Upload
charleen-hoover
View
217
Download
0
Embed Size (px)
Citation preview
1
Monthly Report : May 2012WC Province
Presented by Y Simons
06 June 2012
Terminal buildings of the LANSERIA AIRPORT
GAUTENG PROVINCEFirst Quarter Report
2
1.Purpose of Presentation, Vision and Mission.
2.Overview of Gauteng Province
3. Footprint
3. Human Resources Management
4. Financial Administration
5. Counter Corruption and Security Services
6. Information Services
7. IGR and Stakeholder Management
8. Projects
9. Core Business Operation Reports
Table of Contents
3
Purpose
• To inform the Portfolio Committee of Home Affairs about the Gauteng Department of Home Affairs state of the Province as at 30 June 2012.
4
Vision and Mission
Vision A safe, secure South Africa where all of its people are proud
of, and value, their identity and citizenship.
Mission The efficient determination and safeguarding of the identity
and status of citizens and regulations of immigration to ensure security, promote development and fulfill our international obligations.
5
Late Registration of BirthChild passportsRectification
Identity documentsPersonal AmendmentsRectificationsPassports and Travel Documents
Death RegistrationsFull B/M/D Certificates
Civil marriageCustomary marriageCivil Union marriage
Birth RegistrationAdoptionsForeign BirthRe-Registrations
Home Affairs Value Chain
6
Minister’s Delivery Agreement 2011/12DHA focused Medium Term Strategic Framework Outcomes:
All people in South Africa are and feel safe
Securing the identity and status of citizens
An efficient, effective and development oriented public service and an empowered, fair and inclusive citizenship
Service delivery access and quality.
Specific target areas that the Province support include:
• The registration of every child birth within 30 days of delivery.
• The issuing of identity documents to every South African 16 years and above.
• Registering of all deaths and the provision of accurate statistics in this regard by the end of each financial year, covering the previous calendar year.
• Turnaround times for all services, queuing times and unit costs per service
• The maximum distance for a citizen to travel to access Home Affairs services.
7
Gauteng Province Management Team:
Head: Marabastad RRC Solani Ntukwana
A/Provincial Manager: Gauteng
Mpho Moloi
Finance & Support :Pumeza Mdwara
DMO: JHB Metro Lungile Mkhulise
DMO: West Rand and Sedibeng Districts Lerato Afilaka
DMO: Tshwane Metro Ncomeka Mlenzana
DMO: Ekurhuleni Metro Mamokubung Moeketsi
Head: Port of Entry Themba Mgabe
8
3 x Metro: (City of Johannesburg, City of Tshwane, Ekurhuleni Metro), 2 x District Municipalities (West Rand, Sedibeng), 1 x Refugee Centre: Marabastad, 2 x Land Port: (Lanseria Airport and Waterkloof Air Force Base).
GP Geographical outlay
9
Item Gauteng South Africa GP as % of SA
Area (sq.km.) 17010 1219 090 1.4
Population (2001 Census)* Population estimates 2011
8 837 00011 328 203
(Growth – 22%)
44 819 76850 586 757
19.7%22.39%
Unemployed 25,2% * 26%
With 22.39% of SA’s population - GP is the highest contributor to GDP (*33.7%)
PREVAILING INDUSTRIES:• Construction• Manufacturing• finance, real estate and ICT business
UNEMPLOYMENT:• At 26% Gauteng is the fifth highest although higher than the national average standing at 25.2% in 2012..
