1 BROOKHAVEN SCIENCE ASSOCIATES
NSLS-II Experimental Facilities Overview
Qun ShenDirector, Experimental Facilities Division
NSLS-II Experimental Facilities Advisory Committee Meeting
April 23-24, 2009
2 BROOKHAVEN SCIENCE ASSOCIATES
Outline
• Updates since May 2008 EFAC Meeting Selection of project beamlines Staffing, organization Revised labor estimates for beamline construction at CD-3
• Activities and progress R&D and infrastructure Beamline design progress BAT Charter Interface management LOB programming
• Issues and outlook • Summary
3 BROOKHAVEN SCIENCE ASSOCIATES
Project Beamlines: LOI Reviews & Decisions
• Beamline and strategic planning workshops held January-March 2008• Received 11 Letters of Interest (LOIs) from groups wanting to form
Beamline Advisory Teams (BATs) for the project beamlines and subsequent beamlines
• LOIs were reviewed by external reviews and Experimental Facilities Advisory Committee (EFAC). EFAC met May 5-7, 2008 and heard presentations from all 11 LOIs. EFAC report received June 2008.
• NSLS-II carefully evaluated the EFAC rankings and recommendations, and additional information in submitted LOI, external peer reviews, oral presentations and dialog at the EFAC meeting, as well as reviewers’ comments at technical and project reviews, and overall project priorities.
• Final decision on project beamline selection was communicated with DOE program office and announced at end of August 2008.
4 BROOKHAVEN SCIENCE ASSOCIATES
Six Project Beamlines at NSLS-II
1 meV
0.1 meV
Inelastic x-ray scattering
Hard x-ray nanoprobe
100m long
High-energy powder diffraction
Sub-m reso. x-ray spectroscopy
30m long hutch
Coherent hard x-ray scattering
Coherent soft x-ray scattering/polarization
5 BROOKHAVEN SCIENCE ASSOCIATES
Staff Hiring
• Recruitment of high-quality staff is a major, high-priority activity of XFD during the past year
• Since last EFAC meeting in May 2008, 18 staff have joined XFD:Five group leaders for project
beamlines; Final agreement for one remaining position expected soon;
Ten staff for experimental R&D and photon source development;
Two mechanical engineers for beamline designs.
Expe
rimen
tal F
acili
ties
FTE
• Searches on-going for several key areas:• Nanopositioning engineer / scientist;• Mirror metrology expert;• Beamline scientists.
6 BROOKHAVEN SCIENCE ASSOCIATES
Experimental Facilities Organization
Beamline Advisory
Teams (BATs)
7 BROOKHAVEN SCIENCE ASSOCIATES
Design and Construction Labor Profile
• As part of CD-3 preparations, beamline labor requirement was refined:
• Total effort per BL during project is ~ 28.5 FTE-years (was ~ 23.1 FTE-yrs per BL in original baseline estimate)
8 BROOKHAVEN SCIENCE ASSOCIATES
Revised Non-R&D FTE & Funding Profiles
• Added engineer and tech support during installation and testing
• Revised estimate for Nanoprobe satellite bldg. and beam-transport tunnel
• Adjustments have been made in initial beamline endstation instrumentation to offset increased cost due to added labor
• The initial scope of all beamlines can be met within baseline XFD non-R&D budget of $76.3M
• PCR-08-034 approved & implemented.
Total FTE-yrs = 188.6 (baseline = 155.1)
9 BROOKHAVEN SCIENCE ASSOCIATES
Revised Funding Profile in R&D
• Consolidated MLL and Kinoform into single 1nm R&D• Added R&D beamline at NSLS for optics testing• Redirected thermal modeling engineering effort to optical figure control for
<0.1urad optics
Total budget in R&D is within baseline $19M; Total FTE = 65.6 (baseline = 75.5)
PCR-08-034
10 BROOKHAVEN SCIENCE ASSOCIATES
Experimental Facilities R&D Program
• 1 nm focusing optics and nanopositioning• 0.1 meV high-resolution optics • X-ray beam position monitors• Optical figure control (heat load, metrology)
Yan, Conley, Lima, Chu (NSLS-II); Maser, Macrander, Rose, Stephenson, et al. (ANL)
Deposition Lab
Optical Metrology
Lab
Optical Assembly
Lab
Mechanical &
Electrical Tech Area
Etching and Fine Polishing
Lab
General Purpose
Lab
Nano-positioning
Lab
General Purpose
Lab
Lapping and
Cutting Lab
The east wing of Bldg.703 has been renovatedSeven labs are ISO 7 (Class 10000) clean rooms (4,200 ft2) to accommodate XFD R&D activities
Cai, Huang, Honnicke, Keister, Coburn, Struble (NSLS-II); Shvyd’ko (APS)
11 BROOKHAVEN SCIENCE ASSOCIATES
Moving into R&D Labs and Offices in B703Apr.21, 2009
Jan.2, 2009
12 BROOKHAVEN SCIENCE ASSOCIATES
Multilayer Laue Lens (MLL) for 1 nm Optics
H. Yan, PRB 79, 1 (2009).
t
• wMLL Deposition System (R. Conley):• Contract awarded to CVD; delivery Jul’09; • Grow 1st MLL by Sep’09.
