Risk Assessments in a BRC Accredited packhouse
Citation preview
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 1/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
1. Riskassessmentfor ProcessWater
B: Contaminationwith pathogenicbacteria (E-coli,isteria,!almonella"
Water !o#rce$anksPipes
• Water !o#rce%from the Co#ntr&'sains.
• Water not #se%for %rinking
•
Pro%#cts not R$E.
) * +
• nn#alcheck forbacterial #alit&.
• $reatwater withapproe%%econtaminant
/!
C: !ol#ble Chemicals Water !o#rce • Water not #se% for%rinking
* * 0 • nn#al Check for
chemical #alit&• Change
!o#rce of water/!
P: /oreign Bo%ies Water !o#rce • Water from ains!#ppl& 1 ) )
• is#al • 2iscar%lot fo#n% notconforming
3&gienes#periso
r
0. Riskassessmentfor !#pplier pproal(Pro%#ce"
B: Contaminationwith pathogenicbacteria (E-coli,isteria,!almonella"
an#res, farmworkers, farmimplements,irrigation water.
• Pro%#ct onl&so#rce% from approe%s#ppliers. !#pplierscompelle% to conformto 45B 4P!tan%ar%s.
•
Pro%#cts not R$E.
) * +
• /arm 3&giene #%its carrie% o#tb& Packho#setechnical team
• Con%#ctanal&sis an%%eci%e onactions base%on s#pplierapproal
proce%#re.
/!
C: R E6cee%ancesof pestici%es an%herbici%es
Crop protectionchemicals
• Pro%#ct onl&so#rce% from approe%s#ppliers. !#pplierscompelle% to conformto 45B 4P!tan%ar%s.
1 0 0
• Con%#ctann#al R$esting.
• ccor%ingto !#pplierapproalproce%#re
/!
P: /oreign mattere.g. broken farme#ipment,emplo&ee rings,st#%s watches etc.soil, plant
fragments, stonesetc.
/rom pro%#ceimme%iateenironmentswhile on farm.
• Pro%#ct onl&so#rce% from approe%s#ppliers. !#pplierscompelle% to conformto 45B 4P!tan%ar%s.
• Pro%#ct gra%e% atpackho#se
1 * *
• Checkemplo&eestrainings an%behaio#rs onsite.
• ccor%ingto s#pplierapproalproce%#re
/!
7. Riskassessmentfor 2rinkingWater
B: Contaminationwith pathogenicbacteria (E-coli,isteria,!almonella"
Water !o#rce • Water fromBottle% Water !#pplier#se%.
• Water fromapproe% s#pplier.
• Pro%#cts not R$E.
1 0 0 • nal&se water forpotabilit&ann#all&
• Change s#pplier /!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( - o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 2/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
C: !ol#ble Chemicals Water !o#rce • Water conformingto national stan%ar%s.
1 0 0
• nal&sewater forpotabilit&ann#all&
• Changes#pplier
/!
P: Colloi%s, !oil
Particles
Water so#rce • Water conforming
to national stan%ar%s 1 ) )
• 8ational
stan%ar%sestablishe% forwater.
• Change
s#pplier
19. Riskassessmentfor5rganoleptictesting.
B: 8one • •
C: $ransfer ofpackagingconstit#ents topro%#ct e.g.pro%#ct liners.
Plastic Packagingwith transferableconstit#ents
• pproal of allpackaging s#ppliers
• 2ata sheets toshow conformit& withE Reg#lations (E1;)<:*990"
* * 0
• Packagings#pplier approal.
• 2ata sheetsshowingconformance withE reg#lations
• Changes#pplier
/!
P: $asteCharacteristics of
the pro%#ct
Pro%#ct • $aste of pro%#ctis alwa&s tr#e to t&pe
so long as thefreshness an% bree% ofcrop is strictl&controlle%.
1 1 1
• Check ariet& at intake,
re=ect #nknown arieties
• Raises#pplier
noti>cation forcorrectieaction.
• ctaccor%ing tos#pplierapproalproce%#re
/!
-+ Contamination ofPro%#ctfrom3&giene
Chemicals
B: Bacterial growth ?ns#@icientbacterici%alactiit&
• pproe%chemicals to haee@icac& tests.
• Pro%#cts not R$E.
* ) +
• 4et e@icac&tests froms#ppliers
• Changes#pplier
/!
C: Contaminationwith cleaningchemicals
Resi%#es on work s#rfaces
• Rinsing %oneafter cleaning alls#rfaces as percleaning sche%#le.
• Pro%#ctsrelatiel& safe on foo%
• Chemicalshan%le% b& traine%sta@.
1 * ) • Proce%#refor han%ling ofchemicalspresent.
• Chemicalrecor%s in placefor eri>cation ofpreparation.
• Retrainsta@ on mi6ingof chemicals
• Raises#ppliernoti>cation.
• Cleane#ipment in%esignate%areas an% times
/!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $ o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 3/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: 8one • •
1+. Pro%#ct 3ol%ingCol%room(b#se an%
risk ofcontamination"
B: Contaminationwith pathogenicbacteria (E-coli,isteria,
!taph&lococc#s,!almonella"
E6pos#re ofpro%#ct
• Pro%#ct packe%therefore protecte%from an& f#rthersigni>cant microbial
%eterioration.• Restricte% access
area
• Pro%#cts not R$E.
1 * *
• 2ispatchs#perisorcontrols access tocol% room.
•
•
?nsect an% Pest?nfestation
E6pos#re ofpro%#ct
• %e#ate pestcontrol meas#res inplace. pproe% pestcontrol contractor #se%to control ingress ofpests.
• Pro%#ct packe%
hence protecte% frominsect ingress.
• Col% room is#nfao#rable for pestingress an% infestation%#e to lowtemperat#res.
) * +
• 5#ter %oorlocke% when notin #se.
• Pest controltren%s an%correctie actionsin place
• ?ncreasepest controls#reillance.
• ChangePest controlpro%#cts orprocesses
Rentokil
C: Contaminationwith paints, taintsan% %etergents.
Col% room • 8o painting %onein col%rooms whenthere is pro%#ct beinghel% there.
• 8o %etergents#se% in col%rooms
when there is pro%#ct.
1 * *
• 3&giener#les in place tocontrol allmaintenancework.
• RetrainContractors an%ke& sta@ onmaintenance /!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 4/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: $emperat#re b#se
E6ternal reco#rsefrom packho#seto col% room
• Pro%#ct precoole%an% packe% to protectagainst temperat#reb#il% #p.
• 5nl& a er&
minim#m time allowe%for pro%#ct %#ringpacking an% onreco#rse to col% room.
) 1 )
• Pro%#ct nothel% in packho#sein s#ch times asto res#lt to#nacceptable
temperat#re b#il%#ps
• $emperat#retren%s foriss#ance, en%linean% %ispatchmaintaine% an%reiewe%.
• Recoolpro%#ct toacceptable%ispatchtemperat#res
•
Retrainke& sta@ ontemperat#reregime an%monitoring.
3accp$eam
/oreign Bo%&Contamination
E6ternal reco#rsefrom packho#seto col% room
• Pro%#ct packe%therefore protecte%against ingress offoreign bo%ies.
• !trict control for
small items in place• Comprehensie
maintenance programin place.
1 ) )
• !mall itemsmonitoringproce%#re
• aintenanceprogram
• Pro%#ctassesse% %#ring%ispatch
• ?nci%encemanagementproce%#res inplace
• Retrainsta@ onproce%#res
• Replacemaintenance
contractors.• 2ispose
nonconformingpro%#ct
• Carr& o#tinternal ore6ternalpro%#ct recall
/!
*1. 5@ice4lassWin%ows,!ockets an%
lightingshatters as aso#rce ofcontamination
B: 8one • •
C: 8one • •
P: Broken 4lass !plintering onbreakage
• 4lass incl#%e% inthe glass a#%its for the
packho#se.• ll sockets
incl#%e% in the glass,har% plastics an%ceramics a#%its.
• 4lass is shatterproof.
1 ) )
• 4lass a#%its%one twice %ail&
• ?nci%encemanagementproce%#re inplace
• ?ncl#%e%in glass
breakageproce%#re.
ll Ae&!ta@
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( ( o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 5/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
*0. Packho#seEntrance
B: Contaminationwith Pathogenicbacteria (e.g. Ecoli, !tapha#re#s".
