Economic Inclusion UpdateReporting Period: July 1, 2009 – December 31, 2009

Submitted: May 31, 2010

1

Page 2: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

Third Party Monitoring & Compliance Verification

2

Page 3: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

3

Name of Project Summary Owner Awards To Date

John G. Rangos Bldg. First Lab Bldg. FC-NEBP $54.1 MillionMBE $14.7million (27%)WBE $ 4.2 million (8% )

Phase 1 Parking Lot A Site Prep

Pre-ConstructionPreparation

FC-NEBP $271,000MBE 100%

Phase 1 Parking Lot B Site Prep

Pre-ConstructionPreparation

FC-NEBP $386,000MBE 100%

Shelter DevelopmentPark View at Ashland Terrace – 74 units

Residential ApartmentsAshland Commons – 78 units

FC-NEBP $12.5 Million MBE $4.2 million (34%)WBE $855,207 (7%)

Pennrose DevelopmentChapel Green – 63 units

Townhomes FC-NEBP $12.1 Million MBE $6.9 million (57%) WBE $847,930 (7%)

EBDI Demolition 500 Houses EBDI $11.1 Million MBE $11million (99%) WBE $85,000 (1%)

McDonough Mews Townhomes

EBDI $1.26 Million*MBE $587,665 (47%)WBE $39,990 (3%)

3

Summary of Design and Construction Projects Verified To Date (Completed)

Page 4: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

4

Summary of Design & Construction Projects Verified To Date (On-Hold)

Name of Project Summary Owner Awards To Date

A&R DevelopmentTownes at Eager – 49 total units

Townhomes FC-NEBP $9 MillionMBE $2.3 million (26%)WBE $350,000 (4%)

L2 Building Schematic Design FC-NEBP $2.5 MillionMBE $ 87,315 (4%)*WBE $ 29,000 (1%)*

4

*The current record reflects three companies for which the documentations are available.

Page 5: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

5

Summary of EBDI Professional & Other Services Contracts Verified To Date

AS OF DECEMBER 31, 2009

Summary For Professional Services Projects (Total)

Total Contract Awards to Date:

December 2009$11,787,028.89*

Participation

Professional Services Goal Difference

MBE $1,408,551.62 11.95% 17% +5.05%

WBE $2,795,535.50 23.72% 9% +14.72%

TOTAL $4,204,087.12 35.67% 26% +9.67%

LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE

MLBE $781,510.62 6.63%

WLBE $235,685.00 2.00%

LBE $2,199,215.46 18.66%

TOTAL LOCAL $3,216,411.08 27.29%

NON-MBE/WBE and NON LOCAL Firms

$5,383,726.31 45.68%

*The amount excludes those on hold but includes the projects without contract issued.

Page 6: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

6

Summary of EBDI Professional & Other Services Contracts Verified To Date

COMPLETED AS OF DECEMBER 31, 2009

Summary For Professional Services Projects (Completed)

Total Contract Awards to Date:

December 2009$7,014,507.39*

Participation

Professional Services Goal Difference

MBE $1,113,401.62 15.87% 17% -1.13%

WBE $244,198.00 3.48% 9% -5.52%

TOTAL $1,357,599.62 19.35% 26% -6.65%

LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE

MLBE $711,510.62 10.14%

WLBE $185,685.00 2.65%

LBE $1,370,376.11 19.54%

TOTAL LOCAL $2,267,571.73 32.32%

NON-MBE/WBE and NON LOCAL Firms

$4,286,531.66 61.11%

*The amount excludes those on hold but includes the projects without contract issued.

Page 7: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

7

Summary of EBDI Professional & Other Services Contracts Verified To Date

ACTIVE AS OF DECEMBER 31, 2009

Summary For Professional Services Projects (Active)

Total Contract Awards to Date:

December 2009$4,772,521.50*

Participation

Professional Services Goal Difference

MBE $295,150.00 6.18% 17% -10.82%

WBE $2,511,337.50 52.62% 9% +43.62%

TOTAL $2,846,487.50 59.64% 26% +33.64%

LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE

MLBE $70,000.00 1.47%

WLBE $50,000.00 1.05%

LBE $828,839.35 17.37%

TOTAL LOCAL $948,839.35 19.88%

NON-MBE/WBE and NON LOCAL Firms

$1,097,194.65 22.99%

*The amount excludes those on hold but includes the projects without contract issued.

