92
1 http:// www.rucker.army.mil/weather/mefweb /MEFweb.htm Today’s Planning Data As of: 11 January 2006

1 EFweb.htm Today’s Planning Data As of: 11 January 2006

Embed Size (px)

Citation preview

Page 1: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

1

http://www.rucker.army.mil/weather/mefweb/MEFweb.htm

Today’s Planning Data

As of: 11 January 2006

Page 2: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

3

UH-60 MOI Phase III

Daily Briefs

TD 44 TD 45 TD 46 TD 47 TD 48

TD 49 TD 50 TD 51 TD 52 TD 53

Page 3: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

4

TD 44

TD 44

Page 4: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

5

BDE SOP

6-23. STANDARDIZED STUDENT BRIEFING.

a. Graduate and undergraduate students will: (1) Hand write/print all answers to daily questions. Daily handwritten

answers will be checked by the assigned IP. (No computer generated answers or copies)

(2) All daily questions will be answered in the following method. When called to answer a question the student (graduate and undergraduate) will stand, address the briefing officer and respond to the question.

(3) When answering daily questions in class, it will be closed book. b. Instructor pilots will be present during the student briefing and daily

question period.

Page 5: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

6

DAILY QUESTIONS

The 1-212th SOP, Chapter 6 Flight Procedures and Rules is applicable to

BN SOP Page 1, Para 6-1, c

all personnel under the supervision of the 1-212th Aviation Regiment. Each Pilot-in-Command will carry a copy of this SOP, with all changes posted, when engaged in flight activities

Page 6: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

7

Recommendations for changes, additions, or deletions to 1-212th SOP, Chapter 6 Flight Procedures and Rules, should be forwarded to

BN SOP Page 1, Para 6-1, f

Commander, 1-212th Aviation Regiment, ATTN: Chief, 1-212th Aviation Standards.

Page 7: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

8

BN SOP Page 1, Para 6-1, g

IAW The 1-212th SOP, Chapter 6 Flight Procedures and Rules, must approve deviations from this SOP. Violations resulting from in-flight emergencies or other unavoidable situations will be reported immediately as time permits to

?

The 1-212th Commander

Commander 1-212th Aviation Regiment.

Page 8: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

9

Fort Rucker Regulation 95-1 applies to ?

Fort Rucker Regulation 95-1, page 1, Para 1-3

all aviation activity at Fort Rucker, Alabama

Page 9: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

10

In addition to the requirements of AR 95-1, paragraph 2-5, all aircraft operating in the Fort Rucker local flying area will carry

?

Fort Rucker Regulation 95-1, page 5, Para 4-1, a

the appropriate maps required to navigate the corridor structure to and from their assigned area of operations. These maps will identify authorized training routes and applicable noise avoidance areas

Page 10: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

11

Mission BriefingMission BriefingMission: MOI Phase III - Stagefield/Training Area

Task(s): Standards, common errors, recovery techs

SOP

Scheduled Times: Syllabus/Issue/Code/Downtime

Flight Modes – D N NG VMC IMC Hood Terrain Flt, Multi-aircraft, Maneuvering Flt, External Loads

Go around procedures IAW BDE SOP (Ch 6 para 6-21)

Special Mission Equipment

Flight Route and/or Stagefield

Page 11: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

13

Mission BriefingMission BriefingWeather - MEF - 175Risk AssessmentCrew CoordinationSafety Considerations (Safety tip using

5 step process)Noise AvoidanceAir Mission CommanderIIMC ProceduresIP/SP assignments to include seat assignmentsAuthorization to Pick-up PL CrewsSOFs & ASAMs (ASM User Page)

Weather - MEF - 175Risk AssessmentCrew CoordinationSafety Considerations (Safety tip using

5 step process)Noise AvoidanceAir Mission CommanderIIMC ProceduresIP/SP assignments to include seat assignmentsAuthorization to Pick-up PL CrewsSOFs & ASAMs (ASM User Page)

Page 12: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

14

TD 45

TD 45

Page 13: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

15

DAILY QUESTIONS

USAAVNC Regulation 95-1 applies to ?

all rated and nonrated crewmembers assigned to operational flying positions at the USAAVNC.