People enteringwitho#t washinghan%s, isitorswitho#t followingh&giene r#les
• Packho#se sta@traine% on packho#seentr& proce%#res.
• 3&gienes#perisor alwa&s at
han% to receie isitorsan% contractors.
• 3ealth#estionnaire in placefor workers ret#rningfrom leaes an% illness.
• Pro%#cts notR$E.
1 * *
• 3&gienein%#ction
• ?nci%encemanagementproce%#res
•
aintenanceproce%#res
• Retrainsta@ onpackho#seentrance an%in%#ctionproce%#res.
3&giene!#perisor
Pest ingress E6ternal reas • 2oor close >ttingan% kept close% whennot in imme%iate #se.
• Packho#se >tte%with insectroc#tors toattract an% trap an&insects.
• /acilit& has a pestcontrol program forro%ents an% insectswith Rentokil.
* * 0
• Pest controlchecks
• Pest controltren%s to checkfor prealence
• ?ncreasepest controlchecks
• Changepest controlpro%#cts. Rentokil
C: Chemical spillage Chemicals an%%etergents
• rea !eparate%from the packing an%storage areas.
• 3&giene sta@traine% on chemicalshan%ling.
1 ) ) • Personnelchecks eer&packing %a&.
• Contractorsan% isitorsmonitore% an%
accompanie%
• Retrainsta@ onin%#ction.
• Retrainh&giene sta@ onchemical
han%ling.• ccompan & isitors an%contractors
3&gienes#periso
r
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( & o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 6/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: 2ea% ?nsects ?nsectroc#tors • ?nsectroc#tors#sing gl#e to attractan% trap insects henceno electroc#tionsplashes of %ea%insects
1 * *
• ?nsecttren%s
• ?nsectchecks %one atreg#lar interals
• ?nci%encemanagementproce%#re inplace.
• 2ispose
a@ecte%pro%#cts asappropriate
/!
*. Risk ssessmentagainstPro%#ct orProcesssabotage
B: Contaminationwith bacteria orbacteriacontainingmaterials
!ta@, isitors an%contractors
• ?n%#ction to allsta@.
• !ec#rit& checks%one to sta@
• Compan& emplo&scommitte% sta@.
• Pro%#cts not R$E.1 ) )
• !ec#rit&Checks
• 3&gieneChecks
• isitors an%contractorsin%#ction
• a& o@sta@responsible
• 2isposeo@contaminate%pro%#ct.
• Bar entr&to nonconforming isitors orcontractors
3&gienes#periso
r
C: 3&gienechemicals, paints,pestici%es, otherchemicals
!ta@, contractors • !ta@ traine% onin%#ction an% sitesec#rit&.
• Chemicalshan%le% b& traine%sta@, chemical storessec#re% an% restricte%.
• Bait stationslocke%, sec#re% an%rob#st
• 3&giene checks%one to all sta@
1 ) ) • ?nci%encemanagementproce%#res inplace
• Baitshan%le% onl& b&traine% sta@ orprofessionalcontractor
• 2isposea@ecte%pro%#ct.
• a& o@ orlitigateresponsiblesta@.
• !ec#rechemicalstorage store.
• 2o notstore pestici%eson site
ll Ae&!ta@
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( ) o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 7/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: /oreign ob=ects onpro%#ct e.g. ke&s,rings, phones,st#%s, necklaces,coins etc.
People (Ae& sta@etc."
• Compan& hasrob#st 3#manReso#rce Base.
• %e#atel&traine% a#thorise%
persons man theprocesses an%pro%#cts.
• !ite sec#rit&a%e#ate.
• Packho#se in aprotecte% compo#n%
• Personalbelongings kept inlockers.
1 * *
• 2ail& sta@h&giene checks.
• !mall itemsmonitoring inplace
• Retrainsta@ onin%#ction an%site sec#rit&.
• a& o@ or
litigateresponsiblesta@ asappropriate
ll Ae&!ta@.
)1. a#n%r&Control
B: Contaminationwith pathogenicbacteria (E-coli,isteria,!almonella"
• Wash water
• ?ne@ectie
cleaning.
• Protectieclothing not likel& tohae a haDar%o#simpact on low carepro%#cts.
• Pro%#ct inten%e%for f#ll cooking.
• a#n%erer awareof compan& policies onh&giene.
• a#n%r& 3&giene #%its carrie% o#t b&Packho#se $echnicalteam.
1 1 1
• a#n%r&a#%its in place
• a#n%r&checke% on arrialfrom la#n%r&.
• a#n%erer#ses compan&approe%%etergents an%sanitiDers
• Ret#rnla#n%r& for re-cleaning.
• Reassessla#n%r&
• Changela#n%r& forcontin#e%nonconformit&.
• a#n%r&controlproce%#re inplace.
3&gienes#periso
r
C: a#n%r&
Chemicals
?mproper
a#n%r&
• Contractor is the
compan&'s 5perations2irector.
• Contractor#n%erstan%s compan&'sla#n%r& proce%#res.
1 1 1 • a#n%r&
a#%its in place• a#n%r&
checke% on arrialfrom la#n%r&.
• a#n%erer#ses compan&approe%%etergents an%sanitiDers
• Reassess
la#n%r&• Change
la#n%r& forcontin#e%nonconformit&.
• a#n%r&controlproce%#re inplace.
3&giene
s#perisor
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( % o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 8/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: 8one • •
(+ RawmaterialsCol% storage
B: Contaminationwith pathogenicbacteria (E-coli, easts an% ol%s"
CoolingE#ipment an%Enironment
• Cleaning sche%#lefor Col%rooms in place,inspecte% beforereg#larl& accor%ing tosche%#le.
• Pro%#cts not R$E.
1 ) )
• 3&gienechecks for tr#cksan% loa%ing area.
•
$rainings%one on sche%#le.
• Reiewcleaningregimes asappropriate
3&giene!#periso
r
C: 3&gienechemicals, otherchemicals
3&gieneactiities,maintenance
• Chemicalshan%le% b& traine%sta@.
• 8o cleaning ormaintenance %onewhen there is pro%#cein col%room.
1 ) )
• Cleaningchecks.
• aintenancechecks an%monitoring.
• Retrainsta@.
3&giene!#periso
r
P: !mall items e.g.probes, specr#lers, n#ts Fbolts
#alit& ControlChecks an%maintenance
• !ta@ traine% onsmall items monitoring.
1 ) )
• !mall itemsmonitoringproce%#re inplace.
• Contractors'in%#ction carrie%o#t for allmaintenace
• Retrainsta@Gcontractors
3&giene!#periso
r
%+ Pro%#ctoa%ing GoHoa%ingtr#ck
B: Contaminationwith pathogenicbacteria (E-coli, easts an% ol%s"
$r#ck • Cleaning sche%#lefor tr#cks in place,inspecte% beforeloa%ing.
• Pro%#ct is packe%in p#nnetsGbags an%bo6es hence a%e#atel&
protecte%.• oa%ing %one b&
traine% sta@.
• Pro%#cts not R$E.
1 ) ) • 3&gienechecks for tr#cksan% loa%ing area.
• $rainings%one on sche%#le.
• oa%ingcarrie% o#t in
enclose% area.
• Retrain!ta@.
3&giene!#periso
r
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( 1 o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 9/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
C: Chemicals loa%e%on tr#cks
$r#ck • Chemicals onl&carrie% in non pro%#cetransport.
• gronom& inp#ts
onl& so#rce% at the
farm leel incl#%ingchemicals
1 0 0
• 3&gieneChecks.
• Chemicalcontrol polic&
• $horo#ghl & clean a@ecte%tr#cks
• Retrainsta@
•
Repriman% asappropriate.
3&giene!#periso
r
P: /oreign bo%ies,e.g. spec r#lers,probes,ph&sical %amageof pro%#cts %#e tohan%ling
$r#ck,han%ling ofpro%#ct
• Cleaning sche%#lefor tr#cks in place,inspecte% beforeloa%ing.
• Pro%#ct is packe%in p#nnetsGbags an%bo6 hence protecte%against %irect contactwith tr#ck s#rfaces.
• Personnel traine%on han%ling ofpro%#cts.
1 ) )
• onitoringfor small items%one.
• Positierelease %one b&traine% #alit&controllers
• oa%ing sta@ traine% onpro%#ct han%ling.
• 2ispose orrework a@ecte%pro%#ct.
