7/24/2019 1 Primary Cementing 22 Jun 00 A
1/17
Primary Cementing
Module CMT101June 2000
7/24/2019 1 Primary Cementing 22 Jun 00 A
2/17
2
Primary Cementing
Provide zonal isolation
Support axial load of casing strings and strings
to be run later
Provide casing support and protection
Support te boreole
The placement of a cementicious material into the annulus
between casing and open hole to :
7/24/2019 1 Primary Cementing 22 Jun 00 A
3/17
3
Types of Casings
Conductor
Surface
Intermediate
Production
Liner
7/24/2019 1 Primary Cementing 22 Jun 00 A
4/17
4
Conductor
Purpose
Prevents washing out under the rig
Provides elevation for ow nipple
Common sies and depths!
3"# $ 2"# %elded
2"# $ &'# Threaded 3"( $ 2""( )* &""( common+
7/24/2019 1 Primary Cementing 22 Jun 00 A
5/17
,
Conductor
-ther .emar/s!
Plugs not used
Careful pumping practices
Large e0cess re1uired
Thru$drill pipe cementing common
-P(s not unusually connected
Common Cements
ccelerated eat
7/24/2019 1 Primary Cementing 22 Jun 00 A
6/17
'
Thru$5rill Pipe Cementing
6ey Points!
Cement contamination
Channelling
5isplacement
Pump until cement to surface
7/24/2019 1 Primary Cementing 22 Jun 00 A
7/17
7
-utside Cementing
Purpose ring cement to surface
8acaroni tu9ing used
8a0: depth 2,"$3"" ft ;igh friction pressures
on$standard connections
Tubing moved
during job
7/24/2019 1 Primary Cementing 22 Jun 00 A
8/17