Page 8: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

8

Summary Of Accomplishments To Date

• Total Dollars Awarded to Date: $127.8 million– Design Contracts Awarded to M/WBE: $3.9 million out of $16.3 million (24%)

– Construction Contracts Awarded to M/WBE: $45.7 million out of $99.7 million (46%)

– EBDI Professional Services Contracts Awarded to M/WBE: $4.2 million out of 11.8 million (36%)

• In the aggregate, EBDI’s activities have produced over $53.8 million to M/WBE enterprises. (42%)

• Because of enhanced competitiveness and demonstrated capacity and ability, many participating M/WBEs have obtained additional work to support business growth and job creation.

• Approximately 57 percent of employment hours have involved minorities and/or females.

• The workforce has consisted of 1,641 workers, of whom over 15 percent (253) were local area residents and more than 40 percent (664; inclusive of 253) were Baltimore City residents.

8

Page 9: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

9

Accomplishments Compared to Project Goals

Design Services as of December 31, 2009

 Total Design

Awards M / WBE Awards

% GOAL Difference

MBE $2,452,701 15.01% 21.00% -5.99%

WBE $16,339,056

$1,450,482 8.88% 13.00% -4.12%

Total $3,903,183 23.89% 34.00% -10.11%

Construction Contracts as of December 31, 2009

 Total

Construction Awards

M / WBE Awards

% GOAL Difference

MBE $40,389,707 40.50% 27.00% 13.50%

WBE $99,739,563

$5,267,654 5.28% 8.00% -2.72%

Total $45,657,361 45.78% 35.00% 10.78%

9

EBDI Professional Services Contracts as of December 31, 2009

 Total

Construction Awards

M / WBE Awards

% GOAL Difference

MBE $1,408,552 11.95% 17.00% -5.05%

WBE $11,787,029

$2,795,536 23.72% 9.00% 14.72%

Total $4,204,087 35.67% 26.00% 9.67%

Page 10: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

10

EMPLOYMENT HOURSTOTAL PROJECT

AS OF DECEMBER 31, 2009

SITE EMPLOYMENT HOURSPROJECT TOTALJUNE 30, 2009

PROJECT TOTALDECEMBER 31, 2009

TOTAL SKILLED WORKERS 322,009.56 353,961.43

Minority Male 147,889.75 45.93% 168,516.80 47.61%

Minority Female 0.00 0.00% 5,662.50 1.60%

Non- Minority Female 693.00 0.22% 693.00 0.20%

TOTAL MINORITY/FEMALE SKILLED WORKERS

148,582.75 46.14% 174,872.30 49.40%

TOTAL LABORERS 84,545.11 87,814.36

Minority Male 71,759.00 84.88% 74,632.50 84.99%

Minority Female 2,366.25 2.80% 2,366.25 2.69%

Non- Minority Female 2.00 0.00% 320.00 0.36%