POVERTY:• High poverty levels in informal settlements
*Provincial Profile Gauteng released 2007, Quarter Labor Force Survey (1st Quarter 2012), P0441/P04413 3rd Quarter 2011 & Mid year population estimates 2011
Population and Socio-economic Indicators:
10
Gauteng Province Footprint
11
Gauteng Province Footprint: Total 65 Offices/BranchesMETRO/DISTRICT MUNICIPALITY NUMBER OF OFFICES PER REGION
Johannesburg Metro 17 Offices/Branches including Lanseria Airport
Sedibeng and West Rand Districts
Tshwane
Ekurhuleni
OR Tambo Airport is in GP but reports in HQ
17
17 including Marabastad and The Showground Office
14
12
Human Resource Management
13
Total EstablishmentFilled as at 1 April
2012Vacant Funded
1 647 1 467 180
Capacity Rate 89% 11%
PROVINCIAL CAPACITY SUMMARY – FILLED AND UNFILLED POSTS
All 180 vacant funded posts are in the various stages of recruitment (Advertisement, Short-listing, Interviews, Security Checks , Assumption of duty and induction).A project is in place to ensure that these are completed by the 31st August 2012. The Project Manager is the Director Finance and Support under whose portfolio HR falls. The next slide explains the project progress so far
All 180 vacant funded posts are in the various stages of recruitment (Advertisement, Short-listing, Interviews, Security Checks , Assumption of duty and induction).A project is in place to ensure that these are completed by the 31st August 2012. The Project Manager is the Director Finance and Support under whose portfolio HR falls. The next slide explains the project progress so far
14
Filling of 180Vacancies POSITION LEVEL NO OF POSTS ADVERTISED NO
ADVERTISEDSHORTLISTED INTERVIEWE
DCLEANER/GROUNDSMAN 3 11 YES 11 NO NOSECURITY GUARD 3 2 NO 0 NO NOADMIN CLERK (HOSPITALS) 5 1 NO 0 NO NOFRONT OFFICE CLERKS / ADMIN CLERK (MOBILE UNITS) / CASHIER /
6 46 YES 23 NO NO
IMMIGRATION OFFICERS 6 15 NO NO NOREGISTRY CLERKS 6 7 NO NO NOREFUGEE RECEPTION OFFICERS
6 1 NO NO NO
CAC / SECRETARY 7 30 NO NO NOSAO / SEWP / 8 19 YES 2 NO NORSDO / RRO MANAGER 8 11CoIO 8 4 YES YES YESASD 9 24 YES 8 5 5DD 11 8 YES 1 4 4CD 14 1 YES YES YESTOTAL 180 45 9
15
Employment Equity:
GP: Demographics vs GP workforce:
African: 73.8% : 90.2 % represented
White: 19.9% : 7.4% represented
Coloured: 3.8% : 2.2% represented
Indian: 2.5% : 0.2% represented
Gender: 100% Female vs 0% Male at SMS level
61.5% female vs 38.5% male over al
Disabled: 9 persons = 0,6%
SALARY LEVEL
AFRICAN COLOURED INDIAN WHITE TOTAL
F M F M F M F M F M
3 58 20 1 0 0 0 0 0 59 204 1 0 0 0 0 0 0 0 1 05 2 8 0 1 0 0 0 0 2 96 571 338 19 5 2 0 52 17 644 3607 54 43 2 1 0 0 16 3 72 478 77 75 1 1 0 0 5 5 83 819 3 2 0 0 0 0 0 0 3 2
