ANNEX A TO UNAMID MSD QUICK GUIDE
CHALLENGES / RESTRICTIONS BY GOVERNMENT OF SUDAN ON UNAMID OPERATIONS
Section
2011 / 12 2012 / 13
Challenges Effects Challenges Effects
Aviation
Procedural delays and refusal
to grant permission/clearance
to UNAMID flights by Military
Intelligence, National Security
and Sudan Civilian Aviation
Authority. Occurs when amendments to daily flight
schedule (DFS) are submitted.
No reason is given for refusal verbally or in writing
Total denial by GoS authorities
(MI/NS/SCAA) for
Medevac/Casevac flight to land
at Super Camps having level II
and III medical facilities
available as well as refusal for
night flights. No reason is given
for refusal verbally or in writing
Restriction of movement to
certain areas by MI GoS
Obtaining clearances from MI
for flight operations and airport
facilities installation /
development.
Flight delays and disruption of
air operations
Life threatening consequences.
Serious impediment in swift and direct transportation of
critical cases from Team Sites
to Level-III hospitals in Nyala Super Camp noting road
distance from Nyala Airport to
the Super Camp is 22km
Flights to Sortoni problematic.
Projects planned for the rehabilitation of Darfur
Airports suffered affecting
operational capability
Same
Same
Deteriorating security situation,
including factional and tribal
conflicts, particularly in North and Central Sectors
Working closely with GoS on rehabilitation of Shawa and
operationalisation of El Genieina;
airfield lighting
Same
Same
Impact on air operations and
resupply of Team Sites.
Anticipate some improvement
2
CITS,
Engineering
Restrictions on importation of
equipment from some
countries, delayed clearances
and restrictions on installation
Delays in execution of CITS
projects, including backbone
projects, aimed at providing better services mission-wide
Same Same
Finance
Inconsistency in the application
of VAT. Though exempted, GoS requires original invoices by
vendors. Furthermore, for every
local invoice paid, a separate Note Verbal is issued to GoS Tax
authority thru MOFA
Delays in payment
transactions and extra workload and risk of loss of
original invoices once
removed from UNAMID archived files.
Same Same
General
Services
Increasing interference in the
operations of PX contractor by
different agencies of GOS.
(i) refusal by GoS to clear
shipments at the port or
to transport shipments
by land without armed
escort;
(ii) interrogation of ESKO
staff by GoS agents at
Khartoum airport when
merchandise are to be
airlifted by commercial
airlines;
Delayed shipments to UNAMID PX operations
resulting in low and non-
existent stocks in remote sites and low moral of the staff in
Sectors
Two containers of electronics,
toiletries, tobacco and perfumes were sent back from
Port Sudan to Haiti and
Liberia due to refusal of GoS agents to clear them after
spending eight (8) months at
the port
Same
Same
Human
Resources
Delays in issuance of Sudanese
visas
Recruitment lead-time has increased, affecting delivery of
mandate. Hiring managers
and candidates frustrated.
Number of good candidates lost to other missions
Situation exacerbated by prolonged period of non-visa issue
Same
3
Restriction of movement of
national staff, including their
arrests and harassment
Low morale of national staff,
especially those frequently
travelling on duty
Medical
Denial of import license
approval for narcotics,
insistence on procurement from
GoS authorised outlets, and on
the quantities to be procured
Denial of clearance approval on
reproductive health materials
Prescribed quantities of
narcotics do not meet
UNAMID requirements; hampering implementation of
UN policy on prevention and
transmission of sexually transmitted diseases, HIV and
AIDS
Same Same
MovCon,
Transport,
Medical,
Procurement
and Contracts
Management
GoS approval required for
cargo that can be airlifted on
UN aircraft to Team Sites
GoS-approval required for
passengers transported in UN
aircraft
GoS-approval required for
moving UNOE to other
Missions
GoS delays on delivering
paperwork (Yellow Copy of F1
form) to the entry points of
importation
GoS denial to conduct business
with certain countries. This
defies the terms of the SOFA
agreement and the rules and
Delays in the resupply of
crucial items like spare parts, rations, medical supplies
including blood. Spoilage of
fresh fruits and vegetables
No passenger to board/or be
added to UNAMID aircraft at
short notice without prior National Security/ Military
Intelligence approval.
Problematic for UNISFA and
UNMISS
Delays in clearing goods and
increased demurrage
Delays in operations implementation
Same
Same
Same
Same
Same
Same
Same
Same
4
regulations of the organization
Supply GoS insistence on escorting
trucks carrying containers
loaded with food rations from
El Obeid into Darfur, and
frequent stoppage or
cancellations of transportation
GoS insistence that all trucks
carrying container loaded with
food rations being delivered
from UNAMID Super Camp to
team sites be either on
UNAMID-escorted convoy or GoS-escorted convoy. These
convoys are not reliable as
multiple cancellations were experienced by the Mission
GoS restriction on movement of
trucks carrying fuel due to
security reasons, including
clearance denial for UNAMID
escorted convoys
Food rations meant for
consumption at certain periods
could not be supplied timely to the troops who ended up with
fewer entitlements than
expected.
The contractor requested
UNAMID to fly the food using its air assets or approval
from the Mission to fly the
food by commercial means to
the destinations resulting in additional cost to the mission
Convoys were considerably delayed threatening stock
replenishment of fuel in
general and from hubs to team
site locations in particular
Same
Same
Same
Same
Same
Same
Water /
Environment
GoS yet to provide land for one
landfill site (El Geneina) and
tipping site at 24 team site
locations
Delays in acquiring land for
carrying out hydro-geophysical
surveys and development of
boreholes
Improper disposal of solid
wastes within the camp,
posing health risks to the camp residents
No hydro-geophysical surveys have been carried out in El
Geneina, resulting in
continuous outsourcing of
water from vendors
Same
Same
Same
Same
* * * * *