27
Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From Approx. Sta. To Approx. Qty Offset Location Comments Utility Type of Facility 1 State, 2 Utility Not/Reimbursable XE01 32nd Ave XS1-XS2 115+75. to 117+25. 150 5' plus Cut Right In Right of way Adjust or relocate line for storm drain XCEL Energy Gas Line 2 Not reimbursable XE02 SW RAMP XS27- XS28 5+00. to 6+50. 150 2.5' Cut Left In Right of way Conflict depending on cover below existing ditch XCEL Energy Gas Line 2 Not reimbursable XE03 36th St S of 32nd Ave XS45- XS46 11+00. to 13+00. 200 2.0' Cut Left In Right of way Possible Conflict depending on cover below existing roadway - removing 10" existing pavement and 12" of base. Replace with 12" base and 10" concrete. XCEL Energy Gas Line 2 Not reimbursable XE04 36th St S of 32nd Ave XS47- XS49 14+00. to 16+00. 200 1.6' Cut Left In Right of way Possible Conflict depending on cover below existing ditch - removing 1.6' for new ditch section. XCEL Energy Gas Line 2 Not reimbursable CCE01 32nd Ave XS3 118+00. to 118+40. 40 9' plus Cut Left In Right of way Conflict with new retaining wall. Cass County Electric Buried Power line 2 Not reimbursable CCE02 32nd Ave XS3 118+30. to 118+50. 20 5' plus Cut Right In Right of way Possible Conflict with Culvert Cass County Electric Buried Power line 2 Not reimbursable CCE03 32nd Ave XS4 118+70. to 118+90. 20 5' plus Cut Right In Right of way Possible Conflict with Culvert Cass County Electric Buried Power line 2 Not reimbursable CCE04 32nd Ave XS4 119+30. to 119+30. 50 2' Cut Left In Right of way Adjust or relocate line Cass County Electric Buried Power line 2 Not reimbursable CCE05 32nd Ave XS4 120+12. to 120+12. 40 2' Cut Left In Right of way Adjust or relocate line Cass County Electric Buried Power line 2 Not reimbursable CCE06 NWquad-Trail XS19 15+22. to 15+22. 1 2' Fill Left In Right of way Raise pedestal if needed for fill for new bike/ped path Cass County Electric Pedestal for Buried Power line 2 Not reimbursable CCE07 SW RAMP XS30- XS32 9+00. to 10+50. 150 1.4' Cut Right In Right of way Possible Conflict depending on cover below existing ditch - removing 1.4' for new ditch section. Cass County Electric Buried Power line 2 Not reimbursable CCE08 36th St S of 32nd Ave XS4 10+00. to 10+40. 40 1.5' Cut Left In Right of way Possible Conflict depending on cover below existing ditch - removing 1.5' for new ditch section. Cass County Electric Buried Power line 2 Not reimbursable . MC1 No known conflicts Midcontinent Communications Fiber Optic Line 2 Not reimbursable CL01 No known conflicts CenturyLink Fiber Optic Line 2 Not reimbursable Contact information for Utility Facilities with or without Conflicts Utility Company Name and Address Contact Name Phone Number Cass County Electric - 4100 32nd Ave SW, Fargo, ND 58104 Chuck Ames (701) 356-4500 CenturyLink - 125 S Dakota Ave, Sioux Falls, SD 57194 Dan Kaiser 1 605 339 5656 CenturyLink – 409 1st Ave N, Fargo, ND 58102 Brendan Christenson 701-241-3771 Midco Communications -50 22nd Street East, West Fargo, ND 58078 Ron Deutz (701) 212-5683 Xcel Energy - 2302 Great Northern Drive, Fargo, ND 58102 Scott Ladwig (701) 241-8663 Xcel Energy - 2302 Great Northern Drive, Fargo, ND 58102 Susan Balkovatz (701) 241-8610 Xcel Energy - 2302 Great Northern Drive, Fargo, ND 58102 John Ness (701) 241-8695 Approx. Maximum Cut/Fill [email protected] Email [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]

1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls

Item # Location

Cross Section

Sht #Approx. Sta.

From Approx. Sta. To

Approx. Qty Offset Location Comments Utility Type of Facility

1 State,

2 Utility Not/Reimbursable

XE01 32nd Ave XS1-XS2 115+75. to 117+25. 150 5' plus Cut Right In Right of way Adjust or relocate line for storm drain XCEL Energy Gas Line 2 Not reimbursable

XE02 SW RAMP XS27-XS28 5+00. to 6+50. 150 2.5' Cut Left In Right of way Conflict depending on cover below existing ditch XCEL Energy Gas Line 2 Not reimbursable

XE03 36th St S of 32nd Ave

XS45-XS46 11+00. to 13+00. 200 2.0' Cut Left In Right of way

Possible Conflict depending on cover below existing roadway - removing 10" existing pavement and 12" of base. Replace with 12" base and 10" concrete.

XCEL Energy Gas Line 2 Not reimbursable

XE04 36th St S of 32nd Ave

XS47-XS49 14+00. to 16+00. 200 1.6' Cut Left In Right of way

Possible Conflict depending on cover below existing ditch - removing 1.6' for new ditch section.

XCEL Energy Gas Line 2 Not reimbursable

CCE01 32nd Ave XS3 118+00. to 118+40. 40 9' plus Cut Left In Right of way Conflict with new retaining wall. Cass County Electric Buried Power line 2 Not reimbursable

CCE02 32nd Ave XS3 118+30. to 118+50. 20 5' plus Cut Right In Right of way Possible Conflict with Culvert Cass County Electric Buried Power line 2 Not reimbursable

CCE03 32nd Ave XS4 118+70. to 118+90. 20 5' plus Cut Right In Right of way Possible Conflict with Culvert Cass County Electric Buried Power line 2 Not reimbursable

CCE04 32nd Ave XS4 119+30. to 119+30. 50 2' Cut Left In Right of way Adjust or relocate line Cass County Electric Buried Power line 2 Not reimbursable

CCE05 32nd Ave XS4 120+12. to 120+12. 40 2' Cut Left In Right of way Adjust or relocate line Cass County Electric Buried Power line 2 Not reimbursable

CCE06 NWquad-Trail XS19 15+22. to 15+22. 1 2' Fill Left In Right of way Raise pedestal if needed for fill for new bike/ped path Cass County Electric Pedestal for Buried

Power line 2 Not reimbursable

CCE07 SW RAMP XS30-XS32 9+00. to 10+50. 150 1.4' Cut Right In Right of way

Possible Conflict depending on cover below existing ditch - removing 1.4' for new ditch section.

Cass County Electric Buried Power line 2 Not reimbursable

CCE08 36th St S of 32nd Ave XS4 10+00. to 10+40. 40 1.5' Cut Left In Right of way

Possible Conflict depending on cover below existing ditch - removing 1.5' for new ditch section.

Cass County Electric Buried Power line 2 Not reimbursable

.

