    Structural Shotcrete Specifications

    By,

    Dudley R. (Rusty) Morgan

    AMEC Earth & Environmental,

    a division of AMEC Americas Limited

    and

    Larry Totten

    Johnson Western Gunite Company

    San Leando, California, USA

    SHOTCRETE FOR AFRICA CONFERENCE

    Misty Hills Conference Centre

    South Africa

    -

  • 7/28/2019 06 Structural Shtocrete Specifications

    2/87

    Subject of Presentation

    Review of structural shotcrete specifications

    Shotcrete construction of:

    In-ground parking structure, Calgary Alberta

    Seismic retrofit of heritage masonry structure, Vancouver, British

    Columbia

    Walls and pilasters in 50 storey hotel, Vancouver, BC Whistler 2010 Olympics Bobsleigh/Luge Track

  • 7/28/2019 06 Structural Shtocrete Specifications

    3/87

    In-Ground Parking Structure, Calgary, Alberta

    20 m deep soldier pile/timber lagging stressed channels tie-back evacuation

    Cloth/bentonite waterproofing membrane system

    Reinforced shotcrete perimeter walls

  • 7/28/2019 06 Structural Shtocrete Specifications

    4/87

    Calgary Parking Structure

    Preconstruction mock-up of

    typical structural steel wall

  • 7/28/2019 06 Structural Shtocrete Specifications

    5/87

    Calgary Parking Structure

    Shooting preconstruction mock-up

  • 7/28/2019 06 Structural Shtocrete Specifications

    6/87

    Calgary Parking Structure

    Finishing pre-construction mock-up

  • 7/28/2019 06 Structural Shtocrete Specifications

    7/87

    Calgary Parking Structure

    Core extracted from pre-construction mock-up for core grading to

    prequalify shotcrete nozzlman

  • 7/28/2019 06 Structural Shtocrete Specifications

    8/87

    Calgary Parking Structure

    Hoarding installed for cold weather shotcreting

    Shotcreting continued at ambient temperatures

    as low as -30oC

  • 7/28/2019 06 Structural Shtocrete Specifications

    9/87

    Calgary Parking Structure

    Structural reinforcing steel erected ready for shooting

    Note hoarding enclosure for cold-weather shotcreting

  • 7/28/2019 06 Structural Shtocrete Specifications

    10/87

    Calgary Parking Structure

    Start-up of shooting of structural walls using bench-gunning technique

  • 7/28/2019 06 Structural Shtocrete Specifications

    11/87

    Calgary Parking Structure

    Bench-gunning second lift

    Note blowpipe

  • 7/28/2019 06 Structural Shtocrete Specifications

    12/87

    Calgary Parking Structure

    Upper lift finished to line and grade

    Flash-shooting lower lift to shooting wires, ready for

    cutting, screeding and finishing

  • 7/28/2019 06 Structural Shtocrete Specifications

    13/87

    Calgary Parking Structure

    Trimming shotcrete with

    cutting rod to shooting

    wires

  • 7/28/2019 06 Structural Shtocrete Specifications

    14/87

    Calgary Parking Structure

    Finished structural shotcrete wall

    Finisher is cleaning top of wall and rebar to accept

    cast concrete suspended slab that will rest onstructural shotcrete wall

  • 7/28/2019 06 Structural Shtocrete Specifications

    15/87

    Calgary Parking Structure

    Four levels of structural shotcrete walls completed

  • 7/28/2019 06 Structural Shtocrete Specifications

    16/87

    Calgary Parking Structure

    Close-up view of four levels of structural shotcrete walls

    Column conventional cast-in-place formed concrete

    (too heavily reinforced for shotcrete construction)

  • 7/28/2019 06 Structural Shtocrete Specifications

    17/87

  • 7/28/2019 06 Structural Shtocrete Specifications

    18/87

    Calgary Parking Structure

    Core extracted from shotcrete wall for compressive

    strength testing

    Note dense quality of shotcrete free of voids or defects

  • 7/28/2019 06 Structural Shtocrete Specifications

    19/87

    Calgary Parking Structure

    Structural shotcrete walls approximately 50%

    completed

    S i i R fi f H i M S

  • 7/28/2019 06 Structural Shtocrete Specifications

    20/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    Faade of South Building

