Design and Construction ofDesign and Construction ofDesign and Construction of Infrastructure in Cold Regions
Design and Construction of Infrastructure in Cold Regions
James BuskaJames Buska
Engineer Research and Development CenterCold Regions Research and Engineering Laboratory
Engineer Research and Development CenterCold Regions Research and Engineering Laboratoryg g g y
Hanover, New Hampshire, USAg g g y
Hanover, New Hampshire, USA
Engineer Research and Development CenterUS Army Corpsof Engineers
Cold Regions InfrastructureCold Regions InfrastructureInnovative cold regions solutions for design construction operationInnovative cold regions solutions for design construction operation
Dining Facility Ft Drum NY
Innovative cold regions solutions for design, construction, operation and maintenance of standard and strategic facilities world-wide.Key issues include:
Innovative cold regions solutions for design, construction, operation and maintenance of standard and strategic facilities world-wide.Key issues include:
Strategic national defense facilities are Strategic national defense facilities are Strategic national defense facilities are Strategic national defense facilities are
Shallow Utilidors at Eielson Air Force Base
Dining Facility, Ft. Drum, NYggoften located in cold and remote often located in cold and remote locationslocations
Army Transformation infrastructure must Army Transformation infrastructure must support all weather, all season operationssupport all weather, all season operations
ggoften located in cold and remote often located in cold and remote locationslocations
Army Transformation infrastructure must Army Transformation infrastructure must support all weather, all season operationssupport all weather, all season operations
Many facilities are unique Many facilities are unique -- performance performance criteria must be adapted to provide high criteria must be adapted to provide high reliabilityreliability
Cold regions requirements can add Cold regions requirements can add significant cost penalties to build andsignificant cost penalties to build and
Many facilities are unique Many facilities are unique -- performance performance criteria must be adapted to provide high criteria must be adapted to provide high reliabilityreliability
Cold regions requirements can add Cold regions requirements can add significant cost penalties to build andsignificant cost penalties to build and
South Pole Station, Antarcticasignificant cost penalties to build and significant cost penalties to build and sustain facilitiessustain facilitiessignificant cost penalties to build and significant cost penalties to build and sustain facilitiessustain facilities
Thermal Analysis of BassettHospital AlaskaHospital, Alaska
Thule, Greenland Airfield Overlay
Missile Defense Silo Test
Research engineers with cold regions facilities experience in building envelopes, roofs, Research engineers with cold regions facilities experience in building envelopes, roofs, Cold Climate Infrastructure ExpertiseCold Climate Infrastructure Expertise
foundations, utilities and pavementsfoundations, utilities and pavements Expertise that combines research and practice to develop innovative solutions to Expertise that combines research and practice to develop innovative solutions to
infrastructure problems in cold environmentsinfrastructure problems in cold environments Unique capabilities sought by government and industry for solutions to facility challengesUnique capabilities sought by government and industry for solutions to facility challenges Unique capabilities sought by government and industry for solutions to facility challengesUnique capabilities sought by government and industry for solutions to facility challenges Design, constructability, and operability reviews Design, constructability, and operability reviews Cold climate design, construction, and operation often extends beyond the experience base Cold climate design, construction, and operation often extends beyond the experience base
of the private sectorof the private sector Troubleshooting during and after constructionTroubleshooting during and after construction Challenges:Challenges:
How to include cold climate considerations in facility design criteria and standard How to include cold climate considerations in facility design criteria and standard d id idesignsdesigns
How to incorporate our knowledge and expertise into the Army MILCON Transformation How to incorporate our knowledge and expertise into the Army MILCON Transformation processprocess
Cold Regions Conditions and IssuesCold Regions Conditions and IssuesCold Regions Conditions and IssuesCold Regions Conditions and Issues
Extreme Temperature Ranges Extreme Temperature Ranges Extreme Temperature Ranges Extended Darkness/Daylight Permafrost/Seasonally Frozen Ground
Extreme Temperature Ranges Extended Darkness/Daylight Permafrost/Seasonally Frozen GroundPermafrost/Seasonally Frozen Ground Fragile Environment Short Summer Work Season
Permafrost/Seasonally Frozen Ground Fragile Environment Short Summer Work Season Remote Sites Limited Logistics Infrastructure Remote Sites Limited Logistics Infrastructure Construction Mobilization/Demobilization Potential for Interior Moisture Problems Snow and Ice
Construction Mobilization/Demobilization Potential for Interior Moisture Problems Snow and Ice Snow and Ice Snow and Ice
Building Envelope ComponentsBuilding Envelope Componentsu d g e ope Co po e tsu d g e ope Co po e ts
Roofing Systems Roofing Systems Attics and Cathedral Ceilings Ceilings and Skylights Attics and Cathedral Ceilings Ceilings and Skylights Walls, Windows, and Doors Air Barrier System Vapor Retarder or Vapor Barrier
Walls, Windows, and Doors Air Barrier System Vapor Retarder or Vapor Barrier Vapor Retarder or Vapor Barrier Floors and Basements Other Building Components
Vapor Retarder or Vapor Barrier Floors and Basements Other Building ComponentsOther Building ComponentsOther Building Components
This presentation will discuss lessons learned during field and This presentation will discuss lessons learned during field and This presentation will discuss lessons learned during field and This presentation will discuss lessons learned during field and laboratory studies for some of these building envelope components.laboratory studies for some of these building envelope components.laboratory studies for some of these building envelope components.laboratory studies for some of these building envelope components.
