Economic Inclusion UpdateReporting Period: July 1, 2009 – December 31, 2009
Submitted: May 31, 2010
1
Third Party Monitoring & Compliance Verification
2
3
Name of Project Summary Owner Awards To Date
John G. Rangos Bldg. First Lab Bldg. FC-NEBP $54.1 MillionMBE $14.7million (27%)WBE $ 4.2 million (8% )
Phase 1 Parking Lot A Site Prep
Pre-ConstructionPreparation
FC-NEBP $271,000MBE 100%
Phase 1 Parking Lot B Site Prep
Pre-ConstructionPreparation
FC-NEBP $386,000MBE 100%
Shelter DevelopmentPark View at Ashland Terrace – 74 units
Residential ApartmentsAshland Commons – 78 units
FC-NEBP $12.5 Million MBE $4.2 million (34%)WBE $855,207 (7%)
Pennrose DevelopmentChapel Green – 63 units
Townhomes FC-NEBP $12.1 Million MBE $6.9 million (57%) WBE $847,930 (7%)
EBDI Demolition 500 Houses EBDI $11.1 Million MBE $11million (99%) WBE $85,000 (1%)
McDonough Mews Townhomes
EBDI $1.26 Million*MBE $587,665 (47%)WBE $39,990 (3%)
3
Summary of Design and Construction Projects Verified To Date (Completed)
4
Summary of Design & Construction Projects Verified To Date (On-Hold)
Name of Project Summary Owner Awards To Date
A&R DevelopmentTownes at Eager – 49 total units
Townhomes FC-NEBP $9 MillionMBE $2.3 million (26%)WBE $350,000 (4%)
L2 Building Schematic Design FC-NEBP $2.5 MillionMBE $ 87,315 (4%)*WBE $ 29,000 (1%)*
4
*The current record reflects three companies for which the documentations are available.
5
Summary of EBDI Professional & Other Services Contracts Verified To Date
AS OF DECEMBER 31, 2009
Summary For Professional Services Projects (Total)
Total Contract Awards to Date:
December 2009$11,787,028.89*
Participation
Professional Services Goal Difference
MBE $1,408,551.62 11.95% 17% +5.05%
WBE $2,795,535.50 23.72% 9% +14.72%
TOTAL $4,204,087.12 35.67% 26% +9.67%
LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE
MLBE $781,510.62 6.63%
WLBE $235,685.00 2.00%
LBE $2,199,215.46 18.66%
TOTAL LOCAL $3,216,411.08 27.29%
NON-MBE/WBE and NON LOCAL Firms
$5,383,726.31 45.68%
*The amount excludes those on hold but includes the projects without contract issued.
6
Summary of EBDI Professional & Other Services Contracts Verified To Date
COMPLETED AS OF DECEMBER 31, 2009
Summary For Professional Services Projects (Completed)
Total Contract Awards to Date:
December 2009$7,014,507.39*
Participation
Professional Services Goal Difference
MBE $1,113,401.62 15.87% 17% -1.13%
WBE $244,198.00 3.48% 9% -5.52%
TOTAL $1,357,599.62 19.35% 26% -6.65%
LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE
MLBE $711,510.62 10.14%
WLBE $185,685.00 2.65%
LBE $1,370,376.11 19.54%
TOTAL LOCAL $2,267,571.73 32.32%
NON-MBE/WBE and NON LOCAL Firms
$4,286,531.66 61.11%
*The amount excludes those on hold but includes the projects without contract issued.
7
Summary of EBDI Professional & Other Services Contracts Verified To Date
ACTIVE AS OF DECEMBER 31, 2009
Summary For Professional Services Projects (Active)
Total Contract Awards to Date:
December 2009$4,772,521.50*
Participation
Professional Services Goal Difference
MBE $295,150.00 6.18% 17% -10.82%
WBE $2,511,337.50 52.62% 9% +43.62%
TOTAL $2,846,487.50 59.64% 26% +33.64%
LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE
MLBE $70,000.00 1.47%
WLBE $50,000.00 1.05%
LBE $828,839.35 17.37%
TOTAL LOCAL $948,839.35 19.88%
NON-MBE/WBE and NON LOCAL Firms
$1,097,194.65 22.99%
*The amount excludes those on hold but includes the projects without contract issued.