MC1 No known conflicts Midcontinent Communications Fiber Optic Line 2 Not reimbursable

CL01 No known conflicts CenturyLink Fiber Optic Line 2 Not reimbursable

Contact information for Utility Facilities with or without ConflictsUtility Company Name and Address Contact Name Phone NumberCass County Electric - 4100 32nd Ave SW, Fargo, ND 58104 Chuck Ames (701) 356-4500CenturyLink - 125 S Dakota Ave, Sioux Falls, SD 57194 Dan Kaiser 1 605 339 5656CenturyLink – 409 1st Ave N, Fargo, ND 58102 Brendan Christenson 701-241-3771Midco Communications -50 22nd Street East, West Fargo, ND 58078 Ron Deutz (701) 212-5683Xcel Energy - 2302 Great Northern Drive, Fargo, ND 58102 Scott Ladwig (701) 241-8663Xcel Energy - 2302 Great Northern Drive, Fargo, ND 58102 Susan Balkovatz (701) 241-8610Xcel Energy - 2302 Great Northern Drive, Fargo, ND 58102 John Ness (701) 241-8695

Approx. Maximum

Cut/Fill

[email protected]

[email protected]@[email protected]@[email protected]@xcelenergy.com

Page 2: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

INTERSTATENORTH DAKOTA

29

OFFICE OF PROJECT DEVELOPMENT

33rd St S

36th St S

39th St S

41st St S

43rd St S

32nd Ave S

R-49-W

T-139-N

Sec 23

R-49-W

T-139-N

Sec 26

R-49-W

T-139-N

Sec 27

R-49-W

T-139-N

Sec 22

IM-8-029(166)062

SU-8-984(152)155

Sec Line

Sec Line32nd Ave S

1/4 Line

42nd St S

1/4 Line

32nd St S

Fargo District

CITY OF FARGO

__________________________________________

APPROVED DATE _________________________

CITY ENGINEER

29-062.282

Structure No.

DESIGNERS

ND DEPARTMENT OF TRANSPORTATION

__________________________________________

APPROVED DATE _________________________

__________________________________________

DISTRICT REVIEWGRAND

FORKS

GO

LD

EN

VA

LLE

Y

CASS

RIC

HLA

ND

RANSOM

SARGENTDICKEY

LA MOURE

BARNES

KIDDER

LOGAN

MC IN

TOSH

BU

RLEIG

H

MORTON

GRANT

SIOUXADAMS

HETTINGER

SLOPE

BOWMAN EM

MO

NS

OLIVER

MERCER

STARKBIL

LIN

GS

DUNN

MC KENZIE

MC LEAN

SHERID

AN

WELLS

EDDY

FOSTER

GRIG

GS

STEELE

TRAILL

DIVIDE

WILLIAMS

BURKE

MO

UNTR

AIL

RE

NVIL

LE

WARD

MC H

EN

RY

BOTTINEAU

ROLLE

TTE

TO

WNER

CAVALIER

RA

MSEY

WALSH

PE

MBIN

A

NELS

ONBENSONP

IER

CE

STUTSMAN

STATE COUNTY MAP

0.44 Miles

0.91 Miles

0.44 Miles

0.91 Miles

PCN 21262

IM-8-029(166)062

Sta 138+95

End Project

PCN 21261

SU-8-984(152)155

PR-17-A0

Sta 157+72

End Project

29-062.249

Structure No.

PCN 21261

SU-8-984(152)155

PR-17-A0

Sta 92+78

Begin Project

PCN 21262

IM-8-029(166)062

Sta 115+75

Begin Project

RP 62

33rd Ave S

11

Cass County

Apex Engineering Group

City of Fargo No. PR-17-A0

FHWA Limited Involvement

21261

Grading, Salvaged Base, PC Concrete Pavement, Bridge Widening, Ramp Construction, Retaining Wall,

SU-8-984(152)155

32nd Avenue South - 42nd Street to 32nd Street

SU-8-984(152)155

Storm Sewer, City Utilities, Box Culvert, Curb & Gutter, Sidewalk, Signing, Marking, Lighting & Incidentals

IM-8-029(166)062 21262

STATE PROJECT NO.

ND

PCNNO.

SHEET

NO.

SECTION

__________________________________________

APPROVED DATE _________________________

engineer under the laws of the state of ND.

and that I am a duly registered professional

prepared by me or under my direct supervision

I hereby certify that the attached plans were

10/26/2016 mike.johnson T:\Projects\2015\15.103.0105 Fargo 32nd Avenue South Reconstruction\80984155.152\Design\001\001TS_Title.dgn7:02:53 AM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

DEPARTMENT OF TRANSPORTATIONNORTH DAKOTA

ANDCITY OF FARGO

JOB #

GROSS MILES NET MILES PROJECT NUMBER \ DESCRIPTION

effective on the date the project is advertised.

Department of Transportation and the Supplemental Specifications

2014 Standard Specifications adopted by the North Dakota

GOVERNING SPECIFICATIONS:

IM-8-029(166)062

Interstate 29 and 32nd Avenue South Interchange Improvements

35 mph (East of 36th St)

40 mph (West of 36th St)

250' (35 mph)

305' (40 mph)

DESIGN DATA

Traffic Average Daily

Limited Access Control

Current 2015

Forecast 2040

Pass: 28,001

Pass: 40,559

Trucks: 1,319

Trucks: 1,911

29,320

Total: 42,470

Design Speed:

Bridges: HS 25

Pavement Design Life 30 (years)

Minimum Sight Dist. for Stopping:

Clear Zone Distance: 14 feet

Design Accumulated One-way Rigid ESALs: 16,027,900

Page 3: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

Concrete Widening

Concrete Full Depth Reconstruction

IM-8-0

29(1

66)0

62

SU-8-9

84(1

52)1

55

IM-8-0

29(1

66)0

62

SI-8-9

84(1

52)1

55

Shared-Use Path

Concrete

Bridge Widening & Deck Overlay

I - 29 S

B

I - 29 N

B

12’ X 8’ BCB

Construct

FLYING J TRAVEL PLAZA

WINDBREAK

BOSS SHOP

FARGO TIRE SERVICE

LOVE’S TRAVEL STOP

FARGO TRACTOR

LUTHER FAMILY BUICK GMCHERE WE GO CHILDCARE

COMMUNICATIONS

CONSOLIDATED

HUDDLE HOUSE

THERMO KING OF FARGO

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/2/2016 mdockter R:\project\80029062.166\design\Sheets\004SW_001.dgn1:54:58 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

IM-8-029(166)062 4 3

32nd Ave Interchange

Scope of Work

Page 4: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

Utility Conflict Legend Sheet

at own expenserelocate or adjustutility company to Buried telephone,Conflict with

at own expenserelocate or adjustutility company to Fiber optic line,Conflict with

at own expenserelocate or adjustutility company to Buried electric line,Conflict with

billable to NDDOTrelocate or adjustutility company to Utility Pole,Conflict with

billable to NDDOTrelocate or adjustutility company to Utility Pole anchor,Conflict with

at own expenserelocate or adjustutility company to Utility Pole,Conflict with

at own expenserelocate or adjustutility company to Utility Pole anchor,Conflict with

earth around poleto leave existing NDDOT contractorNo Conflict

at own expenserelocate or adjustutility company to Gas line,Conflict with

billable to NDDOTrelocate or adjustutility company to Fiber optic line,Conflict with

billable to NDDOTrelocate or adjustutility company to Buried telephone,Conflict with

billable to NDDOTrelocate or adjustutility company to Buried electric line,Conflict with

billable to NDDOTrelocate or adjustutility company to Gas line,Conflict with

at own expenserelocate or adjustutility company to Cable/TV facality,Conflict with

billable to NDDOTrelocate or adjustutility company to Cable/TV facality,Conflict with

