08112011 Meeting Agenda

Embed Size (px)

Citation preview

  • 8/11/2019 08112011 Meeting Agenda

    1/17

    General ontractors

    Lic# CGC 051088

    PROJECT PROGRESS MEETING AGENDA 3

    DATE: August 11,2011

    FROM:

    Tim Milcich

    PROJECT:

    Hillsborough Community College

    EAP Learning Center at Dale Mabry Campus

    Items of Discussion:

    1.

    Introduction / Sign-in

    2.

    Review last meeting minutes

    3.

    Project Schedule - See updated master schedule

    4. Contingency Modifications

    No Contingency Modifications to date

    5. Request for Information

    None open - see enclosed R. F. I. Log

    6. Submittals

    See enclosed Submittal log - steel, glass/storefront, canopy

    7.

    Contractor Items

    Color selections needed

    Signage changes

    , Hardware

    o

    HVAC Lead time

    8.

    Engineer Items

    9.

    Campus Items

    10. Direct Material Purchase

    HVAC equipment ~- see enclosed Owner Direct Purchase log

    11. Owner Items

    12. Next meeting will be held on August 25, 2011

    1109

    Lakeland, FL 33802-1109 Phone: 863/644-6499

    www.crossroadsconstruction.net

    Fax:

    863/644-597

  • 8/11/2019 08112011 Meeting Agenda

    2/17

    EAP L earning Center at Dale Mabry Cam pus

    Progress Meeting Agenda

    August 11,2011

    Page 2

    All work that is not covered in the cost of the work and requires payment from Design,

    Construction Manager or Owners Contingency funds shall be submitted for review by the

    architect and owner prior to work being performed. A Contingency Authorization Request form

    shall be submitted to the architect for signature and forwarde d to the ow ner representative for

    approval signature. Work shall not be performed unti l the Cons truction Ma nager has rec eived

    the approved authorization form; any such work completed prior to receipt of written

    author izat ion w i ll not be approved for payment. Any discussions a bout proposed chan ges m ust

    be followed up with a Contingency Authorization Request form PRIOR to any work

    commencing.

    Work associated Change Orders Requests that result in an increase to the Guaranteed

    Maximum Price (GMP) shall not be completed until a Change Order is approved by the

    Hillsborough C omm unity Col lege B oard of Trustees. Any such work com pleted pr ior to receipt

    of and approved Chan ge Order w i ll not be funded .

  • 8/11/2019 08112011 Meeting Agenda

    3/17

    General ontractors Lie# CGC 051088

    Hillsborough Community College

    Dale Mabry EAP Learning Center

    Progress Meeting Notes

    Meeting Day/Date: Thursday, July 28 , 2011

    Meeting Time: 2:00 PM

    A sign-in sheet was distributed with the following personnel in attendance:

    David Ca bec eiras ..............................................................

    CC Facilities Planning & Construction

    Be n M arsh all ............................................................................

    CC Facilities Construction Mgmt.

    Jim W igge rs ................................................................................

    illsborough Com munity College

    J. Brent Ellis ................................................................................

    illsborough Com munity College

    Step hen Ca rroll ......................................................................................

    chenkel Shultz Architects

    Tim M ilcich ........................................................................................

    rossroads Construction Co.

    Jeff White ............................................................................................

    rossroads Construction Co.

    Brian Montry ...........

    ............

    i ..............................................................rossroads Construction Co.

    After introductions, the following w as discussed:

    a) Previous meeting notes were reviewed.

    b

    No updates to main schedule

    1) Air handler delivery anticipated last week o f August

    2) VA V delivery anticipated 3rd week of A ugust

    c) Canopy, Storefront, Doors & Hardw are, and Interior Signage subm ittals are needed

    d)

    Crossroads to prepare plan schedule for demo lition and installation of new air handler. It

    serves areas other than this project. Is tempo rary unit required? (It was discussed later

    during site visit that this is not the case. The new unit serves EAP Center only.)

    e) Front w all frame d over dirt; Ne eds to be filled in. Schenkel Shu ltz to provide A.S.I.

    Float concrete u p to that level is the b est alternative.

    f) End user reque sts to put back door in 105A to corridor. (It was d ecided to leave it as is).

