    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 1 / 46

    SMS

    n 0606

    TSO REV. : 0

    KINGDOM OF SAUDI ARABIA

    NORTH SOUTH RAILWAY PROJECT

    NSR

    (i)

    -

  • 8/3/2019 1 Safety Management System

    2/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 2 / 46

    SMS

    n 0606

    TSO REV. : 0

    Drafted by :TSO

    Ref. : SMS 0606 Rev. : 0

    Follow-up of document

    VALIDATION OF DOCUMENT

    NAME AND FUNCTION Visa and date

    Fabrice BARBEAU 09/10/06

  • 8/3/2019 1 Safety Management System

    3/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 3 / 46

    SMS

    n 0606

    TSO REV. : 0

    CONTENTS

    NSR ............................................................................................................................................................................1

    II. GENERAL ORGANIZATION ..................................................................................................................................5

    A. POLICY AND ENGAGEMENT ............................................................................................................5B. OBJECT, APPLICABILITY AND DELIMITATION OF WORK ..............................................................6C. REFERENCE DOCUMENTS ..............................................................................................................6D. LIST OF PARTIES ..............................................................................................................................6

    1. Contracting authority, Engineer and contractor ................................................................................... 62. Possible supplier ...................................................................................................................................73. Further information ..............................................................................................................................7

    III. ORGANIZATIONS OF CONTROL AND SERVICE ...............................................................................................7

    IV. ORGANIZATION OF SAFETY ..............................................................................................................................8

    A. ORGANISATION CHART, AUTHORITIES AND RESPONSABILITIES OF THE MANAGEMENTTEAM ...............................................................................................................................................8

    1. Project Director ....................................................................................................................................82. Project Manager ................................................................................................................................... 83. Deputy Project Manager .......................................................................................................................84. Safety Manager .................................................................................................................................... 9

    5 R i t d S f t Offi 9

  • 8/3/2019 1 Safety Management System

    4/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 4 / 46

    SMS

    n 0606

    TSO REV. : 0

    A. PURPOSE .........................................................................................................................................15B. PARTICIPATION ...............................................................................................................................15C. FREQUENCY ....................................................................................................................................15D. PROCEDURE ...................................................................................................................................16E. TOPICS .............................................................................................................................................16

    XI. INCIDENT INVESTIGATION AND ANALYSIS ....................................................................................................16A. OBJECTIVES :..................................................................................................................................16B. TREATEMENT :................................................................................................................................16C. REPORTING :...................................................................................................................................17D. SAFETY COMMITTEE MANAGER ...................................................................................................17E. INCIDENT REPORT PROCEDURE ..................................................................................................17

    XII. IN-HOUSE SAFETY RULES AND REGULATIONS ...........................................................................................17

    A. RULES AND REGULATIONS ...........................................................................................................17B. PERSONNAL PROTECTIVE EQUIPMENT ......................................................................................17C. COLOUR OF SAFETY HELMET .......................................................................................................18

    XIII. SAFETY PROMOTION ......................................................................................................................................19

    XIV. EVALUATION, SELECTION AND CONTROL OF SUB-CONTRACTOR ........................................................19

    A. OBJECTIVES :..................................................................................................................................19B. COVERAGE :....................................................................................................................................19

    XV MAINTENANCE REGIMES FOR ALL CONSTRUCTION PLANT EQUIPMENT AND TOOLS 21

  • 8/3/2019 1 Safety Management System

    5/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 5 / 46

    SMS

    n 0606

    TSO REV. : 0

    II. GENERAL ORGANIZATION

    A. POLICY AND ENGAGEMENT

    This policy applies to the Environmental aspects and Safety concerning the project ..

    The elements of the policy expressed by the Management of the Construction site are declined according tofollowing points:

    Adoption of a strategic vision by optimizing in a durable way the use of human, material and financial

    resources available.

    Improvement of the quality of our products and services by regularly measuring the level of satisfaction of

    our customers to be able to satisfy in all circumstances their expressed and implicit needs.

    The satisfaction of our partners by permanently adapting to current and future expectations of our

    customers, collaborators, board of trustees and public bodies.

    The involvement and training of the collaborators to give them in a targeted way increasing responsibility

    and continuous training.

    Ensure the Environmental protection, health and safety of our employees by protecting their working station

    and by developing a methods and procedures respectful of the environment.

  • 8/3/2019 1 Safety Management System

    6/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 6 / 46

    SMS

    n 0606

    TSO REV. : 0

    B. OBJECT, APPLICABILITY AND DELIMITATION OF WORK

    The direction of the construction site ensures the respect of this S.M.S. This plan defines all the elementsof organization contributing to the respect of safety and makes reference to the general procedures,procedures specific, process or instructions of building site.