11/17/2016 R:\project\80029062.166\utilities\004UC_001_utility conflict legend.dgn

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

NA 1IM-8-029(166)062

Page 5: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

XE01at own expenserelocate or adjustutility company to Gas line,Conflict with

XE04at own expenserelocate or adjustutility company to Gas line, cutting 1.6’Conflict with

CCE01at own expenserelocate or adjustutility company to & retaiming wallBuried electric line Conflict with

CCE05at own expenserelocate or adjustutility company to approx 2’ fillElectric PedestalConflict with

CCE08at own expenserelocate or adjustutility company to lowering grade by 1.5’Buried electric line,Conflict with

see city plan setGas line,Conflict with

XE03at own expenserelocate or adjustutility company to Gas line, cutting 2.0’’& 10" contrete replacing 12" base & 12" base Remove 8" pavement

XE02at own expenserelocate or adjustutility company to Gas line, cuting 2.5’Conflict with

CCE07at own expenserelocate or adjustutility company to lowering grade by 1.3’Buried electric line,Conflict with

CCE02 & CCE03at own expenserelocate or adjustutility company to & storm drain pipesBuried electric line Possible Conflict with

CCE04 & CCE05at own expenserelocate or adjustutility company to lowering grade by 1.3’Buried electric line,Conflict with

Inv S

W 8

92.7

3

Top 8

95.9

3

Rim 8

95.3

8

BI

896.17

Inv 893.45

Rim 898.20

CBS

18" R

CP

CenturyLink

Inv 894.45

Rim 898.65

CBS

18" R

CP

Inv 895.17

Rim 898.77

CBS

18" R

CP

Inv 896.1

Rim 899.38

CBS

899.51

2 C

SFES (good)

30"

X 130’ C

SP (good)

(Chain: S

CL29)

3284+37 - 408’ Rt to S

W end

899.60

899.61899.68

899.8

7

Chnlk

36" CSP

900.02

900.07

2 CSFES (fair)

36" CSP (fair)

37+49 (Chain: SCL32) - 98’ Rt to S End

37+57 (Chain: SCL32) - 106’ Lt to N End

CA

SS C

O E

LE

C

900.12

CASS C

O E

LE

C

XLENER

900.32

900.46

2 RCFES (poor W end)

15" RCP (poor, skew)

136’ Lt to W end

37+73 (Chain: SCL32)

Water

ND

DO

T

Tel

Vault

Guy P

ole

EL

XLE

NER

901.05

901.5

0

(0.5’ pipe separation fro

m F

ES at both e

nds)

2 R

CF

ES (poor)

24"

X 7

4’ R

CP (poor, s

ke

w)

3282+13 - 1

50’ to N

E e

nd

3281+62 - 2

06’ to S

W e

nd

Chain S

CL 2

9

24"

RC

P

CASS C

O E

LEC

Chnlk

900.52

ND

DO

T

Chnlk

CASS C

O E

LEC

Hd

wl

902.29

Tel

Vault

902.381 CSFES (fair)

18" RCP (fair, skew)

202’ to NW end

35+17 (Chain: SCL32)

902.56

ND

DO

T

XLE

NE

R

902.58

16" PVC MUNICIPAL

XLE

NE

R

ND

DO

T

902.7

6

Chnlk

1 RCFES (poor)

15" RCP (poor, skew)

141’ Rt to W end

37+63 (Chain: SCL32)

ND

DOT

CASS C

O E

LEC

903.11

2 RCFES (fair E end)

15" RCP (fair, skew)

85’ Lt to E end

39+50 (Chain: SCL32)

ND

DO

T

Hd

wl

CASS CO ELEC

903.43903.44

Chnlk

XLE

NER

XLENER

Century

Lin

k

XLENER

Chnlk

CASS C

O E

LEC

WGV

FH

903.85

903.88

Hd

wl

Riprap

903.92

903.92

Chnlk

NDDOT

16" P

VC M

UNICI

PAL Ap

prox L

oc

FH

16" PVC

MU

NICIP

AL Approx

Loc

CASS C

O E

LEC

CenturyLink Approx Loc

CASS CO ELEC

Rock

CASS CO ELEC

EL

Hd

wl

XLENER

CASS CO ELEC

EL (3)

Sig

n

CAS

S C

O E

LEC

30" C

SP

NDDOT

904.38

904.38

MID

CO

904.46

XLE

NER

CenturyLink

E Mtr

Hd

wl

Approx Loc

904.60

Hd

wl

Tel Ped (2)

Hd

wl

CASS CO ELEC

Chnlk

EL

Approx Loc

Rock

Century Link Approx Loc

Century

Link

Appro

x Loc

NDDOT

10" PVC

10" P

VC M

UNICIP

AL

MIDCO

24" C&G

MIDCO

Rock

Riprap

Elec Ped

FLYING J TRAVEL PLAZA

WINDBREAK

BOSS SHOP

MOTEL 6

LOVE’S TRAVEL STOP

FARGO TRACTOR

LUTHER FAMILY BUICK GMC

HUDDLE HOUSE

MUNICIPAL Approx Loc

ND

DO

T A

ppro

x L

oc

EL

Century Link Approx Loc

Asp

h

FH

Rock

Inv 904.46

Rim 905.25

CBR

CAS

S C

O E

LE

C

XLENER

MU

NICIP

AL

XLE

NE

R

Century

Link

Chnlk

24" C&G

16" P

VC

CASS C

O E

LEC

ND

DOT Approx Loc

ND

DO

T

Appro

x L

oc

ND

DO

T Appro

x L

oc

2 CSFES (fair)

36" CSP (fair)

37+34 (Chain: SCL32)- 94’ Rt to S End

37+40 (Chain: SCL32) - 106’ Lt to N End

Century Lin

k

Appro

x L

oc

905.87

1 CSFES (fair)

15" CSP (fair, skew)

251’ to NW end

32+63 (Chain: SCL32)

Chnlk

MID

CO

NDDOT Approx Loc

36"

CS

P

NDDOT Approx Loc

CASS CO E

LEC

906.19

1 CSFES (fair, N end)

15" CSP (fair, skew)

139’ to N end

23+34 (Chain: SCL32)

20" DIP

MUNICIPAL Approx Loc

24"

Mtbl

24"

Mtbl

NDDOT Approx Loc

Curb

Cut

8" PVC MUNICIPAL

2 P

VCFES (good)

18"

X 60’ P

VC (good)

(Chain: SCL29)

3283+97 - 484’ Rt to S

W end

CA

SS C

O E

LE

C

Asp

h

Municipal Approx Loc

Century Link

Grass

Grass

MID

CO

16" P

VC

MU

NICIP

AL

Century Lin

k

Appro

x L

oc

30" C

&G

Inv 903.01

Rim 907.01

CBR

30" C

&G

CASS C

O E

LEC

Sign

Asph

16" P

VC

30" C

&G

Municipal Approx Loc

24" C&G

Century Link

WGV

FH

30" C

&G

15" CSP

24" C&G

MU

NICIP

AL A

ppro

x L

oc

Appro

x L

oc

E Mtr

Municipal Approx Loc

24" C&G

24" C&G

Sig

n

MUNICIPAL

907.99

1 CSFES (fair, S end)

15" CSP (fair, skew)

