Inspection and Testing

Approved for Public Release

Page 2: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 2

Introduction

• All materials and services supplied to Electric Boat must be inspected and tested in accordance with Purchase Order invoked specifications, drawings, standard clauses, etc. – Determine if supplier or government have

additional or more stringent requirements.

Approved for Public Release

Page 3: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 3

Introduction (continued)

• Purchase order imposes inspection systems via EB2678 and Standard Clauses (60-5, 60-19, 60-58) for MIL-I-45208, MIL-Q-9858, or ISO9000 series– Accordingly, suppliers must establish and

maintain a compliant inspection system– System must also address subtier suppliers– Be aware of Supplemental Technical

Requirements (60-58 STRs) for ISO9000

Approved for Public Release

Page 4: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 4

Introduction (continued)

• Inspection and Testing that result in OQE must be performed by a supplier’s organization independent of production, i.e., the Quality Control Department.

Approved for Public Release

Page 5: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 5

3 Basic Types of Inspection:

• Receiving Inspection verifies acceptability of materials, services, and associated documentation at receipt.

Approved for Public Release

Page 6: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 6

• In-Process Inspection performed at manufacturing stages deemed necessary to verify: – internal compliance with requirements as

production progresses, statistical process control charting, non-accessible assembly, etc.

– as required by the purchase order, drawing, or specifications to be an EB or Government Hold/Witness Point (SC37-8 series).

3 Basic Types of Inspection:

Approved for Public Release

Page 7: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 7

• Final Inspection shall verify that the product is dimensionally acceptable, properly assembled, and the documentation is satisfactory in accordance with the purchase order.

3 Basic Types of Inspection:

Approved for Public Release

Page 8: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 8

Requirements

• Inspection and Testing must be accomplished using clear, complete, and current procedures and instructions

• Inspection and Testing shall be performed in appropriate environmental conditions with respect to temperature, humidity, noise, vibration, etc.

Approved for Public Release

Page 9: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 9

Requirements (continued)

• Instruction needs to specify:– Source of the inspection or test criteria

• drawing, specification, standard clause, etc.

– Gaging or tooling required to ensure proper accuracy of measurements

– Provision for recording the actual results as objective quality evidence for reference

Approved for Public Release

Page 10: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 10

Requirements (continued)

• When required by a standard clause (10, 60, 76 series), drawing, or specification, procedures shall be approved by Electric Boat on a Vendor Procedure Approval Request (VPAR), prior to performance of the testing.

Approved for Public Release

Page 11: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 11

Requirements (continued)

• Examples of Testing Procedures requiring Electric Boat approval:– NDT Procedures– Noise Testing Procedures– Shock Testing Procedures– Vibration Procedures

Approved for Public Release

Page 12: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 12

Requirements (continued)

• Examples of Testing Procedures requiring Electric Boat approval (continued):– Forging test specimen location drawings– Production Procedures (when specified by the

Purchase Order or Procurement Specification)– Qualification and First Article Procedures

(when specified by the Purchase Order or Procurement Specification)

Approved for Public Release

Page 13: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 13

Dielectric Voltage Withstand Test

Dielectric Voltage can be a Destructive test.

Voltage Level and time should be considered.

• Example: Operating Voltage is 440VAC• Test at 2 X 440 +1000VAC= 1880VAC

Electrical Testing

Approved for Public Release

Page 14: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 14

Insulation Resistance

An Insulation Resistance test is normally done with DC and is usually performed at a lower voltage level such as five (500VDC) hundred volts. An IR test measures the quality of the insulation system and provides a measure in ohms or megohms. It is sometimes used before a HiPot Test as both a predictor of a failure condition and to provide a quantitative value of the insulation system.

Often performed before, during and after Hydro on Electrical Hull Penetrators.

Electrical Testing

Approved for Public Release

Page 15: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 15

Continuity

• Determines if there is an uninterrupted electrical connection between two points.

• Resistance or DC Resistance • Measured in ohms• The opposition to current flow• Report actual results EX: > 1 Ohm

Electrical Testing

Approved for Public Release

Page 16: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 16

Documentation

• Inspection and test results shall be documented, preferably on a company form with letterhead.

• Inspection and test results must clearly indicate:– the type and number of inspections or tests performed – the results of the inspection or test– the signature/date of personnel performing the test– additional requirements of the applicable SC76-9 series

Approved for Public Release

Page 17: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 17

Documentation (continued)

• When required by the Purchase Order, generally a Standard Clause, the Inspection and Test Reports shall be provided to Electric Boat.

• Inspection and Test Reports shall not contain any qualifying statements, such as “to the best of our knowledge”, “while in our possession”, “approximately”, etc.

Approved for Public Release

Page 18: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 18

Documentation (continued)

• All instruments, gages, and tools used to perform official inspections and tests must be calibrated in accordance with a documented calibration program.

• Actual instruments, gages, and tools used to perform official inspections and tests should be identified and listed in the inspection or test report: – provides additional objective quality evidence– traceability if gage out of calibration

Approved for Public Release

Page 19: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 19

Documentation (continued)

• Inspection Records and Test Reports shall be traceable back to the product being tested or inspected and the applicable procedures or instruction being used.

• Corrections of errors on Inspection Records or Test Reports shall be in accordance with the requirements of Electric Boat Specification 2678.

Approved for Public Release

Page 20: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 20

Suggestion

• Initiate a method and procedure defining type and accuracy of gages to be used for dimensional inspection of particular attribute tolerance ranges– Gage for +/-.020” tolerance different than

+/-.0005” tolerance as is a 50psig test different than a 500psig test

– 10% rule

Approved for Public Release

Page 21: 1 Inspection and Testing Approved for Public Release

Inspection and Testing 21

Suggestion

• To better ensure that the integrity and caliber

of the inspection system and the personnel

are being maintained:– Implement an overcheck program that periodically

confirms inspector results– Implement a refresher training and qualification

program for inspectors (similar to NDT, welding, etc.)