13
1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

Embed Size (px)

Citation preview

Page 1: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

1

Cross Border Intraday on the North Italian Borders

Interim solution – Scheduling

ForumRome, 13th March 2012

Page 2: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

2

The nominations gate for using of the intraday capacity are the following:

•XBID1 : 15:10 - 15:30 on D-1

•XBID2 : 12:15 - 12:35 on D

France-Italian and Swiss-Italian borders

Terna will be the single point of contact for the nominations of the intraday capacity.

Nominations have to be done only to the scheduling system of Terna.

Moreover, due to IT requirements on RTE side, an intraday IT transaction has to be asked by MPs, as stated in RTE Nomination Rules (so called Import/Export Rules).

Austrian-Italian and Slovenian-Italian borders

Nominations have to be done to both TSOs.

Lower value rule will be applied in case of mismatch.

XB ID Interim solution on the North Italian Borders - SchedulingIntroduction

Page 3: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

3

Terna will continue to use the same scheduling system (DAMAS) also for the nominations of the intraday capacity.

The modalities to enter the nominations remain the same:

Web form

Client Application

Web Service

A new Contract Type will be introduced for the Intraday nominations: A07

Dedicated UPV/UCV will be used for the two sessions of Intraday: UPV_TSOIcodSDCZ

The Italian Congestion Management Rules will be updated after the approval of the Cross-border Intraday Capacity Auction Rules.

XB ID Interim solution on the North Italian Borders - SchedulingScheduling system of Terna

Page 4: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

4

Market Party Entitled

TERNA ELES

Nom

inatio

n

CAI: X01Capacity: 10 MW

PA

s

CAI: X01Capacity: 10 MWMatching

Registration

PAsNomination

CAI: X01Capacity: 10 MW

Auctions

CAI: X01Capacity: 10 MWMatched: 2 MW

Nominated: 2 MW

Nominated: 5 MW

Programming Authorizations (PAs)

XB ID Interim solution on the North Italian BordersExchange flows on Slovenian-Italian border

Lower value rule applied in case of mismatch

Page 5: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

5

Market Party Entitled

TERNA RTE

Nom

inatio

n

CAI: X01Capacity: 10 MW

PA

s

CAI: X01Capacity: 10 MW

Registration

PAs

CAI: X01Capacity: 10 MW

Auctions

CAI: X01Capacity: 10 MWNominated: 2 MW

Nominated: 2 MW

Nominated: 2 MW

Programming Authorizations (PAs)

XB ID Interim solution on the North Italian BordersExchange flows on France-Italian border

Nominations

Page 6: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

6

07:00 11:00 12:00 13:00 15:00 16:00

07:00Nomination Gate:Y/M PTR schedules

12:45Nomination Gate

Day Ahead schedules,Cut Off Time at 13:30

Until 12:45Nominations to Terna:

Daily PTRs with CAINominations to Swissgrid:

Total netted, as today

Until 07:00Nominations to Terna and

Swissgrid:Y/M/LTC PTRs with CAI

as today

10:40Receiving of Daily

ProgrammingAuthorizations

CH<->IT

*Details can be found in New version of the “Technical Balance Group Regulations” of Swissgrid

15:00Receiving of Intraday 1

ProgrammingAuthorizations

CH<->IT

15:30Nomination Gate

and Cut Off Time:Intraday 1 schedules

Until 15:30Nominations to Terna:

Intraday 1 PTRs with CAINo Nominations

at Swissgrid*

15:45Receiving of modified or imposed

Time Series (with Intraday 1Nominations made at Terna)

from Swissgrid *

15:10Results from

MI 2Market in IT

XB ID Interim solution on the North Italian Borders - SchedulingScheduling process on Swiss-Italian border - Day D-1

Page 7: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

7

10:00 11:00 12:00 13:00

10:25 – 10:40Intraday 2 Auction CH-IT

*Details can be found in New version of the “Technical Balance Group Regulations” of Swissgrid

11:40Receiving of Intraday 2

ProgrammingAuthorizations

CH<->IT

12:35Nomination Gateand Cut Off Time:

Intraday 2 schedules

Until 12:35Nominations to Terna:

Intraday 2 PTRs with CAINo Nominations

at Swissgrid*

12:50Receiving of modified or imposed

Time Series with Intraday 2Nominations made at Terna

from Swissgrid *

12:15Results from

MI 4Market in IT

XB ID Interim solution on the North Italian Borders - SchedulingScheduling process on Swiss-Italian border - Day D

Page 8: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

8

For using Intraday Capacity CH-IT, nominations at Swissgrid are not required

The BG-R will get an modified or imposed Time Series on his day ahead A:A relationship Nominations in an Intermediate Confirmation Report (ICNF) from Swissgrid after receiving the intraday CAS from Terna.

This modified or imposed Time Series has to be included in all further intraday schedule messages sending to Swissgrid for this specific day.

New Version of the “Technical Balance Group Regulations” will be placed on Swissgrid Website in April 2012

This new version of the “Technical Balance Group Regulations” will come into force on the 30th of Mai 2012 at the expected go-live date of this ID CH-IT project

XB ID Interim solution on the North Italian Borders - SchedulingScheduling - Changes for Swiss Balancing Groups

Page 9: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

9

APG and Terna are working together to change the matching process of the scheduling on their common border.

The new matching process is based on the SO-SO approach defined by the UCTE (now ENTSO-E) and already in use in the Central-East Europe region.

The intra-day mechanism on this border will start only after the implementation of the new matching process. The date of the go-live is expected by the end of 2012.

Further information about the new matching process and the intraday mechanism will be provided in due time before the go-live.

The SO-SO matching approach will be extended in a second step also on Slovenian-Italian border

XB ID Interim solution on the North Italian Borders - SchedulingScheduling on Austrian-Italian border

Page 10: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

10

Thank you for your attention !!

Questions and answers

Page 11: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

11

Back Up

Page 12: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

12

XB ID Interim solution on the North Italian Borders - SchedulingScheduling – Example with modified Time Series, only A:A

Swissgrid BG-R TERNA

Y/M/D NominationsTotal aggregated and netted,

with an A:A releationship

Matching (Export leading, as today)Correction Cycle from 12:45 to 13:30

Sending of CAS (only A:A relationships updated)

12:45-13:30

12:00

15:45

D-1

Daily Nominationswith CAI

Intraday 1 Nominationswith CAI, Contract Type A0715:20

ICNF with an modified TS for the A:A relationsship

15:40

CNF

18:30

Sending of a new schedule with intraday TS for CH-DE, the modified TS for the A:A relationsship CH-IT

has to be included, else the TS CH-IT will be rejected

ICNF CNF

Page 13: 1 Cross Border Intraday on the North Italian Borders Interim solution – Scheduling Forum Rome, 13 th March 2012

13

XB ID Interim solution on the North Italian Borders - SchedulingScheduling – Example with imposed Time Series, only A:A

Swissgrid BG-R TERNA

Y/M/D NominationsTotal aggregated and netted,without an A:A releationship

Matching (Export leading, as today)Correction Cycle from 12:45 to 13:30

Sending of CAS (with a new A:A relationships)

12:45-13:30

12:00

15:45

D-1

Daily Nominationswith CAI

Intraday 1 Nominationswith CAI, Contract Type A0715:20

ICNF Total with an imposed TS for the new A:A relationsship

15:40

CNF

18:30

Sending of a new schedule with intraday TS for CH-DE, the imposed

TS for the new A:A relationsship CH-IT has to be included, else the whole schedule message will be

rejected

ICNF CNF