8
Summary Of Accomplishments To Date
• Total Dollars Awarded to Date: $127.8 million– Design Contracts Awarded to M/WBE: $3.9 million out of $16.3 million (24%)
– Construction Contracts Awarded to M/WBE: $45.7 million out of $99.7 million (46%)
– EBDI Professional Services Contracts Awarded to M/WBE: $4.2 million out of 11.8 million (36%)
• In the aggregate, EBDI’s activities have produced over $53.8 million to M/WBE enterprises. (42%)
• Because of enhanced competitiveness and demonstrated capacity and ability, many participating M/WBEs have obtained additional work to support business growth and job creation.
• Approximately 57 percent of employment hours have involved minorities and/or females.
• The workforce has consisted of 1,641 workers, of whom over 15 percent (253) were local area residents and more than 40 percent (664; inclusive of 253) were Baltimore City residents.
8
9
Accomplishments Compared to Project Goals
Design Services as of December 31, 2009
Total Design
Awards M / WBE Awards
% GOAL Difference
MBE $2,452,701 15.01% 21.00% -5.99%
WBE $16,339,056
$1,450,482 8.88% 13.00% -4.12%
Total $3,903,183 23.89% 34.00% -10.11%
Construction Contracts as of December 31, 2009
Total
Construction Awards
M / WBE Awards
% GOAL Difference
MBE $40,389,707 40.50% 27.00% 13.50%
WBE $99,739,563
$5,267,654 5.28% 8.00% -2.72%
Total $45,657,361 45.78% 35.00% 10.78%
9
EBDI Professional Services Contracts as of December 31, 2009
Total
Construction Awards
M / WBE Awards
% GOAL Difference
MBE $1,408,552 11.95% 17.00% -5.05%
WBE $11,787,029
$2,795,536 23.72% 9.00% 14.72%
Total $4,204,087 35.67% 26.00% 9.67%
10
EMPLOYMENT HOURSTOTAL PROJECT
AS OF DECEMBER 31, 2009
SITE EMPLOYMENT HOURSPROJECT TOTALJUNE 30, 2009
PROJECT TOTALDECEMBER 31, 2009
TOTAL SKILLED WORKERS 322,009.56 353,961.43
Minority Male 147,889.75 45.93% 168,516.80 47.61%
Minority Female 0.00 0.00% 5,662.50 1.60%
Non- Minority Female 693.00 0.22% 693.00 0.20%
TOTAL MINORITY/FEMALE SKILLED WORKERS
148,582.75 46.14% 174,872.30 49.40%
TOTAL LABORERS 84,545.11 87,814.36
Minority Male 71,759.00 84.88% 74,632.50 84.99%
Minority Female 2,366.25 2.80% 2,366.25 2.69%
Non- Minority Female 2.00 0.00% 320.00 0.36%
TOTAL MINORITY/FEMALE LABORERS 74,127.25 87.68% 77,318.75 88.05%
TOTAL SKILLED & LABORERS 406,554.67 441,775.79
Minority Male 219,648.75 54.03% 243,149.30 55.04%
Minority Female 2,366.25 0.58% 8,028.75 1.82%
Non- Minority Female 695.00 0.17% 1,013.00 0.23%
TOTAL MINORITY/FEMALE SKILLED & LABORERS 222,710.00 54.78% 252,191.05 57.09%
PROJECT GOAL15%
ACHIEVED TO DATE57.09%
DIFFERENCE+42.0
9%
10
11
SITE WORKFORCEPROJECT TOTAL
JUNE 2009PROJECT TOTALDECEMBER 2009
DIFFERENCE SINCE JUNE 2009
