  • Pearl GTL Project

    LINDE ENGINEERING

    Shell Project No: HP-3000-QAT Contractor Project No: 5887

    Project Document Number: T- 4.250.923 Project Rev.: A Page 2 of 27

    Purchase Order Number:

    2MH127

    Tag/Item Number(s): N/A

    Unit(s): ASU

    PCWBS: Z

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    D A 14.09.08 Ready for Construction SK EO AG RFC

    C O 06.03.08 Issued for Company comments BR UA ZG ICC

    B 25.01.08 Issued for Review BR UA ZG IFR

    A 02.01.08 Issued for Internal Review BR UA ZG IIR

    GAMA Rev.

    Project Rev Date Description

    Prepared By

    Checked By

    Approved By

    Status

    No. No. ORIGINATOR

    LINDEGINEERING AG

    Document Title:

    INSPECTION TEST PLAN FOR COMPRESSOR

    Contractor

    Gama Qatar Co. W. L. L.

    Document No. LOC470

    GAM ITP QAC GTL 036 D

    Org. Code

    Doc. Type

    Disc. Code

    Geogr. Area

    Seq. No

    Rev. No Vendor Code

    Project Document Number: T-4.250.923

    Rev No: A

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    ITP NO: GAM-ITP-QAC-GTL-036

    ITP FOR INSTALLATION OF COMPRESSOR (FSI)

    DATE: 17.09.08-REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. VENDOR (MAN)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible

    Party Verifying Documents S A X C

    T-4.250-923 REV-A Page 4 of 27

    1.0

    DOCUMENTATION

    1.1 Contractor drawings, project specifications, manuals, codes 100% - -

    TECHINICAL OFFICE - H R R

    1.2 Lifting studies (For Heavy Equipments) 100%

    T.4.234.084 - HSSE - H R R

    2.0 EQUIPMENT

    2.1 Equipment identification and name plate verification 100% T-4.250.945

    Approved drawing, DEP 31.10.03.10; DEP

    31.29.00.10

    STORE

    INCHARGE GAM-QCR-QAC-GTL-080 I S S

    2.2 Receiving inspection 100% T-4.250.945;T.4.250.927 Approved drawing, DEP 31.29.00.10

    STORE

    INCHARGE GAM-QCR-QAC-GTL-080 I I S

    2.3 Storage, preservation and documentation(FSI) 100% T.13.377.360E;T.4.250.932

    Approved drawing, DEP 31.29.00.10;DEP

    70.10.70.11 T.13.377.454E; Vendor instruction,

    QCI GAM-QCR-QAC-GTL-069 I R S S

    2.5 Inspection measuring and test equipment calibration 100% T.4.250.915 - QCI Calibration certificate H R R R

    3.0 INSTALLATION

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    ITP NO: GAM-ITP-QAC-GTL-036

    ITP FOR INSTALLATION OF COMPRESSOR (FSI)

    DATE: 17.09.08-REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. VENDOR (MAN)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible

    Party Verifying Documents S A X C

    T-4.250-923 REV-A Page 5 of 27

    3.1 Foundation complete and accepted 100% T-4.250.945

    Approved drawing, DEP 34.19.20.31;

