48
1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director [email protected] Anil MENGI, Devolo Director Strategic Positioning SmartGrid [email protected] www.g3-plc.com

1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director [email protected] Anil MENGI, Devolo Director Strategic Positioning

Embed Size (px)

Citation preview

Page 1: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

1

Marc DELANDRE, G3-PLC Alliance, General Secretary& ERDF Metering Division [email protected]

Anil MENGI, Devolo Director Strategic Positioning [email protected]

www.g3-plc.com

Page 2: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

2

Agenda

THE PRODUCT

G3 PLC ALLIANCE

G3-PLC in Germany

G3-PLC in France

G3-PLC : an essential step towards smart gridG3-PLC main capabilitiesG3-PLC main features

A proactive world of international players and utilitiesObjectives and organizationA balanced ecosystemMembership representation over the worldCertification processG3-PLC in the field : proven performance

ERDF key figuresField pilotsG3-PLC Mass Rollout in France

Devolo key figuresField pilotsSmart Metering in Germany

Page 3: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

3

G3-PLC Technology

An essential step towards smart grid

Page 4: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

4

High robustness / High level of immunity against narrow band interferers and attenuation

High level of data security Bi-directional communication Long range communication on MV

(greater than 6 km)

Supports IPv6 (Internet protocol) Supports DLMS/COSEM protocol as

application layer Plug and play solution Interoperability with other vendors Open source, no license fee Upgradable

Characteristics of G3-PLC

G3-PLC provides the required performance and cost efficiency

for the power grids

Page 5: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

5

What is G3-PLC ?

Page 6: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

6

DSOs Requirements G3-PLC Features

To be able to communicate in a

reliable manner in a harsh environment

Robustness• Forward Error Correction + Reed Solomon Encoding + Robust modulation• Mesh networking

To be able to answer future needs… in a

secure way

Future proof / Security• IPv6 native• 128-bit PSK Authentication and ciphering CCM at MAC layer• Ability to download firmware over the power line• Ability to accommodate future applications over IPv6• Compliant with IoT (Internet of Things)

Multisourcing for better competitiveness

Interoperability• G3-PLC is an international standard available for free at http://www.itu.int/rec/T-REC-G.9903• G3-PLC Alliance ensures a large number of solutions served by a community of silicon and meter vendors

Minimum Installation efforts

Minimal maintenance costs

Simplicity• Plug and Play (Stateless Address Self configuration embedded)• Statistics available

To be able to operate with clusters from 2 to

1500 meters

Scalability• Support up to 2000 nodes• Mesh network with route is self-reconstructing when a link is broken without impacting the whole cluster

DSOs Requirements and G3-PLC Answers

Page 7: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

7

Meters communicating directly with the Data Concentrator

The routing algorithm allows the communication with this meter using an intermediate node chosen regarding an optimized metric

A routing node

If the route gets impassable…

… a new route is automatically created

Robustness : typical cluster topology

Page 8: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

9

Up to-500kHz PLC resource partitioning WorldwideEU

ROPE

Series1

0 50 100 150 200 250 300 350 400 450 500

G3-A

A

G3-B

B C D

G3-ARIB

ARIB

G3-FCC

FCC

USA

and

Ro

W C

hina

JAPA

N

Frequency (kHz)

In Europe, Cenelec A band is reserved for energy management

G3 500 kHz

Page 9: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

10

The G3-PLC Alliance

A proactive world of international

players and utilities

Page 10: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

11

G3-PLC Alliance : objectives and organization

Promoters (Executive members)

Contributors

G3-PLC Alliance 3 main objectives1. Maintain and ensure the evolution and backward

compatibility of the G3-PLC ITU technical specifications2. Operate interoperability & conformity tests and

programs of certification3. Promote

• G3-PLC technical features in SDO’s (IEEE, ITU, IEC, ISO, etc.) and influence the convergence of the standards

• G3-PLC technical features and overall value to utilities• G3-PLC in any Smart Grid applications

Over 60 members www.g3-plc.com

Markets

Smart Metering

Energy Management

Renewable Energy

Light Control

Automotive

Page 11: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

12

Operators (Utilities, DSOs..)IntegratorsDevices (Meters, DCs, HEMS)PlatformsChips

