On-Going and RecentlyCompleted Projects
Bauer International PhilippinesRegalia Park Tower Cubao, Q.C.
Philippines 1109P.O. Box 10154 Q.C.
Reference List
wps.cn/moban
On-Going Project
1. Introduction
CLARK WATER DEEP WELL 39
Clark Freeport Zone, PampangaWater Concessionaire
Design and Build of Deepwell 39
Water Treatment Plant For Iron and Manganese
Ultimate Capacity: 2160 m3/day
wps.cn/moban
On-Going Project
1. Introduction
LAGUNA WATER MARKET AREASta. Rosa, LagunaWater ConcessionaireUltimate Capacity: 4 MLD
Supply of Labor and MaterialsFor Fabrication, Supply and
Installation of Iron and ManganeseUsing DMI-65
wps.cn/moban
On-Going Project
1. Introduction
LAGUNA WATER- PULONG
Sta. Rosa, LagunaWater Concessionaire
Supply of Labor and MaterialsFor Fabrication, Supply and
Installation of Iron and ManganeseUsing DMI-65
Ultimate Capacity: 4 MLD
wps.cn/moban
1. Introduction
RC COLA ISABELA
Cauyan, IsabelaBeverage Plant
Supply and Installation ofWastewater Treatment
PlantUsing Dynamic SBR System
Ultimate Capacity: 912m3/day
Recently Completed Project
wps.cn/moban
1. Introduction
RC COLA CANLUBANG
Canlubang, LagunaBeverage Plant
Design, Supply and Installation
Of Reverse OsmosisSystem
Ultimate Capacity: 490 m3/day
Recently Completed Project
wps.cn/moban
1. Introduction
MAYNILAD PALTOK PROJECTBrgy. Paltok, Quezon City
Water and Wastewater Concessionaire
Design, Supply and Installation
And Construction ofSewage Treatment Plant
Using MBRR
Ultimate Capacity: 4900 m3/day
Recently Completed Project
wps.cn/moban
Recently Completed Project
1. Introduction
MAYNILAD LEGAL PROJECT
Legal St., Brgy. Sangandaan Quezon City
Water and Wastewater Concessionaire
Design, Supply, Installation, Testing, and Comissioning
of the SBR Electro Mechanical Works System for the Upgrading of Legal
Communal Septic Tank
Ultimate Capacity: 409 m3/day
wps.cn/moban
Recently Completed Project
1. Introduction
MAYNILAD GRANT PROJECTGrant St., Brgy. Sangandaan Quezon City
Water and Wastewater Concessionaire
Design, Supply, Installation, Testing, and Comissioning of the
SBR Electro Mechanical Works System for the Upgrading of
Grant Communal Septic Tank
Ultimate Capacity: 621 m3/day
wps.cn/moban
Recently Completed Project
PHILIP MORRIS PHILS., INC.
Fortune Ave, Brgy. Fortune, Marikina, Philippines
Cigarette Manufacturing Plant
Domestic and Industrial Interconnection to Centralized WWTP
Ultimate Capacity: 40 m3/day