10 8 21 0 1 0 1 4 3 12 2611 0 0 0 0 0 0 0 1 0 112 0 4 0 0 0 0 0 0 0 413 6 0 0 0 0 0 0 0 6 0
Total 780 511 23 9 2 1 77 29 882 550
16
Performance management
2012/2013 Performance Cycle:•Performance agreements signed: 99% compliance•Performance assessment for the 2011/12 financial year: 100%
•Moderation process for 2011/12 assessment cycle: 95% complete
Explanation for Deviation• The 1% deviation is as a result of maternity
leave and some such instances.• Full compliance
• Moderation Committees are in the final stages of completion of the process
17
Training & Capacity buildingTraining
• 4 x SMS Member attending the SMS Development Programme at WITS University • x Line Managers attending the New Management Development Programme • x Emerging managers development programme.• Supply Chain management process/function for decentralisation• Transport management
18
Financial Management
19
Budget
GAUTENG 352,128 70,012 282,116 19.9%
PAYMENTS 350,260 69,711 280,549 19.9%
COMPENSATION OF EMPLOYEES 325,444 67,528 257,916 20.7%
GOODS AND SERVICES 24,816 2,183 22,633 8.8%
PAYMENT FOR CAPITAL ASSETS 858 61 797 7.1%
MACHINERY & EQUIPMENT 831 61 770 7.3%
SOFTWARE AND INTANGIBLE ASSETS 27 – 27 –
TRANSFERS AND SUBSIDIES 1,010 240 770 23.8%
PROVINCIAL AND LOCAL GOVERNMENTS 57 – 57 –
DEPARTMENTAL AGENCIES & ACCOUNTS 23 – 23 –
HOUSEHOLDS (HH) 930 240 690 25.8%
BUDGET ALLOCATION
EXPENDITURE AS AT 30 JUNE
2012
FUNDS AVAILABLE
R'000 R'000 R'000
PROVINCE% BUDGET
SPEND
20
GAUTENG BUDGET ALLOCATION
COMPENSATION OF EMPLOYEES
GOODS AND
SERVICES
TRANSFERS AND SUBSIDIES
PAYMENT FOR CAPITAL ASSETS
GRAND TOTAL
NO OF FILLED POSTS
AMOUNT
NO OF FUNDED VACANT POSTS
AMOUNTTOTAL
FUNDED POSTS
TOTAL COMPEN-
SATION OF EMPLOYEES
R'000 R'000 R'000 R'000 R'000 R'000 R'000
1 467 302 094 180 23 350 1 647 325 444 24 839 987 858 352 128
•Overtime - Allocation: R1M - Payments: R260 153.86 all made within 30 days - Requests submitted: R3 410 553.52
21
Revenue CollectionName of Office Revenue Collected 2012/13 Revenue
Collection April – June 2012/13
% Difference Q12012/13 vs Q1 2011/12
April May June Total Total
Jhb Metro 4 452 154 9 822 352 13 692 357 27 966 863 27 966 863 6 741 603
Tshwane Metro 503 770 7 061 497 11 297 861 18 863 128 18 863 128 13 640 994
Ekurhuleni Metro 3 878 894 6 153 585 10 100 893 20 133 372 20 133 372 4 097 708
Sedibeng District 2 924 867 1 106 270 1 775 530 5 806 667 5 806 667 (5 946 687)
West Rand District 667 822 1 208 961 2 059 622 3 936 405 3 936 405 3 936 405
Lanseria POE - - - - - (3,750 )
Total 12 427 507 25 352 665 38 926 263 76 706 435 76 706 435 22 466 273
22
Property Management.