Value of the Alliance: balanced Ecosystem

USAEUASIA

1120

33

Page 12: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

13

Over 60 members

CISCO

Page 13: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

14

Process for certification and lab tests

There are three steps towards G3 certification :

1 Become a Member

3Certify your chip at a Certification Lab

Pass the WS3 IOT

Certify your product at a Certification Lab

2

Become a Member

Platforms Products

1

3

2Use a certified chip

Page 14: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

15

2 labs in France and Japan are certifying G3-PLC ARIB , FCC and Cenelec

Details can be found on www.G3-PLC.comwww.lanpark.eu

www.tuv.com

Yokohama, JapanTauxigny, France

Page 15: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

16

Certificates

Page 16: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

17

G3-PLC certified platforms Manufacturer Model Type Bandplan DateRenesas REL-G3PLC-CPX1 PAN Device ARIB October 24th 2014

Renesas REL-G3PLC-CPX1 PAN Coordinator ARIB October 24th 2014

Renesas REL-G3PLC-CPX2 PAN Device ARIB October 24th 2014

Renesas REL-G3PLC-CPX2 PAN Coordinator ARIB October 24th 2014

Texas Instruments TMDSPLCKITV4-ARIB PAN Device ARIB December 4th 2014

Texas Instruments TMDSPLCKITV4-ARIB PAN Coordinator ARIB December 4th 2014

STMicroelectronics STCOMET PAN Device CENELEC A November 5th 2014

Texas Instruments TMDSPLCKITV4-CEN PAN Device CENELEC A November 5th 2014

Texas Instruments TMDSDC3359 PAN Coordinator CENELEC A November 5th 2014

Renesas Y-EU-OFDM-PLC-A2 PAN Device CENELEC A November 21st 2014

Renesas Y-EU-OFDM-PLC-A2 PAN Coordinator CENELEC A November 21st 2014

Maxim Integrated ZENO PAN Device CENELEC A December 10th 2014

Maxim Integrated ZENO PAN Coordinator CENELEC A December 10th 2014

Atmel ATPL250-EK PAN Device CENELEC A December 16th 2014

STMicroelectronics STCOMET PAN Coordinator CENELEC A February 17th 2015

Maxim Integrated ZENO PAN Device ARIB February 20th, 2015

Maxim Integrated ZENO PAN Coordinator ARIB February 20th, 2015

Semtech Corp. ENIGMA PAN Device CENELEC A March 24th, 2015

STMicroelectronics STM32F4PLC-2 PAN Device CENELEC A March 31st, 2015

Renesas RENESAS-GCXP PAN Device FCC April 2nd, 2015

Renesas RENESAS-GCXP PAN Coordinator FCC April 2nd, 2015

Semtech Corp. ENIGMA PAN Device FCC April 2nd, 2015

Maxim Integrated ZENO PAN Device FCC April 2nd, 2015

Maxim Integrated ZENO PAN Coordinator FCC April 2nd, 2015

Renesas REL-G3PLC-CPX2 PAN Device FCC April 2nd, 2015

Renesas REL-G3PLC-CPX2 PAN Coordinator FCC April 2nd, 2015

Page 17: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

18

G3-PLC certified products

Details of all certified devices can be found on the website as well as certification documentswww.g3-plc.com

Manufacturer Model Type Bandplan DateSumitomo Electric Industries MM2334 Communication module ARIB December 10th 2014

Sumitomo Electric Industries MM2033/MM2034 Communication module ARIB December 10th 2014

Sumitomo Electric Industries MM2032 Communication module ARIB December 18th 2014

Sumitomo Electric Industries MM2301 Communication module ARIB December 19th 2014

Page 18: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

19

G3 PLC in the Field: proven performance

Widely field tested under harsh conditions by independent organizations.Many successful field tests with G3 modems have been carried out proving industrial performance on all the technical dimensions (range, throughput, resiliency ...)

