Upload
julian-farmer
View
244
Download
5
Embed Size (px)
Citation preview
1 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
THE BECKMAN COULTER logo, COULTER, DxH, TruColor, and UniCel are trademarks of Beckman Coulter, Inc; COULTER and UniCel are registered in the USPTO.
2 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Objectives
Software OverviewSystem & Details StatusDaily Checks & ShutdownSystem MaintenanceSet-UpSample ProcessingCleaning ProceduresSample-Flow
3 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Software OverviewStatus Area
Global Icons and Navigation/Status Buttons
Alert Status IconsUtility Icons
System Icons
Local Navigation Bar
Status Bar
4 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
System Status
Active = online and readyInactive = offline and not readyDisabled = maker or stainer not available for useEnabled = maker and/or stainer available for use
LIS Status:Green = LIS Interface ONGray = LIS Interface OFF
Alert Status Icon color meaning:Red = error
Yellow = warning
Neutral = OK
Displays if unit is Online, Offline, in Diagnostics, or Stopped
Printer Status:Displays Auto Print Disabled if Disable All Auto Printed Reports is selected from Print Print Printer Setup
5 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Details Status
DATE & TIME of last DAILY CHECK and SHUTDOWN Cycles
TRANSPORT STATUS
DEFAULT SLIDE ORDERCASSETTE PREPARATIONSINGLE-TUBE PREPARATION
MAKER & STAINER STATUS
START BUTTON
TRANSFERS
6 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Daily Checks & Shutdown
7 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Supplies
Slidemaker Supplies Tab
Cleaner
Broken Slides Status
Printer Ribbon Status
Slide Status
Setup Supplies
Configure ContainersEmpty Broken Slides
Replace Ribbon
Diluent 1 & 2
8 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Supplies
Slidestainer Supplies Tab
Setup Supplies
Stain Protocol Reagents
Slidestainer Supplies Details
Bio Waste Status
Empty Basket Status
Drawer Spaces
Methanol Waste Status
Config Low LevelView Log
Slidestainer Baths
9 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Supplies - Details
10 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Loading Slides
11 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
12 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Setting up the Slidemaker
13 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Basket Settings
SMS Configuration>Basket Settings
14 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Set Pre-Stain Drying Type
SMS Configuration>Pre-Stain Drying
15 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Configure the Slide Label
SMS>Configuration>Slide Label
16 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Set up Basket Location Availability
SMS Configuration>Basket Location Availability
17 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Set up Stain Only Priority
SMS Configuration>Stain-Only Priority
18 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Set up Agitation
SMS>Configuration> Agitation Settings
19 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Set up Heater Availability
SMS Configuration>Heater Availability
20 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Set up Smear Settings
SMS Configuration> Smear Settings
21 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
22 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Setting up the Slidestainer
23 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Set Active Staining Protocol
SMS Configuration>Staining Protocols
24 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Add/Edit a Staining Protocol
SMS Configuration>Staining Protocols
25 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Configure Baths (Mapping) to the Bath Location
26 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Configure Baths (Mapping) to the Bath Location
27 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Configure Baths (Mapping) to the Bath Location
28 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Copying a Staining Protocol
• SMS Configuration>Staining Protocol
• Select a protocol• Select “Copy Protocol”• Re-Name the copy• Select “OK”
29 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Delete a Protocol
• SMS Configuration>Staining Protocol
• Select a protocol• Select “Delete Protocol”• Select “OK”
30 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Quick Rinse
Follow the procedure, when needed, to reduce stain precipitate on the slide for the Wright Giemsa QR (quick rinse) default stain protocol.
31 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Disable/Enable the Slidemaker
• Select System Status>Details Status• Select Module>Disable or Enable Maker• Select “OK”• Select “YES”
32 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Disable/Enable the Slidestainer
• Select System Status>Details Status• Select Module>Disable or Enable Stainer• Select “OK”• Select “YES”
33 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
34 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Running SamplesCassette Presentation
• Load the samples into the cassettes• Place cassettes into the input buffer
35 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Running SamplesSingle Tube Presentation
36 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
37 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Basket Management
System Status>Details Status>Basket Management
38 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Basket Details
System Status>Details Status>Basket Management>Basket Details
39 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Advance Basket
System Status>Details Status>Basket Management>Advance Basket
40 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Basket to Stain Next
System Status>Details status>Basket Management
41 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Cancel Staining
System Status>Details status>Basket Management
42 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
43 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Loading/Removing BasketsInput/Output (I/O) Drawer
The indicator lights in the I/O drawer mean the following:
• Blinking Green – when the basket is ready for you to remove it• Steady Green – when the basket is ready to be used by the system• Blinking Red – when the basket is in an error state• Blinking Blue – when a basket is loaded with slides for staining only
44 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Staining Samples ManuallyStain-Only Priority
45 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Making Slides (No Staining)
• Select “Make Slide” on the Default Test Order for the applicable cassette or single tube preparation (OR)
• Add or edit a test from the Worklist Pending tab (OR)
• Load the samples for the processing of downloaded Test Orders from the LIS
46 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
47 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Cleaning Procedures
Daily• Daily Checks• Shutdown• Cleaning Stainer Baths and Tray (Daily or as Needed)
Weekly• Cleaning Baskets• Clean Stainer Fill Probes, Drain Probes and
Level Sense ProbesAs Needed Procedures
• For additional information on As Needed Procedures refer to Instructions For Use (IFU)
48 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
49 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Specimen Transport Module (STM)
50 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
UniCel DxH SlideMaker
51 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
UniCel DxH SlideStainer
52 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Sample Aspiration Flow
53 of 53 Rev A.1 (03/2013)Beckman Coulter Professional Development
©2013 Beckman Coulter, Inc.
Any Questions?
Move your lab forwardwith Beckman Coulter.