• MLL testing (H. Yan, E. Lima):• Collaboration with CNM/APS; • 1st far-field image of 2D
focusing by MLL
• MLL theory (H. Yan):• Effect of interfacial
roughness
13 BROOKHAVEN SCIENCE ASSOCIATES
0.1 meV Optics & R&D Beamline at NSLS
NSLS X16a beamline SourceMirrorMono
• Crystal fabrication facility in Bldg.703 • R&D beamline X16A at NSLS developed
and started operations April 2009 • End-station test instrument designed and assembled
with temperature control ovens for dispersion crystals
Tilting (rad)
Cai, Huang, Honnicke, Keister, Coburn, Struble (NSLS-II)Shvyd’ko (APS)
14 BROOKHAVEN SCIENCE ASSOCIATES
Optical Metrology Laboratory
ALS: flat mirror (InSync) measurements
NSLS-II Optical Metrology Lab plans to house/develop cutting-edge metrology tools for advanced optics development:
• Fizeau interferometer• Long Trace Profiler (LTP)• Phase shifting micro-interferometer• Atomic Force Microscope (AFM)• At wavelength metrology
15 BROOKHAVEN SCIENCE ASSOCIATES
XPD BAT, November 24, 2008
BAT Meetings
SRX BAT, October 30, 2008
CHX BAT, December 9, 2008
IXS BAT, December 5, 2008
CSX BAT, January 8, 2009 HXN BAT, January 26, 2009
• All Beamline Advisory Teams (BATs) have completed first official meetings:• Good progress made on scientific and technical scopes• All BAT reports have been received• Beamline conceptual designs in progress
16 BROOKHAVEN SCIENCE ASSOCIATES
MOU and BAT Charter
17 BROOKHAVEN SCIENCE ASSOCIATES
Main Elements of BAT Charter
• Beamline Advisory Team (BAT) is a small group of scientists who submit a Letter of Interest (LOI) to NSLS-II, representing a particular community, to propose a specific beamline based on a specific set of experimental techniques to carry out a particular scientific mission.
• Submitted LOIs are reviewed by external reviewers and by the NSLS-II Experimental Facilities Advisory Committee (EFAC), and approved by the NSLS-II.
• Primary role of BAT is to advise the NSLS-II Experimental Facilities Division Director on the scientific mission and the technical requirements for the beamline and to work closely with the beamline scientists during design, construction, and commissioning of the beamline.
• NSLS-II has the overall responsibility for the design and construction of the beamline, including hiring of staff. Major beamline revisions are to be made in consultation with the associated BAT and the community at large. Final decisions on any issues in the design and construction of a beamline reside with the NSLS-II.
18 BROOKHAVEN SCIENCE ASSOCIATES
Need EFAC Advice on the Following …
• Does the BAT Charter adequately describe roles and responsibilities of the BAT?
• Does individual BAT membership adequately represent the particular user community for the beamline?
• To ensure high quality interactions between BAT and NSLS-II, we believe there is a need for formal communication channels between EFAC and the BATs:• to periodically review how BAT is doing by EFAC, e.g. every 1-2 years;• to allow BAT to register concerns and complaints about certain NSLS-II actions.
• Should NSLS-II have a BAT Council, consisting of representatives from all BATs?
19 BROOKHAVEN SCIENCE ASSOCIATES
Beamline Construction Schedule Baseline
CD-3 Review
Procurement start
EF beneficial occupancy
Conceptual Design
Preliminary Design
Final Design
Long lead time procurement
InstallationTesting
Construction start Ready for Beam
20 BROOKHAVEN SCIENCE ASSOCIATES
Project Beamline Conceptual Designs
• Finalizing X-ray optics and beamline layout;• Optimizing insertion device specifications; • Heat load analysis on x-ray mirrors and
monochromators; • Concept of end-station instrument;• Iterating with BAT;• Cost and schedule update
21 BROOKHAVEN SCIENCE ASSOCIATES
Project Beamline Insertion Device Optimizations
• Studies on insertion device options: Oleg Chubar (XFD/ASD) Toshi Tanabe (ASD)
• New XFD/ASD joint working group on IDs: members include XFD, ASD, and NSLS staff; meets weekly to discuss ID options and specifications; current focus is on high-beta long straights.