GP has a total number of 28 Leased building of which 17 are on a month to month lease
GP has a total number of 13 state owned buildings
The remaining 24 offices out of 65 are either in Thusong Centers or Municipal Buildings
23
Office Refurbishment: • Offices refurbished to conform to the DHA Corporate Model:
- Ennerdale
- Eldorado park
- Devon
- Duduza
- EkangalaThese are Offices which were planned for FY 11/12 but have only been signed off in the 1st
quarter Achievements in Finance and Supply Chain Management:• Provincial SCM Function successfully activated without dedicated capacity• Director Finance and Support appointment is a good thing
Challenges:• Province unable to register service providers on suppliers database – causing delays in
issuance of BI 488 – D:F&S escalated to CD: SCM
Actions going forward:• Quarterly Asset verification • Relevant SCM Structures appointed in writing by D: Fin & Support, • Inspection Teams mandated to do physical inspection of assets in offices• Disposal project – commenced (1) reprioritize usable assets
(2) dispose of obsolete furniture & equipment
24
No Condition Requirement
Good Fair Poor Un roadworthy
Jhb Metro 46 10 31 5 5 Need to be replace
Tshwane Metro 50 2 24 24
Ekurhuleni Metro 37 10 20 7
Sedibeng District 21 2 15 4
West Rand District 19 16 3
Marabastad RRC 5 5
Lanseria POE 4 2 1 1
PM Office 9 7 2 1 Panel Beating1 Replacement
Total 191 33 112 46
Transport Management:
25
Mobile Offices: Office Reg. No Driveable Yes/No Functional Yes/No
Akasia XLX 769 GP Yes Yes
Pretoria VGN167GP Yes NoJohannesburg VJK728GP Yes Yes
Soweto VGM603GP Yes No
Krugersdorp VGM586GP Yes Yes
Vereeniging VJK730GP Yes No
Vereeniging VGM588GP Yes No
Germiston VDC532GP Yes No
Springs VHH008GP Yes No
Springs VGN170GP Yes No
10 5
CHALLENGES:•3 x not connecting although satellite dishes are there•2 x require computers•1 x requires a link star to connect
26
Counter Corruption and Security Services
27
Investigations: Output Volumes as at end JUNE 2012
Cases received 42
Under investigation 8
Investigations finalised 34
Referred to Labour Relations 14
Dismissed 3
Criminally charged 2
28
Information Services
29
Hospital Connection
PROVINCE BASELINE ANNUAL TARGET
Q1TARGET Q1 ACTUAL PERFORMANCE
SOURCE OF EVIDENCE
1. GP 19 12 7 3 Parklane, Garden City,Mulberton
MOU/IT REPOR
Due to Audit process the remain 4 Hospital could not be connected because IT equipment could not be released . The remaining Hospitals for the 1st Quarter will be incorporated into the 2nd Quarter .
30
IGR and Stakeholder Management
31
Municipality Meeting & purpose Status
West Rand District Municipality Speakers ForumDiscussion on the new constitution of DHA stakeholder Forum
Active
Randfontein Local Municipality Stakeholder Forum:-To advance the NPR Campaigns-Ensure LRB mop up is successful-Intensify mobile outreach programmes-Resuscitate and strengthen stakeholder forum
Active
Mogale City Local Municipality Stakeholder Forum:
To advance the NPR Campaigns-Ensure LRB mop up is successful-Intensify mobile outreach programmes-Resuscitate and strengthen stakeholder forum
Active
Merafong Local Municipality Stakeholder Forum:
To advance the NPR Campaigns-Ensure LRB mop up is successful-Intensify mobile outreach programmes-Resuscitate and strengthen stakeholder forum
Active
Westonaria Local Municipality Stakeholder Forum:
To advance the NPR Campaigns-Ensure LRB mop up is successful-Intensify mobile outreach programmes-Resuscitate and strengthen stakeholder forum
Active
Stakeholder Forum Management
32
Municipality Meeting & purpose Status
Sedibeng District Municipality Speakers ForumDiscussion on the new constitution of DHA stakeholder Forum
Active
Midvaal Local Municipality Stakeholder Forum:
To advance the NPR Campaigns-Ensure LRB mop up is successful-Intensify mobile outreach programmes-Resuscitate and strengthen stakeholder forum
Active
Emfuleni Local Municipality Stakeholder Forum:
To advance the NPR Campaigns-Ensure LRB mop up is successful-Intensify mobile outreach programmes-Resuscitate and strengthen stakeholder forum
Active
Lesedi Local Municipality Stakeholder Forum:
To advance the NPR Campaigns-Ensure LRB mop up is successful-Intensify mobile outreach programmes-Resuscitate and strengthen stakeholder forum
Active
Stakeholder Forum Management Cont
33
Municipality Meeting & purpose Status
Ekurhuleni Metropolitan Municipality
EMM/DHA Stakeholder Forum has not met in the month of June due to unavailability of committee members.