    C. REFERENCE DOCUMENTS

    Contract documents STTSO documentsThe form of tender with attachments Quality Manual Management (QMM)

    The particular conditions and appendices Safety Management Manual (SMM)

    The specifications (the particular specification withappendices, the general specification withappendices, design criteria and performancespecification, the materials and workmanshipspecifications and, the drawing and CAD standard)

    ProcessusGenerales and specifiques procedures

  • 8/3/2019 1 Safety Management System

    7/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 7 / 46

    SMS

    n 0606

    TSO REV. : 0

    2. Possible supplier

    Refer to the Project Quality Manual

    3. Further information

    Period of execution

    Beginning of work :

    End of work : ..

    Schedules of work

    Day :

    .

    Night : Only in exceptional circumstances

    manpower

    Average :

    Maxim um :

    Staging Area .

    Office

    Work Site .

  • 8/3/2019 1 Safety Management System

    8/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 8 / 46

    SMS

    n 0606

    TSO REV. : 0

    IV. ORGANIZATION OF SAFETY

    A. ORGANISATION CHART, AUTHORITIES AND RESPONSABILITIES OF THE MANAGEMENT TEAM

    Project Director

    Project Manager Deputy ProjectManager

    Safety Manager

    Works TrainSafety Team

    Storage aeraSafety Team

    Lifti ti L i t k

  • 8/3/2019 1 Safety Management System

    9/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 9 / 46

    SMS

    n 0606

    TSO REV. : 0

    4. Safety Manager

    The Safety Manager reports directly to the Project Director and is in charge of the definition and application of theon Site Safety Management System. He is overall responsible for the general safety. His responsibility includes :

    Setting up the safety organisation. Particularly he draws up the Site Safety Plan and the associated

    procedures. Ensuring that suitably qualified Registered Safety Officers (RSO) are employed. Ensuring that suitably qualified Registered Environmental Control Officers (RECO) are employed. Ensuring that suitably experienced Site Safety Supervisors (SSS) are employed. Ensuring compliance with applicable Health and Safety legislation NSR requirements. Liaising with Publics Bodies on site safety matters generally. Liaising an co-ordinating in terms of safety matters, including safety meetings, inspections and other

    relevant matters pertaining to safety where necessary. Establishing emergency preparedness procedures in collaboration with Police, Fire and Emergency Medical

    Services. Ensuring that reviews, audits and safety training are ongoing. Supervising the hazard identification system. Act as Secretary to the Safety Committee and assist it.

    5. Registered Safety Officer

    Advice the occupier, Project Manager or any other person in-charge of the worksite on the measures to betaken in the interest of Safety and Health of the persons employed therein ; with the approval of such

    i P j t M i l t h

  • 8/3/2019 1 Safety Management System

    10/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 10 / 46

    SMS

    n 0606

    TSO REV. : 0

    6. Registered Environmental Control Officer (RECO)

    The Registered Environmental control officer is to ensure the construction site is free of environmental healthhazards. The RECO reports to the Safety Manager.

    The RECO is responsible for :

    Preparing & submitting a Site Environmental Control Programme in accordance to the prescribed format tothe occupier of the construction site at least three weeks before work commences on the worksite.

    Advising the occupier, Project Management via the Safety Manager or any other person in charge of theworksite on what needs to be done for conditions/situations which cause environmental health problems orare likely to cause environmental health problems.

    Implementing such measures, with approval of such occupier.

    Inspecting the worksite to ensure all facilities and equipment relevant to the maintenance of environmental

    health are in proper working condition and do not pose any environmental health hazard.

    Pointing out and discussing environmental health irregularities such as mosquito and fly breeding, rodentinfestation, noise/dust/smoke/water pollution, poor housekeeping, earth littering, poor refuse management,poor maintenance of sanitary facilities, etc. with the occupier of the construction site and recommendmeasures to rectify such irregularities.

    Attending to all feedback on such irregularities and inform the occupier of the construction site accordingly.

    Reporting and submitting a site Environmental Control Report in accordance to the prescribed format to the

    i f th t ti it f t i ht th 1st d 15th f th th

  • 8/3/2019 1 Safety Management System

    11/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 11 / 46

    SMS

    n 0606

    TSO REV. : 0

    Use an audible signal communication system if the above statement is not complied. (E.g. walky talkie,handphone).

    Take measures to ensure safe lifting operation and rectify any unsatisfactory or unsafe condition reported.

    Ensure that receptacle is used when lifting any loose load to prevent the load or part of it falling out duringthe lifting operation.

    Check the lifting gears/tackles every 3 months to ensure their safe working condition and colour it accordingto the coloured code.

    Monitor and ensure that the mechanics carries out the maintenance for the crane every 3 months.

    Responsible for the safety of all lifting operation.