Total Non-Minority Male 717 45.73% 732 44.61% +15 +2.43%
Total Minority Male 841 53.64% 882 53.75% +41 +4.88%
Total Minority Female 7 0.45% 24 1.46% +17 +242.86%
Non-Minority Female 3 0.19% 3 0.18% 0 0%
TOTAL 1,568 100.00% 1,641 100.00% +73 +4.66%
Total Area Residents
21202, 21205, 21206, 21213, 21218 and 21237 236 15.05% 253 15.42% +17 +7.20%
Total Baltimore City Residents 609 38.84% 664 40.46% +55 +9.03%
Average Hours Average WeeksAverage
Wage/hour
Majority Male 259.35 6.38 $27.09
Minority Male 275.68 6.54 $17.95
Minority Female 334.53 2.46 $7.53
Non-Minority Female 337.67 9.12 $18.07
EMPLOYMENT – Head CountTOTAL PROJECT
AS OF DECEMBER 31, 2009
11
Details for Active Projects
12
13
CONTRACTSA & R DEVELOPMENT
AS OF DECEMBER 31, 2009
Design Summary For The Townes at EagerTotal Project
Awards to
Date:
Previous ReportJUNE 2009$8,589,424
Participation
Current ReportDECEMBER
2009$8,589,424
Participation
Total ProjectValue
$9,000,154
Change from Last
Report
$1,197,105 13.93% $1,197,105 13.93% Design Goal Difference 0.00%
MBE
$372,796 31.14% $372,796 31.14% 21% +10.14% 0.00%
WBE
$6,290 0.53% $6,290 0.53% 13% -12.47% 0.00%
TOTAL $379,086 31.67% $379,086 31.67% 34% -2.33% 0.00%
LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE
MLBE $372,796 65.47% $372,796 65.47% 0.00%
WLBE $0 0.00% $0 0.00% 0.00%
LBE $7,090 1.25% $7,090 1.25% 0.00%
TOTAL LOCAL $379,886 66.71% $379,886 66.71% 0.00%
NON-MBE/WBE & NON LOCAL Firms
$810,930 8.29% $810,930 8.29% 0.00%
% OF PROJECT COMPLETED: 20.22% No change since June 2009 (Project is on hold)
14
CONTRACTSA & R DEVELOPMENT
AS OF DECEMBER 31, 2009
Construction Summary For The Townes at EagerTotal
Project Awards to
Date:
Previous Report
JUNE 2009$8,589,424
Participation
Current ReportDECEMBER
2009$8,589,424
Participation
Total ProjectValue
$9,000,154
Change from Last Report
$7,394,299 86.09% $7,394,299 86.09%Construction
GoalsDifference 0.00%
MBE
$1,954,267 26.43% $1,954,267 26.43% 27% -0.57% 0.00%
WBE
$346,450 4.69% $346,450 4.69% 8% -3.31% 0.00%
TOTAL $2,300,717 31.11% $2,300,717 31.11% 35% -3.89% 0.00%
LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE
MLBE
$1,804,970 24.41% $1,804,970 24.41% 0.00%
WLBE $0 0.00% $0 0.00% 0.00%
LBE $0 0.00% $0 0.00% 0.00%
TOTAL LOCAL $1,804,970 24.41% $1,804,97 24.41% 0.00%
NON-MBE/WBE & NON LOCAL
Firms$5,093,582 68.89% $5,093,582 68.89% 0.00%
% OF PROJECT COMPLETED: 20.22%
15
EMPLOYMENT HOURS A & R DEVELOPMENT - TOWNHOMES AT EAGER
AS OF DECEMBER, 2009
15
16
SITE WORKFORCEPROJECT TOTAL
JUNE 2009PROJECT TOTALDECEMBER 2009
Change since June 2009
Total Non-Minority Male 16 57.14% 19 61.29% +3 +18.8%
Total Minority Male 12 42.86% 12 38.71% +0 +0.00%
