

20 Falconara

21 Ferrara

22 Ferrera

23 gaggiano

24 gagliano

25 gela

26 giaurone

27 glorenza

28 grottammare

29 hera lacinia

30 livorno

31 mantova

32 marlengo

33 medesano

34 melfi

35 milazzo

36 minerbio

37 monte alpi

38 Nera montoro

39 pineto

40 pisticci

41 pomigliano

42 porto marghera

43 prati di vizze

44 priolo gargallo

45 Ragusa

46 Ravenna

47 Ripalta

48 Rivalta

49 Roseto

50 Rotello

51 Rubicone

52 sabbioncello

53 sarmato

54 sarroch

55 sergnano

56 simeri crichi

57 s. potito

58 s. salvo

59 sulmona

60 taranto

61 termoli

62 torrevaldaliga

63 torviscosa

64 trecate

65 val d’agri

sINcE Its FoUNdatIoN IN 1974, skEma has bEEN oNE oF ItalY’s lEadINg NamEs FoR oNshoRE aNd oFF-

shoRE applIcatIoNs: oIl & gas plaNts, REFINERIEs, powER plaNts, oFFshoRE platFoRms, shIp-

pINg, pIpElINEs aNd, moRE gENERallY, pRocEssINg, maNUFactURINg aNd sERvIcEs pRojEcts.

end users: skema’s longstanding end users For projects in italy include: Agip, edison, enel,

enicheM, eni gRoUp, eRg, fiAT engineeRing, fosTeR wheeleR, ilvA, sAipeM, sARAs, snAMpRogeTTi, TechinT,

Technip, TecniMonT

offshoRe pRojecTs

agostino a agostino b agostino c amelia b amelia c amelia danemone bangela angelina angela cluster annabella antares antonella arianna aarmida barbara a barbara b

barbara d barbara E barbara F barbara g barbara h barbara t barbara t2basil calpurniacervia b cervia c cervia E daria b Eleonora garibaldi agaribaldi c

garibaldi kgela 1 giovanna luna apca pcbpc-wa pc80 bIsRavennaRegina

onshoRe pRojecTs

power plantplatform

oil plant

gas plant

Refinery / plant

italy

mai

n pr

ojec

ts

24 25

italy

mai

n pr

ojec

ts

top

proj

eCts

al

phab

etic

al

orde

r

a-z26 27

dIscovEREd IN 2007, thE goldEN EaglE aREa (whIch Is madE Up oF REsERvoIRs goldEN EaglE, hobbY aNd

pEREgRINE), Is locatEd IN appRoxImatElY 113 m watER dEpth IN thE Uk sEctoR oF thE NoRth sEa 70 km oFF-

shoRE (19 km NoRth oF thE bUzzaRd FIEld, 21 km NoRthwEst oF thE EttRIck FIEld aNd 4 km soUth oF thE

atlaNtIc FIEld). thE FIEld Is dEvElopEd UsINg two platFoRms - a wEllhEad platFoRm aNd a pRodUctIoN,

UtIlItY aNd QUaRtERs (pUQ) platFoRm. thE two platFoRms aRE coNNEctEd bY a 70 m bRIdgE. thE FacIlI-

tIEs bEINg bUIlt at goldEN EaglE caN act as a FUtURE hUb FoR tIEbacks. opERatoR NExEN has EstImatEd

thE goldEN EaglE aREa coNtaINs 140-150 mIllIoN baRREls oF oIl EQUIvalENt IN gRoss REcovERablE coN-

tINgENt REsoURcEs, makINg It oNE oF thE laRgEst oIl dIscovERIEs IN thE Uk NoRth sEa IN REcENt YEaRs.

epc contractor: cb&i / end user: nexen peTRoleUM

skeMA MoToR conTRol And

MAnAgeMenT sYsTeM (McMs)

the motor control and manage-

ment system (mcms) developed for

the platforms integrates the intelli-

gent motor control centers made by

skema with the process control sys-

tem (pcs), the power management

system (pms) and the distribution

management system (dms), and en-

ables an integrated and safe man-

agement of all the electrical users.

the integration is achieved thanks

to the communication capabili-

ties of the dcUs which operate as

gateways between the upstream

pcs/pms/dms and the IEds with-

in the downstream switchgear.

the dcUs allow concurrent commu-

nication via redundant modubus-RtU

and opc between the different sys-

tems. such integration completely ex-

ploits the capabilities of the 400 IEds

(supplied by different manufacturers)

which measure, protect and control

all the users connected to the mcms.