USAAVNC Regulation 95-1, page 1, para 1-3

Page 14: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

16

IAW USAAVNC Regulation 95-1 & Fort Rucker Reg 95-1: Night/night vision goggle/night vision system training may be conducted at basefield hover areas with ____

visibility provided the following considerations have been met:

(1)The student pilot or rated student pilot has not flown more than ___ training flights in that phase of the flight training course. This restriction does not apply to OH-58D left seat and gunnery flight training phases,AH-64 IPC gunnery flight training phase, and CH-47 IPC.

(2) This provision is not applicable to the AH-64 pilot night vision system (PNVS) flight training phase

USAAVNC Regulation 95-1, page 10, para 5-2, c 1, 2

1 mile

5

Page 15: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

17

Flights conducted under a program of instruction are prohibited from carrying passengers. Exceptions are

Commanders within the Aviation Training Brigade may approve other passengers on a case-by-case basis and in accordance with the provisions of AR 95-1, paragraphs 3-12 and 3-13.

USAAVNC Regulation 95-1, page 2, para 2-8

students enrolled in a formal course of instruction, standardization instructor pilots (SPs), instructor pilots (IPs), instrument examiners (IEs), maintenance test flight evaluators, nonrated crewmember instructors (FI), nonrated crewmember standardization instructors (SI), flight surgeons and flight surgeon students (MO).

Page 16: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

18

IAW USAAVNC Regulation 95-1 Flights in USAAVNC fixed wing and rotary wing aircraft outside the local flying area, published in Fort Rucker Reg 95-2, requires the approval of

. Requests will be submitted in accordance with procedures outlined in

?

the DCAO.

USAAVNC Reg 95-1 chapter 3, paragraph 3-2.

USAAVNC Regulation 95-1, page 2, para 2-1, b

Page 17: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

19

What is the purpose of Fort Rucker Regulation 95-2?

The purpose of this publication is to establish general policy for airspace, stagefield, basefield, and range usage at Fort Rucker, Alabama. All items are regulatory in nature and shall be strictly followed.

Fort Rucker Regulation 95-2, page 6, para 1-1,a

Page 18: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

20

All references made to airport surface areas around stagefields are for Fort Rucker users from the surface to feet mean sea level (MSL) and the lateral distance of

statute miles (SMs) unless otherwise depicted in the appropriate stagefield diagram. These surface areas are for Fort Rucker users and do not apply to civil aircraft.

Fort Rucker Regulation 95-2, page 10, para 1-2 p

1400

2

Page 19: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

21

The AMC at stagefields outside Cairns AAF Class D Airspace is responsible for contacting _______ by land line or aircraft radio to ascertain if weather conditions prevail in the Class D Airspace that will permit recovery to the basefield during marginal weather conditions.

Fort Rucker Regulation 95-2, page 26, para 3-5

METRO

Page 20: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

22

Emergency or Precautionary Landing Areas. The area located approximately __________________________________________________________________________________________ are designated as the emergency landing areas (see the Lowe Heliport diagram). Aircraft returning to Lowe AHP with an emergency shall advise Lowe AHP ATCT. Aircraft experiencing hydraulic or tail rotor failure should proceed to Cairns AAF. Air traffic controllers shall consider all helicopters landing at Lowe as an emergency if material damage or abnormal engine/flight control is reported.

Fort Rucker Regulation 95-2, page 42, para 3-17, c

110 meters south of 36 landing pads (south hover area), and 200 meters north of E and G pads (north tracking),

Page 21: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

23

TSO RESPONSIBILITIES.

a. The TSO shall be designated for each flight where or more aircraft are engaged in flight training? The TSO shall ensure that he/she has logged in with the ATCT by making an entry in the ATC log or by relaying his/her name and duty to the ATCT.