    9. Rigger

    Ensure that the load to be lifted is secure, stable and balanced.

    Report any defect in the lifting gears/tackles to the Lifting Supervisor.

    10. Signalman

    Responsible for all signalling used in the lifting operation.

    Give correct and clear signals to guide the crane operator in the manoeuvre of the load safely to itsdestination.

    R t ti f t f diti t th Lifti S i

  • 8/3/2019 1 Safety Management System

    12/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 12 / 46

    SMS

    n 0606

    TSO REV. : 0

    V. SAFE WORK PRATCICES

    STTSO will establish and maintain detailed procedures to ensure that safe work practices are followed. Theseprocedures shall incorporate instructions stated in the relevant standards, codes and statutory regulations. STTSOwill establish a list of all statutory requirements and establish a procedure to update this listing.

    All safety critical activities are identified in the risk analysis report. Before commencement of work, STTSOprepare Permit-to-work for each routine high risk work activity. (Cf. Risk analysis report)

    Objectives :

    To eliminate unsafe acts

    To prevent accidents by reducing excessive risk taking

    To serve as training material and checklist for supervisors on specific operation

    Coverage :

    Electrical works

    Housekeeping

    Manual handling

    Lifting operation by cranes

    Fire prevention

    Cables laying and trackside installation

    Hot work

    Working at height

    W ldi d tti

  • 8/3/2019 1 Safety Management System

    13/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 13 / 46

    SMS

    n 0606

    TSO REV. : 0

    C. SAFETY ORIENTATION COURSE (SOC) :

    All workers regardless of nationality at the work site must complete this course.

    This course is conducted in English

    Those employees without the certificate will not be allowed into the site.

    A copy of the SOC certificate of every employee must be submitted to the safety section of CTW before start ofwork.

    D. CWCS SAFETY ORIENTATION COURSE

    This training is conducted for workers by CTWs before they start work.

    The workers are brought around on a site tour and the classroom briefing The orientation may consist of :

    General safety rules and regulations,

    Personal protective equipment,

    Housekeeping,

    Accident reporting,

    Emergency evacuation procedures,

    Permit-to-work system,

    C f t i

  • 8/3/2019 1 Safety Management System

    14/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 14 / 46

    SMS

    n 0606

    TSO REV. : 0

    VII.GROUP MEETINGS

    STTSO will establish a communication system among managers, supervisory personnel, safety personnel,workers and sub-contractors. The communication system shall consist of the co-ordination meeting, safety

    committee meeting, tool box meeting

    A. PURPOSE :

    To serve as an avenue for discussion on remedies for hazards.

    To update on technological advance in terms of safety.

    To ensure an effective site safety committee meeting.

    To comply with factories (safety committee) regulation.

    B. OBJECTIVE :

    Group meetings are an important method of successful supervisor employee communications by makingeffective use of communication time by allowing employee participation and providing equal exposure to vitalinformation. These meetings can also help to create a co-operative communication climate, encourage team sprit,and enhance the supervisors leadership role.

    VIII SAFETY COMMITTEE

  • 8/3/2019 1 Safety Management System

    15/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 15 / 46

    SMS

    n 0606

    TSO REV. : 0

    The Committee will discuss the cause of the accident, incident, dangerous occurrence ornear miss and recommend measures to be taken to prevent a recurrence of such accident or dangerousoccurrence.

    C. ORGANISE PROMOTIONAL ACTIVITIES

    STTSO, through the Site Safety Committee, will participate or organise its own contest,competition or other activity held to promote the safe conduct of work in the Site.

    D. SAFETY RULES AND REGULATIONS

    The Site Safety Committee will prepare a set of rules and regulations which will promote thesafety, health and welfare of the workmen.

    STTSO display a copy of these rules and regulations on Site, translated into languages

    which the workers can understand.

    E. MONTHLY SAFETY TALK

    At the monthly meeting, one of the members of the Site Safety Committee will give a talk onsafety and health at work on the Site, and the talk will be followed by a discussion by the Committee.

    The Chairman, will appoint the Registered Safety Officer and the Site Safety Supervisors toconduct daily tool box meetings to the workforce so as to promote the safety and health of workers onthe Site and for the guidance of the persons employed therein.

  • 8/3/2019 1 Safety Management System

    16/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 16 / 46

    SMS

    n 0606

    TSO REV. : 0

    D. PROCEDURE

    To arrange for the employees to gather at scheduled time

    To inform the site safety officer or safety manager before commencement of the meeting.

    Workers should be encourager to bring up hazard, and unsafe conditions present at the work area during themeeting.