Date of meeting awaited from Speaker’s office
COJ Metropolitan Municipality 31 May 2012 In the process of launching regional forums in order to properly form the Metro Forum , however there is a project that is taking place between the City and DHA , EPWP recruited 200 volunteers for a period of 12 months to assist with service delivery in all DHA offices within the City.
Stakeholder Forum Management Cont.
34
Municipality Meeting & purpose Status
Tshwane Metropolitan Municipality Launch of the Metropolitan Stake holder Forum on the 27TH June 2012 at the City Hall
Launch of the Tshwane Metropolitan Municipality Stakeholder Forum , all regions launched before.
RRC Inform the Angolans about cessation of their status as Refugees
Stakeholder Forum Management Cont.
35
Projects
36
Worst Performing Office Germiston
Areas Identified Recommendations
Office Manager was still on leave feedback of the inspection
outcomes to be communicated on his return 2012-07-05 by the
DMO:
Findings inter alia:
Lack of Quality Assurance on reports and statistics submitted by
the office.
Unauthorised people found in restricted areas
Management of fleet
HR matter/ Lack of compliance with leave policy
Security of documents
No Floorwalker
No means to measure the time it takes for clients in the office
No complaint register and effective way of dealing with queries
Head of Office to take charge and monitor reports submitted
by the office
Internal memo issued by DMO regarding hawkers and
unauthorized clients in restricted areas.
who is responsible for the region to give training i.r.t safe
keeping of keys and management of logbooks
The role of managers in monitoring leave and ensuring that
leave forms are submitted on time. Introduction of time off
register by the LOM and monitoring thereof.
Supervisors to assist with floor walking during peak times
Time cards to be introduced.
Complaint register to be maintained and updated with LOM taking charge and monitoring
37
Worst Performing Office Germiston
Areas Identify Recommendations
Computers at counters not working
No dedicated registry for the office
No use of handover certificates
Permitting not compliant to service standards
No interface between CS management and law
enforcement
Law enforcement without lockable cabinets leading to
documents left unsecured
Requests made to the DG who indicated that no exceptions will be
attended waiting for the instruction that will allow move of assets.
In the interim CPU for LOM used at the counter.
Applications dating back January 2012 not yet dispatched,
assistance requested from A:CD Permitting. Still waiting for
feedback
Management to be more visible in the affairs of IMS DMO to
monitor the relationship
Requested a list of requirements for law enforcement for us to procure necessary equipment’s
38
Worst Performing Office Centurion
Areas Identify Recommendations
- Ramp completed, certificate issued to accommodate at 75 clients at
a time
- Staff to be assertive and pro-active in advising clients of the office
challenges on an hourly basis
- Ensure that everything within staff area of responsibility is 100%
actioned and adhered to
- Dept to acquire a new office space that will be
compliant without any pressure from other
tenants
- Regular meetings and visits by DMO
- Counter corruption and security to resolve the
replacement of stolen computers
39
Worst Performing Office Soshanguve
Areas Identify Recommendations
- Acting Head Office Mr Nlkwana has
- embarked on a number of control measures like ensuring that there
is job segregation, ensuring that people understand what is
expected of them at work, dealing decisively with late coming and
leaving early from work, etc
- There has been great improvement on office operations including
staff conduct, however there are still concerning security and
corruption concerns
- Great improvement on late coming and absenteeism levels
- Customer service levels are surely improving
- Standard Operating procedures are adhered to a greater extent
- The issue of lost ID’s is being dealt with by Provincial counter
corruptions and has been handed over to Labour Relations for
urgent intervention
40
Filing at TIRRO(Marabastad Satellite Office)
BACKGROUND AND DISCUSSION
• The Acting PM had a meeting with entire Gauteng Management team to discuss any assistance that could
be offered by the Province to the Refugee Centre Tirro when some disorder erupted in this premises.
