8/18/2019 1. IAD local participation presentation Final.pdf
1/30
QATAR RAIL
DOHA METRO PROJECTBUSINESS OPPORTUNITIES FOR LOCAL MARKET
Daniel Leckel
Chief Program Officer
7 May, 2015
8/18/2019 1. IAD local participation presentation Final.pdf
2/30
AGENDA
2
I. PROJECT OVERVIEWII. OVERVIEW OF POTENTIAL BUSINESS OPPORTUNITIES FOR LOCAL
MARKET:
A. CIVIL WORKS
B. MEPC. ARCHITECTURAL
D. RAIL SYSTEMS
E. MAINTENANCE
F. OTHER SERVICES
III. PROGRAM OVERVIEW
8/18/2019 1. IAD local participation presentation Final.pdf
3/30
I. PROJECT OVERVIEW
8/18/2019 1. IAD local participation presentation Final.pdf
4/30
4
Metro Network 2022 Metro Network 2026
8/18/2019 1. IAD local participation presentation Final.pdf
5/30
AWARDED CONTRACTS
5
Contract
NumberContract Title
Award
DateContractors
RTC/075/2013Manufacture, Supply and Install (MSI) - Metro Phase 1 Systems,
Rolling Stock, Trackwork and Depot 20/02/2015
Mitsubishi Heavy Industries, Ltd - Mitsubishi Corporation - Hitachi, Ltd -
Kinki Sharyo Co., Ltd - Thales Canada Inc. Consortium
RTC/075/2013Systems Maintenance (SM) - Metro Phase 1 Systems, Rolling
Stock, Trackwork and Maintenance20/02/2015
Mitsubishi Heavy Indistries, Ltd - Mitsubishi Corporation - Hitachi, Ltd -
Kinki Sharyo Co., Ltd - Thales Canada Inc. Consortium MSI
RTC/081/2013Design and Build Package - Red Line North Elevated and At-
Grade30/11/2014
Rizzani De Eccher S.p.A. - Lotte Engineering and Construction Co., Ltd. -
Redco International Trading and Contracting WLL Joint Venture (RLR JV)
RTC/082/2013 Design and Build Package - Green Line Elevated and At-Grade 23/07/2014Saudi Binladin Group Company Ltd. - PORR Bau GmbH - Hamad Bin Khalid
Contracting Co. W.L.L. Joint Venture (SPH JV)
RTC/074/2013 Design and Build Package - Red Line South Elevated & At-Grade 26/02/2014FCC Construccion, S.A. - Yüksel İnşaat, A.S. - Archirodon Construction(Overseas) Company, S.A. - Petroserv Limited JV
RTC/040/2012 Design and Build Package - Gold Line Underground 20/02/2014Aktor S.A.-Larsen & Tourbo Limited-Yapi Merkezi Insaat V.E. - Sezai Turkes
Feyzi Akkaya Marine Construction - Al Jaber Engineering LLC JV
RTC/042/2012Design and Build Package - Major Stations – Musheireb andEducation City Stations
23/05/2013Samsung C&T Corporation, Obrascon Huarte Lain S.A (OHL) & Qatar
Building Company
RTC/038/2012 Design and Build Package - Red Line North Underground 16/05/2013Impregilo SpA - SK Engineering & Construction Co. Ltd. - Galfar AI Misnad
Engineering & Contracting W.L.L. JV
RTC/039/2012 Design and Build Package - Red Line South Underground 16/05/2013QDVC - GS Engineering & Construction Corp. - AI-Darwish Engineering
W.L.L. JV
RTC/041/2012 Design and Build Package - Green Line Underground 16/05/2013PORR Bau GmbH - Saudi Binladin Group Company Ltd - Hamad Bin Khalid
Contracting Co. W.L.L. JV
8/18/2019 1. IAD local participation presentation Final.pdf
6/30
DOHA METRO STATIONS
Design & Build
• Design Life - 120 Years • Earth Work
• Temporary Work
• All Civil Structures
• Underground Work
• MEP Works
• Architectural Finishes • Above Ground Works
STATION TYPICAL LONGITUDINAL SECTION
STATION TYPICAL CROSS SECTION
8/18/2019 1. IAD local participation presentation Final.pdf
7/30
II. OVERVIEW OF POTENTIAL
BUSINESS OPPORTUNITIESLOCAL MARKET
8/18/2019 1. IAD local participation presentation Final.pdf
8/30
A. BUSINESS OPPORTUNITIES
CIVIL WORKS
8/18/2019 1. IAD local participation presentation Final.pdf