    Box 1109

    ~ Lakeland FL 33802-1109 Phone: 863/644-6499 Fax: 863/644-5973

    ,~ www.crossroadsconstruction.net ~

  • 8/11/2019 08112011 Meeting Agenda

    4/17

    HCC - Dale Mabry

    EAP Learning Center

    Progress Meeting Notes

    July 28,2011

    Page 2

    g) Architect is working on lettering layout for exterior; will advise.

    h) Information is needed for TV bracket mounts - to be provided to Brian Montry.

    i) Color samples were delivered to the Architect

    j

    Alum inum C anopy and electrical materials are less than $10,000 and therefore will not be

    direct purchased by HC C

    All work that is not covered in the cost of the work and requ ires payment from D esign, Construction

    Mana ger or Ow ners Contingency funds shall be submitted for review by the architect and ow ner

    prior to work being performed. A Contingen cy Authorization Re quest form shall be submitted to the

    architect for signature and forw arded to the ow ner representative for approval signature. Wo rk shall

    not be performed until the Construction Manager has received the approved authorization form; any

    such work completed prior to receipt of written authorization will not be approved for payment. Any

    discussions about proposed changes m ust be fol lowe d up w ith a C ont ingency Author ization

    Request form PRIOR to any work commen cing.

    Work associated Change O rders Requests that result in an increase to the G uaranteed M aximum

    Price (GMP) shall not be completed until a Change Order is approved by the Hillsborough

    Comm unity College Boa rd of Trustees. Any such work com pleted prior to receipt of and approved

    Change O rder wi l l not be funded.

  • 8/11/2019 08112011 Meeting Agenda

    5/17

    o

    o

    ~E

    I--

    Z

    l-

    Z z

    111

    W

    Z Z

    l--

    w

    Z Z Z

    w w w

    F-

    w

    Z F-

    w

    Z Z

    z

    z Z z

    I

    ~-i

    ~r-i

    w

    0

    n ~

    W

    0

    0

    I-

    0

    Z n ~

    Wi w

    Z

    0

    0

    o

    0

    O

    0

    o

    0

    o

    o

    C~

    o

    t-

    O

    0

    o

    0 0

    ~ ~

    0 0 0 0

    ~ ~

    0

    0 0

    0 0 0 0 0

    o

  • 8/11/2019 08112011 Meeting Agenda

    6/17

    0

    o

    t-

    0

    l-

    Z

    o

    2-~

    m UJ

  • 8/11/2019 08112011 Meeting Agenda

    7/17

    CHANG E SUNINIARY

    : 1127

    HCC DALE MABR

    EAP LEARNING CENTE

    Owners CM

    REF. Proposa l DESCRIPTION

    Owner

    C.O.

    C o ntin ge nc y C o ntin ge n cy

    Owner C.O. Da te

    (proposed Change Order)

    DATE RECD

    Original Contract Amount:

    243 ,9 15 .20 12,0 01.07 7,560 .68

    $263,476.95

    Adjusted Purchase Order Amt.

    12,001.07

    Adjusted Owners Contingency

    Note: Pending changes h ave not been added to the adjusted

    purchase order amount nor deducted from contingency amounts~

    L

    $7,560.68JAdjusted CM Contingency

    $0.001To tal Approved Changes

    $0.001T otal Pending Changes

  • 8/11/2019 08112011 Meeting Agenda

    8/17

    OWN ER CONTINGENCY LOG

    HCC D LE M BRY E P LE RNING CENTER

    PROJECT NO: 27

    Owner

    REF.

    DES~;RIPTION Owner s

    D A T E

    C.O.

    Owner C.O. (proposed Change Order)

    Cont ingency

    RECD

    PO 1~

    Original Contingency Amount

    12,001.07

    $1 2 ~ C ont ingency Balance

  • 8/11/2019 08112011 Meeting Agenda

    9/17

    Cl~ CONTINGENCY LOG

    HCC DALE MABRY EAP LEARNING CENTER

    PROJECT NO : 1127

    Owner

    REF. DESCRIPTION M DATE

    C.O.

    Owner C.O.