• It was discovered that the filing system was not conducive and ideal enough to promote free-flow of
processes. The RRO’s and RSDO’s are not allowed to assist in filing activities hence capacity was drawn from
Gauteng Province.
•We had fourteen personnel from Gauteng Province who started on the 10 th of July 2012 with training and started
with the actual project on 11th of July 2012. The approach that was adopted was to group these files per country
per year.
• With the period they stayed there (13 days in total) they finished only two countries, Ethiopia and Burundi (A
total number of 1200 files were filed per day).
The project proved to be time consuming and costly, as all these participants had to be booked in for
accommodation around Pretoria.
41
Filing at TIRRO(Marabastad Satellite Office)
FINDINGS
The project has not been finalized as there are still a number of countries to be dealt with.
We cannot continue with the officials from the Province as their services are needed in their
original offices.
The completed countries still need to be captured on a data base and filed in designated
areas on the bulk filers that are still on order.
The data capturers and the spread sheets still need to sourced, in the week of 23 July
2012
The completed files have not made much difference as far as turnaround times in pulling
the files are concerned because they were not filed in numerical order as the standard
approach, however, as soon as the database is implemented this will be in order,• RECOMMENDATION
• To source data capturers urgently to start with capturing files accordingly.
• The SANDF staff that have been assisting in Immigration /permitting section could be an option to
explore to run with the project and put it to rest or alternatively to source or deploy plus-minus 50 contract
workers for a period of six months.
42
Filing at TIRRO(Marabastad Satellite Office)
Categories
Burundi Ethiopia Total
RI - REPORT FOR INTERVIEW 352 5260 5612
RU - REJECTED AS UNFOUNDED 208 7121 7329
CD - COLLECTIVE DECISION 0 88 88
A - APPROVED 235 1103 1338
FR - FINAL REJECTION 99 269 368
MU - MANUFESTLY UNFOUNDED 16 272 288
D - DOMANT 324 266 590
43
Duplicate ID Project as at 30 June 2012DM Office Total of
ApplicationsType of Duplicate Id's Issued Total of
EnquiriesMultiple Sharing
Jhb Metro 193 141 52 137 Total 193 141 52 137West Rand 68 34 34 0 68 Total 68 34 34 0 68Sedibeng 67 33 34 0 67
Total 67 33 34 0 67Ekurhuleni Metro 49 27 8 0 56 Total 49 27 8 0 56Tshwane Metro 201 117 74 15 106 Total 201 117 74 15 106
GP Grand Total 578 352 202 15 434
44
Core Business Operations
45
Immigration Inspectorate: allMonthly target in relation to baseline
Target April 12
May 12 June 12
Total for Q1
Nr illegal foreigners detected 100% 1860 1041 1430 4331Nr of illegal foreigners detained
100%
1435 846 1361 3642Nr of illegal foreigners released
100%
113 147 115 375
46
PERMANENT RESIDENCE PERMITS: APRIL 2012
CATEGORY
OUTSTANDING FROM PREVIOUS MONTH
RECIEVED APPLICATIONS FROM APPLICANT.
SENT TO HUB FOR ADJUDICATION.
