Status and Outlook of theRPC Commissioning

Marcello Maggi/INFN-Bari

Marcello Maggi7/12/2006

2

RPC

GAS Distribution

System

HV Easy Crate

System

GAS Close Loop

T,ThrsChamberDCS

ConfDB

FinalCabling

PatchPanels

LBB

TBC

DCC

X-DAQ

Sorter

Trigger

TriggerDCS

X-DAQ

Event dump

LV Easy Crate

System

RBC

TechnicalTrigger

CondDB

THE RPC TRIGGER SYSTEM

Marcello Maggi7/12/2006

3

RPC

GAS SimpleSystem

HV SY1527System

GAS Close Loop??

T,ThrsPrelim.Chamber

DCS

ConfDB

On-flightCabling

PatchPanels

LBB

TBC

DCC

X-DAQ

Sorter

Prelim.Trigger

DCS

X-DAQ

Event dump

LVSY1527 System

HzMeter

noise

SECTOR COMMISSIONING

Marcello Maggi7/12/2006

4

Status of RPC Commissioning

W+2 Completed (except horiz. Sectors) W+1 Completed (except horiz. Sectors) W0 Sector 4 and 5 to completion

Sector Test are done before final cabling

RPC BARREL

Marcello Maggi7/12/2006

5

Status of RPC Commissioning RE+3 pre-commissioned RE+2 pre-commissioned RE+1 pre-commissioned RE-1/2 pre-commissionedMissing Front-End functional and read-out test and

cooling test. Few gas leakages to be fix and understood

Commissioning needs a clear resource allocation and commitments

RPC ENDCAP

Marcello Maggi7/12/2006

6

RPC

GAS Distribution

System

HV Easy Crate

System

T,ThrsChamberDCS

ConfDB

FinalCabling

PatchPanels

LBB

TBC

DCC

X-DAQ

Trigger

TriggerDCS

X-DAQ

Event dump

LV Easy Crate

System

RBC

TechnicalTrigger

CondDB

TOWER TEST

Marcello Maggi7/12/2006

7

Tower Test

On going Tower Test on Near Side Half Wheel +1

Step 1) Cabling: connectivity, CCU chain

Step 2) LV up: grounding and functionalities

Step 3) HV up: stability

Step 4) Data Acquisition: performance, full chain

Use of the MTCC set-up in Green and Balcony Barracks

new

Marcello Maggi7/12/2006

8

MTCC

Marcello Maggi7/12/2006

9

B=3.8T B=3.8T

Th=220mVTh=220mVB=3.8T Th=205mVB=3.8T Th=205mV

B=0T B=0T Th=220mVTh=220mV

MTCC preliminary results

10 Ottobre10 Ottobre

Entries 30712Entries 30712

Mean 0.3705Mean 0.3705

RMS 5.125RMS 5.125

OF 0OF 0

19 Ottobre19 Ottobre

Entries 30712Entries 30712

Mean 16.37Mean 16.37

RMS 88.58RMS 88.58

OF 769OF 769

29 Ottobre29 Ottobre

Entries 30712Entries 30712

Mean 0.514Mean 0.514

RMS 11.1RMS 11.1

OF 119OF 119

NOISE

Noise stable during entire period

Marcello Maggi7/12/2006

10

MTCC preliminary results

EFFICIENCY

HV = 8.5 kV

HV = 9.0 kV

HV = 9.2 kV

HV = 9.4 kV

HV = 9.6 kV

DT Segment extrapolation to RPC

Marcello Maggi7/12/2006

11

MTCC preliminary results

Start using stand-alone RPC reconstruction

Studied RPC

3

RESIDUALS

Marcello Maggi7/12/2006

12

Use of RPC MTCC results

Dedicated Cosmics MC production

Comparison Data Vs MC

Improve the model of the simulation

RPC Trigger and Reconstruction performance with realistic simulation

Marcello Maggi7/12/2006

13

RPC Technical Trigger

LBBox

RBC

LBBox

LBBox

RBC

LBBox

LBBox

RBC

LBBox

LBBox

RBC

LBBox

LBBox

RBC

LBBox

LBBox

RBC

LBBox

1 RBC/ 2 sectorsUXC area

Barrel Wheel

USC area

TTU

TTU

TTU

TTU

TTU

VME Crate

10 Optical Ribbons

Receiv

ing

p

an

el

1 Optical Ribbon/Half wheel

Fiber

Commissioned

In preparation

Marcello Maggi7/12/2006

14

DQM

3 Modules developed

Digi used tested on FF

Efficiency Barrel done

Sync Specific Trigger Studies

Marcello Maggi7/12/2006

15

DCS HV/LV

Data stored on and retrieved from OnlineDBImportant for off-line RPC performance analyses

HV components sensitive to temperature to be understood

Marcello Maggi7/12/2006

16

GAS SYSTEM

Prototype Closed Loop under test at ISR

Many results to report, and to understand

New-Binos stability feature “cured” On going Commissioning of Distributors Gas Gain Monitor to be set-up

Marcello Maggi7/12/2006

17

Conclusion

Clear set of performance benchmark Sector Test on Barrel going smoothly Tower Test ala MTCC in preparation now Time to devote more effort on SW

Few items to follow up closely