08. Gambar Pabrik.pdf

Embed Size (px)

Citation preview

  • 7/24/2019 08. Gambar Pabrik.pdf

    1/12

    R.MEETING&

    PRESENTASI

    R.Sterilisasi

    R. MESINFILTER AXOGY

    Laboratorium

    Akses Berkas

    Administrasi

    R. TAMU &RECEPTIONIST

    DapurBersih

    R. CUCI GALON

    BAGIANLUAR

    WC

    KM

    WISMA1

    R. GENSET

    R. ADMIN

    R. Mesin Filling Galon R. Mesin Filling Gelas R. Mesin Filling Botol

    2500

    1000 3000 1300 300 1000

    WISMA2

    500

    300

    120

    580 1000 1000 1000 600 175 825 1000 400

    DENAH

    1700

    WC/KM

    R.WUDHLU

    MUSHOLLA

    250

    200

    400

    200

    200

    1285

    8285

    1285

    POS

    400

    400

    250

  • 7/24/2019 08. Gambar Pabrik.pdf

    2/12

    AA

    LAY OUT

    R. DIR.

    CABANG

    R.M

    EETING&

    PRE

    SENTASI

    R.

    Sterilisasi

    R. MESINFILTER AXOGY

    Laboratorium

    GUDANGGALLON,

    KARTON& GELAS

    Akses Berkas

    Administrasi

    R. TAMU &

    RECEPTIONIST

    Dapur

    Bersih

    Karton Gelas SiapKirim

    R.ADMIN

    GUDANG

    R. CUCI GALON

    BAGIANLUAR

    WC

    KM

    WISMA1

    R. GENSET

    R. ADMIN

    Karton Galon SiapKirim

    POS

    R. Mesin Filling Galon R. Mesin Filling Gelas R. Mesin Filling Botol

    2500

    Karton BotolSiap Kirim

    1300

    300

    WISMA

    2

    WC/KM

    R.WUDHLU

    MUSHOLLA

    6000

    500

    3000

    1650

    250

    200

    400

    3500

    LUAS TANAH

    LUAS BANGUNAN

    : 5000 M2

    : 1600 M2

    400

    400

    8285

    250

    B

    10003000

    200

    200

    1285

    PRODUKSI BOTOL

    RUANG

    RAW MATERIAL

    RUANG GUDANG GALON, BOTOL,

    350

  • 7/24/2019 08. Gambar Pabrik.pdf

    3/12

    PT MEGATIRTAALAMI

    Produksi Galon Produksi Botol ProduksiGelasGudang Bahan Baku

    R. CHEMICAL

    PONDASI BATUKALI

    530

    -0,05-0,15-0,27-0,35

    -1,10-1,20-1,25

    -2,17

    -2,23

    -2,38

    +4,29

    +5,64

    FOOT PLATE

    450

    SLIDING

    SWING

    GENSET

    BETONBERTULANG

    530 536 550 400 1000 285

    10

    10

  • 7/24/2019 08. Gambar Pabrik.pdf

    4/12

    TAMPAK SAMPING

    POTONGAN B - B

    -0,05-0,15-0,27-0,35

    -1,10-1,20

    -1,25

    -2,17

    -2,23

    -2,38

    +4,00

    100Pasangan Bata

  • 7/24/2019 08. Gambar Pabrik.pdf

    5/12

    PAS. PONDASI BT. PECAH

    FOOT PLATE

    FOOT PLATE

    FOOT PLAT

    15

    80

    25

    DENAH PONDASI

    10001600

    Sloof 20 x 20

    Pasangan Bata 10 cm

    15

    20

    BETON BERTULANG

    200 200

    1285

    250

    200

    400

    400

    400

    250

    3500

    300 200 500 500 500500 500 500 500 600 175285 540 450 550 400 1473

    200

    400

    BETON BERTULANG

    PRODUKSI BOTOL

    RUANG

    RAW MATERIAL

    RUANG GUDANG GALON, BOTOL,

  • 7/24/2019 08. Gambar Pabrik.pdf

    6/12

    SAB

    TAMPUNGAN

    KRAN AIR

    SUMUR AIR BERSIH

    SAL. TINJA

    SAL. AIR KOTOR

    BAK KONTROL

    SUMUR PERESAPAN

    KETERANGAN

    SP

    ST SEPTICTANK

    SAL. AIR BERSIH

    S SHAFT

    SAL. AIR HUJAN

    SUMUR PERESAPAN

    AIR HUJAN

    SPAH

    BK

    WC

    KM

    WISMA1

    WISMA2

    SANITASI

    Septic Tank Resapan