• Retrainsta@.
• ?nci%encemanagementproce%#re forsmall itemsloss.
ll Ae&!ta@
09. ?ns#late%transport toairport
B: o#l%ing $r#ck • Packho#se siteclose to the airport (1<min %rie".
• Pro%#ct coole%prior to %ispatch.
1 0 0
• Pro%#ctchecks prior to%ispatch.
• !tockrotation in place.
• 2isposeo@ a@ecte%pro%#ct
• ?ncrease2ispatchchecks.
!#periso
rs
C: Chemicals loa%e%on tr#cks
$r#ck • Chemicals onl&carrie% in non pro%#cetransport.
• gronom& inp#ts
onl& so#rce% at thefarm leel
1 0 0 • Chemicalpolic& in place.
• Cleaning oftr#cks %one b&
traine% h&gienesta@.
• Retrainsta@,
• $horo#ghl & clean an%
rinse tr#ck.• Repriman
% responsiblesta@ asappropriate.
ll Ae&!ta@
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( ' o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 10/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: 2eh&%ration(Weight loss ofpacke% pro%#ct Ilegalit& iss#e"
$r#ck • Packho#se siteclose to the airport.
• Pro%#ct protecte%b& a%e#ate packaging.
• $r#cks ins#late%
against temperat#reb#il% #p.
• Pro%#ct weighe%incl#%ing tare formoist#re.
1 1 1
• 5nlineassessment forweights
• Positierelease of
pro%#cts.
• Reiewthe moist#retare.
• Retrainonline an%
%ispatch Cs
/!
0). Packaging$raceabilit&
B: 8one • •
C: Chemicals e.g.%&es #se% onbo6es.
Packagingprocessing atfactor&
• Packagingassesse% at intake.
• Packagingso#rce% from approe%s#ppliers.
• 2ata sheets to
show conformit& withE Reg#lations (E1;)<:*990"
1 ) )
• 2ata sheetsproi%e% forpackaging
• pproe%s#ppliercerti>cates
checke% for ali%it&.
• Re=ecta@ecte% batches
• Raises#ppliernoti>cation forcorrectie
action• Change
s#pplier forrepeate% nonconformance
/!
P: /oreign Bo%&Contamination
PackagingProcessing at/actor&
• !#ppliercompliant to?nternationall&accepte% stan%ar%.
• !#pplier cantrace pro%#cts base%on the %ates the& were%eliere%.
1 ) )
• ?ntakeassessment for allpackaging.
• Re=ecta@ecte% batches
• Raises#ppliernoti>cation forcorrectieaction
• Changes#pplier forrepeate% nonconformance
/!
0+. Packaging !torage
B: Contamination b&PathogenicBacteria.
Ro%ents,Enironment
• /actor& entilationproofe% against ingressof bir%s to accessmaterials receiing an%packaging storageareas.
1 ) ) • !tore checksthro#gh internala#%its an% reg#larh&giene checks.
• Coerprimar&packaging withpol&thene bags.
3&giene!#periso
r
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( - o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 11/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
• CoerPartl& #se%packaginga%e#atel&.
• Ens#re
pest control is%one assche%#le%.
• Pro%#ct ow Risk.
• Pro%#cts not R$E.
• Primar& packagingprotecte% b& pol&thene.
• Baits in place to
control ro%ent actiit&.
C: Pest ControlChemical
Pest controlpro%#cts #se% onbaits
• se of non to6icin%icator baits
1 0 0
• Pest controlreports to showthat non to6icbaits are #se%.
• seapproe% s#pplierfor pest control.
• 2isposea@ecte%Packaging
• Changes#pplier if#nable tos#ppl& non to6icbaits.
/!
P: /oreign Bo%&Contamination
4lassEnironment
• ll lights coere% b&shatter proof coering.
• 8o 4lass inPackaging area. 3ar%Plastic incl#%e% in4lass a#%it.
• Baits in place tocontrol ro%ent actiit&.
* ) +
• 4lass a#%itscarrie% o#t.
• ?nci%encemanagement inplace
• 2isposea@ecte%packaging.
• Reiewglass a#%itactiities tocoer f#rtherrisk.
/!
<9. Risk ssessmenton2oc#mentControl nomalies
?ncorrect Controlsbase% on incorrectrecor%s
inor anomalies%#ring reiews
• $raining %one onpersonnel for %oc#mentcontrol.
• 2oc#mentRecommen%e%Changes Recor% p#t on
master copies to enablechange nee%s berecor%e% b& all ke&sta@.
1 1 1
• Control ofrecor%s an%%oc#mentproce%#res inplace.
• 2oc#ment
changes %one inreal time.
• 2oc#ment#p%ate recor%>lle% on reiew ofan& s&stem%oc#ments.
• !trictl&follow%oc#ment an%recor% controlproce%#res.
/!
<1. Risk ssessment
B: 8oneC: 8one
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( -- o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 12/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
on etal2etection
P: /oreign Bo%&Contamination
Rings, st#%s,knies, pins,mobile phones,staplers etc
• $he h&gieneprere#isites er& clearan% a%e#ate on sta@in%#ction, isitors an%contractors in%#ctionwith regar% toprotectie clothing an%control of metals.
• !mall items strictl&monitore% atpackho#se leel.
* ) +
• 3&gienechecks for isitors,contractors an%sta@.
• !ta@ traine%on 3&giene r#les.
• Retrain!ta@
• ccompan & an% train isitors an%
contractors.3&giene
!#perisor
<0. Risk ssessmenton !mall?tems oss
B: 8one • •
C: 8one • • •
P: /oreign Bo%&Contamination
ost small itemse.g. knies,probes, pen
coers, specr#lers, ke&s,coins, etc.
• C#stomer noti>cation%one on small itemsloss for them to metal%etect.
• ?nci%enceanagementproce%#re traine% to allpersonnel.
• &ni"es' !mall ?temscontrol proce%#res inplace, Aniesmonitore% ho#rl&.
• Probes and S#ecRulers' controlle%thro#gh the E#ipment
integrit& checks, oniss#ance an% on ret#rn.
* ) + • !mall itemsmonitoringtraine% to ke&sta@.
• Aniesmonitore% ho#rl&.
• ockersproi%e% for sta@to keep personalitems.
• Packho#seentr& r#lestraine% to ke&sta@.
• Retrainsta@.
• ?nstit#tethe inci%encemanagementproce%#re.
All &e$ Sta(
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( -$ o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 13/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
• Pen Co"ers' 5nl&li%-less pens #se% b&ke& sta@.
• &e$s' 3&gienes#perisor controls allpackho#se ke&s.
• Coins and other
#ersonal items'h&giene in%#ction %oneon all sta@. !ta@lockers proi%e% forpersonal items
<. Risk ssessmenton Plasteross
B: 8one • •
C: 8one • • •
P: /oreign Bo%&Contamination
ost Plasters. • !trict monitoring ofall Plasters coming topro%#ction.
• ?nci%enceanagementproce%#re traine% to allAe& personnel.
* * 0
• Plastercontrol proce%#rein place.
• ?nci%encemanagementproce%#re inplace.
• 2isposea@ecte%pro%#ct, lookfor plaster in allpossible areas,retrain a@ecte%sta@ on smallitemsmonitoring
/!
+1. Risk ssessmentforCalibration
B: 8one • •
C: 8one • • •
P: Wrong%etermination ofph&sicalproperties ofpro%#cts e.g.
temperat#res
n- calibrate%probes
• ?nternal calibrationsfor probes carrie% o#tb& traine% sta@.
1 1 1 • ?nternal%oc#mentationa#%its.
• Reg#larchecks
• Retrainsta@
/!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( - o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 14/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
: Weighing of #n%erweights or oer-weights.
n-calibrate%scales
• ?nternal calibrationsfor probes carrie% o#tb& traine% sta@.
• Calibrationstraceable to aninternational stan%ar%carrie% o#t b& Aen&aB#rea# of !tan%ar%s atleast once a &ear orother legal bo%ies.
1 1 1
• !calescalibrate% strictl&on sche%#le.
• ?nternal eri>cations %one%ail& for allscales.
• Remoescale frompro%#ction.
• Recalibrate scale
!#periso
r
+<. Risk ssessmentfor /ire
B: 8one • •
C: 8one • • •
P: Worker an%Pro%#ct B#rning
/ires • People traine% on >re>ghting
• %e#ate space forreco#rse to >reassembl& point.