    To constantly train workers on safe work procedures

    To educate the employees in order to prevent accidents

    To inform employees about the proceedings of the site safety committee meeting

    To keep a record of the date, time, attendance of the participants and the details of the meeting at least once ina week

    The meeting shall be at least 10 minutes and not to exceed 20 minutes

    One or some of the suggested topics may be propagated or discussed

    E. TOPICS

    Safety rules and regulations

    Safety work practices

  • 8/3/2019 1 Safety Management System

    17/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 17 / 46

    SMS

    n 0606

    TSO REV. : 0

    C. REPORTING :

    After receiving medical attention, the injured workman shall inform his/her immediate superior within 24 hoursfrom the accident happened either through writing or with the following data for investigation purposes :

    Date and time of accident,

    Place of accident took place,

    Brief description of accident, Part of body injured,

    Witness of the accident, if any,

    Duration of medical leave, if any,

    Contact telephone number if medical leave more than 3 days.

    D. SAFETY COMMITTEE MANAGER

    He shall comment on the accident case and if necessary he may call for a board of enquiry for further

    investigation to the accident.

    E. INCIDENT REPORT PROCEDURE

    Refer toAppendix n 3

    XII. IN-HOUSE SAFETY RULES AND REGULATIONS

  • 8/3/2019 1 Safety Management System

    18/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 18 / 46

    SMS

    n 0606

    TSO REV. : 0

    C. COLOUR OF SAFETY HELMET

    Personnel Coulor of safety Helmet

    Contractors site agents and foremen White red stripe

    Sub-contractors and supervisory staff of sub-contractors

    Yellow with red stripe

    Registered safety officers, safety supervisors Blue

    Lifting supervisors BrownRiggers * RedSignallers * YellowAll other workers Yellow

    * In addition to the helmet colour codes, riggers and signalman will be provided with red reflective vest andidentification tags.

  • 8/3/2019 1 Safety Management System

    19/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 19 / 46

    SMS

    n 0606

    TSO REV. : 0

    XIII. SAFETY PROMOTION

    STTSO will develop a safety promotional programme to demonstrate his commitment to advancing the safetyculture at the Site and reinforcing the concept that safety and construction are inseparable. The programme willenhance personal safety awareness and influence all attitudes and behaviour of all personnel on health, safety and

    welfare.The programme will consist of general promotional activities which are carried out as part of a day-to-day

    activity and high impact promotion activities which are carried out as a campaign to reinforce a particular safety pointat the Site. STTSO will organise a minimum of two safety campaigns for each calendar year.

    Promotional materials and activities willinclude the following:

    Display of safety policy on the site notice board,

    Display of accident statistics,

    Safety talks or screening of videos on safety in appropriate workers languages,

    Display of signs, poster or other visual material, aimed at increasing safety awareness or to drawattention to particular safety issues,

    The issue of safety handbooks or brochures aimed at increasing safety awareness.

    STTSO will provide, erect, maintain and finally remove when ordered, an Accident Statistics Board 3m x 2min size written boldly in English, the content of which will include, at least, the following :

    D

  • 8/3/2019 1 Safety Management System

    20/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 20 / 46

    SMS

    n 0606

    TSO REV. : 0

  • 8/3/2019 1 Safety Management System

    21/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 21 / 46

    SMS

    n 0606

    TSO REV. : 0

    STTSO will be responsible for ensuring his sub-contractors good safety performance. STTSO will :

    Establish an effective ongoing programme that uses specific safety performance criteria for evaluation ofsub-contractors,

    Stipulate safety performance in the contractual agreements between STTSO and sub-contractors,

    Conduct meetings before bid submission to address specific safety requirements,

    Include site specific safety, health and welfare requirements in bid packages,

    Request safety and health information from each prospective sub-contractor and evaluate it during theselection process,

    Establish specific training requirements for sub-contractors,

    Conduct pre-job meetings to address job safety expectation;

    Require formal sub-contractor safety orientations for all new employees at the Site; Review the safety performance of sub-contractors (Accomplishment of last safety programme (if any),

    awards received from authorities and other agencies (if any), to submit monthly safety report on or before5th day of each month to the safety department. Report format will be issued prior to the workcommencement),

    Maintain records of all sub-contractors in particular items related to legislative requirements. These willinclude incident reports, inspection reports, minutes of Safety Committee Meetings and safety statistics.