Importantly, the mcms not only helps

the operator to control the users, but

is of great significance to the electrical

engineer in verifying the performances

of the electrical networks by means of

continuous monitoring of the param-

eters set in the IEds with special at-

tention to those which influence the

reliability/maintenance of the plant.

the mcms records the running hours,

the number of operations of each

feeder circuit and analyzes the most

frequent causes of tripping/alarms,

so that the engineer can plan proac-

tive counter measures to avoid future

plant problems which may cause eco-

nomic losses and, in the worst cas-

es, safety risks to the plant/personnel.

this type of intelligent reporting is piv-

otal in ensuring a proactive and cost ef-

fective maintenance regime of the plant.

all the dcUs components are dual

redundant and can survive any in-

dividual component failure. the se-

rial links communicating with the

downstream IEds via modbus-RtU

ring (motor managers, measuring

devices and protection relays) can

survive a fault where the serial ca-

ble is broken between two devices.

system response times are of ut-

most importance, the mcms is de-

signed for ultimate performance. a

command received from the pcs is

actuated by the IEds in less than

100 ms and the change of status

is available to the pcs in less than

1 second. these performances are

achieved while the dcUs communi-

cate concurrently with the pcs via

modbus-tcp, with the pms via mod-

bus-RtU and with the dms via opc.

solUTions deliveRed

skema was awarded the contract for the

design, engineering and manufacturing

of Intelligent low voltage switchgear

and the motor control and manage-

ment system (mcms) for the project.

the supply consists of:

Intelligent motor control centers >

(72 columns, 341 drawers)

power centers (14 columns) >

4 dual Redundant >

data concentrator Units (dcUs)

distribution boards >

motor control and management >

system (mcms)

golden eAgle / NoRth sEa (Uk)

UniTedkingdoM

Ireland

France

germany

gg

gold

en e

agle

gold

en e

agle

28 29

jasmINE Is a gas coNdENsatE REsERvoIR that lIEs IN somE 80 m oF watER at a dEpth oF 4,115 m bElow thE

sEabEd, aNd Is locatEd 240 km soUth-East oF abERdEEN. thE jasmINE dEvElopmENt compRIzEd a wEllhEad

platFoRm tIEd back to thE coNocophIllIps opERatEd jUdY platFoRm, whIch Is appRoxImatElY 9 km wEst

oF thE jasmINE FIEld, vIa a mUltIphasE pIpElINE aNd RIsER platFoRm coNNEctEd to thE ExIstINg jUdY plat-

FoRm vIa a lINkINg bRIdgE.

epc contractor: woRleYpARsons / end user: conocophillips

solUTions deliveRed

skema was awarded the con-

tract for the design, engineering

and manufacturing of 7 low volt-

age switchboards and the Integrat-

ed protection and control system.

skema supply included:

Intelligent motor control centers >

(69 columns, 377 drawers)

power centers (27 columns) >

3 Remote terminal Units >

(RtUs)

Integrated protection and >

control system (Ipcs)

skeMA noMinee foR The AwARd

foR excellence

on 22nd February 2012 skema was

invited to attend the jasmine supplier

awards for Excellence ceremony, as

a Nominee among the 15 excellent

suppliers (out of the over 160 suppli-

ers for the project) to the conocophil-

lips jasmine development project.

conocophillips launched the jasmine

supplier awards for Excellence pro-

gramme in january 2011, with the aim

to develop and recognize the project’s

principal suppliers through setting key

metrics, evaluating business perform-

ance, identifying gaps and opportu-

nities for improvement and recog-

nizing and rewarding excellence.

being one of the best suppliers to

conocophillips is a matter of pride

for skema, whose nomination in the

“planning and delivery” category

was motivated by conocophillips

as follows: “skema was a bright

star in jasmine’s electrical success.

their embrace of sap’s ERp prior to

jasmine was evident in their planning,

scheduling, detailed design, material

availability, along with the lv switch-

gear’s and mcc’s fabrication.”