- France - China- The Netherlands - Taiwan- Japan - Mexico- Belgium - Germany- USA - Malaysia

Page 19: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

20

G3-PLC

In France

Page 20: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

21

ERDF manages the French distribution network

Customers

Supply

Transport

Generation& Trading

Primary

substatio

ns

2,200

Medium

voltage

600,000 km

Low voltage

680,000 kmMete

rs

35 milli

on

Secondary substa

tions

740,000

35,000employees

11 millionField-operations

3 billion €

investment

1.3 millionkm of network 35 million

customers

Distribution

95%French territory

1,000concession contracts

Page 21: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

22

Linky : the French Smart Metering system

Remote control

Adjusting Local Balance

Network investment

Self Healing

Four main targets

Page 22: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

23

The first ERDF G3 PLC field tests

23

2011 – 2013 66 MV/LV Transformers 2 000 meters

Discovery and data collection rate> 99%100% plug & play from the DC to the meters

Ping = 0,3s

Alarm = 1s

Index D/L = 2s(16 index = 10 supp. + 4 dist. + 2 total.)

Daily data collection = 13s(16 index + load profile + power parameters + logbooks)

Firmware D/L = 4,5mn(FW size = 230kB)

2013 – 2015 Interoperability in the field 5 000 meters

Page 23: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

24

Customer

installation

“Real Time”Concentrator

SOGRID Project 2013 – 2016 : MV-LV

Equipment

management

• on MV Side

• on LV side

Exchange data

Defects detection

Data collection Power modulation

in case of

emergency

Smart Meters

Data flow

MV

Connecti

on

Page 24: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

25

Linky system at a glance

Meters G3-PLC Data concentrators WAN Information System

Linky35.000.000

IS

Focus onmain Linky

functionalities Pricing schedules

Specific mobile peak-

load tariff

Customerpower

breakerSupply quality

compliance

BIDIRECTIONAL COMMUNICATION

Real-timedata report

plug-in

Generation / Load shaperecording

700.000Concentrators

1 + 7 switches

Page 25: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

26

French mass rollout : 35 million Meters

2013 2014 2015 2016 2017 2018 2019

2 000 G3 Meters Pilot

2011 2012

5 000 G3 Meters Pilot

2020

SOGRID Project

First G3 deployment

G3 mass rollout

Linky Program : Key figures5 billion € investment35 million customers5 000 jobs for mass rollout

Page 26: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

27

G3-PLC

In Germany

Dr.-Ing. Anıl Mengi

Director Strategic Positioning SmartGrid

[email protected]

Page 27: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

2828

Headquarter: Aachen (founded 2002)

Number of employees: 230

Core competence: Powerline Communications

12 European Subsidiaries/ Sales Agents

Over 27 Million PLC adapters sold worldwide

devolo AG: From the startup to the worldwide PLC market leader

Page 28: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

29

German mass rollout : ~ 45 million Meters

2013 2014 2015 2016 2017 2018 2019

G3-PLC Pilot Trials

2011 2012 2028

First G3 deployment

G3 mass rollout

1 000 G3 Meters

Meter data privacy and security requirements are set by the Germany’s Federal Office for Information Security (BSI)

Page 29: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

3030

Smart Metering Scenario in Germany

Page 30: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

3131

Smart Metering Scenario in Germany

Data security in the smart grid

Protected. Encryption of consumer data and data of energy producers

Safe. Highest secure level to protect public infrastructure

Page 31: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

3232

Smart Metering Scenario in Germany

Data communication in the smart grid

Powerful. G3-PLC Technology

Sustainable. Practice-based development for all future use cases in the smart grid

Page 32: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

3333

Control Box

Smart Metering Scenario in Germany

Switching in smart grids

Page 33: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

3434

Switchingin smart grids

Control BoxG3-PLC Modem 500k Smart Meter Gateway

Data communicationin smart grids

Data securityin smart grids

SmartGrid Products

Page 34: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

3535

In the Household

Electricity Smart Meter

devoloG3-PLC Modem 500k

devolo Smart Meter Gateway

Intelligent Smart-Metering-System on BKE Adapter-Plate

Smart Metering Scenario in Germany

Page 35: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

3636

Bi-directional end-to-end IP connection, end-to-end security

IPv4 and IPv6 are supported (integration of existing subnets with IPv4)

Layer 2 Access Protection

Smart Metering Scenario in Germany

G3-PLC is an ideal technology for smart grid / metering applications in Germany

Page 36: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

37

Comparison of PLC Technologies for Germany

Page 37: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

38

Comparison of PLC Technologies for Germany

Page 38: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

39

Comparison of PLC Technologies for Germany

Page 39: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

40

EU Regulation of high-speed narrowband Powerline Communication in the spectrum 150-500 kHz

Page 40: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

41

Standardization and Regulation

Page 41: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

42

Market access is granted, if products are compliant with the EMC regulation.