    T.13.376.358 DEP 31.29.00.10,

    QCI GAM-QCR-QAC-GTL-114; GAM-QCR-QAC-GTL-113 H I I I

    3.2 Foundation chipping to sound metal 100% T-4.250.945

    Approved drawing, DEP 34.19.20.31; T.13.376.358

    DEP 31.29.00.10, QCI

    GAM-QCR-QAC-GTL-114; GAM-QCR-QAC-GTL-113

    I S I I

    3.3 Anchor bolts control & pocket cleaning 100% T-4.250.945

    Approved drawing, DEP 34.19.20.31;T.13.376.358

    DEP 31.29.00.10, QCI GAM-QCR-QAC-GTL-114; GAM-QCR-QAC-GTL-113 I S I I

    3.4 Shims Installation 100% T-4.250.945 Approved drawing, DEP 31.29.00.10,

    QCI GAM-QCR-QAC-GTL-114 I S I I

    3.5 Levelling, orientation & alignment (driven & driver set) (FSI)

    100% T-4.250.945; T.13.377.360E Approved drawing, DEP

    31.29.00.10, Vendor specification

    QCI

    GAM-QCR-QAC-GTL-114; GAM-QCR-QAC-GTL-115

    H I I I

    3.6 Settlement monitoring 100% T-4.250.945 Approved drawing, DEP 31.29.00.10,

    QCI GAM-QCR-QAC-GTL-116 I R S S

    3.7 Checking and recording of soft foot 100% T-4.250.945

    Vendor specifications, Approved drawings, DEP 31.29.00.10-sec 3.9.4.7

    QCI GAM-QCR-QAC-GTL-114 I I S S

    3.8 Bolts Tightening(FSI) 100% T.4.250.945; T.13.377.360E Approved drawing, DEP

    31.29.00.10, Vendor specification,

    QCI GAM-QCR-QAC-GTL-114; GAM-QCR-QAC-GTL-041

    H I I S

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    ITP NO: GAM-ITP-QAC-GTL-036

    ITP FOR INSTALLATION OF COMPRESSOR (FSI)

    DATE: 17.09.08-REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. VENDOR (MAN)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible

    Party Verifying Documents S A X C

    T-4.250-923 REV-A Page 6 of 27

    3.9 Grouting 100% T-4.234.545 DEP34.19.20.31;

    T.13.376.358;Manufactures Instruction;

    QCI GAM-QCR-QAC-GTL-025 I I I I

    3.10

    Jack screw removal

    100% T-4.250.945 Vendor specifications,

    Approved drawings DEP 31.29.00.10,

    QCI GAM-QCR-QAC-GTL-114 I S S S

    3.11 Temporary earthing 100% T-4.250.945 Approved drawing, DEP 31.29.00.10,

    QCI GAM-QCR-QAC-GTL-104 I S I S

    3.12 Anchor bolts Tightening after grouting(FSI) 100% T.4.250.945; T.13.377.360E

    Approved drawing, DEP 31.29.00.10, QCI GAM-QCR-QAC-GTL-041 H I I S

    3.13 Flange parallelism (FSI) 100% T-4.250.936 T.13.377.360E Approved drawing,;DEP

    31.29.00.10;DEP 31.38.01.11;T.13.376.815E

    QCI GAM-QCR-QAC-GTL-114; GAM-QCR-QAC-GTL-058 H I I I

    3.14 All piping installation, alignment, & connection without any objectionable load

    100% T-4.250.936 Approved drawing,

    DEP 31.29.00.10, DEP 31.38.01.11;T.13.376.815E

    QCI GAM-QCR-QAC-GTL-114 H I S S

    3.15 Cold alignment levelling rechecking (FSI)

    100% T-4.250.936; T.13.377.360E

    Approved drawing, DEP 31.29.00.10, DEP

    61.10.08.11; T.13.377.455E Vendor specification

    QCI GAM-QCR-QAC-GTL-114; GAM-QCR-QAC-GTL-115 H I I I

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    ITP NO: GAM-ITP-QAC-GTL-036

    ITP FOR INSTALLATION OF COMPRESSOR (FSI)

    DATE: 17.09.08-REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. VENDOR (MAN)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible

    Party Verifying Documents S A X C

    T-4.250-923 REV-A Page 7 of 27

    3.16 Coupling Installed Properly 100% T-4.250.936

    Approved drawing, DEP 31.29.00.10; DEP

    31.38.01.11;T.13.376.815E;DEP 31.29.00.36

    QCI GAM-QCR-QAC-GTL-114 I S I S

    3.17 Mechanical seal/Packing installation check(FSI)

    100% T-4.250.945 T.13.377.360E

    Approved drawing, DEP 31.29.00.10, DEP

    61.10.08.11; T.13.377.455E Vendor specification

    QCI GAM-QCR-QAC-GTL-114 I I I I

    3.18 Cleaning, flushing and oil filling (FSI) 100% T-4.250.930; T.13.377.360E

    DEP 31.29.00.10, DEP 61.10.08.11;