  • 8/3/2019 1 Safety Management System

    22/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 22 / 46

    SMS

    n 0606

    TSO REV. : 0

    XVI. HAZARD IDENTIFICATION AND RISK ASSESSMENT

    A. PROCESS

    Work procedureidentification

    Standard or specific

    Analysis of work processlimitations

    Start

    Start

    art

    jkopjpojopjkopStart

    art

    arSSart

    art

    artIdentification of potantial

    hazards

    Risk estimate

    Risk evaluation

    Assessment ofInitial Risk

    Assessment ofresidual risk

  • 8/3/2019 1 Safety Management System

    23/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 23 / 46

    SMS

    n 0606

    TSO REV. : 0

    XVII. IDENTIFICATION OF RISKS SPECIFIC TO MAIN WORK PROCESSES.

    Work process

    Data ExaminationActivity

    Methods

    Regulatoryrequirements

    Human andPhysical

    Resources

    Identify inherentRisks

    Human FactorOrganisational Factors

    Technical Factors

    Work process

    safetysheet

  • 8/3/2019 1 Safety Management System

    24/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 24 / 46

    SMS

    n 0606

    TSO REV. : 0

    C. FIRE EQUIPMENTS :

    The means of immediate fight against fire (extinguishers) have to be accessible without obstacle.

    The information developed will be documented and communicated as appropriate within the Site to ensure thatthe Site organisation can respond to emergency situations.

    STTSO will establish a programme of training, drills and exercises to test and evaluate the preparedness foremergency actions.

    STTSO will, once every six months, organise role playing emergency exercises based on likely site scenarii inwhich the key site personnel work through their emergency response roles. The Authoritys Safety Department willbe invited to this exercise as an observer.

  • 8/3/2019 1 Safety Management System

    25/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 25 / 46

    SMS

    n 0606

    TSO REV. : 0

    XIX. OCCUPATIONAL HEALTH

    STTSO will plan and implement occupational health programmes on hearing conservation and respiratoryprotection. In addition, programmes for the prevention of industrial dermatitis and work-related back injuries andstrains shall be documented and implemented.

    STTSO will provide education and training to all workers on the relevant health hazards, safe work practices andproper use of PPE.

    XX.LIST OF APPLICABLE PROCEDURES

    Documents Status

    GeneralAvailable and& applicable

    Exists toadapt

    To becreated

    Reference Associated Process (cf. S.M.M)

    S.M.S S.M.S rv.

    AContractual follow-up of the businessand the realization of the works

    Record Control PRO 4011 Piloting and planning

    Non-conformity reporting PRO 4006 Survey and measuring

    Preventive and correctiveaction

    PRO 4007 Piloting and planning

  • 8/3/2019 1 Safety Management System

    26/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 26 / 46

    SMS

    n 0606

    TSO REV. : 0

    A. CONTROL PLAN

    The control plan will verify the effective implementation and it confers unity to the requirement of:

    S.M.S.

    Relevant procedures.

    B. CONTROLS ORGANIZATION

    Safety controls

    Controls by ST-TSOand its partners

    Controls by theCustomer

  • 8/3/2019 1 Safety Management System

    27/46

    International Project Division

    DIVISION MANAGER

    PROJECT DIRECTOR

    Quality, Environment and

    Safety Divisions

    DIVISION MANAGER

    QUALITY MANAGER E.H.S.E. MANAGER TECHNICALMANAGERCONSTRUCTIONMANAGER COMMERCIALMANAGER

    TRACKSUPERVISOR

    THIRD RAILSUPERVISOR

    BALLASTSUPERVISOR

    MACHINEOFFICEREQUIPMENT

    SUPERVISOR

    DESIGNENGINEER

    SURVEYOR

    PLANNING

    ENGINEER

    PROCUREMENTOFFICER

    ACCOUNTING

    QUALITYSUPERVISORIN

    SPECTOR

    Engineering Office

    ENGINEERING OFFICEMANAGER

    Contracting Authorities

    Local Authorities

    P.E.

    L.E.W.

    Licensed

    Surveyor

    Others

    Contractors

    AC AC

    AC

    AC

    AC

    AC

    AC

    External LinksHierarchicalLinks

    FunctionalLinks

    Auto-ControlAC

    QUALITYE.H.S.

    SUPERVISORINSPECTORS

    Define improvementsrequired

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 27 / 46

    SMS

    n 0606

    TSO REV. : 0

    TSO 13/02/2012

    Appendix 1

  • 8/3/2019 1 Safety Management System

    28/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 28 / 46

    SMS

    n 0606

    TSO REV. : 0

    APPENDIX N 2 SAMPLE WORK PROCESS SAFETY SHEET

    D. MAJOR WORK PROCESS FORM

    Project : CTW 100

    (a) FICHE N 1

    Work to be executedWorks in Staging Area :

    - Receiving materials- Unloading- Storage, re-loading

    - Various materials and equipments

    Equipment used- Delivery Vehicles- Forklift- Lifting Implements- Containers- Tip / Bin

  • 8/3/2019 1 Safety Management System

    29/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 29 / 46

    SMS

    n 0606

    TSO REV. : 0

    APPENDIX N 3 ACCIDENT / INCIDENT / DANGEROUS REPORT

    ACCIDENT OCCURRENCE REPORT FORM Page 1 of 6

    Name of Main Contractor : Report Ref. No :

