1
Project Selection Project Selection
Submitted by: Site Location
Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
Mike Fieramosca Westminster No Fault Found (T) $TBD
Mike Fieramosca Westminster Order Entry Process(T)Project within Order Delivery Cluster
$TBD
Mike Fieramosca Westminster Returns (T)Project Within Order Delivery Cluster
$TBD
Mike Fieramosca Westminster Lost Opportunities (T)Project Within Order Delivery Cluster
$TBD
Mike Fieramosca Westminster Planning (T)Project Within Order Delivery Cluster
$TBD
2
Project Selection Project Selection
Submitted by: Site Location
Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
Mike Fieramosca Westminster Order Accuracy (T)Project within Order Delivery Cluster
$TBD
Mike Fieramosca Westminster Product Launch Process (M) $600K
Mike Fieramosca Westminster SSD Yield (M)Project within High Volume Yield Cluster
$200K
Mike Fieramosca Westminster Notification Device Yield (M)Project within High Volume Yield Cluster
$50K
Mike Fieramosca Westminster Product Offerings (M) $TBD
3
Project Selection Project Selection
Submitted by: Site Location
Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
Mike Fieramosca Westminster Shadow Systems (M) $350K
Mike Fieramosca Westminster Inventory Management (M)Project Cluster including (1)Inventory Accuracy; (2)Inventory Planning; and (3)Demand Forecasting.
$TBD
Micheal Corkery Boca Raton Alternate Sales Channels for Labels (M) $300K
Micheal Corkery Boca Raton Replace the Rogue Repair Centers. Re-Engineer / Define Clear & Customer Focused Repair Operation (M)
$TBD
Micheal Corkery Boca Raton Attain the ability to identify and accurately capture and invoice in vs out-of-warranty repairs (M)
$200K
4
Project Selection Project Selection
Submitted by: Site Location
Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
Micheal Corkery Boca Raton & Atlanta
Freight Invoice Post Audit Process (M) $500K
Micheal Corkery Atlanta Improve Forecasting Process
Sales Group / Demand Planning (M)
$TBD
Micheal Corkery Puerto Rico Automate Tray Filling Process and Label Production (M)
$250K
Micheal Corkery Puerto Rico Improve Molding Productivity (M) $200K
Micheal Corkery Puerto Rico Reduce / Eliminate Roll Down Process (M) $500K
5
Project Selection Project Selection
Submitted by: Site Location
Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
Micheal Corkery Puerto Rico Investigate the use of new materials for Label Production (M)
$1,000K
Micheal Corkery TBD Outsource 15-20 High Volume PCBAs. Low Volume PCBAs remain in-house (M)
$2,000K
Micheal Corkery Cork Re-Engineer Repair Center offering in Europe (M)
$500K
Micheal Corkery Cork Rolled Label Productivity Improvement (M) $200K
Micheal Corkery TBD New Product Justification Process (M)Reserve Project
$TBD
6
Project Selection Project Selection
Submitted by: Site Location
Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
Micheal Corkery TBD Rationalized Product Offering (M)Reserve Project
$TBD
Micheal Corkery TBD Grey Market Tag Attack (M)Reserve Project
$TBD
Micheal Corkery TBD Logistics and Distribution Optimization (M)Reserve Project
$TBD
Steve Darr Toronto PIPO
Engineering Change Phase-In,Phase-Out (M)
$305K
Steve Darr Toronto Cyclops (M) $250K
7
Project Selection Project Selection
Submitted by: Site Location
Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
John McStravick Monroe 642 Cartridge Modification (M) $150K
John McStravick Monroe Reduce Mfg.Cost of HUD Assembly (M) $215K
John McStravick Monroe Reduce Scrap & Rework in Assembly Process (M)
$175K
John McStravick Monroe Molded Parts Scrap/Rework Reduction (M) $200K John McStravick
Mark VanDover Marinette Capacity Upgrade to FORAY ABC Dry Chemical Plant
$TBD
8
Project Selection Project Selection
Submitted by: Site Location
Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
Mark VanDover Marinette Redline Extinguisher Cost Reduction Iniative $TBD
Mark VanDover Windsor Flag Extinguisher Cost Reduction $TBD
Mark VanDover Windsor Auto Fill Line $TBD
Russ Kamis Lancaster Scrap Reduction of Chemical Oxygen Generator Fabrication (M)
$200K
Russ Kamis Lancaster Efficiency Improvements with Assembly in the Cylinder and Valve Cell (M)
$50K
9
Project Selection Project Selection
Submitted by: Site Location Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
Don Lyman San Diego AD Back Office Project ClusterIncludes (1)Service, (2)Repair, & (3)Order Entry
$TBD
Don Lyman San Diego Supply Chain ImprovementsDemand Forecasting Integration with Operations
$TBD
David Stonehouse Walthamstow Rework Reduction $TBD
David Stonehouse Walthamstow Increased SMA Rates $TBD
David Stonehouse Echt European Transfer Management Process $900K
10
Project Selection Project Selection
Submitted by: Site Location Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
David Stonehouse Letchworth & Echt
European Order Management $250K
David Stonehouse TBD European Forecasting Process $500K $250K
David Stonehouse Echt Warehouse Productivity $138K
David Stonehouse Great Yarmouth First Time Yield $75K $300K
David Stonehouse Great Yarmouth On-Time Delivery $300K
11
Project Selection Project Selection
Submitted by: Site Location Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
Steve You Korea Cost Savings by way of Product Development (M)
$220K
Steve You Korea Cost Savings by Refurbishing Operation Improvement (M)
$220K
John McStravick Skelmersdale To Be IdentifiedReserve Placeholder
$TBD
John McStravick Skelmersdale To Be IdentifiedReserve Placeholder
$TBD
Mark VanDover Coatecocke
Quebec
To Be IdentifiedReserve Placeholder
$TBD
12
Project Selection Project Selection
Submitted by: Site Location
Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
Mark VanDover Coatecocke
Quebec
To Be IdentifiedReserve Placeholder
$TBD
13
Project Selection Project Selection
Submitted by: Site Location Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
14
Project Selection Project Selection
Submitted by: Site Location Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)
15
Project Selection Project Selection
Submitted by: Site Location Project Description
(M-Mfg. & T-Transactional)
Est.Savings ($US)
Est.EBIT ($US)