24
1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

Embed Size (px)

Citation preview

Page 1: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

1

EUDET Kick-off Meeting

Summary and Outlook

Where are we now andwhere do we go from here?

Joachim MnichDESY

17.02.2006

Page 2: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

2

Formal Status of the Project

EUDET officially started 1.1.2006

Final contract available

1) to be signed by DESY and EC defines entry into force important for some partner to hire personnel & spend money

2) accession forms to be signed by all partners underwayAfter that all formalities done!

Expect first instalment soon Now we must fully concenrate on scientific part of the project

Complete management structure in place

Page 3: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

3

EUDET

Network Transnational Access Joint Research Activities

Management

Detector R&D Network

Access to DESY Test Beam

Access to Detector R&D Infrastructures

Test Beam Infrastructures

Tracking Detectors

Calorimeter

Structure of EUDET:

Scientific Status of the Project

Detector R&D Network: Information exchange and intensified collaboration Common simulation and analysis framework Validation of simulation Deep submicron radiation-tolerant electronics

Test Beam Infrastrucuture Large bore magnet Pixel beam telescope

Tracking Detectors Large TPC prototype Silicon TPC readout Silicon tracking

Calorimeter ECAL HCAL Very Forward Calorimeter FE Electronics and Data Acquistion System

Activities split up into several tasks:

Page 4: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

4

Status of Tasks

Web based information system:

well advanced framework for eudet.org existing please start using it JRAs should take care of their part assign responsible person(s)

development of framework not finished: papers, meetings, outreach, … new demands will pop up

On next slides: Typical examples, no claim of completenessEmphasis on items to be achieved soon

Page 5: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

5

Testbeam Infrastructure

Magnet (PCMAG)

Magnet existing at KEK

Magnet to be used by several other devices (TPC, Si detectors, calorimeter?)Point were close inter-JRA collaboration and communication is needed

Infrastructure Areas of work identified

Transport to DESY August 2006

Page 6: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

6

Testbeam Infrastructure

Pixel Telescope

Simulation σ ≈ 2µm

2007: Demonstrator based on existing CMOS chip limited speed but useful beam telescope

DAQ important issue beyond beam telescope

→ DAQ workshop at this workshop

Page 7: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

7

Detailed working plan establised

Testbeam Infrastructure

Page 8: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

8

Tracking

TPC

fieldcage design based on light small prototype TPC

prototype electronics - FADC based on ALTRO - TDC type readout important: well defined interfaces to readout planes - mechanics - electronics

Design of readout planes will be complexNeed input now from all potential users

60 cm length80 cm diam.

TDC scheme

Page 9: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

9

Si-TPC

Going from MediPix to TimePix

clock distribution scheme under discussion - local oscillator per pixel - distributed clock

final pixel schematics in ≈ 1 month chip submission in summer 1st TimePix operational 1/2007

Page 10: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

10

Silicon Tracking

FE electronicsMechanicsCoolingAlignment

Incorporated into SILC

Example: FE chips in 130 nmSubmission in April

Potential application of NA2 access to rad. hard micro-electronics

Page 11: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

11

Study, design and construction Study, design and construction of an half module of an half module

160cm160cm

36 cm36 cm

Study, design and construction Study, design and construction of an half module of an half module

160cm160cm

36 cm36 cm

Calorimeter

ECAL

The EUDET Module:- 2006 R&D and design e.g. radiator material

HCAL design:Input from testbeam

Page 12: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

12

Very Forward Calorimeter

Laser-based positioning system Test system linearity/homogeneity

First ideas:

Positioning system Readout: high linearity at large dynamic range

Page 13: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

13

Electronics for Calorimeter

C h a n n e l 0

C h a n n e l 1

C h a n n e l 2

C h a n n e l 3

C h a n n e l 6 2

C h a n n e l 6 3

T h r e sh o ld 0

T h r e sh o ld 1

T h r e sh o ld 2

T h r e sh o ld 3

T h r e sh o ld 6 2

T h r e sh o ld 6 3

>

B unc h c ro s s ing ID

Dig

ital m

emor

y[ 6

4 bi t s

(da

t a)