ROOF DRAINAGEROOF DRAINAGE
Most steep roofs drain over their eaves. Some low-slope roofs also drain to eaves Most steep roofs drain over their eaves. Some low-slope roofs also drain to eaves Some low-slope roofs also drain to eaves. Other low-slope roofs drain internally. Some low-slope roofs also drain to eaves. Other low-slope roofs drain internally.
OverOver--thethe--eaves drainage in cold eaves drainage in cold OverOver--thethe--eaves drainage in cold eaves drainage in cold ggclimates can be problematic.climates can be problematic.
ggclimates can be problematic.climates can be problematic.
Lesson Lesson LearnedLearnedLearnedLearned
Complex Roofing SystemsComplex Roofing SystemsComplex Roofing SystemsComplex Roofing Systems
Ambulatory Health Care CenterMcGuire AFB, NJ
Ambulatory Health Care CenterMcGuire AFB, NJ
The facility has experienced roof leaks since its initial occupancy, even during warm weather In winter problematic ice dams formed at the eaves of the sloped metal roofsThe facility has experienced roof leaks since its initial occupancy, even during warm weather In winter problematic ice dams formed at the eaves of the sloped metal roofsweather. In winter, problematic ice dams formed at the eaves of the sloped metal roofs and snow ingestion through ventilation louvers resulted in more leakage problems.weather. In winter, problematic ice dams formed at the eaves of the sloped metal roofs and snow ingestion through ventilation louvers resulted in more leakage problems.
Problematic ice dams and icingsProblematic ice dams and icings Interior wall wetting under the ice damsInterior wall wetting under the ice dams
Lessons Lessons Learned the Learned the Hard WayHard Way
Melt water flowing out under an Melt water flowing out under an gice dam that has been removed
gice dam that has been removed
Snow ingestion problems d til ti it
Snow ingestion problems d til ti itunder a ventilation monitorunder a ventilation monitor
Over-the-Eaves Drainage ProblemsOver-the-Eaves Drainage Problemsgg
Lesson Lesson LearnedLearned
Creeping, sliding, and falling snow and ice should be Creeping, sliding, and falling snow and ice should be anticipated from roofs that drain to cold eaves.anticipated from roofs that drain to cold eaves.
Creeping, sliding, and falling snow and ice should be Creeping, sliding, and falling snow and ice should be anticipated from roofs that drain to cold eaves.anticipated from roofs that drain to cold eaves.
Ice Dams at Cold EavesIce Dams at Cold Eaves
This large ice dam caused thisThis large ice dam caused thisThis large ice dam caused thisThis large ice dam caused thisLesson Lesson
This large ice dam caused this This large ice dam caused this metal roof to leak at its eaves.metal roof to leak at its eaves.This large ice dam caused this This large ice dam caused this metal roof to leak at its eaves.metal roof to leak at its eaves.
LearnedLearned
Puddle of Puddle of MeltwaterMeltwaterPuddle of Puddle of MeltwaterMeltwaterMeltwater Meltwater Behind Ice Behind Ice
Dam at EavesDam at Eaves
Meltwater Meltwater Behind Ice Behind Ice
Dam at EavesDam at Eaves
Internally Drained Low-SlopeInternally Drained Low-SlopeInternally Drained Low Slope Roofing Systems
Internally Drained Low Slope Roofing Systems
In cold climates, internally drained low slope roofing systems have an
In cold climates, internally drained low slope roofing systems have anlow-slope roofing systems have an important advantage over systems that drain to cold eaves
low-slope roofing systems have an important advantage over systems that drain to cold eavesthat drain to cold eaves.