    (proposed Change Order) Contingency RECD

    PO 1~

    Original Contingency Amount:

    7,560.68

    $7,560.68 ~Con t ingency Balance

  • 8/11/2019 08112011 Meeting Agenda

    10/17

    E

    C

    ~ = ~ ~

    ~o.~

    {/ ~.~

    o~g

    ~ 0 0

    w

    ~

    ~

    --

    I~ ~ ~

    ~

    o~

    .~

    > o

    ~

    ~o,

    ~g~

    m

    ~ ~

    p..

    ~ ~ ~

    ~

    0

    ~D 0

    -0

    ;m~

    ~ ~.

    8~ ~5

    ~ ~

    ~

    ~

    0

    m

    ~-

    m

    ..~ 0

    ~

    ,_

    ~

    ~

    ~ Q

    o ~

    ~ -0

    ~ m 0 0 ~

    O_ ~

    N

    ~

    .--

    ~ ~

    ~ ~

    ~ ~

    0 ~

    .m_

    ~ o

    ,~ N

    ~ ~

    ~ ~

    o ~-

    ~ ~

    ~ ~

    5~

    E , o _

    ~ ~

    ~

    ~

    0

    ~

    D

    ~

    ~

    ~

    0

    ~

    ~.m

    )

    s

    a

    ~

    ;

    ~

    .c ~

    ~

    O~

    ~_m~

    ~

    ~

    ~ ~

    ~ m.~

    m

    ~ ~

    i --

    ~

    0 ~

    C

    ~g

    6 ~ ~ N

    ~- c~-~

    ~ 0~

    ~

    ~. ~

    a~ ~

    o~

    a~

    ~

    ff l

    ~

    ~90~

    h~

    ~

    ~ ~ ~ ~

    < ~0

    ~

  • 8/11/2019 08112011 Meeting Agenda

    11/17

    ~o~

    =b~

  • 8/11/2019 08112011 Meeting Agenda

    12/17

    0 0

    0

    0 0

    0 0

    W

    01

    L~

    0

    0

    r~

    I. -

    o

    W

  • 8/11/2019 08112011 Meeting Agenda

    13/17

    0

  • 8/11/2019 08112011 Meeting Agenda

    14/17

  • 8/11/2019 08112011 Meeting Agenda

    15/17

    o

  • 8/11/2019 08112011 Meeting Agenda

    16/17

    DATE:

    FROM:

    PROJECT:

    PROJECT PROGRESS MEETING AGENDA 3

    August 11,2011

    Tim M ilcich

    Hillsborough Comm unity College

    EAP Learning Center at Dale M abry Campus

    Items of D iscussion:

    1. Introduction / Sign-in

    2. Review last meeting minutes

    3. Project Schedule

    4. Contingency Mo difications

    No C ontingency Modifications to date

    5. Request for Information

    See enclosed R. F. I. Log

    6.

    Submittals

    See enclosed Submittal log

    7. Contractor Items .....

    8. Engineer Items

    9. Campus I tems

    10. Direct M aterial Purchase

    11. Owner Items

    s

    HV AC eq uipment - DMP requisition forwarded on 7/7/11

  • 8/11/2019 08112011 Meeting Agenda

    17/17

    EAP Learning Center at Dale Mabry Cam pus

    Progress Meeting Agenda

    August 11,2011

    Page 2

    All work that is not covered in the cost of the work and requires payment from Design,

    Construction Manager or Owners Contingency funds shall be submitted for review by the

    architect and owner prior to work being performed. A Contingency Authorization Request form

    shall be submitted to the architect for signature and forwarded to the own er representative for

    approval signature. Work shall not be performed unti l the Con struction M anage r has received

    the approved authorization form; any such work completed prior to receipt of written

    author izat ion w i ll not be approved for payment. Any discussions a bout proposed change s mu st

    be followed up with a Contingency Authorization Request form PRIOR to any work

    commencing.

    Work associated Change Orders Requests that result in an increase to the Guaranteed

    Maximum Price (GMP) shall not be completed until a Change Order is approved by the

    Hillsborough C omm unity Col lege B oard of Trustees. Any such w ork completed pr ior to receipt

    of and approved Chan ge Order w i ll not be funded .