1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

Embed Size (px)

Citation preview

Page 1: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

1

Evolve in real lifeA case study

Matrix seminar – March 2011

Liviu BÂRSAN

Page 2: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

2

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Who am I Liviu BARSAN

Diploma in Mechanichal Engineering, Politechnical University, Bucharest

Master in Biotechnical Engineering

In Valrom since 2005

R&D department – part design & engineering

Who am I?

Page 3: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

3

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Who we are

Who are we?

VALROM Industrie srl

Romanian company headquarted in Bucharest

Shareholders: Valsir Spa (Italy) & Romstal Group (Romania)

Established: 1996

330 employees in 2010 (630 in 2008)

Sales of 45 mil. € in 2010 (75 mil. € in 2008 )

Market leader in plastic pipes & fittings

Page 4: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

4

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Who are we

Ukraine• logistics• production

site

Moldovia• sales

Bulgaria• sales

Who are we?

• Branches in Bulgaria, Moldavia & Ukraine (production site)

Page 5: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

5

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

What we do

Heating & sanitary systems; water, gas and sewage networks; waste-water treatment plants

Production: plastic pipes & fittings – PE, xPE, PP (homo & random) etc

Production facilities: Romania (2 sites) & Ukraine

Extrusion (12 lines); injection molding (8 machines)

Roto: 4 machines (Caccia & Polivinil)

Our business

Page 6: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

6

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Roto shop

Established in 2003

Machines: 2 Caccia RT 3503F, 1 Polivinil 3500 3C, 1 Polivinil 4500 3C

Tools shop – reworking, new moulds, maintenance

Grinding process in house – Powder King PK DD 220

Consumption – 60 MT/month

Raw materials: PE – compact & foaming, PP (limited)

In house design & engineering

Roto shop

Page 7: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

7

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Roto shop

Roto shop

Page 8: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

8

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Roto shop

Products range: water tanks, sewage manholes, water-meter chambers, small waste-water treatment plants etc

Technology: single, multi-layer, foaming, lining

Roto shop

Page 9: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

9

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Beginnings

Involved in this project since beginning (2009)

The material still under development

Valrom agreed to test it on industrial scale

Our goal – cost cutting by either decrease of oven temperature or cooking time

Steps: 1. preliminary evaluation on industrial mould & equipment2. limited production test (subject to material availability)3. full production test (at least 24 hours)4. economical evaluation

Evolve - beginnings

Page 10: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

10

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Evaluation

Preliminary evaluation on industrial equipment: mould & equipment

Scope: evaluate how much we can decrease the oven temp and/or cooking time

Equipment: Caccia & Polivinil

Standard condition: 50 kg for 30 min @ 270 0C • PIAT 155 0C

Thickness: standard 6 mm

Material: Evolve M748F, powder, black

Part evaluation: Matrix lab

Evolve – preliminary evaluation

Page 11: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

11

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

Evolve – preliminary evaluation

L. Barsan (Marh 2011) - © Valrom Industrie

Page 12: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

12

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Evaluation

Evolve – preliminary evaluation

Page 13: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

13

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Evaluation

Evolve – preliminary evaluation

Page 14: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

14

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Evaluation

No. Cooking conditions

Density (g/cm3)

Impact strength (J)

Aspect

1 25 @ 260 0C 0.942 60.9 No pinholes; inside surface looks nice & smooth

2 23 @ 260 0C 0.939 60.9 No pinholes; inside surface looks nice & smooth

3 20 @ 280 0C 0.937 60.9 No pinholes; inside surface looks bumpy – slightly undercooked

4 20 @ 285 0C 0.943 60.9 No pinholes; inside surface looks nice & smooth

Evolve – preliminary evaluation

Page 15: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

15

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

Evolve – preliminary evaluation

L. Barsan (Marh 2011) - © Valrom Industrie

Page 16: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

16

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Evaluation

Conclusions for evaluation:

The new material performs well

There is no decrease in product performance

It allows decrease of oven temperature and/or cooking time

Further tests to follow on either time or temperature decrease

Evolve – preliminary evaluation

Page 17: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

17

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Trial

Small scale trial

Scope: • confirm preliminary evaluation of product capabilities –

lower gas consumption; on larger scale• test effect of dry blending

Equipment: Polivinil machine running exclusively Evolve for one shift

Material: Evolve powder, natural, dry blend pigment (grey) in our facility

Lab evaluation: Matrix

Page 18: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

18

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Trial

Small scale trial

Evolve cooks faster

Natural better than grey dry blend

5 7 9 11 13 15 17 19 21 23 250.920

0.925

0.930

0.935

0.940

0.945

N-307 N-307 EVOLVE N-307 GREY EVOLVE

Cook time (min)

Par

t D

ensi

ty (

g/c

m^

3)

Page 19: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

19

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Small scale trial

Conclusions

Standard part thickness 6 mm

Standard cycle: 30 min @ 270 0C

Oven temperature reduction: 30 min @ 252 0C

Cycle time reduction: 22 min @ 270 0C

Part evaluation: Matrix labTrial

Page 20: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

20

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Industrial run

Scope • record of primary data• perform economical calculation

Two days run on all machines

Product range: shafts, water tanks

Evolve used exclusively

Gas consumption measured accurately• before trial• during trial

Full industrial run

Page 21: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

21

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Industrial run

Full industrial run

Results

2010 average:• 617.390 kg processed• 285.062 m3 consumption

24 h before:• 2.561 kg PE processed • 1.230 m3 consumption

Evolve, in 2 days:• 5.338 kg PE • 2.181 m3 consumption

Page 22: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

22

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Industrial run

Full industrial run

2010 (average) 24h before EVOLVE0

0.1

0.2

0.3

0.4

0.5

0.4600.4802

0.4085

GAS Consumption

Page 23: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

23

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

Conclusions

Gas consumption can be decreased by 15% (14,93%)

Cooking time can be reduced by 25%

The values depends on local conditions:• machine efficiency• type of material • processing conditions

Savings: it depends on your conditions

Conclusions

Page 24: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

24

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

How to

1. Get a gas meter

2. Make it works

3. Register your average consumption • 1 month minimum

4. Get enough material for 24 h production

5. Register your consumption before trial

How to ... in 8 steps

Page 25: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

25

What we do

Who we are

Who am I

Roto shop

Beginnings

Evaluation

Trial

Industrial run

Conclusions

How to

L. Barsan (Marh 2011) - © Valrom Industrie

How to ... in 8 steps

6. Run full day production• decrease your oven temperature with 18 0C or• decrease your cooking time with 26%

7. Register gas consumption during trial

8. Check quality of the final product • Matrix might run some lab test for you

Calculate the savings and take the right decision!

How to

Page 26: 1 Evolve in real life A case study Matrix seminar – March 2011 Liviu BÂRSAN

26

Thank you !

Questions and comments...