“Many thanks for all your good efforts in making this happen.

Skema’s proactive approach towards resolving and expediting really helps

us and is very much appreciated by the Project.”

Senior Expeditor

jAsMinedevelopMenT / NoRth sEa (Uk)

UniTedkingdoM

Ireland

France

germany

jj

jasm

ine

jasm

ine

30 31

jj

32 33

jasm

ine

jasm

ine

kARAchAgAnAk, The enoRMoUs gAs field - thE kaRachagaNak FIEld, locatEd oNshoRE IN wEstERN ka-

zakhstaN (aRoUNd 150 km to thE East oF thE cItY oF URalsk), was dIscovEREd IN 1979 aNd Is oNE oF thE

laRgEst gas coNdENsatE FIElds IN thE woRld. covERINg aN aREa oF 280 km2 aNd holdINg ovER 1.2 bIllIoN

toNs oF oIl aNd coNdENsatE aNd 1.35 tRIllIoN m3 oF gas, thE gIaNt kaRachagaNak FIEld pRodUcEs aN av-

ERagE oF 150,000 baRREls oF coNdENsatE aNd 20 mIllIoN m3 oF gas pER daY. thE ExpaNsIoN oF thE FIEld

has INvolvEd aN INvEstmENt oF ovER $ 5.5 bIllIoN.

epc contractor: jv bechTel lTd And snAMpRogeTTi Uk

end user: kARAchAgAnAk peTRoleUM opeRATing b.v.(kpo) / a consortium oF: british gas, eni, lukoil, chevron

solUTions deliveRed

skema supplied for the project:

9 packaged substations, com- >

plete with mv switchboards,

transformers, 400 v switchgear/

motor control centers, battery

and battery charger, distribution

boards, hvac system, Fire and

safety and the lighting system

lv switchgear and motor control >

centers (20 switchboards, more

than 250 panels and 1300

motor starters)

Mv And lv swiTchgeAR

key features of skema’s Intelligent

motor control centers are its draw-

ers and incomers equipped with

microprocessor relays. In addi-

tion skema developed the Electri-

cal control system for the karach-

aganak project in kpc and Unit 2.

Each station is equipped with a Re-

mote terminal Unit (RtU), which col-

lects data from the switchboards

and interfaces with dms and dcs.

the accumulated data is then made

available for visualization on Ews

and on plan dms. skema has sup-

plied a total of nine packaged sub-

stations for Early works, two 6 kv

packaged substations for Unit 3, a

packaged substation for a Flash gas

compressor control Room, and a se-

ries of eight packaged substations

for a waste management complex.

as for the switchgear, skema supplied

the karachaganak project alone with

some 123 mv panels, 622 lv panels,

38 RtUs, 24 110v dc panels, more

than 250 relays, and 2,559 drawers.

kARAchAgAnAk / kazakhstaN

“Skema provided an excellent serv-ice in assisting with the commission-

ing of their supplied equipment on site here in Karachaganak. I can say that the work completed was carried

out in a timely manner, to high stand-ards, often in arduous conditions.

The working relationship that devel-oped with Skema personnel was ex-

cellent, as they were always pre-pared to go the extra mile to resolve any anomaly that arose on site and meet the end user’s expectations.”

Electrical Commissioning Engineer, KPO

kAzAkhsTAn

caspian seaUzbekistan

kyrgyzstan

kara

chag

anak

kara

chag

anak

kk

34 35

k

36 3736

4Th sTAbi-lizATion & sweeTening TRAinEpc coNtRactoRs: peTRofAc

ENd UsER: kARAchAgAnAk

peTRoleUM opeRATing b.v.(kpo)

/ a coNsoRtIUm oF: bRItIsh gas,

ENI, lUkoIl, chEvRoN

the karachaganak 4th stabilization &

sweetening train project aims to increase

the capacity of the existing karachaga-

nak processing complex (kpc) facilities

through the addition of a fourth train.

solUTions deliveRed

skema was responsible for the de-

sign, manufacturing, supply, in-

spection, testing, export packing

and supervision of testing and com-

missioning of:

power centers (12 columns) >

Intelligent lv switchgear/motor >

control centers

(78 columns, 266 drawers)

bus ducts >

RtUs (6 columns) >

In tegra ted pro tec t ion and >

control system

wAsTe MAnAgeMenT coMplexENd UsER: kARAchAgAnAk

peTRoleUM opeRATing b.v.