3

Page 22: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

24

The primary TSO duty shall be to

He/She is authorized to give recommendations to the ATCT facility chief, shift supervisor, or controller in charge to ensure safe and efficient training is being conducted. The TSO is authorized use of the radio to make direct, on-the-spot technical information and instruction to any individual experiencing a critical or emergency aircraft operating condition. He/She may utilize other IPs or SPs in the training area to relay information and monitor the progress of any aircraft experiencing difficulties. NOTE: During Primary IERW training supervised solo flights, the flight contractor TSO must be physically present in the stagefield tower.

ensure the safe and efficient conduct of training

TSO RESPONSIBILITIES cont

Page 23: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

25

The TSO shall be familiar with the provisions of AR 420-90, Fire and Emergency Services; Fort Rucker Reg 95-1; Flight Regulations, Fort Rucker Reg 95-2; the appropriate noise avoidance procedures for that facility, and the 110th Aviation Brigade SOP. Provide recommendations to the ATC facility chief concerning lane usage to enhance training or in the interest of flight safety. NOTE: Final authority for ATC of aircraft _______________________________________rests with the facility chief or ATC shift supervisors

Fort Rucker Reg 95-2 page 230, App C, C-1, a-d

Page 24: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

26

USAAVNC Regulation 95-4 applies to?

all USAAVNC departments, directorates, offices, and tenant activities that perform functions of flight training, flight time input, and flight reports production utilizing the ACFRS.

USAAVNC Regulation 95-4, para 1-2

Page 25: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

27

What is the purpose of Fort Rucker Regulation 95-59?

To provide a list of MEE required to be installed and operational to meet flight training performance objectives, by category, in accordance with established programs of instruction.

USAAVNC Regulation 95-59, para 1

Page 26: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

28

Mission BriefingMission BriefingMission: MOI Phase III - Stagefield/Training Area

Task(s): Standards, common errors, recovery techs

SOP

Scheduled Times: Syllabus/Issue/Code/Downtime

Flight Modes – D N NG VMC IMC Hood Terrain Flt, Multi-aircraft, Maneuvering Flt, External Loads

Go around procedures IAW BDE SOP

Special Mission Equipment

Flight Route and/or Stagefield

Page 27: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

29

Mission BriefingMission BriefingWeather - MEF - 175Risk AssessmentCrew CoordinationSafety Considerations (Safety tip using

5 step process)Noise AvoidanceAir Mission CommanderIIMC ProceduresIP/SP assignments to include seat assignmentsAuthorization to Pick-up PL CrewsSOFs & ASAMs (ASM User Page)

Page 28: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

30

TD 46

TD 46

Page 29: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

31

DAILY QUESTIONS

What is the purpose of Fort Rucker Regulation 210-5?

PURPOSE: To establish responsibilities and standardize procedures concerning flight-training facilities used by the United States Army Aviation Center (USAAVNC)

Fort Rucker Regulation 210-5, page 1, para 1

Page 30: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

32

What is the purpose of USAAVNC Regulation 350-4?

PURPOSE: To establish responsibilities and standardize procedures concerning the utilization of classrooms at the United States Army Aviation Center (USAAVNC).

USAAVNC Regulation 350-4, para 1

Page 31: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

33

USAAVNC Regulation 350-15 will be implemented for

?

all Department of Army (DA) resident Programs of Instruction (POIs) conducted at USAAVNC.

USAAVNC Regulation 350-15, para 1,e

Page 32: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

34

(USAAVNC Regulation 350-16) The purpose of the Uniform Flight Grading System is to--

(1) Standardize procedures to distinguish satisfactory from unsatisfactory progress in training.

(2) Provide performance feedback to the student on a daily basis. This helps motivate students to put forth their best effort during training and evaluations by permitting them to compare their progress with minimum progress standards and the progress of their peers.

(3) Permit the evaluation of training methods and instructor effectiveness.

USAAVNC Regulation 350-16, para 1-1, b

Page 33: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

35

What is the purpose of USAAVNC Regulation 350-20?

PURPOSE. This regulation outlines the administrative policies, procedures, and provisions governing student disposition for formal resident training courses conducted at the USAAVNC.