They avoid all over-the-eaves that drain to cold eaves.
They avoid all over-the-eaves ydrainage problems.
ydrainage problems.
Lesson Lesson L dL dLearnedLearned
Two identically constructed roofsTwo identically constructed roofsTwo identically constructed roofs.The building on the right, with no icings, was unheated.
Two identically constructed roofs.The building on the right, with no icings, was unheated.
LessonLessonLesson Lesson LearnedLearned
BUILDINGBUILDINGBUILDING HEAT
BUILDING HEATHEATHEAT
THE SUNTHE SUN
ICICLES AND ICE DAMSICICLES AND ICE DAMS
S bl ti i i d i dS bl ti i i d i dS bl ti i i d i dS bl ti i i d i dSevere problematic icings and ice dams Severe problematic icings and ice dams developed all along the eaves of this facility.developed all along the eaves of this facility.
Severe problematic icings and ice dams Severe problematic icings and ice dams developed all along the eaves of this facility.developed all along the eaves of this facility.
Two dining facilities at Fort Drum, NY on the same date (Jan. 12, 1994).Two dining facilities at Fort Drum, NY on the same date (Jan. 12, 1994).
The unmodified The unmodified building is subjected building is subjected to severe icings allto severe icings all
The unmodified The unmodified building is subjected building is subjected to severe icings allto severe icings allto severe icings all to severe icings all along its eavesalong its eavesto severe icings all to severe icings all along its eavesalong its eaves
There are only a few There are only a few There are only a few There are only a few small icicles at the base small icicles at the base
of the valleys of the of the valleys of the building with improved building with improved
attic entilationattic entilation
small icicles at the base small icicles at the base of the valleys of the of the valleys of the
building with improved building with improved attic entilationattic entilationattic ventilationattic ventilationattic ventilationattic ventilation
LessonLessonLesson Lesson LearnedLearned
AIR AIR EXFILTRATIONEXFILTRATIONEXFILTRATION
VAPOR DIFFUSION
EXFILTRATIONVAPOR DIFFUSIONVAPOR DIFFUSIONVAPOR DIFFUSION
Lessons Lessons LearnedLearned Roof VentilationRoof Ventilation
Roof ventilation coupled with additional insulation and reductions in air exfiltration can eliminate chronic i i l h f f i ld li
Roof ventilation coupled with additional insulation and reductions in air exfiltration can eliminate chronic i i l h f f i ld liicings along the eaves of roofs in cold climates.
Attention must be given to minimizing exfiltration of i t i d i i t tti d th d l
icings along the eaves of roofs in cold climates.
Attention must be given to minimizing exfiltration of i t i d i i t tti d th d lwarm, moist indoor air up into attics and cathedral
ceiling airways.
Heat losses from all so rces s ch as arm HVAC
warm, moist indoor air up into attics and cathedral ceiling airways.
Heat losses from all so rces s ch as arm HVAC Heat losses from all sources such as warm HVAC equipment located in attics must be considered when sizing roof ventilation systems.
Heat losses from all sources such as warm HVAC equipment located in attics must be considered when sizing roof ventilation systems.
EnvironmentalD i C it iEnvironmentalD i C it iDesign CriteriaDesign Criteria
Northeast Portion of ground snow load map in ASCE Standard 7map in ASCE Standard 7 Ground snow loads, pg are presented in lb/ft2
ASCE Standard 7ASCE Standard 7Minimum Design Loads for Minimum Design Loads for
Buildings and other StructuresBuildings and other Structures
ASCE Standard 7ASCE Standard 7Minimum Design Loads for Minimum Design Loads for
Buildings and other StructuresBuildings and other Structures
SNOW DRIFTINGSNOW DRIFTING
Snow will drift into areas of Snow will drift into areas of Aerodynamic ShadeAerodynamic Shade
Snow will drift into areas of Snow will drift into areas of Aerodynamic ShadeAerodynamic ShadeLesson Lesson LearnedLearnedLearnedLearned
15 lb/ft2
130 lb/ft2130 lb/ft2
20 lb/ft220 lb/ft2
The peak snow load of this drift was 130 lb/ftThe peak snow load of this drift was 130 lb/ft22..The ground snow load at the time was 20 lb/ftThe ground snow load at the time was 20 lb/ft22 andand
The peak snow load of this drift was 130 lb/ftThe peak snow load of this drift was 130 lb/ft22..The ground snow load at the time was 20 lb/ftThe ground snow load at the time was 20 lb/ft22 andandThe ground snow load at the time was 20 lb/ftThe ground snow load at the time was 20 lb/ft , and , and
the snow load on the upper roof was 15 lb/ftthe snow load on the upper roof was 15 lb/ft22..The ground snow load at the time was 20 lb/ftThe ground snow load at the time was 20 lb/ft , and , and
the snow load on the upper roof was 15 lb/ftthe snow load on the upper roof was 15 lb/ft22..