(kpo) / a coNsoRtIUm oF:

bRItIsh gas, ENI, lUkoIl,

chEvRoN

as part of its long-term commit-

ment to health, safety and environ-

mental protection, the kpo consor-

tium has completed construction of

a new Eco-centre (waste manage-

ment complex), which houses state-

of-the-art technology and enables

the recycling, treatment and safe dis-

posal of drilling fluids and wastes.

solUTions deliveRed

skema was awarded the contract

for the design, engineering, manu-

facturing, inspection and testing of:

1 transformer >

packaged substation

1 lv switchgear >

packaged substation

the transformers and substations were

housed within a two-hour fire-rated

enclosure, and were supplied as com-

plete pre-wired and assembled mod-

ular self-contained units, installed on

concrete leg foundations 1,400 mm

above ground, and equipped with

bolt-on stairs and access platforms.

the transformers package included

two 6/0.72 kv, 3 mva each, to allow

maintenance of one unit while the oth-

er is in service, as well as power and

auxiliary cables for interconnection to

the packaged lv substation. the lv

substation package included a tcc

690v switchboard, two 690/420 v,

400 kva each, transformers and a

tcc 400 v switchgear.

kk

kara

chag

anak

kara

chag

anak

36 37

The giAnT kAshAgAn - kashagaN, 80 km soUth-East oF atYRaU, IN thE NoRth caspIaN sEa, Is thE laRgEst oIl FIEld

dIscovEREd ovER thE last thIRtY YEaRs woRldwIdE aNd ExtENds ovER a sURFacE aREa oF appRoxImatElY 75 km bY 45

km. Its dEvElopmENt REpREsENts oNE oF thE gREatEst challENgEs FacEd bY thE pEtRolEUm INdUstRY, gIvEN thE dEEp,

hIgh-pREssURE REsERvoIR, thE hIgh sUlFUR coNtENt, thE shallow watERs that FREEzE IN wINtER aNd thE maRkEd shIFts

IN tEmpERatURE (FRom -30°c to +40°c). thE potENtIal daIlY avERagE pRodUctIoN amoUNts to 1.2 mIllIoN baRREls,

wIth EstImatEd REsERvEs oF 38 bIllIoN baRREls. thE kashagaN pRojEct coNsIsts oF two dEvElopmENts: oFFshoRE

complEx (aRtIFIcIal IslaNds IN thE caspIaN sEa) aNd oNshoRE complEx (bolashak oNshoRE pRocEssINg FacIlItY).

end user: Agip kco

/ a consortium oF: conocophillips - eni - exxonmobil - inpex - kazmunaigas - shell - total

solUTions deliveRed

skema supplied for the kashagan

project local Equipment Rooms,

medium and low voltage com-

plete packaged substations, proc-

ess and Uti l i t ies buildings, al l

lv switchgear/Intell igent power

motor control centers, RtUs, lms/

dms (onshore) and the Integrat-

ed protection and control system.

190 km2 total area of onshore operations =

the size of amsterdam

120,000 tons

total weight of steel items and struc-

tures used = 1.5 times the weight of the

golden gate bridge in san Francisco

510 km total length of pipelines = almost the dis-

tance between New York and montreal

5,000 km total length of electric and instrumen-

tation cables = about the distance

between almaty and Rome

50,000 m3

volume of concrete structures used

= the size of the landmark 88-floor

building of petronas towers in kuala

lumpur, malaysia

kAshAgAn / kazakhstaN

“Company congratulates Contractor with the big

achievement of meeting the requested delivery date, and thanks for its good work and

cooperation.”