USAAVNC Regulation 350-20, page 2, para 1

Page 34: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

36

Mission BriefingMission BriefingMission: MOI Phase III - Stagefield/Training Area

Task(s): Standards, common errors, recovery techs

SOP

Scheduled Times: Syllabus/Issue/Code/Downtime

Flight Modes – D N NG VMC IMC Hood Terrain Flt, Multi-aircraft, Maneuvering Flt, External Loads

Go around procedures IAW BDE SOP

Special Mission Equipment

Flight Route and/or Stagefield

Page 35: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

37

Mission BriefingMission BriefingWeather - MEF - 175Risk Assessment

Crew Coordination

Safety Considerations (Safety tip using 5 step process)

Noise Avoidance

Air Mission Commander

IIMC Procedures

IP/SP assignments to include seat assignments

Authorization to Pick-up PL Crews

SOFs & ASAMs (ASM User Page)

Page 36: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

38

TD 47

TD 47

Page 37: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

39

(USAAVNC Reg 350-27) Unless otherwise specified in the POI, the instructional period to be used for all classroom subjects, including flight briefings will consist of 50 minutes of instruction with a 10-minute rest break between consecutive periods of instruction.

Flight departments may consolidate and allow students a . Portions of flight periods when students are not actively engaged in

may be considered rest breaks?

USAAVNC Regulation 350-27, page 1, para 2,a,b

rest breakslonger break

flight or student/instructor critiques

Page 38: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

40

(BDE SOP) Synthetic Flight Training Simulators (SFTS) / Combat Mission Simulator (CMS) / Longbow Crew Trainer (LCT) training and evaluations: IP/SP/Instrument Examiners (IE) may log time while occupying or when conducting instruction or evaluations?

the cockpit, Instructor Operator Station (IOS) or jump seat

BDE SOP para 6-7, a

Page 39: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

41

Day-phase training after sunset: USAAVNC instructor pilots may continue to train students in support of a day-phase POI after sunset and log that time as syllabus time. The following conditions apply.(1) IERW training

.(2) Graduate flight training may continue until scheduled downtime.(3) Any night restrictions on maneuvers in the Aircrew Training Manual or Flight Training Guide will apply. Also, IP’s will ensure that night training weather requirements are met.(4) Flight time logged on DA Form 2408-12 will be per AR 95-1.(5) Time logged on DA Form 2408-12 as night

?(6) Commanders and instructors will ensure

?

Page 40: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

42

Day-phase training after sunset: USAAVNC instructor pilots may continue to train students in support of a day-phase POI after sunset and log that time as syllabus time. The following conditions apply.(1) IERW training may continue until 30 minutes after sunset.(2) Graduate flight training may continue until scheduled downtime.(3) Any night restrictions on maneuvers in the Aircrew Training Manual or Flight Training Guide will apply. Also, IP’s will ensure that night training weather requirements are met.(4) Flight time logged on DA Form 2408-12 will be per AR 95-1.(5) Time logged on DA Form 2408-12 as night will not be credited toward any night phase POI requirements.(6) Commanders and instructors will ensure that the training conducted after sunset is viable and valuable.

BDE SOP para 6-7, b

Page 41: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

43

What is the goal of risk management?

The fundamental goal of risk management is to enhance operational capabilities and mission accomplishment, with acceptable loss.

FM 3-100.12 page I-1, para 2

Page 42: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

44

Discuss the 4 principles of risk management.

1. Accept No Unnecessary Risk.

An unnecessary risk is any risk that, if taken, will not contribute meaningfully to mission accomplishment or will needlessly endanger lives or resources. No one intentionally accepts unnecessary risks. The most logical choices for accomplishing a mission are those that meet all mission requirements while exposing personnel and resources to the lowest acceptable risk. All military operations and off-duty activities involve some risk. The risk management process identifies threats that might otherwise go unidentified and provides tools to reduce or offset risk. The corollary to this axiom is “accept necessary risk” required to successfully complete the mission or task.