Total Minority Female 0 0.00% 0 0.00% +0 +0.00%
Non-Minority Female 0 0.00% 0 0.00% +0 +0.00%
TOTAL 28 100.00% 31 100.00% +3 +10.71%
Total Area Residents
21202, 21205, 21206, 21213, 21218 and 21237
6 21.43% 7 22.58% +1 +16.67%
Total Baltimore City Residents
6 0.00% 7 22.58% +1+16.67
%
EMPLOYMENT – Head CountA & R DEVELOPMENT - TOWNHOMES AT EAGER
AS OF DECEMBER 31, 2009
17
CONTRACTSL-2 DEVELOPMENT- LIFE SCIENCE BUILDING
AS OF DECEMBER 31, 2009
Design Summary For Life Science Building
Total Project Awards to Date:
DECEMBER 2009$2,454,750*
Design $2,454,750 ParticipationDesignGoal
Difference
MBE $87,315 3.56% 21% -17.44%
WBE $29,000 1.18% 13% -11.82%
TOTAL $116,315 4.74% 34% -29.26%
LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE
MLBE $0 0.00%
WLBE $29,000 1.18%
LBE $0 0.00%
TOTAL LOCAL $29,000 1.18%
NON-MBE/WBE and NON LOCAL Firms
$0 0.00%
*The total award to date reflects awards to the three contractors for whom the documentations are available.
18
CONTRACTSTHE MICHAEL GROUP
AS OF DECEMBER 31, 2009Design Summary For McDonough Mews
Total Project Awards to Date:
Previous ReportJUNE 2009$2,407,136
Participation
Current ReportDECEMBER
2009$1,261,373
Participation Change from
Last Report
Design $64,600 2.68% $64,600 5.12%DesignGoal
Difference
0.00%
MBE
$0 0.00% $64,600 100.00% 21% +79.00% n.a.
WBE
$64,600 100.00% $0 0.00% 13% -13.00% -100%
TOTAL $64,600 100.00% $64,600 100.00% 34% +66.00% 0.00%
LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE
MLBE
$0 0.00% $64,600 100.00% n.a.
WLBE $64,000 100.00% $0 0.00% -100%
LBE $0 0.00% $0 0.00% 0.00%
TOTAL LOCAL $64,000 100.00% $64,600 100.00% 0.00%
NON-MBE/WBE and
NON LOCAL Firms$0 0.00% $0 0.00% 0.00%
PROJECT 100% COMPLETED
19
CONTRACTS THE MICHAEL GROUP
AS OF DECEMBER 31, 2009Construction Summary For McDonough Mews
Total Project Awards to Date:
Previous ReportJUNE 2009
$2,407,136
Participation
Current Report
DECEMBER 2009
$1,261,373
Participation
Change from Last
Report
Construction $2,342,536 97.32% $1,196,773 94.88%Construction
GoalDifference -48.91%
MBE
$504,065 21.52% $523,065 43.71% 27% 16.71% +3.77%
WBE
$19,000 0.81% $39,990 3.34% 8% -4.66% +110.47%
TOTAL $523,065 22.33% $563,055 47.05% 35% +12.05% +7.65%
LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE
MLBE $386,790 16.51% $386,790 32.32% 0.00%
WLBE $0 0.00% $0 0.00% 0.00%
LBE $1,779,481 75.96% $633,718 52.95% -64.39%
TOTAL LOCAL $2,166,271 92.48% $1,020,508 85.27% -52.89%
NON-MBE/WBE and
NON LOCAL Firms$39,990 1.71% $0.00 $0.00 -100.0%
PROJECT 100% COMPLETED
20
EMPLOYMENT HOURS THE MICHAEL GROUP – McDONOUGH MEWS
AS OF DECEMBER, 2009
SITE EMPLOYMENT HOURSPROJECT TOTALJUNE 30, 2009
PROJECT TOTALDECEMBER 31, 2009