    T.13.377.455E;DEP 70.10.80.11 Vendor

    specification

    QCI GAM-QCR-QAC-GTL-114; GAM-QCR-QAC-GTL-070 H H I I

    3.19 Temporary suction strainers Installation check

    100% T-4.250.936 Approved drawing, DEP 31.29.00.10,

    QCI GAM-QCR-QAC-GTL-114 I S I S

    3.20 Erection Damage(Equipments) 100% T.4.251.035 - QCI GAM-QCR-QAC-GTL-127 I I I R

    4.0 FINAL INSPECTION

    4.1 Final alignment(FSI) 100% T-4.250.945 T.13.377.360E Vendor specifications,

    Approved drawings, DEP 31.29.00.10

    QCI GAM-QCR-QAC-GTL-115 H I I I

    4.2 Checking and recording of distance between shaft ends and/or between hubs

    100% T-4.250.945 Approved drawings, DEP 31.29.00.10 -SEC 4.20.9

    QCI GAM-QCR-QAC-GTL-114 I I I S

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    ITP NO: GAM-ITP-QAC-GTL-036

    ITP FOR INSTALLATION OF COMPRESSOR (FSI)

    DATE: 17.09.08-REV. D

    S. GAMA QATAR X. CONTRACTOR QC C. COMPANY A. VENDOR (MAN)

    I: INSPECTION / TEST R: DOCUMENT ISSUED/REPORT REVIEW S: SURVEILANCE H: HOLD POINT (Notification Required and Presence Mandatory). W: WITNESS (Notification Required but Presence not Mandatory)

    Item Activity Test Frequency Reference Document Acceptance Criteria Responsible

    Party Verifying Documents S A X C

    T-4.250-923 REV-A Page 8 of 27

    4.3 Shaft turning freely by hand 100% T-4.250.945 DEP 61.10.08.11;

    T.13.377.454E Approved drawings,DEP 31.29.00.10

    QCI GAM-QCR-QAC-GTL-114 I S I S

    4.4 Cleanliness check for equipment and associated system (FSI)

    100% T-4.250.930 T.13.377.360E

    Vendor specifications DEP 61.10.08.11; T.13.377.455E;

    DEP 31.29.00.10DEP 70.10.80.11,

    QCI GAM-QCR-QAC-GTL-114; GAM-QCR-QAC-GTL-070 H H I I

    4.5 Verification of auxiliary system completion 100% T-4.250.945

    Vendor specifications, Approved drawings, DEP

    31.29.00.10

    QCI GAM-QCR-QAC-GTL-114 I I I S

    4.6 Verification of piping pressure test acceptance Prior to final alignment

    100% T-4.250.908 DEP 31.40.40.38 QCI GAM-QCR-QAC-GTL-065 H W H W

    4.7

    Installation of accessories & coupling guard

    100% T-4.250.945

    Vendor specifications DEP 61.10.08.11;

    T.13.377.454E;Approved drawings, DEP 31.29.00.10

    QCI GAM-QCR-QAC-GTL-114 I S I S

    4.8 General Punch List (Clearing) 100% T-4.250.945 - QCI GAM-QCR-QAC-GTL-128 H H H R

    4.9 Equipment Box up 100% T-4.250.945 - QCI GAM-QCR-QAC-GTL-133 H I H S

    4.10 Installation Completion and sign-off quality records 100% T-4.250.945 T.13.377.555G QCI All Reports H R H R

  • C2-ASU PROJECT GAMA QATAR

    Form No: GAM-QCR-QAC-GTL-025 Inspection Gr.:

    ITP No.: Laboratory:

    GROUT POUR CARD(PRE/POST POUR)

    Record No: Date:

    TAG NO.: LOCATION: DESCRIPTION: DRAWING: TYPE OF GROUT: QUANTITY OF GROUT:

    GAMA/T Const. GAMA/T - QC CONTRACTOR COMPANY(*) REMARKS Item

    No.