1 0 0
• /ire %rills
• /iretrainings
• Retrainsta@
/!
+. Risk ssessmenton pro%#ctcontacte#ipment,achinesan% storageareas
B: Contaminationwith pathogenicBacteria
Contact s#rfaces •
Cleaning sche%#les inplace for all s#rfaces.
• 2econtaminationchemicals so#rce% fromapproe% s#ppliers.
• Pro%#cts not R$E.
* ) +
•
Cleaningproce%#res•
Retrainsta@
• Re-cleane#ipment
3&gienes#periso
r
C: 4reases an% oilsfrom moing parts
• • •
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( -( o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 15/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: /oreign Bo%&Contamination
8#ts, bolts, har%plastics etc.
• E#ipment incl#%esscales, sealingmachines, choppingboar%s an% tablecloths. Risk ofcontamination isminimal since pro%#ctis alrea%& in o#terpackaging beforepro6imit& to machines.
• achines #se% for%irect pro%#ctionchecke% for integrit&on a %ail& basis.
• #arterl& a#%its %onefor all e#ipments tocheck for integrit&.
* ) +
• Checke#ipmentintegrit& %ail&beforecommencement of pro%#ction.
• ?solatemachine frompro%#ction
• Recommen% formaintenance.
• Retrainsta@ onintegrit&checks.
aintenance
s#perisor
71. Risk
ssessmenton icrobialan%Chemical nal&ses ofpro%#cts
B: Contamination
with pathogenicBacteria.
Pro%#ct so#rces • Pro%#ct onl& so#rce%
from 45B 4P!o#rces.
• Pro%#ct anal&se% onceper &ear as a co#ntercheck of the approe%so#rces.
• /arm 3&giene #%itscon%#cte%.
• Pro%#cts not R$E.
* ) +
• Pro%#ct
microbial checks,• icrobial
res#ltscomparison chartsin place.
• Con%#ct
h&giene a#%itsto the farm.
/!
C: R E6cee%ances Crop Protectionpro%#cts
• Pro%#ct onl& so#rce%from 45B 4P!o#rces.
• Pro%#ct anal&se% onceper &ear as a co#ntercheck of the approe%so#rces.
1 0 0
• Pro%#ct onl&from 4lobal 4P/arms.
• CCP atpositie releasefor haresting on>el% 3accp
• nal&sethe farmprere#isites to
check wherefa#ltshappene%.
• Retrainsta@ asappropriate
/!
P: 3ea& metals ?rrigation water. • Water anal&se% for lea%an% ca%mi#m
1 0 0 • •
8one • •
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( -& o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 16/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
7<. Risk ssessmenton PositieRelease ofPro%#ctsan% other
Pro%#ctrelate%materials
B: Contaminationwith pathogenicBacteria.
oss of control ofbacterial growthinhibitingparameters e.g.temperat#re
• Positie release %oneon all pro%#ct #alit¶meters, especiall&temperat#re, foo%safet& iss#es an%#alit& attrib#tes.
• Positie release %oneb& #ali>e% an% traine%personnel.
• Pro%#cts not R$E.
* * 0
• Positierelease %one onall pro%#cts b&traine% sta@
• 2isposeo@ or reworka@ecte%pro%#ct.
• Retrainsta@
/!
C: 8one • • •
P: $orn Packaging,packaging o@ c#ts,small items e.g.probes, specr#lers an% pens.
Packaging, smallitems han%le% b&positie releasepersonnel
• Packaging s#pplie%from approe%s#ppliers.
• Packaging of a%e#aterob#stness towithstan% normalhan%ling.
• Personnel han%lingsmall items a%e#atel&traine% on small itemscontrol.
1 ) )
• Packagingrelease% b&traine% sta@ to goto pro%#ction
• ?ntakeassessment of allpackaging %oneb& traine% sta@.
• ll smallitems monitore%accor%ing toproce%#re.
• ?solatean% reworkG%ispose a@ecte%pro%#ct asappropriate.
• Retrainsta@ on positiereleaseproce%#res
/!
• Pro%#ct liners rob#stan% able to withstan%processing con%itions.
• Pro%#ct %ii%ers ma%eof carton materialsimilar to the pro%#ctcartons
• checke% onpositie release.
• /acilit&temperat#remonitoring inplace
• $ren% non
conformances#se% to retrainsta@
• beforerelease.
• Retrainsta@ on positierelease
$emperat#re B#il%p
Wrong PositieRelease$emperat#res
• 2ispatch C traine% onpositie release
• /oo% !afet& anagerCon%#cts Weekl&Positie release a#%itson $emperat#res.
1 1 1
• 2ispatchtemperat#res
• Re-coolpro%#ct
/!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( -) o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 17/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
7;. Risk ssessmenton 4eneral3&giene
B: Contaminationwith pathogenicBacteria.
Personnel,Protectie wear,workenironment an%processing tools
• ll personnel traine%on packho#se h&gienein%#ction.
• ll protectie clothingla#n%ere% b& approe%la#n%erer,
• comprehensiecleaning sche%#lee6ists for all packho#setools.
• Pro%#cts not R$E.
1 1 1
• Cleaning!che%#les.
• Cleaningrecor%s
• Personnel
check recor%s• a#n%r&
checks
• sstip#late% in theh&gieneproce%#res.
3&giene
sta@
Contaminationwith PathogenicBacteria
ops an% $ableCloths
• ops onl& #se% toclean Joors.
• ops %ippe% inbacterici%al %etergentbefore cleaning.
• $able cloths %ippe% insanitiDer before #sean% alwa&s %#ring theoperation.
• $able cloths %rie% an%kept in a clean placewhen not in #se.
1 1 1
• Cleaning!che%#les.
• Cleaningrecor%s
• Personnelcheck recor%s
• a#n%r&checks
• sstip#late% in theh&gieneproce%#res.
3&gienesta@
C: (!ee Riskassessment onh&giene chemicals(R 9<"
• • •
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( -% o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 18/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: 3air (Bear%s,mo#staches an%#ncoere% hair", Keweller&, rings,st#%s etc fromsta@, n#ts an%
bolts frome#ipment
Personnel,Packho#seenironment
• Comprehensiein%#ction %one to allsta@.
• Personal an%enironmental h&giene%one to sta@ on reg#larbasis.
• !noo%s proi%e% toan&one who cannotshae bear%s, b#t allsta@ enco#rage% toshae bear%s an%completel& coer theirhair.
1 1 1
• Cleaning!che%#les.
• Cleaningrecor%s
• Personnel
check recor%s• a#n%r&
checks
• sstip#late% in theh&gieneproce%#res.
3&gienesta@
). Risk ssessmentonCommissioni
ng of newmachines
B: icrobialContaminationfrom Coolers an%other contact
machines
ncleanmachines
• ll machinescommissione% before#se.
• ll aspects of foo%
contamination checke%on iss#ing thro#gh thee#ipment integrit&checks.
• Pro%#cts not R$E.
* ) +
• achineintegrit& checks.
• Recheckmachinesbeforecommissioning.
• $rain sta@ on correctoperation an%integrit&checking.
Contractors G /!
C: Contaminationfrom 4reases
4reases onoing Parts
• ll machinescommissione% before#se.
• achines %o not #segreases an% oils.
• ll aspects of foo%contamination checke%
on iss#ing.
1 * * • Ens#ree#ipment %o not#se greases.
• Ens#re alll#bricants arefoo% gra%e.
• !ta@ #sing
e#ipment tocheck for integrit&before #se.
• Remoeachine fromoperation.
• Repairmachine, retestan% cleanbefore #se.
Contractors, /!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( -1 o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 19/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: /oreign Bo%&Contamination
8#ts, bolts, har%plastics etc.
• ll machinescommissione% before#se.
• ll aspects of foo%contamination checke%on iss#ing.
• achines #se% for%irect pro%#ctionchecke% for integrit&on a %ail& basis.
• #arterl& a#%its %onefor all e#ipments tocheck for integrit&.
* ) +
• Check formachine integrit&at commissioning.
• Ens#remachines are ingoo% workingcon%ition.
• $rain sta@how to check forintegrit&.
• Remoemachine frompro%#ction
• Repair,retest, an%clean machinebefore #se. Contracto
rs, /!