TOTAL SKILLED WORKERS 93.50 93.50
Minority Male 93.50 100.00% 93.50 100.00%
Minority Female 0.00 0.00% 0.00 0.00%
Non- Minority Female 0.00 0.00% 0.00 0.00%
TOTAL MINORITY/FEMALE SKILLED WORKERS 93.50 100.00% 93.50 100.00%
TOTAL LABORERS 642.00 642.00
Minority Male 642.00 100.00% 642.00 100.00%
Minority Female 0.00 0.00% 0.00 0.00%
Non- Minority Female 0.00 0.00% 0.00 0.00%
TOTAL MINORITY/FEMALE LABORERS 642.00 100.00% 642.00 100.00%
TOTAL SKILLED & LABORERS 735.50 735.50
Minority Male 735.50 100.00% 735.50 100.00%
Minority Female 0.00 0.00% 0.00 0.00%
Non- Minority Female 0.00 0.00% 0.00 0.00%
TOTAL MINORITY/FEMALE SKILLED & LABORERS 735.50 100.00% 735.50 100.00%
PROJECT GOAL15%
ACHIEVED TO DATE100%
DIFFERENCE+85.00%
% OF PROJECT COMPLETED: 100%
20
21
SITE WORKFORCEPROJECT TOTAL
JUNE 2009PROJECT TOTALDECEMBER 2009
Total Non-Minority Male 0 0.00% 0 0.00%
Total Minority Male 27 100.00% 27 100.00%
Total Minority Female 0 0.00% 0 0.00%
Non-Minority Female 0 0.00% 0 0.00%
TOTAL 27 100.00% 27 100.00%
Total Area Residents 9 33.33% 9 33.33%
21202, 21205, 21206, 21213, 21218 and 21237
Total Baltimore City Residents 10 37.04% 10 37.04%
PROJECT 100% COMPLETE
EMPLOYMENT – Head CountTHE MICHAEL GROUP – McDONOUGH MEWS
AS OF DECEMBER 30, 2009
22
CONTRACTSPENNROSE DEVELOPMENT
AS OF DECEMBER 31, 2009
Design Summary For the Pennrose– CHAPEL GREEN
Total Project Awards to Date:
Previous Report
JUNE 2009$12,092,442
Participation
Current ReportDECEMBER
2009$12,092,442
Participation
Total Projec
tValue
$15,350,000
Change since June
Report
Design $1,411,538 11.67% $1,411,538 11.67%Design
GoalDifferenc
e0.00%
MBE
$333,477 23.63% $333,477 23.63% 21% +2.63% 0.00%
WBE
$112,176 7.95% $112,176 7.95% 13% -5.05% 0.00%
TOTAL $445,653 31.57% $445,653 31.57% 34% -2.43% 0.00%
LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE
MLBE $333,477 23.63% $333,477 23.63% 0.00%
WLBE $18,969 1.34% $18,969 1.34% 0.00%
LBE $764,198 54.14% $764,198 54.14% 0.00%
TOTAL LOCAL $1,116,644 79.11% $1,116,644 79.11% 0.00%
NON-MBE/WBE and NON LOCAL Firms
$201,687 14.29% $201,687 14.29% 0.00%
% OF PROJECT COMPLETED: 78.78%
23
CONTRACTSPENNROSE DEVELOPMENT
AS OF DECEMBER 31, 2009
Construction Summary for Pennrose – CHAPEL GREEN
Total Project Awards to
Date:
Previous Report
JUNE 2009 $12,092,442
Participation
Current Report DECEMBER 2009
$12,092,442
Participation
Total ProjectValue
$15,350,000
Change
since Last Report
$10,680,9
0488.33% $10,680,904 88.33%
Construction
Goal
Difference 0.00%
MBE
$6,569,31161.51%
$6,569,311 61.51% 27%+34.51
%0.00%
WBE
$735,754 6.89% $735,754 6.89% 8% -1.11% 0.00%
TOTAL $7,305,065 68.39% $7,305,065 68.39% 35%+33.39
%0.00%
LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE
MLBE$5,899,31
155.23% $5,899,311 55.23% 0.00%
WLBE $735,754 6.89% $735,754 6.89% 0.00%
LBE $0 0.00% $0 0.00% 0.00%
TOTAL LOCAL$6,635,06
562.12% $6,635,065 62.12% 0.00%
NON-MBE/WBE and NON LOCAL Firms
$3,375,839
31.61% $3,375,839 31.61% 0.00%% OF PROJECT COMPLETED: 78.78%
24
EMPLOYMENT HOURS PENNROSE DEVELOPMENT - CHAPEL GREEN
AS OF DECEMBER, 2009
SITE EMPLOYMENT HOURSPROJECT TOTALJUNE 30, 2009
PROJECT TOTALDECEMBER 31, 2009
TOTAL SKILLED WORKERS 45,952.00 52,351.00
Minority Male 30,236.25 65.80% 35,462.75 67.74%
Minority Female 0.00 0.00% 0 0.00%
Non- Minority Female 0.00 0.00% 0 0.00%
TOTAL MINORITY/FEMALE SKILLED WORKERS 30,236.25 65.80% 35,462.75 67.74%
TOTAL LABORERS 19,147.25 22,356.00
Minority Male 16,241.25 84.82% 19,114.75 85.50%
Minority Female 0.00 0.00% 0 0.00%
Non- Minority Female 2.00 0.01% 320.00 1.43%
TOTAL MINORITY/FEMALE LABORERS 16,243.25 84.83% 19,434.75 86.93%
TOTAL SKILLED & LABORERS 65,099.25 74,707.00
Minority Male 46,477.50 71.39% 54,577.50 73.06%
Minority Female 0.00 0.00% 0 0.00%
Non- Minority Female 2.00 0.00% 320 0.43%
TOTAL MINORITY/FEMALE SKILLED & LABORERS 46,479.50 71.40% 54,897.50 73.48%
PROJECT GOAL15%
ACHIEVED TO DATE
73.48%
DIFFERENCE+58.42%
% OF PROJECT COMPLETED: 78.78%
24
25
SITE WORKFORCEPROJECT TOTAL
JUNE 2009PROJECT TOTALDECEMBER 2009
Change Since June 2009
Total Non-Minority Male 89 34.72% 92 35.80% +3 +3.37%
Total Minority Male 159 64.81% 164 63.81% +5 +3.14%
Total Minority Female 0 0.00% 0 0.00% +0 +0%
Non-Minority Female 1 0.46% 1 0.39% +0 +0%
TOTAL 249 100.00% 257 100.00% +8 +3.21%
Total Area Residents
East Baltimore21202, 21205, 21206, 21213,
21218 and 2123757 24.54% 57 22.18% +0 +0%
Total Baltimore City Residents 111 45.83% 115 44.75% +4 +3.60%
% OF PROJECT COMPLETED:
78.78%
EMPLOYMENT – Head CountPENNROSE DEVELOPMENT - CHAPEL GREEN
AS OF DECEMBER 31, 2009
26
Professional Services Summary
SITE WORKFORCEPROJECT TOTALDECEMBER 2009
Average HoursAverage Hourly
Wage
Total Non-Minority Male 9 14.52% 488.04 11.44
Total Minority Male 36 58.06% 424.74 11.20
Total Minority Female 17 27.42% 333.09 10.68
Total Non-Minority Female 0 0.00% 0 0
TOTAL 62 100.00% 415.50 11.13
Total Area Residents
East Baltimore21202, 21205, 21206, 21213, 21218
and 2123716 25.81%
Total Baltimore City Residents 50 80.65%
EMPLOYMENT – Head CountBROADWAY SERVICES
AS OF DECEMBER 31, 2009
27
Listing of M/WBE Firms Awarded Contracts
28
Summary of M/WBE Awarded for EBDI Professional & Other Services Projects
AS OF DECEMBER 31, 2009
MBEs AwardedB&D Consulting Sunshine Cleaning
BMW Cleaning Solutions The Afro American
Brick House Brown Tide Water
Broadway Services Trident Group Inc.