9/30
FUTURE CONTRACTS FOR LOCAL SUPPLIERS AND
CONTRACTORS
ConcreteWorks
Block Works FormworkWater
Proofing
CurtainWalling
Grouting ScreedingSite SignBoards
ConstructionChemicals
9
CIVIL WORKS
8/18/2019 1. IAD local participation presentation Final.pdf
10/30
B. BUSINESS OPPORTUNITIES
MEP
8/18/2019 1. IAD local participation presentation Final.pdf
11/30
11
1. MECHANICAL SYSTEM
2. ELECTRICAL SYSTEM
3. PLUMBING SYSTEM
FROM EARTH MATS UNDER STATIONS BASE
SLABS
…TO VERTICAL TRANSPORTATION SYSTEMS
MEP WORKS
8/18/2019 1. IAD local participation presentation Final.pdf
12/30
12
The ELECTRICAL SYSTEM includes thefollowing sub-systems:
1. Earthing System - Earthing & Bonding
2. Low Voltage Power Supply Distribution System
• Low Voltage Distribution
• Wires
• Raceways
• Cable Trays and Boxes
•
Emergency Power• Switchboard – DBs
3. Lighting System - Lighting & Emergency Lighting
4. Lightning Protection System
5. Elevator, Escalator, Moving Walk System
6. Building Management System
8/18/2019 1. IAD local participation presentation Final.pdf
13/30
13
The MECHANICAL & PLUMBING SYSTEM includes the followingsub-systems:1. Air Conditioning System
• Chiller
• AHU
• CRAC• FCU
• Air Curtain
• Chilled Water Pump
2. Ventilation System - General & Special Ventilation
• Exhaust Fan
• Smoke Extract Fan
3. Plumbing System
• Domestic Water
• Sanitary and Rain Water Drainage
• Irrigation Water
• Tunnel Drainage
• Fuel Oil (Domestic Pump, Sump Pump)
4. Fire Fighting System• Gas Suppression
• Special Ventilation
• Standpipe & Sprinkler
• Smoke & Fire Detection - Fire Pump
8/18/2019 1. IAD local participation presentation Final.pdf
14/30
FUTURE CONTRACTS RELATING TO MEP
FOR LOCAL SUPPLIERS AND CONTRACTORS
• BACS (Building Automation & Control System)
• Clean Agent Suppression System
• Fire Alarm & Detection
• Earthing & Lightning Protection
• Lighting Control System
• Indoor Air Quality & Monitoring System
• Energy Measurement & Monitoring System
• Rainwater Reuse System & Grey Water Treatment System
• Etc.
14
MEP –
SERVICES
8/18/2019 1. IAD local participation presentation Final.pdf
15/30
FUTURE CONTRACTS RELATING TO MEP
FOR LOCAL SUPPLIERS AND CONTRACTORS
MEP –
SUPPLY AND MANUFACTURING
15
Mechanical Systems
• Air Handling Units
• Fan Coil Units
• Fans & Blowers
• Pumps• Air Conditioners
• Heat Exchangers
• Water Tanks
• Sanitary Fixture & Accessories
•
Pipe & Fitting• Air Ductworks
• Insulation
• Etc.
Electrical Systems
• Medium Voltage Panels
• Sub Main Distribution Boards
• Motor Control Centres• Distribution Boards
• Cables
• Lighting Fixtures (BOH Only)
• Cable Tray & Trunking
• Etc.
8/18/2019 1. IAD local participation presentation Final.pdf
16/30
C. BUSINESS OPPORTUNITIES
ARCHITECTURAL
8/18/2019 1. IAD local participation presentation Final.pdf
17/30
ARCHITECTURAL FINISHES
17
• A/G SHELTERS
• LANDSCAPING
• CEILINGS
• WALLS
• FLOORS
• EQUIPMENT FITOUTS
• GLAZING
• WAYFINDING
• FURNITURES
8/18/2019 1. IAD local participation presentation Final.pdf
18/30
FUTURE CONTRACTS RELATING TO ARCHITECTURAL
WORKS FOR LOCAL SUPPLIERS AND CONTRACTORS
– Stainless Steel Wall Panel
– GFRC Ceiling Panels
– Aluminum Ceiling Panels
– Stone Cladding
– Steel Mesh
– Ceramic Tiles
– Terrazzo
– Metal Doors
– Wooden Doors
– Steel Fire Doors
– Aluminum Glass Doors
– Wall Cladding
– Ceilings
– Signage
– Aluminum Profiles
– Steel Profiles
– Gypsum Board
– Painting
– Etc.