APPROVED FROM HUB
REJECTIONS FROM HUB
TOTAL OF PR APPLICATIONS NOT FINALIZED
26 (A) 67 58 58 1 0 126 (B) 73 72 109 3 0 526 (C) 229 58 25 2 0 24226 (D) 8 3 2 0 0 2SEC 27 (A) 55 37 27 2 0 20SEC 27 (B) 119 51 83 4 0 45SEC 27 (C) 36 13 28 0 0 9SEC 27(D) 62 47 51 1 0 39SEC 27 (E) 4 4 1 0 0 3SEC 27 (F) 5 0 0 0 0 0SEC 27 (G) 68 67 66 1 0 1TOTAL
726 410 450 14 0 367
Permanent Residence Permits:
47
PERMIT TYPE Outstanding from Previous Month
Applications Received from Clients during current month
Permits Approved
and Received from Hub
Outstanding
Applications at the
Hub – Post October
2010
Outstanding
Applications at the Hub – Pre October
2010
Rejection
s from Hub
Total of TRP
Applications not
finalized
Visitors 1269 1041 940 132 86 43 1464
Study568 440 566 22 29 84 478
Treaty2 1 2 0 0 0 1
Business524 16 51 2 0 17 472
Medical363 31 58 2 2 2 342
Relative10543 834 2910 18 60 360 7951
Quota Work 264 78 41 7 21 5 291
General Work7479 438 1163 22 40 134 6561
Exceptional Skills54 22 38 0 0 0 36
Intra Company526 45 29 0 0 4 538
Retired persons6 4 10 0 0 0 0
Corporate 16 83 75 0 0 3 14
Exchange0 0 0 0 0 0 0
Total21614 3033 5883 205 238 652 18148
Temporary residence Permits r1
48
REFUGEE RECEPTION OFFICES Month Number Asylum Seeker Permits
ExtendedNew arrivalsApril:5539May:12099June:9222
April 25039
May 22256
June 21485
Total 67780
Month Interviewsconducted
Adjudicated Pending Granted Rejected
UNF MU
April 5539 5539 - 41 1177 4321May 6948 6948 506 16 2237 4314June 3712 3712 5510 205 1805 1702Total 16199 16199 6016 262 5219 10337
Status determination:
49
Ports of Entry
MAY 2012 STATISTICS - MONTHLY OPERATIONAL REPORT – LANSERIA PORT OF ENTRYFlights Pax/
Crew Pax/Crew Pax/Crew Pax/Crew OPL BAY Penaltie
sSailing Probiti
onAdmiss
ionStow- Crew
in / out Arrival Arrival Departure
Departure Permits Permits Issued Notices Notice Refused
aways
SAC Foreigner SAC Foreigner Issued Issued Issued Issued In Out
2814 5571 2839 5662 2566 0 0 5 0 0 0 0 0 0
50
DHA Annual Target: 6% of births registered within 30 days of the birth event against the estimated 1.1 million births per annum (54% of total births or 594 000 000 births registered)
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
147062 157129 39668
Q1 PROGRESS:STATISTICS
57328
ANALYSIS
Achieved
CHALLENGES:
None availability of birth notifications at the health facility and mothers are made to wait for some time before they can register children’s births.
Some of the mothers who are not married prefer to have their children use fathers surnames .This delays the process of registering the child because the father has to ask time off from work to sign for paternity.
51
DHA Annual Target: 80 additional health institutions with maternity facilities operational for online birth registration
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
19 12 7
Q1 PROGRESS:STATISTICS
3 Parklane, Garden City,Mulberton
ANALYSISNot Achieved
CHALLENGES:
•Due to Audit process the remain 4 Hospital could not be connected because IT equipment could not be released . The remaining Hospitals for the 1st Quarter will be incorporated into the 2nd Quarter .
52
DHA Annual Target: 15 additional stakeholder forums launched and functional - comprising of 7 provincial, 3 metro and 5 district forums
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
0 1 Provincial and One Metro 1
Q1 PROGRESS:STATISTICS1 Tshwane Metro was Launched on the 27 June 2012
ANALYSISAchieved
CHALLENGES:
53
DHA Annual Target: 100% of South African learners writing matric issued with IDs as required by examination regulations
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
100% 100% 100%
Q1 PROGRESS:STATISTICS100%( 3086)
ANALYSISAchieved
CHALLENGES:
54
DHA Annual Target: An increase of 5% in the issuance of Identity Documents (first issue) to citizens 16 years of age and above in relation to the baseline (1 222 200)
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
1 77 075 185 928 46 482
Q1 PROGRESS:STATISTICS
53992
ANALYSIS
Achieved
CHALLENGES:
55
DHA Annual Target: 100% of identified ID duplicate cases resolved (multiple persons sharing same ID number) - 38 000
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
100% 100%
Q1 PROGRESS:STATISTICS578 Applications received 15 Id Application issued
ANALYSIS
CHALLENGES:
56
DHA Annual Target: 15 offices refurbished
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
7 3 0
Q1 PROGRESS:STATISTICSEnnerdale
- Eldorado park
- Devon
- Duduza
- Ekangala
ANALYSIS:The Office open was not part or this first quarter but from the last financial year but it has only been sign off in this quarter
CHALLENGES:
57
DHA Annual Target: 8 new offices opened
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
0 1 0
Q1 PROGRESS:STATISTICS0
ANALYSIS
CHALLENGES:
The identified office in Fochville is not coming on-stream as envisaged due to availability of facilities in the area and DPW processes that make it difficult to acquire sites with speed.