Carr Communications Visionary Marketing
Charm City Signs, LLC. Watkins Security Agency
Covenant Lock & Keys
DPN
Dynis, LLC
E. Wilson
G. C. Cooper
Gabrielli Design Studio
Global Design
IH Services
JCP Productions
Ray Butler Loss Prevention
Sage Consulting Group
Shawn Carter
Solomon's Termite & Pest Control
29
Summary of M/WBE Awarded for EBDI Professional & Other Services Projects
AS OF DECEMBER 31, 2009WBEs Awarded
Ann Clewell Graphics
Caplan Group/Sagesse
Curry Printing & Copy Center
Diversified Properties
K. Lechleiter
Little B, Inc
LS Consulting
Maryland Reprographics
My Cleaning Service
Trident Group, Inc.
Urban Green Env. LLC
30
Summary of M/WBE Awarded for Architecture & Engineering Projects
AS OF DECEMBER 31, 2009
MBEs Awarded: WBEs Awarded:Columbia Engineering, Inc. A 2 Z Environmental Group, LLC
Delon Hampton Associates Carroll Engineering, Inc.
EBA Engineering Floura Teeter
Faisant Associates Gower Thompson
H. A. Winchester Enterprises Interiors By Joanne
Harris-Kupfer Architects, Inc. K. Lechleiter Architect, LLC
Hope Furrer Associates Melville Thomas Architects, Inc.
JRS Architects, Inc P.E.L.A. Design, Inc.
Mahan Rykiel Associates Phoenix Engineering
Page Technologies Rohrer Studio
Peristyle Site Resources
Peter Fillat Architects The Balter Company
Phoenix Engineering William T. King, Inc.
QPS Qodesh CM
QPS, INC
Sue Ann's Office Supply
The Whitfield Company
WFT Engineering, Inc.
30
31
Summary of M/WBE Awarded for Construction Projects
AS OF DECEMBER 31, 2009MBEs Awarded ContractsA & A Plumbing Fallsway Construct ion P & J Construction
Acorn Supply & Distributing Fire Safety Co. Patriot Construction Management, Inc.
AJ O Concrete Constr. G. Cooper Const & Maintenance Personal Electric
Allstate Floors & Construction, Inc. GE Frisco Phipps Construction
Aluminum And Glass Co. Genesis Steel Svc Precision Contracting
ATJ Construction Grass Roots Landscaping QPS, INC
Best Fence Hammer Head Trucking Queens Quality Painting
Blue Lake Crane Hanover Land Svc Regional Contracting Services
Bryant Concrete Constr. Hensel Phelps Rich-Roofing & Skylight Installation
C. L. McCoy Framing Hopkins Transport Spark Quality Fence Co.
C. L. Myles Contracting Company, Inc. J M Murphy Enterprises, Inc. Total Concrete
Calmi/Gill-Simpson Joint Venture J.K. Datta Consultants Utley Mechanical
Chesapeake Contracting Services, Inc. JDG, Inc. Winchester Enterprises
Cleo Enterprise, Inc. JUL Enterprise Wright Construction
Commercial Interiors, Inc. L & J Construction
D & G Brice Contractors, Inc. M & N Professional Concrete Contractors, Inc.
Doracon Madison Design Group
East West Carpentry, Inc. N & C Construction, Inc
English Concrete Contractors Nico, Inc
31
32
Summary of M/WBE Awarded for Construction Projects
AS OF DECEMBER 31, 2009
WBEs AwardedA 2 Z Environmental Group, LLC
Acorn Supply
Allegany Door & Hardware
Baltimore Window
Broadway Electric
CB Flooring
Design Plus Sprinkler Systems
EBDI Commercial Properties Project One
Fleet Electric, Inc.
Hanover Land Svc
Hopkins Transport
Moisture Proof & Masonry, Inc.
Monumental Supply
Mystic Construction
Sunrise Safety
Superior Painting & Contract
The Dexter Company
32