128’ to S end

23+42 (Chain: SCL32)

Grass

24"

C&

G

Elec MH

NDDOT

24" C&G

ND

DO

T A

ppro

x L

oc

15" RCP

Inv W 901.87

Inv E 901.87

Rim 908.28

CBS

ND

DOT

6" Curb

Plu

gged

Traf Sig w/arm & LhtTel Vault

ND

DO

T A

ppro

x L

oc

MU

NICIP

AL

Asp

h

15"

RC

P

15"

RC

P Plu

gged

MU

NICIP

AL

ND

DOT

24" C

&G

24" C

&G

MUNICIPAL Approx Loc

24" C&G 909.77

1 CSFES (poor)

15" CSP (poor, skew)

105’ to NW end

34+53 (Chain: SCL32)

Inv NE 905.28

Rim 909.43

CBS MH

Elec

PPP TSCB

PPP

24"

Mtbl

& Lht

w/arm

Traf Sig

Century Link Approx Loc30"

C&

G

24"

C&

G

Elec MH

Asp

h

MH

Elec

Elec MH

24" C&G

Broken

Municipal Approx Loc

Traf Sig w/arm15"R

CP

Inv S 907.59

Rim 911.64

CBS

Inv N 907.35

Inv S 909.58

Inv E 909.88

Rim 911.88

CBS

36"

CS

P

EL (2)

MUNICIPAL

MUNICIPAL

MU

NICIP

AL A

ppro

x L

oc

18" R

CP

8" CI

Station

Lift

1 R

CES (fair, N end)

18" R

CP (fair)

474’ to N end

3297+23 (Chain: SCL29)

& Lht

w/arm

Traf Sig

24" C&G

MUNICIPAL Approx Loc

CA

SS C

O E

LE

C

MH

Elec

MUNICPAL

6" Curb

Planter

Elec MH

24" C&G

Municipal Approx Loc

MUNICIPAL

MU

NICIP

AL A

ppro

x L

oc

24" C&GMunicipal Approx Loc Municipal Approx Loc

E Mtr

CA

SS C

O E

LE

C

24" C&G

ND

DO

T

EL

24" C&G

24" C&G

TSCB

MUNICIPAL

Municipal Approx Loc

24" C&G

Inv W 915.31

Inv NE 915.36

Rim 919.31

CBS

EL

Elec MH

Elec MH

24" C&G

Winged Hdwls

Single 14’X8’X56’ RCB

N 446837.82 E 2885051.91

N 446841.83 E 2885107.47

Str #29-062.282

PPP

6" Curb

24" C&G Broken

24" C&G Broken 24" C&G

MU

NICIP

AL

Traf Sig w/arm & Lht 15"

RC

P

MU

NICIP

AL Pl

anter

Inv NE 916.21

Rim 921.11

CBS

Municipal Approx Loc

6" Curb

MH

Elec

Traf Sig w/arm

Planter

MUNICIPAL

28’ Snow Gate

& Lht

w/arm

Traf Sig MUNICIPAL Approx Loc

Traf Sig w/arm 24" C

&G

Elec MH

MUNICIPAL

Traf Sig w/arm

24" C

&G

Inv SW 916.04

Rim 922.44

CBS

24" C

&G

Elec MH

6" Curb

24" C&G

Broken

Planter

Inv NE 917.63

Rim 922.58

CB

Inv NW 908.42

Rim 912.87

CBR

Inv SE 917.63

Rim 922.58

CB

Elec MH

30"

C&

G

PPP

w/arm

Traf Sig

MH

Elec

24" C

&G

24" C

&G

Elec MH

24" C

&G

w/arm

Traf Sig & Lht

w/arm

Traf Sig

6" Curb

Elec MH

Municipal Approx Loc

MUNICIPAL

MUNICIPAL

24" C&G 24" C

&G

6" Curb Municipal Approx LocMunicipal Approx Loc

Municipal Approx Loc

Elec MH

MUNICIPAL

MUNICIPAL

24" C&G

2" Curb6" Curb

6" Curb 6" Curb

Elec MH

24" C&G

6" Curb

24" C&G

2" Curb

Elec MH

NDDOT

24" C&G

Elec MH

24" C&G

24" C&G

Elec MH

24" C&G

Chnlk

24" C&G

Chnlk

6" Curb

Steel Cont Stringer

Clr Rdwy 81’

Overall Length 265’

N 446620.84 E 2884666.72

N 446600.56 E 2884402.50

Str #29-062.249

24" C&G

52

61A

68A

69A

52A

53A 57A

59A

899.68

899.61

906.85

905.60905.60

906.50

900.50

900.50

900.00

900.50

900.25

899.00

899.25

60A

58B

58A62A

910.00

906.80

63A 65A

66A

900.50

901.05

67A

909.30

64A

906.60 904.60

903.50

56A

906.50

905.10

904.30

55A

5554

55B

902.90

901.00

51A

903.80

900.00

900.50

900.50901.00

Access C

ontrol

Access Control

Access C

ontrol

Access C

ontrol

Access C

ontrol

Access C

ontrol

Access C

ontrol

Access C

ontrol

Access C

ontrol

Access

Control

Access Control

Access Control

Access C

ontrol

Access C

ontrol

Access C

ontrol

Acce

ss Control

36th St S

W

w/24" SRP

Line & Grout 36" CSP

Install Pipe Elbows

3276

3277

3278

3279

3280

3281

3282

3283

3284

3285

3286

3287

3288

3289

3290

3291

3292

3293

3294

3295

3296

3297

3298

10

11

12

13

14

15

01

2

34

5

6

7

0 1 2

3

45

6

7

8

9

10

11

23

45

67

89

10

11

12

13

14

15

16

17

18

19

20

21

22

9

10

11

12

13

14

15

16

01

23

4

5

6

7

8

9

10

11

12

13

14

15

16

8

9

10

11

12

13

14

15

16

17

18

8

9

10

11

12

13

14

15

16

17

1011

1213 14

15

16

17 18

19

20

21

22 23 24 25

26

27

28

2930

31

32

33

34

1

2

1

2

115116

117118

119120

121122 123 124 125 126 127 128 129 130 131 132 133

134135

136137

138139

140

Page 6: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

CCE01at own expenserelocate or adjustutility company to & retaiming wallBuried electric line Conflict with

XE01at own expenserelocate or adjustutility company to Gas line,Conflict with

Elev 903.80

O/s 73.5' Lt

Sta 115+78

Elev 902.90

O/s 98.3' Lt

Sta 118+40

Elev 895.56

O/s 87.4' Rt

Sta 115+75

Chain PR32ND

32nd Ave South Alignment

Stations & Offsets this sheet listed from Chain PR32ND

Notes:

Elev 899.68

O/s 137.2' Rt

Sta 118+37Elev 899.61

O/s 141.8' Rt

Sta 118+82

Elev 901.00

O/s 127.3' Lt

Sta 119+15

Project Limits - I

M-8-0

29(1

66)0

62

ADJUST MANHOLEInv NW 908.39Inv NW 908.39Inv S 900.29Inv S 906.99Rim 912.64SD MH

CCE02 & CCE03at own expenserelocate or adjustutility company to & storm drain pipesBuried electric line Possible Conflict with

CCE04 & CCE05at own expenserelocate or adjustutility company to lowering grade by 1.3'Buried electric line,Conflict with

890

895

900

905

910

915

920

925

890

895

900

905

910

915

920

925

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/7/2016 mdockter R:\project\80029062.166\utilities\sheets\060PP_002.dgn3:07:54 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

IM-8-029(166)062

Plan & Profile

32nd Avenue South

Sta 115+75 to 119+20

12

899.61

899.68

36" CSP

900.32

24"

RC

P

Chnlk

902.58

XLENER

Chnlk

CenturyLink Approx Loc

Rock

CASS CO ELEC

Sig

n

30" CSP

CASS CO ELEC

Rock

24" C&G

Rock

36"

CS

P

Grass

Conc

Conc M

UNICIP

AL A

ppro

x L

oc

Municipal Approx LocConc

MUNICIPAL

24"

C&

G

Elec MH

Sw

Conc

Conc

15" RCP

MUNICIPAL Approx Loc

Conc

24" C&G

Broken

15"R

CP

36"

CS

P

EL (2)

MU

NICIP

AL A

ppro

x L

oc

18" R

CP

8" CI

Station

Lift

MUNICIPAL Approx Loc 52

52A

53A

55A

5554

55B

51A

LOT 1

1

10' Utility Easement

116 117 118 119

15" Conduit

15" Conduit

located at Chain PR32ND

Existing Profile 32nd Ave. South

116+00 117+00 118+00 119+00

906.35

908.12

908.38

908.64

908.94

909.27

909.62

909.90

910.25

910.63

911.01

911.43

911.88

912.37

912.86

913.36

913.91

914.46

915.02

Page 7: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

CCE05at own expenserelocate or adjustutility company to approx 2' fillElectric PedestalConflict with

for details and quantities

See Plan & Profile Sheet for Shared Use Path

for details and quantities

See Plan & Profile Sheet for SW Loop

Elev 906.50

O/s 111.9' Lt

Sta 120+48

Elev 906.85

O/s 137.1' Rt

Sta 120+65

Elev 906.60

O/s 139.4' Lt

Sta 123+31

Chain PR32ND

32nd Ave South Alignment

RE

MO

VE

RE

MO

VE

REMOVE

REMOVE

CCE04 & CCE05at own expenserelocate or adjustutility company to lowering grade by 1.3'Buried electric line,Conflict with

900

905

910

915

920

925

930

935

900

905

910

915

920

925

930

935

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/7/2016 mdockter R:\project\80029062.166\utilities\sheets\060PP_003.dgn3:07:56 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

IM-8-029(166)062

Plan & Profile

32nd Avenue South

Sta 119+20 to 125+00

13Inv 893.45

Rim 898.20

CBS

36" CSP

900.32Chnlk

CAS

S C

O E

LEC

30" C

SP

CASS CO ELEC

Elec Ped 906.19

1 CSFES (fair, N end)15" CSP (fair, skew)139' to N end23+34 (Chain: SCL32)

907.99

1 CSFES (fair, S end)15" CSP (fair, skew)128' to S end23+42 (Chain: SCL32)

Inv NW 902.00

Inv SW/NE 899.60

Rim 912.40

SD MH

18" R

CP

MUNICIPAL Approx Loc

CAS

S C

O E

LE

C

MUNICPAL

Planter

Conc

Conc

Conc Sw

Conc

Municipal Approx Loc

Conc

MU

NICIP

AL A

ppro

x L

oc

24" C&G

E Mtr

CA

SS C

O E

LE

C

24" C&G

24" C&G

24" C&G

EL

Elec MH

PPP 24" C

&G

MU

NICIP

AL M

UNICIP

AL Municipal Approx

Loc

Conc Sw Conc

6" Curb Traf Sig w/arm

Conc

Planter

MUNICIP

AL

28' Snow Gate

& Lht

w/arm

Traf Sig

Conc

Traf Sig w/arm Elec MH 24" C

&G

24" C

&G

24" C&G

Broken

Inv NE 917.63

Rim 922.58

CB

Inv SE 917.63

Rim 922.58

CB

Elec MH

30"

C&

G

PPP

w/arm

Traf Sig

Conc Sw Elec MH

6" Curb

Municipal Approx Loc

MUNICIPAL

24" C&G Municipal Approx Loc

Elec MH

Conc

MUNICIPAL

Conc

6" Curb

6" Curb24" C&G

Conc

24" C&G

24" C&G

Conc57A

59A

58B

58A56A

55A

55

9.51'119120 121 122 123 124

125

located at Chain PR32ND

Existing Profile 32nd Ave. South

119+00 120+00 121+00 122+00 123+00 124+00 125+00

913.91

914.46

915.02

915.60

916.25

916.74

917.37

917.86

918.46

919.11

919.79

920.28

920.73

921.16

921.61

922.04

922.48

922.29

922.59

922.93

923.29

923.70

924.04

924.36

924.66

924.97

925.26

925.53

925.81

926.05

926.26

926.46

926.66

Page 8: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

XE02at own expenserelocate or adjustutility company to Gas line, cuting 2.5'Conflict with

for removal quantities

See Plan & Profile Sheet for 32nd Ave

Chain PR32SWR

SW Ramp Alignment

for details and quantities

See Plan & Profile Sheet for SW Loop

900

905

910

915

920

925

930

935

900

905

910

915

920

925

930

935

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/7/2016 mdockter R:\project\80029062.166\utilities\sheets\060PP_008.dgn3:07:59 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

IM-8-029(166)062

Plan & Profile

SW Ramp

Sta 0+77.10 to 6+00

18

907.9

9

1 C

SF

ES (fair, S e

nd)

15"

CSP (fair, ske

w)

128' to S e

nd

23+42 (

Chain: S

CL32) PlanterE

lec M

H

MUNI

CIPAL

MUNICIPAL

M

unicipal Appro

x L

oc

Traf Sig w/arm

MU

NICIP

AL

28' Sno

w G

ate

Traf Sig w/arm

24" C

&G

24" C&G

24"

C&

G

Bro

ken

Inv N

E 9

17.6

3

Rim 9

22.5

8

CB

Inv S

E 9

17.6

3

Rim 9

22.5

8

CB

Elec M

H

30" C&G

w/arm

Traf Sig

Elec M

H

6"

Curb 2

4"

C&

G Elec MH 59

A

0

1

2

3

4

5

6

122

123

900

910

920

930

922.01

VPI 1+17.00

EL 920.67

L = 80.00'

VPI 4+37.00

EL 918.11

L = 340.00'