Directive 2004/108/EC:

a manufacturer is allowed to assess the EMC of its products

either by compliance with a European Harmonized Standard• EN 50065 in 3-148,5 kHz• EN50561-1 in 1.8-30 MHz (only applicable for in-house PLC)

or by doing an EMC assessment based on own procedures and methods • devolo sold over 27 Million PLC adapters by doing so!• EMC limits in 150-500 kHz are defined as recommendation in IEEE standard.

Product compliance with all applicable directives (e.g. safety etc.)

Standardization and Regulation in Europe

Page 42: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

43

G3-PLC Field Trial in Hamburg, Germany

Vattenfall Europe Metering GmbH with devolo AG

Goal:

Evaluate the performance of devolo's PLC technology in the access area PLC

Location:

Hamburg, Bramfeld: Typical environment of urban grid

Result: All measurement points were reliably connected. There data rates up to 60 kbps net payload UDP have been

achieved. Project completion was in the spring of 2013.

Next Goal:

Evaluation of G3-PLC behavior in difficult scenarios

Test area Hamburg-

Bramfeld

Netzplan zum

Testgebiet

Page 43: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

44

G3-PLC Field Trial in Berlin, Germany

Vattenfall Europe Metering GmbH with devolo AG

Goal:

Evaluation of G3-PLC in the difficult network scenarios

Locations:

Berlin, Märkisches Viertel: a large number of Households Berlin, Hohenschönhausen: High-rise buildings Berlin, Kaulsdorf: Overhead lines at low voltage

Results:

All measurement points were reliably connected, except the ones with overhead lines at low voltage(Overhead line Area: problem with the overvoltage protective device from DDR time)

There data rates up to 60 kbps net payload UDP has been achieved. Project completion was in December 2013.

Next Goal: Evaluation of G3-PLC in a large scale network

Märkisches

Viertel

Hohenschönhaus

en

Kaulsdo

rf

Page 44: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

4545

• City West/Europacenter

• Weitläufiges Gebiet

• Potential für 450 Zählpunkte

Berlin● Europacenter (City West)

● Wide Area

● Ullsteinhaus● Overall 500 G3-PLC devices

Hamburg● 3 Shopping centers● Overall 450 G3-PLC devices● Very compact

(almost 100% deployment)

Picture: 50,2 Das Magazin für intelligente Stromnetze

Large Scale G3-PLC in Berlin and Hamburg

Vattenfall Europe Metering GmbH with devolo AG

Page 45: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

4646

Technical Goals:

1. Evaluation of G3-PLC in a large scale network

Deployment of almost 1000 G3-PLC-Modems in Berlin and Hamburg

Simulation of real network traffic based on the requirements in Germany

Evaluation of the bandwidth

Evaluation of the G3-PLC behaviour in changing topologies / Routing

2. Administration and Management of the G3-PLC network

Large Scale G3-PLC in Berlin and Hamburg

Page 46: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

47

G3-PLC Application Scenarious in Germany

Page 47: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

4848

Optimal network coverage in practice - without using repeaters

Optimal Range by lower frequency band (150-500 kHz)

Fulfilling the bandwidth requirements for Smart Grid Applications

Performance reserves for future requirements

Technology principle "cover and provide bandwidth“

Designed by the international open standard ITU-T G.9903

Integrated smart meters with G3-PLC are available

Conclusion: Advantages of G3-PLC Technology

Page 48: 1 Marc DELANDRE, G3-PLC Alliance, General Secretary & ERDF Metering Division Director marc.delandre@g3-plc.com Anil MENGI, Devolo Director Strategic Positioning

49

İlginiz için teşekkür ederim!

THANK YOU

FOR YOUR ATTENTIONFor follow up or for any further information:

Marc Delandre, G3-PLC Alliance General SecretaryPhone : +336 6939 8520E-mail : [email protected]

Anıl Mengi, Director Strategic Positioning at devolo AGPhone:  +49 241 182 79-162Mobile: +49 151 467 51 336E-Mail: [email protected]