    PART A (Type of Accident)

    Major Accident (MOM reportable) Minor Accident (Non MOM Reportable)

    LTA Staff Injury Public Member Injury

    PART B (Details of Accident)

    PROJECT : CONTRACT :

    EXACT LOCATION :

    OCCURRENCE DATE : OCCURRENCE TIME :

    REPORTED DATE : REPORTED TIME :

    PART C (Details of Injured Person)

  • 8/3/2019 1 Safety Management System

    30/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 30 / 46

    SMS

    n 0606

    TSO REV. : 0

    ACCIDENT OCCURRENCE REPORT FORM Page 2 of 6PART E (Details of Injury)

    Use the following codes :

    Nature of Injury Injured Bodypart

    ABR : Abrasions/scratches BODY : Injury linked to entire bodyAMP : Amputation FEET : Feet/ToesASP : Asphyxia/Drowning HAND : Hand/FingersBCC : Bruises/Crushing/Contusions HEAD : Head/Face/NeckBN(C) : Chemical Burns LOWER : Lower Limbs (Legs)

    BN(H) : Heat Burns TORSO : Shoulder to Groin/HipCCS : Concussion/Internal Injury UPPER : Upper Limbs (Arms)DEATH : Fatality NA : Not ApplicableDIS : DislocationELECT : Effects of ElectricityEYE : Eye InjuryFG : Faint/GiddyFT : FractureFZ : Freezing/Frostbite/HypothermiaHEAT : Heat stress and strain

  • 8/3/2019 1 Safety Management System

    31/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 31 / 46

    SMS

    n 0606

    TSO REV. : 0

    ACCIDENT OCCURRENCE REPORT FORM Page 3 of 6PART F (Description of Accident)

  • 8/3/2019 1 Safety Management System

    32/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 32 / 46

    SMS

    n 0606

    TSO REV. : 0

    ACCIDENT OCCURRENCE REPORT FORM Page 4 of 6PART G (Causes of Accident)

    (1) Direct Causes

    (i) Unsafe Conditions

    Absence of safety means Congestion/restricted actionDressing/apparel hazard Environmental hazard (gas/dust/smoke)High temperature hazard Hazardous arrangementInadequate guarding Inadequate illuminationInadequate/improper PPE Inadequate ventilationInadequate warning system Improper/faulty equipmentNoise hazard Presence of fire/explosion hazard

    Poor housekeeping Radiation hazardUnsound structure Others (key details into Remarks)No unsafe condition

    Remarks :

    (ii) Unsafe Practice

    Careless/reckless Disregard instructions

  • 8/3/2019 1 Safety Management System

    33/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 33 / 46

    SMS

    n 0606

    TSO REV. : 0

    ACCIDENT OCCURRENCE REPORT FORM Page 5 of 6

    (ii) Human Factors

    Foul play Fatigue/stressInadequate capability IllnessImproper or lack of motivation/interest Improper assignment of personnel

    Lack of knowledge Lack of skillLack of training Needs conflicting with safetyNot qualified Unsafe attitudeNon human factors Others (key details into Remarks)

    Remarks :

    (3) Weakness of Safety Management System

    Safety policy Safe work practicesSafety training Group meetingsIncident investigation and analysis In-house safety rules and regulationsSafety promotion Evaluation, selection and control of SCSafety inspections Maintenance regime for all machineryHazard analysis Control of movement and use of Emergency preparedness hazardous substances and materials

  • 8/3/2019 1 Safety Management System

    34/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 34 / 46

    SMS

    n 0606

    TSO REV. : 0

    ACCIDENT OCCURRENCE REPORT FORM Page 6 of 6PART I (Details of Investigating Person)

    NAME :

    DESIGNATION :

    COMPANY :

    TEL : DATE : SIGN :

    PART J (Reviewed By)

    NAME :

    DESIGNATION :

    COMPANY :

    TEL : DATE : SIGN :

    PART K (Form Completed By)

  • 8/3/2019 1 Safety Management System

    35/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 35 / 46

    SMS

    n 0606

    TSO REV. : 0

    APPENDIX 4 SAFE WORK PERMIT

    Serial No.................................Expires at 23.59 Hours

    Date Time On Day of IssueThis permit is valid only for the day, time and period stated above. The conditions of issue must becomplied with throughout the duration of the work. This permit may be withdrawn at any time. You areresponsible for the copy of this permit and must produce it on request.

    LOCATION

    Specific Work To Be Performed

    Does other work in the area present a hazard to this job?...........................................................................................................................................

    SAFETY APPROVAL Conditions of Issue which must be observed.