900

910

920

930

-2.4997%

-0.8004% -0.8004%

-2.1000%

located at Chain PR32SWR

Existing Profile

located at Chain PR32SWR

Proposed Profile SW Ramp

900

910

-+00 1+00 2+00 3+00 4+00 5+00 6+00850 9

22.48

922.49

922.01

922.01

921.90

921.97

921.90

921.81

921.70

921.64

921.56

921.38

921.14

920.88

920.62

920.05

918.66

917.08

914.66

912.39

910.33

907.85

906.15

905.37

904.60

903.86

903.34

903.15

902.81

902.57

902.50

902.37

1+00 2+00 3+00 4+00 5+00 6+00850 9

21.87

921.45

921.07

920.76

920.51

920.33

920.17

920.01

919.85

919.69

919.53

919.36

919.18

918.98

918.75

918.51

918.25

917.96

917.66

917.34

917.00

916.63

916.25

915.85

915.42

914.98

914.52

914.04

913.54

850

Page 9: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

XE02at own expenserelocate or adjustutility company to Gas line, cuting 2.5'Conflict with

Elev 899.25

O/s 55.0' Lt

Sta 10+26

Elev 899.00

O/s 40.0' Rt

Sta 10+26

Chain PR32SWR

SW Ramp Alignment

RE

MO

VE

CCE07at own expenserelocate or adjustutility company to lowering grade by 1.3'Buried electric line,Conflict with

890

895

900

905

910

915

920

925

890

895

900

905

910

915

920

925

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/7/2016 mdockter R:\project\80029062.166\utilities\sheets\060PP_009.dgn3:08:01 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

IM-8-029(166)062

Plan & Profile

SW Ramp

Sta 6+00 to 12+00

19

CenturyLink

899.87

CASS CO ELEC

901.50

(0.5' pipe se

paratio

n fro

m F

ES at b

oth en

ds)

2 RCFE

S (poor)

24" X 74' R

CP (poor, skew)

3282

+13 - 1

50' to

NE en

d

3281

+62 - 2

06' to SW end

Chain SCL

29

XLENER

904.38

904.38

Hdwl

6

7

8

9 10

11

12

VPI 9+80.00

EL 904.54

L = 500.00'

+0.1974%

-2.4997%

located at Chain PR32SWR

Existing Profile

located at Chain PR32SWR

Proposed Profile SW Ramp

located at Chain PR32SWR

Proposed Profile SW Ramp

6+00 7+00 8+00 9+00 10+00 11+00 12+00

902.57

902.50

902.37

902.07

901.78

901.56

901.41

901.29

901.54

901.50

901.47

901.71

902.03

902.62

902.84

903.47

904.33

903.71

903.84

903.97

904.25

904.25

904.14

904.34

904.49

904.65

904.76

904.94

905.10

905.14

905.17

905.19

905.23

6+00 7+00 8+00 9+00 10+00 11+00 12+00

914.52

914.04

913.54

913.04

912.54

912.04

911.54

911.04

910.54

910.06

909.60

909.17

908.76

908.36

907.99

907.64

907.32

907.01

906.73

906.46

906.22

906.00

905.81

905.63

905.47

905.34

905.23

905.14

905.07

905.03

905.00

905.00

905.01

Page 10: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

CCE08at own expenserelocate or adjustutility company to lowering grade by 1.5'Buried electric line,Conflict with

XE03at own expenserelocate or adjustutility company to Gas line, cutting 2.0''& 10" contrete replacing 12" base & 12" base Remove 8" pavement

XE04at own expenserelocate or adjustutility company to Gas line, cutting 1.6'Conflict with

Elev 900.50

O/s 81.4' Lt

Sta 13+97

Chain PR36S_NB

36th Street Alignment

890

895

900

905

910

915

920

925

890

895

900

905

910

915

920

925

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/7/2016 mdockter R:\project\80029062.166\utilities\sheets\060PP_018.dgn3:08:04 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

IM-8-029(166)062

Plan & Profile

36th Street - South of 32nd Ave

Sta 10+00 to 14+60

28

899.51

2 CSF

ES (g

ood)

30" X

130' C

SP (g

ood)

(Chain: S

CL29)

3284+3

7 - 40

8' Rt to SW

end

899.60

Water

902.29

902.56

Chnlk

16" PVC MUNICIPAL Approx Loc

FH

16" PVC

MUNICIPAL A

pprox Lo

c

EL

EL (3)

MIDCO

XLENER

E Mtr

Tel Ped (2)

EL

Century

Link Ap

prox Loc

Century Link Approx Loc

MIDCO

MIDCO

Riprap

Asph

CASS C

O E

LEC

XLENER

Century Link

Chnlk

16" PVC

CASS CO E

LEC

24"

Mtbl

24"

Mtbl

Curb Cut

2 PVCFE

S (goo

d)

18" X

60' PVC (

good)

(Chain: S

CL29)

3283+9

7 - 484' Rt to

SW end

Asph

Century Link

MIDCO

30"

C&

G

30"

C&

G

CASS C

O E

LE

C

Sign

Asph

30" C&G30"

C&G

ND

DO

T

69A

9

1011

12

13

14

906.66

VPI 10+80.00

EL 906.70

L = 60.00'

VPI 14+00.00

EL 908.00

L = 80.00'

+0.0500%

+0.0500% +0.4053% +0.4053%

+0.4053%

+0.8067%

located at Chain PR36S_NB

Proposed Profile 36th Street

located at Chain PR36S_NB

Existing Profile

9+00 10+00 11+00 12+00 13+00 14+00

906.61

906.62

906.62

906.62

906.64

906.66

906.69

906.70

906.68

906.69

906.70

906.68

906.66

906.69

906.70

906.71

906.71

906.72

906.78

906.85

906.89

906.94

907.02

907.14

907.28

907.44

907.60

907.76

907.93

908.15

9+00 10+00 11+00 12+00 13+00 14+00

906.66

906.67

906.68

906.70

906.73

906.79

906.87

906.95

907.03

907.11

907.19

907.27

907.35

907.43

907.51

907.59

907.68

907.76

907.84

907.93

908.04

908.17

908.32

908.48

908.65

Page 11: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

XE04at own expenserelocate or adjustutility company to Gas line, cutting 1.6'Conflict with

Elev 900.50

O/s 87.4' Lt

Sta 15+54

Chain PR36S_NB

36th Street Alignment

RE

MO

VE

RE

MO

VE

Project Limits

- IM-8-029(1

66)062

890

895

900

905

910

915

920

925

890

895

900

905

910

915

920

925

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

12/7/2016 mdockter R:\project\80029062.166\utilities\sheets\060PP_019.dgn3:08:06 PM

purposes.

implementation

construction or

and not for

is preliminary

This document

PRELIMINARY

60

IM-8-029(166)062

Plan & Profile

Sta 14+60 to 17+34.40

36th Street - South of 32nd Ave

29 900.02900.0

7

2 C

SF

ES (fa

ir)36" C

SP (fa

ir)37+49 (C

hain: S

CL32) - 9

8' Rt to S E

nd

37+57 (C

hain: S

CL32) - 1

06' Lt to N E

nd

900.1

2

XLE

NE

R

900.4

62 R

CF

ES (p

oor W

end)

15" R

CP (p

oor, s

ke

w)

136' Lt to W e

nd

37+73 (C

hain: S

CL32)

XLENER 901.0

5

900.5

2

1 R

CF

ES (p

oor)

15" R

CP (p

oor, s

ke

w)

