25
1 Precision Performance and Maximized Drainage Precision Performance and Maximized Drainage

1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

Embed Size (px)

Citation preview

Page 1: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

1

Precision Performance and Maximized DrainagePrecision Performance and Maximized Drainage

Page 2: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

2

CONCEPTCONCEPT

• PDS tile installed on concrete base

• FieldTurf installed over the tile

• Water flows: Through Turf and PDS 2x2 Tile Onto base Into drains

Page 3: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

3

THE COMPLETE SYSTEMTHE COMPLETE SYSTEM

Crushed StonePDS Tile

Concrete

FieldTurf

Page 4: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

4

THE COMPLETE SYSTEM – In ActionTHE COMPLETE SYSTEM – In Action

Crushed StonePDS Tile

Concrete

FieldTurf

Page 5: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

5

Roof Top Anchoring – Special CaseRoof Top Anchoring – Special Case

Crushed StonePDS Tile

Concrete

FieldTurf

Wall

Angle Iron

Adhesive

Page 6: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

6

MAJOR BENEFITSMAJOR BENEFITS

• Precision Performance

• Maximized Drainage

• Installation Friendly

• Reduced Installation Time

• Minimized Base Cost

Page 7: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

7

PRECISION PERFORMANCEPRECISION PERFORMANCE

• Surface Consistency

Uniform surface…anywhere

64 squares conform to surface

No “bridging”

Page 8: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

8

PRECISION PERFORMANCEPRECISION PERFORMANCE

• Exceptional Load Bearing Capacity

Max load at yield is 164 psi 4.3 times greater than competition

Design safety factor of 2.7 Competitor is 0.62…not much safety

1,088 legs and roman arches Support and distribute stresses Delivers long term performance

Page 9: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

9

PRECISION PERFORMANCE - FEAPRECISION PERFORMANCE - FEA

Page 10: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

10

PRECISION PERFORMANCEPRECISION PERFORMANCE

• Thermal Expansion and Contraction

PDS Tile will install flat in “heat”

224 thermal “u” joints per 2x2 tile Bi-directional 0°-90°

“Slack” in “Smart Clip” Bi-directional Ensures easy assembly

Page 11: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

11

PRECISION PERFORMANCEPRECISION PERFORMANCE

• Tri-Axial Design

0°/ 90°/±45° resists bending and twisting

Grid holes less than 9/16” wide Eliminates “dip” causing gaps by 77%

• Turf Grip

18 Small “bumps” per small square

Edges of Tri-axial design

Infill acts as ballast

Turf stays in place. Sure footed.

Page 12: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

12

MAXIMIZED DRAINAGEMAXIMIZED DRAINAGE

• Maximized Volume Voids

• Unequalled Vertical Permeability

• Unparalleled Horizontal Transmissitivity

• Outstanding Support

Page 13: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

13

MAXIMIZED DRAINAGEMAXIMIZED DRAINAGE

• Maximized Volume Voids

PDS tile has 84% volume voids It’s more about what’s not there

Typical competitive product has 35%

PDS tile guarantees drainage

Page 14: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

14

MAXIMIZED DRAINAGEMAXIMIZED DRAINAGE

• Unequalled Vertical Permeability

PDS tile has 71% surface voids

Ensures water flow through turf/tile

PDS tile never holds back water

Page 15: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

15

MAXIMIZED DRAINAGEMAXIMIZED DRAINAGE

• Unparalleled Horizontal Transmissitivity

Optimized number of legs Ensures horizontal flow

Optimized leg ht Maximizes below tile volume

Lab tested (ASTM) PDS tile drains 153 times better than

competitive product

All this…in a low profile ½” design

0.172

0.328

Page 16: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

16

MAXIMIZED DRAINAGEMAXIMIZED DRAINAGE

• Outstanding Support

1,088 legs 1.93 legs/si 19% leg area/si No load concentration Better than a bed of nails!