1)+ Risk ssessmenton pro%#ctcontamination from the
achines(e.g. col%-rooms,sealers,weighingmachines"
B: icrobialContamination e.g.. onoc&togenes,E. coli, !almonella
33C Water,improperl&washe%e#ipment.
• Water from ainss#ppl& an% >t for #se.
• Cleaning sche%#les inplace for all machines
• Pro%#cts not R$E.
1 ) )
• Pro%#cttests carrie% o#tat least ann#all&.
• 33C $ankmonitore%
• ?nstit#temaintenance forall machines /!
C: Contaminationfrom 4reases
4reases onoing Parts
• ll machinescommissione% before#se.
• achines %o not #segreases an% oils.
• ll aspects of foo%contamination checke%on iss#ing.
1 * * • Ens#ree#ipment %o not#se greases.
• Ens#re alll#bricants arefoo% gra%e.
• !ta@ #singe#ipment tocheck for integrit&before #se.
• Remoeachine fromoperation.
• Repairmachine, retestan% cleanbefore #se.
Contractors, /!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( -' o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 20/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: /oreign Bo%&Contamination
8#ts, bolts, har%plastics etc.
• ll machinescommissione% before#se.
• ll aspects of foo%contamination checke%on iss#ing.
• achines #se% for%irect pro%#ctionchecke% for integrit&on a %ail& basis.
• #arterl& a#%its %onefor all e#ipments tocheck for integrit&.
* ) +
• Check formachine integrit&at commissioning.
• Ens#remachines are ingoo% workingcon%ition.
• $rain sta@how to check forintegrit&.
• Remoemachine frompro%#ction
• Repair,retest, an%clean machinebefore #se. Contracto
rs, /!
;. Risk ssessmentonaintenance
B: icrobialContamination
Contractors an%#nclean workingtools
• Contractors sensitiDe%on h&giene r#les an%reg#lations beforecon%#ctingmaintenance.
• Contractors e#ipmentchecke% an% wherenecessar& cleane% b&h&giene sta@ beforeentr& into thepackho#se.
• Pro%#cts not R$E.
1 ) )
• 3&giene?n%#ction
• isitors an%contractorsin%#ction
• Retrain isitors an%contractors
/!
C: Contaminationfrom 4reases
4reases onoing Parts
• 8o greases onoing Parts.
1 ) ) • 3&gienein%#ction forcontractors
• Remoemachinere#iringgrease
aintenance
s#perisor
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $ o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 21/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: /oreign Bo%&Contamination
8#ts, bolts, har%plastics etc.
• 8#ts an% bolts wellfastene% on all parts ofthe machines.
• maintenancesche%#le agree% withthe installers of thecol% rooms.
• 5ther machineschecke% %ail& forintegrit&.
* ) +
• achinecommissioningan% integrit&checks
Remoe machinefrom pro%#ctionan% repair.
/!
;*. Risk ssessmenton ccess to!ensitieareas in thepackho#se(Compan&
Premises"
B: Contaminationwith pathogenicbacteria ormaterialscontainingbacteria.
3#mans • isitors an%contractors in%#cte% onh&giene r#les an%accompanie% b& seniorsta@.
• Pro%#cts not R$E.
* ) +
• 3&gieneR#les forin%#ction.
• Premises arestricte% areamonitore% b&compan& sta@.
• Remoepersons inrestricte%areas.
C: 8one • •
P: /oreign Bo%&Contaminationfrom contractorssmall items.
8#ts, bolts, har%plastics,maintenancesmall items e.g.pliers, callipers,pencils etc.
• ll contractors areaccompanie% b& the/oo% safet& manager atall times to ens#re the&onl& %o what the& haecome for.
• ll sta@ traine% tointercept all#naccompanie% isitorsan% refer them to thefoo% safet& manager or
the packho#semanager.
* * 0 • achineschecke% forintegrit& on a%ail& basis.
• aintenancecontractors awareof the %angers offoreign bo%&contamination.
• Remoea@ecte%machine frompro%#ctionarea.
• Repair,clean an% retestmachine.
aintenance
personnel.
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $- o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 22/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
!c:
!ite !ec#rit&,pro%#ct an%process sabotage.
na#thorise% isitors an%strangers
• ll isitors report tothe receptionist.
• ll contractors areaccompanie% b& the/oo% safet& manager atall times to ens#re the&onl& %o what the& haecome for.
• ll sta@ traine% tointercept all#naccompanie% isitorsan% refer them to thefoo% safet& manager orthe packho#semanager.
* * 0
• !ite sec#rit&
• Compan& ina protecte%compo#n%.
• Remoeperson fromrestricte% area.
• Retrain asappropriate.
• Recheckthe sec#rit&proce%#res forthe compan&
ll Ae&!ta@
;+. Risk ssessment
on ccess to!ensitieareas in thepackho#se(Packaging!tore"
B: 8one • •
C: 8one • •
P: /oreign Bo%&Contaminationfrom contractorssmall items.
8#ts, bolts, har%plastics,maintenancesmall items e.g.pliers, callipers,pencils etc.
• ll contractors areaccompanie% b& the/oo% safet& manager atall times to ens#re the&onl& %o what the& haecome for an% that nocontamination ofpackaging is happening%#ring the isit.
• ll sta@ traine% tointercept all#naccompanie% isitors
an% refer them to thefoo% safet& manager.
• 5nl& managers,s#perisors an%2irectors are allowe%into the store, b#talwa&s in the compan&of the compan&storekeeper.
1 1 ) • 3&gienein%#ction,
• !ec#rit&training
• Remoeperson fromrestricte%storage.
• Repriman% asappropriate.
• Retrain onaccess to theseareas
Packaging store
s#perisor.
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $$ o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 23/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
!: na#thorise%remoal ofpackaging stockitems
na#thorise%sta@
• 5nl& managers,s#perisors an%2irectors are allowe%into the store, b#talwa&s in the compan&of the compan&
storekeeper.• ll contractors are
accompanie% b& the/oo% safet& manager atall times to ens#re the&onl& %o what the& haecome for.
•
1 1 1
• 3&gienein%#ction,
• !ec#rit&training
• Remoeperson fromrestricte%storage.
• Repriman% asappropriate.
• Retrain onaccess to theseareas
Packagin
g stores#perisor
.
199. Risk ssessmenton ccess to!ensitie
areas in thepackho#se(3&giene!tore"
B: 8one • • •
C: 3&gieneChemicals
Chemical i6 #ps • 5nl& managers,s#perisors an%2irectors are allowe%
into the store, b#talwa&s in the compan&of the 3&giene!#perisor.
1 ) )
• Restricte% ccess
• Retrain!ta@.
• 2iscar%
a@ecte%chemicals
3&giene
!#perisor
P: /oreign Bo%&Contaminationfrom contractorssmall items.
8#ts, bolts, har%plastics,maintenancesmall items e.g.pliers, callipers,pencils etc.
• ll contractors areaccompanie%.
• ll sta@ traine% tointercept all#naccompanie% isitorsan% refer them to thefoo% safet& manager orthe packho#se
manager.• 5nl& managers,
s#perisors an%2irectors are allowe%into the store, b#talwa&s in the compan&of the 3&giene!#perisor.
•
1 1 1
• 3&gienein%#ction,
• !ec#rit&training
• Remoeperson fromrestricte% store.
• Repriman% asappropriate.
• Retrain onaccess to these
areas
3&giene
s#perisor.
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $ o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 24/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
19). Risk ssessmenton llergens
B: llerg& Pro%#ct • Pro%#ct onl& so#rce%from 4lobal 4ap!o#rces.
• ll pro%#cts not onc#rrent list ofE#ropean nion onmaterials containingallergens.
1 ) )
• Contin#o#sresearch onallergens.
• Compliancewith the E ist(2irectie*99)G; of5ctober *99)" nne6 ???
• Remoeallergen fromcontact withother pro%#cts.
• %e#atel & label allergenin keeping withthe E2irectie
/!
PersonnelCarr&ing llergenContaining foo%s
• Personnel $raining an%onitoring.
• !ta@ foo% control1 ) )
• Personnel3&giene Checks.
• Retrain!ta@ on foo%control
• Remoeallergenmaterials fromsite
/!
E#ipments GProcesses
• E#ipment ColorCo%ing an%
!egregation.
1 ) )• 8o 3an%ling
of allergens on
site
• 8G /!