141' Rt to W e

nd

37+63 (C

hain: S

CL32)

2 R

CF

ES (fa

ir E e

nd)

15" R

CP (fa

ir, ske

w)

85' Lt to E e

nd

39+50 (C

hain: S

CL32)

FH

CASS C

O E

LE

C

904.4

6

Chnlk

Appro

x L

oc

10" PVC M

UNICIP

AL

Riprap

MU

NICIP

AL A

ppro

x L

oc

FH

Rock

Inv 9

04.4

6Rim 9

05.2

5C

BR

MU

NICIP

AL

XLENER

2 C

SF

ES (fa

ir)36" C

SP (fa

ir)37+34 (C

hain: S

CL32)- 9

4' Rt to S E

nd

37+40 (C

hain: S

CL32) - 1

06' Lt to N E

nd

Century Link Approx Loc

MIDCO CASS C

O E

LE

C

20" D

IP

16" PVC MUNICIPAL

Century Link Approx Loc

16" PVC WG

V

FH

Approx Loc

E Mtr

24" C

&G

Inv W 9

01.8

7In

v E 9

01.8

7Rim 9

08.2

8C

BS

6" C

urb

Plugged

Tel V

ault MUNICIP

AL 15" RCP15" RCP Plug

ged

(Not F

ound)

SD M

H

MUNICIPAL 24" C&G

24" C&G

24" C

&G In

v N

E 9

05.2

8Rim 9

09.4

3C

BS M

HElec

PPP

TS

CB

PPP

24" Mtbl

& L

ht

w/arm

Traf Sig Century Link Approx Loc 30" C&G

24" C&G

Elec M

H

MH

Elec

Elec M

H

Traf Sig w/arm

& L

ht

w/arm

Traf Sig

24" C

&G

M

HElec

6" C

urb

Elec M

H

24" C

&G

MU

NICIP

AL

68

A

69

A

65

A

66

A

67

A

AD

DI

TI

ON

FI

RS

T

FO

RD

VA

LL

EY

15

16 17

18

137

138

139

VPI 14+00.00

EL 908.00

L = 80.00'

VPI 16+50.00

EL 910.02

L = 80.00'