Contract Holder

kAzAkhsTAn

caspian seaUzbekistan

kyrgyzstan

kk

kash

agan

kash

agan

38 39

Mv/lvpAckAged sUbsTA-TionsoNshoRE

skema was in charge of the engineering,

manufacturing, testing and commis-

sioning of 9 mv/lv packaged substa-

tions. the substations feed the infra-

structure utilities for the kashagan field

and are part of the Early works of the

kashagan Experimental programme.

Each substation was equipped with:

10 kv switchboards >

pmcc lv switchgear >

distribution boards >

distribution transformers >

ac and dc Ups batteries >

alarm and communication RtUs >

hvac system >

Electrical control system >

offshoRe bUildings / IN coUNtRYsolUTions deliveRed

Epc contract for 13 offshore Utilities

buildings for Island d.

keY sUccess fAcToRs:

maximum local content achieva- >

ble for modular substations

project delivered on time and >

without any punch list

complete project cycle managed >

by internal resources: from fea-

sibility studies to the design of

structures, electrical hvac and

safety systems, procurement,

construction, assembly, pre-com-

missioning, start-up, commission-

ing, load out activities and on site

supervision and installation

fRAMeAgReeMenToNshoRE /oFFshoRE

skema was awarded the frame agree-

ment for the provision of all intelligent

lv switchgear/Intelligent power mo-

tor control centers, RtUs, the Inte-

grated protection and control system

for both offshore and onshore facili-

ties and lms / dms (onshore).

5.5 km = the total length of columns

supplied by skema.

Epc coNtRactoRs:

Abb ps&s - AkeR kvAeRneR -

bATeMAn - consAfe - foRes

ge oil & gAs np – gUsTo Msc -

kAzsTRoYseRvice - liTwin -

Mss - pUnji lloYd -

sAipeM - sbM - sieMens

TURboMAchineRY -

RoseTTi MARino - Renco -

Tekfen - zAfeR

“The products supplied by Skema were able to meet the strict technical standards of the job. Skema’s project team showed competent technical skills and the ability to work

and support us at all stages of the project from engineering to commissioning.”

Project Electrical and Instrumentation Engineer

kk

40

kash

agan

kash

agan

40 41

locAleQUipMenTRooMsoFFshoREend user: Agip kco / a consor-

tium oF: conocophillips - eni -

exxonmobil - inpex - kazmun-

aigas - shell - total

skema was awarded the Epc contract

for the provision of 18 local Equip-

ment Rooms (lERs).

the scope of work includes the co-

ordination and monitoring of every

aspect of the project, from feasibili-

ty studies and cost/performance op-

timization to the design of structural,

electrical, hvac and safety systems,

procurement, construction, assembly,

commissioning, final inspection and

supervision of on-site installation.

the lERs are pre-fabricated steel-

structure modules, which have the

following systems installed: medium

and low voltage switchboards, trans-

formers, distribution switchboards,

Upss and relevant batteries, super-

vision and control equipment, hvac

with provisions for explosive/dan-

gerous gas injections, electrical net-

works, fire-detection and fire-fighting

systems and telecoms equipment.

Each lER has an average length of

50 m and weight of 1000 t.

the lERs were built in Raven-

na, shipped to the caspian sea

on barges and located on artifi-

cial islands in the caspian sea.

size of The leRs

scope of woRk diMensions (m) weighT (t)

complex a ler 36.3 x 15.3 x 8.3 800

drilling island main ler 55.2 x 15.3 x 8.3 1,050

drilling island hvac ler 35.9 x 11.3 x 8.3 500

psa1 main ler 48.6 x 15.3 x 8.3 1,000

psa1 hvac ler 42.6 x 15.3 x 8.3 800

riser island main ler 48.6 x 15.3 x 8.3 1,000

riser island hvac ler 24.6 x 15.3 x 8.3 500

psa2 main ler 48.6 x 15.3 x 8.3 1,000

psa2 hvac ler 42.6 x 15.3 x 8.3 800

pua main ler 57.5 x 15.3 x 8.3 1,150

pua hvac ler 43.7 x 15.3 x 8.3 850

lsa main ler 42.6 x 15.3 x 8.3 800

lsa hvac ler 42.6 x 15.3 x 8.3 800

lsa ibeev ler 33.8 x 17.6 x 11.8 800

drilling island east main ler 66.5 x 15.2 x 8.3 1,105

drilling island east hvac ler 48.5 x 15.2 x 8.4 947

pua emergency diesel generator ler 35.9 x 15.3 x 8.3 500

complex a emergency diesel generator ler 6.0 x 4.0 x 4.0 20

ToTAl 11,484 m2 14,422 tons

kk

kash

agan

kash

agan

“First of all congratulations at completing barge 3 and 4 pre-commissioning. Your personnel

and the support offered to them during their stay here was first class. All concerned were im-pressed – our subcontractors,

our client and all.”

