Lean Office – Layout & CellsLean Office – Layout & Cells
http://http://www.managementsupport.comwww.managementsupport.com
2
Cellular Layout - Work CellsCellular Layout - Work Cells
Special case of product-oriented layout - in what is Special case of product-oriented layout - in what is ordinarily a process-oriented facilityordinarily a process-oriented facility
Consists of Consists of differentdifferent operations brought together to operations brought together to make a productmake a product
3
Requirements for Cellular ProductionRequirements for Cellular Production
Identification of families of processes - group technology Identification of families of processes - group technology codescodes
High level of training and flexibility on the part of the High level of training and flexibility on the part of the employeesemployees
Either staff support or flexible, imaginative employees to Either staff support or flexible, imaginative employees to establish the work cells initiallyestablish the work cells initially
Mistake proofing at each station in the cellMistake proofing at each station in the cell
4
Work Cells, Focused Work Centers and Work Cells, Focused Work Centers and the Focused Factorythe Focused Factory
Work Cell A temporary assembly-line-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility
Focused WorkCenter
A permanent assembly-line-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility
Focused Factory A permanent facility to produce a product or component in a product-oriented facility
5
Cellular WorkplacesCellular Workplaces
FG RM
Includes Every StepIncludes Every Step
Source InspectionSource Inspection
Point of Use StoragePoint of Use Storage
Flexible OutputFlexible Output
Reduced Lot SizeReduced Lot Size
Simplified HandlingSimplified Handling
Visual Goals & MetricsVisual Goals & Metrics
6
Line BalancingLine Balancing
Determine cycle time by taking the demand (or production Determine cycle time by taking the demand (or production rate) per day and dividing it into the productive time available rate) per day and dividing it into the productive time available per dayper day
Calculate the theoretical minimum number of work stations by Calculate the theoretical minimum number of work stations by dividing total task time by cycle timedividing total task time by cycle time
Perform the line balance and assign specific assembly tasks to Perform the line balance and assign specific assembly tasks to each work stationeach work station
7
Line Balancing StepsLine Balancing Steps
1.1. Determine tasks (operations)Determine tasks (operations)2.2. Determine sequenceDetermine sequence3.3. Draw precedence diagramDraw precedence diagram4.4. Estimate task timesEstimate task times5.5. Calculate cycle time Calculate cycle time 6.6. Calculate number of work stationsCalculate number of work stations7.7. Assign tasks Assign tasks 8.8. Calculate efficiencyCalculate efficiency