IXS beamline
22 BROOKHAVEN SCIENCE ASSOCIATES
Project Beamline Heat Load Analysis
• Thermal analysis on x-ray monochromators
Water-cooled Si mono.Max. slope error ~ 20 rad
LN2-cooled Si mono.Max. slope error ~ 0.2 rad
Vishy Ravindranath, Sushil Sharma (ASD) Lonny Berman (NSLS)
• Heat load analysis on x-ray optics are on-going for six beamlines• Primary conclusion is that LN2-cooled Si mono is needed for hard
x-ray undulator beamlines; Systematic study is underway.
23 BROOKHAVEN SCIENCE ASSOCIATES
Hard X-ray Nanoprobe in Satellite Building
• Vibration isolation from main building• 100 m long larger working distance• Concrete expt. hutch w/ acoustic damping• Consideration of vibration isolation
similar to EM, from ground up • Air-lock entry and
temperature stability
• ……
N. Simos (CFD)
vibration sources
24 BROOKHAVEN SCIENCE ASSOCIATES
Laboratory Office Building (LOB)
• XFD effort on LOB programming requirements:• Held several expanded staff meetings to
discuss LOB space requirements• Did detailed estimates on staffing levels and
expected number of users, & their office needs• Did detailed analysis on basic equipment needs
that are required by most user groups in support of their experiments at beamlines• Worked with professional lab planners from HDR on realistic laboratory layouts• Held a town-hall meeting with broader community to discuss with the community
about our current plan and invite feedback
• LOB design at CD-2 was baselined under certain financial constraints, and needs to be reevaluated.
• Expanded LOB design has been given the green light by DOE to proceed.
25 BROOKHAVEN SCIENCE ASSOCIATES
Outreach to Community
• Six beamline advisory teams, with combined membership of >50 scientists representing a diverse user community, have been the main focus of community interactions during the past year.
• NSLS-II XFD participations in several community organized workshops and meetings, including:
• BER/NIH workshop on life science at NSLS-II, Sep.11-12, 2008• High pressure research workshop, Oct. 6, 2008• XAS community workshop, Mar. 6, 2009• Workshop on SR applications in microelectronics, Mar. 20, 2009• Workshop on SR applications in glass research, Apr. 6, 2009• Weekly beamline transition workgroup meetings
• Focused efforts in XFD on defining BATs, recruitment, R&D infrastructure, and beamline conceptual designs have made it difficult to be more engaged with the community during the past year.
• With more staff scientists on board, we fully expect that community outreach will regain momentum in the coming year.
26 BROOKHAVEN SCIENCE ASSOCIATES
Responses to May 2008 EFAC Recommendations
27 BROOKHAVEN SCIENCE ASSOCIATES
Responses to Previous EFAC Recommendations
28 BROOKHAVEN SCIENCE ASSOCIATES
Issues and Outlook
• High resolution R&D programs, 1 nm and 0.1 meV, are very challenging; Outcomes may have impact on beamline designs
Need to design beamlines with built-in flexibility to accommodate R&D outcomes
• Interface activities with ASD especially in the area of insertion device optimization and front-end designs; may impact beamline schedule
Need proactive interface management and considerable interactions at several levels
• Recruiting and retaining best staff in XFD Hiring of in the coming months will focus on nanopositioning eng., optical metrology
expert, and beamline scientists. Efforts to create and maintain a nurturing research environment in XFD and
encourage discussions on science, R&D, and career developments.
• Managing priorities and interacting with BATs Need open and transparent discussions with BAT so difficult decisions can be made
with BAT inputs; EFAC input and advisory are welcome.
29 BROOKHAVEN SCIENCE ASSOCIATES
Summary
• NSLS-II Experimental Facilities Division is making good progress in staff recruitment, infrastructure building, x-ray optics R&D, and beamline conceptual designs.
• Beamline Advisory Team selection process for project beamlines completed by CD-3. Beamline advisory team charter developed.
• Beamline conceptual designs, with full engagement of BATs, are well underway and on schedule.
• Considerable interactions with community and NSLS are on going, particularly in LOB programming and workshop participations. An increasing level of NSLS-II outreach activities are anticipated for the coming year, given much higher level of staffing in XFD.
• We appreciate EFAC input and advice on many topics discussed or to be discussed at today’s meeting