2
Outline
RosettaNet Organization RosettaNet Standard PIPs Examples General RosettaNet Applications Case Sharing
Semiconductor Industry Infrastructure Dancing scenario
Open Issues
3
RosettaNet Organization
Established on 1998 www.rosettanet.org
Key sponsors, that’s why applied in global Intel, Motorola, HP, Nokia, Cisco, Seagate, Sonly, Samsung, Toshi
ba, Fujitsu, IBM, Infineon, Philips
It’s a virtual organization Few formal staffs, about 20 On loan resource from sponsors
Board Information Technology (IT) Electronic Component (EC) Semiconductor (SM) since 2000, SPIL is the initiate member along
with TSMC, UMC, and ASE Solution
Score Card System
4
RosettaNet Standard
RNIF (RosettaNet Implementation Framework) 2.0
PIP (Partner Interface Process) Business flow Specified message contents
RNTD (Technical Dictionary)
7
PIPs Examples
3A1 3: Cluster; A: Segment; Number: A sequence numberEach process has a unique PIP code
PIP Code Business Flow Message Content Real Case
8
PIPs Examples
Acknowledgement
7B1 is a one way PIP along with one acknowledgement
PIP Code Business Flow Message Content Real Case
9
PIPs Examples
•3A4 is a two way PIP along with one ack•Business flow can be decomposed by multiple PIPs
PIP Code Business Flow Message Content Real Case
10
PIPs Examples
Microsoft Word ¤å¥ó
Document Type Definition
HTML Document
1 Required. Only once0..1 Optional. If having value, only once0..n Optional, If having value, allow multiple times1..n Required, allow multiple times
SPEC
DTD
PIP, data structure
Dictionary Usage
XML based sample
PIP Code Business Flow Message Content Real Case
11
PIPs Examples
PIP Code Business Flow Message Content Real Case
Project Kick off
Mapping SPECEvents Mapping
12
General RN Applications
3A4/8 Purchase Order Related (Vendor / Customer)Purchase OrderReceive / Confirm
Purchase OrderReceive / Confirm
3B2 Notify Of Advance Shipment (Customer/ Vendor ) Shipping NotificationShipping NotificationWafer/Goods ReceiveWafer/Goods Receive
In Process WIP UpdateIn Process WIP Update7B1/3D8 Distribute Work In Process (Customer)
4C1 Distribute Inventory Report (Not Available)Inventory StatusInventory Status
7B5 Production Work Order (Customer)Work Order CreateWork Order Create Production Order Release
Production Order Release
3B2 Notify Of Advance Shipment (Customer)Shipping NotificationShipping Notification Shipping Confirmation.Shipping Confirmation.
Testing/Inkless fileData Application
Testing/Inkless fileData Application
7C7 Testing Result Data (Not Available)
Purchase OrderIssue/ ConfirmPurchase OrderIssue/ Confirm
WIP ManagementWIP Management
Testing Data Sharing / Analysis
Testing Data Sharing / Analysis
3B2 Notify Of Advance Shipment (Customer)Shipment AllocationShipment Allocation
3C3/4/6/7 Invoicing and Payment (Not Available) Account Receivables/Cash
Account Receivables/Cash
Account Payable/Remittance
Account Payable/Remittance
Consigned Inventory Management
Consigned Inventory Management
Shipping PlanningShipping Planning
13
Case Sharing
Semiconductor Industry Infrastructure Scenario Cases
Foundry1
Foundry2
Foundry3
Probing1
Probing2
Assembly1
Assembly2
Assembly3
Testing1
Testing2
BumpingFoundry Assembly Testing
Stock Point
Probing Testing SMT
Virtual FactoryFacing different partners
14
Case Sharing
Semiconductor Industry Infrastructure Scenario Cases
•Design
•Foundry
•Probing
•Assembly
•Testing
Intel
MediaTek
TSMC/UMC
KYEC
ASE/SPIL
ASE/SPIL
Integration in oneCompany
Disintegration by Multiple CompaniesTraditional Process
15
Case Sharing
Semiconductor Industry Infrastructure Scenario Cases
DataData WarehouseWarehouse
ERPERP(Oracle R11i)(Oracle R11i)
MESMES(Promis)(Promis)
CustomerCustomerWebWeb
E-MailE-Mail
FTPFTP
EDIEDI
B2BiB2Bi(webMethod)(webMethod)
B2BiB2Bi
BackendBackendSystemSystem
CIMCIM(By Site)(By Site)
Business Flow Customer
Online Query
Auto Send
Purchase Order
Work Order
Wafer Shipping
WIP and Inventory
Shipment
Internet Internet
PC
Assembly *1 Bumping *1
Testing *1
XXX
16
Open Issues
(1) Even RosettaNet is a standard, but each customer has its own definition, especially in transaction base data integration.
(2) There is still lack of mechanism for data revision(3) Some changes will impact business process(4) It needs a well-constructed infrastructure, or it is diffic
ult to meet customer’s requirement(5) Even after go live, we can still found some scenario is
out of design. User’s involvement is very important, or it will bring more problems.
(6) EEI is a trend, most customer has this kind of requirement, especially IDM.
•Business flow and system integration
17
Open Issues•Project Management
1. High level supports
2. Project members are complex, and they should join project in different stage. For example, Project manager, business analyst, end user, backend system analyst, programmer, B2Bi expert, Network engineer et al No body can understand all things
3. Global collaboration Only voice, not FTF meeting. If considering the language capability, it brings more challenge during implementation. It is easy to confuse requirement.
4. Time zone difference Need to well arrange or will delay over 3 days