  • 8/3/2019 1 Safety Management System

    36/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 36 / 46

    SMS

    n 0606

    TSO REV. : 0

    APPENDIX 5-1

    NON-CONFORMITY SHEET No. :

    Department: Valid from:

    By the person in charge of operations concerned by NC (name): Signature:

    Name of entity concerned by the NC:

    Service: Workshop: Work site:

    ilsofthenonconformity

    Date the NC was reported: Audit

    Location of the NC:

    Followinginspection Minutes of Management review

    Customer complaint

    Description of the reported situation: Inspection of the workplace

    Other (specify)

    NC Labour

  • 8/3/2019 1 Safety Management System

    37/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 37 / 46

    SMS

    n 0606

    TSO REV. : 0

    Nonconformitylifted Date: Date:

    Signature: Signature:

    APPENDIX 5-2

    ACTION SHEET CORRECTIVEPREVENTIVE

    No......................

    ORIGIN

    Non-conformity sheet No..

    CAUSE OF THE NONCONFORMITY: NATURE OF THE NC:

    Labour

    Measurement

    Equipment

  • 8/3/2019 1 Safety Management System

    38/46

    SAFETY MANAGEMENT SYSTEM

    CTW 100 - SECTION A - AZ ZABIRAH - RAS AZZAWR

    SEGMENT 7 - DIRECT LINK

    Page 38 / 46

    SMS

    n 0606

    TSO REV. : 0

    Project Manager, Safety Manager, RECO

    Name: Date: Signature:

    VALIDATION AND VERIFICATION OF THE EFFICIENCY OF THE ACTION:

    Project Director, Name: Date: Signature:

  • 8/3/2019 1 Safety Management System

    39/46

    APPENDIX 6 : PROCESS CONTROL SHEET Page 39 sur 46

    Inputd

    ata

    Control points CriteriaAssessment

    Observations AssessmentS A M I

    Check that the input data:

    1. Is defined C1

    2. Is sufficient C3

    3. Is required for the process's activities C2

    4. Has clearly identified and known sources C1

    Check that the input data required for each part of theprocess is:

    1. Available E1

    2. Formalized C4

    3. Comprehensible E3

    E. TRANSMITTED

    1. To the right person E1

    2. At the right time E1

    3. Can be transmitted in case of malfunction E4

    TSO 13/02/2012

  • 8/3/2019 1 Safety Management System

    40/46

    APPENDIX 6 : PROCESS CONTROL SHEET Page 40 sur 46

    Processa

    ctiv

    ities

    Control points CriteriaAssessment

    Observations AssessmentS A M I

    Check that the processes' activitiesare:

    1. Defined C1

    2. Sufficient to achieve the expectedresult for the process

    C3

    3. Required to achieve the expectedresult for the process

    C2

    1. Available E1

    2. Applicable E3

    3. Under control E1

    Check that the process-relatedinstruction sheets are:

    1. Available E1

    2. Formalized C4

    3. Comprehensible E3

    Transmitted

    1. To the right person E1

    2. At the right time E1

    3. Can be transmitted in case ofmalfunction

    E4

    TSO 13/02/2012

  • 8/3/2019 1 Safety Management System

    41/46

    APPENDIX 6 : PROCESS CONTROL SHEET Page 41 sur 46

    Ou

    tpu

    tda

    tafor

    theprocess

    Control points CriteriaAssessment

    Observations AssessmentS A M I

    Check that the output data/results for

    each activity are:

    1. Defined(in the process manualor the quality plan)

    C1

    2. Sufficient to perform the nextprocess activities

    C3

    3. Required to achieve the expectedresult for the process

    C2

    Check that the output data/results foreach activity are:

    1. Recorded E1

    2. In conformity C2

    Transmitted

    1. To the right person E1

    2. At the right time E1

    3. Can be transmitted in case ofmalfunction

    E4

    TSO 13/02/2012

  • 8/3/2019 1 Safety Management System

    42/46

    APPENDIX 6 : PROCESS CONTROL SHEET Page 42 sur 46

    Con

    tro

    lsan

    dd

    ev

    iations

    Control points CriteriaAssessment

    Observations AssessmentS A M I

    Check that the control plan is:

    1. Defined C1

    2. Applied E1

    3. Effective E2

    Check that nonconformities are:

    1. DetectedE1

    2. Recorded C4

    Dealt with(or exempted from

    control)E1

    1. Checked and approved afteraction

    E2

    2. Followed up E4

    Check that measuring instrumentsare:

    1. Adequate C2

    2. Serviced E1

    3. Calibrated C2

    4. Inspected and recorded on aregular basis C2

    Check that customer complaints are:

    1. Duly acknowledged and recorded E1

    2. Dealt with as expected E2

    TSO 13/02/2012

  • 8/3/2019 1 Safety Management System

    43/46

    APPENDIX 6 : PROCESS CONTROL SHEET Page 43 sur 46

    Reso

    urces

    /Work

    ingenv

    ironme

    nt

    1.