Commissioning Superintendent

42 43

kk

kash

agan

kash

agan

44 45

18 leRs

offshore

9 substations

Early works / onshore

10 pUbs offshore / built in Italy

13 pUbsoffshore / built in country

(kazakhstan)

All pMccsFrame agreement for all lv

switchgear /

Intelligent power motor control

centers and RtUs /

onshore / offshore

5.5 km the total length of columns

supplied by skema

ipcs onshore / offshore

lMs/dMs onshore

eskene wesT RAil / oNshoRE

Eskene west Rail consists of three

basic facilities linked by a common

rail system that require upgrading

works to accommodate the increased

rail traffic from Rail loading Facili-

ties (RlF) and marshalling Yard (mYd).

solUTions deliveRed

skema was awarded the contract for

the design, fabrication, supply and

delivery of medium and low voltage

switchgear, motor control centers

and RtUs.

epc contractor:

woRleYpARsons

end user: Agip kco / a consorti-

um oF conocophillips - eni - exx-

onmobil - inpex - kazmunaigas -

shell - total

skema supply included:

10 kv switchboard >

(37 columns)

6 power motor control centers >

(45 columns)

19 motor control centers >

(123 columns)

8 RtUs (16 columns) >

33 distribution boards >

51 junction boxes >

kk

kash

agan

kash

agan

46 47

thE $ 1.5 bIllIoN oNshoRE gas dEvElopmENt (ogd) III pRojEct INvolvEs thE ExpaNsIoN oF thE pRodUctIoN ca-

pacItY oF a massIvE gas-pRocEssINg plaNt IN habshaN, appRoxImatElY 130 km soUth-wEst oF abU dhabI, IN

thE UNItEd aRab EmIRatEs. thE habshaN complEx Is oNE oF thE laRgEst gas-pRocEssINg plaNts IN thE woRld.

epc contractor: bechTel / end user: gAsco

solUTions deliveRed

skema was awarded the contract

for the supply of Intelligent low

voltage switchgear compliant with

the most stringent requirements

of the oil & gas industry, the in-

ternationally recognized shell dEp.

the supply included:

21 415 v switchgear systems/ >

motor control centers (378 col-

umns, 1662 drawers)

14 RtUs >

Integrated protection and control >

system (Ipcs).

ogd iii / UaE

inTegRATed pRoTecTion And conTRol sYsTeM (Ipcs)

the Ipcs is based on IcUs (Integrat-

ed control Units) located in each

substation, which communicate with

the motor starters and the protec-

tion relays, making all the information

available for the operator worksta-

tions and the redundant servers in-

stalled in the main control Room, and

operate as a gateway with the dcs,

which sends commands and receives

feedback via the tcp/Ip interface.

the Ipcs created for the gasco ogd

III project not only displays the status

and alarms of all the components of

the electrical network but also greatly

assists the operators in maintaining the

plant because it stores the parameter

settings of all the control units (both

motor managers and protection relays)

and compiles the sequence of events

and the disturbance waves recorded by

the protection relays in case of faults.

“I appreciate all aspects of Ske-ma’s performance, and in particu-

lar: your team’s efforts in turning around accurate engineering docu-mentation in a timely fashion, Ske-ma’s proactiveness in dealing with third parties, Skema’s flexible and

adaptable manufacturing approach to accommodate EBCL’s construc-

tion priorities, and Skema’s swift clear communication with the OGD

III Project team and the overall quality of Skema’s work product. Skema’s approach to the OGD III

project has been most profession-al at all times and its high caliber

performance has been noted.”