Removing Snow and Ice from Roofs
Removing Snow and Ice from Roofs
Lessons Lessons Learned the Learned the Hard WayHard WayHard WayHard Way
SLIDING SNOWSLIDING SNOW
Photo by Rick Flood, Ian Mackinlay Architecture
The ability of slippery unobstructed roofs to shed snow The ability of slippery unobstructed roofs to shed snow loads by sliding can be an advantage and a disadvantage.loads by sliding can be an advantage and a disadvantage.
The ability of slippery unobstructed roofs to shed snow The ability of slippery unobstructed roofs to shed snow loads by sliding can be an advantage and a disadvantage.loads by sliding can be an advantage and a disadvantage.
Sliding Snow and Iceand Ice
Plumbing Vents
Plumbing Vents
Equipment and PeopleEquipment and PeopleEquipment and People on the Ground Below
Equipment and People on the Ground Below
Lightning ProtectionLightning Protection
Entrances and
Entrances andand
Hazards Below
and Hazards Below
Sliding Snow IssuesSliding Snow Issues
Lesson LearnedLesson LearnedLesson Learned Lesson Learned the Hard Waythe Hard Way
Vehicle damaged by snow Vehicle damaged by snow Vehicle damaged by snow Vehicle damaged by snow g yg yand ice that fell from a roofand ice that fell from a roof
g yg yand ice that fell from a roofand ice that fell from a roof
Interior Moisture ProblemsInterior Moisture ProblemsComposite Medical Facility
Elmendorf AFB, AlaskaComposite Medical Facility
Elmendorf AFB, Alaska
Severe condensation d f t i d
Severe condensation d f t i d
Heavy frost on entry doors
Heavy frost on entry doors
and frost on windowsand frost on windows
yy
Field Investigations and Thermal ModelingField Investigations and Thermal Modeling
Min. Max. 49.5 63.6
63.649.5
*>64.0F
60 0
Infrared Thermogram
Infrared Thermogram
High heat lossHigh heat loss
49.5
45 0
50.0
55.0
60.0
63.649.5*
DesignDesignDesignDesign $178 million, 269,000 sq. ft. medical facility Participated in design reviews 1998 - 2000 Applied our lessons learned and cold climate
$178 million, 269,000 sq. ft. medical facility Participated in design reviews 1998 - 2000 Applied our lessons learned and cold climate
New Bassett HospitalNew Bassett HospitalConstructionConstruction
Applied our lessons learned and cold climate expertise to help designers avoid interior moisture problems
Applied our lessons learned and cold climate expertise to help designers avoid interior moisture problems
New Bassett HospitalFort Wainwright, Alaska
New Bassett HospitalFort Wainwright, AlaskaConstructionConstruction
May 2002 to June 2006 Infrared survey of the facility conducted in
March 2006
May 2002 to June 2006 Infrared survey of the facility conducted in
March 2006March 2006 The purpose of the survey was to determine if
there were any building envelope problems Survey results were quite good, with only a
few heat loss problems related to
March 2006 The purpose of the survey was to determine if
there were any building envelope problems Survey results were quite good, with only a
few heat loss problems related tofew heat loss problems related to construction still in progress
Some minor problems were identified and targeted for resolution before completion of construction
few heat loss problems related to construction still in progress
Some minor problems were identified and targeted for resolution before completion of construction
Infrared SurveyInfrared SurveyInfrared SurveyInfrared Survey
Engineering Solutions for DoD Engineering Solutions for DoD US Army Corps Facilities in Cold ClimatesFacilities in Cold Climates
Cl R d U dCl R d U d Cl R d U dCl R d U d
US Army Corpsof Engineers Engineer Research and Development Center
Clear Radar UpgradeClear Radar Upgrade Missile Defense ProgramMissile Defense Program Cold Climate Design Guidance Cold Climate Design Guidance
for Criteria and Standards for Criteria and Standards
Clear Radar UpgradeClear Radar Upgrade Missile Defense ProgramMissile Defense Program Cold Climate Design Guidance Cold Climate Design Guidance
