21
1 Future plans for the Future plans for the development and implementation development and implementation of WISE of WISE Tim Lack ETC Water

1 Future plans for the development and implementation of WISE Tim Lack ETC Water

Embed Size (px)

Citation preview

Page 1: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

1

Future plans for the development Future plans for the development and implementation of WISEand implementation of WISE

Tim LackETC Water

Page 2: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

2

WISE concept and implementation WISE concept and implementation planplan

Page 3: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

3

WISE – intermediate solutionWISE – intermediate solution

• All water-related information from EU water policy • Water Framework, Urban Waste Water Treatment, Nitrates,

Bathing Waters and Drinking Water Directives• upcoming Marine Strategy and Flood Action Programmes. • other water-related datasets such as Eionet-Water and from

relevant water research projects.

• Provides the geo-referencing for data • an important building block for INSPIRE.

• Proposed timetable • Available to the public in 2006 • Fully operational by 2010.

Page 4: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

4

Timetable of eventsTimetable of events

• Brainstorming meeting June 7• DG ENV, EEA, ESTAT, JRC

• Main considerations• process and validation of data • where and how to hold data,• data flows, • access rights, • visualisation

• WISE draft Implementation Plan• WISE Steering Group discussion – 15 September

Page 5: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

5

Main areas of agreementMain areas of agreement

• A desire to support a single stream of data.• A single data definition

• Temporal and spatial integration • Support different frequencies for data collection

• Coordinated data exchange standards • Move towards disaggregated data collection• Common standards for visualisation. • State of the Environment Reporting Drafting

Group (under the CIS structure)

Page 6: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

6

Perceived success factorsPerceived success factors

• The co-operation of the Member States• EU25 and the EEA member countries• Two Reporting Drafting Groups (Compliance and SOE)

• Involvement of DG ENV, EEA, ESTAT, JRC, Buy in from International River Basin Commissions, UNEP etc.

• Definition of base environmental data against which reporting is made

• Provision of access to all information types• Numerical data, ecological status (computed), thematic

maps, reports, downloads, documents (e.g. methodologies),

Page 7: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

7

WISE visionWISE vision

Page 8: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

8

Now – two parallel processes operate

Member states WISE prototype

Map ServerMember states

Member states EOINET water

Water baseMember states

WISE Vision current

Page 9: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

9

WISE prototype

EOINET water

Map Server

Water base

Now

2006

Member statesMember states

Member statesMember states

WISE prototype

State of env’ment

Member statesMember states

Member statesMember states

Inter calibrat’n

WISE publicMember states

Member states

Member statesMember states

Urban WWTD

Accessprotocols

WISE Vision - 2006

Page 10: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

10

WISE prototype

EOINET water

Map Server

Water base

Now

2006

Member statesMember states

Member statesMember states

WISE prototype

State of env’ment

Member statesMember states

Member statesMember states

Inter calibrat’n

WISE publicMember states

Member states

Member statesMember states

Water Frame’k

State of

env’mentMember statesMember states

Nitrates, bathing

Joint qst’naire

WISE public

2010

Urban WWD

Pushpull

protocols

Accessprotocols

WISE expert

WISE analysis

Accessprotocols

WISE Vision - 2010

Page 11: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

11

WFD

SOEMember states

Member statesNitrates, bathing

JQ

WISE public

Pushpull

protocols

Accessprotocols

WISE expert

WISE analysis

WISE Vision - 2010

Page 12: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

12

Reportnet ToolsReportnet Tools

Directory – User access management

CR – Content registry

ROD – Reporting Obligation Database

DD – Data Dictionary

GDEM – Generic Data Exchange Modules

CDR – Central Data Repository

Page 13: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

13

WISE prototype

EOINET water

Map Server

Water base

Now

2006

Member statesMember states

Member statesMember states

WISE prototype

State of env’ment

Member statesMember states

Member statesMember states

Inter calibrat’n

WISE publicMember states

Member states

Member statesMember states

Water Frame’k

State of

env’mentMember statesMember states

Nitrates, bathing

Joint qst’naire

WISE public

2010

Urban WWD

Pushpull

protocols

Accessprotocols

WISE expert

WISE analysis

Accessprotocols

WISE Vision - 2010

Page 14: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

14

WISE Implementation PlanWISE Implementation Plan

Page 15: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

15

Outline planOutline plan

• Basic steps• Conceptual and preparatory work • Detailed design and prototype• Development of upload facilities• Development of access facilities• Roll out for other directives

• Involved JRC, DG Env, EEA and Eurostat• Based around Waterbase and WISE prototype• 2006 launch - 2010 full roll out

Page 16: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

16

Conceptual and preparatory workConceptual and preparatory work

• Establish the user requirements including common information requirements (Task 1)

• Protocols (Task 2)• a common “submissions” user interface including validation

and system security (Task 2a)• automated data exchange between systems (Task 2b)• dissemination and publication of information to the broader

user community. (Task 2c)

• Organisation requirement to manage WISE. (Task 3)• Planned for completion by end of 2005

Page 17: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

17

Detailed design stageDetailed design stage

• Test concepts for 2006 publication using existing WISE prototype (Task 4) (Q1 2006)

• Detailed functional design (Task 5) (Q1 2006)• Submission tools and data exchange modules

• Upgrade of existing Reportnet tools• Design of publication toolset

• Design of common water information schema for water information (Task 6) (Q1 2006)• INSPIRE SDIC

• Determination of the GIS standards required (Task 7) (Q2 2006)

Page 18: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

18

Implement submission toolsImplement submission tools

• Common entry point (Task 8)• Likely extension of ROD capabilities

• Defining reporting requirement (Task 9)• Likely development of Data Dictionary facilities• Providing GIS capability

• Data exchange modules (Task 10)• Extension of DEM to enable automatic validation and

exchange• Providing GIS capability

• Target by Q4 2006

Page 19: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

19

Implement harvesting toolsImplement harvesting tools

• Develop shared Data Repository (Task 11)• Likely central dataset• Separate from master data

• Development of publication module (Task 12)• Web viewer, GIS functionality, Data download, Analysis

capability, Document repository, FAQs and graphical design

• Develop system access protocols (task 13)• Access• Level of functionality

• Target by Q4 2006

Page 20: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

20

Timetable for other DirectivesTimetable for other Directives

• Urban Water Water Treatment - Q3 2007• Nitrates Directive – Q3 2007• Bathing Waters Directive – Q2 2008• Drinking Water Directive Q1 – 2 2008• IPPC - Q4 2007• Thereafter

• Joint Questionnaire• Marine strategy• Floods initiative

Page 21: 1 Future plans for the development and implementation of WISE Tim Lack ETC Water

21

• Thank you for your attention!