Project Director

IranIraq

saudi arabia

Yemen

oman

UAeQatar

kuwait

OO

ogd

iii

ogd

iii

48 49

thE QataR FERtIlIzER compaNY (QaFco) sItE Is locatEd aboUt 40 km soUth oF doha cItY aNd 7 km soUth oF

thE REsIdENtIal aREa oF mEsaIEEd. thE pRojEct FacIlItIEs INclUdE two ammoNIa plaNts wIth a total daI-

lY pRodUctIoN capacItY oF 4,600 toNs aNd a UREa plaNt wIth a daIlY pRodUctIoN capacItY oF 3,850 toNs,

aloNg wIth othER sUppoRt UtIlItIEs. wIth thEsE hUgE pRodUctIoN capacItIEs, QaFco Is coNsIdEREd to bE thE

laRgEst ammoNIa aNd UREa pRojEct aNYwhERE IN thE woRld, aNd also thE most INvEstmENt-INtENsIvE.

epc contractor: sAipeM / end user: QAfco

solUTions deliveRed

skema was awarded the contract

for the design, manufacturing, in-

spection, testing and supervision of

the on-site commissioning of high-

performance, reliable, flexible so-

lutions. the supply of Intelligent

low voltage switchgear included:

5 power centers >

(193 columns)

29 motor control centers >

(1,223 columns with 1,608

drawers)

distribution lv switchboards >

(274 columns)

11 Interface monitoring >

systems (Ims)

1.5 km = the total length of pmcc

columns supplied by skema.

inTelligenT pMccs

the Intelligent motor control centers

were equipped with an on-board touch-

screen operator interface to operate

the switchboards and compile data on

trends, alarms and event sequences.

this operator interface acts as a gate-

way to the dcs (distributed control

system) to allow the process con-

trol system to start/stop motors and

record the activation of alarms.

the pmcc switchboards were de-

signed to prevent any risk of a short

circuit and internal arc fault at 75 ka-

690 v for 0.3 seconds – to this end,

they were fully type-tested by an in-

dependent laboratory.

QAfco 5-6 / QataR

wATch The video!

saudi arabia

Yemen

oman

UaE

IranIraq

QATAR

kuwait

qq

qaFc

o 5-

6

qaFc

o 5-

6

50 51

qq

qaFc

o

qaFc

o

52 53

field sUbsTATion ReplAceMenT

the Field substation Replacement

project aims to upgrade and ration-

alize the existing Field power supply

system by replacing 6 existing field

substations with 3 new substations.

solUTions deliveRed

skema was awarded the contract for

the design, manufacturing, inspec-

tion and testing of hv switchboards

and Remote terminal Units (RtUs):

3 35 kv, 1250 a, gas insulated >

switchboards (26 columns)

3 6 kv, 1250 a, 20 ka, 1 sec., air insu- >

lated switchgear units (74 columns)

4 redundant RtUs (10 columns) >

and Electrical control systems -

based on plc

switchgear continuous thermal >

monitoring solution

arc fault protection system >

tENgIz FIEld (tENgIz Is kazakh FoR “sEa”), IN wEstERN kazakhstaN, Is locatEd IN thE low-lYINg wEtlaNds

aloNg thE NoRthEast shoREs oF thE caspIaN sEa aNd Is oNE oF thE bIggEst oIl FIElds IN thE woRld. dIs-

covEREd IN 1979, tENgIz coNtaINs 24 bIllIoN baRREls oF hIgh QUalItY oIl aNd sIx to NINE bIllIoN baRREls

(1 km³ aNd 1.4 km³) oF REcovERablE oIl. It Is dEEp, havINg a taRgEt dEpth oF 4,500 m. It also coNtaINs

sIgNIFIcaNt gas REsERvEs (18,000 bIllIoN m3). thE pRocEssINg plaNt Is madE Up oF bUIldINg blocks.

end user: TengizchevRoil / a consortium oF: chevron, exxonmobil, lukarco

solUTions deliveRed

skema supplied its products and so-

lutions for the tengiz field, and in par-

ticular for the central power station,

the central distribution substation, for

ktl 1 and ktl 2 load Relief substa-

tions, sulfur Forming, train 2.3 power

station Upgrade, plant Nitrogen sys-

tem and kulsary Rip sera Rail Yard.

skema supplied for the project:

10 mv switchgear (83 sections) >

Intelligent power motor control >

centers switchgear (140 col-

umns, more than 759 drawers)

power centers (43 columns) >

4 Remote terminal Units >

lv distribution panels >

(210 boards)

Tengiz / kazakhstaN

“On behalf of TCO I would like to thank you for your professionalism in all kind of

arrangements and communication, adher-ence to the original shipment dates and

for high quality documentation.”