Page 43: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

45

2. Make Risk Decisions at the Appropriate Level.Anyone can make a risk decision; however, the appropriate level for risk decisions is the one that can make decisions to eliminate or minimize the threat, implement controls to reduce the risk, or accept the risk. Commanders at all levels must ensure that subordinates know how much risk they can accept and when to elevate the decision to a higher level. Ensuring that risk decisions are made at the appropriate level will establish clear accountability. The risk management process must include those accountable for the mission. After the commander, leader, or individual responsible for executing the mission or task determines that controls available to them will not reduce risk to an acceptable level, they must elevate decisions to the next level in the chain of command.

Discuss the 4 principles of risk management.

Page 44: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

46

3. Accept Risk When Benefits Outweigh the Cost.

The process of weighing risks against opportunities and benefits helps to maximize mission success. Balancing costs and benefits is a subjective process and must remain a leader's decision.

Discuss the 4 principles of risk management.

Page 45: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

47

Discuss the 4 principles of risk management.

4. Anticipate and Manage Risk by Planning. Integrate risk management into planning at all levels. Commanders must dedicate time and resources to apply risk management effectively in the planning process, where risks can be more readily assessed and managed. Integrating risk management into planning as early as possible provides leaders the greatest opportunity to make well-informed decisions and implement effective risk controls. During execution phases of operations, the risk management process must be applied to address previously unidentified risks while continuing to evaluate the effectiveness of existing risk control measures and modify them as required.

FM 3-100.12 pg I-2, para 4

Page 46: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

48

Mission BriefingMission BriefingMission: MOI Phase III - Stagefield/Training Area

Task(s): Standards, common errors, recovery techs

SOP

Scheduled Times: Syllabus/Issue/Code/Downtime

Flight Modes – D N NG VMC IMC Hood Terrain Flt, Multi-aircraft, Maneuvering Flt, External Loads

Go around procedures IAW BDE SOP

Special Mission Equipment

Flight Route and/or Stagefield

Page 47: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

49

Mission BriefingMission BriefingWeather - MEF - 175Risk AssessmentCrew CoordinationSafety Considerations (Safety tip using the 5 steps)Noise AvoidanceAir Mission CommanderIIMC ProceduresIP/SP assignments to include seat assignmentsAuthorization to Pick-up PL CrewsSOFs & ASAMs (ASM User Page)

Page 48: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

50

TD 48

TD 48

Page 49: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

51

What is the intent of Chapter 4 of the Flight Training Guide for UH60 MOI Mission Training?

To provide the IP with a compilation of common errors, instructional techniques, and recovery procedures that have time proven qualities. The material in this chapter is not all encompassing. It is merely an attempt to fill the voids between the ATM, Instructor Pilot’s Handbook, and local SOPs.

Page 50: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

52

During UH-60 AQC Phase I – Transition how many training days are conducted in the SFTS?

6 TDs are flown in SFTS. (TD 1,2,3,4,16,17)

FTG UH60 AQC page 6

Page 51: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

53

How many weeks is the IERW UH-60 transition?

4 weeks

FTG IERW UH-60 Transition page 2, para 1-1, b

Page 52: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

54

IERW UH-60 Basic Combat Skills phase consists of hours to be flown in training days?

IERW UH-60 Basic Combat Skills phase consists of 25.1 hours to be flown in 20 training days?

FTG IERW UH-60 Basic Combat Skills page 2, para 1-3, a

Page 53: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

55

During IERW UH-60 Night/Night Vision Goggles the following equipment and references are required at the flight line:

1. Essential flight equipment and uniform.

2. FMs 90-4 and 1-204.

3. TMs 1-1520-237-10 and 1-1520-237-CL.4. TC -1-210 and UH-60 Aircrew Training Manual.

5. Terrain Flight Mission Planning Guide.

FTG IERW UH-60 NIGHT/NVG page 3, para 1-4, a

Page 54: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

56

Mission BriefingMission BriefingMission: MOI Phase III - Stagefield/Training Area