CleaningPractices
• !egregation ofCleaning E#ipment
• Proper cleaning ofe#ipment
1 ) )
• 8o han%lingof allergens onsite
• 8G /!
$ransport ofpro%#ce an%pro%#cts
• Pro%#ce CrossContamination 1 ) )
• 8o han%lingof allergens onsite
• 8G /!
8ew Pro%#ct2eelopment
• ?ngre%ient form#lation
• 8ew Pro%#cts 1 ) )• 8o han%ling
of allergens onsite
• 8G /!
Pro%#ct
Reform#lation
• Reconstit#tion of
?ngre%ients 1 ) )
• 8o han%ling
of allergens onsite
• 8G /!
Packaging • Packaging containingallergens 1 ) )
• 8o han%lingof allergens onsite
• 8G /!
C: 8one • •
P: • • •
B: 8one • •
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $( o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 25/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
11). Risk ssessmenton (Woo%"
C: 8one • • •
P: Chippe% woo% onpro%#ct
Woo% frompro%#ct pallets in%ispatch col%room.
• 8on I Woo% Polic& inplace in processingareas
1 0 0
• 8o woo%allowe% inpro%#ction areas.
• !ta@ traine%on woo% polic&.
• Woo% #se%in packaging storechecke% forintegrit&.
• Remoe%efectie palletan% all chippe%pieces frompackagingstore.
ll ke&
sta@
11+. Risk ssessmenton ProcessJow an%aterials!egregation
B: . icrobialcontaminationfrompathogens e.g.E. coli, !taph. #re#s e.t.c
. CrossContamination
Personnel
5ther Pro%#cts
• Personnel entranceseparate% frommaterials entrance an%pro%#ct e6it b& time ofoperation.
• Personnel a%e#atel&traine% on packho#seentrance proce%#res.
• Pro%#cts easil&i%enti>able %#ringgra%ing an% packing,hence packers able toremoe an& possiblecross contaminants.
• Pro%#cts similar innat#re an% notpotentiall& haDar%o#sas cross contaminants.
• Pro%#cts not R$E.
* ) + • 3&gienetrainings %one onall personnel
• ?n%#ctiontrainings for isitors an%contractors beforework G isits.
• Pro%#ctproperl& arrange%in storage areas.
• Pro%#cteasil& i%enti>ablehence eas& toseparate %#ringgra%ing.
• Packho#seentrance forpro%#ceseparate% b& time
to personnelentrance.
• Retrainsta@ onpackho#ser#les.
• %here tor#lesconcerning sta@ s pro%#ce
entrance topackho#se.
/!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $& o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 26/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
C: Chemical spillsfrom han% wash%ispensers an%item sanitiDers
3an% wash area,h&giene sanitiDersan% %etergents
• Personnel entranceseparate% frommaterials entrance an%pro%#ct e6it.
• 3&giene chemicalsintro%#ce% to packingareas before pro%#ce isintro%#ce% topackho#se b& traine%personnel.
1 * 0
• Chemicalsfrom approe%s#ppliers
• Chemicalshan%le% b&traine% sta@
• 2isposeo@ a@ecte%pro%#ct.
• Retrainsta@ onchemicalhan%ling.
3&giene!#periso
r
P: Anies an% othersmall items,personnel itemse.g. watches,rings, st#%s etc
!mall itemsintro%#ction topackho#se,personnel
• 3&giene items kept inpackho#se an%controlle% b& traine%personnel.
• Personnel traine% onpackho#se in%#ctionan% h&giene r#les.
* ) +
• !mall itemsmonitoring
• 3&gienein%#ction
• ?nstit#tethe inci%encemanagementproce%#re.
• Retrainsta@
3&gienes#periso
r
11;. Risk
ssessmenton Cleaning
B: icrobial
contaminationfrom pathogense.g. .onoc&togenes, E.coli, !taph. #re#se.t.c
Primar&,
!econ%ar& an%$ertiar& contacts#rfaces
• Personnel traine% on
personal an%enironmental h&giene.
• %e#ate cleaningsche%#les in place.
• Pro%#cts not R$E.
* * 0
• icrobial
s#reillance %oneann#all&.
• 3&gienechecks %one atstart an% en% ofshift
• Reisit
2etergent an%!anitiDere@icacies
3&giene!#periso
r
C: Chemical spillsfrom h&gienechemicals an%sanitiDers
h&giene sanitiDersan% %etergents
• 3&giene sta@ traine%on control of h&gienechemicals.
• ost chemicals aremil% irritants.
• Chemical control
proce%#re e6ists.
* * 0 • !anitiDerpreparationchecks in place.
• %herenceto trainingsche%#les.
• Retrain!ta@.
• ReiewsanitiDer an%2etergenthan%ling
process.
3&gienes#periso
r
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $) o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 27/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: Anies an% othersmall items,loosene% machineparts, loosene%cleaninge#ipment parts
oss of smallitems an%machine an%e#ipmentbreakages %#ringthe cleaning
operations
• Cleaning onl& %one inareas where there is nopro%#ction or pro%#ctstorage.
• Cleaning %one #singe#ipment that is of
high integrit& an% lessprobabilit& ofbreakage.
• Cleaning %one b&well traine% personnel.
* ) +
• !mall itemsmonitoring
• 3&gienein%#ction an%training tocleaning sta@
• %herenceto maintenance of machines.
• ?nstit#tethe inci%encemanagementproce%#re.
• Retrainsta@
• Reiewmaintenanceproce%#res forcleaninge#ipment.
3&gienes#periso
r
P: 8one • • •
!: na#thorise%remoal of store%items
na#thorise%personnel
• 5nl& traine% h&gieneoperaties, managers,s#perisors an%2irectors are allowe%into the store, b#t
alwa&s in the compan&of the compan&storekeeper.
• ll contractors areaccompanie% b& the/oo% safet& manager atall times to ens#re the&onl& %o what the& haecome for.
1 1 1
• !ec#rit&traine% to all sta@.
• Retrainsta@
• Repriman% as appropriate
/!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $% o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 28/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
1*0. Risk ssessmenton ccess to!ensitieareas in thepackho#se
(Packho#se,incl#%ingcol% rooms"
B: Contamination ofpro%#ct from sickpeople or peoplewho hae notwashe% theirhan%s.
isitors, workersan% Contractors
• ll sta@ traine% onpersonal h&giene an%compan& h&giene r#les.
• ll isitors signin%#ction forms an%are alwa&s
accompanie% b& the/oo% safet& manager inthe %#ration of their isit.
• Proce%#res forreporting sicknessa%e#ate an% welltraine% to the sta@
• ?nci%encemanagementproce%#res are in placean% well traine% to
sta@.
1 1 1
• !ec#rit&traine% to all sta@.
• Retrainsta@
• Repriman% as appropriate
/!
C: n& chemicals orspra&s that ma&taint orcontaminate thepro%#ct frompersonnel an% isitors e.g.%eo%orants
isitors, workersan% Contractors
• ll sta@ traine% onpersonal h&giene an%compan& h&giene r#les.
• ll isitors signin%#ction forms an%are alwa&saccompanie% b& the/oo% safet& manager inthe %#ration of their isit.
• Proce%#res for
reporting sicknessa%e#ate an% welltraine% to the sta@
?nci%ence managementproce%#res are in placean% well traine% tosta@.
1 ) ) • !ec#rit&traine% to all sta@.
• Retrainsta@
• Repriman% as appropriate
/!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $1 o2 1 3e4
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 29/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: /oreign Bo%&Contaminationfrom contractorssmall items.
8#ts, bolts, har%plastics,maintenancesmall items e.g.pliers, callipers,pencils etc.
• ll contractors areaccompanie% b& the/oo% safet& manager atall times to ens#re the&onl& %o what the& haecome for.
• ll sta@ traine% tointercept all#naccompanie% isitorsan% refer them to thefoo% safet& manager orthe packho#semanager.
• Col% roomss#perisors control an%ens#re no #na#thorise%workers enter the col%rooms witho#t being
s#perise%.
1 ) )
• !ec#rit&traine% to all sta@.
• Retrainsta@
• Repriman% as appropriate
/!
!c:
na#thorise%remoal of store%items
na#thorise%personnel, isitors an%contractors
• ll contractors areaccompanie% b& the/oo% safet& manager atall times to ens#re the&onl& %o what the& haecome for.