    ST SP

    BK BK BK BK

    BK BK BK

    BK

    Septic TankResapan

    STSP

    WC/KM

    R.WUDHLU

    MUSHOLLA

    1000 3000 1300 300 1000

    200

    200

    1285

    1650

    250

    200

    400

    300

    120

    580 1000 1000 1000 600 175 825 1000 400

    POS

    400

    400

    250

    BK

  • 7/24/2019 08. Gambar Pabrik.pdf

    7/12

    DENAH KERAMIK & PAVING

    BK BK

    1000 3000 1300 300 1000 200

    200

    200

    1285

    300

    120

    580 1000 1000 1000 600

    175

    825 1000 400

    250

    200

    400

    16501650

    1285

    POS

    400

    400

    250

    PRODUKSI BOTOLRUANG

    RAW MATERIALRUANG

    GUDANG GALON, BOTOL,

  • 7/24/2019 08. Gambar Pabrik.pdf

    8/12

    DENAH PLAFON

    BK BK

    1000 3000 1300 300 1000 200

    200

    200

    1285

    300

    120

    580 1000 1000 1000 600

    175

    825 1000 400

    250

    200

    400

    16501650

    1285

    BETON BERTULANG

    POS

    400

    400

    250

    POS

    400

    400

    250

  • 7/24/2019 08. Gambar Pabrik.pdf

    9/12

    INSTALASI LISTRIK

    titik lampu

    saklar tunggal

    saklar double

    stop kontak

    box panel MCB

    meteran

    titik lampu taman/jalan stop kontak ACAC

    70

    20

    12

    8

    35

    1

    1

    10

    saklar tripel meteran4 1

    1000 3000 1300 300 1000

    250

    200

    400

    1650

    200

    200

    1285

    300

    120

    580 1000 1000 1000 600 175 825 1000 400

    1650

    8285

    1285

    POS

    400

    400

    250

    AC

    ACACAC

    AC

    AC AC

    ACAC

  • 7/24/2019 08. Gambar Pabrik.pdf

    10/12

    DETAIL BDETAIL A

    B

    RIB 6 MM

    PLAT t=6MM

    100X200

    GORDING CNP

    125.50.20.2,3

    BAUT 16 MM

    LAS 4 MM

    RIB 8 MM

    TIAP 1500MM

    PL 12 MM

    EX. WF 200

    PLAT STRIP 4X10

    WF 250.150

    LAS 4 MM

    PL 12 MM

    WF 250.150

    BAUT 16 MM

    RIB 6 MM

    A

    DETAIL KONTRUKSI ATAP

  • 7/24/2019 08. Gambar Pabrik.pdf

    11/12

    Angker

    A

    POTONGAN-A

    PL 10 MM

    Angker

    WF 250.150

    WF 250.150

    -0,05

    -0,15-0,27

    -0,35

    -1,10

    -1,20

    -1,25

    -2,17

    -2,23

    -2,38 PONDASI FOOT PLATE

    PASANGAN BATA 15/15

    SLOOF 15/20

    POND. BATU KALI

    SPESI

    URUGKAN HASIL PEMATANGAN

    dan PEMADATAN LAHAN

    8 D 16

    KOLOM 30/30

    LANTAI KERJA

    PASIR DIPADATKAN

    KOLOM 30/30

    120

    30 4545

    30

    30

    120

    30

    30

    DETAIL PONDASI

    80

    LANTAI

  • 7/24/2019 08. Gambar Pabrik.pdf

    12/12

    20 A

    INPUT2X6mm

    Lampu 1 + stop kontak

    Ke Mesin Galon

    Ke Mesin Botol

    Ke Mesin Gelas

    Ke Kompressor

    NYM 2x2,5 mm

    33.000 VA

    220 V

    PANEL ADI DEPAN SETELAH METERAN

    PANEL B

    DI RUANG MESIN PRODUKSI

    PLN

    Ukuran Kabel

    NYMH 2x2,5 mm yang

    ke mesin-mesin

    Ukuran Kabel

    Lampu : NYM 2x2,5 mm

    Merk Eterna

    Stop Kontak : NYM 2x2,5 mm

    Merk Eterna

    WIRING DIAGRAM

    NYM 2x2,5 mm

    NYM 2x2,5 mm

    Lampu 1 + stop kontak

    Lampu 1 + stop kontak

    20 A

    20 A

    25 A

    25 A

    25 A

    25 A

    NYM 2x2,5 mmStop Kontak AC

    20 A

    100 A