    TYPE OF ACTIVITY Signature Date Signature Date Signature Date Signature Date 1.0 Setting Out 2.0 Concrete Surface Preparation 3.0 Equipment / Surface Alignment 4.0 Formworks 5.0 Isolation Joint 6.0 Metal Surface Preparation 7.0 Mixing / Placing / Finishing of Grout (1) 8.0 Curing of Grout (1) 9.0 Removal of Shims

    10.0 Mixing / Placing / Finishing of Grout (2) 11.0 Curing of Grout (2) 12.0 Sealant to Isolation Joint 13.0 Final Inspection Remarks:

    Full Name/Signature/Date GAMA QATAR CONTRACTOR COMPANY

  • GAM-QCR-QAC-GTL-041

    C2 ASU PEARL GTL PROJECT RASLAFFAN INDUSTRIAL CITY

    BOLT TIGHTENING INSPECTION REPORT

    Subcontract Ref.: Report No.:

    Item Description: Inspection Date: Item Location / Area: Test Code No.:

    Subsystem: ITP No.:

    Ref. DWG / Docs:

    Used Measuring and test equipment ref. (if applicable):

    INSPECTIONS Bolting Item No/Spool

    No Mark No./Joint No

    Grade Size Bolt Tightening (Torque Value)

    Inspectors Signature

    ORGANIZATIONS DATE NAME SIGNATURE

    THIRD PARTY REP.

    GAMA REP.

    LINDE REP.

    Acce

    pted

    By

    QSGTL OR its PMC REP.

  • GAM-QCR-QAC-GTL-058

    C2 ASU PEARL GTL PROJECT RASLAFFAN INDUSTRIAL CITY

    FLANGE ALIGNMENT INSPECTION REPORT

    Subcontract Ref.: Report No.:

    Item Description: Inspection Date: Item Location / Area: Test Code No.:

    Subsystem: ITP No.:

    Ref. DWG / Docs:

    Used Measuring and test equipment ref. (if applicable):

    INSPECTIONS Item No/Spool

    No Mark No./Joint No Face Distance Face parallelism Centreline offset Inspectors

    Signature

    ORGANIZATIONS DATE NAME SIGNATURE

    THIRD PARTY REP.

    GAMA REP.

    LINDE REP.

    Acc

    epte

    d B

    y

    QSGTL OR its PMC REP.

  • Company Project No: Piping Test No:

    PIPING FIELD Project Title: Location Priority System No:

    TEST REPORTS/C Prepared By: Test Media:

    Name: Signature Date: Description Of TestLINDE Acceptance By: Reference Flow Sheets (List All applicable):

    Name: Signature Date:

    Line Number Line SizeDrawing or Isometric

    NumberRev

    (At Time of Test)

    From To Paint CodeInsul. Code

    Equipment Tested Trough:

    WELDING INSPECTION RELEASE, READY FOR TEST Lines/ piping as tabulated above have been tested and found to (All Welding and NDT is complete and per specification and piping is ready for test) supports, valves and components in place except for items nece

    GAMA WELDING Test Witnessed By

    Inspector: Name Signature: Date: GAMA Inspector: Name Signature:

    LINDE Welding LINDE Field

    Inspector: Name Signature: Date:: Engineer: Name Signature:

    QSGTL or its PMC QSGTL or its PMC

    Inspector: Name Signature: Date:: Inspector: Name Signature

    C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITYQQQ AAA TTT AAA RRR

    GAM-QCR-QAC-GTL-065

  • Piping Test No:

    PIPING FIELD TEST REPORT Description of Test (Continuation Sheet)

    Line Number Line SizeDrawing or Isometric

    NumberRev

    (At Time of Test)

    From To Paint CodeInsul. Code

    GAM-QCR-QAC-GTL-065

  • PROJECT: C2 ASU PEARL GTL PROJECT, RAS LAFFAN INDUSTRIAL CITY

    EQUIP. TAG.NO.: DESCRIPTION: LOCATION:

    MANUFACTURER: DRG.NO.: RFI NO:

    MONTH

    1 2

    3 4 5 6

    7

    8

    9

    10

    11

    12

    ACTIVITY Month

    Date Checked

    Check all internal and accessories storage is acceptable

    Visual Check : Is there any damage

    Check for protective covers on all the openings

    Check all warning labels,like N2 warning plate are existent

    Check Purge Pressure level

    If Re-purge is required, indicate pressure level

    GAMA SIGN WITH DATE

    LINDE SIGN WITH DATE

    QSGTL or its PMC

    NOTE:

    GAM-QCR-QAC-GTL-069

    STORAGE, PRESERVATION AND NITROGEN PURGING REPORT

    FORM NO:

    SHT:

  • Item Location Area: Isometric No: Report No:

    sub system: Form No:

    GAMA QATAR LINDE QSGTL or its PMC

    Signature Date Signature Date Signature Date

    Cleaning Method

    Inspection method Inspection Result Erection

    C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY CLEANLINESS ACCEPTENCE REPORT

    s

    h

    e

    e

    t

    Cleanliness class Spool

    Sub Contract Ref:

    Item Description: Inspection Date

    Pre Fabrication

    QQQ AAA TTT AAA RRR

    GAM-QCR-QAC-GTL-070

  • C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY

    PERIODIC PREVENTIVE MAINTENANCE CHECK

    Subcontract Ref.: Report No. Item Description: Inspection Date: Item Location / Area: Vendor IMOI Ref: Subsystem: Equipt.Tag No Ref. DWG / Documents:

    Used Measuring and test equipment ref. (if applicable): Date of Inspection

    PRESERVATION REQUIREMENTS (ROTATIC EQUIPMENT)

    1.General Inspection-Weather Protection/Painting 2. All openings sealed including Motor junction Box. 3. All Mechanical surfaces protected against rust. 4.Check Nitrogen Pressure 5.Anchor bolts/shims covered with grease

    6.Rotate all shafts,pulleys,lubricators by 21/4 turns

    7.Check oil levels of-bearing housing, gear/crank casing, tanks 8.Check for water at drain points

    9.Flange faces-protection denso tape & dust blinds in place

    ORGANIZATIONS DATE NAME SIGNATURE

    THIRD PARTY REP.

    GAMA REP.

    LINDE REP.

    A

    c

    c

    e

    p

    t

    e

    d

    B

    y

    QSGTL REP. GAM-QCR-QAC-GTL-073

    QQQ AAA TTT AAA RRR

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    GAM-QCR-QAC-GTL-080

    EQUIPMENT RECEIPT CHECK SHEET

    ITEM No: PO No: REQ No:

    UNIT No: MANUFACTURER :

    ITEMS TO BE CHECKED INSPECTOR

    INITIAL REMARKS

    1 Name Plate

    2 Preparation and painting

    3 Desiccant installed

    4 Moisture present

    5 Nozzle flange faces acceptable

    6 Temporary nozzle protection acceptable

    7 Internals and accessories complete and storage acceptable

    8 Purge - pressure:

    Purge monitoring date: Pressure

    Date of initial inspection:

    Name and signature of Inspector:

  • C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY

    EARTHING INSPECTION TEST REPORT

    Test No.: System: Client: Project: Location: Description:

    Relevant Drawings & Specifications:

    Location:

    Inspection - Earthing Installation Item no Description Accept Reject N/A

    1 Installed in accordance with relevant drawings and specifications 2 Earth terminal mechanical protection correct 3 Earth terminal supported correctly 4 Neutral earthing resistor resistive value at ___________oC: 5 Neutral earthing resistor insulation resistance to earth: 6 Earth boss correctly fitted

    7 Continuity

    Inspection After concrete Item no Description Accept Reject N/A

    1 Location & Elevation 2 Proper projection 3 Free Movement of Threads 4 Resistivity 5 Continuity

    Remarks:

    GAMA QATAR LINDE QSGTL or its PMC

    Name:

    Signature:

    Date:

    GAM-QCR-QAC-GTL-104

  • Report No:

    FOUNDATION INSPECTION REPORT Date:

    PROJECT: C2 ASU PEARL GTL PROJECT-RAS LAFFAN INDUSTRIAL CITY

    Tag No: Drg. No:

    Area: Unit: Plot Plan:

    ELEVATION 0 90 180 270 REQUIRED ACTUAL DEVIATION TOLERANCE REMARKS

    ORIENTATION ACCEPTED REJECTED POCKET CLEANING ACCEPTED REJECTED

    REQUIRED ACTUAL DEVIATION TOLERANCE REMARKS

    NO. OF ANCHOR BOLTS ANCHOR BOLT DIA ANCHOR BOLT LENGTH FOUNDATION POCKET POCKET DEPTH

    FOUNDATION CHIPPING REQUIRED NOT REQUIRED IF REQUIRED THICKNESS

    NOTE:

    THE ABOVE MENTIONED FOUNDATION IS ACCEPTED AND RELEASED FOR ERECTION ACTIVITIES

    GAMA LINDE QSGTL or its PMC Name

    Sign

    Date GAM-QCR-QAC-GTL-113

  • C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY COMPRESSOR INSTALLATION PROCESS SHEET

    Item No: Report No: Item Description: Date: Drawing No: Area:

    QQQ AAA TTT AAA RRR

    Signature & Date Item No

    Description Gama Linde QSGTL

    1. Foundation complete, Level & Accepted. 2. Compressor & Driver Set 3. Base Anchor Bolts Tight 4. Grouted 5. Pre alignment check of compressor & Driver Before Pipe

    Connection

    6. Verify Piping pressure test acceptance Before final alignment 7. Piping connections complete with no objectionable loads or

    strains on the flanges

    8. Shaft Turning Freely 9. Final alignment 10. Jacking Screws Removed 11. Seals Installed & Complete 12. Accessories Installed & Ready for service

    (Guards,Vents,Drains,sample connection,strainers,etc)

    13. Auxiliary System Complete(Seal,Flush,Water cooling etc)

    14. Temporary Suction Screens in Place

    15. Cleanliness Checked

    Remarks: The Installation of the above compressor has been satisfactorily completed in accordance with the Drawings & Specifications ORGANIZATIONS DATE NAME SIGNATURE

    GAMA QATAR REP

    LINDE REP

    QSGTL REP

    GAM-QCR-QAC-GTL-114

  • Report No:

    EQUIPMENT LEVELLING & ALIGNMENT REPORT Date:

    PROJECT: C2 ASU PEARL GTL PROJECT-RAS LAFFAN INDUSTRIAL CITY

    Tag No: Manufacturer: Drg. No:

    Equip. Description

    No. of reading Orientation Elevation Plumpness Tolerance Remarks

    ORIENTATION : ACCEPTED REJECTED

    LEVELLING REQUIRED ACTUAL ACC REJECTED

    GRADIENT / SLOPE REQUIRED

    ACTUAL ACC REJECTED

    GAM-QCR-QAC-GTL-115 PAGE 1 OF 2

  • REMARKS: ..

    GAMA LINDE QSGTL or its PMC

    Name

    Sign

    Date

    GAM-QCR-QAC-GTL-115 PAGE 2 OF 2

  • GAM-QCR-QAC-GTL-116 PAGE 1 OF 2

    EQUIPMENT- SETTLEMENT MONITORING

    REPORT NO: DATE:

    PROJECT: C2 ASU PEARL GTL PROJECT-RAS LAFFAN INDUSTRIAL CITY

    AREA:

    ITEM NO:

    WEIGHT:

    NAME:

    PLANNED LEVEL/DIFFERENCE PLUMB ORIENTATION SIGN DATE

    LEVEL 0 90 180 270 BOTTOM MIDDLE TOP A B C D TCM TSKJN

    180 270

    TOLERANCE

    LEVEL: : _________________ PLUMB: : _________________ ORIENTATION:_________________

  • GAM-QCR-QAC-GTL-116 PAGE 2 OF 2

    THE SETTLEMENT OF THE ABOVE EQUIPMENT HAS BEEN SATISFACTORILY COMPLETED IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS (PAINTING AND INSTALLATION EXCEPTION). REMARKS: ---------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------------------------

    ORGANIZATIONS NAME DATE SIGNATURE

    GAMA

    LINDE

    QSGTL or its PMC

  • PROJECT: C2 ASU PEARL GTL PROJECT RAS LAFFAN INDUSTRIAL CITY

    Originator Date of observation:

    Discipline:

    Location / Area:

    Unit No :

    SYSTEM NUMBER:

    Drawing / Specification Numbers Description of Discrepancy/Observation (Be specific, events, time, date, location, etc :)

    Corrective Action:

    Originator: Name: _____________________________Signature: _____________________Date: ________________ NCR Required YES NO (Circle one) CTQ to Contractor Required YES NO (Circle one) Remarks if any: Site Engineer: Name: _______________________ Signature: ________________ Date: ______________ QA/QC Manager: Name: _________________________ Signature: _______________ Date: ______________ Discrepancy Corrected/Remarks: GAMA Representative: Name: ____________________ Signature: ______________ Date: ________________ Close-out of Corrective Action - Remarks: NCR No.: ___________________ CTQ No: ______________ Site Engineer: Name: ___________________ Signature: __________________ Date: ___________ DISTRIBUTION (Original QA/QC file)