Interface Coordinator

kAzAkhsTAn

caspian sea

Uzbekistan

kyrgyzstan

tt

teng

iz

teng

iz

54 55

inTegRATed pRoTecTion And

conTRol sYsTeM

the Integrated protection and con-

trol system (Ipcs) for the project

was designed to monitor and con-

trol hv and lv switchgear located in-

side the different packaged substa-

tions (North, south and west). Each

packaged substation is equipped

with a redundant Interface control

Unit (IcU) controlling 33 kv and 6.6

kv switchgear with protocol IEc-

61850, low voltage switchgear and

other utilities (hvac, Ups, F&g) via

modbus and hardwired interfaces.

a scada system is installed in the

Field control Room to control and

supervise the electrical network.

Every substation is also equipped

with 4 video cameras and a vo-

ca l c ommun i ca t i o n s y s t em .

this allows to control the unat-

tended substations (both through

cabled alarms and alarms gen-

erated by the video cameras reg-

istering unexpected movements),

and to communicate with the op-

erators, giving them directions.

data are recorded and are availa-

ble in real time for an asset lifetime

management system (maintenance

and energy efficiency management

of the plant and its components).

swiTchgeAR conTinUoUs TheR-

MAl MoniToRing solUTion

skema provided tco with Exer-

therm™, a continuous thermal moni-

toring solution which allows to moni-

tor, in real time, the thermal health and

status of key bus bar joints and critical

cable connections. this is achieved

by installing small plastic, non-con-

tact, non-powered, lifetime calibrat-

ed infrared and cable sensors within

the main electrical panels supplied.

this solution provides numerous tan-

gible benefits over traditional periodic

scans, including greatly increased lev-

els of safety and integrity protection

and reliability assurance throughout

the lifecycle of the electrical panels.

the integrity protection was further

enhanced by utilising a load-map™

software module which enables tco to

dynamically adjust the thermal alarm

levels applicable to the load on the

circuit being monitored, which provid-

ed tco with a level of integrity protec-

tion even at lower utilized load levels.

ARc fAUlT pRoTecTion sYsTeM

the 6 kv switchgear supplied for the

project has been equipped with a REa

arc fault protection system, which can

operate as a stand-alone device or in

combination with other modules, like

the REF relays. the REa arc fault pro-

tection system function is based on de-

tecting the intense light of an electric

arc, alone or on a detection of light and

simultaneous phase or neutral over-

current. on detection of an arc fault,

the REa protection system delivers

trip commands in less than 2.5 ms to

all circuit breakers that feed the fault

zone. Furthermore, the system opera-

tion indicators help localizing faults by

selectively guiding the maintenance

staff to the fault zone, that was identi-

fied by the arc fault protection system.

the REa module supplied for the

project features: two high-speed, gal-

vanically isolated, insulated gate bi-

polar transistor (Igbt) outputs (hso1

and hso2) for cb tripping purpos-

es; it offers one heavy-duty relay out-

put (tRIp3) to be used, for example,

as a circuit-breaker failure protection

(cbFp) output for an upstream cir-

cuit-breaker, or as an alarm output;

it features an adjustable three-phase

overcurrent or two-phase and neu-

tral overcurrent condition monitoring

function, which enhances the reliabil-

ity of the arc fault detection by elim-

inating unwanted cb tripping caused

by light not related to any arc fault,

e.g. flash light used in photography.

“Finally a word of thanks to you and your team for an excellent performance and outstanding custom-

er service on our project.”

E/I Project Engineer

tt

teng

iz

teng

iz

56 57

© skema milan - Italy

www.skemaq.it