18
• Supply and Installation for Branding Materials:
• Subcontracting for Architectural Works
8/18/2019 1. IAD local participation presentation Final.pdf
19/30
D. BUSINESS OPPORTUNITIES
RAIL SYSTEMS
8/18/2019 1. IAD local participation presentation Final.pdf
20/30
SCOPE OF WORKS• Rolling Stock
• Trackwork
• Energy
• Tunnel Ventilation
• Platform Screen Doors
• Signalling
• Telecommunications
• Depot Equipment
• Depot & Stabling Yard Construction
• 20 Years Maintenance
Procurement of Mechanical and Electrical equipment/supplies forsystems such as Trackwork, Depot, Energy, Singaling,Telecommunication, Tunnel Ventilation and etc.
20
8/18/2019 1. IAD local participation presentation Final.pdf
21/30
FUTURE CONTRACTS RELATING TO RAIL SYSTEMS
FOR LOCAL SUPPLIERS AND CONTRACTORS
Potentially local procured products in Qatar, incl.:
21
• Turnout - Assembly
• Turnout - Manganese
Crossing
• Switchgear
• 33kV Switchgear
• DC Switchgear
• Transformer
• Rectifier Transformer
• Auxiliary Transformer
• Ceiling (Various)
• Wall Materials (Various)
• Ready Mixed Concrete
• Reinforced Bar
• Platform Screen Door
• Tunnel Ventilation System
• Cables (Various Power
Cables)
• Signs and Markers
• Construction Equipment
• Electrical Equipment
• Rectifier
• Distribution Board (LV
Switch Board)
• Battery & Charger
• Uninterruptable Power
Supply (UPS)
• Blue Light Station
• Cable Tray
• Steel Structure
• Floor, Roof Ceiling and
Wall Materials
• Floor Materials (Various)
• Roof Materials (Various)
8/18/2019 1. IAD local participation presentation Final.pdf
22/30
E. BUSINESS OPPORTUNITIES
MAINTENANCE
8/18/2019 1. IAD local participation presentation Final.pdf
23/30
FUTURE CONTRACTS RELATING TO OPERATION &
FACILITY MANAGEMENT FOR LOCAL SUPPLIERS AND
ONTRACTORS
• Tenders for Railway Operation and Facility Management (FM) of
the DOHA METRO and LUSAIL TRAM will be issued in 2016and the Contractors will be appointed in early 2017.
• The respective scope of work of the Operation and Facility
Management Contractors will include services that will be
opportunities for local businesses.
• When the results of prequalification are announced, by Q4-2015,
prequalified companies will seek local sub-contractors to perform
these services.
23
8/18/2019 1. IAD local participation presentation Final.pdf
24/30
SERVICES THAT THE FUTURE METRO OPERATOR AND
TRAM OPERATOR ARE LIKELY TO SUBCONTRACT
• MEP Maintenance
• Depot Cleaning
• Depot Security
•
Building Maintenance• Catering in Depot
• Waste Management
• Pest Control
• Staff Transportation
24
8/18/2019 1. IAD local participation presentation Final.pdf
25/30
SERVICES THAT THE FUTURE METRO FM CONTRACTORS
AND TRAM FM CONTRACTORS ARE LIKELY TO
SUBCONTRACT
• MEP Maintenance
• Stations Cleaning
• Stations Area Landscaping
• Stations Security
• Station Building Maintenance
• Parking Attendant
• Waste Management
• Pest Control
• Staff Transportation
• Staff Accommodation
25
8/18/2019 1. IAD local participation presentation Final.pdf
26/30
F. BUSINESS OPPORTUNITIES
OTHER SERVICES
8/18/2019 1. IAD local participation presentation Final.pdf
27/30
FUTURE CONTRACTS RELATING TO OTHER SERVICES
FOR LOCAL SUPPLIERS AND CONTRACTORS
• Specialist Services
• Manpower Providers
• Construction Equipment Providers (cranes, trucks, generators, etc.)
•
Financial Services• Banking and Insurance Services
• Legal Consultancy
• Etc.
27
8/18/2019 1. IAD local participation presentation Final.pdf
28/30
III. PROGRAM OVERVIEW
8/18/2019 1. IAD local participation presentation Final.pdf
29/30
29
TIMESCALES
8/18/2019 1. IAD local participation presentation Final.pdf
30/30
Thank you