    QA/QC Manager Site Manager

    Site Engineer Project Manager

    Construction Manager Originator GAM-QCR-QAC-GTL-127

    REPORT NO.:

    SITE INSPECTION REPORT

    DATE:

  • Report No:Inspection Date:SYSTEM NUMBER:

    TAG NUMBER:

    LOOP FOLDER:

    (A,B,C,D,E) (X,Y,Z)

    GAMA REP

    LINDE REP

    QSGTL or its PMC

    SIGNATURE

    DESCRIPTION OF WORK QSGTL or its PMCGAMA LINDE

    COMPLETED(Date/Initials)

    DATE NAME

    Ref Dwg/Documents:

    C2 ASU PEARL GTL PROJECT

    GENERAL PUNCH LIST

    RAS LAFFAN INDUSTRIAL CITY

    ITEM NO ISO or DWG NUMBER

    EQUIPMENT CIVIL STRUCTURAL PAINTING INSULATION

    Sub contractor Ref:Item Description:Item Location / Area:

    PRIORITY/ CATEGORY

    Sub System:

    ORGANIZATIONS

    AC

    CE

    BTE

    D B

    Y

    WILL BE TRANSFERRED TO THE MECHANICAL COMPLETION PUNCH LISTALL PRIORITY A ITEMS SHOWN ABOVE HAVE BEEN VERIFIED AND ARE COMPLETED .INCOMPLETE PRIORITY B ITEMS

    CATEGORY X: CONSTRUCTION GROUP IS RESPONSIBLE FOR COMPLETION OF ITEM. CATEGORY Y: ENGINEERING INPUT IS REQUIRED FOR COMPLETION OF ITEM. CATEGORY Z: COMMISSIONING GROUP IS RESPONSIBLE FOR COMPLETION OF ITEM.

    PRIORITY A : ITEMS SHALL BE COMPLETED BEFORE MECHANICAL COMPLETION (MC)PRIORITY B : ITEMS MAY BE COMPLETED AFTER MCPRIORITY C : ITEMS WILL BE COMPLETED BEFORE SYSTEM RFSU (READY FOR START UP UNIT) IS ACHIEVEDPRIORITY D : ITEMS SHALL BE COMPLETED BEFORE RFSU IS ACHIEVEDPRIORITY E : ITEMS SHALL BE COMPLETED BEFORE ACCEPTENCE IS ACHIEVED

    QQQ AAA TTT AAA RRR

    GAM-QCR-QAC-GTL-128

  • C2 ASU PEARL GTL PROJECT

    RAS LAFFAN INDUSTRIAL CITY

    Report No: Date: Area:

    Equipment Box-Up Acceptance Sheet

    QQQ AAA TTT AAA RRR

    It is hereby certified that the Equipment referenced has been mechanically completed in accordance with Drawings, Specifications, Inspection and Test Records. The referenced Equipment is ready for box-up. Equipment No

    Equipment Designation

    Vendor / Manufacturer

    PID No

    C h e c k l i s t Accepted

    GAMA Accepted VENDOR

    Accepted LINDE

    Accepted QSGTL

    1 Name Plate, CE-marking (if applicable)

    2 Internals installed 3 Internal piping installed

    4 Fillings completed 5 Refractory completed

    6 Internal transport protection removed

    7 Equipment internally clean and dry

    8 Nozzles / manholes closed acc. drawing

    9 Specified blind flanges installed

    10 Specified nozzle gaskets installed

    11 Specified bolts and nuts installed

    12 Specified torques applied

    13 Bolts lubricated (covers, manholes)

    14

    Remarks /

    ORGANIZATIONS

    NAME

    DATE

    SIGNATURE

    GAMA

    VENDOR

    LINDE

    QSGTL or its PMC

    GAM-QCR-QAC-GTL-133

    ITP FOR COMPRESSORS .pdf104-Earthing Test Report.pdfClient:Project:

    116-EQUIPMENT - SETTLEMENT MONITORING.pdfLEVEL/DIFFERENCEPLUMBORIENTATIONSIGNTOLERANCE

    127-SITE INSPECTION REPORT.pdfSITE INSPECTION REPORTOriginatorDD