• ll sta@ traine% tointercept all#naccompanie% isitorsan% refer them to thefoo% safet& manager or
the packho#semanager.
• Col% roomss#perisors control an%ens#re no #na#thorise%workers enter the col%rooms witho#t beings#perise%.
1 ) )
• !ec#rit&traine% to all sta@.
• Retrainsta@
• Repriman% as appropriate
/!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $' o2 1 3e4
AVENUE LTD
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 30/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
1*. Risk ssessmenton ccess to!ensitieareas in thepackho#se
(5@ices"
B: 8one • • •
C: 8one • •
P: 8one • •
!c:
na#thorise%remoal of o@iceitems
na#thorise% isitors, sneakingworkers
• isitors alwa&sescorte% b&receptionist to theperson the& want tosee.
• Packho#ses#perisors alwa&s incontrol of sta@moement.
• 5@ices alwa&s locke%in times of theinc#mbents abscence.
1 * *
• !ec#rit&traine% to all sta@.
• Retrainsta@
• Repriman% as appropriate
/!
-$+ Risk ssessment
on 3an%-washing
B: Contaminationwith Pathogenic
Bacteria
isitors,contractors an%
workers who arenot properl&traine%.
• $horo#gh in%#ction%one to all sta@.
• 3an% washingproce%#re in place.
• 3an% washingfacilities an% bannersfor remin%ing people towash han%s proi%e%.
• 3&giene trainingscarrie% o#t.
• Pro%#cts not R$E.
* ) +
• 2ail&3&giene Checks
• !#pplierChecks
• Retrainsta@
• Bar isitors an%contractorsfrom entr&
/oo%!afet&$eam
C: Chemical spills Packho#seEntrance
• Workers traine% onhan%-washing.
• Chemicals han%le% b&
traine% workers.• Packho#se entrance
completel& segregate%from pro%#ce han%lingareas
* * 0
• 3an%-washing recor%s.
• is#al
obseration ofsta@.
• Retrainsta@
• Repriman
% as appropriate 3&gienes#perisor
P: • • •
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( o2 1 3e4
AVENUE LTD
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 31/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
-&+ Risk ssessmenton !ta@,Contractorsan% isitors'3ealth an%
!afet&
B: Contaminationwith PathogenicBacteria
isitors,contractors an%workers who arenot properl&traine% oraccompanie%.
• $horo#gh in%#ction%one to all sta@.
• !ta@ >ll health#estionnaire on ret#rnfrom illnesses or leaese6cee%ing one week.
• isitors >ll a health#estionnaire beforeaccess to pro%#ctionareas.
• Pro%#cts not R$E.
* ) +
• 3&giene#estionnaires.
• Reports ofillness
• /irst ai%
• Remoesta@ G isitor Gcontractor fromoperation.
• !eekme%ical
assistance
3&giene!#periso
r
C: Contaminationwith %eo%orants,nail polish an%personalme%icines
isitors,contractors an%workers who arenot properl&traine% oraccompanie%.
• $horo#gh in%#ction%one to all sta@.
• isitors >ll a health#estionnaire beforeaccess to pro%#ctionareas.
* * 0
• 3&gienein%#ction %one toall sta@, isitorsan% contractors
• Retrainpersonsa@ecte%
3&gienes#periso
r
P: Contamination
with hair, rings,st#%s, mobilephones, braceletsan% other =eweller&.
isitors,
contractors an%workers who arenot properl&traine% oraccompanie%.
• $horo#gh in%#ction
%one to all sta@.• isitors >ll a health
#estionnaire beforeaccess to pro%#ctionareas.
• /#ll protectieclothing worn an%incl#%e% in the sta@in%#ction an% h&gieneproce%#res.
• Keweler& policies inplace.
* * 0
• 3&giene
in%#ction %one toall sta@, isitorsan% contractors
• Retrain
personsa@ecte%
3&gienes#periso
r
1)+. Risk ssessmentonPackho#seEnironment
B: icrobialContamination
Constr#ction %#ston packaging an%pro%#cts.
• Packho#secompletel& proofe%against %#st.
• Pro%#cts not R$E.
* * 0
• Cleaningsche%#les forpackaging store
• Re-clean3&giene
sta@
C: 8one • •
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( - o2 1 3e4
AVENUE LTD ** S S i L L l F Fi PB P b bili SV S i B Bi l i l h i l P Ph i l R!" R # ! "
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 32/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: /oreign Bo%&Contamination
Constr#ction %#ston packaging an%pro%#cts
• temporar& roof hasbeen p#t on thepackaging store toprotect packaging from%#st.
• Packho#se
completel& proofe%against %#st.
* * 0
• Cleaningsche%#les for roof of packaging store
• Reclean
3&gienesta@
!c: na#thorise%access tosensitie areas.
na#thorise% isitors, sneakingworkers
• isitors alwa&sescorte% b&receptionist to theperson the& want tosee.
• Packho#ses#perisors alwa&s incontrol of sta@moement.
• isitors instr#cte% on
areas the& are allowe%to access.
* * 0
• !ite sec#rit&a%e#ate
• Remoeresponsiblesta@ fromrestricte% area
ll ke&sta@
/: /ire ctiities in8eighbo#ringPremises
• 8eighbo#ringcompan& has safet&preca#tions in place.
• ?t is illegal to smokein p#blic areas inAen&a.
* * 0
• is#alobseration
• /iretrainings
/!
1);. Risk ssessmenton/re#enc&
of ?nternal #%its
B: Contaminationwith Pathogenicbacteria
Risk of 2eiation • ll Chapters of the/!!C **999 !tan%ar%a#%ite% at least onceper &ear.
•
nn#al #%itinga%e#ate for safet& ofcompanies pro%#cts.
• f#ll /!!C **999Eal#ation %one b&/oo% safet& Cons#ltantBefore the certi>cationa#%it.
• Pro%#cts not R$E.
* ) + • Comparatiemonitoring for thesche%#les s theact#al a#%it %ates.
•
nal&sis ofcorrectie actionsre#ire%.
• nal&ses oftren%s forclearing nonconformancesarising frominternal a#%its
• Retrainsta@.
• Raiseinci%ence for
contin#e% nonconformance.
• Close o@correctieactions
• p%atecorrectieaction log
/!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( $ o2 1 3e4
AVENUE LTD P kh Ri k A K ** S S it L L l F Fi PB P b bilit SV S it B Bi l i l h i l P Ph i l R!" R # ! " t
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 33/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
C: Contamination Risk of 2eiation • ll Chapters of the/!!C **999 !tan%ar%a#%ite% at least onceper &ear.
• nn#al #%itinga%e#ate for safet& of
companies pro%#cts.• f#ll /!!C **999
Eal#ation %one b&/oo% safet& Cons#ltantBefore the certi>cationa#%it.
* ) +
• Comparatiemonitoring for thesche%#les s theact#al a#%it %ates.
• nal&sis ofcorrectie actions
re#ire%.• nal&ses of
tren%s forclearing nonconformancesarising frominternal a#%its
• Retrainsta@.
• Raiseinci%ence forcontin#e% nonconformance.
• Close o@correctieactions
• p%atecorrectieaction log
/!
P: Contamination Risk of 2eiation/rom /rom!&stems
• ll Chapters of the/!!C **999 !tan%ar%a#%ite% at least onceper &ear.
• nn#al #%iting
a%e#ate for safet& ofcompanies pro%#cts.
• f#ll /!!C **999Eal#ation %one b&/oo% safet& Cons#ltantBefore the certi>cationa#%it.
* ) +
• Comparatiemonitoring for thesche%#les s theact#al a#%it %ates.
• nal&sis of
correctie actionsre#ire%.
• nal&ses oftren%s forclearing nonconformancesarising frominternal a#%its
• Retrainsta@.
• Raiseinci%ence forcontin#e% non
conformance.• Close o@
correctieactions
• p%atecorrectieaction log
/!
10*. Risk ssessmenton 3ea&metals onpro%#cts
B: 8one /!C: Contamination
with ea%(9.1mgGAg" an%Ca%mi#m(9.9<mgGAg" tocompl& with E2irectie11:*99+ of 1;th 2ec *99+
?rrigation water • Water checke% forhea& metals ann#all&.
• Pro%#ct grown aboe
gro#n% (!igni>cantl&re%#cing the likel&contamination fromsoil"
* ) + • Checking forconformance ofirrigation water
an% soil.• !#pport
pro%#ct well%#ring growing.