Task(s): Standards, common errors, recovery techs

SOP

Scheduled Times: Syllabus/Issue/Code/Downtime

Flight Modes – D N NG VMC IMC Hood Terrain Flt, Multi-aircraft, Maneuvering Flt, External Loads

Go around procedures IAW BDE SOP

Special Mission Equipment

Flight Route and/or Stagefield

Page 55: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

57

Mission BriefingMission BriefingWeather - MEF - 175Risk Assessment

Crew Coordination

Safety Considerations (Safety tip using 5 step process)

Noise Avoidance

Air Mission Commander

IIMC Procedures

IP/SP assignments to include seat assignments

Authorization to Pick-up PL Crews

SOFs & ASAMs (ASM User Page)

Page 56: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

58

TD 49

TD 49

Page 57: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

59

What are the standards for Perform Flight Characteristics at VH-IAS?

1.Maintain dual engine maximum torque +0%, -5% torque.

2.Establish Vh airspeed +/- 5 KIAS.

UH-60 Handbook for Combat Maneuvering Flight and Power Management Instructor

Pilot Handout page 23.

Page 58: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

60

What symbol would be used on DA Form 2408 series to indicate that the aircraft has been or may have been chemically contaminated?

C

DA Form 2408 Status Symbols

Page 59: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

61

What Flight Variation Code would be used to indicate aircraft rejected due to maintenance deficiency within the first two hours of issue?

“J”

Logging Flight Time Flight Variation Codes

Page 60: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

62

During Pre-flight you discover your assigned aircraft does not have full fuel tanks, what form (located in logbook) would you be used to report this discrepancy?

USAAVNC FORM 155

Page 61: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

63

Complete the following chart IAW Fort Rucker Reg 95-1

Special VFR ceiling and visibility minimums for Fort Rucker operated airfields and heliports are:

Rotary Wing Ceiling Visibility

Daytime

Night/NVD

300’ ½ SM

500’ 1 SM

Fort Rucker Regulation 95-1, page 5, Para 4-2, a

Page 62: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

64

Mission BriefingMission BriefingMission: MOI Phase III - Stagefield/Training Area

Task(s): Standards, common errors, recovery techs

SOP

Scheduled Times: Syllabus/Issue/Code/Downtime

Flight Modes – D N NG VMC IMC Hood Terrain Flt, Multi-aircraft, Maneuvering Flt, External Loads

Go around procedures IAW BDE SOP

Special Mission Equipment

Flight Route and/or Stagefield

Page 63: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

65

Mission BriefingMission BriefingWeather - MEF - 175Risk Assessment

Crew Coordination

Safety Considerations (Safety tip using 5 step process)

Noise Avoidance

Air Mission Commander

IIMC Procedures

IP/SP assignments to include seat assignments

Authorization to Pick-up PL Crews

SOFs & ASAMs (ASM User Page)

Page 64: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

66

TD 50

TD 50

Page 65: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

67

IAW Fort Rucker Reg 95-1 for SFVR what are the minimum ceiling and visibility for Multi-Aircraft Operations at night?

700’ – 1

Fort Rucker Regulation 95-1, page 5, Para 4-2, a

Page 66: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

68

IAW USAAVNC Reg 95-1 flights conducted under a program of instruction are prohibited from carrying passengers. Exceptions are_______? students enrolled in a formal course of instruction, standardization instructor pilots (SPs), instructor pilots (IPs), instrument examiners (IEs), maintenance test flight evaluators, nonrated crewmember instructors (FI), nonrated crewmember standardization instructors (SI), flight surgeons and flight surgeon students (MO). Commanders within the Aviation Training Brigade may approve other passengers on a case-by-case basis and in accordance with the provisions of AR 95-1, paragraphs 3-12 and 3-13.

USAAVNC Regulation 95-1, page 2, para 2-8

Page 67: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

69

IAW USAAVNC Reg 95-1 the CG, USAAVNC, is the waiver authority for, and has waived, the requirement for seats during and

. UH-60 crews will comply with the restrictions and procedures in AR 95-1, paragraph 8-11e. parachute drops and rappelling missions.

