Upload
logan-morgan
View
212
Download
0
Embed Size (px)
Citation preview
1
Item 2.7Item 2.7
ECIP 2009-2013ECIP 2009-2013 developmentsdevelopments
Reference: Reference: ►►Action Paper SCG/8/AP05Action Paper SCG/8/AP05 ►►Flimsy SCG/8/FL06Flimsy SCG/8/FL06
Christian CoëfféChristian Coëffé
ECIP ManagerECIP Manager
SCG/8 14 & 15 May 2008
2
PCPC
SCGSCG
TeamsTeams& & PSGsPSGs
ECIP Approval process
strate
gic in
put
strate
gic in
put
Fin
al appro
val
ATM StrategicOrientations
Endorsement ofECIP amendments
Proposed list ofECIP amendments
Final list ofECIP amendments
ECIP Strategicdevelopments
Approval of final listof ECIP amendments
Analysis of proposedECIP amendments
SCG/8(May 2008)
3
ECIP amendments for 2009-2013
Reference remains the proposal made at the SCG/7 meeting, with the exception of :
8.33 kHz channel spacing below FL 195 COM10 ‘Tentative’ objective is not accepted COMd2 ‘Under development’ is introduced
Common ATS provision in the Upper Airspace of the Central European (CEATS) States
FAC01 objective is removed from ECIP A new FAB-related objective is expected for the next cycle
Centralised SSR Code Assignment & Management System (CCAMS) To be discussed under agenda item 4.4
A number of extensions of applicability areas confirmed by Stakeholders A-SMGCS with Antalya / Turkey Airport collaborative decision making with Roma-Fumicino / Italy European air traffic controller licence requirements & enhanced training of ATCOs
with Belgium ATS-Qsig digital signalling for ground telephone applications with Denmark
4
A first analysis led to a list of 10 SESAR OI/TI steps considered mature enough for integration into the ECIP process (see Annex 3 of Action Paper SCG/8/AP01)
A more in depth analysis reduced the initial list to 3 SESAR OI/TI steps (see Flimsy SCG/8/xxxx)
Both Airspace-related and Environment-related ECIP opportunities still need detailed technical discussions through normal working arrangements before being proposed for integration into ECIP
SESAR-related ECIP headlinesfor 2009-2013 (1/2)
5
Airport CDM extended to regional airports (SESAR OI step DCB-0304) Provide improved estimates of arrivals at regional airports Integrate improved estimates of arrivals at regional airports in ATFCM
Interactive network capacity planning (SESAR OI step DCB-0201) Develop interface to exchange capacity (planning) and demand (forecasted)
data with Airspace & Demand Data Repository (ADR & DDR) through CFMU portal
Harmonised EUROCONTROL ECAC area rules for OAT-IFR and GAT interface (SESAR OI step AOM-0301) Develop specifications for harmonised OAT rules under IFR
SESAR-related ECIP headlinesfor 2009-2013 (2/2)
6
ECIP 2009-2013 – Next Steps
TodayToday
SCG agreement on ECIP objectivesamendments for 2009-2013
+SESAR-relatedECIP headlines
JuneJune
ECIP Status Report 2007
JulyJuly
PC endorsementfor 2009-2013
SeptemberSeptember
•ATM implementation perspective•Detailed objectives description•Executive summary
7
2008 remains a transition year :
2009 should show the renewed ECIP/LCIP process
Proposal is to discuss with SCG members in October 2008 :
strategic orientations for the next cycle what has already been done to adapt ECIP/LCIP process during
the SESAR definition phase what is still to be done for the next cycle
Next cycle 2010-2014
8
ECIP 2009-2013 - Recommendations
Members of the SCG are invited to: Agree that
the new objectives and significant changes to existing ones set out in Annexes 1 & 2 of SCG/8 Action Paper 05;
the SESAR-related ECIP headlines as proposed in the Flimsy SCG/8/FL06
be submitted to the EUROCONTROL Provisional Council by correspondence for their endorsement and subsequent inclusions in the ECIP 2009-2013 document