58
DHA Annual Target : 95% of IDs (First issues) issued within 54 days
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
95% 95%
Q1 PROGRESS:STATISTICS95% ( 63126)
ANALYSIS
Achieved
CHALLENGES:
59
DHA Annual Target: 95% of IDs (Re- issues) issued within 47 days
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
95% 95%
Q1 PROGRESS:STATISTICS95%(36588)
ANALYSISAchieved
CHALLENGES:
60
59% (2050/ 3475) of secondary schools visited to collect ID applications from learners of 16 years and above
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
(567 743 201
Q1 PROGRESS:STATISTICS
425
ANALYSISAchieved
CHALLENGES:Schools do not co-operate with the department and the learners are not informed in time
During the month of June not much schools was visited due to exams and winter holidays.
61
Ten Outreach programmes in 2012/13, at least two per quarter, conducted in Gauteng to assist with birth registration and ID collection
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
0 1 1
Q1 PROGRESS:STATISTICS0
ANALYSIS
Not achieved
CHALLENGES:There have been small outreached programmes in Regions but not on that was co- ordinated by the Provincial Office .
62
Permanent residence permits applications in Gauteng collected, quality assured and referred to head office within 2 days
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
2 days 2 days 2 days
Q1 PROGRESS:STATISTICS
2 days
ANALYSISAchieved
CHALLENGES:
Incorrect particulars on permits causes embarrassment to Department.
Response from HUB is not as expected thus causing 90% of problem cases with applicant lodging complaints
63
Permanent residence permits finalized (update on T&T and filed) within 1 day at front offices in Gauteng
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
1 day 1 day 1 day
Q1 PROGRESS:STATISTICS
1 day
ANALYSISAchieved
CHALLENGES:
64
Temporary residence permits (work, business, corporate) registered on T&T at front offices within 2 days IN Gauteng
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
2 days 2 days 2 days
Q1 PROGRESS:STATISTICS2 days
ANALYSISAchieved
CHALLENGES:System downtimes
Permits not dispatched on the track and trace system resulting in new application s not being able to be captured
65
Temporary residence permits (work, business, corporate) finalized (capture on T&T and filed) within 1 day at front offices in Gauteng
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
1 day 1 day 1 day
Q1 PROGRESS:STATISTICS1 Day
ANALYSISAchieved
CHALLENGES:
66
849 transgressors of departmental legislation successfully charged (Admission of guilt fine paid or offender deported)
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
4500 100% 100%
Q1 PROGRESS:STATISTICS100%(363)
ANALYSISAchieved
CHALLENGES:
Lack of training in investigating immigration offices mounting necessary prosecution and also preparing statements for the courts.
67
100% of all detected undocumented foreigners deported/transferred within 30 days) in Gauteng
BASELINE for Province (11/12)
ANNUAL TARGET for Province (12/13)
QUARTER 1 TARGET for Province
100% 100% 100%
Q1 PROGRESS:STATISTICS
100% (221)
ANALYSISAchieved
CHALLENGES:
68
Thank you