• Pro%#ctso#rce% from4lobal 4P/arms.
• Changewater so#rce.
/!
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( o2 1 3e4
AVENUE LTD P kh Ri k A t K ** S S it L L l F Fi PB P b bilit SV S it B Bi l i l h i l P Ph i l R!" R # ! " t
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 34/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
P: 8one
-(&+ Risk ssessmenton /oo%2efence an%
Bio-$errorism
B: Pro%#ctContaminationfrom intentionall&place% bio-haDar%s
e.g. pathogenicbacteria
$errorist ctiities
• Compan& sec#rit&tightene% aro#n%transport ro#tes.
* ) +
• $amperproof pa%locks#se% for pro%#cean% pro%#ct
tr#cks.• $r#ste%
people #se% toopen tr#cks asinstr#cte% b& thecompan&
• #arantine an% re=ectpro%#cts.
• 3alt
operations #ntilthreat iscleare%.
/oo%!afet&anager
C: Contaminationwith chemicalsintentionall&place% on pro%#cts
$errorist ctiities
• Compan& sec#rit&tightene% aro#n%transport ro#tes
* ) +
• $amperproof pa%locks#se% for pro%#cean% pro%#cttr#cks.
• $r#ste%
people #se% toopen tr#cks asinstr#cte% b& thecompan&
• #arantine an% re=ectpro%#cts.
• 3altoperations #ntilthreat is
cleare%.
/oo%!afet&
anager
P: Contaminationwith Ph&sicalhaDar%s e.g. nails,glass etc.
$errorist ctiities
• Compan& sec#rit&tightene% aro#n%transport ro#tes
1 0 0
• $amperproof pa%locks#se% for pro%#cean% pro%#cttr#cks.
• #arantine an% re=ectpro%#cts.
• 3altoperations #ntilthreat iscleare%.
/oo%!afet&
anager
-(1+ Risk
ssessmenton wall-Joor =#nction
B: Pro%#ctContaminationfrom pathogenicbacteria(especiall& .onoc&togenes".
cc#m#late%bacteria %#e toinabilit& to clean
• Walls are panelle%.
•
2#e to %r&operations, there is noacc#m#lation of wateran% %irt on wall toJoor.
• Pro%#cts not R$E.
* * 0
• Cleaning
!che%#les• Post
cleaninginspections
• 8G
/oo%!afet&
anager
C: • • •
P: • • •
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( ( o2 1 3e4
AVENUE LTD Packho se Risk Assessments Ke ** Sc: Security L: Legal F: Fire PB: Probability SV: Severity B: Biological : hemical P: Physical R!": Rea#y !o "at
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 35/38
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
1<1. Riskassessmenton absenceof %rains.
B: Pro%#ctContaminationfrom pathogenicbacteria
Ran%omoement ofwaste water
• 5nl& %r& operations.
• Cleaning %one afterpro%#ction operations.
• Water easil& g#i%e%%#ring cleaning.
* * 0
• Cleaning!che%#les
• Postcleaninginspections
• 8G
/oo%!afet&
anager
C: • • •
P: • • •
1<0. RiskassessmentonContamination from5nline $ests.
B: Pro%#ctContaminationfrom pathogenicbacteria
3#man Contacton non-%estr#ctiesampling
• Pro%#ct inten%e% forcooking before eating.
• Cs traine% an%monitore% on personalh&giene
* * 0
• !ta@h&gienemonitoring.
• Retrain!ta@. /oo%
!afet&anager
C: • • •
P: Contaminationwith broken smallitems e.g. probes,pens, staples e.t.c.
#alit& Control?tems
• 8o staples in thepackho#se
• Pens are one piecean% allowe% for sta@
%oing recor%e% onl&.• !mall items iss#e%
an% monitore%
* * 0
• onitoringof small items.
• Personnelh&giene
monitoring
• Retrainsta@.
/oo%!afet&
anager
1<7. Riskassessmenton 3#mi%it&onitoring
B: Pro%#ctContaminationfrom pathogenicbacteria
Water atomiDe% atpro%#ce %#ringpre-cooling
• 33C water checke%for microbial #alit& * * 0
• Watermonitoring
• ?f testsfails, changewater so#rce
/oo% !afet&anager
C: • • •
P: 2eh&%ration 2r& air col%room • ssess h#mi%it& of33C
* * 0
• Coolerh#mi%it&monitoring
• Re#estfor emergenc&maintenance onthe coolinge#ipment
/oo% !afet&anager
1+9. Riskassessmenton ChlorineChecking ofprocesswater
B: • • •
C: E6cessie Resi%#alChlorine
Poor m#nicipaltreatment
• Water testing
• Water not ingre%ientin >nal pro%#cts
* * 0• Water
Potabilit& testing• Change
water so#rce/oo% safet&
manager
P: • • •
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( & o2 1 3e4
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security L: Legal F: Fire PB: Probability SV: Severity B: Biological : hemical P: Physical R!": Rea#y !o "at
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 36/38
AVENUE LTD Packhouse Risk Assessments Key: Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
1+). Riskassessmenton irPress#re2i@erentials
B: icrobialContamination
ow risk to highrisk areas
• 8ot applicable.Pro%#ce is low carean% will be cooke% b&c#stomer before eating
* * 0
• Pro%#ct an%contact sericecleaning an% postcleaninginspections.
• Pro%#ct an%
contact microbialmonitoring
• 8G
/oo% !afet&anager
C: • • •
P: • • •
C: • • •
P: • • •
1+. Riskassessmenton foot wear#se% infactor&
B: icrobialContamination
Workers shoes • 8ot applicable.Compan& e6ercising%r& operations %#ringpacking of freshpro%#ce.
• icrobialcontamination will notca#se harm as thepro%#ct is inten%e% forf#ll cooking beforecons#mption.
• 8o cleaning %one%#ring normal packingoperations.
• $he probabilit& an%pro6imit& of shoes tomaterials
• !ta@ hae been
instr#cte% to hae%e%icate% footwear forthe packho#seoperations.
• Pro%#cts not R$E.
* 1 *
• Compan&%e%icate%footwear isassesse% %#ringh&giene checks.
• n&onewitho#t factor&%e%icate%footwearallowe% to goan% get a cop&.
/oo% !afet&anager
C: • • •
P: • • •
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( ) o2 1 3e4
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security L: Legal F: Fire PB: Probability SV: Severity B: Biological : hemical P: Physical R!": Rea#y !o "at
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 37/38
AVENUE LTD Packhouse Risk Assessments Key: Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Prerequisites Risk Assessment Worksheet
Problem Area
Hazard Control Measures / Justifcation
PB
S
Risk
Monitorin!Procedure
Correcti"e Action
Res#onsibilit$ Hazard % Source
-%-+ Riskassessmenton factor&%rains
B: icrobialContamination
2rainageBackJows
• 8ot applicable.Compan& e6ercising%r& operations %#ringpacking of freshpro%#ce.
• icrobial
contamination will notca#se harm as thepro%#ct is inten%e% forf#ll cooking beforecons#mption.
• 8o cleaning %one%#ring normal packingoperations.
• $he probabilit& an%pro6imit& of shoes tomaterials
• !ta@ hae been
instr#cte% to hae%e%icate% footwear forthe packho#seoperations.
• Pro%#cts not R$E.
* 1 *
• Compan&%e%icate%footwear isassesse% %#ringh&giene checks.
• n&onewitho#t factor&%e%icate%footwearallowe% to goan% get a cop&.
/oo% !afet&anager
C: • • •
P: • • •
** Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical
Reference Issue No Authorized by Issue date Review date Page Reason for Review
$%&'($)'+#oc $-( . - !/0 $-.-.$-$ -1+-+$-( % o2 1 3e4
AVENUE LTD Packhouse Risk Assessments Key: ** Sc: Security L: Legal F: Fire PB: Probability SV: Severity B: Biological : hemical P: Physical R!": Rea#y !o "at
7/18/2019 02 Packhouse Risk Assessments 2014
http://slidepdf.com/reader/full/02-packhouse-risk-assessments-2014 38/38
AVENUE LTD Packhouse Risk Assessments Key: Sc: Security, L: Legal, F: Fire, PB: Probability, SV: Severity, B: Biological, : hemical, P: Physical R!": Rea#y !o "at
Reference Issue No Authorized by Issue date Review date Page Reason for Review