USAAVNC Regulation 95-1, page 3, para 3-5

Page 68: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

70

IAW Fort Rucker Reg 95-2, An Emergency / Precautionary situation is one which may place an aircraft in danger; i.e., uncertainty, lost, or in distress. Whenever it is believed that an emergency/precautionary situation exists or is imminent, Air Traffic Control (ATC) personnel shall

and. Information contained on DA Form

2397AB-R (Abbreviated Aviation Accident Report) shall be furnished to Crash Control as soon as it becomes available.

Page 69: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

71

IAW Fort Rucker Reg 95-2 Emergency/Precautionary Determination. An emergency/precautionary situation is one which may place an aircraft in danger; i.e., uncertainty, lost, or in distress. Whenever it is believed that an emergency/precautionary situation exists or is imminent, Air Traffic Control (ATC) personnel shall initiate crash procedures and immediately alert the Cairns Crash Control Center. Information contained on DA Form 2397AB-R (Abbreviated Aviation Accident Report) shall be furnished to Crash Control as soon as it becomes available.

Fort Rucker Regulation 95-2, page 7, Para 1-2, a

Page 70: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

72

IAW Fort Rucker Reg 95-2 Terrain flight activities shall be confined to and designated areas. Area of Operation (AO) Bearcat, AO Hawk, and

training areas are designated as terrain flight training areas (TFTAs).

Page 71: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

73

IAW Fort Rucker Reg 95-2 Terrain flight activities shall be confined to established route/areas and designated basefield hover areas. Area of Operation (AO) Bearcat, AO Hawk, and AO Vanguard training areas are designated as terrain flight training areas (TFTAs).

Fort Rucker Regulation 95-2, page 7, Para 1-2, c, (1)

Page 72: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

74

Mission BriefingMission BriefingMission: MOI Phase III - Stagefield/Training Area

Task(s): Standards, common errors, recovery techs

SOP

Scheduled Times: Syllabus/Issue/Code/Downtime

Flight Modes – D N NG VMC IMC Hood Terrain Flt, Multi-aircraft, Maneuvering Flt, External Loads

Go around procedures IAW BDE SOP

Special Mission Equipment

Flight Route and/or Stagefield

Page 73: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

75

Mission BriefingMission BriefingWeather - MEF - 175Risk Assessment

Crew Coordination

Safety Considerations (Safety tip using 5 step process)

Noise Avoidance

Air Mission Commander

IIMC Procedures

IP/SP assignments to include seat assignments

Authorization to Pick-up PL Crews

SOFs & ASAMs (ASM User Page)

Page 74: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

76

TD 51

TD 51

Page 75: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

77

ACFRS users, in the normal course of performing their assigned functions, have access to significant amounts of personal data. Irreparable damage can be done to an individual by disclosing or failing to adequately safeguard personal information. Therefore, personal information acquired while working on the ACFRS must be

?

Page 76: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

78

ACFRS users, in the normal course of performing their assigned functions, have access to significant amounts of personal data. Irreparable damage can be done to an individual by disclosing or failing to adequately safeguard personal information. Therefore, personal information acquired while working on the ACFRS must be scrupulously safeguarded.

USAAVNC Regulation 95-4, Chapter 2, para 2- 4

Page 77: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

79

Non-acceptance of an aircraft or flight simulator will be indicated in black ink by the pilot's—

(1)Use of flight variance code on DA Form 2408-12 (Army Aviator's Flight Record).

(2) Appropriate entry on DA Form 2408-13-1 (Aircraft Maintenance and Inspection Record), and the time entry was recorded.

USAAVNC Regulation 95-59, para 3, b

Page 78: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

80

From the list of Minimum Essential Equipment required to be installed and operational to meet flight training performance objectives, by category, in accordance with established programs of instruction, what aircraft lighting must be operational for Contact/Transition training?