    S i i R t fit f H it M St t

  • 7/28/2019 06 Structural Shtocrete Specifications

    21/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    Faade of North Building

    S i i R t fit f H it M St t

  • 7/28/2019 06 Structural Shtocrete Specifications

    22/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    Pre-construction shooting of mock-up of column/wall

    connection, to prequalify shotcrete nozzleman for

    project

    S i i R t fit f H it M St t

  • 7/28/2019 06 Structural Shtocrete Specifications

    23/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    Completion of shooting of

    pre-construction mock-up of

    column/wall connection

    Seismic Retrofit of Heritage Masonry Structure

  • 7/28/2019 06 Structural Shtocrete Specifications

    24/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    View of back stripped face of mock-up column/wall

    connection

    Note complete lack of any voids, shadows or other defects

    Seismic Retrofit of Heritage Masonry Structure

  • 7/28/2019 06 Structural Shtocrete Specifications

    25/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    View of locations of cores

    to be extracted for core

    grading in pre-constructionmock-up of wall/column

    connection

    Seismic Retrofit of Heritage Masonry Structure

  • 7/28/2019 06 Structural Shtocrete Specifications

    26/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    View of 5 cores extracted at locations of reinforcing

    steel from wall/column connection mock-up

    All cores were better than Grade 2

    Seismic Retrofit of Heritage Masonry Structure

  • 7/28/2019 06 Structural Shtocrete Specifications

    27/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    Interior of North building,

    gutted and braced

    Reinforcing steel installedin exterior walls, pilasters

    and columns, ready for

    shotcreting

    Seismic Retrofit of Heritage Masonry Structure

  • 7/28/2019 06 Structural Shtocrete Specifications

    28/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    L-bar anchors grouted into exterior stone masonry

    walls

    Seismic Retrofit of Heritage Masonry Structure

  • 7/28/2019 06 Structural Shtocrete Specifications

    29/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    Double mat of rebar installed on exterior masonrywall, ready for shotcreting

    Seismic Retrofit of Heritage Masonry Structure

  • 7/28/2019 06 Structural Shtocrete Specifications

    30/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    Nozzlman bench gun shooting 450 mm thick structural

    shotcrete wall

    Basement shotcrete left in natural shotcrete finish(since basement backfilled)

    Seismic Retrofit of Heritage Masonry Structure

  • 7/28/2019 06 Structural Shtocrete Specifications

    31/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    Bench gun shooting 1m deep pilaster through 4 layers