TOTAL MINORITY/FEMALE LABORERS 74,127.25 87.68% 77,318.75 88.05%

TOTAL SKILLED & LABORERS 406,554.67 441,775.79

Minority Male 219,648.75 54.03% 243,149.30 55.04%

Minority Female 2,366.25 0.58% 8,028.75 1.82%

Non- Minority Female 695.00 0.17% 1,013.00 0.23%

TOTAL MINORITY/FEMALE SKILLED & LABORERS 222,710.00 54.78% 252,191.05 57.09%

PROJECT GOAL15%

ACHIEVED TO DATE57.09%

DIFFERENCE+42.0

9%

10

Page 11: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

11

SITE WORKFORCEPROJECT TOTAL

JUNE 2009PROJECT TOTALDECEMBER 2009

DIFFERENCE SINCE JUNE 2009

Total Non-Minority Male 717 45.73% 732 44.61% +15 +2.43%

Total Minority Male 841 53.64% 882 53.75% +41 +4.88%

Total Minority Female 7 0.45% 24 1.46% +17 +242.86%

Non-Minority Female 3 0.19% 3 0.18% 0 0%

TOTAL 1,568 100.00% 1,641 100.00% +73 +4.66%

Total Area Residents

21202, 21205, 21206, 21213, 21218 and 21237 236 15.05% 253 15.42% +17 +7.20%

Total Baltimore City Residents 609 38.84% 664 40.46% +55 +9.03%

Average Hours Average WeeksAverage

Wage/hour

Majority Male 259.35 6.38 $27.09

Minority Male 275.68 6.54 $17.95

Minority Female 334.53 2.46 $7.53

Non-Minority Female 337.67 9.12 $18.07

EMPLOYMENT – Head CountTOTAL PROJECT

AS OF DECEMBER 31, 2009

11

Page 12: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

Details for Active Projects

12

Page 13: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

13

CONTRACTSA & R DEVELOPMENT

AS OF DECEMBER 31, 2009

Design Summary For The Townes at EagerTotal Project

Awards to

Date:

Previous ReportJUNE 2009$8,589,424

Participation 

Current ReportDECEMBER

2009$8,589,424

Participation 

Total ProjectValue

$9,000,154

Change from Last

Report

$1,197,105 13.93% $1,197,105 13.93% Design Goal Difference 0.00%

MBE

$372,796 31.14% $372,796 31.14% 21% +10.14% 0.00%

WBE

$6,290 0.53% $6,290 0.53% 13% -12.47% 0.00%

TOTAL $379,086 31.67% $379,086 31.67% 34% -2.33% 0.00%

LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE

MLBE $372,796 65.47% $372,796 65.47% 0.00%

WLBE $0 0.00% $0 0.00% 0.00%

LBE $7,090 1.25% $7,090 1.25% 0.00%

TOTAL LOCAL $379,886 66.71% $379,886 66.71% 0.00%

NON-MBE/WBE & NON LOCAL Firms

$810,930 8.29% $810,930 8.29% 0.00%

% OF PROJECT COMPLETED: 20.22% No change since June 2009 (Project is on hold)

Page 14: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

14

CONTRACTSA & R DEVELOPMENT

AS OF DECEMBER 31, 2009

Construction Summary For The Townes at EagerTotal

Project Awards to

Date:

Previous Report

JUNE 2009$8,589,424

Participation

Current ReportDECEMBER

2009$8,589,424

Participation

 Total ProjectValue

$9,000,154

Change from Last Report

$7,394,299 86.09% $7,394,299 86.09%Construction

GoalsDifference 0.00%

MBE

$1,954,267 26.43% $1,954,267 26.43% 27% -0.57% 0.00%

WBE

$346,450 4.69% $346,450 4.69% 8% -3.31% 0.00%

TOTAL $2,300,717 31.11% $2,300,717 31.11% 35% -3.89% 0.00%

LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE

MLBE

$1,804,970 24.41% $1,804,970 24.41% 0.00%

WLBE $0 0.00% $0 0.00% 0.00%

LBE $0 0.00% $0 0.00% 0.00%

TOTAL LOCAL $1,804,970 24.41% $1,804,97 24.41% 0.00%

NON-MBE/WBE & NON LOCAL

Firms$5,093,582 68.89% $5,093,582 68.89% 0.00%

% OF PROJECT COMPLETED: 20.22%

Page 15: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

15

EMPLOYMENT HOURS A & R DEVELOPMENT - TOWNHOMES AT EAGER

AS OF DECEMBER, 2009

15

Page 16: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

16

SITE WORKFORCEPROJECT TOTAL

JUNE 2009PROJECT TOTALDECEMBER 2009

Change since June 2009

Total Non-Minority Male 16 57.14% 19 61.29% +3 +18.8%

Total Minority Male 12 42.86% 12 38.71% +0 +0.00%

Total Minority Female 0 0.00% 0 0.00% +0 +0.00%

Non-Minority Female 0 0.00% 0 0.00% +0 +0.00%

TOTAL 28 100.00% 31 100.00% +3 +10.71%

Total Area Residents

21202, 21205, 21206, 21213, 21218 and 21237

6 21.43% 7 22.58% +1 +16.67%

Total Baltimore City Residents

6 0.00% 7 22.58% +1+16.67

%

EMPLOYMENT – Head CountA & R DEVELOPMENT - TOWNHOMES AT EAGER

AS OF DECEMBER 31, 2009

Page 17: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

17

CONTRACTSL-2 DEVELOPMENT- LIFE SCIENCE BUILDING

AS OF DECEMBER 31, 2009

Design Summary For Life Science Building

Total Project Awards to Date:

DECEMBER 2009$2,454,750*

 

Design $2,454,750 ParticipationDesignGoal

Difference

MBE $87,315 3.56% 21% -17.44%

WBE $29,000 1.18% 13% -11.82%

TOTAL $116,315 4.74% 34% -29.26%

LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE

MLBE $0 0.00%

WLBE $29,000 1.18%

LBE $0 0.00%

TOTAL LOCAL $29,000 1.18%

NON-MBE/WBE and NON LOCAL Firms

$0 0.00%

*The total award to date reflects awards to the three contractors for whom the documentations are available.

Page 18: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

18

CONTRACTSTHE MICHAEL GROUP

AS OF DECEMBER 31, 2009Design Summary For McDonough Mews

Total Project Awards to Date:

Previous ReportJUNE 2009$2,407,136

Participation

Current ReportDECEMBER

2009$1,261,373

Participation Change from

Last Report

Design $64,600 2.68% $64,600 5.12%DesignGoal

Difference

0.00%

MBE

$0 0.00% $64,600 100.00% 21% +79.00% n.a.

WBE

$64,600 100.00% $0 0.00% 13% -13.00% -100%

TOTAL $64,600 100.00% $64,600 100.00% 34% +66.00% 0.00%

LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE

MLBE

$0 0.00% $64,600 100.00% n.a.

WLBE $64,000 100.00% $0 0.00% -100%

LBE $0 0.00% $0 0.00% 0.00%

TOTAL LOCAL $64,000 100.00% $64,600 100.00% 0.00%

NON-MBE/WBE and

NON LOCAL Firms$0 0.00% $0 0.00% 0.00%

PROJECT 100% COMPLETED

Page 19: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

19

CONTRACTS THE MICHAEL GROUP

AS OF DECEMBER 31, 2009Construction Summary For McDonough Mews

Total Project Awards to Date:

Previous ReportJUNE 2009

$2,407,136

Participation 

Current Report

DECEMBER 2009

$1,261,373

Participation 

Change from Last

Report

Construction $2,342,536 97.32% $1,196,773 94.88%Construction

GoalDifference -48.91%

MBE

$504,065 21.52% $523,065 43.71% 27% 16.71% +3.77%

WBE

$19,000 0.81% $39,990 3.34% 8% -4.66% +110.47%

TOTAL $523,065 22.33% $563,055 47.05% 35% +12.05% +7.65%

LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE

MLBE $386,790 16.51% $386,790 32.32% 0.00%

WLBE $0 0.00% $0 0.00% 0.00%

LBE $1,779,481 75.96% $633,718 52.95% -64.39%

TOTAL LOCAL $2,166,271 92.48% $1,020,508 85.27% -52.89%

NON-MBE/WBE and

NON LOCAL Firms$39,990 1.71% $0.00 $0.00 -100.0%

PROJECT 100% COMPLETED

Page 20: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

20

EMPLOYMENT HOURS THE MICHAEL GROUP – McDONOUGH MEWS

AS OF DECEMBER, 2009

SITE EMPLOYMENT HOURSPROJECT TOTALJUNE 30, 2009

PROJECT TOTALDECEMBER 31, 2009

TOTAL SKILLED WORKERS 93.50 93.50

Minority Male 93.50 100.00% 93.50 100.00%

Minority Female 0.00 0.00% 0.00 0.00%

Non- Minority Female 0.00 0.00% 0.00 0.00%

TOTAL MINORITY/FEMALE SKILLED WORKERS 93.50 100.00% 93.50 100.00%

TOTAL LABORERS 642.00 642.00

Minority Male 642.00 100.00% 642.00 100.00%

Minority Female 0.00 0.00% 0.00 0.00%

Non- Minority Female 0.00 0.00% 0.00 0.00%

TOTAL MINORITY/FEMALE LABORERS 642.00 100.00% 642.00 100.00%

TOTAL SKILLED & LABORERS 735.50 735.50

Minority Male 735.50 100.00% 735.50 100.00%

Minority Female 0.00 0.00% 0.00 0.00%

Non- Minority Female 0.00 0.00% 0.00 0.00%

TOTAL MINORITY/FEMALE SKILLED & LABORERS 735.50 100.00% 735.50 100.00%

PROJECT GOAL15%

ACHIEVED TO DATE100%

DIFFERENCE+85.00%

% OF PROJECT COMPLETED: 100%

20

Page 21: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

21

SITE WORKFORCEPROJECT TOTAL

JUNE 2009PROJECT TOTALDECEMBER 2009

Total Non-Minority Male 0 0.00% 0 0.00%

Total Minority Male 27 100.00% 27 100.00%

Total Minority Female 0 0.00% 0 0.00%

Non-Minority Female 0 0.00% 0 0.00%

TOTAL 27 100.00% 27 100.00%

Total Area Residents 9 33.33% 9 33.33%

21202, 21205, 21206, 21213, 21218 and 21237

Total Baltimore City Residents 10 37.04% 10 37.04%

PROJECT 100% COMPLETE

EMPLOYMENT – Head CountTHE MICHAEL GROUP – McDONOUGH MEWS

AS OF DECEMBER 30, 2009

Page 22: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

22

CONTRACTSPENNROSE DEVELOPMENT

AS OF DECEMBER 31, 2009

Design Summary For the Pennrose– CHAPEL GREEN

Total Project Awards to Date:

Previous Report

JUNE 2009$12,092,442

Participation 

Current ReportDECEMBER

2009$12,092,442

Participation 

Total Projec

tValue

$15,350,000

Change since June

Report

Design $1,411,538 11.67% $1,411,538 11.67%Design

GoalDifferenc

e0.00%

MBE

$333,477 23.63% $333,477 23.63% 21% +2.63% 0.00%

WBE

$112,176 7.95% $112,176 7.95% 13% -5.05% 0.00%

TOTAL $445,653 31.57% $445,653 31.57% 34% -2.43% 0.00%

LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE

MLBE $333,477 23.63% $333,477 23.63% 0.00%

WLBE $18,969 1.34% $18,969 1.34% 0.00%

LBE $764,198 54.14% $764,198 54.14% 0.00%

TOTAL LOCAL $1,116,644 79.11% $1,116,644 79.11% 0.00%

NON-MBE/WBE and NON LOCAL Firms

$201,687 14.29% $201,687 14.29% 0.00%

% OF PROJECT COMPLETED: 78.78%

Page 23: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

23

CONTRACTSPENNROSE DEVELOPMENT

AS OF DECEMBER 31, 2009

Construction Summary for Pennrose – CHAPEL GREEN

Total Project Awards to

Date:

Previous Report

JUNE 2009 $12,092,442

Participation

Current Report DECEMBER 2009

$12,092,442

Participation

Total ProjectValue

$15,350,000

 Change

since Last Report

$10,680,9

0488.33% $10,680,904 88.33%

Construction

Goal

Difference 0.00%

MBE

$6,569,31161.51%

$6,569,311 61.51% 27%+34.51

%0.00%

WBE

$735,754 6.89% $735,754 6.89% 8% -1.11% 0.00%

TOTAL $7,305,065 68.39% $7,305,065 68.39% 35%+33.39

%0.00%

LOCAL BUSINESS ENTERPRISES ARE LOCATED WITHIN THE CITY OF BALTIMORE

MLBE$5,899,31

155.23% $5,899,311 55.23% 0.00%

WLBE $735,754 6.89% $735,754 6.89% 0.00%

LBE $0 0.00% $0 0.00% 0.00%

TOTAL LOCAL$6,635,06

562.12% $6,635,065 62.12% 0.00%

NON-MBE/WBE and NON LOCAL Firms

$3,375,839

31.61% $3,375,839 31.61% 0.00%% OF PROJECT COMPLETED: 78.78%

Page 24: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

24

EMPLOYMENT HOURS PENNROSE DEVELOPMENT - CHAPEL GREEN

AS OF DECEMBER, 2009

SITE EMPLOYMENT HOURSPROJECT TOTALJUNE 30, 2009

PROJECT TOTALDECEMBER 31, 2009

TOTAL SKILLED WORKERS 45,952.00 52,351.00

Minority Male 30,236.25 65.80% 35,462.75 67.74%

Minority Female 0.00 0.00% 0 0.00%

Non- Minority Female 0.00 0.00% 0 0.00%

TOTAL MINORITY/FEMALE SKILLED WORKERS 30,236.25 65.80% 35,462.75 67.74%

TOTAL LABORERS 19,147.25 22,356.00

Minority Male 16,241.25 84.82% 19,114.75 85.50%

Minority Female 0.00 0.00% 0 0.00%

Non- Minority Female 2.00 0.01% 320.00 1.43%

TOTAL MINORITY/FEMALE LABORERS 16,243.25 84.83% 19,434.75 86.93%

TOTAL SKILLED & LABORERS 65,099.25 74,707.00

Minority Male 46,477.50 71.39% 54,577.50 73.06%

Minority Female 0.00 0.00% 0 0.00%

Non- Minority Female 2.00 0.00% 320 0.43%

TOTAL MINORITY/FEMALE SKILLED & LABORERS 46,479.50 71.40% 54,897.50 73.48%

PROJECT GOAL15%

ACHIEVED TO DATE

73.48%

DIFFERENCE+58.42%

% OF PROJECT COMPLETED: 78.78%

24

Page 25: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

25

SITE WORKFORCEPROJECT TOTAL

JUNE 2009PROJECT TOTALDECEMBER 2009

Change Since June 2009

Total Non-Minority Male 89 34.72% 92 35.80% +3 +3.37%

Total Minority Male 159 64.81% 164 63.81% +5 +3.14%

Total Minority Female 0 0.00% 0 0.00% +0 +0%

Non-Minority Female 1 0.46% 1 0.39% +0 +0%

TOTAL 249 100.00% 257 100.00% +8 +3.21%

Total Area Residents

East Baltimore21202, 21205, 21206, 21213,

21218 and 2123757 24.54% 57 22.18% +0 +0%

Total Baltimore City Residents 111 45.83% 115 44.75% +4 +3.60%

% OF PROJECT COMPLETED:

78.78%

EMPLOYMENT – Head CountPENNROSE DEVELOPMENT - CHAPEL GREEN

AS OF DECEMBER 31, 2009

Page 26: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

26

Professional Services Summary

SITE WORKFORCEPROJECT TOTALDECEMBER 2009

Average HoursAverage Hourly

Wage

Total Non-Minority Male 9 14.52% 488.04 11.44

Total Minority Male 36 58.06% 424.74 11.20

Total Minority Female 17 27.42% 333.09 10.68

Total Non-Minority Female 0 0.00% 0 0

TOTAL 62 100.00% 415.50 11.13

Total Area Residents

East Baltimore21202, 21205, 21206, 21213, 21218

and 2123716 25.81%

Total Baltimore City Residents 50 80.65%

EMPLOYMENT – Head CountBROADWAY SERVICES

AS OF DECEMBER 31, 2009

Page 27: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

27

Listing of M/WBE Firms Awarded Contracts

Page 28: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

28

Summary of M/WBE Awarded for EBDI Professional & Other Services Projects

AS OF DECEMBER 31, 2009

MBEs AwardedB&D Consulting Sunshine Cleaning

BMW Cleaning Solutions The Afro American

Brick House Brown Tide Water

Broadway Services Trident Group Inc.