+ 12

bi ts

(B

CID

)]*d

e pht

mem

ory write

D a ta o u t

an a lo g u e f r o n t- en d

DHCAL TECH1 layout

FE chip (1mm)Wafer (500µm)PCB (600µm)

Common readout architecture Several key innovative features (power pulsing, digitsation,…) Key issue for ILC calorimeter concept

ECAL:Reduce thickness to minimum

Page 14: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

14

Data Acquisition

DAQ has been identified as key issue of EUDET

part of the infrastructures easy-to-use for users cross-JRA issue combined testbeam run of several sub-detectors

relations to software framework (→ NA2)

DAQ is an important issuse for ILC detectors EUDET is not going to design/build anything close to the final ILC DAQ system but we must stay connected to the international R&D efforts to go into the same direction

Page 15: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

15

Transnational Access

TA1 2006 → 2009 DESY TestbeamTA2 2008 → 2009 Access to infrastructure

Eligible user: - European user groups, i.e. the speaker of the group must be affiliated to a European institute - but not from the same country, e.g. non-German for TA1 - EUDET or extra-EUDET Eligible projects: - ILC related or any other HEP or non-HEP project

Procedure: - write a short proposal for typically 2-3 weeks testbeam usage - to be evaluated by our Selection Board

Your potential profit: - travel money

More details soon on eudet.org

Page 16: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

16

The Near Future

2006 2007 2008 2009

EUDET time profile:

2006 is already a very important year!

Reminder:What do we have to achieve until the end of the year?2006 milestones and deliverables

Page 17: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

17

Milestones 2006

JRA1: Testbeam Infrastructure September: Prototype 1 of small digital chip December: Magnet available

NA2: Detector R&D Network October: 1st stage computing network October: Annual Scientific Workhop December: 1st version of electronic information system

NA1: management: February: Kick-off Meeting done October: Annual Meeting (IB, SC)

Page 18: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

18

JRA3: Calorimeters September: HCAL VME test stand October: Concept review of all tasks December: ECAL mechanics concept December: TECH1 December: ASIC prototype DHCAL

Milestones 2006

JRA2: Tracking Detectors December: TPC preamp prototype board December: TimePix operational

Page 19: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

19

Deliverables 2006

Page 20: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

20

Next Steps

Lot of work to be accomplished already in 2006

Consolidate plans Advertise positions quickly and start to hire personnel Start to spend money (where reasonable) Remember: we should try to stick to our spending profile

Continue bi-weekly meetings of SC

Plan for full review of status in summer - scientific and financial aspects - coordinators, tasks leaders

Annual Workshop Meeting in October - similar layout and duration as Kick-off Meeting - preparation of Annual Report - date and venue being discussed

Page 21: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

21

EUDET in the ILC Universe

Relation to developments in Americas and Asia talks by Andy White and Tohru Takeshita with very positive reactions towards EUDET

Page 22: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

22

Fully incorporated in the ILC detector R&D- Make optimal use of EUDET resources on international scale- Avoid unnecessary duplication structures

Special attention:

- EUDET is a contract between you and the EC with well defined milestones and deliverables some only months away- Need for some independent structures managements, meetings,.. - Find delicate equilibrium between these exigencies

EUDET in the ILC Universe

Page 23: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

23

EUDET in the ILC Universe

My personal view on EUDET and the relation to other ILC activities(in the language of particle physicists) consider EUDET as sort of (large) virtual institute

which is part of an even larger collaboration the ILC detector R&D

EUDET provides resources to and takes responsibilities in the collaboration which must be carefully synchronised with the other collaborators

e.g. with collaborations as CALICE, FCAL, SILC, LCTPC

yet, even as virtual institute EUDET is responsible towards its funding agency (European Union) requires an adequate internal structure and management

This meeting was an important and successful step towards our goals

Page 24: 1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY 17.02.2006

24

Acknowledgements

Many thanks to all of you for coming to DESY and participating in this Kick-off Meeting (approximately 100 participants) Many thanks to our Advisory Board for following the meeting

As well as to Stefano Fontana (EU) for his visit and his talk

For the organisation of the workshop many thanks to Ramona Matthes & Adrian Vogel

See you all at our Annual Workshop end of this year!