Aircraft Position LightsAircraft Anti-collision LightsLanding Light

USAAVNC Regulation 95-59, page A-2

Page 79: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

81

IAW BN SOP, during flight, flight suits will be worn with collars turned up, sleeves down and

. All other protective clothing and equipment will be IAW AR 95-1. ID tags will be worn IAW AR 670-1.

Nomex gloves under sleeves

BN SOP Page 3, Para 6-2, a, 1

Page 80: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

82

UH-60: Aircraft will ground taxi to the takeoff pad/edge of ramp prior to picking the aircraft up to a hover. The only exception is

?

if the tailwheel will not unlock

BN SOP Page 3, Para 6-2, c, note

Page 81: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

83

Mission BriefingMission BriefingMission: MOI Phase III - Stagefield/Training Area

Task(s): Standards, common errors, recovery techs

SOP

Scheduled Times: Syllabus/Issue/Code/Downtime

Flight Modes – D N NG VMC IMC Hood Terrain Flt, Multi-aircraft, Maneuvering Flt, External Loads

Go around procedures IAW BDE SOP

Special Mission Equipment

Flight Route and/or Stagefield

Page 82: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

84

Mission BriefingMission BriefingWeather - MEF - 175Risk Assessment

Crew Coordination

Safety Considerations (Safety tip using 5 step process)

Noise Avoidance

Air Mission Commander

IIMC Procedures

IP/SP assignments to include seat assignments

Authorization to Pick-up PL Crews

SOFs & ASAMs (ASM User Page)

Page 83: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

85

TD 52

TD 52

Page 84: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

86

FOD Control: Any tools or maintenance equipment found in or around the helicopter will be reported to ACLC immediately. Do not

?

move the FOD until ACLC has made the inspection.

BN SOP Page 3, Para 6-2, f, 1

Page 85: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

87

Checklist/Operators Manual: AQC and IERW Transition students may write in references to NOTES, CAUTIONS, and WARNINGS in their checklist. These written-in entries are limited to

?

the letters N, C, or W ONLY.

BN SOP Page 8, Para 6-3, a, 4

Page 86: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

88

To reestablish aircraft currency (UH-60), the following commander designated tasks will be evaluated as a minimum?

Page 87: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

89

1004 Prepare a UH-60 PPC 1005 Perform preflight inspection 1007 Perform before starting engines through aircraft shutdown checks 1015 Perform ground taxi 1016 Perform hover power check 1017 Perform hovering flight 1018 Perform VMC takeoff 1023 Perform fuel management procedures 1026 Perform electronically aided navigation 1028 Perform VMC approach 1029 Perform roll-on landing 1053 Perform simulated engine failure at altitude 1058 Perform flight with AFCS off 1062 Perform ECU lockout operations 1063 Perform procedures for stabilator malfunction 1068 Perform or describe emergency procedures 1146 Perform VMC flight maneuvers NOTE: An instrument approach should also be flown.

BN SOP Page 12, Para 6-3, e, 2

Page 88: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

90

The Design Eye Point (DEP), if applicable, seat adjustment position, will be demonstrated and emphasized to ALL students at the beginning of

?

each phase if applicable.

BN SOP Page 14, Para 6-3, f, 4

Page 89: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

92

Mission BriefingMission BriefingMission: MOI Phase III - Stagefield/Training Area

Task(s): Standards, common errors, recovery techs

SOP

Scheduled Times: Syllabus/Issue/Code/Downtime

Flight Modes – D N NG VMC IMC Hood Terrain Flt, Multi-aircraft, Maneuvering Flt, External Loads

Go around procedures IAW BDE SOP

Special Mission Equipment

Flight Route and/or Stagefield

Page 90: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

93

Mission BriefingMission BriefingWeather - MEF - 175Risk Assessment

Crew Coordination

Safety Considerations (Safety tip using 5 step process)

Noise Avoidance

Air Mission Commander

IIMC Procedures

IP/SP assignments to include seat assignments

Authorization to Pick-up PL Crews

SOFs & ASAMs (ASM User Page)

Page 91: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

94

TD 53

TD 53

Page 92: 1  EFweb.htm Today’s Planning Data As of: 11 January 2006

95

AAR