    Human

    Resources

    Control points CriteriaAssessment

    Observations AssessmentS A M I

    Check that the staff concerned knows:

    1. The process's input data E1

    2. The process's activities E1

    3. The process-related proceduresand instruction sheets

    E1

    4. The process's output data E1

    Check that the human resources:

    1. Meet requirements to executethe process. E2

    2. Are used advisedly C2

    1. Check that responsibilities aredefined. C1

    2. Check that there are means tocompensate for faults.

    E1

    TSO 13/02/2012

  • 8/3/2019 1 Safety Management System

    44/46

    APPENDIX 6 : PROCESS CONTROL SHEET Page 44 sur 46

    Res

    ources

    /Work

    ingenv

    ironm

    en

    t

    1.

    Ma

    teria

    lResources

    Control points CriteriaAssessment

    Observations AssessmentS A M I

    Check that the machinery andequipment used:

    1. Meets requirements E2

    2. Is in conformity C2

    3. Is monitored and checked E4

    4. Is used advisedly C2

    Check that there are means to

    compensate for faults. E1

    Working environment

    1. Is it adequate for the process? E1

    2. Is it suitable for storing (products,materials, equipment etc.) and/orbacking up data?

    E3

    3. Does it meet HSE standards? C2

    4. Is it inspected on a regular basis(workplace inspections)?

    E4

    Overall assessment

    TSO 13/02/2012

  • 8/3/2019 1 Safety Management System

    45/46

    APPENDIX 6 : PROCESS CONTROL SHEET Page 45 sur 46

    Scoring and rating criteria proposed for the 4 levels S/A/M/I

    Conformity

    ConformityS

    SatisfactoryA

    AcceptableM

    MediocreI

    InadequateCriteria

    CompletePartial,

    being extendedPartial,

    need perceivedPartial,

    need not perceived

    Fully structured, fullyborne out by evidence

    Fully structured, partialevidence available

    Partially structuredVery partially or not atall structured

    Existence of aStructure

    Meets therequirements

    Mainly meets therequirements

    Partially meets therequirements

    Not compliant withmost of therequirements

    Conformity

    concernsthe entire site, or thefield of application

    Concerns manydepartments, beingextended on site

    Only concerns a fewdepartments, on-sitedeployment notlaunched, needperceived

    Only concerns a fewdepartments

    Field of application

    Fully formalizedPartially formalized,being developed

    Partially formalized, noimprovements underway,but need perceived

    Very partiallyformalized or not at all,need for improvementnot perceived

    Formalization

    OVERALLASSESSMENT%

    S A M I

    80-100 60-79 40-59 0-39

    Notes: a/ Critical questions are in bold italics

    b/ For the scores, refer to the "Criteria" box in the questionnaire,letter "C" or "E" indicates the type of question: Conformity or Efficiency,and number "1, 2, 3 or 4" indicates the corresponding criterion.

    c/ Non-audited or irrelevant questions are not counted, and identified under "observations" by:

    - NA: Not audited- N/A: Not applicable

    TSO 13/02/2012

  • 8/3/2019 1 Safety Management System

    46/46

    APPENDIX 6 : PROCESS CONTROL SHEET Page 46 sur 46

    TSO 13/02/2012

    Scoring and rating criteria proposed for the 4 levels S/A/M/I

    Efficiency

    ConformityS

    SatisfactoryA

    AcceptableM

    MediocreI

    InadequateCriteria

    CompletePartial,

    being extended -some evidence

    Partial,need perceived

    Partial,need not perceived-hardly any evidence

    Fully and rigorouslyunder control

    Partially undercontrol(improvements inprogress)

    Partially under control Not well under controlUnder control,

    mastered

    Giving the expectedresults

    More or less givingthe expected results

    Only partially achieving theexpected results

    Hardly achieving any ofthe expected results

    Expected resultsachieved

    optimized Being optimized Optimization planned optimization not planned Optimization

    Extension over time orcapitalizationguaranteed

    Extension over timeor capitalization inprogress

    Perceived need to extendover time or capitalize

    Need not guaranteed andnot perceived

    Extended over timeCapitalization

    OVERALLASSESSMENT%

    S A M I

    80-100 60-79 40-59 0-39

    Notes: a/ Critical questions are in bold italics

    b/ For the scores, refer to the "Criteria" box in the questionnaire,

    letter "C" or "E" indicates the type of question: Conformity or Efficiency,and number "1, 2, 3 or 4" indicates the corresponding criterion.

    c/ Non-audited or irrelevant questions are not counted, and identified under "observations" by:

    - NA: Not audited- N/A: Not applicable