Leg Beveling Smooth “edges”

Added radii to bottom of legs

Page 17: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

18

INSTALLATION FRIENDLYINSTALLATION FRIENDLY

• Lightweight design 1.468 lbs for 3.92 sf of tile Easy to handle, speeds up install Easy to cut

• 8 “Smart Clips” Provide firm positive lock

• Beveled “teeth” in clip Allows for easy tile removal

• Small rotation in Smart Clips Installer can roll up the tile Temporarily place it aside if required

8 S

ma

rt Clip

s8

Sm

art C

lips

Page 18: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

19

PDS TILE – Transition JointPDS TILE – Transition Joint

FTTK Logo Bottom Left

Install PDS Joint Align with Centre

Face this way

FTTK Logo Bottom Left

Face this way

PDS Joint (Green)

Page 19: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

20

REDUCED INSTALLATION TIMEREDUCED INSTALLATION TIME

• Installed in 50% less time

• Increased installation capacity

• Use PDS…make $$

Natural Soil or Fill

Crushed Stone

Liner

Page 20: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

21

MINIMIZED BASE COSTMINIMIZED BASE COST

• Save significantly on base cost Depending on location

• Use PDS…save $$ !!!

Natural Soil or Fill

Crushed Stone

Liner

Page 21: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

22

PDS TILE - TECHNICAL SUMMARYPDS TILE - TECHNICAL SUMMARY

Feature Value BenefitWeight Lightweight @ 1.468 lbs for a tile Easier to handle. Truck = one field

Field Conformance 64 small squares Conforms locally to field

Tri-axial design 0°/90°/±45° supports Resist bending and twisting

Smart Clip Easy to clip. Addresses expansion. Installer friendly. Easy to reposition.

Surface Dimensions 23.76” x 23.76” Tile efficient. Less for a field.

Tile Ht Remains ½” Low profile.

Leg Ht 0.328” Maximizes horizontal drainage.Added radii to bottom of legs

Roman Arches Optimized design Supports and distributes stresses

Vertical Flow: Permeability Surface Voids 71% Maximizes vertical drainage.

Horizontal Flow: Transmissitivity Volume voids – 84% Maximized volume under tile

Maximizes horizontal drainage.

Compression 164 PSI “Right spec.” Safety design factor 2.7

Thermal Expansion Joints 224 bi-direction “u” joints per tileSmart Clip has bi-directional “slack”

Easy install.Tiles expand & contract

Turf Grip 18 friction bumps. Friction with ribs. Improved turf grip. Sure footed.

Page 22: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

23

PDS TILE MANUFACTURINGPDS TILE MANUFACTURING

• Currently Less than 4 days = 80,000 sf

• By Nov 2007 Less than 2 days

• High Capacity

Page 23: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

24

PDS Installations: 2” Stone, LinerPDS Installations: 2” Stone, Liner

• Approx. 500,000 sf installed 5 fields in total PDS is validated

• Over 1 MM sf by 2008 Q1

• Varied climates Hot, Cold, Wet

Stadium Location SF DateDimond HS Alaska 98,000 Aug, 2007Schopflin California 167,000 Sep, 2007Spruce Grove Alberta 223,600 Oct, 2007

488,600

Page 24: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

25

PDS Installations: Concrete or AsphaltPDS Installations: Concrete or AsphaltStadium Location SF Date

Aloha Stadium Hawaii 129,760 Jul, 2003Westminster College Utah 109,660 Jul, 2006McMahon Stadium Alberta 107,100 May, 2006Maranatha High School California 104,960 Sep, 2005University of Wisconsin Wisconsin 91,120 Aug, 2003Montclair Sate New Jersey 88,320 Jun, 2006Clark-Plan Texas 85,760 Jun, 2006Oregon State University Oregon 84,480 Jun, 2005St. John's University New York 80,464 Sep, 2002Sams Stadium Texas 71,440 Aug, 2007McMurray Louisiana 61,000 Oct, 2007Creighton University Nebraska 33,280 Sep, 2006Sara Roosevelt New York 25,600 Aug, 2006Lifetime Fitness Florida 19,900 Feb, 2007Denver Broncos Colorado 17,420 Jul, 2003GM Renaissance Michigan 8,000 Jun, 2006

1,118,264

Page 25: 1 Precision Performance and Maximized Drainage. 2 CONCEPT PDS tile installed on concrete base FieldTurf installed over the tile Water flows: Through Turf

26

Precision Performance and Maximized DrainagePrecision Performance and Maximized Drainage