    of rebar

    Note nozzle inserted through first mat of rebar

    Seismic Retrofit of Heritage Masonry Structure

  • 7/28/2019 06 Structural Shtocrete Specifications

    32/87

    Seismic Retrofit of Heritage Masonry Structure

    Vancouver, BC

    View of above-grade perimeter wall being finished to

    line and grade

    Note shooting wire

    Heavily Reinforced Structural Shotcrete Walls and

  • 7/28/2019 06 Structural Shtocrete Specifications

    33/87

    Heavily Reinforced Structural Shotcrete Walls and

    Pilaster for New 50 Storey Hotel, Vancouver, BC

    Preconstruction mock-p of pilaster and wall

  • 7/28/2019 06 Structural Shtocrete Specifications

    34/87

    Heavily Reinforced Pilaster Mock-up with Two Sided Form

    Note shooting wire

  • 7/28/2019 06 Structural Shtocrete Specifications

    35/87

    Shooting Wall Mock-up with Wet-Mix Shotcrete

  • 7/28/2019 06 Structural Shtocrete Specifications

    36/87

    Shooting Pilaster Mock-up

  • 7/28/2019 06 Structural Shtocrete Specifications

    37/87

    Shooting Pilaster Mock-up

    Note use of blow-pipe to control rebound

    Use of Pencil Vibrator to Help Consolidate

  • 7/28/2019 06 Structural Shtocrete Specifications

    38/87

    p

    Shotcrete in Wall Mock-up

  • 7/28/2019 06 Structural Shtocrete Specifications

    39/87

    Trimming Shotcrete to Line and Grade with Cutting Rod

  • 7/28/2019 06 Structural Shtocrete Specifications

    40/87

    Finishing Shotcrete with Rotary Disc

  • 7/28/2019 06 Structural Shtocrete Specifications

    41/87

    Final Finishing of Shotcrete

  • 7/28/2019 06 Structural Shtocrete Specifications

    42/87

    Diamond Saw Cutting Wall and Pilaster Mock-ups

  • 7/28/2019 06 Structural Shtocrete Specifications

    43/87

    Saw Cut Wall Section

    C f S S

  • 7/28/2019 06 Structural Shtocrete Specifications

    44/87

    Close-up of Saw-cut Wall Section

    S C t Pil t S ti

  • 7/28/2019 06 Structural Shtocrete Specifications

    45/87

    Saw-Cut Pilaster Section

    Note dense shotcrete

    Cl f S C t Pil t S ti

  • 7/28/2019 06 Structural Shtocrete Specifications

    46/87

    Close-up of Saw-Cut Pilaster Section

    Note excellent shotcrete consolidation around dense

    reinforcing steel

    C E t t d f Pil t

  • 7/28/2019 06 Structural Shtocrete Specifications

    47/87

    Cores Extracted from Pilaster

    Note excellent consolidation of shotcrete

    Cores E tracted from Wall Section

  • 7/28/2019 06 Structural Shtocrete Specifications

    48/87

    Cores Extracted from Wall Section

    Note excellent consolidation of shotcrete around dense

    reinforcing steel

    Whistler 2010 Olympics Bobsleigh/Luge Track

  • 7/28/2019 06 Structural Shtocrete Specifications

    49/87

    Whistler 2010 Olympics - Bobsleigh/Luge Track

    Installation of Rebar and Cooling Pipes in Track

  • 7/28/2019 06 Structural Shtocrete Specifications

    50/87

    Installation of Rebar and Cooling Pipes in Track

    Stay Form Expanded Metal Lath

  • 7/28/2019 06 Structural Shtocrete Specifications

    51/87

    Stay-Form Expanded Metal Lath

    Correct and Incorrect Method of

    Encasing Reinforcing Bars with Shotcrete

  • 7/28/2019 06 Structural Shtocrete Specifications

    52/87

    Encasing Reinforcing Bars with Shotcrete

    Typical Reinforcing and Cooling Pipe Detail

  • 7/28/2019 06 Structural Shtocrete Specifications

    53/87

    Typical Reinforcing and Cooling Pipe Detail

    Note use of expanded metal lath in first sections of track

    Note Use of Diagonal Spacer Bar

  • 7/28/2019 06 Structural Shtocrete Specifications

    54/87

    Note Use of Diagonal Spacer Bar

    Note Congestion at Cooling Pipe Header

  • 7/28/2019 06 Structural Shtocrete Specifications

    55/87

    Note Congestion at Cooling Pipe Header

    Track Ready for Shooting

  • 7/28/2019 06 Structural Shtocrete Specifications

    56/87

    Track Ready for Shooting

    Note use of temporary plastic screed bars

    Shotcreted and Finished Section of Track

  • 7/28/2019 06 Structural Shtocrete Specifications

    57/87

    Shotcreted and Finished Section of Track

