1 HST Pipeline Project Review March 14, 2003

1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

1

HST PipelineProject Review

March 14, 2003

Page 2: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

2

Review Objectives

Re-familiarize Project (and others) with production data processing done by STScI

Familiarize everyone with new processing hardware and how we plan to use it

Describe the steps we will be taking to shift development, I&T, and production data processing from the old systems to the new systems

Page 3: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

3

Introduction

History – Long View History – Last Year Data processing requirements Goals of this project Overall plan

Page 4: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

4

What do we mean by “data processing” ? Receipt of science and engineering data Reformatting, quality checking, calibration, etc.

needed to prepare data for the archive Archiving the data Retrieving the data Processing and calibration of retrieved data Sending data off to the user User access tools

Page 5: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

5

History – Long View

Original plan (1981) TRW provides OSS and PODPS as two of three major

pieces of SOGS OSS to be used for real-time decision making PODPS to process science data, including calibration, for users

STScI provides SDAS (analysis tools) Established FITS format as basic science data format

Data provided to users on 1600/9600 bpi tapes No archive

Page 6: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

6

History – Long View

Pre-launch changes (1981-1990) Astrometry and Engineering Data to come to STScI PODPS to run STSDAS-based calibrations STScI to develop CDBS (calibration data base system) Archive activities started

STScI developed DMF, a prototype optical disk based archive, pressed into service ~ L+ 1 year

DADS development started at Loral StarView development started at STScI

Page 7: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

7

History – Long View

Post-Launch changes I (1990-1996) DADS delivered, data transferred from DMF to DADS

Starview released

OMS developed for engineering data and jitter files OPUS replaced OSS and PODPS

Consolidated software systems Important technology upgrade to support future growth Pipeline development for STIS and NICMOS started

Page 8: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

8

History – Long View Post-Launch Changes II (1996 – 2001)

Data volume doubled with STIS and NICMOS Archive utilization increased substantially UNIX version of OPUS developed for FUSE Archive upgraded

Magneto-Optical media replaced Optical Disks NSA project opened DADS architecture to multiple storage

media Spinning disks considered, but judged too expensive

CDBS re-implemented OTFR deployed

Reduced archive volume Provided up-to-date calibrations to users

Page 9: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

9

History – Long View

Page 10: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

10

History – Long View Additional improvements and consolidations have

been in our plans over the last few years DADS evolution

Remove VMS dependencies Make future technology migrations easier Improve services based on community usage of HST archive

Replace OMS Remove VMS dependency Simplify system

ACS data and data processing Increased volume Drizzle algorithms for geometric correction and image co-

addition

Page 11: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

11

History – Last Year Several parts of the system exhibited unacceptable

performance Processing of data from HST to the Archive Response time to user requests for data from Archive

Several specific causes NFS mount problems Disk corruption in OPUS Jukebox problems Other specific hardware problems

Symptomatic of more general problems with the data processing systems

Page 12: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

12

History – Last Year

Page 13: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

13

History – Last Year

Page 14: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

14

History – Last YearDADS Downtime Statistics

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

14.00%

16.00%

18.00%

20.00%

May-02 Jun-02 Jul-02 Aug-02 Sep-02 Oct-02 Nov-02 Dec-02 Jan-03

% D

ow

nti

me

Goal: <5%

(1 day/week = 14%)

Page 15: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

15

History – Last Year Immediate steps were taken to upgrade available

hardware Added 6 CPUs and memory to Tru64 systems Added CPUs and memory to Sun/Solaris systems Added and reconfigured disk space

Large ACS data sets moved to an ftp site to avoid load on archive system EROs and GOODs data sets Ftp site off-loaded ~10GBytes/day from archive in last

several months (~20% effect)

Page 16: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

16

Current status

System keeping up with demands Running ~50% capacity on average Loading in various places is very spiky

Instability of system, and diversion of resources, has put delivery of data to ECF and CADC substantially behind schedule

Expect load to increase in spring as ACS data become non-proprietary

Page 17: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

17

ECF, CADC, NAOJ Data Transfer

0

10

20

30

40

50

60

70

80

90

Date

GB

Sh

ipp

ed

NAOJ

POD

ECF/CADC

Page 18: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

18

Bulk distribution backlog In absolute numbers: ~40,000 POD files Archive Branch does not believe the current AutoBD can

keep up with the current data volume, much less catch up. Implement ftp tool to augment transfer. Tool accesses data

on MO directly. May be able to bypass DADS by using safestores and development JB or stand-alone reader

Distribution re-design CADC/ECF will be included as beta test sites in parallel

operations starting ~ April 1, 2003. New engine allows operators to prioritize requests New engine supports transfer of compressed data Consolidation of operating systems should improve reliability

With all these solutions, preliminary estimate is that backlog could be eliminated in a few months

Page 19: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

19

Data Processing Requirements Performance requirements (Astronomy

community expectations) Data volume requirements

Into system from HST Out of system to Astronomy community

Programmatic goals Fit within declining HST budget at STScI Expect archive to live beyond HST operational lifetime Expect archive will be used to support JWST

Page 20: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

20

Performance Requirements-I

Average time from observation execution to data receipt < 1 day

Average time from observation execution to data availability in archive < 2 days

98% of data available in archive in < 3days

Page 21: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

21

DADS Downtime Statistics

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

14.00%

16.00%

18.00%

20.00%

May-02 Jun-02 Jul-02 Aug-02 Sep-02 Oct-02 Nov-02 Dec-02 Jan-03

% D

ow

nti

me

Goal: <5%

(1 day/week = 14%)