for Criteria and Standards for Criteria and Standards Facility Designs:Facility Designs:
BarracksBarracks Brigade and Battalion Brigade and Battalion
HeadquartersHeadquarters
Facility Designs:Facility Designs: BarracksBarracks Brigade and Battalion Brigade and Battalion
HeadquartersHeadquarters Brigade Combat Team Facilities Brigade Combat Team Facilities Child Development CentersChild Development Centers Company Operation FacilityCompany Operation Facility Dental ClinicsDental Clinics Dining FacilitiesDining Facilities
Brigade Combat Team Facilities Brigade Combat Team Facilities Child Development CentersChild Development Centers Company Operation FacilityCompany Operation Facility Dental ClinicsDental Clinics Dining FacilitiesDining FacilitiesDining FacilitiesDining Facilities Family HousingFamily Housing Medical FacilitiesMedical Facilities Military Entrance Processing Military Entrance Processing
StationsStations
Dining FacilitiesDining Facilities Family HousingFamily Housing Medical FacilitiesMedical Facilities Military Entrance Processing Military Entrance Processing
StationsStations Tactical Equipment Maintenance Tactical Equipment Maintenance
FacilitiesFacilities and Other Facilitiesand Other Facilities
Tactical Equipment Maintenance Tactical Equipment Maintenance FacilitiesFacilities
and Other Facilitiesand Other Facilities
SSLessons Lessons SummarySummaryLearnedLearned Problems can be avoided and more functional designs
developed when snow and ice issues are considered as the design of a building evolves.
Problems can be avoided and more functional designs developed when snow and ice issues are considered as the design of a building evolves.
With a little thought during the design phase, the adverse effects of snow drifting on roofs can be minimized.
Low-slope roofs that drain to cold eaves are particularly
With a little thought during the design phase, the adverse effects of snow drifting on roofs can be minimized.
Low-slope roofs that drain to cold eaves are particularly problematic in cold climates.
It is better to drain low-slope roofs internally, since that avoids all of the over-the-eaves drainage problems.
problematic in cold climates. It is better to drain low-slope roofs internally, since that
avoids all of the over-the-eaves drainage problems. Roofs that drain to cold eaves can encounter snow and ice
related problems in cold climates. Icings at eaves are minimized when roofs are well
Roofs that drain to cold eaves can encounter snow and ice related problems in cold climates.
Icings at eaves are minimized when roofs are well Icings at eaves are minimized when roofs are well insulated and ventilated.
Icings at eaves are minimized when roofs are well insulated and ventilated.
LessonsLessonsMinimizing the Adverse Effects
f S d I R fMinimizing the Adverse Effects
f S d I R f DesignDesignLessons Lessons LearnedLearned
Attic Ventilation Guidelines to Attic Ventilation Guidelines to
of Snow and Ice on Roofsof Snow and Ice on Roofs Design Design GuidanceGuidance
Minimize Icings at EavesMinimize Icings at Eaves
Ventilating Cathedral Ceilings to Prevent Ventilating Cathedral Ceilings to Prevent g gProblematic Icings at Their Eaves
g gProblematic Icings at Their Eaves
G id li f V til ti Atti d C th d lG id li f V til ti Atti d C th d lGuidelines for Ventilating Attics and Cathedral Ceilings to Avoid Icings at Their Eaves
Guidelines for Ventilating Attics and Cathedral Ceilings to Avoid Icings at Their Eaves
Snow Guards for Metal RoofsSnow Guards for Metal Roofs
Sliding Snow CalculatorSliding Snow Calculator
http://www.crrel.usace.army.mil/library/cat_structures.htmlhttp://www.crrel.usace.army.mil/library/cat_structures.html
Sliding Snow CalculatorSliding Snow Calculator
James BuskaResearch Civil Engineer
Tel: (603) 646-4588, Fax: (603) 646-4640Email: [email protected]
Cold Regions Research and Engineering Laboratory
Engineer Research and Development CenterUS Army Corpsof Engineers
Cold Regions Research and Engineering Laboratory72 Lyme Road, Hanover, NH 03755-1290