Carr Communications Visionary Marketing

Charm City Signs, LLC. Watkins Security Agency

Covenant Lock & Keys

DPN

Dynis, LLC

E. Wilson

G. C. Cooper

Gabrielli Design Studio

Global Design

IH Services

JCP Productions

Ray Butler Loss Prevention

Sage Consulting Group

Shawn Carter

Solomon's Termite & Pest Control

Page 29: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

29

Summary of M/WBE Awarded for EBDI Professional & Other Services Projects

AS OF DECEMBER 31, 2009WBEs Awarded

Ann Clewell Graphics

Caplan Group/Sagesse

Curry Printing & Copy Center

Diversified Properties

K. Lechleiter

Little B, Inc

LS Consulting

Maryland Reprographics

My Cleaning Service

Trident Group, Inc.

Urban Green Env. LLC

Page 30: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

30

Summary of M/WBE Awarded for Architecture & Engineering Projects

AS OF DECEMBER 31, 2009

MBEs Awarded: WBEs Awarded:Columbia Engineering, Inc. A 2 Z Environmental Group, LLC

Delon Hampton Associates Carroll Engineering, Inc.

EBA Engineering Floura Teeter

Faisant Associates Gower Thompson

H. A. Winchester Enterprises Interiors By Joanne

Harris-Kupfer Architects, Inc. K. Lechleiter Architect, LLC

Hope Furrer Associates Melville Thomas Architects, Inc.

JRS Architects, Inc P.E.L.A. Design, Inc.

Mahan Rykiel Associates Phoenix Engineering

Page Technologies Rohrer Studio

Peristyle Site Resources

Peter Fillat Architects The Balter Company

Phoenix Engineering William T. King, Inc.

QPS Qodesh CM

QPS, INC

Sue Ann's Office Supply

The Whitfield Company

WFT Engineering, Inc.

30

Page 31: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

31

Summary of M/WBE Awarded for Construction Projects

AS OF DECEMBER 31, 2009MBEs Awarded ContractsA & A Plumbing Fallsway Construct ion P & J Construction

Acorn Supply & Distributing Fire Safety Co. Patriot Construction Management, Inc.

AJ O Concrete Constr. G. Cooper Const & Maintenance Personal Electric

Allstate Floors & Construction, Inc. GE Frisco Phipps Construction

Aluminum And Glass Co. Genesis Steel Svc Precision Contracting

ATJ Construction Grass Roots Landscaping QPS, INC

Best Fence Hammer Head Trucking Queens Quality Painting

Blue Lake Crane Hanover Land Svc Regional Contracting Services

Bryant Concrete Constr. Hensel Phelps Rich-Roofing & Skylight Installation

C. L. McCoy Framing Hopkins Transport Spark Quality Fence Co.

C. L. Myles Contracting Company, Inc. J M Murphy Enterprises, Inc. Total Concrete

Calmi/Gill-Simpson Joint Venture J.K. Datta Consultants Utley Mechanical

Chesapeake Contracting Services, Inc. JDG, Inc. Winchester Enterprises

Cleo Enterprise, Inc. JUL Enterprise Wright Construction

Commercial Interiors, Inc. L & J Construction

D & G Brice Contractors, Inc. M & N Professional Concrete Contractors, Inc.

Doracon Madison Design Group

East West Carpentry, Inc. N & C Construction, Inc

English Concrete Contractors Nico, Inc

31

Page 32: 1 Economic Inclusion Update Reporting Period: July 1, 2009 – December 31, 2009 Submitted: May 31, 2010 1

32

Summary of M/WBE Awarded for Construction Projects

AS OF DECEMBER 31, 2009

WBEs AwardedA 2 Z Environmental Group, LLC

Acorn Supply

Allegany Door & Hardware

Baltimore Window

Broadway Electric

CB Flooring

Design Plus Sprinkler Systems

EBDI Commercial Properties Project One

Fleet Electric, Inc.

Hanover Land Svc

Hopkins Transport

Moisture Proof & Masonry, Inc.

Monumental Supply

Mystic Construction

Sunrise Safety

Superior Painting & Contract

The Dexter Company

32