VPI 17+33.75

EL 910.44

910.58

+0.8067%

+0.8067%

+0.8067%

+0.5000% +0.5000%

located at Chain PR36S_NB

Proposed Profile 36th Street

located at Chain PR36S_NB

Existing Profile

15+00 16+00 17+00 18+00

907.76

907.93

908.15

908.38

908.59

908.82

909.04

909.24

909.45

909.62

909.74

909.87

910.04

910.24

910.32

910.41

910.55

910.84

911.10

15+00 16+00 17+00

908.32

908.48

908.65

908.81

908.97

909.13

909.29

909.45

909.61

909.77

909.92

910.05

910.16

910.27

910.37

910.47

910.57

Page 12: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

115+80.00

890 890

900 900

910 910

920 920

116+00.00

890 890

900 900

910 910

920 920

116+25.00

900 900

910 910

920 920

116+50.00

32nd Ave

908.12

908.38

908.72

909.09

R/W E

xst

R/W E

xst

Te

mp E

smt

Te

mp E

smt

approximate

electric line

location

approximate

electric line

locationapproximate

electric line

location

approximate

fiber optic line

locationapproximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

R/W E

xst

Te

mp E

smt

Te

mp E

smt

sta 116+11.78

offset 123.06

elevation 904.20

curb inlet

sta 116+12.08

offset -55.15

elevation 908.56

std light pole

approximate

electric line

location

approximate

electric line

locationapproximate

electric line

location

approximate

electric line

crossing

approximate

electric line

crossing

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

R/W E

xst

Te

mp E

smt

Te

mp E

smt

sta 116+15.50

offset 72.20

elevation 907.95

std light polesta 116+34.76

offset -107.85

elevation 904.41

std light pole

sta 116+23.51

offset -38.09

elevation 908.10

manhole electric or unidentified

approximate

electric line

location

approximate

electric line

locationapproximate

electric line

location

approximate

fiber optic line

locationapproximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

R/W E

xst

Te

mp E

smt

Te

mp E

smt

sta 116+51.28

offset 113.78

elevation 905.30

std light pole

approximate

electric line

location

approximate

electric line

locationapproximate

electric line

location

approximate

fiber optic line

location approximate

fiber optic line

location

approximate

gas line

location

200

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:27:22 PM

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. IM-8-029(166)062 XS 1

Page 13: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

116+75.00

900 900

910 910

920 920

117+00.00

900 900

910 910

920 920

117+45.00

900 900

910 910

920 920

117+75.00

32nd Ave

909.54

909.90

910.72

911.32

sta 117+61.20

R/W E

xst

R/W E

xst

Te

mp E

smt

Te

mp E

smt

approximate

electric line

location

approximate

electric line

locationapproximate

electric line

location

approximate

fiber optic line

location approximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

R/W E

xst

Te

mp E

smt

Te

mp E

smt

sta 117+19.04

offset 135.10

elevation 905.41

std light pole

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

fiber optic line

locationapproximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

R/W E

xst

Te

mp E

smt

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

R/W E

xst

Te

mp E

smt

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

fiber optic line

location

approximate

gas line

location

200

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:27:24 PM

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. IM-8-029(166)062 XS 2

Page 14: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

890 890

900 900

910 910

920 920

930 930

118+00.00

900 900

910 910

920 920

930 930

118+25.00

900 900

910 910

920 920

930 930

118+41.00

32nd Ave

911.88

912.49

912.88

R/W E

xst

R/W E

xst

Te

mp E

smt

sta 118+07.78

offset -55.47

elevation 911.94

std light pole

sta 117+91.83

offset -100.33

elevation 904.77

std light pole

sta 118+10.09

offset 74.67

elevation 911.76

std light pole

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

electric line

crossing

approximate

electric line

crossing

approximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

Te

mp E

smt

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

Te

mp E

smt

Wetland D

elineate

d

Wetland D

elineate

d

sta 118+40.94

offset -39.67

elevation 911.88

curb inlet

sta 118+40.62

offset 75.45

elevation 912.16

manhole storm

sta 118+41.02

offset -53.75

elevation 912.64

manhole storm

sta 118+39.38

offset 69.19

elevation 911.61

curb inlet

sta 118+41.10

offset -60.52electric pedestal

sta 118+50.34

offset -61.35

electric pedestal

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

fiber optic line

location

200

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:27:27 PM

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. IM-8-029(166)062 XS 3

Page 15: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

930 930

118+60.00

900 900

910 910

920 920

118+83.00

900 900

910 910

920 920

119+00.00

890 890

900 900

910 910

920 920

119+25.00

32nd Ave

913.36

913.99

914.46

915.16

R/W E

xst

Te

mp E

smt

Wetland D

elineate

d

Wetland D

elineate

d

sta 118+65.37

offset -67.28

elevation 912.40

manhole storm

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

fiber optic line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

fiber optic line

location

Wetland D

elineate

d

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

fiber optic line

location

Wetland D

elineate

d

sta 119+32.94

offset -143.85

elevation 898.20

curb inlet

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

approximate

electric line

crossing

approximate

electric line

crossing

approximate

fiber optic line

location

200

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:27:30 PM

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted. IM-8-029(166)062 XS 4

Page 16: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

930 930

14+50.00

890 890

900 900

910 910

920 920

930 930

14+75.00

900 900

910 910

920 920

15+00.00

900 900

910 910

920 920

15+25.00

TrailXS19

910.90

910.36

909.83

909.41

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

electric line

location

Wetland D

elineate

d

Wetland D

elineate

d

sta 14+77.61

offset 52.08

elevation 917.23

std light pole

sta 14+66.09

offset -56.79

elevation 898.20

curb inlet

approximate

electric line

location

approximate

electric line

location

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

electric line

location

Wetland D

elineate

d

Wetland D

elineate

d

sta 15+22.52

approximate

electric line

location

approximate

electric line

location

approximate

electric line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:28:14 PM

200IM-8-029(166)062All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

Page 17: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

5+25.00

900 900

910 910

920 920

5+50.00

900 900

910 910

920 920

5+75.00

900 900

910 910

920 920

6+00.00

SW RampXS27

915.74

915.20

914.64

914.04

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:28:37 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062

Page 18: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

6+25.00

900 900

910 910

920 920

6+50.00

900 900

910 910

920 920

6+75.00

900 900

910 910

920 920

7+00.00

SW RampXS28

913.41

912.79

912.16

911.54

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:28:39 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062

Page 19: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

7+25.00

900 900

910 910

920 920

7+50.00

900 900

910 910

920 920

7+75.00

900 900

910 910

920 920

8+00.00

SW RampXS29

910.91

910.30

909.72

909.17

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

gas line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:28:42 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062

Page 20: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

8+25.00

900 900

910 910

920 920

8+50.00

900 900

910 910

920 920

8+75.00

900 900

910 910

920 920

9+00.00

SW RampXS30

908.66

908.18

907.73

907.32

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

gas line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:28:45 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062

Page 21: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

9+25.00

900 900

910 910

920 920

9+50.00

900 900

910 910

920 920

9+75.00

900 900

910 910

920 920

10+00.00

SW RampXS31

906.94

906.59

906.28

906.00

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

locationapproximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

locationapproximate

gas line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

gas line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:28:48 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062

Page 22: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

10+25.00

900 900

910 910

920 920

10+50.00

890 890

900 900

910 910

920 920

10+75.00

880 880

890 890

900 900

910 910

920 920

11+00.00

SW RampXS32

905.76

905.55

905.37

905.23

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location approximate

gas line

location

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

locationapproximate

gas line

location

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

gas line

location

Wetland D

elineate

d

Wetland D

elineate

d

sta 0+68.14

offset 776.68

elevation 904.38

std light pole

sta 0+97.16

offset 812.05

elevation 903.20

curb inlet

sta 0+72.01

offset 916.59

elevation 905.44

std light pole

sta 0+97.77

offset 912.39

elevation 904.08

curb inlet

approximate

electric line

location

approximate

fiber optic line

locationapproximate

gas line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:28:51 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062

Page 23: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

890 890

900 900

910 910

920 920

11+00.00

900 900

910 910

920 920

11+25.00

890 890

900 900

910 910

920 920

11+50.00

900 900

910 910

920 920

11+75.00

36th St SXS45

906.79

906.89

906.99

907.09

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

sta 11+05.61

offset 49.52

elevation 904.75

std light pole

approximate

electric line

location

approximate

fiber optic line

location

approximate

TV line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

TV line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

sta 11+58.89

offset 56.91

elevation 904.66

std light pole

sta 11+59.46

offset 56.02

elevation 904.70

std light pole

approximate

electric line

location

approximate

fiber optic line

location

approximate

TV line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

TV line

location

approximate

gas line

location

approximate

water line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:29:41 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062

Page 24: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

890 890

900 900

910 910

920 920

12+00.00

900 900

910 910

920 920

12+25.00

890 890

900 900

910 910

920 920

12+50.00

900 900

910 910

920 920

12+75.00

36th St SXS46

907.19

907.29

907.39

907.49

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

sta 12+10.80

offset 59.75

elevation 904.61

std light pole

approximate

electric line

location

approximate

fiber optic line

location

approximate

TV line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

sta 12+20.95

offset 57.30

elevation 904.00

water gate valve

approximate

fiber optic line

location

approximate

TV line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

sta 12+61.40

offset 60.22

elevation 904.89

std light pole

approximate

fiber optic line

location

approximate

TV line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

sta 12+82.69

offset 73.62

elevation 904.64

telephone pedestal

sta 12+84.77

offset 73.01

elevation 904.44

telephone pedestal

approximate

electric line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

TV line

location

approximate

gas line

locationapproximate

water line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:29:44 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062

Page 25: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

13+00.00

900 900

910 910

920 920

13+25.00

900 900

910 910

920 920

13+55.00

900 900

910 910

920 920

14+00.00

36th St SXS47

907.59

907.70

907.82

908.04

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

TV line

locationapproximate

gas line

locationapproximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

sta 13+16.75

offset 77.85

elevation 905.54

std light pole

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

TV line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

dsta 13+67.11

offset 81.08

elevation 906.10

std light pole

sta 13+41.15

offset 57.14

elevation 907.71

water gate valve

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

TV line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Te

mp E

smt

Wetland D

elineate

d

Wetland D

elineate

d

sta 13+78.12

offset 109.98

elevation 906.70

water gate valve

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

TV line

location

approximate

gas line

location

approximate

water line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:29:47 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062

Page 26: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

14+45.00

900 900

910 910

920 920

14+75.00

900 900

910 910

920 920

15+00.00

900 900

910 910

920 920

15+25.00

36th St SXS48

908.36

908.61

908.81

909.01

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

telephone line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

gas line

location

approximate

water line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:29:50 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062

Page 27: 1 Cross Approx. State, Section Approx. Sta. Approx ... 19...Conflict Summary Sheet for I-29 and 32nd ave interchange only.xls Item # Location Cross Section Sht # Approx. Sta. From

00

00

2020

2020

4040

4040

6060

6060

8080

8080

100100

100100

120120

120120

140140

140140

160160

160160

180180

180180

200200

200200

220

220

900 900

910 910

920 920

15+50.00

900 900

910 910

920 920

15+75.00

900 900

910 910

920 920

930 930

16+00.00

900 900

910 910

920 920

16+25.00

36th St SXS49

909.21

909.41

909.61

909.81

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

gas line

location

approximate

water line

location

R/W E

xst

Wetland D

elineate

d

Wetland D

elineate

d

approximate

electric line

location

approximate

electric line

location

approximate

fiber optic line

location

approximate

fiber optic line

location

approximate

telephone line

location

approximate

gas line

location

approximate

water line

location

STATE PROJECT NO.

ND

NO.

SHEET

NO.

SECTION

11/17/2016 mdockter R:\project\80029062.166\utilities\lxsec utility 1.dgn2:29:52 PM

200All facility locations shown are approximate. Actual locations and depths may vary. Facilities may or may not have been relocated and/or adjusted.

PRELIMINARY - THIS DOCUMENT IS PRELIMINARY AND NOT FOR CONSTRUCTION OR IMPLEMENATATION PURPOSES

IM-8-029(166)062