Performance Requirements-II

Archive availability: 95%

Median retrieval times Defined as time from request to when data is ready for

transmission. Does not include transmission time. Non-OTFR data (not recalibrated): 5 hours OTFR data (recalibrated): 10 hours

Median retrieval times Defined as time from request to when data is ready for

transmission. Does not include transmission time. Non-OTFR data (not recalibrated): 5 hours OTFR data (recalibrated): 10 hours

Page 22: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

22

Performance Requirements-III

User support Unlimited number of registered users Support increased level of requests

Currently ~2000/month Expect to grow at 20% per year (guess) Reduce unsuccessful requests to <5%

Routinely handle highly variable demand Daily request volume varies by more than factor of 10 Insulate pre-archive processing from OTFR load

Page 23: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

23

Data Volume Requirements-I

Data volume from HST - now Currently receive ~120 GBits/week from HST Currently ingest ~100 GBytes/week into the archive Currently handle ~2000 observations/week

Data volume from HST – after SM4 Expect ~200 GBits/week from HST Expect to ingest ~160 GBytes/week into archive Expect to handle ~2000 observations/week

Page 24: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

24

Data Volume Requirements-II

Data distribution today More than 300 GBytes/week from archive More than 70 GBytes/week from ftp site

Data distribution projection Distribution volume determined by world-wide

Astronomy community – very unpredictable Large increase expected as Cycle 11 data become non-

proprietary Should expect 500-1000 GBytes/week in a few years

Page 25: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

25

Programmatic Goals Reduce total cost of data processing activities Simplify hardware and network architecture

Reduce Operating Systems from 3 to 1 Terminate use of VMS and Tru64 Eliminate passing of data through various OSs

Consolidate many boxes into two highly reliable boxes Flexible allocation of computing resources

Support easy re-allocation of CPU and Disk resources among tasks

Provide simple growth paths, if needed

Page 26: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

26Current Architecture

TRU64 SOLARISVMS

Page 27: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

27

Programmatic Goals Provide common development, test, and

operational environments Current development and test systems cannot replicate

load of operational systems Reduce complexity of development and test

environments (drop VMS, Tru64) Improve ability to capture performance data,

metrics, etc. Current systems too diverse Difficult to transfer performance measurement on

development/test systems to operations

Page 28: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

28

Current Development and I&T Environment

Nomad

Robbie

Scarab

Development & TestTeams

TO: InstituteCommunity

CD Burners

John (EDP-Dev)

1 TB

ODO Cluster

ToOperations

Jukebox

Barge

Corsair

Aardvark

Artichoke

Liner

Jukeboxes

Tape drive

Jboat

Canoe

Paul (IDR-Beta)

Ringo (EDP-Ops)

George (IDR-Dev)

Alpha/OpenVMS

Alpha/OpenVMS

Alpha/OpenVMS

VMSTRU64

Page 29: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

29

EMC StorageArray

2GB Switch

SUN FIRE15K

EMC BackupManager

SUN BackupManager

HST

FROM: ScienceCommunity(thru StarView)

FUSEEngineering Team

TO: ScienceCommunity

Fatkat

Imagemaker

Fiber Channel

Ethernet 10/100Connections to

Institute Networkand Internet

ARCHC SCARAB

Ops-Jukeboxes

Corsair

Dev-Jukeboxes

DVD DrivesW DVDW DVD

W DVD

DVD DrivesW DVDW DVD

W DVD

CD Burners

CD Burners

New Architecture

SUN FIRE 15K Domain Config

Opus/Archive

To Test andDevelopmentEnvironment

7 Dynamically Re-Configurable Domains

EMC

EMC

EMC

EMC

EMC

EMC

OPUS/Archive OPS

EMC

Databases OPS

Databases OPS

Code Development

System Test

Database Test

OS/Security Test

Page 30: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

30

Programmatic Goals Continue planned pipeline evolution

DADS Distribution redesign provides more flexibility to users and operators

Reflect advent of OTFR Reflect community utilization of the archive Provide operators more control over priority and loadings

Storing copy of Raw Data on EMC will dramatically reduce load and reliance on Jukeboxes

Ingest redesign provides opportunity to finally end the arbitrary boundary between OPUS and DADS

Page 31: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

31

Programmatic Goals Future growth paths for HST

To first order, we expect HST to live within the capabilities of this architecture through SM4 to EOL

Input data volume will increase some, but not a lot Plan to adjust distribution techniques and user expectations to live

within the 15K/EMC resources However, we will encourage ever more and better use of HST

science data

Beyond HST End-of-Life HST data distribution would need to be revisited based on

utilization at the time (seven years from now) and progress of NVO initiatives

Architecture is planned starting point for JWST, hardware is very likely to need major upgrades

Page 32: 1 HST Pipeline Project Review March 14, 2003. 2 Review Objectives Re-familiarize Project (and others) with production data processing done by STScI Familiarize

32

Remainder of the Review Architecture New hardware (Sunfire 15K, EMC)

What it is, how it works Steps to make it operational

Moving development, I&T, databases Moving operational processing

OPUS processing Raw data off Jukeboxes onto EMC Archive software upgrades