    Void and Coarse Aggregate

    Trapped Behind Expanded Metal Lath

  • 7/28/2019 06 Structural Shtocrete Specifications

    58/87

    Trapped Behind Expanded Metal Lath

  • 7/28/2019 06 Structural Shtocrete Specifications

    59/87

    Void at Congested Area of Cooling Pipe Baffle

    and Diagonal Spacer Bar, After Hydro-blasting

  • 7/28/2019 06 Structural Shtocrete Specifications

    60/87

    g p , y g

    Void at Cooling Pipe Spacer Bar After Hydro-blasting

  • 7/28/2019 06 Structural Shtocrete Specifications

    61/87

    g p p y g

    Construction of Second Mock-up Using Stay-Form

  • 7/28/2019 06 Structural Shtocrete Specifications

    62/87

    p g y

    Start of Shotcreting Shoot Cove

    Between Wall/Floor First

  • 7/28/2019 06 Structural Shtocrete Specifications

    63/87

    Shoot Floor Next

  • 7/28/2019 06 Structural Shtocrete Specifications

    64/87

    Consolidate Shotcrete in

    Cove/Floor with Immersion Vibrator

  • 7/28/2019 06 Structural Shtocrete Specifications

    65/87

    Fully Consolidated Shotcrete In Cove/Wall

  • 7/28/2019 06 Structural Shtocrete Specifications

    66/87

    Blow out Rebound/Overspray with Blow-pipe

  • 7/28/2019 06 Structural Shtocrete Specifications

    67/87

    Shoot First Lift on Wall

  • 7/28/2019 06 Structural Shtocrete Specifications

    68/87

    Back Face of Wall

  • 7/28/2019 06 Structural Shtocrete Specifications

    69/87

    Note lack of voids behind stay-form

  • 7/28/2019 06 Structural Shtocrete Specifications

    70/87

    Header Form Stripped off Still-Fresh Shotcrete

  • 7/28/2019 06 Structural Shtocrete Specifications

    71/87

    Finish Coat Applied to Flush with Screed Pipes

  • 7/28/2019 06 Structural Shtocrete Specifications

    72/87

    Screeding Shotcrete to Temporary Screed Pipes

  • 7/28/2019 06 Structural Shtocrete Specifications

    73/87

    Finishing of Shotcrete After Screed Pipe Removal

  • 7/28/2019 06 Structural Shtocrete Specifications

    74/87

    Broom Texture Finish (to aid ice adhesion)

  • 7/28/2019 06 Structural Shtocrete Specifications

    75/87

    Newly Finished Shotcrete Surface

    being Moist Cured by Misting

  • 7/28/2019 06 Structural Shtocrete Specifications

    76/87

    Misting with Water Pressure Sprayer

  • 7/28/2019 06 Structural Shtocrete Specifications

    77/87

    Cut-out Section from Second Mock-up

  • 7/28/2019 06 Structural Shtocrete Specifications

    78/87

    Note good consolidation

    around rebar, cooling

    pipes and stay-form

    Close-up View of Cut-out from Second Mock-up

  • 7/28/2019 06 Structural Shtocrete Specifications

    79/87

    Note good consolidation

    of shotcrete

    Completed section of Track

  • 7/28/2019 06 Structural Shtocrete Specifications

    80/87

    Whistler 2010 Winter Olympics

    Bobsleigh/Luge Track Finish Zone

  • 7/28/2019 06 Structural Shtocrete Specifications

    81/87

    Whistler 2010 Winter Olympics

    Bobsleigh/Luge Track

  • 7/28/2019 06 Structural Shtocrete Specifications

    82/87

    Inspection of iced track prior to first run by Canadian WorldChampion Bobsledders Pierre Lueders and Justin Kripps

    Whistler 2010 Winter Olympics

    Bobsleigh/Luge Track

  • 7/28/2019 06 Structural Shtocrete Specifications

    83/87

    Canadian bobsledders Pierre Lueders, pilot and Justin Krippspush off their two-man bobsled from a lower start for their first

    run down The Whistler Sliding Centre track

    Whistler 2010 Winter Olympics

    Bobsleigh/Luge Track

  • 7/28/2019 06 Structural Shtocrete Specifications

    84/87

    Start of first run on track

    Photo Courtesy VANOC/ Photos: David McColm

    Whistler 2010 Winter Olympics

    Bobsleigh/Luge Track

  • 7/28/2019 06 Structural Shtocrete Specifications

    85/87

    First run on track

    Photo Courtesy VANOC/ Photos: David McColm

    Whistler 2010 Winter Olympics

    Bobsleigh/Luge Track

  • 7/28/2019 06 Structural Shtocrete Specifications

    86/87

    Air time at finish

    Whistler 2010 Winter Olympics

    Bobsleigh/Luge Track

  • 7/28/2019 06 Structural Shtocrete Specifications